ECSS-P-00C(22March2013)-page=1
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 ECSS Standardization objectives, policies and organization ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 1 }
null
ECSS-P-00C(22March2013)-page=2
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 2 Foreword This document (ECSS-P-00C) presents the objectives, policy and organization of ECSS together with its architecture and documents. This Standard has been prepared by the ECSS Technical Authority and approved by the ECSS Steering Board. Published by: ESA Requirements and Stan...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 2 }
null
ECSS-P-00C(22March2013)-page=3
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 3 Change log ECSS-P-00A 4 April 2000 First issue ECSS-P-00B Never published ECSS-P-00C 22 March 2013 Second issue - ECSS objectives and policies updated, in particular the following was added: o Concepts of Handbook, Technical Memorandum and Adoption Notice o Policy for est...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 3 }
null
ECSS-P-00C(22March2013)-page=4
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 4 Table of contents Change log ................................................................................................................. 3 Introduction ................................................................................................................ 6 1 Scope .........
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 4 }
null
ECSS-P-00C(22March2013)-page=5
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 5 6.1.3 Associates ................................................................................................ 17 6.1.4 Observers ................................................................................................. 18 6.1.5 Accession by new participating organizations ...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 5 }
null
ECSS-P-00C(22March2013)-page=6
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 6 Introduction Standardization is an important tool to reduce risks, cost and improve both quality and communication between parties during the preparation and execution of programmes. European Space Agencies and industry have in the past individually developed standards and applied them...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 6 }
null
ECSS-P-00C(22March2013)-page=7
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 7 1 Scope 1.1 General This document states the objectives, policies and organisational structure for establishing, implementing, and maintaining a coherent set of standards for space systems development and operation, created through the European Cooperation for Space Standardization....
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 7 }
null
ECSS-P-00C(22March2013)-page=8
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 8 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions from other documents Standardized definition of terms for the ECSS Standards are defined in ECSS-S-ST-00-01 “ECSS system - Glossary of terms”. For example, the following terms, defined in ECSS-S-ST-00-01, apply to t...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 8 }
null
ECSS-P-00C(22March2013)-page=9
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 9 3.2.4 ECSS developer documents set of internal ECSS documents defining the organisational structures, roles and responsibilities, processes and rules required to define and implement the ECSS policy and to develop, publish and maintain the documents that make up the ECSS system 3.2.5...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 9 }
null
ECSS-P-00C(22March2013)-page=10
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 10 4 ECSS objectives European Cooperation for Space Standardization (ECSS) goal is to provide a set of documents, which have the overall objectives to: • be recognized and accepted by the European space community for use in space programmes/projects; • achieve more cost effective spa...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 10 }
null
ECSS-P-00C(22March2013)-page=11
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 11 5 ECSS policies 5.1 General In order to meet the objectives stated in clause 4, the ECSS policy is to: • produce an integrated and coherent set of management, engineering, product assurance and space sustainability standards  covering all activities, phases and levels for the de...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 11 }
null
ECSS-P-00C(22March2013)-page=12
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 12 5.2 Policy for establishing ECSS System 5.2.1 General The core of the ECSS System is the complete set of ECSS standards. Standards can be developed entirely within ECSS or in cooperation with other SDOs. ECSS standards can be supported/complemented by HBs and TMs. 5.2.2 Policy fo...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 12 }
null
ECSS-P-00C(22March2013)-page=13
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 13 5.2.2.2 Policy for establishing ECSS handbooks ECSS policy is to ensure that ECSS Handbooks: • are developed when need exists to support the application of ECSS standard(s); • describe solution that comply with existing ECSS requirement(s). 5.2.2.3 Policy for using documents deve...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 13 }
null
ECSS-P-00C(22March2013)-page=14
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 14 5.3 Policy for application of the ECSS System ECSS documents are made applicable to a project only through a legal document such as business agreement (e.g. contract) and/or internal directives. When made applicable: • it is the responsibility of the party imposing a particular stan...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 14 }
null
ECSS-P-00C(22March2013)-page=15
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 15 • Nomination of Document and Discipline Focal Points to support the Technical Authority for correct understanding and application of the standards and assessment of feedback and Change Requests. 5.5 Policy for certification and training 5.5.1.1 Certification ECSS neither provides ...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 15 }
null
ECSS-P-00C(22March2013)-page=16
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 16 5.8 Policy for use of ECSS System by non-ECSS members The European Space Agency, on behalf of the participating members, holds copyright for all ECSS documents. No ECSS document may be reproduced in any form without the explicit consent of ESA. However, this consent is granted to EC...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 16 }
null
ECSS-P-00C(22March2013)-page=17
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 17 6 ECSS organization 6.1 Participation 6.1.1 General ECSS is open to participation from all European space sector and associated organizations. Participating entities in ECSS can have a role of Members, Associates or Observers. Agreement to work in the interest of ECSS, to pursue ...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 17 }
