Dataset Viewer
Auto-converted to Parquet Duplicate
number
int64
1
100
question
stringlengths
21
1.02k
A
stringlengths
1
137
B
stringlengths
1
123
C
stringlengths
2
142
D
stringlengths
2
97
correct_answer
stringclasses
4 values
figure
imagewidth (px)
184
2.53k
1
Which of the following factors has the LEAST impact on casing seat selection?
Rate of Penetration
Pore pressure
Kick tolerance
Fracture gradient
A
Not supported with pagination yet
2
When considering calculation methods for survey points, the LEAST precise method is:
Circular arc
Minimum curvature
Radius of curvature
Tangential
D
Not supported with pagination yet
3
Which of the following is NOT a typical purpose for a BHA?
Assure casing can be run into a hole
Control direction and inclination in directional holes
Increase severity of doglegs, keyseats and ledges
Protect the drill pipe from excessive bending and torsional loads
C
Not supported with pagination yet
4
Which of the following is a typical characteristic of plug flow cement placement?
Reynolds number less than 100
Large cement volumes
High displacement rates
Short cementation times
A
Not supported with pagination yet
5
Which of the following is NOT a typical cause for a fishing job?
Cementing error
Differential sticking
Swelling zone
Use of oil-base mud
D
Not supported with pagination yet
6
Which of the following is NOT a component of the hoisting equipment for a drilling rig?
Crown block
Drawworks
Drilling line
Rotary table
D
Not supported with pagination yet
7
Which of the following is NOT a primary function of drilling fluids?
Cuttings removal
Frac proppant
Lubrication and cooling
Well control
B
Not supported with pagination yet
8
Which of the following methods is MOST likely to hydrostatically balance a well kick with only one circulation?
Concurrent
Driller’s
Toolpusher’s
Wait and weight
D
Not supported with pagination yet
9
Critical rotary speed longitudinally (rpm*) is calculated by rpm* = 258,000/L, where L is the total length of the drill string (ft). Which of the following is a multiple of rpm* at which secondary and higher harmonic vibrations will occur?
2
8
16
32
C
Not supported with pagination yet
10
Which of the following is NOT a colloidal polymer?
Xantham gum
Starch
Sodium carboxy methyl cellulose
Hydroxyethyl cellulose
A
Not supported with pagination yet
11
Which of the following is a major consideration for cuttings transport in horizontal wells?
Annulus size
Drilling Rate
Eccentricity
Rotary speed
C
Not supported with pagination yet
12
Which of the following is NOT a routine roller cone bearing package description?
Friction-ball-friction
Friction-ball-roller
Roller-ball-friction
Roller-ball-roller
B
Not supported with pagination yet
13
In comparing the API specs for L-80 and N-80 tubulars, which of the following statements is TRUE?
Minimum yield strength is different
Maximum yield strength is the same
Minimum tensile strength is different
Minimum elongation is the same
C
Not supported with pagination yet
14
Which of the following is NOT a typical separator type?
Horizontal
Slant
Spherical
Vertical
B
Not supported with pagination yet
15
Which of the following is NOT a typical casing hanger type?
Slip-weld
Nominal flange
Boll-weevil
Automatic
B
Not supported with pagination yet
16
The control pressure for a surface safety valve is most likely equal to:
Valve body pressure divided by actuator ratio
Actuator ratio divided by valve body pressure
Two times valve body pressure divided by actuator ratio
Valve body pressure multiplied by actuator ratio
C
Not supported with pagination yet
17
The material for sealing element when approaching 450 degrees F (232 degrees C) and 15,000 psi (103,422 KPa) differential is MOST likely:
Glass-filled Teflon
Kalrez
Nitrile
Viton
A
Not supported with pagination yet
18
Tubing elongation MOST likely occurs with:
Ballooning
Buckling
Reverse Ballooning
Temperature Reduction
C
Not supported with pagination yet
19
Which of the following is NOT an API classification for oil well pumps?
Tubing type with extension shoe and nipple
Tubing type, traveling barrel with bottom hold-down
Rod type, stationary barrel with top hold-down
Rod type, traveling barrel
B
Not supported with pagination yet
20
Which of the following has the LEAST volumetric efficiency for rod pumped wells?
