diff --git "a/processed/ddr/15_9_F_14_activities.csv" "b/processed/ddr/15_9_F_14_activities.csv" new file mode 100644--- /dev/null +++ "b/processed/ddr/15_9_F_14_activities.csv" @@ -0,0 +1,2905 @@ +file,well_name,wellbore_name,report_start,report_end,act_start,act_end,md_m,md_uom,phase,activity_code,state,state_detail,comments,duration_hours +15_9_F_14_2007_11_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-05 10:00:00+00:00,2007-11-05 12:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box meeting with involved personnel. Prepared equipment for skidding. Skidded rig from F-4 to F-14. Removed hatch on F-14.,2.0 +15_9_F_14_2007_11_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-05 12:00:00+00:00,2007-11-05 18:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Continued changing wires on aft PRS. Meanwhile rigged tugger in moonpool for running DCI hose. Worked on releasing DCI hose connection. Came free at 19:00. Changed oil in TDS and cleaned pits. Stopped working on aft PRS due to high wind speed.,6.0 +15_9_F_14_2007_11_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-05 18:00:00+00:00,2007-11-05 21:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed hatches and built scaffolding/fence around open hatches on all levels on slot F-14. Recovered tugger for DCI hose.,3.0 +15_9_F_14_2007_11_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-05T00:00:00+01:00,2007-11-06T00:00:00+01:00,2007-11-05 21:00:00+00:00,2007-11-05 23:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"LD 8 1/4"" DC stand and jar.",2.0 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-05 23:00:00+00:00,2007-11-06 00:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"LD 8 1/4"" DC stand and jar.",1.0 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 00:00:00+00:00,2007-11-06 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW due to noe crane operation. Wind 45-50 knop, with gust up to 65 knop.",5.0 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 05:00:00+00:00,2007-11-06 09:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW due to noe crane operation. Wind 40-45 knop, with gusts up to 60 knop. + +Meanwhile changed oil in TDS, adjusted fingerboard for CART stand, cleaned pits and carried on with rig maintenance.",4.0 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 09:00:00+00:00,2007-11-06 12:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Changed wash pipe and serviced TDS.,3.0 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 12:00:00+00:00,2007-11-06 14:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,PU CART and MU to stand. RB in derrick.,2.0 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 14:00:00+00:00,2007-11-06 18:15:00+00:00,63.0,m,fixed,drilling -- trip,ok,success,"PU 36"" HO assembly. Removed master bushing and outer ring. RIH with 36"" HO assembly to 9 m and re-instated outer ring and bushing. MU and RIH with 36"" HO BHA from 9 m to 63 m.",4.25 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 18:15:00+00:00,2007-11-06 19:15:00+00:00,63.0,m,fixed,drilling -- other,ok,success,Performed derrick inspection prior to spudding the hole. Special care were taken due to high winds of 40-50 knop.,1.0 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 19:15:00+00:00,2007-11-06 20:15:00+00:00,93.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with 36"" HO BHA from 63 m to 93 m.",1.0 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 20:15:00+00:00,2007-11-06 20:45:00+00:00,93.0,m,fixed,interruption -- other,ok,equipment failure,Stopped RIH due to power syncronisation interference with production/prosessmodul.,0.5 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 20:45:00+00:00,2007-11-06 21:45:00+00:00,145.7,m,fixed,drilling -- drill,ok,success,"MU 36"" BHA from 93 m to 143 m. Stung into funnel assisted by ROV. Observed fill in funnel and below. ROV had black-out on camera as soon as 17 1/2"" bit had entered funnel. ROV went to surface for repairs. Continued RIH slowly without pumps and with no rotation until positive tag at 145.7 m.",1.0 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 21:45:00+00:00,2007-11-06 22:30:00+00:00,148.0,m,fixed,drilling -- drill,ok,success,Pumped SW at 550 lpm and washed down with no rotation to 148 m to allow centralizer drill bushing to land out in template guide-funnel.,0.75 +15_9_F_14_2007_11_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-06T00:00:00+01:00,2007-11-07T00:00:00+01:00,2007-11-06 22:30:00+00:00,2007-11-06 23:00:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 148 m to 150 m MD. Drilling parameters : Flow 550 lpm / SPP 4-5 bar / 5 RPM / Torque 1-2 kNm / WOB 1 MT. Reamed hole to ensure landing of centralizer drill bushing in template guide-funnel.",0.5 +15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-06 23:00:00+00:00,2007-11-07 01:15:00+00:00,158.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 150 m to 158 m MD. Drilling parameters : Flow 550-3100 lpm / SPP 4-40 bar / 5-20 RPM / Torque 2-4 kNm / WOB 1-2 MT / ROP 5 m/hr. Pumped 20 m3 hi-vis pill prior to connection. Downlinked and performed survey at 145 m. + +Survey at 145 m 0.3 inc",2.25 +15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 01:15:00+00:00,2007-11-07 05:00:00+00:00,193.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 158 m to 193 m MD. Drilling parameters : Flow 4550 lpm / SPP 80-82 bar / 90 RPM / Torque 4-10 kNm / WOB 1-6 MT / ROP 15-20 m/hr. Pumped 20 m3 hi-vis pills prior to connection. Downlinked and performed survey at 154, 164 and 174 m. Up weight 103 MT / Down weight 96 MT. + +Survey at 154 m 0.21 inc + at 164 m 0,26 inc + at 174 m 0,37 inc",3.75 +15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 05:00:00+00:00,2007-11-07 06:00:00+00:00,204.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole from 193 m to 204 m 17 1/2"" bit depth / 201 m 36"" HO depth. Drilling parameters : Flow 4550 lpm / SPP 80-82 bar / 90 RPM / Torque 4-10 kNm / WOB 1-6 MT / ROP 15-20 m/hr. Pumped 20 m3 hi-vis pills prior to connection. Downlinked and performed survey at 184 m. + +Survey at 184 m 0.43 inc",1.0 +15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 06:00:00+00:00,2007-11-07 06:30:00+00:00,204.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 25 m3 hi-vis sweep and circulated btms up with SW. Displaced hole to 1.40 sg bentonite mud, Flow 5000 lpm / SPP 140 bar / 30 RPM / Torque 2 kNm.",0.5 +15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 06:30:00+00:00,2007-11-07 10:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"POOH with 36"" HO BHA from 204 m to 150 m. Topped up hole with 1.40 sg bentonite mud. Continued POOH with 36"" HO BHA from 150 m to 9 m.",3.5 +15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 10:00:00+00:00,2007-11-07 12:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Removed master bushing and outer ring. POOH with 36"" HO assembly and re-instated outer ring and bushing. LD 36"" HO assembly.",2.0 +15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 12:00:00+00:00,2007-11-07 19:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW due to no crane operation. Wind 40 knop, with gusts up to 50 knop. + +Meanwhile serviced TDS, greased manifolds on BOP, K/C, stand pipe manifolds and performed fluid ends inspection on MP2.",7.75 +15_9_F_14_2007_11_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-07T00:00:00+01:00,2007-11-08T00:00:00+01:00,2007-11-07 19:45:00+00:00,2007-11-07 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed elevator and bails. Installed 30"" bushing. Prepared HTS.",3.25 +15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-07 23:00:00+00:00,2007-11-07 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared rig floor.,0.5 +15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-07 23:30:00+00:00,2007-11-08 04:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting with all personnel involved. Prepared shoe joint and checked float for flow-through with SW. Painted shoe white. Continued to RIH with 30"" conductor as per tally.",5.0 +15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-08 04:30:00+00:00,2007-11-08 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor x-over joint and started installing cement top-up system with cement outlet 35 m below mud line. Aligned UWG top-up system to avoid conflict with the 3 hydraulic rams in the template well slot.",0.5 +15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-08 05:00:00+00:00,2007-11-08 06:00:00+00:00,45.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor x-over joint and installing cement top-up system with cement outlet 35 m below mud line.",1.0 +15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-08 06:00:00+00:00,2007-11-08 09:00:00+00:00,45.0,m,fixed,drilling -- casing,ok,success,"Changed 30"" conductor bails and elevator to to 5 1/2"" DP handling equipment.",3.0 +15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-08 09:00:00+00:00,2007-11-08 11:00:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting with involved personnel. Focused on weather conditions and running into splash zone. PU and installed 30"" conductor housing joint.",2.0 +15_9_F_14_2007_11_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-08T00:00:00+01:00,2007-11-09T00:00:00+01:00,2007-11-08 11:00:00+00:00,2007-11-08 23:00:00+00:00,55.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW, due to high wind and waves. Wind 50-87 knop.",12.0 +15_9_F_14_2007_11_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-09T00:00:00+01:00,2007-11-10T00:00:00+01:00,2007-11-08 23:00:00+00:00,2007-11-09 05:00:00+00:00,55.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW, due to high wind, waves and hael. Wind 65-83 knop.",6.0 +15_9_F_14_2007_11_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-09T00:00:00+01:00,2007-11-10T00:00:00+01:00,2007-11-09 05:00:00+00:00,2007-11-09 23:00:00+00:00,55.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to high wind and waves.,18.0 +15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-09 23:00:00+00:00,2007-11-10 05:00:00+00:00,55.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to high wind and waves.,6.0 +15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 05:00:00+00:00,2007-11-10 12:00:00+00:00,55.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. High wind and waves. Meanwhile performed rig maintenance.,7.0 +15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 12:00:00+00:00,2007-11-10 14:30:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Held a tool box meeting. Run the 30"" conductor housing. Laid down the conductor running tool.",2.5 +15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 14:30:00+00:00,2007-11-10 15:45:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,Run and made up the cementing stinger in the conductor.,1.25 +15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 15:45:00+00:00,2007-11-10 17:30:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Picke up CART housing. Installed 2"" fill up valve. Installed inclinometer on CART.",1.75 +15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 17:30:00+00:00,2007-11-10 20:00:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Installed top up cement system on the 30"" conductor pipe whlie running down. Foot injury on centraliser deck.",2.5 +15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 20:00:00+00:00,2007-11-10 21:15:00+00:00,55.0,m,fixed,drilling -- casing,ok,injury,Investigated incident involving a service hand.,1.25 +15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 21:15:00+00:00,2007-11-10 21:45:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Continued to install top up cement system on the 30"" conductor pipe whlie running down.",0.5 +15_9_F_14_2007_11_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-10T00:00:00+01:00,2007-11-11T00:00:00+01:00,2007-11-10 21:45:00+00:00,2007-11-10 23:00:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Run 30"" conductor on 5 1/2"" landing string.",1.25 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-10 23:00:00+00:00,2007-11-10 23:45:00+00:00,55.0,m,fixed,drilling -- casing,ok,success,"Continued to run 30"" conductor on 5 1/2"" landing string. Problems with top drive torque wrench.",0.75 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-10 23:45:00+00:00,2007-11-11 01:45:00+00:00,55.0,m,fixed,drilling -- casing,ok,equipment failure,Problems with torque wrench on top drive. Not able to disconnect top drive from landing string.,2.0 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 01:45:00+00:00,2007-11-11 03:45:00+00:00,169.0,m,fixed,drilling -- casing,ok,success,Pulled back one single. Broke connection using the iron roughneck. Continued to RIH. Stabbed conductor into guide funnel at 03:30 hrs. Checked orientation of conductor shoe. Observed a broken connetion on the top up cement system. Continued to run the conductor to 160 m. Observed 20 tons weight. Worked conductor down to 169 m.,2.0 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 03:45:00+00:00,2007-11-11 05:00:00+00:00,169.0,m,fixed,drilling -- casing,ok,success,Made up the top drive and started to wash down from 169 m. Flow: 1000 ltr/min. SPP: 4 bar. Observed some of the cement top up piping no longer attached to the conductor pipe. Attempted to recover broken cement top up piping in the guide funnel.,1.25 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 05:00:00+00:00,2007-11-11 06:00:00+00:00,169.0,m,fixed,drilling -- casing,ok,success,Recovered broken off piece of top up cement piping.,1.0 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 06:00:00+00:00,2007-11-11 07:00:00+00:00,180.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting with oncoming crew. Washed down with 30"" conductor from 169 to 180 m, 1000 lpm.",1.0 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 07:00:00+00:00,2007-11-11 11:00:00+00:00,190.0,m,fixed,drilling -- casing,ok,success,"Held a toolbox meeting. Rigged up tugger on centralizer deck and pulled conductor to starboard aft. Guided the conductor carefully through the guide funnel to 180.2 m to avoid further damage on top up cement piping. Washed down with 30"" conductor from 180.2 m to 190 m, 1000 lpm. Observed leakage in top up cement piping at approx. 11 m below top housing.",4.0 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 11:00:00+00:00,2007-11-11 13:00:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,"Laid down top single at 190 m. Made up the cement stand. Washed down with the conductor to approx 40 cm above TD, 1000 lpm. Took digiquartz measurements. RIH and set conductor at TD 196.8 m. Confirmed top of housing 43 cm lower than F-7.",2.0 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 13:00:00+00:00,2007-11-11 13:45:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,Prepared to activated the centralizers on the template using the ROV.,0.75 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 13:45:00+00:00,2007-11-11 18:00:00+00:00,198.8,m,fixed,drilling -- casing,ok,success,"Held a tool box meeting regarding the cementing of the 30"" conductor. Pressure tested the cementing line to 100 bar. Connected hot stab. Run centralizer sylinders on template and verified conductor position with ROV. Checked inclination: Roll 0.12, pitch 0.8.",4.25 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 18:00:00+00:00,2007-11-11 22:15:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,"Circulated 30 m3 of SW with 2500 lpm. Observed returns from slot F-14 came out of conductor annulus on slot F-7. Took time out, evaluated situation.",4.25 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 22:15:00+00:00,2007-11-11 22:30:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,Held a tool box meeting prior to rig down the cement line.,0.25 +15_9_F_14_2007_11_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-11T00:00:00+01:00,2007-11-12T00:00:00+01:00,2007-11-11 22:30:00+00:00,2007-11-11 23:00:00+00:00,196.3,m,fixed,drilling -- casing,ok,success,"Retracted centralizer dogs on template. Picked up 0,5 m to confirm conductor free, free up weight 124 ton, no excess drag.",0.5 +15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-11 23:00:00+00:00,2007-11-12 00:00:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,"Attempted to confirm dogs fully retracted with ROV, not possible due to bad visibility.",1.0 +15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 00:00:00+00:00,2007-11-12 02:00:00+00:00,196.3,m,fixed,interruption -- waiting on weather,ok,success,WOW for visibillity to improve on the template.,2.0 +15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 02:00:00+00:00,2007-11-12 02:30:00+00:00,196.8,m,fixed,drilling -- casing,ok,success,"Washed back to TD with conductor, 800 lpm.",0.5 +15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 02:30:00+00:00,2007-11-12 05:00:00+00:00,196.8,m,fixed,interruption -- waiting on weather,ok,success,WOW for visibility to improve on template.,2.5 +15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 05:00:00+00:00,2007-11-12 20:30:00+00:00,197.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW for visibility to improve on template. Unable to engage hot-stab for centraliser rams. Damaged claw for ROV arm. Came to surface with ROV to repare claw, dived again with ROV.",15.5 +15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 20:30:00+00:00,2007-11-12 21:00:00+00:00,197.0,m,fixed,interruption -- waiting on weather,ok,success,WOW for visibility to improve on template. Held meeting with essential personnel and went thought conductor cementing procedure.,0.5 +15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 21:00:00+00:00,2007-11-12 22:15:00+00:00,197.0,m,fixed,interruption -- waiting on weather,ok,success,WOW for visibility to improve on template.,1.25 +15_9_F_14_2007_11_13.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-12T00:00:00+01:00,2007-11-13T00:00:00+01:00,2007-11-12 22:15:00+00:00,2007-11-12 23:00:00+00:00,197.0,m,fixed,interruption -- waiting on weather,ok,success,WOW for visibility to improve on template. Meanwhile lined up and pressure tested the cement line to 100 bars. Stabbed hot-stab.,0.75 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-12 23:00:00+00:00,2007-11-13 01:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Worked with centralizer rams, rams were not working properlyy. Took out the hot-stab and flushed the lines, and stabbed the hot-stab back in, now the centralising rams worked properly. Retracted rams.",2.0 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 01:00:00+00:00,2007-11-13 02:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,WOW for visibility to improve on template.,1.25 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 02:15:00+00:00,2007-11-13 02:45:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to cementing of the 30"" conductor.",0.5 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 02:45:00+00:00,2007-11-13 03:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Circulated SW at 250 lpm increased to 1000 lpm in 250 lpm steps. Still only returns coming out from F-7, hook load came down with 10 MT to 92 MT while pumping at 1000 lpm.",0.5 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 03:15:00+00:00,2007-11-13 04:30:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Pumped 30 m³ 1.7 SG mud, 1000 lpm, 5.7 bars, hookload dropped to 85 MT. Still only returns out from F-7. Picked up one meter with 120 MT and washed conductor back to setting depth, final hook load 76 MT. Total 20 m³ 1.7 SG mud pumped while washing down.",1.25 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 04:30:00+00:00,2007-11-13 05:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Started to take digiquartz measurement to confirm correct setting depth of the 30"" conductor.",0.5 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 05:00:00+00:00,2007-11-13 08:45:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Picked up to original pick up weight of 120 MT 0.8 meter. Washed down conductor to correct setting depth at 196.8 meter, hook load 101 MT. Checked depth with digiquartz; 38 cm below F-7. Pumped 19 m³ of 1.7 SG mud, then 38 m³ sea water while washing down, return fluid up on nearby well, F-7.",3.75 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 08:45:00+00:00,2007-11-13 11:45:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Washed down 5 cm, and circulated/worked string until correct hookload, pumped a total of 216 m³ of sea water. Hook load 101 MT. Return fluid up on nearby well, F-7.",3.0 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 11:45:00+00:00,2007-11-13 12:45:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Closed the centraliser Rams and verified same with the ROV. Checked depth with digiquartz; 43 cm below F-7.,1.0 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 12:45:00+00:00,2007-11-13 13:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Pumped 15 m³ 1.65 SG mud and applied 20 bars back pressure to IBOP.,0.5 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 13:15:00+00:00,2007-11-13 15:30:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Mixed and pumped 106 m³ 1.52 SG Tuned Light XL cement slurry, experienced problems with plugged lines towards the end. Pumped first 20 m3 at 600 lpm, then increased rate to 1000 lpm. Checked returns on F-7, only minor returns after 70 m³ pumped, got returns up F-14. Displaced cement slurry with 6.5 m³ SW with mud pumps. Hook load dropped from 101 to 99 MT during cement job.",2.25 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 15:30:00+00:00,2007-11-13 16:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Bled off pressure and checked for back-flow. Removed cement hose and flushed through manifolds and hoses.,0.75 +15_9_F_14_2007_11_14.