instruction stringlengths 960 963 | input stringlengths 0 5.58k | output stringlengths 4 732 |
|---|---|---|
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | None | |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | MU baker windowmaster whipstock associated BHA TIH. | |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:30 - 06:00: MU baker windowmaster whipstock milling assembly associated BHA. Continue TIH with DP.
06:00 - 10:00: Continued TIH with windowmaster whipstock milling assembly. Tagged 9 5/8" bridge-plug at 2211 m dpm.
10:00 - 12:00: Oriented whipstock using MWD. Set anchor on whipstock.
12:00 - 18:00: Cut window in 9 5... | Finished RIH with baker windowmaster whipstock. Oriented set same. Cut window from 2202-2207 m. Drilled 6 m of formation. POOH for drilling BHA. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Completed circulating hole clean. Flushed choke kill lines.
00:30 - 03:00: Flow checked, pumped slug POOH to PU drilling BHA.
03:00 - 04:00: Burst hydraulic hose on upper racking arm repaired same.
04:00 - 06:00: Continued to POOH with milling assembly.
06:00 - 06:30: Completed LD milling assembly.
06:30... | TIH with drilling BHA to 9 5/8" window. Corrected problem w/yellow pod tested bops. Attempted to drill-got stuck freed string. Unable to pass back through window. POOH PU milling BHA. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: MU milling BHA TIH to whipstock.
06:00 - 09:00: Milled from 2202-2205 m. Decrease in ROP not making any progress in milling through window.
09:00 - 13:30: Flowchecked, pumped slug POOH with milling BHA.
13:30 - 18:30: TIH to 2187 m with 9 5/8" bridge plug on DP.
18:30 - 19:30: Set bridge plug at 2187 m l... | Tried to mill through 9 5/8" window-unsuccessful. POOH with milling BHA TIH with 9 5/8" bridge-plug. Set same at 2187m. POOH MU 2nd baker windowmaster whipstock. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: MU baker windowmaster whipstock assembly. TIH with BHA on DP.
06:00 - 10:00: Completed TIH with whipstock to 2170 m.
10:00 - 11:00: Attempted to circulate string plugged. RU reverse circulated 1 drillstring volume unplugged string.
11:00 - 12:30: Oriented whipstock using MWD. Set anchor on whipstock.
12:... | Set 2nd whipstock milled window from 2178-2183 m. Drilled 19 m formation. Circulated hole clean POOH to MU drilling BHA. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: Finished drilling to 2202 m total of 19 m of formation drilled beyond window's bottom. PU so through window 5 times no problems.
01:00 - 02:30: PU above top of window pumped 5 m3 hi-vis pill. Circulated hole clean at 2000 LPM at 195 bar. Flushed choke kill lines boosted riser.
02:30 - 06:00: POOH to MU d... | Finished handling milling BHA. MU TIH with drilling BHA to TD. Drilled from 2202 2405 m. Sliding as directional program required to drop angle turn hole toward objective. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Drilled/oriented 8 1/2" hole from 2311 2405 m.
06:00 - 19:00: Drilled/oriented 8 1/2" hole from 2405-2653 m.
19:00 - 20:00: Circulated to clean hole.
20:00 - 00:00: Drilled/oriented 8 1/2" hole from 2653 2711 m.
| Directionally drill 8 1/2" hole from 2405 2768 m. Problems with achieving desired azimuth/turn. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Drilled/oriented 8 1/2" hole from 2711 2768 m. Had problems turning wellpath to the right.
06:00 - 07:00: Circulated hole clean in preparation for trip out.
07:00 - 15:30: POOH for BHA change due to directional problem not enough turn to right in azimuth. Note-no problem in toh through 9 5/8" casing wind... | Circulated hole clean. POOH set motor at 1,5 degrees PU insert bit. TIH to drill ahead-to turn hole to right. Ran gyro survey inside drillstring. Started drilling 8 1/2" hole. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Continued circulating while RU to run gyro.
00:30 - 05:30: MU side-entry sub into drillstring RIH with gyro on atlas e/line. Bit 1 joint off bottom during survey. Ran gyro from 1880 to 2710 m. POOH with gyro RD side-entry sub.
05:30 - 06:00: Drilled from 2768 2771 m sliding.