High fluid level with no gas interference
Gaseous wells with fair downhole separation
Foamy liquid or gaseous conditions
Ample pump submergence with good separation
B
Not supported with pagination yet
21
A caliper survey has been run on a producing gas well. It shows that the casing is partially collapsed 500 ft (152.4 m) above the perforations. The well is starting to load up with fluid, so a decision has been made to install a small diameter tubing string with a packer set just below the partially collapsed interval ...
Weight-set packer
Tension-set packer
Rotation-set packer
Hydraulic-set packer
D
Not supported with pagination yet
22
A platform is producing surplus gas that must be sold into a nearby pipeline; flaring is not permitted. The gas has the following characteristics: gas gravity = 0.689 SG (Air = 1), ratio of specific heats = 1.206, molecular weight = 20, supercompressibility factor = 0.022. Wells on the platform produce a total of 18 mm...
1,191
1,238
1,787
2,649
A
Not supported with pagination yet
23
What type problem does the below dynamometer card indicate that would cause an excessive number of rod parts in the lower portion of the rod string in this well?
Excessive friction
Overtravel
Plunger sticking
Fluid pound
D
24
A well is to be fracture stimulated down the production casing with the following conditions: Fracture propagation gradient: 0.95 psi/ft (2.19 SG) Near well pressure losses: 1,000 psi (6,895 KPa) Casing friction pressure losses: 1,600 psi (11,032 KPa) Surface piping friction losses: 300 psi (2,068 KPa) Stimulation...
11
14
16
17
C
Not supported with pagination yet
25
A 10,000 HP compressor bank is going to be added to a large pipeline compressor station. An inlet meter station is located 1,200 ft (366 m) away from the new compressor site. Pressure at the meter run is 60 psig (414 KPa). Gas from the meter station will be used for fuel. The gas pressure at the fuel line header inside...
1.5 (38)
3.5 (89)
5 (127)
6 (152)
B
Not supported with pagination yet
26
The following readings were made by a field gas technician at a dry gas sales meter. Static pressure: 800 psig (5,516 KPa) Differential: 15-in. (381 mm) H2O Temperature: 130° F (54.4°C) Gas Specific Gravity: 0.62 (Air=1) Meter run: 4.026-in. (102.3 mm) ID Orifice plate: 1.5-in. (38.1 mm) Neglect viscosity, sup...
1,152 (32,621)
1,328 (37,605)
1,341 (37,973)
1,458 (41,286)
A
Not supported with pagination yet
27
A gas well with 40 ppm H2S and 14 mole-% CO2 is planned to be produced up a string of tubing cemented in the well as a “tubingless completion” (i.e., the tubing is actually small-diameter production casing). Initial shut in pressure will be 12,000 psi (82.737 MPa). Initial flowing pressure will be 8,000 psi (55.158 M...
The partial pressure of sour gas is not great enough to need T95 grade pipe
Run all P110 grade pipe. Fast pressure decline mitigates problem with SSC
Recommend running T95 to at least 4,348 ft (1,325 m) from the surface
Recommend running T95 to at least 6,250 ft (1,905 m) from the surface
D
Not supported with pagination yet
28
A plug has been set in a profile nipple below a packer in a well. To confirm that the plug will hold, it has been decided to pressure up on the tubing to 9,000 psi (62.1 MPa). The well is standing full of fresh water. The packer is set at 6,000 ft (1,829 m) and has a 3.5-in. (89 mm) bore. The pipe string is all 2 7/8-...
54.7 (138.9)
33.1 (84.1)
28.4 (72.1)
4.6 (11.7)
A
Not supported with pagination yet
29
A tank is filled with produced water with a density of 8.6 lbm/gal (1.03 SG). A decision has been made to use the fluid for a workover, but the density is too low. Brine with a density of 10.0 lbm/gal (1.20 SG) is to be mixed with fluid in the tank until the contents have the proper density for the job. The brine is to...
147 (1,014)
188 (1,294)
597 (4,116)
956 (6,588)
D
Not supported with pagination yet
30
A pressure relief valve is needed to protect a petroleum storage tank from over-pressure. The relief valve will discharge into a low-pressure vent system with a constant pressure of 0.5 psig (3.4 KPa). The scrubber on this low pressure vent system cannot handle peak flowrates in excess of 6.0 scfm (10.2 m^3/hr). The r...
