_id stringlengths 30 67 | title stringclasses 196
values | text stringlengths 31 8.3k | metadata dict | image null |
|---|---|---|---|---|
ECSS-P-00C(22March2013)-page=1 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
ECSS
Standardization objectives, policies
and organization
ECSS Secretariat
ESA-ESTEC
Requirements & Standards Division
Noordwijk, The Netherlands | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 1
} | null |
ECSS-P-00C(22March2013)-page=2 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
2
Foreword
This document (ECSS-P-00C) presents the objectives, policy and organization of ECSS together with
its architecture and documents.
This Standard has been prepared by the ECSS Technical Authority and approved by the ECSS
Steering Board.
Published by:
ESA Requirements and Stan... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 2
} | null |
ECSS-P-00C(22March2013)-page=3 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
3
Change log
ECSS-P-00A
4 April 2000
First issue
ECSS-P-00B
Never published
ECSS-P-00C
22 March 2013
Second issue
-
ECSS objectives and policies updated, in particular the following
was added:
o
Concepts of Handbook, Technical Memorandum and
Adoption Notice
o
Policy for est... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 3
} | null |
ECSS-P-00C(22March2013)-page=4 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
4
Table of contents
Change log ................................................................................................................. 3
Introduction ................................................................................................................ 6
1 Scope ......... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 4
} | null |
ECSS-P-00C(22March2013)-page=5 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
5
6.1.3
Associates ................................................................................................ 17
6.1.4
Observers ................................................................................................. 18
6.1.5
Accession by new participating organizations ... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 5
} | null |
ECSS-P-00C(22March2013)-page=6 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
6
Introduction
Standardization is an important tool to reduce risks, cost and improve both
quality and communication between parties during the preparation and
execution of programmes. European Space Agencies and industry have in the
past individually developed standards and applied them... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 6
} | null |
ECSS-P-00C(22March2013)-page=7 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
7
1
Scope
1.1
General
This document states the objectives, policies and organisational structure for
establishing, implementing, and maintaining a coherent set of standards for
space systems development and operation, created through the European
Cooperation for Space Standardization.... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 7
} | null |
ECSS-P-00C(22March2013)-page=8 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
8
3
Terms, definitions and abbreviated terms
3.1
Terms and definitions from other documents
Standardized definition of terms for the ECSS Standards are defined in
ECSS-S-ST-00-01 “ECSS system - Glossary of terms”.
For example, the following terms, defined in ECSS-S-ST-00-01, apply to t... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 8
} | null |
ECSS-P-00C(22March2013)-page=9 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
9
3.2.4
ECSS developer documents
set of internal ECSS documents defining the organisational structures, roles and
responsibilities, processes and rules required to define and implement the ECSS
policy and to develop, publish and maintain the documents that make up the
ECSS system
3.2.5... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 9
} | null |
ECSS-P-00C(22March2013)-page=10 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
10
4
ECSS objectives
European Cooperation for Space Standardization (ECSS) goal is to provide a set
of documents, which have the overall objectives to:
•
be recognized and accepted by the European space community for use in
space programmes/projects;
•
achieve more cost effective spa... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 10
} | null |
ECSS-P-00C(22March2013)-page=11 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
11
5
ECSS policies
5.1
General
In order to meet the objectives stated in clause 4, the ECSS policy is to:
•
produce an integrated and coherent set of management, engineering,
product assurance and space sustainability standards
covering all activities, phases and levels for the de... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 11
} | null |
ECSS-P-00C(22March2013)-page=12 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
12
5.2
Policy for establishing ECSS System
5.2.1
General
The core of the ECSS System is the complete set of ECSS standards.
Standards can be developed entirely within ECSS or in cooperation with other
SDOs.
ECSS standards can be supported/complemented by HBs and TMs.
5.2.2
Policy fo... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 12
} | null |
ECSS-P-00C(22March2013)-page=13 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
13
5.2.2.2
Policy for establishing ECSS handbooks
ECSS policy is to ensure that ECSS Handbooks:
•
are developed when need exists to support the application of ECSS
standard(s);
•
describe solution that comply with existing ECSS requirement(s).