06:00 - 13:30: Drilled from 2... | Drilled 8 1/2" hole from 2771-2783 m not making progress. POOH for bit/bha change got stuck while preparing to pull through window. Fight lost returns/tight hole. Successful in pulling through window. Finished POOH. Test bops. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Completed POOH. Insert bit was cored-out.
01:30 - 06:00: Ran BOP test tool to wellhead. Tested pipe rams fail safe valves to 20/345 bar tested both annulars to 20/241 bar. Tested on yellow pod. Function tested on blue pod from subsea control room.
06:00 - 06:30: Completed POOH with BOP test tool.
06:30 -... | TIH to TD to determine hole's condition. Cavings to surface after bu. Increase mud WT. To 1,54 SG. POOH for drilling BHA. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: With top of dcs 10m below window, circulated bottoms up at 2231 m bit depth. 2000 LPM 127 bar. No unusual amount of cuttings at shakers.
01:00 - 04:30: Continued POOH maximum drag through window 2,25 MT.
04:30 - 06:00: MU new insert bit ehp43afldk MU slick drilling BHA with motor MWD.
06:00 - 11:00: RIH ... | RIH. Drilled and oriented 8 1/2" hole from 2783 3052 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Drilled and oriented 8 1/2" hole from 2970 m 3052 m.
06:00 - 06:30: Drilled 8 1/2" hole from 3052 3057 m rotating.
06:30 - 09:30: Circulated hole clean boosted riser. Had excessive amount of cuttings over the shakers.
09:30 - 11:30: Made short trip to 2707 m RIH to TD washed down last stand to TD no prob... | Drilled 8 1/2" hole from 3052-3057 m. Circulated hole clean short tripped to 2707 m no problems on short trip. Circulated tripped for new bit BHA change. Started drilling 8 1/2" hole. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:00: Continued to TIH to 2135 m.
02:00 - 03:00: Filled drillstring. Circulated at 1985 LPM bar oriented bit to 65 deg. Right RIH through casing window.
03:00 - 04:30: Completed TIH to TD-3057 m. Washed last stand to bottom no fill.
04:30 - 06:00: Took scrs. Increase in gas to 6,9 corrected. Completed circulat... | Drilled 8 1/2" hole from 3057 3379 m. Circulated to reduce hole drag. Drilled from 3379 3390 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Drilled 8 1/2" hole from 3369 3379 m. Had increasing amount of cavings in returns.
01:30 - 03:30: Circulated until shakers cleaned-up because of increase in hole drag. Boosted riser flushed choke/kill lines. Flow rate 2500 LPM. Note excessive amount of cuttings to surface took 3 bottoms up for shakers to... | Drilled 8 1/2'' hole from 3390 3573 m. Circulating as required to clean hole |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Drilled 8 1/2'' hole from 3550 3552 m.
00:30 - 02:00: Circulated until shakers cleaned up because of increase in drag in preparation to orient. Boosted riser. Note excessive amount of large casings to surface took 2. 5 x bottoms up for shakers to clean up.
02:00 - 06:00: Drilled 8 1/2'' hole from 3552 35... | Drill to 3632m. Circ and POOH and change BHA. RIH to shoe and routine cut drilling line. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:30: Made up new bit, set ako to 1,5 degr tilt, unload MWD and m/up new jar and RIH to 1040m.
03:30 - 04:00: Fill drill pipe and test MWD. Fail to get signals from MWD. Re-boot MWD computer and got signals OK.
04:00 - 05:30: Continue RIH to 2160m.
05:30 - 06:00: Slip and cut drilling line.
06:00 - 06:30: Cont... | Continue RIH to BTM. Drilled oriented f/3632 3653m. MWD failed to communicate to surface. POOH and changed MWD. RIH to 3085m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Continue change MWD and load same. M/up new bit.
00:30 - 04:00: RIH to CSG window at 2160m. Tested MWD OK at 1000m.
04:00 - 04:30: Fill pipe and oriented tool face and enter into CSG window without obstructions.
04:30 - 06:00: Continued RIH to current depth 3085m.
06:00 - 08:00: Continued RIH to 3640m. W... | Cont RIH. Orient and drill for corepoint. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued drilling f/3752 3783m. Used constant parameters to spot drilling break.
06:00 - 08:30: Drilled 8 1/2" hole from 3783m 3799m. Drilling break 3796 3799m.