6.4 (16.3)
6.0 (15.2)
5.8 (14.7)
5.5 (14.0)
B
Not supported with pagination yet
31
You are calculating the original gas in place using the volumetric method. Which of the following has the LEAST influence on the final result?
Connate water saturation
Initial reservoir pressure
Permeability
Porosity
C
Not supported with pagination yet
32
Which of the following is the LEAST likely source for water which encroaches into a reservoir as pressure declines?
Artesian flow
Compressibility of the rock in the aquifer
Expansion of the water in the aquifer
Water coming out of solution from the oil as the pressure drops
D
Not supported with pagination yet
33
Important characteristics of the production history of many coal-bed methane wells include:
Initial large and declining water cuts and low and improving gas production rates
Initial large but declining gas/liquid ratios and low but increasing water production rates
Stabilized gas/liquid ratios and decreasing gas rates
Stabilized gas/liquid ratios and increasing gas and water production rates
A
Not supported with pagination yet
34
There are known effects of gas on logging tool responses. Which of the following statements is correct?
Density log porosities are not affected by gas
Neutron log porosities are increased by gas
NMR log porosities are reduced by gas
Sonic log porosities are reduced by gas
C
Not supported with pagination yet
35
For decline-curve analysis to be accurate, several conditions must be satisfied. Which of the following conditions is not appropriate?
Drainage area of the well remains constant with time.
Skin factor of well is not changing with time.
Well is in transient flow regime.
Well produces at constant BHP.
C
Not supported with pagination yet
36
A pressure buildup test is run on a well producing dry gas. Current average reservoir pressure is about 3,012 psia (20.77 × 10^3 KPa) and the flowing bottomhole pressure at the time of shut-in was 1,126 psia (7.76 × 10^3 KPa). Which of the following statements about analyzing the test data using a semi-log method is ...
A Horner plot of p vs. Horner time ratio will be required. ws
A Horner plot of p 2 vs. Horner time ratio will be required. ws
Bottomhole pressure must be converted to pseudopressure and then a Horner plot of pseudopressure vs. Horner time ratio will be required.
Semi-log analysis cannot succeed for analysis of a gas-well pressure buildup test.
C
Not supported with pagination yet
37
Volumetric estimate of original gas in place for gas reservoir A was 100 Bscf (2.831 × 10^9 std m^3). A material-balance estimate, using a p/z plot, was 50 Bscf (1.416 × 10^9 std m^3).
One or more producing wells intended to produce from Reservoir A is probably completed by mistake in another non-communicating reservoir.
Some of the mapped gas may not be in pressure communication with the producing wells.
The estimate based on the p/z plot cannot possibly be correct.
The reservoir almost certainly has water influx.
B
Not supported with pagination yet
38
In a low-permeability gas formation, the deliverability curve determined from a plot of Δp2 vs. q, using available test data from a four-point backpressure test with equal-length flow periods, will usually not be “stabilized.” Therefore, the ability of the gas well to deliver gas at a given backpressure will be:
About the same as predicted from the deliverability curve plotted using available test data.
Greater than predicted from the deliverability curve plotted using available test data.
Less than predicted from the deliverability curve plotted using available test data.
Uncorrelated to the value predicted from the deliverability plotted using available test data.
C
Not supported with pagination yet
39
The forecasted production between the current time and the estimated economic limit of a well using a well-defined decline curve is best regarded as
Proved developed reserve
Proved plus probable reserve
Proved plus probable plus possible reserve
Total resource
A
Not supported with pagination yet
40
Thermal oil recovery processes increase recovery largely because they:
improve vertical sweep efficiency to virtually 100% in most cases
increase formation water mobility because of increased formation temperature
reduce oil viscosity
reduce residual oil saturation to near zero in swept areas
C
Not supported with pagination yet
41
An oil reservoir was originally undersaturated and was known to have no water influx. The PVT properties as determined from a recombined fluid sample are shown on the attached curve. The field is to be waterflooded and part of the pre-flood strategy is to determine the new bubble point for this state of depletion. The ...