null
ECSS-P-00C(22March2013)-page=18
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 18 implement ECSS system in their respective projects when applicable for those documents whose preparation they were involved in. Associates are encouraged to provide feedback on their use of the ECSS standards by CR’s or other means. Associates will be given access to specific ECSS bod...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 18 }
null
ECSS-P-00C(22March2013)-page=19
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 19 6.1.7 Change of status A participating organization may change its status according to the following rules: a. For changing status from Observer to either Associate or Full Member or from Associate to Full Member, the principles laid down in 6.1.5 shall be followed. b. For changi...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 19 }
null
ECSS-P-00C(22March2013)-page=20
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 20 Steering Board (SB) Technical Authority (TA) Executive Secretariat (ES) Network of Experts (NoE) Steering Board (SB) Executive Secretariat (ES) Technical Authority (TA) Network of Experts (NoE) Working Group W G W G Working Group Working Group Working G...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 20 }
null
ECSS-P-00C(22March2013)-page=21
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 21 6.2.2.3 Executive Secretariat (ES) The mission of the ES is composed of four items: • Programme function in support to TA to:  build the Work-plan to be endorsed by the SB (e.g. programmatic, resources);  monitor and support the implementation of the Work-plan including final...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 21 }
null
ECSS-P-00C(22March2013)-page=22
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 22 of achieving consensus of the voting members (i.e. full members). 2. If consensus as stated in a.1 above cannot be achieved, decisions are made by the vote of the full members, with a simple majority subject that a quorum of 50% of the voting rights is reached. Votes are weighted in...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 22 }
null
ECSS-P-00C(22March2013)-page=23
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 23 7 ECSS Documentation 7.1 Overview ECSS documentation is divided into 2 categories: • Documents for developers of standards specifying objectives, policies, processes, rules, standard forms; • Documents for users, composed of standards and supporting documents, which collectively...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 23 }
null
ECSS-P-00C(22March2013)-page=24
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 24 The present document (ECSS-P-00: Standardization policy) is the highest level document providing objectives and policies applicable to the development, maintenance and deployment of standards, handbooks and technical memoranda, and defining the ECSS structure. The cooperation agreement...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 24 }
null
ECSS-P-00C(22March2013)-page=25
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 25 ECSS-S-ST-00 ECSS System – Description, implementation and general requirements ECSS-ST-00-01 ECSS System – Glossary of terms ECSS M Standards, HBs and TMs External standards or handbooks “adopted” or called up by ECSS documents ECSS U Standards, HBs and TMs ECSS E Standards, HBs and TM...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 25 }
null
ECSS-P-00C(22March2013)-page=26
ECSS-P-00C(22March2013)
ECSS-P-00C 22 March 2013 26 Bibliography ECSS-D-00 ECSS – ECSS processes ECSS-D-00-01 ECSS - Drafting rules and template for ECSS Standards ECSS-D-00-02 ECSS - Drafting rules and template for ECSS Handbooks ECSS-S-ST-00 ECSS system - Description, implementation and general requirements ECSS-S-ST-00-01 ECS...
{ "document_id": "ECSS-P-00C(22March2013)", "page_number": 26 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=1
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Space product assurance Crimping of high-reliability electrical connections ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Corrigendum 1 The following editorial errors were identified in the published version of this document ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 1 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=2
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Foreword This Standard is one of the series of ECSS Standards intended to be applied together for the management, engineering and product assurance in space projects and applications. ECSS is a cooperative effort of the European Space Agency, national space agencies and Europea...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 2 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=3
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Change log ECSS-Q-70-26A 13 February 2001 First issue Transforming ESA PSS-01-726 into an ECSS Standard ECSS-Q-70-26B Never issued ECSS-Q-ST-70-26C 31 July 2008 Second issue Changes to ECSS-Q-70-26A are: • Redrafting of ECSS-Q-70-26A in conformance with ECSS drafting ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 3 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=4
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Added requirements: 5.1.2.1i; 5.1.2.2f; 5.2.1k; 5.2.4g-h; 5.2.5g-i; 5.2.6d-f (where f was moved from 5.2.6c); 5.2.7i-j; 5.3.1d-g; 5.3.2d-e; 5.3.4.1a; 5.3.4.2a-c; 5.4.3.1e; 5.4.3.2c-e; 5.4.3.3b; 5.4.3.4a-e; 5.4.3.5a-c; 5.4.4j; 5.5.2.2e; 5.5.4.3a-c; 5.5.5k-o; 5.5.9a-l. Modi...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 4 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=5
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Table of contents Change log ................................................................................................................. 3 1 Scope ....................................................................................................................... 8 2 N...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 5 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=6
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.4.2 <<deleted>> .............................................................................................. 29 5.4.3 Tensile strength ........................................................................................ 30 5.4.4 Metallography ............................
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 6 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=7
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure A-5 : Four-indent crimp (dispersive) ........................................................................... 47 Figure A-6 : Typical test fixture for testing lug and splice crimps ........................................... 52 Tables Table 5-1: Equipment for verifi...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 7 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=8