08:30 - 10:00: Circ for geological samples. Boosted riser.
10:00 - 12:30: Continued drilling from 3799m 3810m.
12:30 - 14:00: Circ for geologic... | Drill for core point, negative result. POOH, change bit, function test BOP. Continued RIH. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Continued POOH to surface.
01:30 - 02:00: Changed bit. Set ako to 0,6 degr. Function test shear ram from yellow pod.
02:00 - 02:30: Dump memory on MWD.
02:30 - 03:30: RIH to get BHA below BOP.
03:30 - 04:00: Test BOP functions from yellow pod. All OK.
04:00 - 06:00: Continued RIH to current depth 2004m. ... | Comleted bit change trip and drilled to corepoint at 3837m. Circ with positive hydrocarbons indications. POOH and picked up coring BHA. RIH. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 04:30: Cont RIH with coring BHA. Fill pipe at CSG window. RIH pass window and pull back into CSG with corebarrel, OK. Cont RIH to 3212m. Work away 15t obstruction at 3008m and 3174m. Did not get correct amount of mud in returns.
04:30 - 05:00: Break circ and filled pipe too early. Float valve not operating corr... | Completed reaming to TD. Cut core no 1 m). Currently POOH with core. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Continued cut core from 3849 3854m. Core jammed, torque dropped off and pressure degreased. Attempt to restart coring, not able to obtain torque on BTM.
01:30 - 06:00: Flow check, OK. Pump slug and POOH. Had 15t over pull at 3278 and 3269m. Flow checked inside CSG window, OK. Cont poh. Current depth at r... | POOH and laid down core no 1, 95 recovery. Made up corebarrel and RIH and cut core no 2, 3854 3881m. Start to POOH. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Continued coring from 3858 3881m. Total cut 27m.
01:30 - 02:00: Flow checked, OK. Laid down spacer pup jt. Pump slug.
02:00 - 06:00: POOH. Flow checked inside CSG window, OK. Current depth at report time, 780m.
06:00 - 09:00: Continued POOH with core no 2. Reduced speed last 400m. Held safety brief befor... | Retrived core no 2, 100 recovery. RIH and cut core no 3. Circ down gas level and poh to current depth 1412m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:00: Continued circ BTM'S up. MAX gas from coring 12,75 declined to 2,8
02:00 - 06:00: Flow checked OK. Pump slug and POOH. Flow checked inside CSG window. OK current depth at report time 1412m.
06:00 - 08:30: Continued POOH with core no 3. Flow checked at CSG window and before pulling BHA into BOP.
08:30 - 1... | Retrieved core no 3. 99,6 recovery. Cut core no 4. Circ down gas gas level and poh to current depth 1195m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:00: Circulated BTM up to clean well for coring gas. MAX gas 0,7
02:00 - 06:00: Flow checked, OK. Pump slug and POOH. Flow checked inside CSG window, OK. Current depth at report time 1195m.
06:00 - 09:00: Continued to POOH. Flow checked before pulling BHA into BOP, OK.
09:00 - 10:30: Retrieved core no 4. 96,3... | Recovered core no 4. RIH and cutted core no 5. Circulated BTM up. POOH. Started to retrieve core no 5. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued POOH. Flow checked at CSG window and before BHA entered BOP. Checked corebarrel for h2s gas, no gas present.
06:00 - 07:00: Recovered core no 5. 102 recovery. No h2s gas detected from corebarrel.
07:00 - 08:30: Made up corehead and innerbarrel, serviced corebarrel.
08:30 - 13:30: RIH with coreb... | Recovered core no 5, 102 recovery. RIH and cut core no 6. POOH and recovered core. 100,5 recovery. Changed bit and RIH to cut core no 7. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:00: Continued POOH. Flow checked, OK, before BHA entered BOP. Held restricted speed from 400m and to surface.
02:00 - 03:00: Recovered core no 6. 100. 5 recovery.
03:00 - 04:30: Made up new corehead and innerbarrel, serviced corebarrel.
04:30 - 06:00: RIH with corebarrel to 600m.
06:00 - 07:30: Continued RIH... | Continued RIH. Reamed tight hole to core point. Cutted core no 7. Started poh. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: Continued pumping and rotation up to 3820m.
01:00 - 03:30: Circulated BTM up to clean well from coring gas. MAX gas 2,9 declined to 0,15 Flow checked, OK.