1.460
1.450
1.440
1.240
B
42
A reservoir oil solution gas-oil ratio follows the Rs plot attached. The initial reservoir pressure was 3,000 psia (20,684 KPa). What is the bubble point pressure, psia (KPa) of the oil nearest?
3,000 (20,684)
2,160 (14,893)
1,000 (6,895)
Not enough information
B
43
An oil reservoir was originally undersaturated and was known to have no water influx. The field is to be waterflooded and part of the preflood strategy is to determine the new bubble point for this state of depletion. The initial reservoir pressure is 3,000 psia (20,684 KPa) with an initial oil saturation; Soi = 0.90. ...
465 ( 83)
512 (91)
816 ( 145)
935 (166 )
C
Not supported with pagination yet
44
You have the following information on a reservoir in Table 1. Original reservoir pressure was 2,500 psia (17,237 KPa). Well test information and log analysis indicate the presence of a gas cap however, the size of the gas cap is unknown. The reservoir has exhibited the following production performance during depletion...
0.9995
0.2255
0.2342
0.3454
D
45
Fractional Flow Curve
0.05
0.72
0.64
0.68
D
46
What is the original oil in place in stb (m^3) of a reservoir with the following parameters? Area = 80 acres, (323,749) net pay thickness = 50 ft, (15.2 m) average porosity = 20%, initial water saturation, Swc = 10%, initial gas saturation, Sg = 10%, Initial Oil Formation Volume Factor, Boi = 1.42 rb/stb, (m3/m...
3,496,563 ( 555,954)
3,933,633 (625,448 )
6,206,400 ( 986,818)
300,000,000 (47,700,000 )
A
Not supported with pagination yet
47
Using the following parameters, what is the ratio of the gas cap to the oil rim, m? Area = 80 acres, (323,749 m2) net pay thickness = 50 ft, (15.2 m) average porosity = 20%, initial water saturation, Swc = 10%, initial gas saturation, Sg = 10%, Initial Oil Formation Volume Factor, Boi = 1.42 rb/stb, (m3/m3) In...
0.125
0.22
0.5
not enough information
A
Not supported with pagination yet
48
A density log in a shaly sand records a formation bulk density, ρb = 2.20 g/cm^3. The correction factor for mudcake and hole rugosity is Δρ = 0.05 g/cm^3. From measurements on cores and produced fluids it is known that the matrix and fluid densities are, ρma = 2.68 g/cm^3 and ρfl = 1.2 g/cm^3. What is the density log ...
27
29
32
36
C
Not supported with pagination yet
49
A producer-injector pair of wells in an infinite-acting reservoir has been producing two weeks. The distance between the wells is 500 feet (91.44 m). Assume that the injection and production rates are equal at 1,500 bpd (238.48 m^3/d) and that the rock and fluid properties are the same for both injector and producer. ...
26.91 (185.54)
98.78 (681.06)
239.98 (1654.60)
656.42 (4525.86)
B
Not supported with pagination yet
50
A gas well has been found to be declining exponentially. The observed production rate on 1 January 2004 was 0.6 Bscf/month (1.7 × 10^7 std m^3/month), and on 1 January 2005, it was 0.4 Bscf/month (1.133 × 10^7 std m^3/month). The economic limit for the well is estimated to be 0.003 Bscf/month (8.495 × 10^5 std m^3/mont...
21.5 (6.09 × 108)
17.69 (5.01 x 108 )
1.791 (5.07 × 107)
1.474 (4.17 × 107)
B
Not supported with pagination yet
51
Which of the following has the LEAST influence on drill pipe stretch?
BHA weight
Drill pipe weight
Mud density
Traveling block weight
D
Not supported with pagination yet
52
Which of the following is MOST LIKELY a descriptor for a diamond bit?
Crown
Journal
O-ring Seal
Shirttail
A
Not supported with pagination yet
53
Which of the following is NOT a description of fluid flow?
Laminar
Plastic
Plug
Turbulent
B
Not supported with pagination yet
54
Which of the following is NOT a key rheological property of drilling fluids?