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 1 Scope This Standard specifies: • Requirements for the following crimping wire connections intended for high reliability electrical connections for use on spacecraft and associated equipment operating under high vacuum, thermal cycling and launch vibration:  removable c...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 8 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=9
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Normal socket Normal male Enlarged socket Enlarged male MDM socket MDM male Coax socket Coax male Power socket Power male Butt splice Parallel splice Lug Figure 1-1: Example of interconnections described in this Standard 9
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 9 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=10
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 2 Normative references The following normative documents contain provisions which, through reference in this text, constitute provisions of this ECSS Standard. For dated references, subsequent amendments to, or revisions of any of these publications do not apply. However, par...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 10 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=11
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 3 Terms, definitions and abbreviated terms 3.1 Terms defined in other standards a. For the purpose of this Standard, the terms and definitions from ECSS-S-ST-00-01 apply, in particular for the following terms: 1. acceptance 2. analysis 3. batch 4. component 5. conf...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 11 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=12
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 NOTE 3 Crimping tool based on the combination of tool reference, setting and locator (when necessary). 3.2.3 crimping tool mechanical ratcheting tool used for permanently attaching a wire connection device to a conductor by pressure deformation or by reshaping the barrel ar...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 12 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=13
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 3.4 Nomenclature The following nomenclature applies throughout this document: a. The word “shall” is used in this Standard to express requirements. All the requirements are expressed with the word “shall”. b. The word “should” is used in this Standard to express recommendat...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 13 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=14
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 4 Principles This Standard is structured such that the necessary level of quality is achieved, consistently maintained and high reliability of the end product assured. The following principles are covered: • Preparatory conditions to determine the availability of facilities,...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 14 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=15
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5 Requirements 5.1 Preparatory conditions 5.1.1 Facilities 5.1.1.1 Overview The requirements in this clause can generally be met by using cleanrooms. It is not, however, mandatory to use a cleanroom. NOTE Depending on supplier and customer business agreement. 5.1.1.2 F...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 15 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=16
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 c. The workstations shall not be exposed to draughts. d. Fresh air shall be supplied to the room through a filtering system with positive pressure difference with regard to adjacent rooms. e. The exhaust air shall be suitably restricted. 5.1.1.4 Lighting requirements a. T...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 16 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=17
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Contact crimping tool Splice-lug crimping tool Figure 5-1: Example of crimping tools 5.1.2.2 Insulation strippers a. The supplier shall provide the tooling necessary to avoid damage to the conductor. b. The selection of thermal or precision cutting devices, manual or...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 17 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=18
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.1.2.3 Cutting pliers a. The supplier shall provide the tooling necessary for precision wire trimming and cutting. b. The cutter used for trimming conductor wire shall shear sharply and consistently to produce a clean, flat, smooth-cut surface along the entire cut edge. ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 18 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=19
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 f. All conductor strands shall be inserted cleanly into the barrel without any buckling. g. Strands shall not be left outside or cut back to reduce the conductor diameter to fit an undersized barrel. h. The supplier shall use tools as specified in SAE-AS-22520 for the cri...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 19 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=20
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.2.3 Process review and documentation a. The supplier shall perform a review of all the materials, tools and techniques planned to be used to ensure conformance to requirements of this standard and as a means of identifying potential problems. NOTE Type of wire includes b...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 20 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=21
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure 5-2: Example of a typical connector barrel and single wire crimping 5.2.5 Contact barrel and multiple wire crimping a. Requirements of this clause shall be applied when single multistranded wire crimping cannot be used. b. The maximum number of wires in one c...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 21 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=22
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 barrel and multi-wire crimping is shown in Figure 5-3. f. For separate conductors introduced straight into the barrel the following shall apply: 1. the actual strength measurement is performed on one of the wires (the smaller, if two different sizes are used); 2. the axi...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 22 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=23
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.2.6 Ferrule shield crimping a. The shielding on coaxial cables shall be ensured by braided strands. b. Axial strength measurements shall be performed in compliance with requirements from clause 5.4.3.3. c. <<deleted, moved to 5.2.6f>> d. Only one braided shield shall ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 23 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=24