03:30 - 06:00: Pumped slug. POOH with core no 7. Current depth at report time 2546 m.
06:00 - 09:30: Continued POOH with core no 7. Flow checked in CS... | Retrieved core no 7 98. 9 recovery. Laid down corbarrel. Tested BOP changed uibop and actuator. Made up drilling BHA and started RIH. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Continued to assemble and adjust lever for uibop actuator.
00:30 - 01:30: Continued test on uibop and libop to 34/345 bar 5/10 min, OK.
01:30 - 03:30: Changed MWD. Set navidrill ako to 0 degr. Load MWD and made up bit.
03:30 - 06:00: RIH to current depth 630m.
06:00 - 13:00: Continued RIH with drilling B... | Continued RIH, logged cored intervall, started drilling from 4017m to 4087m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued drilling from 4039m to 4087m. Normal amount of cuttings in returns with approx 5 small size cavings.
06:00 - 11:00: Drilled 8 1/2" hole from 4087m to 4131m.
11:00 - 15:00: Circulated and conditioned hole and mud for logging.
15:00 - 23:30: Flowchecked, pumped slug, and POOH. Dumped MWD memory. ... | Drilled 8 1/2" hole from 4087m to 4131m. Circulated for logs. POOH. R/u atlas and attempted to log. Tool stood up at 2755m. Log out of hole from 2755m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Finished r/u atlas. RIH with first log run hdil-mac-dgr-cht. Logging tool stood up at 2755m. Attempted to work past w/o success tool stood up at same place and picked up cleanly each time. Logged out from 2755m.
06:00 - 08:00: Finished logging run hdil-mac-dgr-cht. R/d logging tools.
08:00 - 17:00: R/u t... | Finished first log run. Ran VSP tool stood up at 2762m. Logged out VSP from 2762m. R/u to run logs on drill pipe. Repaired top drive. R/u and ran logs on drill pipe. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:30: Finished repairing top drive.
03:30 - 06:00: Finished r/u and began RIH with logs on drill pipe. Hdil-mac-zdl-cnd-spl-cht-vsp
06:00 - 00:00: Continued RIH with logging tools on drill pipe hdil-mac-zdl-cnd-spl- cht-vsp. Experienced problems with a discontinuous signal at 2825m 2840m.
| Logged 8 1/2" hole on drill pipe. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 04:30: Continued running logs on drill pipe. Problem with discontinuous signal from 3845m 3872m, 4018m 4024m, 4045m 4120m.
04:30 - 06:00: Began logging out of the hole with VSP.
06:00 - 15:00: Continued logging out of the hole with VSP on drill pipe.
15:00 - 23:00: RIH with logging tools on drill pipe.
23:00 - ... | Logged 8 1/2" hole on drill pipe. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued logging out of hole on drill pipe hdil-mac-zdl-cnd-spl-cnt. Some problems with bad/discontinuous signal in the beginning but it was corrected and a good log is being acquired.
06:00 - 11:30: Continued logging out of hole on drill pipe hdil-mac-zdl-cnd-spl-cht.
11:30 - 13:00: POOH with wet conne... | Logged 8 1/2" hole on drill pipe. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:30: AWS re-terminated and checked out wireline drum collector.
02:30 - 06:00: Checked tools for next logging run fmt-zdl-mac-hdip-cht. Began r/u to RIH on drill pipe.
06:00 - 08:30: R/u logging tools to run on drill pipe fmt-zdl-mac-hdip-cht.
08:30 - 18:00: Poor signal from logging tools. Dismantled and re-t... | Logged 8 1/2" hole on drill pipe. Operations suspended due for 4 hours due to industrial action. Now RIH with logging tools on drill pipe to casing window. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued RIH with logging tools on drill pipe to casing window.
06:00 - 08:00: Continued RIH with logging tools on drill pipe to 2168m of logging tool string).
08:00 - 00:00: Operations suspended due to industrial action. Meanwhile circulated at slow rate 330 LPM, 15 bar.
| RIH to 2168m with logging tools on drill pipe. Operations suspended due to industrial action. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to industrial action. Continued circulating at 330 LPM, 15 bar.
06:00 - 12:00: Operations suspended due to industrial action. Circulated at 330 LPM, 15 bar.