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-13T00:00:00+01:00,2007-11-14T00:00:00+01:00,2007-11-13 16:15:00+00:00,2007-11-13 23:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Waited on cement to set. Meanwhile performed general maintenance.,6.75 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-13 23:00:00+00:00,2007-11-14 04:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Waited on cement to set. Meanwhile performed general maintenance.,5.0 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 04:00:00+00:00,2007-11-14 04:30:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pressure test of top-up system.,0.5 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 04:30:00+00:00,2007-11-14 05:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Lined up for flushing of top-up line.,0.5 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 05:00:00+00:00,2007-11-14 06:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Flushed top-up system and surface lines. Pressure tested UWG top-up system using the cement unit, rupture disk burst at 53 bars (769 psi).",1.25 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 06:15:00+00:00,2007-11-14 08:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Opened centralizer rams on F-14. Retrieved the hot stab from bank # 4.,2.0 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 08:15:00+00:00,2007-11-14 09:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to perform top-up cement job.,0.75 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 09:00:00+00:00,2007-11-14 10:30:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Started to circulate with sea water 500 lpm. Performed cement top-up job, pumped 10.4 m³, 1.56 SG G-cement 82 bars at 500 lpm.",1.5 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 10:30:00+00:00,2007-11-14 13:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Flushed cement lines. Dropped 24 mm ball into the top-up hose, applied 240 bars to top-up to release the line NO-GO, bled down the pressure. Cut the hose using the ROV. Flushed lines and manifold on the rig floor and cement unit.",2.75 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 13:15:00+00:00,2007-11-14 14:15:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Checked inclinometer reading on the CART, opened the valve on the CART tool. Released the CART tool, slacked off to neutral weight = 76 MT, turned to the right 400/3000 Nm. Picked up the CART, tool weight 79 MT. Laid out the cement pump in sub.",1.0 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 14:15:00+00:00,2007-11-14 15:00:00+00:00,197.0,m,fixed,drilling -- casing,ok,success,"Held tool box prior to laying out the landing string. Laid out pup jnts. and HWDP landing string and checked serial numbers. Measured length using a laser measure, racked back landing string in derrick.",0.75 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 15:00:00+00:00,2007-11-14 15:30:00+00:00,197.0,m,fixed,drilling -- casing,ok,equipment failure,Problems with the PRS investigated same.,0.5 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 15:30:00+00:00,2007-11-14 16:30:00+00:00,167.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with landing string, measured same with laser.",1.0 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 16:30:00+00:00,2007-11-14 17:15:00+00:00,167.0,m,fixed,drilling -- casing,ok,equipment failure,"Due to unusual noise from forward PRS, stop operation and performed full inspection of same.",0.75 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 17:15:00+00:00,2007-11-14 17:45:00+00:00,30.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with landing string, measured same with laser.",0.5 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 17:45:00+00:00,2007-11-14 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to pull the master bushing, removed same. Pulled out the CART tool and removed the inclinometer, installed the master bushing.",0.25 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 18:00:00+00:00,2007-11-14 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Function tested and preserved the CART tool.,0.5 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 18:30:00+00:00,2007-11-14 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk, prior to measuring the landing string, and laying out the aluminium inner string.",0.5 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 19:00:00+00:00,2007-11-14 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned the rig floor.,0.25 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 19:15:00+00:00,2007-11-14 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Prepared for measuring the double on top of the CART tool. Laser measuring device was drop down onto the rig floor,0.25 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 19:30:00+00:00,2007-11-14 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Operation was terminated and an investigating was established. A statement of the incident was put together.,1.25 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 20:45:00+00:00,2007-11-14 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk, prior to measuring the landing string, and laying out the aluminium inner string. Measured the double.",0.75 +15_9_F_14_2007_11_15.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-14T00:00:00+01:00,2007-11-15T00:00:00+01:00,2007-11-14 21:30:00+00:00,2007-11-14 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Racked back the CART tool in derrick. Laid out the aluminium inner string.,1.5 +15_9_F_14_2007_11_16.xml,NO 15/9-F-14,NO 15/9-F-14,2007-11-15T00:00:00+01:00,2007-11-16T00:00:00+01:00,2007-11-14 23:00:00+00:00,2007-11-15 03:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared for skidding of the cantilever from F-14 to F-5,4.5 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 00:00:00+00:00,2007-12-04 03:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Held toolbox talk prior to skidding rig from F-1 to F-14. Skidded rig 3 m starboard. Skidded rig/cantilever 6,5 m aft. Removed hatches in wellhead module on F-14. Ran stand of HWDP through rotary and made final adjustments.",3.0 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 03:00:00+00:00,2007-12-04 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke down stand of 5 1/2"" HWDP and laid out three joints for backload and inspection. Rebuilt stand with 3 new joints of 5 1/2"" HWDP and racked back in derrick. Ran tugger from moonpool to seabed to help ROV clear CTS hose.",2.0 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 05:00:00+00:00,2007-12-04 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up 26"" drilling BHA and brought to V-door. Meanwhile helped ROV to clear hose trapped below template using tugger.",1.0 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 06:00:00+00:00,2007-12-04 07:15:00+00:00,22.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to making up 26"" drilling BHA. Removed masterbushing and ran 26"" Bit / gMWD assy through rotary. Inserted gMWD probe in BHA as per Scientific instructions. Meanwhile ROV attempted to connect hose to CTS funnel. CTS hose was too short and the funnel had to be turned. ROV lost 3-finger claw when attempteing to turn CTS funnel.",1.25 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 07:15:00+00:00,2007-12-04 08:00:00+00:00,33.0,m,fixed,drilling -- trip,ok,success,Continued running BHA. Picked up and made up MWD/UBHO assy. Meanwhile pulled ROV to surface for repair.,0.75 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 08:00:00+00:00,2007-12-04 08:30:00+00:00,33.0,m,fixed,drilling -- trip,ok,success,Orientated UBHO sleeve as per Scientific instructions. Meanwhile repaired ROV manipulator claw.,0.5 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 08:30:00+00:00,2007-12-04 09:45:00+00:00,63.0,m,fixed,drilling -- trip,ok,success,"Made up 3 x 9 1/2"" NM DC to BHA and ran in to 63 m MD. Repaired ROV and launched same. Assessed video recording from incident. Found 3-finger claw to be lost in hole. Assessed situation.",1.25 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 09:45:00+00:00,2007-12-04 10:45:00+00:00,63.0,m,fixed,drilling -- trip,ok,success,"Laid out 1 x DC and made up hydro- mechanical jar to 8 1/4"" DC stand. Racked back in derrick. Discussed way forward with town.",1.0 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 10:45:00+00:00,2007-12-04 11:30:00+00:00,63.0,m,fixed,drilling -- drill,ok,equipment failure,"Awaited further instuctions. Discussed way forward with town. Decided to run in with 26"" rock bit BHA in attempt to remove junk in hole.",0.75 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 11:30:00+00:00,2007-12-04 14:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 26"" drilling BHA. Racked back BHA in derrick. Laid out UBHO/MWD assy on deck.",3.25 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 14:45:00+00:00,2007-12-04 15:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"Held toolbox talk prior to making up new 26"" junk removal BHA with rock bit.",0.25 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 15:00:00+00:00,2007-12-04 16:00:00+00:00,30.0,m,fixed,drilling -- drill,ok,equipment failure,"Made up 26"" bit and bit sub to stand of 9 3/4"" drillcollars. Removed masterbushing, ran stand through, installed masterbushing and hung off assy in rotary table.",1.0 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 16:00:00+00:00,2007-12-04 17:00:00+00:00,70.0,m,fixed,drilling -- drill,ok,equipment failure,"Made up jar and 8 1/4"" DC stand. Picked up single 8 1/4"" DC and made up same.",1.0 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 17:00:00+00:00,2007-12-04 18:00:00+00:00,140.0,m,fixed,drilling -- drill,ok,equipment failure,"RIH with 26"" junk removal BHA on 5 1/2"" HWDP from 70 m MD to 175 m MD. Stabbed into CTS on top of conductor housing while observing with ROV.",1.0 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 18:00:00+00:00,2007-12-04 18:45:00+00:00,183.0,m,fixed,drilling -- drill,ok,equipment failure,Washed down from 175 m to 183 m MD with 1000 lpm and tagged cement with 5 MT. Applied 4-6 MT WOB and rotated at 15 rpm down to 185 m MD.,0.75 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 18:45:00+00:00,2007-12-04 19:30:00+00:00,138.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 26 junk removal BHA from 185 m to just above CTS funnel at 138 m MD. ROV inspected 26"" rock bit. No damage or junk could be observed.",0.75 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 19:30:00+00:00,2007-12-04 19:45:00+00:00,185.0,m,fixed,drilling -- drill,ok,equipment failure,Ran back in to 185 m MD to resume drilling cement. Connected CTS hose to ROV and started pumping with dredge pump.,0.25 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 19:45:00+00:00,2007-12-04 22:30:00+00:00,197.0,m,fixed,drilling -- drill,ok,success,Drilled cement from 185 m to 197 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-3 kNm. Controlled penetration rate to 15 m/hrs. Observed higher WOB (autodrill 15 m/hr) from 193 m to 197 m MD indicating hard cement. 20 MT tonne WOB peak at 193 m MD and 3-10 MT downwards. Observed excessive rattling in string and WOB peaks around shoe depth at 197 m MD. Pumped 2 x 20 m3 hi-vis sweeps to clean hole.,2.75 +15_9_F_14_2007_12_05.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-04T00:00:00+01:00,2007-12-05T00:00:00+01:00,2007-12-04 22:30:00+00:00,2007-12-04 23:00:00+00:00,201.0,m,fixed,drilling -- drill,ok,success,Drilled rathole and shoe from 197 m to 201 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-2 kNm / WOB 1-2 MT. Reamed back inside shoe for every 2 m drilled.,0.5 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-04 23:00:00+00:00,2007-12-04 23:15:00+00:00,204.0,m,fixed,drilling -- drill,ok,success,Drilled rathole and shoe from 197 m to 201 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-6 kNm / WOB 1-8 MT. Reamed back inside shoe for every 2 m drilled.,0.25 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-04 23:15:00+00:00,2007-12-04 23:45:00+00:00,206.0,m,fixed,drilling -- drill,ok,success,Drilled 2 m new formation from 204 m to 206 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-2 kNm / WOB 1-2 MT. Pumped 20 m3 his-vis sweep to clean hole.,0.5 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-04 23:45:00+00:00,2007-12-05 02:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 26"" junk removal BHA from 206 m MD to surface on 5 1/2"" HWDP. Laid down 1 x 8 1/4"" DC. Racked back jar/DC assy. Lifted UBHO/MWD assy to HTS due to wind speed limitations on crane. Pulled 9 3/4"" DC/bit stand to surface and inspected 26"" rock bit. Found 2 x pieces of junk trapped in roller cones. Removed 1 piece of 800 g. The other piece was jammed in middle of the bit and could not be removed easily. Also found several worn teeth on bit.",3.0 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 02:45:00+00:00,2007-12-05 03:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"Broke 26"" bit and bit sub. Racked back stand of 9 3/4"" DC.",0.75 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 03:30:00+00:00,2007-12-05 04:30:00+00:00,70.0,m,fixed,drilling -- drill,ok,equipment failure,"Ran 26"" drilling BHA from surface to 70 m MD.",1.0 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 04:30:00+00:00,2007-12-05 05:00:00+00:00,133.0,m,fixed,drilling -- drill,ok,success,"Ran 26"" drilling BHA from 70 m to 133 m MD.",0.5 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 05:00:00+00:00,2007-12-05 06:00:00+00:00,206.0,m,fixed,drilling -- drill,ok,success,"RIH with 26"" drilling BHA from 133 m to 206 m MD. Stabbed into CTS funnel while observing with ROV.",1.0 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 06:00:00+00:00,2007-12-05 07:45:00+00:00,211.0,m,fixed,drilling -- drill,ok,success,"Established drilling parameters. Drilled 26"" hole section from 206 m to 211 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 1-2 MT WOB / Rotation 125 RPM / String torque 1-3 kNm. Pumped 20 m3 hi-vis to clean the hole at 211 m MD. Scientifc drilling reported that UBHO sleeve had not been fastened correctly in the carrier. Decided to pull BHA for remedial action.",1.75 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 07:45:00+00:00,2007-12-05 09:00:00+00:00,63.0,m,fixed,interruption -- repair,ok,equipment failure,"POOH with 26"" drilling BHA from 211 m MD to 63 m MD. No drag observed when pulling BHA through conductor shoe. Racked back DC/jar and NMDC stands to access UBHO sub.",1.25 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 09:00:00+00:00,2007-12-05 10:00:00+00:00,63.0,m,fixed,interruption -- repair,ok,equipment failure,"Checked UBHO relative to scribeline. Checked and thightened UBHO sleeve. Inspected 26"" bit at Centralizer deck - no wear observed.",1.0 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 10:00:00+00:00,2007-12-05 12:30:00+00:00,196.0,m,fixed,interruption -- repair,ok,equipment failure,"Made up and RIH with 26"" drilling BHA from 63 m to 196 m MD. Stabbed into CTS funnel while observing with ROV.",2.5 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 12:30:00+00:00,2007-12-05 12:45:00+00:00,209.0,m,fixed,interruption -- repair,ok,equipment failure,"Washed down with 26"" drilling BHA from 196 m to 209 m MD pumping at 2000 lpm.",0.25 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 12:45:00+00:00,2007-12-05 14:15:00+00:00,195.0,m,fixed,drilling -- survey,ok,success,"Performed singel shot survey on WL with bit inside conductor shoe. Inclination 0,33 deg / Azimuth 306,1 deg / Toolface 050 deg. Halted drilling operation for software upgrade on Siemens F&G system.",1.5 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 14:15:00+00:00,2007-12-05 17:45:00+00:00,195.0,m,fixed,drilling -- drill,ok,equipment failure,Stand-by for software upgrade of Siemens F&G system. At 18:15 hrs => Washed down to 209 m MD while pumping at 2000 lpm. Shut down pumps and waited for gMWD to reset.,3.5 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 17:45:00+00:00,2007-12-05 18:00:00+00:00,209.0,m,fixed,drilling -- survey,ok,success,Pumped at 2000 lpm and obtained gMWD survey - rejected survey.,0.25 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 18:00:00+00:00,2007-12-05 19:00:00+00:00,217.0,m,fixed,drilling -- drill,ok,success,"Slided 26"" drilling BHA from 211 m to 217 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 1-3 WOB / Rotation 95 RPM (bit rpm) / String torque 0-1 kNm. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off on slips.",1.0 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 19:00:00+00:00,2007-12-05 20:15:00+00:00,215.0,m,fixed,drilling -- survey,ok,success,"Performed single shot survey on WL. Inclination 0,2 deg / Azimuth 243,9 deg / Toolface 112 deg. Pumped at 2000 lpm to obtain gMWD survey - rejected data.",1.25 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 20:15:00+00:00,2007-12-05 21:15:00+00:00,226.0,m,fixed,drilling -- drill,ok,success,"Slided 26"" drilling BHA from 217 m to 226 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 2-6 WOB / Rotation 95 RPM (bit rpm) / String torque 0-1 kNm. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off on slips.",1.0 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 21:15:00+00:00,2007-12-05 22:00:00+00:00,226.0,m,fixed,drilling -- survey,ok,success,"Performed single shot survey on WL. Inclination 0,37 deg / Azimuth 297,4 deg / Toolface 112 deg. Pumped at 2000 lpm to obtain gMWD survey - rejected data.",0.75 +15_9_F_14_2007_12_06.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-05T00:00:00+01:00,2007-12-06T00:00:00+01:00,2007-12-05 22:00:00+00:00,2007-12-05 23:00:00+00:00,233.0,m,fixed,drilling -- drill,ok,success,"Slided 26"" drilling BHA from 226 m to 233 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 2-6 MT WOB / Rotation 95 RPM (bit rpm) / String torque 0-1 kNm.",1.0 +15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-05 23:00:00+00:00,2007-12-05 23:45:00+00:00,239.0,m,fixed,drilling -- drill,ok,success,Continued sliding from 233 m to 239 m MD. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off in slips.,0.75 +15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-05 23:45:00+00:00,2007-12-06 00:45:00+00:00,239.0,m,fixed,drilling -- survey,ok,success,"Performed single shot survey on WL. Inclination 0,25 deg / Azimuth 320,5 deg / Toolface 125 deg. Adjusted toolface to 114 deg. Secured drillstring using chain hoist on Centralizer deck. Pumped at 2000 lpm to obtain gMWD survey - obatined data but still 16 deg deviation on toolface.",1.0 +15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-06 00:45:00+00:00,2007-12-06 02:00:00+00:00,249.0,m,fixed,drilling -- drill,ok,success,"Slided 26"" drilling BHA from 229 m to 249 m MD. Drilling parameters : Flow 3100 lpm / SPP 68 bar / 8-10 MT WOB / Rotation 95 RPM (bit rpm)/ String torque 1-3 kNm. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off in slips.",1.25 +15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-06 02:00:00+00:00,2007-12-06 03:00:00+00:00,249.0,m,fixed,drilling -- survey,ok,success,"Performed single shot survey on WL. Inclination 0,27 deg / Azimuth 334,1 deg / Toolface 076 deg. Secured drillstring using chain hoist at Centralizer deck. Pumped at 2000 lpm to obtain gMWD survey : Inclination 0,44 deg / Azimuth 024,1 deg / Toolface 076 deg - good match on toolface figure. Good match between realtime GTF and MTF.",1.0 +15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-06 03:00:00+00:00,2007-12-06 03:45:00+00:00,259.0,m,fixed,drilling -- drill,ok,success,"Slided 26"" drilling BHA from 249 m to 258 m MD. Drilling parameters : Flow 3100 lpm / SPP 68 bar / 1-3 MT WOB / Rotation 95 RPM (bit rpm)/ String torque 0-2 kNm.",0.75 +15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-06 03:45:00+00:00,2007-12-06 05:00:00+00:00,269.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole section from 258 m to 269 m MD. Drilling parameters : Flow 3100 lpm / SPP 68 bar / 1-3 MT WOB / Rotation 130 RPM (bit rpm) / String torque 6 kNm.",1.25 +15_9_F_14_2007_12_07.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-06T00:00:00+01:00,2007-12-07T00:00:00+01:00,2007-12-06 05:00:00+00:00,2007-12-06 23:00:00+00:00,530.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole section from 269 m to 530 m MD. Drilling parameters : Flow 3100-4400 lpm / SPP 68-125 bar / WOB 2-8 MT / Torque 1-11 kNm / String RPM 40 / Bit RPM 40-170. Average ROP 15 m /hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Secured drillstring with sling/chainhoist on Centralizer deck while performing survey. + +Steered intervalls : +268 - 287 m MD +315 - 331 m MD +356 - 377 m MD +396 - 411 m MD +435 - 450 m MD +475 - 495 m MD +515 - 535 m MD",18.0 +15_9_F_14_2007_12_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-07T00:00:00+01:00,2007-12-08T00:00:00+01:00,2007-12-06 23:00:00+00:00,2007-12-07 05:00:00+00:00,636.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole section from 530 m to 636 m MD. Drilling parameters : Flow 4400 lpm / SPP 125-127 bar / WOB 6-8 MT / Torque 2-8 kNm / String RPM 40 / Bit RPM 40-170. Average ROP 18 m /hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Secured drillstring with sling/chainhoist on Centralizer deck while performing survey. + +Steered intervalls : +555 - 575 m MD +597 - 615 m MD",6.0 +15_9_F_14_2007_12_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-07T00:00:00+01:00,2007-12-08T00:00:00+01:00,2007-12-07 05:00:00+00:00,2007-12-07 20:30:00+00:00,878.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section in rotation mode, from 636 m to 878 m MD. Drilling parameters : Flow 4400 - 4480 lpm / SPP 125 - 127 bar / WOB 6-10 MT / Torque 9 - 10 kNm / String RPM 40 / Bit RPM 165 - 172. Avarage ROP 20,3 m/ hrs.Pumped 10 m3 hi-vis sweep for every singel drilled. +Performed gMWD survey on connections.",15.5 +15_9_F_14_2007_12_08.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-07T00:00:00+01:00,2007-12-08T00:00:00+01:00,2007-12-07 20:30:00+00:00,2007-12-07 23:00:00+00:00,981.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section in rotation mode, from 878 m to 981m MD. Reduced flow-rate from 4480 lpm to 4000 lpm due to Utsira sand. Hit top of utsira sand at 888 m. Drilling parameters : Flow 4000 lpm / SPP 121 bar / WOB 2 - 5 MT / Torque 3 - 5 kNm / String RPM 40 / Bit RPM 160- 162. Avarage ROP 38,1m/ hrs. Pumped 10 m3 hi- vis sweep for every singel drilled. Performed g MWD survey on connections",2.5 +15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-07 23:00:00+00:00,2007-12-08 01:30:00+00:00,1064.