| { |
| "task_id": "consumerfinance_010", |
| "domain": "CFPB_REPORTS", |
| "autonomy_type": "ordered table", |
| "oracle_output_cardinality": 2, |
| "instruction": "我想把 CFPB 在 2020 年发布的债务催收规则( Debt Collection Rule)分别梳理清楚,包括提案来源、延后生效的安排、最终生效日,以及实施页面上配套的 quick-reference PDF 信息。请按下面的步骤来查。先确认 CFPB 在 2020 年分两波发布的那两份 Debt Collection Rule 最终规则各自是什么时候发布的。然后分别确认以下信息:1. 这波 final rule 的发布日期;2. 它是从哪个提案(或哪些提案)发展来的,以及各提案的公众评议截止日期;;3. 2021 年那次关于延后生效日的拟议规则有没有覆盖到这一波,那次征求意见最后截止到哪一天;4. 最终实际执行的生效日是哪天;5. 在实施页面上,这一波对应的是哪一份 quick-reference PDF;6. 这份 PDF 正文跳过引言段落后的第一个小标题是什么。", |
| "start_url": "https://www.consumerfinance.gov/rules-policy/final-rules/", |
| "output_format": "请把结果按 final-rule issue date 从早到晚输出一行字符串,每一波用它的 final rule 发布月份(YYYY-MM)来标识:<wave>|<final-rule-date>|<proposal-chain>|<proposal-comment-closes>|<delay-proposal-applied>|<delay-proposal-comments-close>|<controlling-effective-date>|<quick-reference-pdf>|<summary-heading>", |
| "oracle_answer": "2020-10|2020-10-30|2019-05-07 main|2019-09-18|YES|2021-05-19|2021-11-30|Executive summary of the October 2020 final rule|Coverage and Definitions,2020-12|2020-12-18|2019-05-07 main+2020-02-21 supplemental|2019-09-18+2020-08-04|YES|2021-05-19|2021-11-30|Executive summary of the December 2020 final rule|Validation Information Requirements and Disclosures", |
| "metadata": { |
| "State-Gated Retrieval": [ |
| "必须分别处理 2020 年两波同名的 Debt Collection Practices (Regulation F) final rules,而不是合并成一条。", |
| "对每一波都要分别确认:发布日期、对应 proposal chain 及公众意见截止日、2021 年 delayed-effective-date proposed rule 是否覆盖及其截止日、最终生效日、对应 implementation quick-reference PDF,以及该 PDF 跳过引言后的第一个小标题。", |
| "October wave 与 December wave 的 detail page、proposal chain 和 summary PDF 都必须各自独立核验。" |
| ], |
| "dependency_type": "Data + Control", |
| "intra_chain": true, |
| "inter_chain": true, |
| "data_dependency": [ |
| "final-rules index pages and rule-development pages yield the two 2020 Regulation F final-rule waves and their proposal branches", |
| "each final-rule detail page, delayed-effective-date proposal page, and implementation quick-reference PDF yields the wave-specific dates, linked proposals, comment deadlines, and first summary heading", |
| "final rows are produced only after the October and December waves are traced separately end to end" |
| ], |
| "control_dependency": [ |
| "two same-title final rules force correction from name-based collapsing to issue-date branching", |
| "proposal-chain validation must be done per wave; otherwise the later December chain contaminates the October row", |
| "implementation PDFs must be matched back to the correct wave rather than accepting the latest quick-reference page" |
| ], |
| "freeze": { |
| "historical_window": "the 2020-10 and 2020-12 Debt Collection Rule final-rule waves, their linked 2020 proposal pages, the 2021 delayed-effective-date proposal, and the current implementation-page quick-reference PDFs" |
| }, |
| "answer_type": "multi-row ordered table" |
| }, |
| "rubric": { |
| "inclusion_conditions": [ |
| "必须分别处理 2020 年两波同名的 Debt Collection Practices (Regulation F) final rules,而不是合并成一条。", |
| "对每一波都要分别确认:发布日期、对应 proposal chain 及公众意见截止日、2021 年 delayed-effective-date proposed rule 是否覆盖及其截止日、最终生效日、对应 implementation quick-reference PDF,以及该 PDF 跳过引言后的第一个小标题。", |
| "October wave 与 December wave 的 detail page、proposal chain 和 summary PDF 都必须各自独立核验。" |
| ], |
| "exclusion_conditions": [ |
| "排除把两条同名 2020 final rule 合并为一条的结果。", |
| "排除把 December wave 的 proposal chain 或 executive-summary heading 投射给 October wave 的结果。", |
| "排除未单独回到各自 final-rule detail page 和对应 PDF 核验的结果。" |
| ], |
| "normalization": { |
| "field_separator": "|", |
| "record_separator": ",", |
| "schema": [ |
| "wave", |
| "final-rule-date", |
| "proposal-chain", |
| "proposal-comment-closes", |
| "delay-proposal-applied", |
| "delay-proposal-comments-close", |
| "controlling-effective-date", |
| "quick-reference-pdf", |
| "summary-heading" |
| ], |
| "wave": "wave is the final-rule issue month in YYYY-MM", |
| "date_format": "all standalone date fields use YYYY-MM-DD", |
| "proposal_chain": "canonical chain joins proposal milestones with `+`, using pieces such as `2019-05-07 main` or `2020-02-21 supplemental` in chronological order", |
| "proposal_comment_closes": "join multiple comment-close dates with `+` in the same order as proposal_chain", |
| "delay_proposal_applied": "emit `YES` when a delay proposal is part of the chain; otherwise emit `NO`", |
| "quick_reference_pdf": "use the displayed quick-reference PDF title, not the filename", |
| "summary_heading": "use the first substantive heading from the final-rule PDF", |
| "sorting_or_selection": "final-rule-date ascending" |
| } |
| } |
| } |
|
|