12:00 - 14:30: R/u wireline side entry sub and RIH with wet connector. Engaged connector. Communication and pull tested OK.... | Operations suspended due to industrial action. Continued RIH with logging tools on drill pipe. Pipe stuck with logging tools at 4123m. Worked pipe. POOH with wireline. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:30: Continued RIH with logging tools on drill pipe. Lost signal to logging tools at 3800m.
03:30 - 06:00: Pipe stuck while making up top drive. Worked pipe with no success. Atlas sheared clamp on side entry sub and POOH with wireline in order to gain rotation of drill pipe.
06:00 - 08:30: Atlas POOH with wet... | Finished POOH with wireline. Freed stuck pipe. POOH and l/d logging tools. RIH for wiper trip to condition hole for running 7" casing. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:00: Atlas continued break out and l/d logging tool string.
02:00 - 06:00: M/u bit and BHA and RIH for wiper trip to condition hole for running 7" casing.
06:00 - 06:30: Continued RIH for wiper trip to condition hole and mud for running 7" casing.
06:30 - 07:30: Cut and slipped drilling line.
07:30 - 11:00: F... | Made wiper trip to condition hole for running 7" casing. R/u to run 7" casing. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: Finished POOH. L/d drilling jar.
01:00 - 02:30: P/u sl tool bushing retrieving tool), RIH, and retrieve wear bushing discernible wear or marks).
02:30 - 04:30: M/u casing hanger with seal assembly to type st casing hanger running tool c/w SSR plugs. M/u halliburton cementing head.
04:30 - 06:00: R/u fran... | R/u and ran 7" casing. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued running 7" casing.
06:00 - 19:00: Continued running 7" casing.
19:00 - 20:30: M/u casing hanger. R/d casing handling tools and r/u to run casing on drill pipe.
20:30 - 21:00: RIH with casing on HWDP running string. Landed casing and checked datum line OK. Total mud losses running casing 6 m3.
2... | Finished running 7" casing. Circulated and cemented casing. Set seal assembly. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: Pumped 15 m3 halliburton spacer 50oe+. Gained 2 m3 m3 lost). Dropped ball and sheared out bottom plug with 100 bar.
01:00 - 02:00: Batched up and mixed and pumped 10. 1 m3 1. 80 SG cement. Dropped dart and sheared top plug with 230 bar.
02:00 - 04:30: Displaced cement. Pump rate 475 LPM, 10 mud returns. ... | Seal assembly failed to test. Attemped to reset w/o success. Pulled seal assembly. Cleaned sealing area in wellhead with mill/flush tool. Set and tested new seal assembly. Tested BOP. P/u 3 1/2" DP. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued p/u and RIH with 3 1/2" drill pipe.
06:00 - 11:00: Completed PU RIH with 3 1/2" DP to 2530 m.
11:00 - 12:00: TIH to wellhead with hang-off-tool. Secured well with middle 5" pipe rams. Back-out of h-o-t. POOH with landing string.
12:00 - 13:00: Closed blind shear rams. Tested 7" casing to 345 ba... | Well secured using hang-off-tool. 7" casing b/s rams tested to 345 bar. Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Rig operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operation suspended due to ofs strike.
| Operation suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operation suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operations suspended due to ofs strike.
| Operations suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operations suspended due to ofs strike.
06:00 - 00:00: Operation suspended due to ofs strike.
| Operation suspended due to ofs strike. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operation suspended due to ofs strike.
06:00 - 00:00: Operation suspended due to ofs strike
| Operation suspended due to ofs strike |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operation suspended due to ofs strike
06:00 - 00:00: Operation suspended due to ofs strike
| Operations suspended due to ofs strike |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Operation suspended due to ofs strike
06:00 - 17:00: Operation suspended due to ofs strike.
17:00 - 19:00: Laid out diverter running tool and spider.
19:00 - 19:30: RIH with open ended 5" DP to top of shearram.
19:30 - 21:30: Displaced riser and kill and chokelines to OBM. Verified no pressure under BOP.... | Displaced riser to OBM. Screwed into hang-off tool and circulated bottoms up. POOH. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued POOH with 3 1/2" DP to 170 m.
06:00 - 06:30: POOH from 170 m with 3 1/2" DP.