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" section in rotation mode, from 981 m to bottom of Utsira sand at 1064 m MD. Drilling parameters : Flow 4000 lpm / SPP 121 bar / WOB 2 - 5 MT / Torque 3 - 5 kNm / String RPM 40 / Bit RPM 160- 162. Avarage ROP 41,5 m/ hrs. Pumped 10 m3 hi- vis sweep for every singel drilled. Performed g MWD survey on connections.",2.5 +15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 01:30:00+00:00,2007-12-08 02:30:00+00:00,1083.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 1064 m to Td for section at 1083 m MD. Drilling parameters : Flow 4410 lpm / SPP 154 -156 bar / WOB 8 - 13 MT / Torque 10 -13 knm / String RPM 40 / Bit RPM 170. Avarage ROP 22,8 m/ hrs.Pumped 10 m3 hi.vis sweep for every singel drilled. Performed g MWD survey on connections.",1.0 +15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 02:30:00+00:00,2007-12-08 05:00:00+00:00,1083.0,m,fixed,drilling -- drill,ok,success,"At TD, pumped 30 m3 hi vis followed by 30 m3 sea watwr and then 55 m3 hi - vis. Reduced flow rate to 3500 lpm while pumping hi vis pill through BHA. Circulated hole clean with 4480 lpm / SPP 127-130 bar /String RPM 40 / Torque 3-4 kNm. Kept bit below Utsira sand during circulation / reciprocation.",2.5 +15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 05:00:00+00:00,2007-12-08 07:00:00+00:00,1072.0,m,fixed,drilling -- drill,ok,success,"Displaced well to 1.40 sg bentonite mud with 3500 lpm / SPP 70 bar / String RPM 20 / Torque 1-4 kNm. Kept bit below Utsira sand during displacment. SPP leveled out after 14500 strokes at 3500 lpm / SPP 152 bar /String RPM 180 / Torque 2-4 kNm. Observed some returns coming through cement ports on 30"" conductor on F-4.",2.0 +15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 07:00:00+00:00,2007-12-08 09:30:00+00:00,717.0,m,fixed,drilling -- drill,ok,success,"POOH with 26"" drilling BHA from 1072 m MD to 717 m MD. Tight spots when POOH: + + 807-800 m: 10-15 MT overpull + 770-764 m: 13-16 MT overpull + 758-754 m: 10-14 MT overpull + 725-720 m: 16-21 MT overpull + +Encountered leak on PS21 slips.",2.5 +15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 09:30:00+00:00,2007-12-08 10:00:00+00:00,717.0,m,fixed,interruption -- other,ok,equipment failure,Discovered leakage on PS 21 slips. Changed hose.,0.5 +15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 10:00:00+00:00,2007-12-08 13:30:00+00:00,193.0,m,fixed,drilling -- drill,ok,success,"POOH with 26"" drilling BHA from 717 m MD to 193 m MD. Tight spots when POOH: + + 627-620 m: 2-10 MT overpull + 615-612 m: 5-15 MT overpull + 598-596 m: 11-20 MT overpull + 595-590 m: 10-30 MT overpull + 585-580 m: 15-30 MT overpull + 578-575 m: 5-15 MT overpull",3.5 +15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 13:30:00+00:00,2007-12-08 15:00:00+00:00,193.0,m,fixed,drilling -- casing,ok,success,"Built scaffolding under centralizer deck on well head module. + +Meanwhile topped up well with 1.40 sg mud at 193 m MD. Serviced TDS and PRS and performed derrick inspection for loose items.",1.5 +15_9_F_14_2007_12_09.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-08T00:00:00+01:00,2007-12-09T00:00:00+01:00,2007-12-08 15:00:00+00:00,2007-12-08 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box meeting before manual handling of BHA. Continued POOH with 26"" drilling BHA from 193 m MD to OOH. ROV guided BHA out of template. Flushed string with SW when bit was above template. Clean and cleared rig floor of excess equipment.",8.0 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-08 23:00:00+00:00,2007-12-09 01:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,LO pup joints on top of landing string. PU one joint HWDP. MU and RB cmt stand,2.25 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 01:15:00+00:00,2007-12-09 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Spotted csg handling equipment on rig floor.,0.75 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 02:00:00+00:00,2007-12-09 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held pre-job meeting prior to handling DCI valve. Brought DCI frame down to scaffolding below centralizer deck through rotary and deck openings using tugger. Hung up and chained back DCI frame from well head centre using chain hoists and eagle clamps.,2.0 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 04:00:00+00:00,2007-12-09 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU casing running equipment, 20 ft bails and FAC tool.",1.0 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 05:00:00+00:00,2007-12-09 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU casing running equipment, 20 ft bails, elevators, csg tong, slips and FAC tool.",5.5 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 10:30:00+00:00,2007-12-09 11:30:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting prior to running 20"" csg. PU 20"" shoe joint. Encountered signal problems to casing tong.",1.0 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 11:30:00+00:00,2007-12-09 12:15:00+00:00,12.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot ZMS signals on csg tong.,0.75 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 12:15:00+00:00,2007-12-09 13:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,"Continued PU 20"" csg shoe assy. Encountered problems with FWD PRS & HTS",0.75 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 13:00:00+00:00,2007-12-09 13:45:00+00:00,12.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshoot signals and alignement on FWD PRS and HTS.,0.75 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 13:45:00+00:00,2007-12-09 16:00:00+00:00,39.0,m,fixed,drilling -- casing,ok,success,PU intermediate joint and float collar joint. Tread locked connections. Checked float in shoe and float collar for flow through with SW. Filled each joint with 90 strk SW.,2.25 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 16:00:00+00:00,2007-12-09 19:45:00+00:00,109.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" csg from 39 m to 109 m MD. Installed csg centralizers on each joint. Filled every joint with 90 strk SW. Average running speed 2 jnts/hr. Back-up chain on upper casing tong broke-off.",3.75 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 19:45:00+00:00,2007-12-09 20:45:00+00:00,109.0,m,fixed,interruption -- other,ok,equipment failure,Back-up chains on upper part of casing tong broke off. Made up temporary solution with wire slings acting as back-up security to the counterbalance.,1.0 +15_9_F_14_2007_12_10.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-09T00:00:00+01:00,2007-12-10T00:00:00+01:00,2007-12-09 20:45:00+00:00,2007-12-09 23:00:00+00:00,151.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" csg from 109 m to 151 m MD. Installed one centralizer on each joint. Filled every joint with 90 strk SW. Average running speed 2 jnts/hr. + +Stabbed csg into conductor assisted by ROV. Had to use chain tongs in well head area to limit csg string movement in 3-4 m waves.",2.25 +15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-09 23:00:00+00:00,2007-12-10 05:00:00+00:00,414.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" csg from 151 m to 414 m MD. Filled string with SW every 5th joint. Average running speed 4 jnts/hr. + +Observed tight spots at: +250-256 m: 12 MT drag +282-293 m: 16 MT drag - circulated w/SW 650 lpm / 25 bar",6.0 +15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 05:00:00+00:00,2007-12-10 17:30:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" csg from 414 m to 923 m MD. Filled string with SW every 5th joint. Average running speed 5 jnts/hr. Upweight 188 MT/down weight 144 MT at last joint before WH housing. + +Observed tight spots at: +576-588 m: 20-25 MT drag +701-738 m: 15-18 MT drag +800-825 m: 12-15 MT drag",12.5 +15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 17:30:00+00:00,2007-12-10 18:00:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,Greased slips prior to elevator change and topped-up casing with SW.,0.5 +15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 18:00:00+00:00,2007-12-10 20:15:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,"RD 20"" csg handling equipment and RU 5 1/2"" handling equipment.",2.25 +15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 20:15:00+00:00,2007-12-10 21:30:00+00:00,923.0,m,fixed,drilling -- casing,ok,success,"PU 18 3/4"" WH housing/CART assembly and MU to 20"" casing. Oriented DCI valve outlet swivel to STB side using a ring bolt.",1.25 +15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 21:30:00+00:00,2007-12-10 22:15:00+00:00,934.0,m,fixed,drilling -- casing,ok,success,"RIH with 18 3/4"" WH housing/CART assembly from 923 m to 934 m. Removed PS30 slips and installed outer ring and master bushings.",0.75 +15_9_F_14_2007_12_11.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-10T00:00:00+01:00,2007-12-11T00:00:00+01:00,2007-12-10 22:15:00+00:00,2007-12-10 23:00:00+00:00,934.0,m,fixed,drilling -- casing,ok,success,RD csg tong and flush mounted elevators.,0.75 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-10 23:00:00+00:00,2007-12-11 00:00:00+00:00,934.0,m,fixed,drilling -- casing,ok,success,Continued RD csg tong and flush mounted elevators. Cleared rig floor.,1.0 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 00:00:00+00:00,2007-12-11 00:45:00+00:00,953.0,m,fixed,drilling -- casing,ok,success,"RIH with 18 3/4"" WH housing/CART assembly from 934 m to 953 m. Observed 20 MT drag. Circulated with 450 lpm / 30 bar and washed down.",0.75 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 00:45:00+00:00,2007-12-11 02:30:00+00:00,965.0,m,fixed,drilling -- casing,ok,success,"Removed gas sensor and section of grating on x-mas tree deck to enable safe passage of WH housing through deck. Continued RIH with 18 3/4"" WH housing/CART assembly from 953 m to 965 m.",1.75 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 02:30:00+00:00,2007-12-11 05:00:00+00:00,965.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to installing DCI valve. Installed DCI frame on 18 3/4"" WH housing working on scaffolding platform below WH module.",2.5 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 05:00:00+00:00,2007-12-11 07:45:00+00:00,965.0,m,fixed,drilling -- casing,ok,success,"Installed DCI frame on 18 3/4"" WH housing working on scaffolding platform below WH module. Pressure tested DCI frame/ WH to 210 bar/ 5 min. Meanwhile held pre-job meeting for cement job.",2.75 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 07:45:00+00:00,2007-12-11 10:00:00+00:00,1065.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 20"" casing on landing string from 965 m to 1065 m. Washed down last 10 m 440 lpm / 38 bar. Upweight 188 MT/ down weight 138 MT.",2.25 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 10:00:00+00:00,2007-12-11 10:15:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,"Landed 18 3/4"" WH into 30"" conductor by setting down casing string weight + 5 MT to engage lock ring. Performed 25 MT overpull test. Slacked off and kept landing string in tension by an overpull of 3 MT.",0.25 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 10:15:00+00:00,2007-12-11 13:15:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Established circulation in steps with SW to 2300 lpm. At 2000 lpm / 65 bar the returns broke through on well F-12. Reduced flow to 200 lpm / 27 bar and observed for 15 min. Continued circulating 320 m3 of SW at 2300 lpm with returns on F-12. Kept landing string in tension by an overpull of 3 MT.,3.0 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 13:15:00+00:00,2007-12-11 13:45:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,"Lined up to pump from cement unit. Pressurized TDS to 31 bar and tested line up. Released 1 3/4"" preloaded ball for bottom wiper plug.",0.5 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 13:45:00+00:00,2007-12-11 17:45:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Mixed and pumped 242 m3 1.52 sg lead slurry at 1180 lpm / 20 bar.,4.0 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 17:45:00+00:00,2007-12-11 18:30:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Mixed and pumped 20 m3 1.92 sg tail slurry at 800 lpm / 16-20 bar.,0.75 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 18:30:00+00:00,2007-12-11 18:45:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Released top dart. Displaced and sheared sub sea wiper plug by pumping 3 m3 SW with cement unit at 1100 lpm / 11 bar. Top plug sheared after 880 ltrs / 190 bar.,0.25 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 18:45:00+00:00,2007-12-11 19:30:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Zeroed counters for mud pumps and lined up to displace cement with SW using mud pumps. Displaced cement with SW at 3000 lpm. Slowed down to 1400 lpm after 7157 stks (156.95 m3). FCP was 48 bar. Bumped plug after 7230 strokes with 93 bar. Last 20 min of displacement the returns came up F-14 and no flow was observed on F-12.,0.75 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 19:30:00+00:00,2007-12-11 20:15:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Bled of pressure and checked for backflow to cement unit. Volume bled back was 1100 ltr. Disconnected cement hose after pressure had been bled off.,0.75 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 20:15:00+00:00,2007-12-11 20:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Reduced overpull on landing string to neutral. Released CART by 5 right hand turns and observed wellhead with ROV. Pulled above top of wellhead.,0.25 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 20:30:00+00:00,2007-12-11 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pumped 2 sponge balls and flushed landing string with SW. POOH with 18 3/4"" CART from 140 m to surface. LO same.",1.5 +15_9_F_14_2007_12_12.xml,NO 15/9-F-14,NO 15/9-F-14,2007-12-11T00:00:00+01:00,2007-12-12T00:00:00+01:00,2007-12-11 22:00:00+00:00,2007-12-11 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"LO cement head. Prepared for skidding to F-9. + +Operation transfered to F-9.",1.0 +15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 11:00:00+00:00,2008-04-26 12:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk and skidded cantilever to F-14,1.25 +15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 12:15:00+00:00,2008-04-26 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and prepared & rigged up HPDR spider and handling equipment for running HPDR. Function tested Spider slips.,2.25 +15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 14:30:00+00:00,2008-04-26 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk and picked up HPDR Tieback connecter, inspected same. Picked up HPDR double ""A"" and made up same.",2.5 +15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 17:00:00+00:00,2008-04-26 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to run HPDR.,0.25 +15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 17:15:00+00:00,2008-04-26 21:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Completed making up HPDR double ""A"". Made up fairing protector.",4.0 +15_9_F_14_2008_04_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-26T00:00:00+02:00,2008-04-27T00:00:00+02:00,2008-04-26 21:15:00+00:00,2008-04-26 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Function tested HPDR TBC.,0.75 +15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-26 22:00:00+00:00,2008-04-26 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued function test of HPDR TBC. +Running of HPDR suspended. Resumed maintenance of the aft PRS.",1.0 +15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 10:00:00+00:00,2008-04-27 12:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pulled back the HPDR double ""A"" and the TBC to rig floor. Held tool box talk prior to re-arranging hatch covers. Transferred riser equipment from the moon pool to the rig floor and to the tension deck. Picked up damaged tension cylinder from centraliser deck to rig floor. Prepared for skidding.",2.75 +15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 12:45:00+00:00,2008-04-27 13:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk prior to skid cantilever. Started to shut down production.,0.25 +15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 13:00:00+00:00,2008-04-27 14:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded the cantilever to F-12.,1.0 +15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 14:00:00+00:00,2008-04-27 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for re-arrange hatch covers.,3.0 +15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 17:00:00+00:00,2008-04-27 19:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and moved hatches in the moon pool.,2.25 +15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 19:15:00+00:00,2008-04-27 20:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk and skidded cantilever from F-12 to F-14.,1.0 +15_9_F_14_2008_04_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-27T00:00:00+02:00,2008-04-28T00:00:00+02:00,2008-04-27 20:15:00+00:00,2008-04-27 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed guide wires for running the HPDR.,1.75 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-27 22:00:00+00:00,2008-04-27 22:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued installation of guide wires.,0.5 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-27 22:30:00+00:00,2008-04-28 00:00:00+00:00,36.6,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with TBC and HPDR double ""A"".",1.5 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 00:00:00+00:00,2008-04-28 01:30:00+00:00,36.6,m,fixed,drilling -- bop/wellhead equipment,ok,success,ROV installed guide wires at template.,1.5 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 01:30:00+00:00,2008-04-28 02:30:00+00:00,36.6,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up 5½"" DP to HPDR lifting sub, and racked back in derrick.",1.0 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 02:30:00+00:00,2008-04-28 02:45:00+00:00,36.6,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to pick up HPDR double ""B"".",0.25 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 02:45:00+00:00,2008-04-28 04:00:00+00:00,36.6,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up HPDR ""B"". Removed lifting sub on HPDR ""A"" and commenced preparing flange connection.",1.25 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 04:00:00+00:00,2008-04-28 12:45:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued making up the HPDR and ran in same. Held tool box talk with day shift prior to run HPDR. Prepared ROV for brush & clean the VX profile on 18 3/4"" WH and performed same.",8.75 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 12:45:00+00:00,2008-04-28 14:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 5½"" DP with HPDR lifting sub. Attached to the HPDR tension jnt. Ran in and parked TBC inside guide funnel",1.25 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 14:00:00+00:00,2008-04-28 15:15:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,ROV removed guide wires and funnel and parked funnel on F-3. Simultaneously prepared all equipment for installation of the tension system.,1.25 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 15:15:00+00:00,2008-04-28 19:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed riser and set down 22MT. Launched hot stab in moon pool and locked the TBC. Took over pull of 15 MT. Slacked off to 10 MT over pull.,3.75 +15_9_F_14_2008_04_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-28T00:00:00+02:00,2008-04-29T00:00:00+02:00,2008-04-28 19:00:00+00:00,2008-04-28 22:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed centralizer and Boat collision stool.,3.0 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-28 22:00:00+00:00,2008-04-29 02:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed tension ring, cylinders and the tensioning up system.",4.0 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 02:00:00+00:00,2008-04-29 02:15:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Applied 90 bars to the tension cylinders, equal to 150 MT.",0.25 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 02:15:00+00:00,2008-04-29 03:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Disconnected the HPDR lifting sub and retrieved same to the rig floor.,0.75 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 03:00:00+00:00,2008-04-29 04:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out riser spider and installed master bushing. Prepared for installation of hatch covers.,1.0 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 04:00:00+00:00,2008-04-29 05:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed hatch cover on F-13 & F-15. Found that tension system not filled with Nitrogen.,1.0 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 05:00:00+00:00,2008-04-29 08:00:00+00:00,136.5,m,fixed,interruption -- repair,ok,operation failed,Held tool box talk and ran in with the HPDR lifting sub and made up same. Released hydraulic pressure to the tension cylinders and kept 132 MT on the string. Filled damper tank with Nitrogen. Applied 90 bars hydraulic pressure to the tension cylinders = 150 MT. Disconnected the HPDR lifting sub and retrieved same to rig floor.,3.0 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 08:00:00+00:00,2008-04-29 10:15:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and ran in with BOP riser jnt and landed same. Secured hatch and made up the BOP riser jnt to the HPDR tension jnt.,2.25 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 10:15:00+00:00,2008-04-29 12:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and lined up kill and equalized F-12 flow line for opening up production.,1.75 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 12:00:00+00:00,2008-04-29 13:45:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Completed making up the BOP riser jnt. Cleared the well bay area.,1.75 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 13:45:00+00:00,2008-04-29 14:45:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Filled up riser with SW and performed integrity test of the HPDR to 30 bars / 10 min.,1.0 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 14:45:00+00:00,2008-04-29 15:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Cleared well area for Vetco equipment. +* Continued programmed maintenance of the aft PRS.",0.25 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 17:00:00+00:00,2008-04-29 18:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Prepared equipment for nippling the BOP. +* Continued programmed maintenance of the aft PRS.",1.0 +15_9_F_14_2008_04_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-29T00:00:00+02:00,2008-04-30T00:00:00+02:00,2008-04-29 19:00:00+00:00,2008-04-29 19:30:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Built scaffolding around the BOP riser. +* Continued programmed maintenance of the aft PRS.",0.5 +15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-29 22:30:00+00:00,2008-04-29 23:30:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Released the Claxton tool. Pulled out and LD 5½"" DP.",1.0 +15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-29 23:30:00+00:00,2008-04-30 00:15:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved Claxton tool and parked it on the rig floor.,0.75 +15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-30 00:15:00+00:00,2008-04-30 04:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and commenced nippling up the BOP.,3.75 +15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-30 04:00:00+00:00,2008-04-30 05:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Nippled up the BOP.,1.0 +15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-30 05:00:00+00:00,2008-04-30 07:45:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed bell nipple, diverter and made up bell nipple and torqued up NT2 connector. +* Continued with planned maintenance in derrick and on PRS's.",2.75 +15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-30 15:15:00+00:00,2008-04-30 16:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box and filled BOP/riser with SW. Performed line test to 155 bars 10 min.,0.75 +15_9_F_14_2008_05_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-04-30T00:00:00+02:00,2008-05-01T00:00:00+02:00,2008-04-30 16:00:00+00:00,2008-04-30 17:00:00+00:00,136.5,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pressure tested the well/BOP/riser to 155 bars 10 min. Volume pumped/return 1700/1500 litres. +* Operation suspended due to programmed maintenance in derrick and PRS's",1.0 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-09 23:00:00+00:00,2008-05-10 00:00:00+00:00,35.