Optimize schedule for 4 Jobs across 4 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 2 d...
null
Optimize schedule for 4 Jobs across 4 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 2 Operation 0 dura...
null
Solution: Job 2 Operation 0 on Machine 0 : 0 + 110 -> 110 Job 0 Operation 0 on Machine 2 : 0 + 75 -> 75 Job 1 Operation 0 on Machine 3 : 0 + 103 -> 103 Job 3 Operation 0 on Machine 2 : 75 + 92 -> 167 Job 1 Operation 1 on Machine 1 : 103 + 110 -> 213 Job 0 Operation 1 on Machine 0 : 110 + 84 -> 194 Job 3 O...
null
5
5
Optimize schedule for 5 Jobs across 5 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 2 d...
null
Optimize schedule for 5 Jobs across 5 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 2 Operation 1 dura...
null
Solution: Job 3 Operation 0 on Machine 1 : 0 + 277 -> 277 Job 0 Operation 0 on Machine 2 : 0 + 7 -> 7 Job 4 Operation 0 on Machine 3 : 0 + 188 -> 188 Job 2 Operation 0 on Machine 4 : 0 + 41 -> 41 Job 2 Operation 1 on Machine 0 : 41 + 173 -> 214 Job 1 Operation 0 on Machine 4 : 41 + 323 -> 364 Job 2 Operat...
null
4
3
Optimize schedule for 4 Jobs across 3 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 1 d...
null
Optimize schedule for 4 Jobs across 3 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 3 Operation 0 dura...
null
Solution: Job 3 Operation 0 on Machine 0 : 0 + 46 -> 46 Job 0 Operation 0 on Machine 1 : 0 + 166 -> 166 Job 2 Operation 0 on Machine 2 : 0 + 154 -> 154 Job 3 Operation 1 on Machine 2 : 154 + 61 -> 215 Job 0 Operation 1 on Machine 0 : 166 + 110 -> 276 Job 1 Operation 0 on Machine 1 : 166 + 272 -> 438 Job 0...
null
7
6
Optimize schedule for 7 Jobs across 6 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 5 d...
null
Optimize schedule for 7 Jobs across 6 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 5 Operation 0 dura...
null
Solution: Job 5 Operation 0 on Machine 0 : 0 + 16 -> 16 Job 2 Operation 0 on Machine 1 : 0 + 34 -> 34 Job 1 Operation 0 on Machine 2 : 0 + 34 -> 34 Job 3 Operation 0 on Machine 4 : 0 + 33 -> 33 Job 0 Operation 0 on Machine 5 : 0 + 34 -> 34 Job 5 Operation 1 on Machine 3 : 16 + 48 -> 64 Job 0 Operation 1 o...
null
15
15
Optimize schedule for 15 Jobs across 15 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 9...
null
Optimize schedule for 15 Jobs across 15 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 2 Operation 0 du...
null
Solution: Job 12 Operation 0 on Machine 0 : 0 + 356 -> 356 Job 13 Operation 0 on Machine 1 : 0 + 235 -> 235 Job 9 Operation 0 on Machine 2 : 0 + 406 -> 406 Job 5 Operation 0 on Machine 4 : 0 + 45 -> 45 Job 7 Operation 0 on Machine 5 : 0 + 122 -> 122 Job 6 Operation 0 on Machine 9 : 0 + 51 -> 51 Job 1 Oper...
null
4
3
Optimize schedule for 4 Jobs across 3 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 0 d...
null
Optimize schedule for 4 Jobs across 3 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 0 Operation 0 dura...
null
Solution: Job 2 Operation 0 on Machine 0 : 0 + 30 -> 30 Job 0 Operation 0 on Machine 0 : 30 + 340 -> 370 Job 2 Operation 1 on Machine 1 : 30 + 235 -> 265 Job 3 Operation 0 on Machine 1 : 265 + 383 -> 648 Job 2 Operation 2 on Machine 2 : 265 + 347 -> 612 Job 1 Operation 0 on Machine 0 : 370 + 351 -> 721 Jo...
null
4
4
Optimize schedule for 4 Jobs across 4 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 1 d...
null
Optimize schedule for 4 Jobs across 4 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 1 Operation 2 dura...
