File size: 6,937 Bytes
dc45511 | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 | {
"absolute_id": 224,
"persona": "Operations Manager",
"task": "Based on the stability-related documents downloaded in the document, summarize the progress of the entire business, what has been completed, what is to do, what is the problem, classify by department, generate an excel form, leave a box for follow-up information, and put it on the desktop (__ PH_15 __)",
"task_diff": "hard",
"output_files": [
"Guaranteed_Progress.xlsx"
],
"rubrics": [
"Does the output Excel table contain 8 records of different departments/business lines, namely, open platform, general platform, enterprise collaboration application core services, stability group (weekly meeting), stability system construction, XX platform conference reinsurance, XX application stability special, general stability construction?",
"Do the columns in the Excel table contain department, completed, to-do, question, and follow-up information?",
"Is the follow-up information column left blank for subsequent follow-up?",
"Are the completed items of the open platform including the MR incorporation UT coverage card point increased to 60%, the MergeCheck item review completed, and the stability weekly reporting mechanism established These 8 completed items?",
"Does the open platform to-do list include 21 to-do items such as grayscale capacity building in progress, storage split planning, and message isolation planning?",
"Do the open platform issues include more inventory issues, incremental issues that are not effectively contained, and a large number of legacy defects?",
"Common Platform Completed Identify Issue Completed, Overall Development Plan Framework Developed?",
"Do the common platform issues include 9 issues such as process issues in release control and long-tail services that need to be prioritized?",
"Are 15 of the completed enterprise collaboration application core services completed, including the establishment of a cross-team stability team, the completion of a static resource storage disaster recovery plan, and the full launch of the basic capacity reconstruction?",
"Do the core service issues for enterprise collaboration applications include five issues, such as infrastructure and core downstream failures, which can easily lead to main link paralysis, and traffic surge caused by user growth?",
"Has the Stability Group (weekly meeting) completed 11 items, including the release of the accident liability specification v2.1, the completion of the technical plan for the interception of changes, and the development of the MVP version of the automation drill, been completed?",
"Has the construction of the stability system been completed, including 6 items such as the completion of the infrastructure regulation Q2 goal, the completion of the service level pre-marking, and the establishment of the positioning stop loss SOP?",
"Does the stability system construction issue include 5 issues such as the L2L3 alarm coverage rate is lower than the target value, and there are no audits and no quality inspection problems in some change channels?",
"XX platform conference reinsurance completed Does it include 13 items that have been confirmed by the business line contact person, most of the reinsurance plans have been prepared, and the sealing board has been completed as planned?",
"Is the reinsurance issue for the XX platform launch marked as no major issue at the moment, and proceed as planned?",
"XX Has the application stability special been completed? Including the ability to converge permissions has been online, the black screen operation control has been self-tested, Q1 has achieved 0 cases of P-level own engineering accidents, etc. 4 items have been completed?",
"XX Does the application stability special issue include 8 issues such as multiple project delays due to large project X manpower adjustment, 1 P-level accident in Q1, and 0% completion rate of red and blue drills?",
"Are the completed, to-do, and questions for all departments in the output file from the 8 original documents provided, without falsification?",
"Whether the generated file can be opened normally"
],
"rubric_types": [
"Basic Evaluation",
"Basic Evaluation",
"Basic Evaluation",
"Outcome Evaluation",
"Outcome Evaluation",
"Outcome Evaluation",
"Basic Evaluation",
"Outcome Evaluation",
"Outcome Evaluation",
"Outcome Evaluation",
"Outcome Evaluation",
"Outcome Evaluation",
"Outcome Evaluation",
"Outcome Evaluation",
"Basic Evaluation",
"Outcome Evaluation",
"Outcome Evaluation",
"Process Evaluation",
"Outcome Evaluation"
],
"file_dep_graph": [
{
"from": "Stability_Special_Summary_Plan.md",
"to": "Guaranteed_Progress.xlsx"
},
{
"from": "Weekly_Stability_Group_Meeting.md",
"to": "Guaranteed_Progress.xlsx"
},
{
"from": "Stability_System_Construction_Weekly.md",
"to": "Guaranteed_Progress.xlsx"
},
{
"from": "Alignment_Of_Stability_Building_Ideas_WIP.md",
"to": "Guaranteed_Progress.xlsx"
},
{
"from": "Stability_Construction_Ideas.md",
"to": "Guaranteed_Progress.xlsx"
},
{
"from": "Stability_Construction.md",
"to": "Guaranteed_Progress.xlsx"
},
{
"from": "Stability_Plan.md",
"to": "Guaranteed_Progress.xlsx"
},
{
"from": "Stability_Guarantee.md",
"to": "Guaranteed_Progress.xlsx"
}
],
"data_manifest": [
{
"filename": "Stability_Special_Summary_Plan.md",
"stored_relpath": "data/6e94f253aaf7d35e_Stability_Special_Summary_Plan.md"
},
{
"filename": "Weekly_Stability_Group_Meeting.md",
"stored_relpath": "data/e015e13ff1bc72e8_Weekly_Stability_Group_Meeting.md"
},
{
"filename": "Stability_System_Construction_Weekly.md",
"stored_relpath": "data/fd58931ae3012d3e_Stability_System_Construction_Weekly.md"
},
{
"filename": "Alignment_Of_Stability_Building_Ideas_WIP.md",
"stored_relpath": "data/75da68bf652cc81d_Alignment_Of_Stability_Building_Ideas_WIP.md"
},
{
"filename": "Stability_Construction_Ideas.md",
"stored_relpath": "data/37378ed92cda9213_Stability_Construction_Ideas.md"
},
{
"filename": "Stability_Construction.md",
"stored_relpath": "data/e9e7361708098e2f_Stability_Construction.md"
},
{
"filename": "Stability_Plan.md",
"stored_relpath": "data/2f261dd48571a2a3_Stability_Plan.md"
},
{
"filename": "Stability_Guarantee.md",
"stored_relpath": "data/79096fd484c91acf_Stability_Guarantee.md"
}
],
"tested_capabilities": [
"Workspace Exploration",
"Task-Providing File Utilization",
"Result-Providing Files Utilization",
"Lineage Tracing",
"Semantic Content Relations Understanding"
]
}
|