06:30 - 09:00: RIH with 4 stds of 3 1/2" DP below BOP test tool. Od on XO sub below test tool was too big to enter 7" CSG. Test plug was not seated. POOH and racked back 3 1/2" DP.
09:00 - 11:00: Unscrewed extension su... | Tested BOP. LD 5" DP from derrick. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued LD 5" DP. Laid down total 144 jts.
06:00 - 06:30: LD 5" DP from derrick.
06:30 - 10:00: Changed handling tools and MU 5 7/8" bit and 7" CSG scraper. PU 9 jts of 4 3/4" DC and 15 jts of 3 1/2" HWDP from deck and RIH.
10:00 - 14:30: RIH to 1502 m with 3 1/2" DP from derrick. Broke circulation at ... | PU 3 1/2" DP from deck. LD 5" HWDP and 6 1/2" DC. RIH to 3820 m. Worked CSG scraper. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: Continued PU 3 1/2" DP from deck. RIH to 2718 m.
01:00 - 05:30: RIH with stands to 3820 m. Broke circulation at 3000 m and 3500 m.
05:30 - 06:00: Installed XO sub and 5" pup joint. Connected top drive and worked CSG scraper over packer setting area from 3795 m to 3820 m. Pumped 850 LPM 310 bar SPP.
06:00... | RIH to pb depth. Circulated and conditioned mud. POOH. RU to RIH with SBT log. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: PU shooting nipple and RIH with same on 7" casing to 92 m.
01:00 - 02:30: Installed XO sub for wireline shieve on top drive saver sub. Changed to 45 ft bails.
02:30 - 03:30: Western atlas made up SBT CCL GR.
03:30 - 04:30: Western atlas investigated power failure on logging tool. Changed out swivel and M... | Run SBT log. Rig down wireline. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:00: Logged from 3556 m to 2592 m.
02:00 - 04:00: POOH from 2592 m with logging tool.
04:00 - 05:30: LD upper casing joint. LD logging tool and rigged down wireline.
05:30 - 06:00: Changed bails and LD hang-off sub for logging shieve.
06:00 - 08:00: L/d 7" liner shooting nipple equipment. Broke and l/d stuffi... | Rigged down logging equipment. Made clean-up/mud condition run inside 7" casing to hight tension while logging). Reduced mudweight from 1,55 SG to 1,47 SG. Started to pull out of hole. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 04:00: Circulated to condition mud, 820 LPM 300 bar. Had problems w/ unstable MW. Circ. Until even 1,47 SG.
04:00 - 06:00: POOH from 4019 m to 3200 m.
06:00 - 08:30: POOH w/ 5-7/8" bit from 3200 m to 1630 m.
08:30 - 09:30: Flushed kill-/choke lines. Circ. To condition mud LPM).
09:30 - 13:00: POOH w/ 5-7/8" bit... | Pulled out of hole with 5-7/8" bit and 7" casing scraper. Ran atlas log no. 2b mac-gr. Ran atlas perforating guns on wireline. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: R/d atlas log no. 2b mac-gr.
00:30 - 02:30: M/u atlas perforating gun assy.
02:30 - 06:00: RIH w/ atlas perforating gun assy. Ih 0235 hrs. Recorded pick-up WT as RIH 2000 m 3000 lbs, 2500 m 4000 lbs, 3000 m 5300 lbs, 3500 m 6600 lbs.
06:00 - 00:00: Ran atlas perforating gun on wireline. Fired 2 first lev... | Perforated 7" casing levels) on atlas wireline. Pulled out. Found upper 3 levels not fired. Worked to solve problem. Made up and ran in hole with atlas perforating assembly. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: Cont. POOH w/ atlas perf. Run assy. OOH 0020 hrs. Found 3 upper upper levels not fired, and lowest 2,6 m of gun assy. Left in hole.
01:00 - 02:00: Slipped cut drilling line while trouble shooting on atlas equip.
02:00 - 04:30: Worked on atlas logging equipment.
04:30 - 06:00: M/u and RIH w/ atlas perfora... | Perforated addotional 2 levels inside 7" casing 3. Level due to correlation problems). Made up schlumberger MDT tool string. Worked to solve contact problems on same. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: M/u schlumb. MDT tool string.
01:30 - 02:30: Connected cable to schlumb. MDT tool string. Tested signals. Got indic. Of contact failure in tool string.
