5,156 | Lamination activities was carried out by workers without task specific PPE such as cartridge type mask, Chemical hand gloves, | Chemical |
9,503 | Safety Inspection for grouting machine could not be confirmed near MC2A | Use of tools and equipment |
7,150 | ZONE 21 CRUSHER AREA- Observed un protected open trench at the said area.All the excavated trench must be fully secured with proper barriers and sign board to prevent the un wanted event occurred. | Unsafe excavations |
9,617 | At Al Ahlia roundabout working area, observed water leakage from toilet water tank | Environment / noise / spills |
3,115 | CP 05: Witnessed 40 plus operatives working for retaining wall 70 m trench with only single ladder access in place. Contractor to ensure every 25 m safe access is provided. | Unsafe access / egress |
7,876 | Floor protection plywood sheets are not maintained / secured properly and contributing tripping hazards at CP-2 L 00 near staircase no 22 area. Action – CMA addressed the concern to TCA JV and advised to ensure all floor protection plywood sheets are properly fixed. | Falls from same level |
10,645 | The chemical (soil fluid) stored by Bauer has not following the MSDS storage requirement. Advised L&T to provide adequate drip tray and be vigilant while opening the valve/transferring the chemical. | Chemical |
10,600 | ABM employees were found standing on re-bar bundles, whereas unguarded protruding L-bar reinforcement is kept nearby. Serious injuries could happen if the employees just stumble onto this steel. | Struck by / against |
1,941 | It was observed that TPI certificates of the lifting belts was expired and the belts were not in good condition. Kindly ensure that the belts are third party inspected and certified before use. (Used with Boom Truck Reg. No. : 308191). The D shackles used were also without locking pin and certificates were unavailabl... | Lifting operations |
1,187 | PPE non-compliance was observed while working with concrete at CP 2 Level 00 area. Operatives were observed without mandatory PPE’s Action: CMA addressed the issue to TCA JV site supervisor and HSE Person for corrective action and follow up. | PPE |
1,563 | The driver is asleep | Traffic Management |
11,178 | Location No: TWS A3-24 Immediate Action Taken Noted hydraulic leaks from the crane and the mechanics rectified the leaks by replacing the hydraulic hose immediately. | Non Hazard |
3,990 | Debris on roof tile and ladder on balcony (eave) Location: AB-14-08 | Falling objects |
5,176 | Masco Contractor should do proper (house keeping) on site. Grade areas adjacent to road and remove unwanted material (tires, wood, loose scattered short steel bars, debris, boulders, scrap metal, etc.) | Housekeeping |
10,520 | In Zone-8 Line-B left open and unsecured the Deep Excavated area / Man holes 1- Incomplete barriers. 2- Using short bund wall. 3- Missing barriers. 4- Barriers are not secured. 5- Villa construction people and their vehicle moving near by the unprotected excavation. 6- Lack of flashing light | Unsafe excavations |
9,341 | Housekeeping to be maintained on site, observation raised at DGS 21A. | Housekeeping |
1,925 | Scaffold erector was found not tie off full body safety harness while on platform at CP-1 Level-2. ACTION: Ensure adequate supervision in place to prevent any unsafe working at height, contractor must send him for refresher working at height training. | Falls from height |
1,318 | Contractor's Main Yard (near offices): - Concrete washout is no longer an enclosed area, but instead residue/deposits are being spilled across the site. Recommend the Contractor clear this area and provide a suitable enclosed washout facility. - A number of fuel spills observed at the fuel storage area, spilling bey... | Environment / noise / spills |
6,774 | Street 39, reinstatement of the rest shelter must be done after heavy wind swept it away, QCS Sec 11, Part 1, Cl 1.1 | Struck by / against |
8,075 | Construction/demolition waste accumulation noticed at CRT to be cleared and timely waste removal to be ensured by the contractor. | Housekeeping |
2,882 | Floor protection plywood sheets are not maintained / secured properly and contributing tripping hazards at CP-2 Level 00 south area. Action – TCA JV to ensure all floor protection plywood sheets are properly fixed. | Falls from same level |
6,718 | Location: TWS 46 A new method of breaking bund wall at TWS no A3-46 which involves a crane, a compressor and a jackhammer was being carried out without MS & RA. | At-Risk Behavior |
6,419 | It is noticed that 220 Volt power tool was being used at site by the sub-contractor at bldg 22C. | Electrical equipment and connections |
5,421 | The drip tray of generator positioned at P03, adjacent to GH# 33 has been misplaced which may cause potential damage to the completed asphalt work in case of any spillage. TCA JV to follow appropriate procedure for all static fuel driven equipment. | Environment / noise / spills |