5.2.2.3
Policy for using documents deve... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 13
} | null |
ECSS-P-00C(22March2013)-page=14 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
14
5.3
Policy for application of the ECSS System
ECSS documents are made applicable to a project only through a legal
document such as business agreement (e.g. contract) and/or internal directives.
When made applicable:
•
it is the responsibility of the party imposing a particular stan... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 14
} | null |
ECSS-P-00C(22March2013)-page=15 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
15
•
Nomination of Document and Discipline Focal Points to support the
Technical Authority for correct understanding and application of the
standards and assessment of feedback and Change Requests.
5.5
Policy for certification and training
5.5.1.1
Certification
ECSS neither provides ... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 15
} | null |
ECSS-P-00C(22March2013)-page=16 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
16
5.8
Policy for use of ECSS System by non-ECSS
members
The European Space Agency, on behalf of the participating members, holds
copyright for all ECSS documents. No ECSS document may be reproduced in
any form without the explicit consent of ESA. However, this consent is granted
to EC... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 16
} | null |
ECSS-P-00C(22March2013)-page=17 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
17
6
ECSS organization
6.1
Participation
6.1.1
General
ECSS is open to participation from all European space sector and associated
organizations. Participating entities in ECSS can have a role of Members,
Associates or Observers.
Agreement to work in the interest of ECSS, to pursue ... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 17
} | null |
ECSS-P-00C(22March2013)-page=18 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
18
implement ECSS system in their respective projects when applicable for those
documents whose preparation they were involved in.
Associates are encouraged to provide feedback on their use of the ECSS
standards by CR’s or other means.
Associates will be given access to specific ECSS bod... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 18
} | null |
ECSS-P-00C(22March2013)-page=19 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
19
6.1.7
Change of status
A participating organization may change its status according to the following
rules:
a.
For changing status from Observer to either Associate or Full Member or
from Associate to Full Member, the principles laid down in 6.1.5 shall be
followed.
b.
For changi... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 19
} | null |
ECSS-P-00C(22March2013)-page=20 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
20
Steering
Board (SB)
Technical
Authority (TA)
Executive
Secretariat (ES)
Network of
Experts (NoE)
Steering
Board (SB)
Executive
Secretariat (ES)
Technical
Authority (TA)
Network of
Experts (NoE)
Working
Group
W
G
W
G
Working
Group
Working
Group
Working
G... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 20
} | null |
ECSS-P-00C(22March2013)-page=21 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
21
6.2.2.3
Executive Secretariat (ES)
The mission of the ES is composed of four items:
•
Programme function in support to TA to:
build the Work-plan to be endorsed by the SB (e.g. programmatic,
resources);
monitor and support the implementation of the Work-plan
including final... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 21
} | null |
ECSS-P-00C(22March2013)-page=22 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
22
of achieving consensus of the voting members (i.e. full members).
2.
If consensus as stated in a.1 above cannot be achieved, decisions
are made by the vote of the full members, with a simple majority
subject that a quorum of 50% of the voting rights is reached.