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held toolbox talk for picking up 18 3/4"" test plug. Picked up jet sub and hung off in rotary. Made up 5 1/2"" stand. Installed elevator tilt on bails. Made up 18 3/4"" test plug.",1.0 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 00:00:00+00:00,2008-05-10 00:30:00+00:00,136.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with jet sub and 18 3/4"" test plug on 5 1/2 DP to 136 m MD.",0.5 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 00:30:00+00:00,2008-05-10 01:00:00+00:00,144.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Stepped up pumps to 3100 lpm / SPP 30 bar. Reciprocated pipe and made 3 passes accross wellhead while pumping. Pumped a total of 46 m3 seawater.,0.5 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 01:00:00+00:00,2008-05-10 01:30:00+00:00,170.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Landed 18 3/4"" test plug in wellhead at 140,9 m MD. Flushed lines and lined up cement unit to pump in kill line on BOP. Closed BOP.",0.5 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 01:30:00+00:00,2008-05-10 02:45:00+00:00,170.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested BOP connector to 20/345 bar 5/10 min. Observerd 0,61% drop on high pressure test, but trend improving with time - ok. Pumped and bled back approx 440 litres.",1.25 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 02:45:00+00:00,2008-05-10 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with jet sub / 18 3/4"" test plug from 170 m MD to surface. Broke out and laid down 18 3/4"" test plug and jet sub. Broke out and laid down 10 3/4"" Itco spear while tracing extension for link tilt.",1.25 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 04:00:00+00:00,2008-05-10 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and tidied drillfloor. Made up nominal seat protector to running tool.,1.0 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 05:00:00+00:00,2008-05-10 05:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to running nominal seat protector.,0.25 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 05:15:00+00:00,2008-05-10 07:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"RIH with nominal seat protector on 5 1/2"" DP from surface to 140 m MD. Set nominal seat protector at 140,8 m MD according to Vecto procedure.",1.75 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 07:00:00+00:00,2008-05-10 08:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with nominal seat protector RT from 140 m MD to surface. Reset running tool and laid out same.,1.5 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 08:30:00+00:00,2008-05-10 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Tested zone management system / anti collison for fwd PRS, aft PRS, TDS and IR - ok.",1.0 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 09:30:00+00:00,2008-05-10 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleared and cleaned drillfloor prior to bringing in 17 1/2"" drilling BHA.",0.25 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 09:45:00+00:00,2008-05-10 10:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to making up 17 1/2"" BHA.",0.25 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 10:00:00+00:00,2008-05-10 16:30:00+00:00,150.0,m,fixed,drilling -- trip,ok,success,"Made up 17 1/2"" drilling BHA comprising of Powerdrive X5, ARC, PowerPulse and SonicVison. Made up NMDC using manual tongs due to short x-over on SonicVision. Made up DC stand with hydraulic jar. Made up stand of DC. Made up 6 5/8"" reg x 5 1/2"" FH x-over. Made up stand of 5 1/2"" HWDP.",6.5 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 16:30:00+00:00,2008-05-10 17:00:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,Removed bowl and masterbushing. Installed PS-30 automatic slips.,0.5 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 17:00:00+00:00,2008-05-10 19:15:00+00:00,1010.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 150 m to 1010 m MD.",2.25 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 19:15:00+00:00,2008-05-10 20:30:00+00:00,1038.0,m,fixed,drilling -- drill,ok,success,"Lined up mudpumps. Stepped up pumps in increments to 3100 lpm / SPP 72 bar. Routed returns through dump hose on flowline. Observed overflow in moonppol due to unfavourable distribution of dump hose. Re-arranged dump hose with ropes and managed to stop overflow. Tested MWD telemetry - ok. Washed down to 1038 m MD while rotating at 30 RPM, no drag observed.",1.25 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 20:30:00+00:00,2008-05-10 21:00:00+00:00,1048.0,m,fixed,drilling -- drill,ok,success,"Picked up and made up 5 1/2"" DP singel to be able to drill shoetrack and ratehole without making connection. Washed down with 3100 lpm / 30 PRM and tagged firm cement at 1048 m MD.",0.5 +15_9_F_14_2008_05_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-10T00:00:00+02:00,2008-05-11T00:00:00+02:00,2008-05-10 21:00:00+00:00,2008-05-10 22:00:00+00:00,1050.0,m,fixed,drilling -- casing,ok,success,Drilled firm cement from 1048 m to 1050 m MD. Drilling parameters : Flow 3100 lpm / SPP 72 bar / Rotation 60 RPM / WOB 3-10 MT / Torque 5-22 kNm.,1.0 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-10 22:00:00+00:00,2008-05-10 22:30:00+00:00,1040.0,m,fixed,drilling -- drill,ok,success,Took SCR's. Performed choke drill.,0.5 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-10 22:30:00+00:00,2008-05-11 00:00:00+00:00,1050.0,m,fixed,drilling -- casing,ok,success,Continued drilling cement and float collar at 1050 m MD. Virtually no penetration observed indicating drilling on float collar. Drilling parameters : Flow 3100 lpm / SPP 74 bar / Rotation 60-70 RPM / WOB 7-10 MT / Torque 5-10 kNm.,1.5 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 00:00:00+00:00,2008-05-11 03:15:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,Drilled firm cement in shoetrack from 1050 m 1077 m MD. Drilling parameters : Flow 3100 lpm / SPP 76 bar / Rotation 60-70 RPM / WOB 5 MT / Torque 8-12 kNm.,3.25 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 03:15:00+00:00,2008-05-11 04:00:00+00:00,1078.0,m,fixed,drilling -- casing,ok,success,"Broke through 20"" casing shoe at 1077 m MD. Observed increased resturn on flowmeter. Picked off bottom and flowchecked - static. Continued drilling to 1078 m MD. Flow 3100 lpm / SPP 77 bar / Rotation 60-70 RPM / WOB 3-5 MT / Torque 4-11 kNm. Meanwhile broke out and laid down adjustable sub setting tool using fwd PRS and fwd IR.",0.75 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 04:00:00+00:00,2008-05-11 04:45:00+00:00,1086.0,m,fixed,drilling -- drill,ok,success,"Cleaned rathole below 20"" casing down to 1083 m MD. Drilled new formation from 1083 m to 1086 m MD. Drilling parameters : Flow 3100 lpm / SPP 78 bar / Rotation 70 rpm / WOB 2-4 MT / Torque 4-9 kNm.",0.75 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 04:45:00+00:00,2008-05-11 05:15:00+00:00,1086.0,m,fixed,drilling -- drill,ok,success,Pumped 40 m3 hi-vis sweep at 3200 lpm to clean well. Meanwhile held toolbox talk prior to displacing to WBM.,0.5 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 05:15:00+00:00,2008-05-11 07:30:00+00:00,1077.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well from seawater to 1,20 sg Performadrill WBM with 3500 lpm. Flushed choke and kill lines on BOP and lined up sandtraps.",2.25 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 07:30:00+00:00,2008-05-11 08:15:00+00:00,1077.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"Obtained even MW in/out 1,21 sg.",0.75 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 08:15:00+00:00,2008-05-11 09:00:00+00:00,1077.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,Ran in to TD at 1086 m MD. Observed thight spot at 1081-1085 m MD. Spotted 10 m3 LCM pill in rathole. Pulled back into shoe at 1077 m MD.,0.75 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 09:00:00+00:00,2008-05-11 10:15:00+00:00,1077.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Lined up cement unit. Pressure tested lines prior to performing FIT. Closed BOP. Performed FIT to 1,38 EMW by pressuring up to 21,5 bar on well.",1.25 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 10:15:00+00:00,2008-05-11 12:00:00+00:00,1077.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Opened BOP and lined up for drilling. Took SCRs. Laid out 5 1/2"" singel used for spacing out in shoetrack. RIH to 1077 MD. Obtained MWD pressure point from FIT, EMW 1,408 sg.",1.75 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 12:00:00+00:00,2008-05-11 14:30:00+00:00,1086.0,m,fixed,drilling -- drill,ok,success,Established drilling parameters : Flow 3000 lpm / SPP 116 bar. Not able to handle flow over shakers. Worked with shaker configuration. Installed coarser top and bottom screens (30/80 mesh).,2.5 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 14:30:00+00:00,2008-05-11 15:30:00+00:00,1110.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1086 m to 1110 m MD. Drilling parameters : Flow 4000 lpm / SPP 112 bar / Rotation 80 rpm / WOB ~5 MT / Torque 7-8 kNm / ROP 25 m/hrs.",1.0 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 15:30:00+00:00,2008-05-11 16:00:00+00:00,1110.0,m,fixed,drilling -- drill,ok,success,Lost mud on shakers due to plugged header box and uneven mud distribution. Picked off bottom and reduced flow rate to 1700 lpm to remedy situation. Cleaned shaker box.,0.5 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 16:00:00+00:00,2008-05-11 19:30:00+00:00,1130.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1110 m to 1130 m MD with reduced ROP 10-15 m/hr due to problems to handle fluid returns at shakers. Drilling parameters : Flow 3500-4000 lpm / SPP 103-150 bar / Rotation 120 rpm / WOB 4-7 MT / Torque 3-7 kNm / ECD 1,22. Reamed half stand on connection. Meanwhile repaired shaker #3.",3.5 +15_9_F_14_2008_05_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-11T00:00:00+02:00,2008-05-12T00:00:00+02:00,2008-05-11 19:30:00+00:00,2008-05-11 22:00:00+00:00,1198.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1130 m to 1198 m MD. Drilling parameters : Flow 3500-4000 lpm / SPP 103-150 bar / Rotation 120 rpm / WOB 4-7 MT / Torque 3-7 kNm / ECD 1,22 / ROP 25-35 m/hrs. Reamed half stand on connection. Meanwhile repaired shaker #3.",2.5 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-11 22:00:00+00:00,2008-05-11 23:30:00+00:00,1240.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1130 m to 1198 m MD. Drilling parameters : Drilled 17 1/2"" hole section from 1130 m to 1198 m MD. Drilling parameters : Flow 3500-4000 lpm / SPP 103-150 bar / Rotation 80-120 rpm / WOB 4-7 MT / Torque 3-7 kNm / ECD 1,22. Meanwhile repaired shaker #3.",1.5 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-11 23:30:00+00:00,2008-05-11 23:45:00+00:00,1240.0,m,fixed,drilling -- circulating conditioning,ok,success,"Reamed full stand due to increaseing ECD 1,22 => 1,25 sg and no sand observed at lag depth for Skade formation. Meanwhile repaired shaker #3.",0.25 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-11 23:45:00+00:00,2008-05-12 01:45:00+00:00,1240.0,m,fixed,drilling -- drill,ok,success,Observed massive overflow on lower shaker screens probably caused by sand plugging. Cleaned screens and attempted various flow / screen configurations. Pulled above Skade formation and reciprocated string with 30 RPM and flow rate as dictated by capacity on shakers. Shaker #3 up an running. Dressed all shakers with 145 mesh bottom screens - able to handle flow at 4200 lpm. Cleaned header box.,2.0 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 01:45:00+00:00,2008-05-12 04:00:00+00:00,1302.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1240 m to 1302 m MD. Drilling parameters : Flow 3800-4200 lpm / SPP 151 bar / Rotation 80-90 rpm / WOB 1-4 MT / Torque 8-12 kNm / ECD 1,25-1,27 / ROP 35-50 m/hrs.",2.25 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 04:00:00+00:00,2008-05-12 08:30:00+00:00,1395.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1302 m to 1395 m MD. Drilling parameters : Flow 4000-4500 lpm / SPP 136-170 bar / Rotation 80-160 rpm / WOB 3-6 MT / Torque 4-10 kNm / ECD 1,25-1,27 / ROP 35 m/hrs.",4.5 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 08:30:00+00:00,2008-05-12 08:45:00+00:00,1395.0,m,fixed,drilling -- drill,ok,success,Picked off bottom for flowcheck due to high gas readings ~4% and no loss in active. Flowchecked for 10 min - well static.,0.25 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 08:45:00+00:00,2008-05-12 11:30:00+00:00,1454.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1395 m to 1454 m MD. Drilling parameters : Flow 4500 lpm / SPP ~165 bar / Rotation 160 rpm / WOB ~4 MT / Torque 4-10 kNm / ECD 1,27-1,28 / ROP 50 m/hrs.",2.75 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 11:30:00+00:00,2008-05-12 13:00:00+00:00,1454.0,m,fixed,drilling -- other,ok,success,Observed blockage on CRI and conveyer screw. Reduced flowrate and unblocked CRI/conveyer. Estabilshed flowrate and circulated cuttings away from BHA.,1.5 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 13:00:00+00:00,2008-05-12 15:00:00+00:00,1480.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1454 m to 1480 m MD at reduced ROP of 20 m/hrs. Experienced shaker screen plugging tendencies / overflow. Drilling parameters : Flow 3500-4100 lpm / SPP 108-147 bar / Rotation 160 rpm / WOB 2-3 MT / Torque 6-8 kNm / ECD 1,27.",2.0 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 15:00:00+00:00,2008-05-12 15:15:00+00:00,1480.0,m,fixed,drilling -- drill,ok,success,Took SCR's.,0.25 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 15:15:00+00:00,2008-05-12 17:00:00+00:00,1498.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1480 m to 1498 m MD at reduced ROP of 20 m/hrs. Experienced shaker screen plugging tendencies / overflow. Drilling parameters : Flow 4000 lpm / SPP 142 bar / Rotation 160 rpm / WOB 3-6 MT / Torque 7-10 kNm / ECD 1,28.",1.75 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 17:00:00+00:00,2008-05-12 18:30:00+00:00,1498.0,m,fixed,drilling -- other,ok,success,Picked of bottom due to problems on shakers. Reciprocated string at 2500 lpm / 60 rpm. Cleaned shaker box. Cleaned shakers and changed to coarser top screens.,1.5 +15_9_F_14_2008_05_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-12T00:00:00+02:00,2008-05-13T00:00:00+02:00,2008-05-12 18:30:00+00:00,2008-05-12 22:00:00+00:00,1568.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1498 m to 1568 m MD. Drilling parameters : Flow 4000 lpm / SPP 142-148 bar / Rotation 160 rpm / WOB ~3 MT / Torque 8-11 kNm / ECD 1,28-1,29 / ROP 25-35 m/hrs.",3.5 +15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-12 22:00:00+00:00,2008-05-13 04:00:00+00:00,1725.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1568 m to 1725 m MD. Drilling parameters : Flow 4000-4200 lpm / SPP 142-163 bar / Rotation 160 rpm / WOB 4-6 MT / Torque 12-15 kNm / ECD 1,29-1,30 / ROP 35-40 m/hrs. Meanwhile laid out 5 1/2"" HWDP landing string using fwd PRS, fwd IR and foxhole.",6.0 +15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-13 04:00:00+00:00,2008-05-13 06:30:00+00:00,1782.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1725 m to 1782 m MD. Drilling parameters : Flow 4000-4200 lpm / SPP 142-163 bar / Rotation 160 rpm / WOB 3-5 MT / Torque ~10 kNm / ECD 1,29-1,31 / ROP 40 m/hrs. Started to Increase MW from 1,27 sg to 1,30 sg.",2.5 +15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-13 06:30:00+00:00,2008-05-13 06:45:00+00:00,1782.0,m,fixed,drilling -- other,ok,success,Heard loud bang in drilling module. Picked off bottom and investigated situation. Found that pressure on BOP tensioner cylinders had dropped to 31 bar. Pressurized back to 45 bar. No leaks found.,0.25 +15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-13 06:45:00+00:00,2008-05-13 15:00:00+00:00,1964.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1782 m to 1964 m MD. Drilling parameters : Flow 4200-4500 lpm / SPP 175-198 bar / Rotation 160 rpm / WOB 4-5 MT / Torque ~11 kNm / ECD 1,31-1,32 / ROP 25-45 m/hrs.",8.25 +15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-13 15:00:00+00:00,2008-05-13 15:15:00+00:00,1964.0,m,fixed,drilling -- drill,ok,success,Took SCR's.,0.25 +15_9_F_14_2008_05_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-13T00:00:00+02:00,2008-05-14T00:00:00+02:00,2008-05-13 15:15:00+00:00,2008-05-13 22:00:00+00:00,2129.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 1964 m to 2129 m MD. Drilling parameters : Flow 4500 lpm / SPP ~199 bar / Rotation 160 rpm / WOB 4-8 MT / Torque 11-13 kNm / ECD 1,32-1,33 / ROP 40-50 m/hrs. MW in/out 1,30 sg. Initiated steering by dowlinking powerdrive at approx 2105 m MD.",6.75 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-13 22:00:00+00:00,2008-05-13 22:45:00+00:00,2135.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 2129 m to 2135 m MD. Drilling parameters : Flow 4500 lpm / SPP 195-198 bar / Rotation 120-160 rpm / WOB 7-9 MT / Torque 11-15 kNm / ECD 1,31-1,32 / ROP 10-15 m/hrs as determined by geology.",0.75 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-13 22:45:00+00:00,2008-05-14 00:30:00+00:00,2185.0,m,fixed,drilling -- drill,ok,success,"Observed negative drilling break at 2135 m MD. Observed significant shift in torque and confirmed top of Grid formation on logs. Drilled 17 1/2"" hole section from 2135 to 2185 m MD. Drilling parameters : Flow 4500 lpm / SPP 195-198 bar / Rotation 120-160 rpm / WOB 6-8 MT / Torque 18-26 kNm / ECD 1,31-1,32 / ROP 20 m/hrs.",1.75 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 00:30:00+00:00,2008-05-14 01:15:00+00:00,2185.0,m,fixed,drilling -- other,ok,success,Got problems with plugged shakers and overflow when Grid sand surfaced. Cleaned shakers and shaker box. Reciprocated string with 500 lpm / 30 rpm. Stepped up rate to 4000 lpm and recommenced drilling.,0.75 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 01:15:00+00:00,2008-05-14 04:00:00+00:00,2209.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 2185 m to 2209 m MD with reduced rate as dictated by geology. Drilling parameters : Flow 4400 lpm / SPP ~197 bar / Rotation 120 rpm / WOB 1-3 MT / Torque 6-14 kNm / ECD 1,31-1,32 / ROP 20 m/hrs. Took survey at connection as instructed by DD. Got problems with plugged shakers and had to reduce flow after connection at 2209 m MD.",2.75 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 04:00:00+00:00,2008-05-14 08:00:00+00:00,2239.0,m,fixed,drilling -- drill,ok,success,"Worked on shakers to unplug screens, worked flow rate up and down accordingly. Drilled 17 1/2"" hole section from 2209 m to 2239 m MD at reduced ROP ~10 m/hrs. Drilling parameters : Flow 4000 lpm / SPP ~163 bar / Rotation 120 rpm / WOB 5-8 MT / Torque 10-14 kNm / ECD 1,31-1,32. Downlinked powerdrive according to DD's instructions.",4.0 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 08:00:00+00:00,2008-05-14 08:30:00+00:00,2239.0,m,fixed,drilling -- drill,ok,success,Picked off bottom due to screen plugging on shakers. Cleaned shaker box and screens.,0.5 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 08:30:00+00:00,2008-05-14 11:00:00+00:00,2264.