10,766 | Repeated Issue: Unlabeled chemical is being utilized for the project to be reviewed by L&T. Awareness training shall be conducted to alert the workforce regarding the possible health hazards. | Health |
10,679 | Mobile crane CR63 observed overtaking & Over speeding against site traffic rules. Operator interrogated. | Vehicle use and movement |
5,709 | Basement area: FHR access blocked and cannot be easily used in case of emergency. Contractor shall take immediate action. | Use of tools and equipment |
6,249 | One of the fence adjacent to the excavation was found to placed in an improper manner with highly inadequate supports; ACC workers were observed working underneath these fence ; a slight push due to wind or by any other means will let the fence to fall on the workers who were inside the excavation. Therefore the same ... | Unsafe excavations |
902 | During the CBM work at CH 71, Observed assigned banksman to assist the reversing truck giving the signal to the drivers at night without a light baton. | Struck by / against |
1,483 | There is no aviation warning light installed at the top of rig machine for the deep injection well. The site safety officer should ensure that the aviation light has been provided. | Struck by / against |
10,931 | An operative was found to be mixing a chemical solution assumed to be a silicon without the mandatory PPE such as hand-glove and nose mask around APM tunnel area, near GH-20. No JSTI and MSDS was available upon request. There are indication of lack of risk awareness and lack of supervision in place from both operati... | Chemical |
5,554 | At the MHA1-41-1 it was observed that NFC operatives storing the rebar cages and material under the overhead power line which is marked as the exclusive zone. Such a practice should not take place. | Electrical equipment and connections |
9,505 | Unsafe rigging practice observed on MC2A bridge works. Rigger interrogate & replaced with experienced one. | Lifting operations |
7,820 | Location: TWS no 17 Tunnel cleaning and lamination work were ongoing inside the tunnel from MH 17 to 18 and EIGHT workers were assigned for these task without keeping a stretcher inside the tunnel. A Stretcher should be kept inside the tunnel to rescue a person from the tunnel. | Confined Spaces |
753 | Observed foreman educating his labors on work at height work safety precautions. Location: Roundabout, Area-1, stage 1, Rest Area. | Non Hazard |
3,788 | In Zone-21 Near the Stock Pile of Back filling material required to close the access road and make diversion for construction vehicles as advised from both ends. | Unsafe access / egress |
11,285 | MC2E- Abutment work- Lack of task specific PPE's. | PPE |
8,869 | Ply board pieces and concrete debris found in the safety catch net fans. Debris and other falling objects shall be removed in regular intervals. | Falling objects |
9,936 | Unprotected protruding steel rebar during construction of road embankment | Struck by / against |
2,523 | observed un safe lifting operation at zone 1. using excavator to lift the hand held compactor. Instructed GRC to follow proper lifting procedures and sufficient equipment. | Lifting operations |
7,473 | Deep excavation for dry-legs near RA 1 found inadequate barriers , big opening has been observed towards side access road LHS , vehilce or person can easily enter intot he excavation which must be secured with solid continuous barriers and hazard sign to be posted. | Unsafe excavations |
2,395 | First aid room with all the required facilities provided. Male nurse available in both day and night shifts. | Non Hazard |
6,610 | Good Observation- Zone 3. Provision of Fire Extinguishers, inspected and Certified by 3rd Party Inspection body, was provided in HQ Building to renew those with expired 3rd Party sticker. | Non Hazard |
262 | CP05 : Shear wall ( 20 mm rebar ) with improper and inadequate support. Contractor to comply with approved temporary works support. | Design |
9,753 | Zone A - Found concrete barriers placed without maintaining adequate distance from the edges of the excavation and also observed workers sitting on the concrete barrier without any personal fall arrest arrangements. Concrete barriers to be placed at least 1.5 meter away from the edges of the excavation, strict action t... | Falls from height |
7,081 | A construction bucket with materials placed outside of the toe board of a scaffolding. Action: Contractor to conduct awareness training regarding falling objects for the operatives apart from removing and placing the said bucket at a safe location to eliminate the risk of falling objects. | Falling objects |
4,296 | No entrance & unsafe access to villa. (The inspection was not conducted because there was no safe access). AC-3-12 AC-3-14 AC-3015 | Unsafe access / egress |
3,755 | Street Lighting Cables laid over the ground without proper safety measures (CH-30+810 to 31+010) (MC20) (RHS). | Electrical equipment and connections |