Votes are weighted in... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 22
} | null |
ECSS-P-00C(22March2013)-page=23 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
23
7
ECSS Documentation
7.1
Overview
ECSS documentation is divided into 2 categories:
•
Documents for developers of standards specifying objectives, policies,
processes, rules, standard forms;
•
Documents for users, composed of standards and supporting documents,
which collectively... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 23
} | null |
ECSS-P-00C(22March2013)-page=24 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
24
The present document (ECSS-P-00: Standardization policy) is the highest level
document providing objectives and policies applicable to the development,
maintenance and deployment of standards, handbooks and technical
memoranda, and defining the ECSS structure. The cooperation agreement... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 24
} | null |
ECSS-P-00C(22March2013)-page=25 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
25
ECSS-S-ST-00
ECSS System – Description, implementation
and general requirements
ECSS-ST-00-01
ECSS System – Glossary of terms
ECSS M Standards, HBs and TMs
External standards or handbooks “adopted”
or called up by ECSS documents
ECSS U Standards, HBs and TMs
ECSS E Standards, HBs and TM... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 25
} | null |
ECSS-P-00C(22March2013)-page=26 | ECSS-P-00C(22March2013) | ECSS-P-00C
22 March 2013
26
Bibliography
ECSS-D-00
ECSS – ECSS processes
ECSS-D-00-01
ECSS - Drafting rules and template for ECSS Standards
ECSS-D-00-02
ECSS - Drafting rules and template for ECSS Handbooks
ECSS-S-ST-00
ECSS system - Description, implementation and general
requirements
ECSS-S-ST-00-01
ECS... | {
"document_id": "ECSS-P-00C(22March2013)",
"page_number": 26
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=1 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Space product
assurance
Crimping of high-reliability electrical
connections
ECSS Secretariat
ESA-ESTEC
Requirements & Standards Division
Noordwijk, The Netherlands
Corrigendum 1
The following editorial errors were identified in the published version of this
document ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 1
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=2 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Foreword
This Standard is one of the series of ECSS Standards intended to be applied together for the
management, engineering and product assurance in space projects and applications. ECSS is a
cooperative effort of the European Space Agency, national space agencies and Europea... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 2
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=3 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Change log
ECSS-Q-70-26A
13 February 2001
First issue
Transforming ESA PSS-01-726 into an ECSS Standard
ECSS-Q-70-26B
Never issued
ECSS-Q-ST-70-26C
31 July 2008
Second issue
Changes to ECSS-Q-70-26A are:
• Redrafting of ECSS-Q-70-26A in conformance with ECSS drafting ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 3
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=4 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Added requirements:
5.1.2.1i; 5.1.2.2f; 5.2.1k; 5.2.4g-h; 5.2.5g-i; 5.2.6d-f (where f was moved
from 5.2.6c); 5.2.7i-j; 5.3.1d-g; 5.3.2d-e; 5.3.4.1a; 5.3.4.2a-c; 5.4.3.1e;
5.4.3.2c-e; 5.4.3.3b; 5.4.3.4a-e; 5.4.3.5a-c; 5.4.4j; 5.5.2.2e; 5.5.4.3a-c; 5.5.5k-o;
5.5.9a-l.
Modi... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 4
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=5 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Table of contents
Change log ................................................................................................................. 3
1 Scope ....................................................................................................................... 8
2 N... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 5
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=6 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.4.2
<<deleted>> .............................................................................................. 29
5.4.3
Tensile strength ........................................................................................ 30
5.4.4
Metallography ............................ | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 6
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=7 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Figure A-5 : Four-indent crimp (dispersive) ........................................................................... 47
Figure A-6 : Typical test fixture for testing lug and splice crimps ........................................... 52
Tables
Table 5-1: Equipment for verifi... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 7
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=8 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
1
Scope
This Standard specifies:
•
Requirements for the following crimping wire connections intended for
high reliability electrical connections for use on spacecraft and associated
equipment operating under high vacuum, thermal cycling and launch
vibration:
removable c... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 8
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=9 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Normal socket
Normal male
Enlarged socket
Enlarged male
MDM socket
MDM male
Coax socket
Coax male
Power socket
Power male
Butt splice
Parallel splice
Lug
Figure 1-1: Example of interconnections described in this Standard
9 | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 9
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=10 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
2
Normative references
The following normative documents contain provisions which, through
reference in this text, constitute provisions of this ECSS Standard. For dated
references, subsequent amendments to, or revisions of any of these publications
do not apply. However, par... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 10
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=11 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
3
Terms, definitions and abbreviated terms
3.1
Terms defined in other standards
a.
For the purpose of this Standard, the terms and definitions from
ECSS-S-ST-00-01 apply, in particular for the following terms:
1.
acceptance
2.
analysis
3.
batch
4.
component
5.
conf... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 11
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=12 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
NOTE 3
Crimping tool based on the combination of tool
reference, setting and locator (when necessary).