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 f. Axial strength measurements shall be performed in compliance with requirements from clause 5.4.3.3. g. <<deleted>> h. Figure A-6Following crimping, the assembly shall be protected by shrink tubing. NOTE Examples of typical lug and splice wire crimpings are shown in ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 24 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=25
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Butt splice crimping Two sided parallel splice crimping One side parallel splice crimping Figure 5-5: Examples of typical lug and splice wire crimping (1 of 2) 25
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 25 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=26
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Crimping of lug Crimping of lug with filler wire Microgaph of crimping of lug with filler wire Figure 5-6: Examples of typical lug and splice wire crimping (2 of 2) 5.3 Requirements for crimp configuration qualification 5.3.1 General a. All crimp configuratio...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 26 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=27
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 e. The supplier shall ensure that the selected materials are qualified for the mission environment. f. In case the mission environment exceeds the temperature range for which the materials are qualified, a qualification shall be performed and agreed with the customer NOTE ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 27 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=28
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 NOTE Figure 5-7 presents a flow chart of the Qualification process test procedure of clause 5.3.2. Wire / braid under ESCC specification? Wire / braid intrinsic tensile strength already characterized? Wire / braid intrinsic tensile strength already characterized? YES NO ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 28 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=29
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.3.3 Sealing and marking a. The supplier shall seal and mark calibrated tools in conformance with clause 5.5.6.3 requirements. 5.3.4 Batch to batch variation 5.3.4.1 Wires qualified by ESCC a. For wires qualified by ESCC the qualified tool set-up may be used without addit...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 29 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=30
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.4.3 Tensile strength 5.4.3.1 General a. The supplier shall use a tensile testing device with characteristics in conformance with Table 5-1. b. The connections shall be loaded until failure occurs. c. The value at failure shall be recorded, together with the information...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 30 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=31
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 c. In the case of different wire sizes crimped into the same barrel axial strength measurements shall be performed on only one wire per sample from the smallest gauge d. In the case where opposed wires are tested a specifically designed test fixture shall be used. NOTE ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 31 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=32
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 f. This section shall then be polished with successively finer grades of diamond paste down to 1 µm. g. To aid microscopic examination, the polished section shall be very lightly etched with an accepted chemical reagent specific to the composition of the materials being cri...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 32 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=33
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.5.2.2 Certification a. <<deleted>> b. The certification of personnel shall be based upon objective evidence of crimp quality, resulting from test and inspection of the crimped joints. c. Operators or inspectors shall be re-certified in cases of repeatedly unacceptable q...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 33 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=34
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure 5-8: Quality control during crimping operation Personnel trained and certified (in conformance with clause 5.5.2) Control of compatibility of parts, crimping and stripping tools (in conformance with clauses 5.1.2.1 and 5.1.2.2) Crimp configuration qualified ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 34 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=35
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.5.3 Workmanship a. The supplier shall prepare standards consisting of satisfactory work samples (in conformance with the Figure 5-9 and Figure 5-10) b. The supplier shall have readily available visual aids, which clearly illustrate the quality characteristics of all crimpe...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 35 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=36
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure 5-9: Visible workmanship standards 36
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 36 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=37
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Unacceptable: undercrimp Limit of acceptability: void 10 % Acceptable: preferred Not acceptable: overcrimp A Figure 5-10: Workmanship examples and crimp micro-sections 5.5.4 Visual inspection 5.5.4.1 Pre-crimp inspection (performed by the operator) a. The wire shal...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 37 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=38
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.5.4.2 Post-crimp inspection (performed by quality assurance) a. The QA inspector shall carry out inspection with the use of a binocular microscope having a minimum linear magnification of ×7. NOTE Further examination of surface characteristics can be performed at higher...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 38 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=39
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.5.5 Shift performance inspection and test for harness manufacturing a. <<deleted>> b. <<deleted>> c. <<deleted>> d. <<deleted>> e. <<deleted>> f. <<deleted>> g. <<deleted>> h. <<deleted>> i. <<deleted>> j. <<deleted>> k. Prior to the start of a new harness...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 39 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=40
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 1. At the start of each new shift cleanliness control of the active part of the tool and “go/no-go” checks are performed, 2. Crimping tools which are used for less than 500 crimps per week shall be revalidated after each 500 crimp operations or 2 months whichever is earlier ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 40 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=41