7,679 | MC00 adjacent to sub station - waste asphalt piles require appropriate disposal. | Environment / noise / spills |
3,656 | Open pit inside Building 8C. To be closed immediately. | Falls from height |
9,387 | All gaps and damage concert barriers must be rectified immediately to avoid unauthorized public entry at 3B part 3 areas. | Workplace violence |
4,754 | Equipment checklist was properly maintained by the operator prior to starting the activity at the site. | Non Hazard |
1,309 | Jump form; Electrical connections provided to the AC unit (Cool room) needs to be replaced. Electrical cables being tied with tie wires. MSS to action. | Electrical equipment and connections |
8,156 | Lot of combustible materials were found to dumped indiscriminately and was lying unattended besides store poses a potential fire hazard. Such unsafe condition can initiate fire; moreover, these can also help in propagation of fire should there be one. | Housekeeping |
7,051 | Unsafe vehicle access provided at zone 1. Soft barriers are provided near to the edge and there is chances of vehicle collapse if any vehicle pass near to the barriers. GRC - Corrective Action GRC shall ensure to provide safe and secure vehicle access route and endure to provide edge protection barriers 1.5 meter awa... | Unsafe access / egress |
3,100 | Concrete pour for thrust block for risng main. A person standing on the rebars at the height 1.2mtr over wet concrete, possible falling into concrete and also injury from sharp objects. | Falls from same level |
633 | Hazardous substances were found stored inside general wooden storage boxes without any fire and spill prevention measures at Tunnel 2. CMA advised L&T to move all hazardous substances to the designated storage area and to ensure appropriate spill and fire prevention measures. | Environment / noise / spills |
6,305 | Following safety deficiencies were observed during the inspection conducted at site on 20.11.2018. • Noticed that, for a long the combustible waste materials were storing at waste disposal yard, increase the risk of fire. • Noticed that, chemicals were found stored in Kannon office cabin and people were resting, having... | Chemical |
5,460 | Single board used as a bridge to cross the trench. Opposite to villa BA 10 02. | Unsafe access / egress |
3,980 | Vertical soil hip which can fall and can be dangerous if anyone stay nearby. | Falling objects |
2,234 | Chemical spills are evident on site. Chemical containers are not stored in a proper way provide plastic sheets or drip tray while working with chemicals to avoid spills on site grounds. Conduct a spill drill and also provide necessary corrective action for further activities. | Environment / noise / spills |
6,058 | (Site Location - Al Yahar 20) Lack of welfare facilities at site ( No rest area & No Toilet). Contractor should immediately arrange the adequate welfare facilities at site without further delay. | Health |
11,047 | Absence of housekeeping and damaged temporary electrical DB. BB 03 06. | Electrical equipment and connections |
11,088 | Edge without protection. (MH 1/11/2) | Falls from height |
4,792 | Operative working close to the concrete barrier installed to the highway. Jebal Ali police station area. | Struck by / against |
8,741 | Unsafe and improper material shifting has been identified with below mentioned deficiencies at GH # 47, external area. • Temporary material storage structure has been found shifting by using forklift. • Damaged web sling used for secure the temporary structure. • Fork lift operator competency found expired. • Daily eq... | Use of tools and equipment |
6,671 | CMA Walkthrough- Periodical PMV inspection has not been done for the air compressor at P02 area. The inspection sticker was observed as not updated. Action - CMA identified the issue to L & T construction management and HSE personnel for corrective action. L & T was requested to inspect and provide updated inspection s... | Use of tools and equipment |
420 | Electrical panels not secured and no required signage. | Electrical equipment and connections |
3,653 | Labor working at edge of open area not using fall protection | Falls from height |
7,198 | Poor housekeeping has been noticed at the access way to CP2 near GH# 37. | Housekeeping |
10,092 | Management HSE Walk-through observation: Compressor nozzle man found not wearing ear protections while engage in high noise activity. Need to provide proper/required PPE for specific activity. Ear muffs required at all times while engage in high noise activity. | Environment / noise / spills |
647 | It was observed at Dukhan Bridge a hanging/unsafe form works that might accidentally fall down. QBC Contractor site supervisor was advised to removed/uninstalled this form works and stored in a proper place. | Falling objects |
3,365 | Escalated: Empty boxes, computer accessories on the wall corner located near Project Control Team desk. Advice to housekeeping / certain individual in-charge of office equipment to keep maintain good housekeeping to mitigate/ avoid slips and trips happen to people nearby the place. | Housekeeping |