3.2.3
crimping tool
mechanical ratcheting tool used for permanently attaching a wire connection
device to a conductor by pressure deformation or by reshaping the barrel
ar... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 12
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=13 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
3.4
Nomenclature
The following nomenclature applies throughout this document:
a.
The word “shall” is used in this Standard to express requirements. All
the requirements are expressed with the word “shall”.
b.
The word “should” is used in this Standard to express recommendat... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 13
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=14 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
4
Principles
This Standard is structured such that the necessary level of quality is achieved,
consistently maintained and high reliability of the end product assured. The
following principles are covered:
•
Preparatory conditions to determine the availability of facilities,... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 14
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=15 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5
Requirements
5.1
Preparatory conditions
5.1.1 Facilities
5.1.1.1 Overview
The requirements in this clause can generally be met by using cleanrooms. It is
not, however, mandatory to use a cleanroom.
NOTE
Depending on supplier and customer business
agreement.
5.1.1.2 F... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 15
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=16 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
c.
The workstations shall not be exposed to draughts.
d.
Fresh air shall be supplied to the room through a filtering system with
positive pressure difference with regard to adjacent rooms.
e.
The exhaust air shall be suitably restricted.
5.1.1.4 Lighting requirements
a.
T... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 16
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=17 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Contact crimping tool
Splice-lug crimping tool
Figure 5-1: Example of crimping tools
5.1.2.2 Insulation strippers
a.
The supplier shall provide the tooling necessary to avoid damage to the
conductor.
b.
The selection of thermal or precision cutting devices, manual or... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 17
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=18 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.1.2.3 Cutting pliers
a.
The supplier shall provide the tooling necessary for precision wire
trimming and cutting.
b.
The cutter used for trimming conductor wire shall shear sharply and
consistently to produce a clean, flat, smooth-cut surface along the entire
cut edge.
... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 18
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=19 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
f.
All conductor strands shall be inserted cleanly into the barrel without
any buckling.
g.
Strands shall not be left outside or cut back to reduce the conductor
diameter to fit an undersized barrel.
h.
The supplier shall use tools as specified in SAE-AS-22520 for the cri... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 19
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=20 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.2.3 Process review and documentation
a.
The supplier shall perform a review of all the materials, tools and
techniques planned to be used to ensure conformance to requirements of
this standard and as a means of identifying potential problems.
NOTE
Type of wire includes b... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 20
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=21 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Figure 5-2: Example of a typical connector barrel and single wire crimping
5.2.5 Contact barrel and multiple wire crimping
a.
Requirements of this clause shall be applied when single multistranded
wire crimping cannot be used.
b.
The maximum number of wires in one c... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 21
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=22 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
barrel and multi-wire crimping is shown in
Figure 5-3.
f.
For separate conductors introduced straight into the barrel the following
shall apply:
1.
the actual strength measurement is performed on one of the wires
(the smaller, if two different sizes are used);
2.
the axi... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 22
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=23 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.2.6 Ferrule shield crimping
a.
The shielding on coaxial cables shall be ensured by braided strands.
b.
Axial strength measurements shall be performed in compliance with
requirements from clause 5.4.3.3.
c.
<<deleted, moved to 5.2.6f>>
d.
Only one braided shield shall ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 23
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=24 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
f.
Axial strength measurements shall be performed in compliance with
requirements from clause 5.4.3.3.
g.
<<deleted>>
h.
Figure A-6Following crimping, the assembly shall be protected by shrink
tubing.
NOTE
Examples of typical lug and splice wire
crimpings are shown in ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 24
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=25 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Butt splice crimping
Two sided parallel splice crimping
One side parallel splice crimping
Figure 5-5: Examples of typical lug and splice wire crimping (1 of 2)
25 | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 25
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=26 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Crimping of lug
Crimping of lug with filler wire
Microgaph of crimping of lug with filler wire
Figure 5-6: Examples of typical lug and splice wire crimping (2 of 2)
5.3
Requirements for crimp configuration qualification
5.3.1 General
a.