Yield point
Plastic viscosity
Gel Strength
Funnel viscosity
D
Not supported with pagination yet
55
Which of the following has the LEAST influence on bit nozzle pressure drop?
Bit diameter
Flow rate
Mud density
Nozzle area
A
Not supported with pagination yet
56
Which of the following is NOT a typical section view for directional wells?
Double build
Double twist
S type
Slant type
B
Not supported with pagination yet
57
Which of the following is a conventional rotary shouldered connection size?
4-1/2” REG
5-5/8” REG
6-1/2” REG
7-1/2” REG
A
Not supported with pagination yet
58
Which of the following is a DISADVANTAGE of air drilling?
Differential pipe sticking is eliminated
Downhole explosions or fire may occur
Lost circulation may be reduced
Reduced thawing of frozen zones
B
Not supported with pagination yet
59
Which of the following is FALSE regarding leak-off tests?
Unpurged air can affect the shape of the leak-off test curve
There are two phases of fracturing a formation, initiation and extension
The pressure to initiate is usually less than the pressure to extend
The initial pressure increase vs. volume pumped reflects elastic rock deformation
C
Not supported with pagination yet
60
Which of the following is MOST LIKELY regarding cement flow regimes?
Laminar flow has the smallest displacement efficiency
Plug flow is very inefficient w/small volumes displacing low density mud
Turbulent flow gives low displacement efficiency
Turbulent flow requires the longest pumping times
A
Not supported with pagination yet
61
When backing-off a stuck drill string, which of the following would NOT be a typical step?
Twist the string one counter-clockwise turn per 1,000 feet of free string
Pull the buoyed weight of the string above the stuck point
Fire the shot after working the torque down to the tool joint to be backed off
Twist the string one clockwise turn per 1,000’ of free string
D
Not supported with pagination yet
62
Which of the following is NOT a typical contributing factor in axial friction forces?
Bending of the drill string in a dog leg
Buoyed weight of the drill string lying on the low side
Hanging up of drill string component on a ledge
Packing of the drill string in a cuttings bed
C
Not supported with pagination yet
63
Which of the following does NOT result in collapse of the tube?
Elastic Collapse Pressure
Plastic Collapse Pressure
Transition Collapse Pressure
Yield-Strength Collapse Pressure
D
Not supported with pagination yet
64
The primary function of the counter-balance system in rod pumped wells is:
Speed reduction of the prime mover to suitable pumping speeds
Store energy on the downstroke and release energy on the upstroke
Store energy on the upstroke and release energy on the downstroke
Supply the mechanical energy to transmit to the pump and lift fluids
B
Not supported with pagination yet
65
For bellows-type gas-lift valves, valve spread is:
The difference between opening and closing pressures
The difference between annular and bellow pressures
The depth difference between the top and bottom valves
The depth difference between adjacent valves
A
Not supported with pagination yet
66
Which of the following would be a typical path for gas through a separator?
Primary separation, liquid accumulation, secondary separation, gas outlet
Primary separation, mist extractor, liquid accumulation, gas outlet
Primary separation, secondary separation, liquid accumulation, gas outlet
Primary separation, secondary separation, mist extractor, gas outlet
D
Not supported with pagination yet
67
Which of the following is NOT a primary mechanism in separation devices?
Centrifugal
Gravity
Impingement
Radioactivity
D
Not supported with pagination yet
68
Which of the following is NOT a key assumption for matrix acidizing?
Acid penetrates uniformly and radially
Formation is homogeneous
Pore size varies widely
Reaction rate declines uniformly with decreasing acid concentration
C
Not supported with pagination yet
69
The fracturing fluid coefficient is a key factor in modeling an induced fracture. Which of the following is NOT a category for fracture fluids?
Conductivity-controlled fluids
Reservoir-controlled fluids
Viscosity-controlled fluids
Wall-building fluids
A
Not supported with pagination yet
70
Which of the following is NOT a typical class of pipe cutters?
Acid
Jet-shaped charge
Outside cutter
Tubing punch
D
Not supported with pagination yet
71
A pump is needed to move a high viscosity, heavy (high specific gravity) crude oil from a storage tank to a treating facility for processing. The tank is not insulated and it is located in a cold-weather environment. The field from which this oil is produced has a low reservoir pressure, and the oil is produced in slug...