4,978 | (Al Yahar 21 hydropower) Newly Constructed FIC opening with inadequate protection. | Open shafts, edges, holes |
773 | Barricades the locations where repaired work done from the public . | Non Hazard |
4,305 | Location: TWS No. A3-24 Poor housekeeping noted at TWS no A3-24. Waste should be cleared regularly. | Housekeeping |
4,818 | Telecom Room Unsafe Positioning of Ladder Workers were using the aluminium ladder placed inside the telecom room as an access to either pass over the ladder rails or jumped, also cables were scattered on the ladder.. In both the cases he may trip and fall from height. | Falls from height |
2,478 | Operatives not wearing PPE's. | PPE |
6,121 | WO# 86 Permits The permit of DE-watering system was found expired without renewal copy available at site. All permits shall to be updated and ready at site before the works start. | Workplace violence |
611 | Designated de-nailing area has bene provided in CP1 area. | Non Hazard |
2,655 | A worker was observed using a grinder without the protective guard while grinding over the surface of GRE pipes. Mechanical guard to be provided; ensure the training and inspection of various other tools used by the subcontractors. | Mechanical / guarding |
11,032 | Banks man provided for heavy equipment to control traffic and reversing operation. Good practice. | Non Hazard |
6,726 | While in route to the site work at pit MH A1-13, We observed one loader was driving at excessive speed with no flag man, Where loader driver couldn't see other colleague car. the work stopped immediately and the driver kept away from the site. No one was injured. | Traffic Management |
6,031 | Location : Pumping Sttaion Two ladders were kept on the stair which may cause trip and delay emergency rescue. | Unsafe access / egress |
4,703 | Edges of the excavation must be clean from any materials. Soakaway area. | Housekeeping |
750 | Observed site security guard without cabin/shelter for rest. Location: Al Yalayis road, Area-1, stage 4/5, center median. | At-Risk Behavior |
7,458 | ZONE 9 - Observed trencher operator have no third party certificate for operating trencher.Said operator using expired Back hoe Loader Operator certificate. | Use of tools and equipment |
3,525 | LEEDIEQc3 (Obv 30) One of HVAC duct inside ULO plant room area not secured. Location: ELV room level 01 | Environment / noise / spills |
10,182 | MGX line:-Observed unprotected excavation.Contractor needs to provide proper barrication immediately to prevent fall into excavation. | Unsafe excavations |
1,029 | Poor housekeeping has been identified on the elevated working platform near Ramp 2. Combustible construction wastes were found scattered on the scaffolding platform. Action: CMA addressed the issue to TCA JV site supervisor and HSE person for immediate corrective action. TCA JV was advised to remove all waste materials... | Housekeeping |
4,105 | It was observed that a large amount of mixed construction waste accumulated a Visitors building basement area JTC to ensure the proper segregation of construction waste and prompt disposal of waste from the site. | Housekeeping |
2,267 | (Site Location - Al Yahar 21) Unsafe temporary protection for the newly constructed manholes at site. There is lack of awareness among the site operatives , as they are standing on the unsafe temporary plywood of manhole, which will result a fall into manhole. So, contractor should provide a adequate protection for the... | Open shafts, edges, holes |
446 | Improper and unsafe shade area at Salwa Bridge Abt2 area - Carpentry work was in progress under the unsecured overhead shade with unsecured wooden sheets. Construction team should not promote such unsafe workplace. | Falling objects |
8,422 | Unsafe bridges to cross deep trenches. | Unsafe access / egress |
9,023 | Training for fire watcher has been received and holding with training card. | Non Hazard |
9,273 | Excavator reg # 44734 found with substandard pin which requires to be replaced with standard pin. | Use of tools and equipment |
4,226 | Good Practice: Waste bins are provided in pedestrian crossing area. | Non Hazard |
6,543 | It was observed that the under erection scaffoldings were shaking due to inadequate support while scaffolder working on it. The site engineer was advised to suspend activity temporarily and provide adequate support to prevent from the collapse. | Unsafe working platforms / scaffolds |
5,762 | unsafe open excavation trench. trench edges are loss, cracked, and signs of collapse. please rectify the unsafe immededity and avoid entry of workers until GEC inspection and approval | Unsafe excavations |
11,262 | CAT equipment left unattended and kept at non-designated location after use. Roundabout, irrigation works. | Use of tools and equipment |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.