All crimp configuratio... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 26
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=27 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
e.
The supplier shall ensure that the selected materials are qualified for the
mission environment.
f.
In case the mission environment exceeds the temperature range for
which the materials are qualified, a qualification shall be performed and
agreed with the customer
NOTE ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 27
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=28 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
NOTE
Figure 5-7 presents a flow chart of the
Qualification process test procedure of clause
5.3.2.
Wire / braid
under ESCC specification?
Wire / braid
intrinsic tensile strength already
characterized?
Wire / braid
intrinsic tensile strength already
characterized?
YES
NO ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 28
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=29 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.3.3 Sealing and marking
a.
The supplier shall seal and mark calibrated tools in conformance with
clause 5.5.6.3 requirements.
5.3.4 Batch to batch variation
5.3.4.1 Wires qualified by ESCC
a.
For wires qualified by ESCC the qualified tool set-up may be used
without addit... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 29
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=30 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.4.3 Tensile strength
5.4.3.1 General
a.
The supplier shall use a tensile testing device with characteristics in
conformance with Table 5-1.
b.
The connections shall be loaded until failure occurs.
c.
The value at failure shall be recorded, together with the information... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 30
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=31 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
c.
In the case of different wire sizes crimped into the same barrel axial
strength measurements shall be performed on only one wire per sample
from the smallest gauge
d.
In the case where opposed wires are tested a specifically designed test
fixture shall be used.
NOTE
... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 31
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=32 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
f.
This section shall then be polished with successively finer grades of
diamond paste down to 1 µm.
g.
To aid microscopic examination, the polished section shall be very lightly
etched with an accepted chemical reagent specific to the composition of
the materials being cri... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 32
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=33 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.5.2.2 Certification
a.
<<deleted>>
b.
The certification of personnel shall be based upon objective evidence of
crimp quality, resulting from test and inspection of the crimped joints.
c.
Operators or inspectors shall be re-certified in cases of repeatedly
unacceptable q... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 33
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=34 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Figure 5-8: Quality control during crimping operation
Personnel trained and certified
(in conformance with clause 5.5.2)
Control of compatibility of parts,
crimping and stripping tools
(in conformance with clauses 5.1.2.1
and 5.1.2.2)
Crimp configuration qualified ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 34
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=35 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.5.3 Workmanship
a.
The supplier shall prepare standards consisting of satisfactory work
samples (in conformance with the Figure 5-9 and Figure 5-10)
b.
The supplier shall have readily available visual aids, which clearly
illustrate the quality characteristics of all crimpe... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 35
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=36 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Figure 5-9: Visible workmanship standards
36 | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 36
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=37 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Unacceptable: undercrimp
Limit of acceptability: void 10 %
Acceptable: preferred
Not acceptable: overcrimp
A
Figure 5-10: Workmanship examples and crimp micro-sections
5.5.4 Visual inspection
5.5.4.1 Pre-crimp inspection (performed by the operator)
a.
The wire shal... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 37
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=38 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.5.4.2 Post-crimp inspection (performed by quality
assurance)
a.
The QA inspector shall carry out inspection with the use of a binocular
microscope having a minimum linear magnification of ×7.
NOTE
Further examination of surface characteristics
can be performed at higher... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 38
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=39 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.5.5 Shift performance inspection and test for
harness manufacturing
a.
<<deleted>>
b.
<<deleted>>
c.
<<deleted>>
d.
<<deleted>>
e.
<<deleted>>
f.
<<deleted>>
g.
<<deleted>>
h.
<<deleted>>
i.
<<deleted>>
j.
<<deleted>>
k.
Prior to the start of a new harness... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 39
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=40 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
1.
At the start of each new shift cleanliness control of the active part
of the tool and “go/no-go” checks are performed,
2.
Crimping tools which are used for less than 500 crimps per week
shall be revalidated after each 500 crimp operations or 2 months
whichever is earlier ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 40
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=41 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
c.
The QA organization of the supplier shall notify the customer of the
nonconformance details.
d.