Centrifugal pump
Gear pump
Reciprocating (plunger) pump
Turbine pump
B
Not supported with pagination yet
72
A caliper survey has determined that there has been a uniform 65% wall loss in a 5-in. (127 mm) 23.2 lbm/ft (34.5 kg/m) T95 casing string. Neglecting axial/hoop stresses. What is the new burst pressure rating of this casing string in psi/(Mpa)?
5,550 (38.3)
6,350 (43.78)
10,340 (71.29)
14,300 (98.6)
A
Not supported with pagination yet
73
An electric motor is needed for a hoist. The motor is expected to provide a force of 744 lbf (337.5 kgf) at the edge of a 24-in. (61 cm) diameter pulley. The motor will run at 1200 RPM and the pulley will be attached to a gearbox to provide the correct line speed for the hoist. Assume the motor operates at 85% efficien...
170 HP (126.8)
200 HP (149.1)
340 HP (253.5)
400 HP (298.3)
B
Not supported with pagination yet
74
A recently drilled well is being completed. The well was drilled with 14 lbm/gal (1.68 SG) mud with no mud losses experienced while drilling the well. The 5 1/2-in. (140 mm), 15.50 pound/ft (23.06 kg/m) casing has been perforated from 10,129 ft (3,087.3 m) to 10,141 ft (3,091.0 m). A full string of 2 3/8-in. (60 mm) tu...
Natural gas
Oil
Saltwater
Drilling mud
C
Not supported with pagination yet
75
A well has ceased flowing due to a buildup of saltwater in the tubing. The well is standing full of produced fluid with a density of 8.9 lbm/gal (1.067 SG). A pumping unit is to be installed to lift the fluid from a depth of 10,000 ft (3,048 m). Expected produced water rate is 220 bbl/D (35 m^3/day). The pumping unit w...
15 (11)
20 (15)
35 (26)
40 (30)
D
Not supported with pagination yet
76
A recently-drilled gas well has been completed, but initial flowrates from the well are disappointing. The well has the following characteristics: The pay zone perforations are centered at 15,800 ft (4,816 m). The static reservoir pressure is 0.63 psi/ft (1.45 SG). The fracture gradient at the perforations is 0.95 psi...
High rate, high volume fracture stimulation
Low rate “matrix” hydrochloric acid stimulation
Sand control treatment to reduce sand collection in the wellbore
Scale removal workover
A
Not supported with pagination yet
77
A pumping unit is to be installed on a 5,000 ft (1,524 m) well. The foreman wishes to use 1-in (25.4 mm), 7/8-in. (22.2 mm) and 3/4-in. (19.1 mm) sucker rods to make up the string 8 so he can use his existing inventory and minimize the purchase of new rods. Unfortunately, he only has a limited number of 1-in. (25.4 mm)...
1,435 (437.4)
1,635 (498.3)
1,930 (588.3)
2,260 (688.8)
A
Not supported with pagination yet
78
Three storage tanks are delivered to the site of a new producing well. The tanks appear to be unusual in size. No tank table was delivered with the tanks. The well is to be placed on production as soon as the tanks are set. The basic dimensions of the tanks are: Tank outside diameter: 15.0 ft (4.57 m) Shell thickness:...
509 (80.9)
1,527 (242.8)
1,539 (244.7)
1,593 (253.3)
B
Not supported with pagination yet
79
A producing gas well is to be treated with a scale removal chemical at a low pump rate. The well is equipped with a polished-bore receptacle above the production packer with a 20-ft (6.1 m) seal assembly that travels freely. Bottomhole temperature is 300°F (149 °C). Gas temperature at the surface is 120°F (49 °C). Once...
1.4 (3.6)
5.3 (13.5)
16.6 (42.2)
18.6 (47.2)
C
Not supported with pagination yet
80
A double-acting duplex pump is going to be used to fill a tank from a water pit. The foreman does not know the pump output, but he wants an estimate of the time required to fill the 500 bbl (79.5 m^3) tank with water. Each liner has an internal diameter of 5 1/2-in. (14 cm) and an overall stroke length of 14-in. (35....