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 2239 m to 2264 m MD at reduced ROP ~10 m/hrs. Drilling parameters : Flow 4000 lpm / SPP ~163 bar / Rotation 120 rpm / WOB 4-9 MT / Torque 11-13 kNm / ECD 1,31-1,32.",2.5 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 11:00:00+00:00,2008-05-14 11:15:00+00:00,2264.0,m,fixed,drilling -- drill,ok,success,Picked off bottom due to screen plugging on shakers. Cleaned shaker box and screens.,0.25 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 11:15:00+00:00,2008-05-14 13:45:00+00:00,2281.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 2264 m to section TD at 2281 m MD as determined by samples and logs. Top of Balder encountered at 2268 m MD. Drilling parameters : Flow 3800-4000 lpm / SPP 156-168 bar / Rotation 120 rpm / WOB 4-9 MT / Torque 7-12 kNm / ECD 1,31-1,32 / ROP 8-10 m/hrs..",2.5 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 13:45:00+00:00,2008-05-14 17:30:00+00:00,2240.0,m,fixed,drilling -- drill,ok,success,Racked back 1 stand. Reciprocated string and circulated hole clean with 3 x bottoms up while stepping up rate from 4000 to 4500 lpm as determined by shaker capacity. SPP 171-207 bar. Rotation 120 rpm.,3.75 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 17:30:00+00:00,2008-05-14 19:00:00+00:00,2281.0,m,fixed,drilling -- drill,ok,success,RIH to TD. Sent downlink to set SonicVision in logging mode. Cycled pumps 3 times to obtain correct setting.,1.5 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 19:00:00+00:00,2008-05-14 19:30:00+00:00,2281.0,m,fixed,drilling -- drill,ok,success,Spotted 10 m3 LCM pill at TD with 1750 lpm as restricted by MWD tools.,0.5 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 19:30:00+00:00,2008-05-14 20:30:00+00:00,2037.0,m,fixed,drilling -- trip,ok,success,Pulled 5 stand wet. Observed dry pipe.,1.0 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 20:30:00+00:00,2008-05-14 20:45:00+00:00,2037.0,m,fixed,drilling -- trip,ok,success,Flowchecked well on trip tanks for 15 min - well static.,0.25 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 20:45:00+00:00,2008-05-14 21:15:00+00:00,2037.0,m,fixed,drilling -- trip,ok,success,"Pumped ~8 m3 1,65 sg slug at 1000 lpm / SPP 20 bar.",0.5 +15_9_F_14_2008_05_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-14T00:00:00+02:00,2008-05-15T00:00:00+02:00,2008-05-14 21:15:00+00:00,2008-05-14 22:00:00+00:00,1872.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 2037 m to 1872 m MD. No thight spots observed.",0.75 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-14 22:00:00+00:00,2008-05-14 23:00:00+00:00,1515.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1872 m to 1515 m MD. No thight spots observed.",1.0 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-14 23:00:00+00:00,2008-05-14 23:15:00+00:00,1515.0,m,fixed,drilling -- trip,ok,success,Gained 350 liters more than theoretical. Performed flowcheck on trip tank - well static.,0.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-14 23:15:00+00:00,2008-05-15 00:15:00+00:00,1064.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/""2"" BHA on 5 1/2"" DP from 1515 m to 1064 m MD inside 20"" shoe. No thight spots observed.",1.0 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 00:15:00+00:00,2008-05-15 00:30:00+00:00,1064.0,m,fixed,drilling -- trip,ok,success,Performed flowcheck on trip tank - well static.,0.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 00:30:00+00:00,2008-05-15 02:00:00+00:00,110.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" BHA on 5 1/2"" DP from 1064 m to 149 m MD. Performed pit drill with drilling crews - good response from drillfloor.",1.5 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 02:00:00+00:00,2008-05-15 02:15:00+00:00,110.0,m,fixed,drilling -- trip,ok,success,Flowchecked well on trip tank. Meanwhile performed toolbox talk for removing PS-30 slips.,0.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 02:15:00+00:00,2008-05-15 02:30:00+00:00,110.0,m,fixed,drilling -- trip,ok,success,Removed PS-30 slips from rotary. Installed master bushing.,0.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 02:30:00+00:00,2008-05-15 04:00:00+00:00,73.0,m,fixed,drilling -- trip,ok,success,"Racked back stand of 5 1/2"" HWDP. Broke out 5 1/2"" FH x 6 5/8"" reg x-over. Broke out and laid out 8 1/4"" DC singel. Broke out and racked back stand of 8 1/4"" DC.",1.5 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 04:00:00+00:00,2008-05-15 05:00:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"Broke out and racked back stand of jar and 8 1/4"" DC. Broke and laid out NMDC.",1.0 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 05:00:00+00:00,2008-05-15 05:15:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk for laying out Schlumberger drilling BHA's.,0.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 05:15:00+00:00,2008-05-15 06:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out and laid down SonicVison, MWD, ARC and Powerdrive X5.",1.5 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 06:45:00+00:00,2008-05-15 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for retrieving nominal seat protector.,0.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 07:00:00+00:00,2008-05-15 07:30:00+00:00,47.0,m,fixed,drilling -- casing,ok,success,"Made up jetting sub to stand of 5 1/2"" DP. Made up nominal seat protector RT.",0.5 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 07:30:00+00:00,2008-05-15 08:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"RIH on 5 1/2"" DP and latched wearbushing according to Vetco instructions. Picked up and washed/jetted wellhead at 4000 lpm / SPP 60 bar / 3-5 rpm. Made 3 passes across wellhead while circulating.",1.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 08:45:00+00:00,2008-05-15 10:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with nominal seat protector on 5 1/2"" DP from 140 m MD to surface. Broke out RT and jet sub.",1.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 10:00:00+00:00,2008-05-15 10:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for making up pup to cement head.,0.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 10:15:00+00:00,2008-05-15 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up cement head and made up 4,5 m 5 1/2"" HWDP pup joint. Laid out cement head.",0.5 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 10:45:00+00:00,2008-05-15 11:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held toolbox talk prior to working on TDS.,0.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 11:00:00+00:00,2008-05-15 15:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Removed allignment cylinder on TDS. Replaced cylinder with fixed bar and shimms. Parts to hook up bar to brackets missing. Had to produce new parts in mechanic workshop. + +Meanwhile : +-Brought casing running equipment to drillfloor +-Drifted 5 1/2"" HWDP to 2 3/4"" +-Removed protectors on 14"" casing +-Changed head on PDM",4.75 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 15:45:00+00:00,2008-05-15 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for dropped object inspection and service on TDS.,0.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 16:00:00+00:00,2008-05-15 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Performed dropped object inspection of fwd and aft PRS in manrider.,2.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 18:15:00+00:00,2008-05-15 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up 2 x-overs and TIW to 14"" circulating swedge.",0.75 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 19:00:00+00:00,2008-05-15 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Removed potential dropped object / tag plates from fwd PRS (finding from dropped object inspection).,0.25 +15_9_F_14_2008_05_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-15T00:00:00+02:00,2008-05-16T00:00:00+02:00,2008-05-15 19:15:00+00:00,2008-05-15 22:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Worked on TDS. Made up fixed centering bar / brackets on TDS. + +Meanwhile : +-Performed houskeeping and cleaning in shakers +-Cleaned pits + +Static losses to well before midnight ~100 l/hrs.",2.75 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-15 22:00:00+00:00,2008-05-15 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,worked on TDS. Made up fixed centering bar / brackets on TDS.,1.0 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-15 23:00:00+00:00,2008-05-15 23:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Installed stand in rotary for testing TDS allignment relative to well centre. TDS 5 cm out of centre to STB.,0.5 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-15 23:30:00+00:00,2008-05-16 00:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Removed 2 shimmes ea 6 mm from fixed centering bar on TDS. Tested allignement relative to well centre. TDS 9 cm out of centre to port.,0.75 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 00:15:00+00:00,2008-05-16 01:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Reinstalled 2 shimms ea 6 mm and removed 2 ea shimms 1,5 mm. Tested allignment relative to well centre. TDS alligned with well centre but slightly out to port (~1 cm), not able to come closer with availble range of shimms (addtional 0,5-1 mm shimm may be installed at a later point).",1.5 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 01:45:00+00:00,2008-05-16 02:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Installed lockwire and secured TDS.,0.25 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 02:00:00+00:00,2008-05-16 02:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk for rigging up 14"" casing handling equipment.",0.25 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 02:15:00+00:00,2008-05-16 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up 14"" casing handling equipment. Static losses to well after midnight ~100 l/hrs.",1.75 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 04:00:00+00:00,2008-05-16 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged casing running equipment. Made up LaFleur.,1.0 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 05:00:00+00:00,2008-05-16 05:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for continued rigging of casing running equipment (new crew).,0.25 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 05:15:00+00:00,2008-05-16 08:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged casing running equipment. Installed casing bails.,3.0 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 08:15:00+00:00,2008-05-16 08:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk for installing FMS and running 14"" casing. Lost hydraulics in drilling module due to system trip.",0.5 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 08:45:00+00:00,2008-05-16 09:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Trip on hydraulic supply to drilling areas due to overheating.,1.0 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 09:45:00+00:00,2008-05-16 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued rigging 14"" casing running equipment. Removed master bushing and installed FSM. Functioned slips, tong and elevator. Adjusted backwards travel on casing tong to avoid conflict with elevators. Elevator tilt for BX-2 missing. Rigged up for using tugger to tilt elevator. Meanwhile traced BX-2 elevator tilt adaptor from Sleipner.",1.0 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 10:45:00+00:00,2008-05-16 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Attempted to pick up shoe joint - nogo due to position of eye bolts holding die segments. Sheared eye bolt accidentaly.,0.25 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 11:00:00+00:00,2008-05-16 14:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Drilled out / re-threaded eye bolts on elevator and replaced by normal bolts.,3.0 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 14:00:00+00:00,2008-05-16 14:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to recommencing operation.,0.25 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 14:15:00+00:00,2008-05-16 17:00:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,"Picked up shoe joint and hung off in slips. Picked up and made up intermediate joint, float collar joint and 1st casing joint (#189). Threadlocked couplings. Tested floats in shoe and filled casing.",2.75 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 17:00:00+00:00,2008-05-16 17:15:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk with new crew for continued casing running operations and rigging up elevator tilit adapter. Recieved equipment from Sleipner.,0.25 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 17:15:00+00:00,2008-05-16 18:15:00+00:00,49.0,m,fixed,interruption -- other,ok,equipment failure,Rigged up elevator tilt adapter for BX-2 frame.,1.0 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 18:15:00+00:00,2008-05-16 20:00:00+00:00,74.0,m,fixed,interruption -- other,ok,equipment failure,Recommenced casing running. Not able to latch BX-2 eleavtor onto casing coupling - elevator tillting back when given the closing signal. Troubleshot situation - found no fualts in programming or hook up. Found that elevator needed to have more load for closing. Ran 2 casing joints while troubleshooting.,1.75 +15_9_F_14_2008_05_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-16T00:00:00+02:00,2008-05-17T00:00:00+02:00,2008-05-16 20:00:00+00:00,2008-05-16 22:00:00+00:00,207.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" 96,6# casing from 74 m to 207 m MD. Filled every casing joint with 1,30 sg WBM.",2.0 +15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-16 22:00:00+00:00,2008-05-17 04:00:00+00:00,610.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" 96,6# casing from 207 m to 610 m MD. Filled every casing joint with 1,30 sg WBM. Static losses approx 100 l/hrs after midnight.",6.0 +15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-17 04:00:00+00:00,2008-05-17 11:00:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" 96,6# casing from 610 m to 1077 m MD. Filled every casing joint with 1,30 WBM. Laid out joint #120 due to jammed protector on box end.",7.0 +15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-17 11:00:00+00:00,2008-05-17 11:30:00+00:00,1077.0,m,fixed,drilling -- casing,ok,success,"At 20"" shoe, engaged LaFleur onto casing collar. Broke circulation with 100 lpm / SPP 33 bar. staged up pumps to 1100 lpm / SPP 32 bar. MW out 1,30 sg.",0.5 +15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-17 11:30:00+00:00,2008-05-17 17:30:00+00:00,1540.0,m,fixed,drilling -- casing,ok,success,"Ran 14 96,6# casing from 1077 m to 1540 m MD. Filled every casing joint with 1,30 WBM.",6.0 +15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-17 17:30:00+00:00,2008-05-17 18:15:00+00:00,1540.0,m,fixed,drilling -- casing,ok,success,Detected exhaust fumes from gas turbines on drillflloor. Shut down one gas turbine. Moved HTS rollers to pick casing from fwd bay. Meanwhile reciprocated casing.,0.75 +15_9_F_14_2008_05_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-17T00:00:00+02:00,2008-05-18T00:00:00+02:00,2008-05-17 18:15:00+00:00,2008-05-17 22:00:00+00:00,1874.0,m,fixed,drilling -- casing,ok,success,"Ran 14 96,6# casing from 1540 m to 1874 m MD. Filled every casing joint with 1,30 WBM. Laid out joint #48 due to jammed protector on box end.",3.75 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-17 22:00:00+00:00,2008-05-18 00:30:00+00:00,2126.0,m,fixed,drilling -- casing,ok,success,"Ran 14 96,6# casing from 1874 m to 2126 m MD. Filled every casing joint with 1,30 WBM. Laid out joint #48 due to jammed protector on box end. Joint #14 & #13 added to tally due to lay outs. Meanwhile tested CRI hose to 200 bar. Leakage 3% / 10 min.",2.5 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 00:30:00+00:00,2008-05-18 01:00:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 14"" casing pup joint D (4,92 m MD). Took up/down weight 320/276 MT.",0.5 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 01:00:00+00:00,2008-05-18 03:00:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,Rigged down BX elevator. Broke out and laid down LaFleur tool. Removed casing bails. Installed drilling bails and drilling elevator.,2.0 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 03:00:00+00:00,2008-05-18 03:15:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,"Performed toolbox talk prior to picking up 14"" casing hanger / PADPRT.",0.25 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 03:15:00+00:00,2008-05-18 03:45:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 14"" casing hanger / PADPRT. Removed rubber protection on PADPRT. Took up/down weight 360/278 MT.",0.5 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 03:45:00+00:00,2008-05-18 04:00:00+00:00,2131.0,m,fixed,drilling -- casing,ok,success,Removed FMS from rotary.,0.25 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 04:00:00+00:00,2008-05-18 05:00:00+00:00,2134.0,m,fixed,drilling -- casing,ok,success,Installed master bushing. Checked casing hanger and PADPRT.,1.0 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 05:00:00+00:00,2008-05-18 05:15:00+00:00,2134.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to removing casing tong.,0.25 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 05:15:00+00:00,2008-05-18 05:45:00+00:00,2134.0,m,fixed,drilling -- casing,ok,success,Rigged down Odfjell casing tong.,0.5 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 05:45:00+00:00,2008-05-18 06:30:00+00:00,2233.0,m,fixed,drilling -- casing,ok,success,"RIH with 14"" casing / PADPRT on 5 1/2"" HWDP from 2134 m to 2233 m MD.",0.75 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 06:30:00+00:00,2008-05-18 08:00:00+00:00,2273.0,m,fixed,drilling -- casing,ok,success,"On last stand prior to landing casing hanger, broke circulation and staged up pumps : 220 lpm/13 bar, 220 lpm/15 bar, 490 lpm/16 bar. Took 10-12 MT weight at 2243 m MD. Increased flowrate to 1500 lpm / 28 bar. Washed down to 2273 m MD.",1.5 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 08:00:00+00:00,2008-05-18 08:15:00+00:00,2273.0,m,fixed,drilling -- casing,ok,success,Picked up and made up cement head. Hooked up cement hose and controls.,0.25 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 08:15:00+00:00,2008-05-18 09:15:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,"Washed down 14"" casing with 550 lpm/18 bar down to 2276 m MD. Landed hanger at 140,84 m MD and set down 7 MT.",1.0 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 09:15:00+00:00,2008-05-18 11:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Staged up pumps to 2300 lpm / 42 bar. Circulated hole clean piror to cementing. Got a lot of cuttings and cavings over the shakers.,1.75 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 11:00:00+00:00,2008-05-18 13:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,"Pumped 20 m3 1,60 sg tuned spacer at 2300 lpm. Lined up cement pump. Dropped 1 3/4"" ball for 1st wiper plug. Mixed and pumnped 34,5 m3 1,9 sg cement. Pump rate 500-600 lpm / CUP 15-22 bar. Released dart for 2nd wiper plug and displaced with 2,5 m3 WBM from cement unit. Lined up mud pumps for displacing cement with WBM.",2.0 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 13:00:00+00:00,2008-05-18 14:15:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,"Zeroed stroke counter. Displaced cement with 1,30 sg WBM at 3000 lpm. Bumped wiper plug after 7780 strokes (~97% pump efficiency) by observing 70 bar pressure increase.",1.25 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 14:15:00+00:00,2008-05-18 15:45:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,"Lined over to cement pump and tested 14"" casing against float collar / wiper plug to 345 bar / 15 min - ok. Pumped and bled back 2000 litres. No additional flowback observed - floats holding pressure.",1.5 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 15:45:00+00:00,2008-05-18 16:15:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Set PADPRT in position to set MS seal by applying 30 MT overpull and setting down while rotating 4 times clockwise.,0.5 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 16:15:00+00:00,2008-05-18 16:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Pressure tested surface lines agains kil HCR to 207 bar - ok.,0.25 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 16:30:00+00:00,2008-05-18 17:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Closed upper pipe rams. Pressurized bulk seal in PADPRT to 207 bar to set MS-seal. Vented DP to athmosphere.,1.0 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 17:30:00+00:00,2008-05-18 18:45:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Tested seal assembly to 35 bar / 5 min - ok. Increased pressure to 345 bar - pressure leaked off at approx 3-4 bar / 10 min - trend not improving. Took addtional 10 MT overpull (block 118 MT). Repeated 345 bar test on MS seal with same result. Pumped and bled back approx 400 liter.,1.25 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 18:45:00+00:00,2008-05-18 20:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Not able to obtain 345 bar test on MS-seal - steady leak off 3-4 bar / 10 min (>1%). Bled off pressure and closed additional valves in kill manifold. Greased valves on cement unit.,1.25 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 20:00:00+00:00,2008-05-18 20:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,"Perfomed line test against HCR, 345 bar / 4 bar drop in 10 min. Attempted to re-test MS-seal. Observed volume mismatch and wrong line-up - bled off pressure.",0.5 +15_9_F_14_2008_05_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-18T00:00:00+02:00,2008-05-19T00:00:00+02:00,2008-05-18 20:30:00+00:00,2008-05-18 22:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Attempted to re-test MS-seal. Pressurized MS seal to 345 bar / 3 bar drop in 10 min but trend not improving. Closed isolation valve on cement unit and monitored pressure on kill manifold from Gesoservice. Pressure Dropped from 329 to 320 bar in 30 min but no improvement observed. Discussed situation. Dedcided to work on valves and lines to obtain better line test before reverting to testing MS-seal.,1.