The supplier’s calibration procedure shall include the requirements
specified in this clause for tool calibration.
5.5.6.2 Validation
a.
The QA organization of the supplier s... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 41
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=42 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
c.
Quality records and logbooks shall contain the following information:
1.
the as-built and test configuration list (waiver and deviation
summary);
2.
nonconformance reports and corrective actions;
3.
copy of the visual inspection and performance test results with
refere... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 42
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=43 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
1.
prepare four samples at the beginning of a shift or before a series
of crimping operations of which:
(a)
three samples are submitted to the tensile strength test as
specified in the requirements from the clause 5.4.3, and
(b)
the fourth sample is retained for reference a... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 43
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=44 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Tools preparation per 5.5.5k
Preparation and test of 4 samples per tool
in compliance with 5.5.5l at beginning of
the manufacturing of a new harness.
“Go/no-go” check is done at beginning of
each shift per 5.5.5m.1
Are more than 500 crimps
performed with the tool in a
week?
... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 44
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=45 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
5.6
Document requirements
a.
The supplier shall produce documentation for:
1.
Process identification, in a PID or a specific internal procedure and
RFA,
2.
Inspection,
3.
Traceability,
4.
Testing, both procedures and records,
5.
Logbooks, and
6.
Calibration.
b. ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 45
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=46 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Annex A (informative)
Crimp configurations and tools
A.1
Overview of crimp configurations
Many crimp interconnection technologies are currently available for space
applications. Confined or compactive crimps are made by a tool, which exerts
an even pressure around the recept... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 46
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=47 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Figure A-1: Confined irregular-octagon crimp (compactive)
Figure A-2: Dimpled confined octagon crimp (compactive)
Figure A-3: Regular-hexagon crimp (compactive)
Figure A-4: Semicircular one- or two-indent crimp (dispersive)
Figure A-5: Four-indent crimp (dispersive) ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 47
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=48 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
A.2
Typical settings of crimping tools
For the type of crimping covered in this Standard typical tool selector settings
are applicable. Those are, however, only indicative and require effective
calibration or validation before use for production of high-reliability crimps, in ... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 48
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=49 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
26
22 - 22
2
-
-
28
22 - 22
1
-
-
DBAS 3401-008 connector family
12
12 - 12
-
8
-
14
12 - 12
-
7
-
16
16 - 16
-
6
-
18
16 - 16
-
5
-
20
16 - 16
4
-
20
20 - 20
7
-
-
22
20 - 20
6
-
-
24
20 - 20
5
-
-
26
20 - 26
6
-
-... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 49
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=50 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Table A-3: Guideline for selector setting – Four-indent crimp (dispersive) – Two different
wires
Connector
Wire gauge
(AWG)
Wire barrel
contact size
Crimping tool / Selector setting
M22520/2-01 M22520/1/01
M300-BT
D*SUB
3401-002 connector family
-
8 - 8
-
-
-
... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 50
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=51 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Table A-6: Guideline for die selection – Regular hexagon (compactive ) – Ferrule coaxial
shield crimp
Coaxial sort
Coaxial
cable
reference
M22520/5-01 Crimping tool
Die / Slot selection
M22520/10-01 Crimping
tool Die / Slot selection
D*SUB
3401-002 connector
family
RG... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 51
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=52 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Figure A-6: Typical test fixture for testing lug and splice crimps
52 | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 52
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=53 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Annex B (informative)
Examples of typical ultimate axial strength
Examples of typical values of intrinsic wire strength of ESCC qualified wires and presented in the Table B-1.