1.00 hours
1.17 hours
1.25 hours
2.50 hours
C
Not supported with pagination yet
81
Which of the following statements is TRUE regarding undersaturated oil reservoirs?
The two phase and single phase factors are equal above the bubble point
The initial solution gas-oil ratio does not equal the solution gas-oil ratio at a specified pressure above the bubble point
Below the bubble point, the two-phase factor decreases while pressure decreases
Below the bubble point, the single phase factor increases while pressure decreases
A
Not supported with pagination yet
82
Which of the following is the LEAST likely characteristic of a reservoir fluid?
Compressible liquid
Gas
Incompressible liquid
Superfluid
D
Not supported with pagination yet
83
Reservoir simulators are well-suited to help us determine
Aquifer size and strength, remaining reserves, corporate overhead
Future water production, optimal infill well location, results of fracture stimulation treatments
Optimal well spacing in reservoirs, coning characteristics of wells, and optimal flood patterns in improved recovery projects
Unique reservoir description, optimal enhanced recovery method, good matches of reservoir history
C
Not supported with pagination yet
84
The factors that cause recovery factors to vary in uncertain ways in oil reservoirs do not include
distribution of permeabilities vertically and horizontally
presence and location of reservoir boundaries
presence and location of reservoir heterogeneities
unexpected variations in oil prices
D
Not supported with pagination yet
85
Each type of logging tool has special formation evaluation applications. Which of the following statements is FALSE?
Pressure versus depth measurements can be used to identify reservoir fluids and fluid contacts
NMR and density logs can be combined to predict gas-corrected formation porosity in gas-bearing zones
Resistivity measurements alone can be used to differentiate oil zones from gas zones
NMR fluid characterization logs can be used to identify low-resistivity pay zones.
C
Not supported with pagination yet
86
Given accurate test data, the exponent, n, in the Rawlins-Schellhardt gas-well deliverability equation should be:
less than 0.5.
between 0.5 and 1.0.
greater than 1.0.
between 1.0 and 2.0.
B
87
A reservoir produces gas at an initial gas/liquid ratio (GLR) of 20,000 scf/STB (3,561 std m^3/std m^3). After some period of production at constant GLR, the producing GLR begins to increase with time. Essentially all the produced liquids are gas condensate. The reservoir fluid is most likely which one of the following...
Black oil
Dry gas
Gas condensate (retrograde gas)
Wet gas
C
Not supported with pagination yet
88
The proper ranking of average (typical, not exceptional) oil reservoir recovery efficiency (from lowest to highest) by drive mechanism is
solution-gas drive; rock-and-fluid expansion drive; water drive; expanding gas- cap drive
solution-gas drive; expanding gas-cap drive; water drive; gravity drainage drive
rock-and-fluid expansion drive; solution-gas drive; water drive; expanding gas- cap drive
rock-and-fluid expansion drive; expanding gas-cap drive; gravity-drainage drive; water drive
B
Not supported with pagination yet
89
Low-permeability or tight gas reservoirs ordinarily produce at economic rates because they are
Stimulated with long, highly conductive hydraulic fractures
Provided substantial tax and other economic incentives by governmental authorities
Drilled with very wide well spacing, often 640 acres (2.59 × 106 m2), and drain large areas efficiently with limited numbers of vertical wells
Completed in formations of massive thickness.
A
Not supported with pagination yet
90
You are designing a waterflood for a reservoir that is currently below bubblepoint pressure and shut-in. The initial reservoir pressure was at the bubble point with no gas cap. The oil reservoir has the following information: • Flood Pattern — 5-spot • Pattern Area — 80 acres (323,749 m^2) • Formation Thickness — 59 f...
0 (0 )
960 ( 152,640)
2,092 ( 332,628)
2,542 (404,178)
B
Not supported with pagination yet
91
A reservoir oil solution gas-oil ratio follows the R plot attached. The initial reservoir pressure was 3,000 psia (20,684 KPa). If the current reservoir pressure is 2,500 psia (17,237 KPa), what is the oil solution gas-oil ratio (scf/stb) (m^3/m^3) nearest?