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-18 22:00:00+00:00,2008-05-18 23:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Greased and operated valves on kill manifold and in moonpool. Changed valve #33 and #35 on cement unit. Greased valves on cement unit. Drained mud from cement unit and filled tanks with water.,1.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-18 23:30:00+00:00,2008-05-19 00:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,"Pressure tested cement unit against isolation valve. Obtained test to 345 bar with 1,3 bar drop / 10 min.",0.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 00:00:00+00:00,2008-05-19 01:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,"Tested kill line against valve in moonpool and K3 valve on kill manifold. Pressurized to 35 bar, dropped 0,5 bar / 5 min - ok. Pressurized to 345 bar, dropped 0,7 bar / 5 min - ok. + +Tested kill line against HCR valves. Pressurized to 35 bar, dropped 0,5 bar / 5 min - ok. Pressurized to 345 bar, dropped 1 bar / 5 min -ok.",1.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 01:30:00+00:00,2008-05-19 02:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,"Lined up to test MS-seal from above. Pressurized to 35 bar, dropped 0,6 bar 5 min - ok. Pressurized to 345 bar. Pressure dropped 0,7 bar / 5 min in the start but with gradually increasing fall off trend. Dropped 1,8 bar / 5 min towards the end of the test. Pumped and bled back 373 liter. Bled off pressure and discussed situation. Decided to re-attempt pressurizing MS seal with PADPRT tool.",0.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 02:00:00+00:00,2008-05-19 02:45:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,"Re-sat PADPRT by applying 30 MT overpull. Pressurized to 207 bar to re-energize MS-seal. Held pressure for 10 min / 1,3 bar drop (0,5%). Slacked off overpull on PADPRT to relax bulk seal. Took 30 MT overpull to expose MS-seal.",0.75 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 02:45:00+00:00,2008-05-19 03:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,"Lined up to pressure test MS seal from above. Pressurized to 35 bar, pressure dropped 0,4 bar / 5 min - ok. Pressurized to 345 bar. Pressure dropped at 1,7 bar / 5 min in the beginning but improved towards the end of the test to 0,5 bar / 5 min. Last 10 min 1,1 bar drop (0,32%) - ok. Pumped and bled back 400 liter. Lost 20 MT on block while performing test.",0.75 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 03:30:00+00:00,2008-05-19 04:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,success,Attempted to released PADPRT by slacking off weight and applying 4 rigihthand turns - nogo. Discussed situation.,0.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 04:00:00+00:00,2008-05-19 05:45:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Discussed way forward with regards to releasing PADPRT. Repeated PADPRT release procedure but got same negative result.,1.75 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 05:45:00+00:00,2008-05-19 07:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Awaited instructions for releasing PADPRT.,1.25 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 07:00:00+00:00,2008-05-19 07:30:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Reverted to emergency release procedure. Rotated string 13 times counterclockwise until torque bulid up of 10 000 Nm. Attempted to pull free with 40 MT overpull - nogo. Repeated emergency release procedure but got same negative result.,0.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 07:30:00+00:00,2008-05-19 11:00:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Awaited instructions for releasing PADPRT. Meeting ongoing with town.,3.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 11:00:00+00:00,2008-05-19 11:15:00+00:00,2276.0,m,fixed,drilling -- casing,ok,equipment failure,Held toolbox talk for attempt to free PADPRT with straight pull release.,0.25 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 11:15:00+00:00,2008-05-19 11:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,Stepped up hookload. Released PADPRT with 60 MT overpull. Observed 30 MT continuos drag after release.,0.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 11:45:00+00:00,2008-05-19 12:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Staged up pumps to 2650 lpm / SPP 25 bar. Circulated riser clean. Got fines over shakers.,0.75 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 12:30:00+00:00,2008-05-19 12:45:00+00:00,137.0,m,fixed,drilling -- casing,ok,success,Broke out and laid down cement head.,0.25 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 12:45:00+00:00,2008-05-19 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with PADPRT on 5 1/2"" HWDP fdrom 137 m MD to surface. Laid out PADPRT. Found tool cavities packed with cuttings.",1.25 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 14:00:00+00:00,2008-05-19 14:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to running wearbushing.,0.25 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 14:15:00+00:00,2008-05-19 14:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made up jet sub and testable WBRRT.,0.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 14:45:00+00:00,2008-05-19 15:15:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"RIH with jet sub / WBRRT on 5 1/2"" DP from surface to 140 m MD. Washed across wellhead from 136,5 m to 143 m MD with 2650 lpm.",0.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 15:15:00+00:00,2008-05-19 16:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Set wearbushing at 140,5 m MD according to Vetco instructions. Applied 8 MT overpull to verify setting.",0.75 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 16:00:00+00:00,2008-05-19 17:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Lined up kill manifold for re-testing MS-seal. Closed UPR. Conducted line test against HCR to 345 bar / 5 min, dropped 0,6 bar - ok.",1.0 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 17:00:00+00:00,2008-05-19 19:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Attempted to replicate test on MS seal testing against WBRRT. Conducted low pressure test to 35 bar / 5 min - ok. Pressured up to 345 bar, not able to obtain good test, pressure leaked off at approx 3,5 bar / 10 min (~1%) and did not stabilize. Topped up drillpipe and observed for flow up drillpipe. Observed flow from drillpipe. Discussed situation. Decided to pull WBRRT and install test plug for test of MS-seal and BOP.",2.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 19:30:00+00:00,2008-05-19 21:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with WBBRT from 140 m MD to surface. Laid down WBBRT.,1.5 +15_9_F_14_2008_05_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-19T00:00:00+02:00,2008-05-20T00:00:00+02:00,2008-05-19 21:00:00+00:00,2008-05-19 22:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Made up BOP test plug. RIH with BOP test plug on 5 1/2"" DP from surface to 140 m MD.",1.0 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-19 22:00:00+00:00,2008-05-19 22:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Set plug in wearbushing according to Vetco instructions. Lined up for testing BOP and MS seal from cement unit.,0.5 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-19 22:30:00+00:00,2008-05-19 23:30:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested BOP. Attempted to get test on MS-seal on BOP test #1 against LPR. Pressured up to 345 bar, leaked off at 2 bar / 10 min but did not stabilize.",1.0 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-19 23:30:00+00:00,2008-05-20 00:00:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP (test #2).,0.5 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 00:00:00+00:00,2008-05-20 00:45:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested BOP, test #3 against UPR. Simultaneously pressure tested MS seal to 345 bar. Obtained test result of 1,3 bar / 10 min (0,37%) and improving trend - ok.",0.75 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 00:45:00+00:00,2008-05-20 04:00:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP (test #4 to #7).,3.25 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 04:00:00+00:00,2008-05-20 05:45:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP (test #7 and #8). Reverted to repair on TDS.,1.75 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 05:45:00+00:00,2008-05-20 11:15:00+00:00,140.0,m,fixed,interruption -- other,ok,equipment failure,Parked TDS for service. Worked on TDS allignment cylinder. Meanwhile pressure tested valves in kill and choke manifolds to 35/345 bar 5/10 min.,5.5 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 11:15:00+00:00,2008-05-20 11:45:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Made up test swage to TDS and connected cement hose. Flushed and pressure tested line.,0.5 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 11:45:00+00:00,2008-05-20 13:00:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested upper/lower IBOPs and kelly hose to 35/345 bar 5/10 min - ok.,1.25 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 13:00:00+00:00,2008-05-20 13:30:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Rigged down test swage and laid out same.,0.5 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 13:30:00+00:00,2008-05-20 14:15:00+00:00,140.0,m,fixed,interruption -- other,ok,equipment failure,Continued working on TDS allignment cylinder.,0.75 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 14:15:00+00:00,2008-05-20 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with BOP test plug on 5 1/2"" DP from 140 m MD to surface.",0.75 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 15:00:00+00:00,2008-05-20 19:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Continued working on TDS allignment cylinder. Picked up single and installed in rotary for making final allignment on TDS.,4.5 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 19:30:00+00:00,2008-05-20 19:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to picking up 12 1/4"" drilling BHA.",0.25 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 19:45:00+00:00,2008-05-20 21:15:00+00:00,24.0,m,fixed,drilling -- trip,ok,success,"Picked up 12 1/4"" powerdrive xceed and hung off in rotrary. Gauged bit. Picked up and made up xceed/motor and made up same.",1.5 +15_9_F_14_2008_05_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-20T00:00:00+02:00,2008-05-21T00:00:00+02:00,2008-05-20 21:15:00+00:00,2008-05-20 22:00:00+00:00,24.0,m,fixed,drilling -- trip,ok,success,Picked up C-link assy. Not able to spin in threads. Tendencies of thread gaulling in box. Washed threads. Refurbished and grinded threads as required.,0.75 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-20 22:00:00+00:00,2008-05-20 22:45:00+00:00,26.0,m,fixed,drilling -- trip,ok,success,Reinstalled lift sub on C-link assy to check threads - ok. Made up schlumberger C-link assy - ok.,0.75 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-20 22:45:00+00:00,2008-05-21 01:15:00+00:00,61.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up ARC, Powerpulse, Sonicvison, NMDC and NMDC pony. + +Meanwhile lined up for testing CRI hose and perform injection test. Observed that CRI hose had detached from subsea wellhead. Valve on hose and check valve was dug in the mud/seabed. Attempted to grab valve assembly but could not apply enough force with ROV.",2.5 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 01:15:00+00:00,2008-05-21 02:15:00+00:00,159.0,m,fixed,drilling -- trip,ok,success,"Made up stand og 8 1/4"" DC and jar. Made up stand of DC. Made up x-over. Picked up and made up 4 x 5 1/2"" HWDP singles (1 stand). + +Meanwhile deployed moonpool tugger to assist ROV in recovering CRI valve assembly from mud/seabed.",1.0 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 02:15:00+00:00,2008-05-21 02:45:00+00:00,159.0,m,fixed,drilling -- drill,ok,success,Held toolbox talk. Removed masterbushing and installed automatic slips in rotary,0.5 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 02:45:00+00:00,2008-05-21 03:30:00+00:00,526.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" drilling BHA on 5 1/2"" DP from 159 m to 526 m MD. + +Meanwhile worked to recover CRI valve assembly with ROV and tugger assist. Closed valve on subsea wellhead.",0.75 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 03:30:00+00:00,2008-05-21 04:00:00+00:00,526.0,m,fixed,drilling -- drill,ok,success,Made up TDS. Circulated according to Schlumberger instructions and performed shallow test of MWD.,0.5 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 04:00:00+00:00,2008-05-21 07:45:00+00:00,2139.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" drilling BHA on 5 1/2"" DP from 526 m to 2139 m MD. Broke circulation every 500 m.",3.75 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 07:45:00+00:00,2008-05-21 08:30:00+00:00,2139.0,m,fixed,interruption -- other,ok,equipment failure,Checked allignement of TDS.,0.75 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 08:30:00+00:00,2008-05-21 09:15:00+00:00,2139.0,m,fixed,drilling -- drill,ok,success,Held handover meeting and toolbox meeting prior to chokedrill. Performed choke drill.,0.75 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 09:15:00+00:00,2008-05-21 10:00:00+00:00,2206.0,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 12 1/4"" BHA on 5 1/2"" DP from 2139 m to 2206.",0.75 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 10:00:00+00:00,2008-05-21 10:15:00+00:00,2206.0,m,fixed,drilling -- drill,ok,success,Laid out single from stand #51 to space out for drilling shoetrack and rathole without connection.,0.25 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 10:15:00+00:00,2008-05-21 11:15:00+00:00,2248.0,m,fixed,drilling -- drill,ok,success,"Made up TDS and broke circulation. Whashed down from 2206 m at 2650 lpm / SPP 123 bar and tagged cement plug at 2247,8 m MD.",1.0 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 11:15:00+00:00,2008-05-21 15:30:00+00:00,2248.0,m,fixed,drilling -- casing,ok,success,"Drilled on cement plugs at 2248 m MD. Drilling parameters : Flow 2700 lpm / SPP ~120 bar / String RPM 105 / WOB 3-6 MT / Torque ~5 kNm / ECD 1,31-1,32. Picked off bottom every 10-15 min to clean bit.",4.25 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 15:30:00+00:00,2008-05-21 17:00:00+00:00,2275.0,m,fixed,drilling -- casing,ok,success,"Broke through plugs/float collar. Drilled firm cement from 2248 m to shoe at 2275 m MD. Drilling parameters : Flow 2700 lpm / SPP ~120 bar / String RPM 105 / WOB 1-3 MT / Torque 5-9 kNm / ECD 1,32.",1.5 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 17:00:00+00:00,2008-05-21 18:00:00+00:00,2281.0,m,fixed,drilling -- casing,ok,success,"Cleaned rathole below 14"" casing down to 2281 m MD. Remaed through shoe for every 2 m drilled. Drilling parameters : Flow 2500-3000 lpm / SPP 113-140 bar / String RPM 105-115 / WOB 1-2 MT / Torque ~7 kNm / ECD 1,32.",1.0 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 18:00:00+00:00,2008-05-21 18:30:00+00:00,2284.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2281 m to 2284 m MD. Drilling parameters : Flow 2500-3000 lpm / SPP 114-145 bar / String RPM 105-115 / WOB 3-4 MT / Torque 7-9 kNm / ECD 1,32.",0.5 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 18:30:00+00:00,2008-05-21 20:15:00+00:00,2268.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"Circulated at 3000 lpm to clean hole and get even mudweight. Observed clean shakers and even MW in/out of 1,30 sg. Meanwhile made preparations for XLOT. Transferred mud to cementer and flushed kill line to drillfloor. Set choke on cement unit bleed back. Pulled bit inside casing.",1.75 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 20:15:00+00:00,2008-05-21 20:30:00+00:00,2268.0,m,fixed,formation evaluation -- rft/fit,ok,success,Closed UPR. Verifed line up to standpipe 1 and kill line to BOP.,0.25 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 20:30:00+00:00,2008-05-21 21:30:00+00:00,2268.0,m,fixed,formation evaluation -- rft/fit,ok,success,Performed XLOT cycle #1. Pressured up on well to ~100 bar at 92 lpm. observed fall off trend for 15 min. Pumped 1776 l and bled back 775 l.,1.0 +15_9_F_14_2008_05_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-21T00:00:00+02:00,2008-05-22T00:00:00+02:00,2008-05-21 21:30:00+00:00,2008-05-21 22:00:00+00:00,2268.0,m,fixed,formation evaluation -- rft/fit,ok,success,Performed XLOT cycle #2. Pressured up on well to ~98 bar at 92 lpm. Observed fall off trend for 15 min.,0.5 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-21 22:00:00+00:00,2008-05-21 22:45:00+00:00,2268.0,m,fixed,formation evaluation -- rft/fit,ok,success,Bled back after XLOT cycle #2. Pumped 1770 l and bled back 1150 l. Observed pressure bulid up for 15 min after bleed off. Meanwhile had toolbox talk prior to mud displacement.,0.75 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-21 22:45:00+00:00,2008-05-22 01:30:00+00:00,2284.0,m,fixed,drilling -- circulating conditioning,ok,success,"Lined up for mud displacement. Pumped 8 m3 WBM spacer and 10 m3 hv-vis OBM spacer. Tripped in to TD at 2284 m MD. Pumped 200 m3 og 1,30 sg OBM at 3000 lpm / SPP 170 bar. Decreased pump rate to 1000 lpm / SPP 25 bar towards end of displacement. Took WBM back to pits and separated treatable and non-treatable interface.",2.75 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 01:30:00+00:00,2008-05-22 02:45:00+00:00,2268.0,m,fixed,drilling -- circulating conditioning,ok,success,Established closed circulation system. Opened for shakers. Filled poor-boy and sand traps. Filled trip tanks.,1.25 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 02:45:00+00:00,2008-05-22 03:15:00+00:00,2220.0,m,fixed,drilling -- drill,ok,success,Racked back 1 stand. Picked up single and made up to stand #51.,0.5 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 03:15:00+00:00,2008-05-22 04:00:00+00:00,2280.0,m,fixed,drilling -- drill,ok,success,RIH to 2280 m MD and attempted to establish drilling parameters. Pumped at 3000 lpm but got overflow on shakers. Cut back rate to 1700 lpm to be able to handle flow. Stepped up rate to 3000 lpm as dictated by flow on shakers.,0.75 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 04:00:00+00:00,2008-05-22 05:00:00+00:00,2289.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2284 m to 2289 m MD. Drilling parameters : Flow 3500 lpm / SPP 232 bar / String RPM 44 / Bit RPM 144/ WOB 2-3 MT / Torque 7-8 kNm / ECD 1,32 / ROP 20 m/hr. Experienced problems with MWD signal.",1.0 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 05:00:00+00:00,2008-05-22 05:30:00+00:00,2289.0,m,fixed,interruption -- repair,ok,equipment failure,"Trouble-shoot MWD signal. Meanwhile drilled ahead 1 m of 12 1/4"" hole.",0.5 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 05:30:00+00:00,2008-05-22 06:30:00+00:00,2299.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2290 m to 2299 m MD. Drilling parameters : Flow 3500 lpm / SPP 232 bar / String RPM 44 / Bit RPM 144 / WOB 2-3 MT / Torque 7-8 kNm / ECD 1,32 / ROP 20 m/hr. Experienced problems with FWD PRS.",1.0 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 06:30:00+00:00,2008-05-22 07:30:00+00:00,2299.0,m,fixed,interruption -- other,ok,equipment failure,Re-booted software on FWD PRS. Meanwhile circulated with 3000 lpm / 10 rpm and reamed up/down 20 m.,1.0 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 07:30:00+00:00,2008-05-22 17:00:00+00:00,2460.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2299 m to 2460 m MD. Drilling parameters : Flow 3500 lpm / SPP 232-238 bar / String RPM 120-140 / Bit RPM 220-240 / WOB 3-8 MT / Torque 6-13 kNm / ECD 1,32 / Drilled with limited ROP 20-30 m/hr due to problems with MWD sinal decoding.",9.5 +15_9_F_14_2008_05_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-22T00:00:00+02:00,2008-05-23T00:00:00+02:00,2008-05-22 17:00:00+00:00,2008-05-22 22:00:00+00:00,2591.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2460 m to 2591 m MD. Drilling parameters : Flow 3500 lpm / SPP 238-249 bar / String RPM 140 / Bit RPM 240 / WOB 3-8 MT / Torque 6-13 kNm / ECD 1,32-1,33 / ROP 30-50 m/hr. Hard stringers encountered at 2518-2519 m and 2565-2568 m MD. + +Meanwhile inspected CRI hose using ROV.",5.0 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-22 22:00:00+00:00,2008-05-22 22:45:00+00:00,2593.0,m,fixed,drilling -- drill,ok,success,Used 4 attempts to downlink to Schlumberger powerdrive. Meanwhile drilled ahead with limited ROP from 2591 m to 2593 m.,0.75 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-22 22:45:00+00:00,2008-05-23 01:15:00+00:00,2638.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2593 m to 2638 m MD. Drilling parameters : Flow 3500 lpm / SPP 249 bar / String RPM 140 / Bit RPM 240 / WOB 6-11 MT / Torque 13-18 kNm / ECD 1,32-1,33 / ROP 40-50 m/hr in Ty formation and 10-25 m/hr in Ekofisk formation.",2.5 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 01:15:00+00:00,2008-05-23 02:00:00+00:00,2648.0,m,fixed,drilling -- drill,ok,success,Used 5 attempts to downlink to Schlumberger powerdrive. Meanwhile drilled ahead with limited ROP from 2638 m to 2648 m. Performed downlink with bit off botm.,0.75 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 02:00:00+00:00,2008-05-23 04:00:00+00:00,2666.