null
Solution: Job 1 Operation 0 on Machine 1 : 0 + 21 -> 21 Job 3 Operation 0 on Machine 3 : 0 + 91 -> 91 Job 0 Operation 0 on Machine 1 : 21 + 138 -> 159 Job 1 Operation 1 on Machine 3 : 91 + 137 -> 228 Job 3 Operation 1 on Machine 1 : 159 + 80 -> 239 Job 0 Operation 1 on Machine 2 : 159 + 88 -> 247 Job 1 Op...
null
6
5
Optimize schedule for 6 Jobs across 5 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 2 d...
null
Optimize schedule for 6 Jobs across 5 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 0 Operation 2 dura...
null
Solution: Job 3 Operation 0 on Machine 1 : 0 + 45 -> 45 Job 0 Operation 0 on Machine 2 : 0 + 292 -> 292 Job 5 Operation 0 on Machine 3 : 0 + 294 -> 294 Job 3 Operation 1 on Machine 4 : 45 + 256 -> 301 Job 5 Operation 1 on Machine 1 : 294 + 12 -> 306 Job 3 Operation 2 on Machine 2 : 301 + 415 -> 716 Job 4 ...
null
2
2
Optimize schedule for 2 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 0 d...
null
Optimize schedule for 2 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 0 Operation 0 dura...
null
Solution: Job 0 Operation 0 on Machine 0 : 0 + 356 -> 356 Job 1 Operation 0 on Machine 1 : 0 + 331 -> 331 Job 1 Operation 1 on Machine 0 : 356 + 322 -> 678 Job 0 Operation 1 on Machine 1 : 356 + 254 -> 610 Makespan: 678.0, as it is the maximum end completion time of Operation 1
null
7
2
Optimize schedule for 7 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 0 d...
null
Optimize schedule for 7 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 0 Operation 0 dura...
null
Solution: Job 6 Operation 0 on Machine 0 : 0 + 39 -> 39 Job 3 Operation 0 on Machine 0 : 39 + 234 -> 273 Job 6 Operation 1 on Machine 1 : 39 + 94 -> 133 Job 2 Operation 0 on Machine 0 : 273 + 313 -> 586 Job 3 Operation 1 on Machine 1 : 273 + 123 -> 396 Job 5 Operation 0 on Machine 1 : 396 + 280 -> 676 Job...
null
20
15
Optimize schedule for 20 Jobs across 15 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 3...
null
Optimize schedule for 20 Jobs across 15 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 3 Operation 0 du...
null
Solution: Job 5 Operation 0 on Machine 0 : 0 + 89 -> 89 Job 9 Operation 0 on Machine 1 : 0 + 51 -> 51 Job 8 Operation 0 on Machine 2 : 0 + 7 -> 7 Job 0 Operation 0 on Machine 3 : 0 + 137 -> 137 Job 4 Operation 0 on Machine 4 : 0 + 53 -> 53 Job 6 Operation 0 on Machine 6 : 0 + 178 -> 178 Job 7 Operation 0 ...
null
7
5
Optimize schedule for 7 Jobs across 5 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 1 d...
null
Optimize schedule for 7 Jobs across 5 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 1 Operation 1 dura...
null
Solution: Job 0 Operation 0 on Machine 1 : 0 + 121 -> 121 Job 5 Operation 0 on Machine 3 : 0 + 304 -> 304 Job 1 Operation 0 on Machine 4 : 0 + 41 -> 41 Job 1 Operation 1 on Machine 0 : 41 + 278 -> 319 Job 3 Operation 0 on Machine 4 : 41 + 236 -> 277 Job 0 Operation 1 on Machine 2 : 121 + 52 -> 173 Job 5 O...
null
3
2
Optimize schedule for 3 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 0 d...
null
Optimize schedule for 3 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 0 Operation 0 dura...
null
Solution: Job 0 Operation 0 on Machine 0 : 0 + 198 -> 198 Job 2 Operation 0 on Machine 1 : 0 + 3 -> 3 Job 1 Operation 0 on Machine 0 : 198 + 277 -> 475 Job 0 Operation 1 on Machine 1 : 198 + 274 -> 472 Job 2 Operation 1 on Machine 0 : 475 + 178 -> 653 Job 1 Operation 1 on Machine 1 : 475 + 278 -> 753 Make...
null
5
4
Optimize schedule for 5 Jobs across 4 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 2 d...
null
Optimize schedule for 5 Jobs across 4 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 4 Operation 0 dura...