Table B-1: Typical ultimate axial strength for compactive and dispersive crimped joints manufactured u... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 53
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=54 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
AWG
Number and size of strands (∅ in mm)
Conductor
section in mm2
Minimum tensile resistance for
crimps with the following
composition
Kapton
Tefzel
Teflon/Kapton
Silver-plated
Silver-plated
10
-
-
-
5,30
850 N
-
8
-
-
-
8,98
1500 N
-
6
-
-
-
13,4
23... | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 54
} | null |
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=55 | ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017) | ECSS-Q-ST-70-26C Rev.1
15 March 2017
Bibliography
ECSS-S-ST-00
ECSS system — Description and implementation
and general requirements
55 | {
"document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)",
"page_number": 55
} | null |
ECSS-E-ST-10-09C(31July2008)-page=1 | ECSS-E-ST-10-09C(31July2008) | ECSS-E-ST-10-09C
31 July 2008
Space engineering
Reference coordinate system
ECSS Secretariat
ESA-ESTEC
Requirements & Standards Division
Noordwijk, The Netherlands | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 1
} | null |
ECSS-E-ST-10-09C(31July2008)-page=2 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
Foreword
This Standard is one of the series of ECSS Standards intended to be applied together for the
management, engineering and product assurance in space projects and applications. ECSS is a
cooperative effort of the European Space Agency, nationa... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 2
} | null |
ECSS-E-ST-10-09C(31July2008)-page=3 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
Change log
ECSS‐E‐ST‐10‐09A
Never issued
ECSS‐E‐ST‐10‐09B
Never issued
ECSS‐E‐ST‐10‐09C
31 July 2008
First issue
3 | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 3
} | null |
ECSS-E-ST-10-09C(31July2008)-page=4 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
Table of contents
Change log.................................................................................................................3
Introduction................................................................................................................7
1 Scope............ | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 4
} | null |
ECSS-E-ST-10-09C(31July2008)-page=5 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
5.3.2
Notation ......................................................................................................18
5.3.3
Figures........................................................................................................18
5.4
Technical requirements ................... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 5
} | null |
ECSS-E-ST-10-09C(31July2008)-page=6 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
C.6 IAU/IAG Working Group on Cartographic Coordinates and Rotational
Elements (WGCCRE)...............................................................................................36
References .............................................................................................. | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 6
} | null |
ECSS-E-ST-10-09C(31July2008)-page=7 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
Introduction
Clear definition of reference directions, coordinate systems and their inter‐
relationships is part of the System Engineering process. Problems caused by
inadequate early definition, often pass unnoticed during the exchange of
technical informa... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 7
} | null |
ECSS-E-ST-10-09C(31July2008)-page=8 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
1
Scope
The objective of the Coordinate Systems Standard is to define the requirements
related to the various coordinate systems, as well as their related mutual inter‐
relationships and transformations, which are used for mission definition,
engineering, verification, oper... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 8
} | null |
ECSS-E-ST-10-09C(31July2008)-page=9 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
2
Normative references
The following normative documents contain provisions which, through
reference in this text, constitute provisions of this ECSS Standard. For dated
references, subsequent amendments to, or revisions of any of these
publications, do no... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 9
} | null |
ECSS-E-ST-10-09C(31July2008)-page=10 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
3
Terms, definitions and abbreviated terms
3.1
Terms from other standards
For the purpose of this Standard, the terms and definitions from
ECSS‐S‐ST‐00‐01 apply.
NOTE 1
Some terms are taken from other documents,
referenced in square brackets in the References.
NO... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 10
} | null |
ECSS-E-ST-10-09C(31July2008)-page=11 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
3.3
Abbreviated terms
For the purpose of this Standard, the abbreviated terms from ECSS‐S‐ST‐00‐01
and the following apply:
Abbreviation
Meaning
AIT
assembly integration and test
AIV
assembly integration and verification
BCRS
barycentric celestial reference system
BIPM
Bure... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 11
} | null |
ECSS-E-ST-10-09C(31July2008)-page=12 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
TT
terrestrial time
UTC
coordinated universal time ‐temps universel coordonné
WGCCRE
Working Group on Cartographic Coordinates and
Rotational Elements
w.r.t.
with respect to
12 | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 12
} | null |
ECSS-E-ST-10-09C(31July2008)-page=13 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
4
Objectives, process and principles
4.1
General
This
Clause
provides
the
background
to
the
requirements
and
recommendations stated in Clause 5, from the conceptual, process and technical
points of view.