02:30 - 06:00: Worked to solve contact failure in schlumb. MDT tool string.
06:00 - 07:30: Worked to solve contact failure in schlumb. MDT tool string. F... | Ran schlumberger MDT log on drill-pipe. Had failure on cable contact with MDT assembly. Worked to solve problem. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: Cont. Running/pumping locomotive into DP on atlas cable. Latched same onto MDT tool string.
01:00 - 01:30: Tested cable connection to schlumb. MDT tool string.
01:30 - 06:00: Had contact failure w/ packer module on schlumb. MDT tool string. Worked to solve problem. Unlatched/latched locomotive MAX. 9500 ... | Pulled out of hole with schlumberger MDT logging assembly. Changed out damaged part. Ran in hole with MDT tool string on drill pipe to 3600 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 05:00: Cont. RIH w/schlumb. MDT tool assy. On 3-1/2" DP from 1800 m to 3600 m.
05:00 - 06:00: Launched locomotive into DP, installed side-entry sub. Ran/pumped locomotive inside 3-/2" DP on atlas cable.
06:00 - 11:00: Pumped locomotive down DP on atlas cable. Latched same onto MDT tool string. Attempted to get ... | Not able to get proper signals from schlumberger MDT tool. Pulled out with same. Modified MDT tool string. Ran in hole to 3604 m. Ran locomotive on atlas wireline. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:30: Cont. RIH w/schlumb. MDT tool assy. On 3-/2" DP from 1960 m to 3604 m.
03:30 - 05:30: Launched locomotive inside 3-1/2" DP, installed side-entry sub. Ran/pumped locomotive inside DP on atlas cable. Latched same onto MDT tool assy.
05:30 - 06:00: Tested schlumb. MDT signals through atlas cable. Good test.... | Tested MDT tool. Unable to operate chamber valve. Circulated and conditioned mud. POOH. R/u atlas and RIH with perforating guns on wireline. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: L/d MDT tool.
01:30 - 06:00: R/u atlas and RIH with atlas perforating guns on wireline. Correlated gun depth and fired guns good indication of detonation. Atlas POOH.
06:00 - 08:00: POOH with atlas wireline perforating guns.
08:00 - 13:00: RIH with BOP test tool. Tested BOP to 20/345 bar to 20/240 bar) f... | POOH with atlas perforating guns. Tested BOP. R/u subsurface DST equipment. P/u DST BHA and RIH. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:30: Continued p/u DST BHA 1 stand 3-1/2" DP.
03:30 - 06:00: Filled test string with 1500 l hivis mud and diesel. Pressure tested to 345 bar.
06:00 - 06:30: Finished pressure testing DST string to 345 bar.
06:30 - 21:00: RIH w/ 3-1/2" DP test string filling with diesel as cushion.
21:00 - 21:30: Tested DST st... | RIH with DST string. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:00: Cleaned and cleared rig floor. P/u umbilical reel and control panel. Made up fluted hanger and sstt. Functioned sstt.
03:00 - 06:00: RIH with test string on 5" tubing. P/u and functioned 2 x subsea lubricator valves.
06:00 - 07:00: Continued RIH with test string.
07:00 - 09:30: Tested DST string against ... | RIH with DST string. R/u surface equipment. Pressure tested DST string and surface lines. Set packer and initiated DST of water zone. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Tested flowline to choke manifold to 345 bar.
00:30 - 01:00: Set packer at 3937m.
01:00 - 02:30: Held pre-test safety meeting. Checked surface valves lines up correctly. Tested ESD system.
02:30 - 06:00: Opened tester valve and initiated main flow period of water zone.
06:00 - 08:00: Continued main flow ... | Continued DST of water zone. RIH with bottom hole sampling tool on wireline tool failed to open. POOH with wireline. Waited on swell and heave to subside to disconnect wireline lubricator and change out sampling tools. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:30: Continued waiting for swell and heave to subside to disconnect wireline lubricator and change out bottom hole sampling tools. Rig heave 2m-3m.
03:30 - 06:00: Rig heave less than 2m. Disconnected wireline lubricator and changed out bottom hole sampling tools.
06:00 - 07:00: Installed wireline lubricator a... | RIH with bottom hole sampling tool on wireline and collected water sample. Reversed out tubing contents. Circulated tubing to seawater and attempted min-frac no injection established. Reverse circulated tubing to kill mud. R/d wireline pressure control equipment and flow head. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Attempted to establish injection down annulus packer set had not come unjayed before and reset when string was slacked off to land fluted hanger in wellhead).