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 c. The QA organization of the supplier shall notify the customer of the nonconformance details. d. The supplier’s calibration procedure shall include the requirements specified in this clause for tool calibration. 5.5.6.2 Validation a. The QA organization of the supplier s...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 41 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=42
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 c. Quality records and logbooks shall contain the following information: 1. the as-built and test configuration list (waiver and deviation summary); 2. nonconformance reports and corrective actions; 3. copy of the visual inspection and performance test results with refere...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 42 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=43
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 1. prepare four samples at the beginning of a shift or before a series of crimping operations of which: (a) three samples are submitted to the tensile strength test as specified in the requirements from the clause 5.4.3, and (b) the fourth sample is retained for reference a...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 43 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=44
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Tools preparation per 5.5.5k Preparation and test of 4 samples per tool in compliance with 5.5.5l at beginning of the manufacturing of a new harness. “Go/no-go” check is done at beginning of each shift per 5.5.5m.1 Are more than 500 crimps performed with the tool in a week? ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 44 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=45
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 5.6 Document requirements a. The supplier shall produce documentation for: 1. Process identification, in a PID or a specific internal procedure and RFA, 2. Inspection, 3. Traceability, 4. Testing, both procedures and records, 5. Logbooks, and 6. Calibration. b. ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 45 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=46
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Annex A (informative) Crimp configurations and tools A.1 Overview of crimp configurations Many crimp interconnection technologies are currently available for space applications. Confined or compactive crimps are made by a tool, which exerts an even pressure around the recept...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 46 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=47
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure A-1: Confined irregular-octagon crimp (compactive) Figure A-2: Dimpled confined octagon crimp (compactive) Figure A-3: Regular-hexagon crimp (compactive) Figure A-4: Semicircular one- or two-indent crimp (dispersive) Figure A-5: Four-indent crimp (dispersive) ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 47 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=48
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 A.2 Typical settings of crimping tools For the type of crimping covered in this Standard typical tool selector settings are applicable. Those are, however, only indicative and require effective calibration or validation before use for production of high-reliability crimps, in ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 48 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=49
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 26 22 - 22 2 - - 28 22 - 22 1 - - DBAS 3401-008 connector family 12 12 - 12 - 8 - 14 12 - 12 - 7 - 16 16 - 16 - 6 - 18 16 - 16 - 5 - 20 16 - 16 4 - 20 20 - 20 7 - - 22 20 - 20 6 - - 24 20 - 20 5 - - 26 20 - 26 6 - -...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 49 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=50
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Table A-3: Guideline for selector setting – Four-indent crimp (dispersive) – Two different wires Connector Wire gauge (AWG) Wire barrel contact size Crimping tool / Selector setting M22520/2-01 M22520/1/01 M300-BT D*SUB 3401-002 connector family - 8 - 8 - - - ...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 50 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=51
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Table A-6: Guideline for die selection – Regular hexagon (compactive ) – Ferrule coaxial shield crimp Coaxial sort Coaxial cable reference M22520/5-01 Crimping tool Die / Slot selection M22520/10-01 Crimping tool Die / Slot selection D*SUB 3401-002 connector family RG...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 51 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=52
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Figure A-6: Typical test fixture for testing lug and splice crimps 52
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 52 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=53
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Annex B (informative) Examples of typical ultimate axial strength Examples of typical values of intrinsic wire strength of ESCC qualified wires and presented in the Table B-1. Table B-1: Typical ultimate axial strength for compactive and dispersive crimped joints manufactured u...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 53 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=54
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 AWG Number and size of strands (∅ in mm) Conductor section in mm2 Minimum tensile resistance for crimps with the following composition Kapton Tefzel Teflon/Kapton Silver-plated Silver-plated 10 - - - 5,30 850 N - 8 - - - 8,98 1500 N - 6 - - - 13,4 23...
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 54 }
null
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)-page=55
ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)
ECSS-Q-ST-70-26C Rev.1 15 March 2017 Bibliography ECSS-S-ST-00 ECSS system — Description and implementation and general requirements 55
{ "document_id": "ECSS-Q-ST-70-26C-Rev.1(15March2017)+Corrigendum1(1June2017)", "page_number": 55 }
null
ECSS-E-ST-10-09C(31July2008)-page=1
ECSS-E-ST-10-09C(31July2008)
ECSS-E-ST-10-09C 31 July 2008 Space engineering Reference coordinate system   ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 1 }
null
ECSS-E-ST-10-09C(31July2008)-page=2
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  Foreword This  Standard  is  one  of  the  series  of  ECSS  Standards  intended  to  be  applied  together  for  the  management,  engineering  and  product  assurance  in  space  projects  and  applications.  ECSS  is  a  cooperative  effort  of  the  European  Space  Agency,  nationa...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 2 }
null
ECSS-E-ST-10-09C(31July2008)-page=3
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  Change log ECSS‐E‐ST‐10‐09A  Never issued  ECSS‐E‐ST‐10‐09B  Never issued  ECSS‐E‐ST‐10‐09C  31 July 2008  First issue  3
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 3 }