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2648 m to 2666 m MD. Drilling parameters : Flow 3500 lpm / SPP 240-246 bar / String RPM 140 / Bit RPM 240 / WOB 11 MT / Torque 14-16 kNm / ECD 1,32 / ROP 10-15 m/hr in Ekofisk formation. Up weight 168 mT / Down weight 150 mT / Rotating weight 157 mT.",2.0 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 04:00:00+00:00,2008-05-23 08:15:00+00:00,2704.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2666 m to 2704 m MD. Drilling parameters : Flow 3100 lpm / SPP 233-235 bar / String RPM 140 / Bit RPM 240 / WOB 11 MT / Torque 13-14 kNm / ECD 1,32 / ROP 9-10 m/hr in Ekofisk formation. Up weight 171 mT / Down weight 147 mT / Rotating weight 157 mT.",4.25 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 08:15:00+00:00,2008-05-23 09:30:00+00:00,2713.0,m,fixed,drilling -- drill,ok,success,Used 4 attempts to downlink to Schlumberger powerdrive. Meanwhile drilled ahead with limited ROP from 2704 m to 2713 m.,1.25 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 09:30:00+00:00,2008-05-23 11:30:00+00:00,2754.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2713 m to 2754 m MD. Drilling parameters : Flow 3500 lpm / SPP 250 bar / String RPM 155 / Bit RPM 255 / WOB 11-12 MT / Torque 19-25 kNm / ECD 1,33-1,34 / ROP 35-40 m/hr",2.0 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 11:30:00+00:00,2008-05-23 12:45:00+00:00,2772.0,m,fixed,drilling -- drill,ok,success,Used several attempts to downlink to Schlumberger powerdrive. Meanwhile drilled ahead with limited ROP from 2754 m to 2772 m.,1.25 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 12:45:00+00:00,2008-05-23 13:30:00+00:00,2788.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole section from 2772 m to 2788 m MD. Drilling parameters : Flow 3200 lpm / SPP 225 bar / String RPM 155 / Bit RPM 255 / WOB 11 MT / Torque 15-35 kNm / ECD 1,33-1,34 / ROP 50 m/hr. Up weight 175 mT / down weight 147 mT / rotating weight 158 mT.",0.75 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 13:30:00+00:00,2008-05-23 14:00:00+00:00,2770.0,m,fixed,drilling -- drill,ok,success,Performed final downlink and took final survey. RB one std.,0.5 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 14:00:00+00:00,2008-05-23 19:00:00+00:00,2785.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated well clean while reciprocated drill string. Pumped 4 x BU at: Flow 3300 lpm / SPP 124 bar / Upwards RPM 40 / Downwards RPM 120. + +Meanwhile MU and checked gyro tools on main deck. PU and MU gyro tool on drill floor.",5.0 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 19:00:00+00:00,2008-05-23 19:45:00+00:00,2785.0,m,fixed,drilling -- survey,ok,success,"Installed battery and dropped gyro tool string inside DP. Pumped down tool with 500-660 lpm and landed gyro on totco ring at 2659,9 m. Performed rotational shots and gyro tool QC at 2655,9 m.",0.75 +15_9_F_14_2008_05_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-23T00:00:00+02:00,2008-05-24T00:00:00+02:00,2008-05-23 19:45:00+00:00,2008-05-23 22:00:00+00:00,2583.0,m,fixed,drilling -- trip,ok,success,"Flow checked well for 15 min. Ok. POOH 5 stds wet from 2785 m to 2583 m. Flow checked well. Ok. Pumped 5 m3 slug. + +Meanwhile performed gyro survey on connection while POOH.",2.25 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-23 22:00:00+00:00,2008-05-23 23:30:00+00:00,2259.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 12 1/4"" BHA from 2583 m and into 14"" csg shoe at 2259. Flow checked well for 15 min. Ok. + +Meanwhile performed gyro survey on connection while POOH.",1.5 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-23 23:30:00+00:00,2008-05-24 02:30:00+00:00,133.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 2259 m to 133 m. + +Meanwhile performed gyro survey on connection while POOH.",3.0 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 02:30:00+00:00,2008-05-24 03:30:00+00:00,133.0,m,fixed,drilling -- trip,ok,success,"BO stand to pick out gyro string. Found gyro tool to be 1 m below connection. MU dedicated fishing tool on tugger and removed tool string out of HWDP. Managed to get gyro data from 2655,9 m to mudline. + +Meanwhile flow checked well. Ok.",1.0 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 03:30:00+00:00,2008-05-24 04:00:00+00:00,88.0,m,fixed,drilling -- drill,ok,success,"RB and LD 12 1/4"" BHA from 133 m to 88 m.",0.5 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 04:00:00+00:00,2008-05-24 08:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"RB and LD 12 1/4"" BHA from 88 m to OOH. Cleaned and cleared rig floor.",4.75 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 08:45:00+00:00,2008-05-24 10:30:00+00:00,138.0,m,fixed,drilling -- other,ok,success,Held tool box talk with involved personnel. MU and RIH with jet sub and wear bushing retrieving tool from surface to 138 m.,1.75 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 10:30:00+00:00,2008-05-24 14:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Jetted area from 138 m to 142 m. Released wear bushing and POOH. LO WBRT assembly and jet sub.,3.5 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 14:00:00+00:00,2008-05-24 14:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor prior to rigging up for csg equipment.,0.75 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 14:45:00+00:00,2008-05-24 15:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Serviced TDS and inspected derrick and top drive for loose items after drilling 12 1/4"" section.",1.0 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 15:45:00+00:00,2008-05-24 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RU 9 5/8"" csg running equipment.",1.25 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 17:00:00+00:00,2008-05-24 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held time out for safety with both crews.,0.5 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 17:30:00+00:00,2008-05-24 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continue RU 9 5/8"" csg running equipment.",3.0 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 20:30:00+00:00,2008-05-24 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held pre job meeting for running csg with focuse on red zone policy. Built scaffolding shelter for csg tong operator on drillfloor.,1.0 +15_9_F_14_2008_05_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-24T00:00:00+02:00,2008-05-25T00:00:00+02:00,2008-05-24 21:30:00+00:00,2008-05-24 22:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,PU shoe joint.,0.5 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-24 22:00:00+00:00,2008-05-24 23:00:00+00:00,38.0,m,fixed,drilling -- casing,ok,success,PU and MU intermediate- and float collar joint. Threads locked connections and checked integrity of shoe and float when RIH.,1.0 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-24 23:00:00+00:00,2008-05-24 23:30:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" XO from Vam Top to Vam Top HC. Adjusted roller guides on csg tong.",0.5 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-24 23:30:00+00:00,2008-05-25 03:00:00+00:00,272.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" Vam Top HC csg w/centr from 49 m to 272 m. Filled csg using top drive every joint. Tripping speed was 6-8 joints/hr. Had hydraulic oil leak on iron roughneck.",3.5 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 03:00:00+00:00,2008-05-25 03:15:00+00:00,272.0,m,fixed,interruption -- other,ok,equipment failure,Repaired bursted fitting on iron roughneck.,0.25 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 03:15:00+00:00,2008-05-25 04:00:00+00:00,339.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" Vam Top HC csg w/centr from 272 m to 339 m. Filled csg using top drive every joint. Tripping speed was 9 joints/hr.",0.75 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 04:00:00+00:00,2008-05-25 07:00:00+00:00,490.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" Vam Top HC csg w/centr from 339 m to 490 m. Filled csg using top drive every joint. Tripping speed was 4-7 joints/hr. Coupling leaking on Odfjell casing tong.",3.0 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 07:00:00+00:00,2008-05-25 07:30:00+00:00,490.0,m,fixed,interruption -- other,ok,equipment failure,Changed leaking coupling on Odfjell csg tong.,0.5 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 07:30:00+00:00,2008-05-25 08:00:00+00:00,490.0,m,fixed,drilling -- casing,ok,success,LO jnt #358 due to damaged box.,0.5 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 08:00:00+00:00,2008-05-25 17:30:00+00:00,1170.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" Vam Top HC csg from 490 m to 1170 m. Crossed over from Vam Top HC to Vam Top at 753.6 m. Filled csg using top drive every joint. Tripping speed was 6-11 joints/hr.",9.5 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 17:30:00+00:00,2008-05-25 19:00:00+00:00,1170.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting. Changed to 10 3/4"" handling equipment and RU casing circulation tool (FAC). Experienced problems with Odfjell spider elevator.",1.5 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 19:00:00+00:00,2008-05-25 19:30:00+00:00,1170.0,m,fixed,interruption -- other,ok,equipment failure,Sorted out problem with Odfjell spider elevator.,0.5 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 19:30:00+00:00,2008-05-25 20:15:00+00:00,1188.0,m,fixed,drilling -- casing,ok,success,"PU and installed XO 9 5/8"" x 10 3/4"". Changed out PS21 slips with PS30 slips. Problems with PDM camera.",0.75 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 20:15:00+00:00,2008-05-25 20:45:00+00:00,1188.0,m,fixed,interruption -- other,ok,equipment failure,Repaired camera on PDM and re-sat HMI software to be able to see picture on the screen.,0.5 +15_9_F_14_2008_05_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-25T00:00:00+02:00,2008-05-26T00:00:00+02:00,2008-05-25 20:45:00+00:00,2008-05-25 22:00:00+00:00,1218.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" csg from 1188 m to 1218 m. Filled csg using FAC tool every joint. Tripping speed was 4 jnts/hr.",1.25 +15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-25 22:00:00+00:00,2008-05-26 04:00:00+00:00,1763.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" csg from 1218 m to 1763 m. Filled csg using FAC tool every joint. Topped up every 5 joints. Tripping speed was 7-11 jnts/hr.",6.0 +15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 04:00:00+00:00,2008-05-26 13:45:00+00:00,2640.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" csg from 1763 m to 2640 m. Filled csg using FAC tool every joint. Topped up every 5 joints. Tripping speed was 5-11 jnts/hr. Broke circulation at shoe with 2200 lpm / 27 bar and circulated 15 min at 1700 lpm / 31 bar.",9.75 +15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 13:45:00+00:00,2008-05-26 15:45:00+00:00,2640.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting and RD FAC tool and changed bails. Changed to 5 1/2"" HWDP handling equipment.",2.0 +15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 15:45:00+00:00,2008-05-26 18:15:00+00:00,2640.0,m,fixed,drilling -- casing,ok,success,"PU and MU 10 3/4"" casing hanger / PADPRT assembly. Marked running tool to make sure it was not backing out. Took out master bushing and ran hanger assy through rotary. Re-installed master bushing. Removed csg tong.",2.5 +15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 18:15:00+00:00,2008-05-26 19:30:00+00:00,2779.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" x 9 5/8"" csg on 5 1/2"" HWDP landing string from 2640 to 2779 m MD.",1.25 +15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 19:30:00+00:00,2008-05-26 20:15:00+00:00,2779.0,m,fixed,drilling -- casing,ok,success,Ball dropped out when PU cement head. Reloaded ball and MU cmt head. Lined up and pressure tested cmt line 345 bar / 5 min.,0.75 +15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 20:15:00+00:00,2008-05-26 21:00:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,"Established circulation at 1500 lpm / 42 bar and washed down from 2779 m to 2783 m. Landed off 10 3/4"" x 9 5/8"" csg at 140.5 m and sat down 5 ton. Kept 5 ton on landing string.",0.75 +15_9_F_14_2008_05_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-26T00:00:00+02:00,2008-05-27T00:00:00+02:00,2008-05-26 21:00:00+00:00,2008-05-26 22:00:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,"Circulated casing volume and btms up, a total of 1150 strks, at 1770 lpm / 53 bar loss free rate. Observed 3 m3/hr loss at 2000 lpm but had full return at 1770 lpm.",1.0 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-26 22:00:00+00:00,2008-05-26 23:15:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,Continued circulating casing volume and btms up at 1770 lpm / 53 bar loss free rate. Meanwhile held pre-job meeting for cmt job.,1.25 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-26 23:15:00+00:00,2008-05-27 00:00:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,"Pumped 30 m3 contaminated OBM, 5 m3 base oil and 19 m3 spacer at 1550-1770 lpm / 46-53 bar.",0.75 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 00:00:00+00:00,2008-05-27 01:00:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,"Verified correct line-up by holding and releasing 20 bar through low torque. Mixed and pumped 13,7 m3 1.90 sg cement slurry at 800 lpm / 31 bar.",1.0 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 01:00:00+00:00,2008-05-27 02:45:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,"Pumped 500 ltrs water, released dart and continued pumping 2500 ltrs water behind cement with cmt unit. Top wiper plug sheared at 170 bar. + +Zeroed stroke counters for mud pumps. Displaced and sheared btm wiper plug by pumping OBM at 1200 lpm using rig pumps. +Continued displacing cement with 111.9 m3 OBM at 1770-1500 lpm using mud pumps. Wiper plug sheared at 114 bar / 4450 stks. Slowed down rate to 1000 lpm / 69 bar (FCP) approx 4 m3 prior to bump. Bumped plug with 138 bar after pumping 5080 strokes, which gives a pump efficiency of 96.5%. No losses during displacement.",1.75 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 02:45:00+00:00,2008-05-27 04:00:00+00:00,2783.0,m,fixed,drilling -- casing,ok,success,Equalized pressure with cmt unit and opened lo-torque valve. Pressured up well to 345 bar / 15 min to test casing using cmt unit. Ok. 1250 ltrs pumped and got 1220 ltrs back. Bleed off from 345 bar to 138 bar and checked for back flow to cmt unit. Lined over to rig pumps and bled off from 138 bar to zero on stand pipe. Checked for back flow. Disconnected cmt hoses and flushed lines.,1.25 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 04:00:00+00:00,2008-05-27 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Reduced weight on landing string from 5 mT to neutral and released PADPRT. LD cmt head std. Dropped sponge balls and flushed string using mud. POOH and LD PADPRT.,4.0 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 08:00:00+00:00,2008-05-27 10:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"PU and RIH with lock down sub from surface to 140 m. Landed lock down sub and made 4 1/4 turns CW, torque 1700 Nm with neutral weight. Toolstring dropped 7.7 inches. Attempted to to set lock down sub. No go.",2.0 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 10:00:00+00:00,2008-05-27 13:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,"1) Performed line test from cmt unit to HCR valve, 30/220 bar 5/10 min. Ok. +2) Pressured up to set lock down sub against closed top pipe ram. No go. +3) Checked for possible leaks in toolstring by opening IBOP and monitor gain in trip tank. No leak observed. +4) Pressured up to set lock down sub against closed btm pipe ram. No go. +5) Pulled lock down sub 1 m above landing no go. Flushed wellhead with 1100 lpm / 15 min. Landed lock down sub and made 4 1/4 turns CW, torque 1700 Nm with neutral weight. Toolstring dropped 8 inches. Attempted to set lock down sub. No go.",3.0 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 13:00:00+00:00,2008-05-27 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,POOH with lock down sub assembly from 140 m to OOH. Checked lock down sub and verified space out. Ok. LD lock down sub.,2.0 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 15:00:00+00:00,2008-05-27 16:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,PU and RIH with jet/flush tool from surface to 140 m. Landed out on 140.03 m.,1.5 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 16:30:00+00:00,2008-05-27 18:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,"Jetted top of 10 3/4"" csg hanger, 750 lpm / 42 bar / 3 rpm / 2 kNm.",1.5 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 18:00:00+00:00,2008-05-27 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with jet/flush tool from 140 m to OOH. Inspected jetting tool and found indication that tool had not landed out on 10 3/4"" csg hanger.",1.5 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 19:30:00+00:00,2008-05-27 20:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,RIH with jet/flush tool from surface to 140 m.,0.5 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 20:00:00+00:00,2008-05-27 21:45:00+00:00,139.0,m,fixed,drilling -- casing,ok,operation failed,"Landed out with jet/flush tool on 10 3/4"" csg hanger with 2 mT. PU and established circulation at 910 lpm / 49 bar / 3 rpm / 2 kNm. Tagged with 2 mT serveral times to clean the CH area. PU 1 m and circulated btms up at 930 lpm / 45 bar.",1.75 +15_9_F_14_2008_05_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-27T00:00:00+02:00,2008-05-28T00:00:00+02:00,2008-05-27 21:45:00+00:00,2008-05-27 22:00:00+00:00,100.0,m,fixed,drilling -- casing,ok,operation failed,POOH with jet/flush tool from 139 m to 100 m.,0.25 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-27 22:00:00+00:00,2008-05-27 22:15:00+00:00,60.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with jet/flush tool from 100 m to 60 m. Could not rack back 5 1/2"" HWDP due to finger on FWD PRS not working.",0.25 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-27 22:15:00+00:00,2008-05-28 02:00:00+00:00,60.0,m,fixed,interruption -- other,ok,equipment failure,Repaired decoder for finger on FWD PRS.,3.75 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 02:00:00+00:00,2008-05-28 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with jet/flush tool from 600 m to OOH. Inspected jetting tool and found indication that tool had not landed out completely on 10 3/4"" csg hanger. Decided that it was no point in re-running the jet/wash tool.",0.5 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 02:30:00+00:00,2008-05-28 04:00:00+00:00,40.0,m,fixed,drilling -- casing,ok,operation failed,"PU and RIH with lock down sub from surface to 40 m. Could not rack back 5 1/2"" HWDP due to finger on fingerboard not working.",1.5 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 04:00:00+00:00,2008-05-28 11:30:00+00:00,60.0,m,fixed,interruption -- other,ok,equipment failure,"Repaired decoder for finger on FWD PRS. + +Meanwhile changed out drilling bails and performed derrick inspection.",7.5 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 11:30:00+00:00,2008-05-28 12:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,RIH with lock down sub from 40 to 140 m.,0.75 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 12:15:00+00:00,2008-05-28 13:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,"Landed lock down sub with 9 mT and made 4 1/4 turns CW, torque 1700 Nm with neutral weight. Toolstring dropped 7.5 inches. Closed UPR and verified correct line-up. +Attempted to pressure up to 35 bar without sucess. Switched to second cmt pump and re-tried pumping up to 35 bar. Ok. Continued pressuring up to 207 bar and sat MS seal. Bled off pressure to zero. Confirmed lock by taking 40 mT overpull.",1.5 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 13:45:00+00:00,2008-05-28 14:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Tested MS in lock down sub 35/345 bar for 5/10 min. Ok,0.5 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 14:15:00+00:00,2008-05-28 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released PADPRT and POOH with running string from 140 m to OOH.,1.5 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 15:45:00+00:00,2008-05-28 16:30:00+00:00,30.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to running RTTS. MU and RIH with jet sub from surface to 30 m and jetted BOP, 3100 lpm / 22 bar / 10 rpm.",0.75 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 16:30:00+00:00,2008-05-28 18:45:00+00:00,87.0,m,fixed,drilling -- casing,ok,success,"Continue RIH with jet sub on 4 stds of 5 1/2"" HWDP from 30 m to 87 m. PU and MU RTTS w/storm valve. Ran Halliburton centrilizer on single above storm valve.",2.25 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 18:45:00+00:00,2008-05-28 21:15:00+00:00,350.