00:30 - 05:00: L/d flowhead and disconnected coflex lines. Changed elevator bails.
05:00 - 06:00: Landed fluted hanger in wellhead. Opened RD circ... | Circulated bottoms up. POOH with DST string. RIH with EZSV retainer to plug water zone perforations. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: P/u 7" EZSV retainer and RIH to 2200 m.
06:00 - 12:30: Completed TIH with 7" EZSV to 3940 m.
12:30 - 13:30: Crown-mounted-compensator wouldn't unlock cmc hydraulic valve was stuck in closed position. Troubleshooted system until valve was freed cmc unlocked.
13:30 - 17:30: Attempted to set EZSV at 3940 m ... | Completed TIH with 7" EZSV. Had problems setting finally set at 3947 m. Tested EZSV. C&c mud. POOH with EZSV setting tool& DP. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Completed POOH with EZSV mechanical setting tool. Performed weekly function test of bops when setting tool locatedø480m. Function tested on yellow pod from toolpusher's office.
06:00 - 08:00: PU used sstt broke-out associated tubulars. LD sstt PU back-up sstt. MU associated tubulars LD on pipe rack for p... | Perforated DST zone using electric line. MU started running DST string. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:30: Completed MU DST BHA. Tested to 345 bar for 10 minutes.
02:30 - 06:00: Continued running DST string PU/MU 3 1/2" ph-6 tubing for testing. Filling tubing with base oil every 7 joints. 38 joints PU/MU as of report time.
06:00 - 00:00: Continued running DST string PU/MU 3 1/2" ph-6 tubing for testing. Filli... | Completed PU/MU 3 1/2" tubing. Landed string in wellhead and correlated with AWS/MWS wireline equipment. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Completed p/u and m/u 3 1/2" tubing. Ran a total of 358 jts.
01:30 - 03:00: M/u dummy fluted HGR. And RIH on 5" DP. Landed in wear bushing. Closed MPR to mark pipe.
03:00 - 06:00: R/u AWS and mws. Ruh with GR/CCL and correlated depth.
06:00 - 07:00: POOH with electric line after correlation run. RD atlas... | RD electric line after making correlation run. Spaced-out DST string. MU sstt continued running DST string-testing as per plan. RU flow head landed-out hanger. Continued pressure testing. Set packer. Closed MPR. Checked for correct valving line-up. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: Completed RU flowhead.
01:00 - 04:00: Landed fluted hanger into wear bushing. Test flowhead, test string, testing equipment as per test procedure.
04:00 - 06:00: Established weights PU 122 MT so 82 MT. Set 7" RTTS packer ø 3799 m. Landed hanger back into wear bushing. Closed MPR. Checked that surface val... | Opened flowed well. Shut-in for downhole pressure build-up test. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:00: Verified that LPR-N valve wasn't leaking. Closed lower lubricator valve performed 10 minute in-flow test. Closed upper lubricator valve. Bled pressure off of surface lines through choke manifold flushed lines to stock tank with seawater.
02:00 - 04:00: While continuing with shut-in pressure build-up test... | Completed shut-in build-up test. Performed bottom-hole-sampling operations via electric line. Started mini-frac operations. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: Completed POOH with bhs electric line.
01:00 - 04:00: RD bhs toolstring. Analyzed/checked samplers for acceptable samples.
04:00 - 06:00: Start performing mini-frac by pumping/bullheading seawater/polymer down test string.
06:00 - 09:00: Continued with mini-frac job using cement unit. Pump rate decreased... | Completed mini-frac job. Perforated upper test zone from 3826-3865 m. Flowed/tested well. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Flowed/tested well on main flow.
06:00 - 00:00: Flowed/tested well on main flow period.
| Flowed/tested well. |
Daily Drilling Reports (DDRs) from Volve field, released by Equinor, consisting of 1759 files. The original files were in WITSML format, but this dataset was converted into Alpaca format for text summarization.
Train set (1596 examples) consists of all the DDRs from 1980 onwards until the end of field, with the exception of the drilling campaigns in 2016. Test set (163 examples) consists of all DDRs from the last few drilling campaigns in 2016 only.