null
ECSS-E-ST-10-09C(31July2008)-page=4
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  Table of contents Change log.................................................................................................................3 Introduction................................................................................................................7 1 Scope............
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 4 }
null
ECSS-E-ST-10-09C(31July2008)-page=5
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  5.3.2 Notation ......................................................................................................18 5.3.3 Figures........................................................................................................18 5.4 Technical requirements ...................
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 5 }
null
ECSS-E-ST-10-09C(31July2008)-page=6
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  C.6 IAU/IAG Working Group on Cartographic Coordinates and Rotational Elements (WGCCRE)...............................................................................................36 References ..............................................................................................
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 6 }
null
ECSS-E-ST-10-09C(31July2008)-page=7
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  Introduction Clear  definition  of  reference  directions,  coordinate  systems  and  their  inter‐ relationships  is  part  of  the  System  Engineering  process.  Problems  caused  by  inadequate  early  definition,  often  pass  unnoticed  during  the  exchange  of  technical informa...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 7 }
null
ECSS-E-ST-10-09C(31July2008)-page=8
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  1 Scope The objective of the Coordinate Systems Standard is to define the requirements  related to the various coordinate systems, as well as their related mutual inter‐ relationships  and  transformations,  which  are  used  for  mission  definition,  engineering,  verification,  oper...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 8 }
null
ECSS-E-ST-10-09C(31July2008)-page=9
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  2 Normative references The  following  normative  documents  contain  provisions  which,  through  reference  in  this  text,  constitute  provisions  of  this  ECSS  Standard.  For  dated  references,  subsequent  amendments  to,  or  revisions  of  any  of  these  publications, do no...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 9 }
null
ECSS-E-ST-10-09C(31July2008)-page=10
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  3 Terms, definitions and abbreviated terms 3.1 Terms from other standards For  the  purpose  of  this  Standard,  the  terms  and  definitions  from  ECSS‐S‐ST‐00‐01 apply.  NOTE 1  Some  terms  are  taken  from  other  documents,  referenced in square brackets in the References.  NO...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 10 }
null
ECSS-E-ST-10-09C(31July2008)-page=11
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  3.3 Abbreviated terms  For the purpose of this Standard, the abbreviated terms from ECSS‐S‐ST‐00‐01  and the following apply:  Abbreviation  Meaning  AIT  assembly integration and test  AIV  assembly integration and verification  BCRS  barycentric celestial reference system  BIPM  Bure...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 11 }
null
ECSS-E-ST-10-09C(31July2008)-page=12
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  TT  terrestrial time  UTC  coordinated universal time ‐temps universel coordonné  WGCCRE  Working Group on Cartographic Coordinates and  Rotational Elements  w.r.t.  with respect to  12
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 12 }
null
ECSS-E-ST-10-09C(31July2008)-page=13
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  4 Objectives, process and principles 4.1 General This  Clause  provides  the  background  to  the  requirements  and  recommendations stated in Clause 5, from the conceptual, process and technical  points of view.  4.2 Concepts and processes 4.2.1 Process The coordinate systems u...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 13 }
null
ECSS-E-ST-10-09C(31July2008)-page=14
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  The  main  mission  chain  typically  includes  inertial,  rotating  planet‐centred  orbital,  spacecraft  mechanical,  instrument  and  product  (i.e.  post‐processing  related) coordinate systems.”  4.2.4 Notation Experts  working  together  within  a  project  need  to  have  a  com...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 14 }
null
ECSS-E-ST-10-09C(31July2008)-page=15
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  important, even when the nominal translation is assumed to be the null vector.  A theoretically null translation can later, in the project life or in more precise  calculations, become non‐null.  Quaternions,  Euler  angles,  mechanical  and  other  parameters  can  be  used  to  describ...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 15 }
null
ECSS-E-ST-10-09C(31July2008)-page=16
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  5 Requirements 5.1 Overview This  clause  contains  process  requirements,  covering  the  management  and  utilisation  of  coordinate  systems  throughout  the  life  cycle  of  space  missions;  general requirements, covering applicability, terminology, notation, figures and  illu...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 16 }
null
ECSS-E-ST-10-09C(31July2008)-page=17
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  NOTE  Subsystems  (or  organisations)  are  free  to  make  specifications within their area of responsibility, so  long as the specific (internal) coordinate system or  time  scale  is  not  used  by  another  subsystem  (or  organisation).  c. For  a  spacecraft  project,  a  prelimi...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 17 }
null
ECSS-E-ST-10-09C(31July2008)-page=18
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  5.3.2 Notation a. A coordinate system shall be identified by a unique descriptive name.  b. Recognised international names should not be used if the exact definition  is not followed.  NOTE  E.g. the name “Pseudo True of Date” can be used if  the  conventional  definition  of  ToD  ...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 18 }
null
ECSS-E-ST-10-09C(31July2008)-page=19
ECSS-E-ST-10-09C(31July2008)
ECSS‐E‐ST‐10‐09C  31 July 2008  5.4 Technical requirements 5.4.1 Frame a. The origin of the frame shall be specified.  b. The  derivation  of  the  origin  of  a  frame  from  reference  points  shall  be  defined.  c. The derivation of the axes of a frame from reference directions shall be  defined.  d. The ax...
{ "document_id": "ECSS-E-ST-10-09C(31July2008)", "page_number": 19 }
null
End of preview. Expand in Data Studio