null
Solution: Job 4 Operation 0 on Machine 0 : 0 + 249 -> 249 Job 2 Operation 0 on Machine 1 : 0 + 198 -> 198 Job 0 Operation 0 on Machine 2 : 0 + 142 -> 142 Job 1 Operation 0 on Machine 2 : 142 + 138 -> 280 Job 0 Operation 1 on Machine 3 : 142 + 47 -> 189 Job 0 Operation 2 on Machine 0 : 249 + 166 -> 415 Job...
null
9
3
Optimize schedule for 9 Jobs across 3 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 2 d...
null
Optimize schedule for 9 Jobs across 3 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 5 Operation 0 dura...
null
Solution: Job 7 Operation 0 on Machine 0 : 0 + 213 -> 213 Job 0 Operation 0 on Machine 2 : 0 + 67 -> 67 Job 0 Operation 1 on Machine 1 : 67 + 12 -> 79 Job 3 Operation 0 on Machine 2 : 67 + 118 -> 185 Job 4 Operation 0 on Machine 1 : 79 + 220 -> 299 Job 5 Operation 0 on Machine 0 : 213 + 105 -> 318 Job 7 O...
null
4
2
Optimize schedule for 4 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 0 d...
null
Optimize schedule for 4 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 0 Operation 0 dura...
null
Solution: Job 1 Operation 0 on Machine 0 : 0 + 95 -> 95 Job 3 Operation 0 on Machine 0 : 95 + 116 -> 211 Job 1 Operation 1 on Machine 1 : 95 + 122 -> 217 Job 0 Operation 0 on Machine 0 : 211 + 137 -> 348 Job 3 Operation 1 on Machine 1 : 217 + 94 -> 311 Job 2 Operation 0 on Machine 0 : 348 + 111 -> 459 Job...
null
8
2
Optimize schedule for 8 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 1 d...
null
Optimize schedule for 8 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 3 Operation 0 dura...
null
Solution: Job 3 Operation 0 on Machine 0 : 0 + 205 -> 205 Job 7 Operation 0 on Machine 1 : 0 + 16 -> 16 Job 1 Operation 0 on Machine 1 : 16 + 345 -> 361 Job 7 Operation 1 on Machine 0 : 205 + 29 -> 234 Job 6 Operation 0 on Machine 0 : 234 + 45 -> 279 Job 1 Operation 1 on Machine 0 : 361 + 74 -> 435 Job 2 ...
null
10
9
Optimize schedule for 10 Jobs across 9 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 8 ...
null
Optimize schedule for 10 Jobs across 9 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 8 Operation 0 dur...
null
Solution: Job 8 Operation 0 on Machine 0 : 0 + 28 -> 28 Job 5 Operation 0 on Machine 3 : 0 + 228 -> 228 Job 7 Operation 0 on Machine 4 : 0 + 228 -> 228 Job 3 Operation 0 on Machine 7 : 0 + 69 -> 69 Job 1 Operation 0 on Machine 8 : 0 + 58 -> 58 Job 8 Operation 1 on Machine 5 : 28 + 5 -> 33 Job 6 Operation ...
null
6
3
Optimize schedule for 6 Jobs across 3 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 1 d...
null
Optimize schedule for 6 Jobs across 3 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 1 Operation 0 dura...
null
Solution: Job 1 Operation 0 on Machine 0 : 0 + 127 -> 127 Job 3 Operation 0 on Machine 1 : 0 + 12 -> 12 Job 0 Operation 0 on Machine 1 : 12 + 118 -> 130 Job 3 Operation 1 on Machine 2 : 12 + 385 -> 397 Job 5 Operation 0 on Machine 0 : 127 + 359 -> 486 Job 2 Operation 0 on Machine 1 : 130 + 308 -> 438 Job ...
null
7
2
Optimize schedule for 7 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Job 0 consists of the following Operations: Operation 0 on Machine 0 d...
null
Optimize schedule for 7 Jobs across 2 Machines to minimize makespan. Each job involves a series of Operations needing specific machines and times. Operations are processed in order, without interruption, on a single Machine at a time. Problem: Machine 0 is used for the following Operations: Job 0 Operation 0 dura...
null
Solution: Job 4 Operation 0 on Machine 0 : 0 + 31 -> 31 Job 6 Operation 0 on Machine 1 : 0 + 1 -> 1 Job 2 Operation 0 on Machine 1 : 1 + 176 -> 177 Job 1 Operation 0 on Machine 0 : 31 + 51 -> 82 Job 0 Operation 0 on Machine 0 : 82 + 71 -> 153 Job 5 Operation 0 on Machine 0 : 153 + 149 -> 302 Job 1 Operati...