375 (67)
779 (139 )
935 ( 166)
Not enough information
C
92
An oil reservoir was originally undersaturated and was known to have no water influx. The field is to be waterflooded and part of the preflood strategy is to determine the new bubble point for this state of depletion. The initial reservoir pressure is 3,000 psia (20,684 KPa) with an initial oil saturation; Soi = 0.90. ...
3,000 (20,684)
2,160 (14,893)
1,800 (12,411)
1,200 (8,274)
C
Not supported with pagination yet
93
You have a PVT analysis for a volumetric reservoir which was undersaturated at the original reservoir conditions of 6,258 psia (36,890 KPa) and 205 °F (96 °C). The reservoir has produced at a constant producing GOR until a marked decrease in the producing GOR was noted. At this point, the cumulative production from the...
287 (8.1)
464 ( 13)
1007 (29)
306 (8.7)
A
94
What is the breakthrough mobility ratio of an inverted 5-spot pattern undergoing waterflood with the average water saturation at breakthrough equal to 68% (Swbt = 0.68)? Use the following table of oil and water relative permeabilities to calculate your answer. Assume µ oil = 0.64 cp and µ water = 0.50 cp.
0.680
0.462
1.000
0.419
D
95
Using the fractional flow curve, what is the water saturation at the well at the time of breakthrough?
0.68
0.64
0.72
0.05
B
96
What is the original volume of gas cap gas in place in mscf (mm^3) of a reservoir with the following parameters? Area = 80 acres, (323,749 m^2) net pay thickness = 50 ft, (15.2 m) average porosity = 20%, initial water saturation, Swc = 10%, initial gas saturation, Sg = 10%, Initial Oil Formation Volume Factor, B...
7,757,800 (219,768)
6,982,020 (197,791)
775,800 ( 21,977)
620,624 (17,581)
C
Not supported with pagination yet
97
A sonic logging tool recorded a travel time of 90 µs/ft in a loosely consolidated sand formation. From local experience it is known that sonic log travel times in this formation read too high because the formation is loosely consolidated. A correction factor, Cp = 1.2, should be applied to the Wyllie time-average equat...
17
24
28
34
B
Not supported with pagination yet
98
From lab measurements on core samples from a zone of interest you are given the following Archie parameters: F = 26.0, and n = 2.3. From resistivity measurements on produced formation water samples, R = 0.05 ohm-m w at reservoir temperature. From log measurements, Rt = 10.0 ohm-m and φ = 0.20. What is Sw, %?
33
35
36
41
D
Not supported with pagination yet
99
A high-pressure gas reservoir had a discovery pressure of 10,000 psia (6.895 × 10^4 KPa). PVT analysis of the gas indicated the following variation in deviation factor, z, with pressure. p, psia z, dimensionless 10,000 (6.895 × 10^4 KPa) 1.47 8,000 (5.516 × 10^4 KPa) 1.30 Formatio...
9.54
14.6
20.0
85.4
B
Not supported with pagination yet
100
A gas reservoir has a reliable estimate of original gas in place of 400 Bcf (400 × 10^9 scf, 1.133 × 10^10 std m^3). There may be water influx into the reservoir from an aquifer. Estimate the cumulative water influx in reservoir barrels (RB) (or reservoir cubic meters, res m^3) if, after two years of production, averag...
66.74 ×10^6 RB (10.61 × 10^6 res m3)
4 × 10^4 RB (6.36 × 10^3 res m3)
66.7 ×10^6 RB (10.6 × 10^6 res m3)
80 × 10^3 RB (12.72 × 10^3 res m3)
D
Not supported with pagination yet

SPE MCQ Dataset

SPE MCQ, which stands for Society of Petroleum Engineers Multiple Choice Question, is a dataset which consists of 100 MCQs of petroleum engineering topic. This MCQ bank is originally from the Study Guide for the SPE Petroleum Engineering Certification Examination (4th ed) (2011)

The MCQ has diverse topics, such as common knowledge, drilling, completion and production, and reservoir engineering.

The dataset has 5 columns:

  • number: Question number
  • question: Question
  • A: Choice A
  • B: Choice B
  • C: Choice C
  • D: Choice D
  • correct_answer: The correct answer
  • figure: The reference figure or table if the question has
Downloads last month
5

Space using ynuwara/spe_mcq_dataset 1