ECSS-1.0 Dataset

Dataset Summary

This dataset provides a focused benchmark for retrieval and generation tasks related to ECSS (European Cooperation for Space Standardization) documents. It includes a set of documents, queries, relevance judgments (qrels), and page images.

  • Number of Documents: 196
  • Number of Queries: 67
  • Number of Pages: 22700
  • Number of Relevance Judgments (qrels): 89
  • Average Number of Pages per Query: 1.3

Dataset Structure (Hugging Face Datasets)

The dataset is structured into the following subsets:

  • corpus: Contains page-level information:
    • _id: A unique identifier for this specific page within the corpus.
    • title: The title of the document.
    • text: The text of the document.
  • queries: Contains query information:
    • _id: Unique identifier for the question.
    • query_text: The question text.
    • relevant_document_ids: A list of corpus documents considered as references for this question, each reference containing:
      • corpus_id: The document identifier.
      • score: The importance or relevance score.

Usage Examples

You can load the datasets using the load_from_disk function from the datasets library. Replace the paths with the actual locations on your machine.

from datasets import load_dataset
dataset_queries_test = load_dataset("FOR-sight-ai/ECSS-1.0", "queries", split="test")

Results

Model Name nDCG@10
bm25 0.43
bge-large-en-v1.5 0.44
nomic-embed-multimodal-3b 0.59
colqwen2.5-v0.2 0.68

Citation

If you use this dataset in your research or work, please cite:

@misc{ecssbenchmark2025,
  title={ECSS RAG benchmark},
  author={Francois Lancelot and Nawal Ould Amer and Benjamin Fourreau and Catherine Kobus and Marion-Cécile Martin},
  primaryClass={cs.IR},
  year={2025},
}
Downloads last month
12