4.2
Concepts and processes
4.2.1
Process
The coordinate systems u... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 13
} | null |
ECSS-E-ST-10-09C(31July2008)-page=14 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
The main mission chain typically includes inertial, rotating planet‐centred
orbital, spacecraft mechanical, instrument and product (i.e. post‐processing
related) coordinate systems.”
4.2.4
Notation
Experts working together within a project need to have a com... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 14
} | null |
ECSS-E-ST-10-09C(31July2008)-page=15 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
important, even when the nominal translation is assumed to be the null vector.
A theoretically null translation can later, in the project life or in more precise
calculations, become non‐null.
Quaternions, Euler angles, mechanical and other parameters can be used to
describ... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 15
} | null |
ECSS-E-ST-10-09C(31July2008)-page=16 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
5
Requirements
5.1
Overview
This clause contains process requirements, covering the management and
utilisation of coordinate systems throughout the life cycle of space missions;
general requirements, covering applicability, terminology, notation, figures and
illu... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 16
} | null |
ECSS-E-ST-10-09C(31July2008)-page=17 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
NOTE
Subsystems (or organisations) are free to make
specifications within their area of responsibility, so
long as the specific (internal) coordinate system or
time scale is not used by another subsystem (or
organisation).
c.
For a spacecraft project, a prelimi... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 17
} | null |
ECSS-E-ST-10-09C(31July2008)-page=18 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
5.3.2
Notation
a.
A coordinate system shall be identified by a unique descriptive name.
b.
Recognised international names should not be used if the exact definition
is not followed.
NOTE
E.g. the name “Pseudo True of Date” can be used if
the conventional definition of ToD ... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 18
} | null |
ECSS-E-ST-10-09C(31July2008)-page=19 | ECSS-E-ST-10-09C(31July2008) | ECSS‐E‐ST‐10‐09C
31 July 2008
5.4
Technical requirements
5.4.1
Frame
a.
The origin of the frame shall be specified.
b.
The derivation of the origin of a frame from reference points shall be
defined.
c.
The derivation of the axes of a frame from reference directions shall be
defined.
d.
The ax... | {
"document_id": "ECSS-E-ST-10-09C(31July2008)",
"page_number": 19
} | null |
End of preview. Expand in Data Studio
ECSS-1.0 Dataset
Dataset Summary
This dataset provides a focused benchmark for retrieval and generation tasks related to ECSS (European Cooperation for Space Standardization) documents. It includes a set of documents, queries, relevance judgments (qrels), and page images.
- Number of Documents: 196
- Number of Queries: 67
- Number of Pages: 22700
- Number of Relevance Judgments (qrels): 89
- Average Number of Pages per Query: 1.3
Dataset Structure (Hugging Face Datasets)
The dataset is structured into the following subsets:
corpus: Contains page-level information:_id: A unique identifier for this specific page within the corpus.title: The title of the document.text: The text of the document.
queries: Contains query information:_id: Unique identifier for the question.query_text: The question text.relevant_document_ids: A list of corpus documents considered as references for this question, each reference containing:corpus_id: The document identifier.score: The importance or relevance score.
Usage Examples
You can load the datasets using the load_from_disk function from the datasets library. Replace the paths with the actual locations on your machine.
from datasets import load_dataset
dataset_queries_test = load_dataset("FOR-sight-ai/ECSS-1.0", "queries", split="test")
Results
| Model Name | nDCG@10 |
|---|---|
| bm25 | 0.43 |
| bge-large-en-v1.5 | 0.44 |
| nomic-embed-multimodal-3b | 0.59 |
| colqwen2.5-v0.2 | 0.68 |
Citation
If you use this dataset in your research or work, please cite:
@misc{ecssbenchmark2025,
title={ECSS RAG benchmark},
author={Francois Lancelot and Nawal Ould Amer and Benjamin Fourreau and Catherine Kobus and Marion-Cécile Martin},
primaryClass={cs.IR},
year={2025},
}
- Downloads last month