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" RTTS w/SSCV on 5 1/2"" DP from 87 m to 350 m. Up weight 92 mT / down weight 97 mT.",2.5 +15_9_F_14_2008_05_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-28T00:00:00+02:00,2008-05-29T00:00:00+02:00,2008-05-28 21:15:00+00:00,2008-05-28 22:00:00+00:00,360.0,m,fixed,drilling -- casing,ok,success,"Reciprocated string and circulated at 290 lpm / 7 bar to clean setting area. Installed RTTS with elements at 350 m and sat down 20 mT, down weight 70 mT.",0.75 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-28 22:00:00+00:00,2008-05-29 00:15:00+00:00,350.0,m,fixed,drilling -- casing,ok,success,"Lined up to test RTTS from below. Verified correct line-up from cmt unit to IBOP and performed line test. No go. Closed manual IBOP on TDS and performed line test. Ok. + +Performed low pressure test to 30 bar / 10 min. Ok. Dropped 1 bar / 10 min. Pressured up in steps and tested RTTS to 230 bar / 10 min from below. Ok. Dropped 1.8 bar / 10 min. 1.3 m3 pumped and 1.35 m3 bled back.",2.25 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 00:15:00+00:00,2008-05-29 01:00:00+00:00,340.0,m,fixed,drilling -- casing,ok,success,PU up to neutral and released from RTTS with 22 turns CCWW. PU to 340 m.,0.75 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 01:00:00+00:00,2008-05-29 02:15:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,Pulled up and greased top of connection. Ran back down to and spaced out below btm pipe ram.,1.25 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 02:15:00+00:00,2008-05-29 03:30:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,"Lined up cmt unit to IBOP on TDS to test RTTS from above and performed line test to 345 bar. Ok. + +Performed low pressure test to 30 bar / 10 min. Ok. Dropped 0 bar / 10 min. Pressured up in steps to test RTTS. Pumped 1.1 m3 to 110 bar and observed leak. 500 ltrs bleed back.",1.25 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 03:30:00+00:00,2008-05-29 04:00:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,Discussed situation and evaluated further action.,0.5 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 04:00:00+00:00,2008-05-29 04:30:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,Discussed situation and evaluated further action.,0.5 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 04:30:00+00:00,2008-05-29 07:15:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,"Stung back into RTTS. Observed 2.2 bar pressure increase when communication to volume below plug was established. + +Lined up to test RTTS from below. Closed manual IBOP on TDS. Performed low pressure test to 30 bar / 10 min. Ok. Dropped 0 bar / 10 min. Pressured up in steps and tested RTTS to 230 bar / 10 min from below. Ok. Dropped 1.7 bar / 10 min. 1.33 m3 pumped and 1.32 m3 bled back. + +Rotated 12 turns to the left and POOH of RTTS. Tested storm valve to 50 bar / 10 min. Ok. Dropped 0.9 bar / 10 min. 121 ltrs pumped and 121 ltrs bled back. Stung out of RTTS.",2.75 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 07:15:00+00:00,2008-05-29 09:15:00+00:00,348.0,m,fixed,drilling -- casing,ok,success,Flow checked well prior to displacing well above RTTS to SW. Ok. Meanwhile held tool box talk with involved personnel. Drained trip tank and poor boy degasser. Re-filled trip tank with SW. Displaced well to SW at 3100 lpm / 20 bar. Flushed C & K and surface lines.,2.0 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 09:15:00+00:00,2008-05-29 09:45:00+00:00,310.0,m,fixed,drilling -- casing,ok,success,Pumped 10 m3 hi-vis pill at 1500 lpm / 15 bar and spotted above RTTS.,0.5 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 09:45:00+00:00,2008-05-29 10:00:00+00:00,310.0,m,fixed,drilling -- casing,ok,success,"POOH with running tool on 5 1/2"" DP from 348 m to 310 m. Could not rack back 5 1/2"" DP due spinner on iron roughneck not working.",0.25 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 10:00:00+00:00,2008-05-29 11:00:00+00:00,310.0,m,fixed,interruption -- other,ok,equipment failure,Investigated problem with pipe spinner on aft roughneck.,1.0 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 11:00:00+00:00,2008-05-29 11:15:00+00:00,310.0,m,fixed,drilling -- casing,ok,success,Held tool box meeting prior to using chain tong to spin out stds of DP.,0.25 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 11:15:00+00:00,2008-05-29 12:30:00+00:00,310.0,m,fixed,drilling -- casing,ok,success,Observed gain in trip tank and flow up RTTS running string. Installed kick valve on string. Shut in well and monitored pressures. No increase in pressure observed. Total gain in trip tank was 420 ltrs.,1.25 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 12:30:00+00:00,2008-05-29 13:00:00+00:00,292.0,m,fixed,drilling -- casing,ok,success,"Opened auto choke and observed no gain in TT through mud gas separator. Opened kick valve and observed no flow. POOH with running tool on 5 1/2"" DP from 310 m to 292 m. Could not rack back 5 1/2"" DP due to lower arm on FWD PRS not working.",0.5 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 13:00:00+00:00,2008-05-29 17:00:00+00:00,292.0,m,fixed,interruption -- other,ok,equipment failure,"Changed out solenoid valve on lower arm on FWD PRS. + +Meanwhile removed every second bolt on slick joint and moved BOP carrier beneath BOP.",4.0 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 17:00:00+00:00,2008-05-29 18:15:00+00:00,292.0,m,fixed,drilling -- casing,ok,success,Held tool box talk for manual handling. Performed equipment check and found loose dies on FWD PRS carrier. Changed dies.,1.25 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 18:15:00+00:00,2008-05-29 20:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with running tool on 5 1/2"" DP from 292 m to OOH.",1.75 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 20:00:00+00:00,2008-05-29 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Cleared rig floor. RIH with 1 single 5 1/2"" DP and closed ram. Drained BOP.",1.0 +15_9_F_14_2008_05_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-29T00:00:00+02:00,2008-05-30T00:00:00+02:00,2008-05-29 21:00:00+00:00,2008-05-29 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed diverter pulling tool.,1.0 +15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-29 22:00:00+00:00,2008-05-30 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued installing diverter pulling tool and POOH with diverter.,4.0 +15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 02:00:00+00:00,2008-05-30 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,LO diverter.,2.0 +15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 04:00:00+00:00,2008-05-30 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued LO diverter.,0.5 +15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 04:30:00+00:00,2008-05-30 06:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RU for pulling slick joint. Pulled master bushing. Pulled and LO slick joint.,1.75 +15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 06:15:00+00:00,2008-05-30 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed tension cylinders from BOP.,2.25 +15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 08:30:00+00:00,2008-05-30 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed slings from TDS. PU claxton tool using BX-elevator and ran Claxton tool through rotary. Installed master bushings and 5 1/2"" DP slips. + +Meanwhile unbolted NT2 connector on BOP.",1.0 +15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 09:30:00+00:00,2008-05-30 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Helt tool box meeting. Moved BOP to stump. MU NT2 connector to stump and adjusted scaffolding according to Vetco request.,2.0 +15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 11:30:00+00:00,2008-05-30 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box meeting. MU Claxton tool to 5 1/2"" DP and installed NT2 connector on to HPDR.",4.5 +15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 16:00:00+00:00,2008-05-30 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box meeting before removing tension cylinders. Transfered weight from riser tension system to TDS. PU up to 130 mT. Dismantled tensioner ring system. + +Meanwhile dismantled annular and cleaned lines from cmt unit through kill, choke and poorboy degasser. Installed cradle and trolly on HTS.",4.0 +15_9_F_14_2008_05_31.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-30T00:00:00+02:00,2008-05-31T00:00:00+02:00,2008-05-30 20:00:00+00:00,2008-05-30 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed moonpool hatch on F-14 and hatch on F-13 for guide wire. Ran 10 mT tugger to moonpool. Production shut down confirmed at 23:55. + +Meanwhile function tested riser spider.",2.0 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-30 22:00:00+00:00,2008-05-30 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Slacked off weight from 129 mT to 110 mT to have TBC in neutral. Installed guide wire using 10 mT tugger. Launched hotstab on mini-reel hose down to seabed, attached to guidewire. Removed dummy hot stab and installed hydraulic hot stab into receptacle at top of TBC using ROV.",1.0 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-30 23:00:00+00:00,2008-05-30 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Operated TBC valve panel to ""Primary unlock"" 2-1-1 using ROV and pressured up through mini-reel to 3000 psi. Held pressure for 15 min and confirmed position of indicator rods and unlock band.",0.5 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-30 23:30:00+00:00,2008-05-31 00:15:00+00:00,137.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled riser 1.5 m above WH using 10-20 mT overpull. Disconnected hot stab and retrieved same.,0.75 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 00:15:00+00:00,2008-05-31 01:45:00+00:00,109.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with riser until connection for 5 1/2"" DP was above rotary. Disconnected 5 1/2"" DP from Claxton tool and RB same. MU and RB RT for production riser.",1.5 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 01:45:00+00:00,2008-05-31 02:45:00+00:00,109.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"PU riser and removed master bushings and ring. Positioned split spider and installed same. + +Meanwhile inspected seal faces in WH and installed debris cover on F-14 using ROV.",1.0 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 02:45:00+00:00,2008-05-31 04:00:00+00:00,109.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pulled HPDR out until first double was above riser spider. Removed fairing on connection using fairing handling tool. Engaged spider dogs and inserted stop bolts. Landed HPDR upper flange on tension joint in riser spider. + +Removed plastic thread protectors and broke flange connection using Bandak tool.",1.25 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 04:00:00+00:00,2008-05-31 06:15:00+00:00,109.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke flange connection on first double using Bandak tool. LO first double with Claxton tool using main crane and TDS.,2.25 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 06:15:00+00:00,2008-05-31 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to pull and LO HPDR to deck. + +Meanwhile brushed and cleaned wellhead using ROV.",10.75 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 17:00:00+00:00,2008-05-31 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box meeting for removing hatch on F-15 and moving riser guide funnel from F-3 to F-14. Removed hatch on F-15.,1.0 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 18:00:00+00:00,2008-05-31 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RU and ran 6 mT tugger for moving riser landing guide funnel. Hooked on tugger wire to master links on funnel using ROV.,0.75 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 18:45:00+00:00,2008-05-31 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lifted and moved riser landing guide funnel from F-3 to F-14. Removed debris cap from F-14 and placed on sea bed. Landed and oriented upper guiding skirt on funnel in east direction. Disconnected ROV hooks on master links. + +Meanwhile removed hatches, built scaffolding/barriers around deck openings and prepared equipment for installing tensioner ring assembly in WH module.",1.25 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 20:00:00+00:00,2008-05-31 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk for running production riser with involved personnel.,0.5 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 20:30:00+00:00,2008-05-31 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lifted TBC/stress joint from cantiliver until handling sub was latched into TDS. Unhooked uppermost sling and lifted TBC/stress joint with TDS until it was hanging vertically above rotary. + +Meanwhile installed VX-ring using ROV, built scaffolding/barriers around deck openings and prepared equipment for installing tensioner ring assembly in WH module.",0.5 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 21:00:00+00:00,2008-05-31 21:30:00+00:00,23.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered TBC/stress joint through rotary. Extended riser spider dogs and installed stop bolts in PR holes #3. Hung off stress joint in riser spider. Alligned TBC ROV panels and checked TBC connector for damage.,0.5 +15_9_F_14_2008_06_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-05-31T00:00:00+02:00,2008-06-01T00:00:00+02:00,2008-05-31 21:30:00+00:00,2008-05-31 22:00:00+00:00,23.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted 1st double with dual lift on block and deckcrane.,0.5 +15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-05-31 22:00:00+00:00,2008-06-01 00:15:00+00:00,37.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up flanged connection according to Vetco/Bandak procedure. Installed fairring on coupling. Ran in and placed TBC connector in level with Weather deck deck. Prepared guidewires in slot F-13 and F-15.,2.25 +15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 00:15:00+00:00,2008-06-01 03:00:00+00:00,15.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Placed TBC in in level with Weatherdeck. Function tested TBC according to Vetco instruction. Installed dummy stabs. Oriented lock/unlock panel to 45 deg starboard aft. Attached ROV hooks to guide slings. Hauled guidewires with ROV hooks through Centralizer deck, ran to sealevel. Landed 1 st double in riser spider. Ran guidewires individually to 20 m above seabed.",2.75 +15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 03:00:00+00:00,2008-06-01 04:00:00+00:00,66.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed handling tool. Lifted 2nd double to drillfloor with dual lift on block and deck crane. Started MU up flanged connection according to Vetco/Bandak procedure. + +Meanwhile installed guidewires using ROV.",1.0 +15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 04:00:00+00:00,2008-06-01 13:00:00+00:00,118.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MU up flanged connection on 2nd double according to Vetco/Bandak procedure. Continued removing handling tools, lifting doubles to drillfloor with dual lift on block and deck crane, MU up flanged connections according to Vetco/Bandak procedure and tested flanges to 3000 psi / 5 min, from 66 to 118 m. Could not MU DP due to PRS not operational. + +Tested deluge system from 10:30 to 10:45 hr.",9.0 +15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 13:00:00+00:00,2008-06-01 13:30:00+00:00,118.0,m,fixed,interruption -- other,ok,equipment failure,Repaired sheared bolts on PRS track on drill floor.,0.5 +15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 13:30:00+00:00,2008-06-01 15:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Landed riser on tension joint land off plate in riser spider. MU DP connection to handling sub using TopDrive and manual rig tongs.Lifted PR string and lowered it down to top of riser landing guide funnel (RLGF). Removed hole cover from RLGF and oriented TBC ROV panels. Hook load 97 mT. Continued lowering PR until TBC was 10 cm above VGX gasket.,1.75 +15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 15:15:00+00:00,2008-06-01 21:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Re-arranged lifting slings on RLGF and put tension on wires. Attempted to unlock guide funnel hinge using ROV. No sucess. Fetched crow bar from surface and attempted to bend guide funnel hinge. No sucess. Fetched cutting device from surface and cut guide funnel hinge with tension on RLGF wire slings. RLGF came free. Lowered PR a fraction. Attempted to move RLGF but found that riser weight had landed off on funnel edge. PU PR a fraction and moved landing guide funnel to seabed aft of F-10/F-15. Alligned TBC ROV panel, landed TBC and applied 15 mT. + +Pumped baseoil to cmt unit and verified line-up to F-12. Performed line test 30 /150 bar 5/10 min against F-12 wing valve. Pumped 8.5 m3 baseoil to pressure up and equalized above DHSV. Opened F-12 DHSV at 93 bar. Displaced cmt unit and kill line to SW.",6.25 +15_9_F_14_2008_06_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-01T00:00:00+02:00,2008-06-02T00:00:00+02:00,2008-06-01 21:30:00+00:00,2008-06-01 22:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Launched hotstab on mini-reel hose down to seabed, attached to guidewire. Removed dummy hot stab and installed hydraulic hot stab into receptacle at top of TBC using ROV. + +Production started at 23:25.",0.5 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-01 22:00:00+00:00,2008-06-01 23:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Sat TBC ROV panel A in ""primary unlock"" 2-1-1 and RIH with PR another 10-15 cm. Sat TBC ROV panel A in ""primary lock"" 2-1-2. Sat down 15 mT on PR. Pressured up through TBC port A to 3000 psi and observed silver band alignement of indicator rods above TBC top cap. Silver band was completely aligned. Sat TBC ROV panel A in ""parked position"". + +Performed 10 mT overpull test to 107 mT to confirmed that TBC was locked. Ok. Sat TBC ROV panel B in ""lower dog flush"" x-1-1 and removed dummy hot-stab to be able to observe possible leak.",1.0 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-01 23:00:00+00:00,2008-06-01 23:45:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lined up to pressure test PR against RTTS plug from cmt unit using SW. Performed line test to 120 bar/5 min. Ok.,0.75 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-01 23:45:00+00:00,2008-06-02 00:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Filled riser with SW using cmt unit.,0.5 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 00:15:00+00:00,2008-06-02 03:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Performed pressure test of PR aginst RTTS plug/14"" csg shoe. +20 bar / 10 min 0.6 bar drop +50 bar / 10 min 0.6 bar drop +60 bar / 10 min 0.8 bar drop +70 bar 7 10 min 0.8 bar drop +80 bar / 10 min 0.8 bar drop +90 bar / 10 min 0.9 bar drop +100 bar / 10 min 1.3 bar drop +110 bar / 10 min 4.0 bar drop. 725 ltrs pumped and 560 ltrs bled back. No leak observed by ROV.",2.75 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 03:00:00+00:00,2008-06-02 04:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pull hot stab out of TBC ROV panel A and insert it into TBC ROV panel B. Flushed upper port on hot stab ""B"" with corrosion inhibitor. + +Meanwhile started to prepare tensioner system in WH module.",1.0 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 04:00:00+00:00,2008-06-02 06:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Sat TBC ROV panel B in ""upper piston flush"" 1-x-x and continued flushing with corrosion inhibitor. Sat TBC ROV panel B in ""parking position"" and installed dummy stab. Released and retrieved guide wires for PR. + +Meanwhile prepared tensioner system in WH module.",2.0 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 06:00:00+00:00,2008-06-02 15:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed centralizers, boat collision stool and tensioner ring in WH module. + +Meanwhile lowered PR cutting equipment and valve and equipment for multibowl down to tensioner deck. Changed out encoder on AFT PRS and worked on BOP annular.",9.5 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 15:30:00+00:00,2008-06-02 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held time-out for safety to discuss recent events.,0.5 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 16:00:00+00:00,2008-06-02 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued installing tensioner ring in WH module. + +Meanwhile worked on BOP annular.",1.0 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 17:00:00+00:00,2008-06-02 18:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box meeting and RU to install hatches on weather deck. Flushed lines from cmt unit to rig floor with baseoil. +Meanwhile closed down production on F-12. Production down at 19:55 hr. +Installed hatch on F-13.",1.25 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 18:15:00+00:00,2008-06-02 18:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on production to confirme valve status. + +Meanwhile installed hatch on F-15.",0.25 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 18:30:00+00:00,2008-06-02 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Verified line up to F-12. Bled off pressure to choke manifold. Performed line test to 120 bar/5 min.,1.0 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 19:30:00+00:00,2008-06-02 19:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Waited for production to verify that DHSV was open and bled off pressure to choke manifold.,0.25 +15_9_F_14_2008_06_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-02T00:00:00+02:00,2008-06-03T00:00:00+02:00,2008-06-02 19:45:00+00:00,2008-06-02 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued installing tensioner ring and tension cylinders in WH module. Production up at 22:00 hr. + +Meanwhile bolted down hatches F-13 and F-15 on weather deck.",2.25 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-02 22:00:00+00:00,2008-06-03 00:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued installing tension cylinders in WH module. Installed protector guide on tensioner deck. + +Meanwhile bolted up hatches F-13 and F-15 on weather deck.",2.75 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 00:45:00+00:00,2008-06-03 01:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Checked level and opened valves on nitrogen system. Transfered weight from TDS to tensioner system. Had 90 bar on all cylinders and 70.5 mT on TDS (neutral) when operation was finished.,1.0 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 01:45:00+00:00,2008-06-03 02:45:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Measured cutting hight on PR to 1414 mm above tensioner deck and marked riser. Verified measurement B on machined tectyl coated area. Adjusted weight in TDS to 72,3 mT. RU and leveled cutting tool. Installed auto-feed system.",1.0 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 02:45:00+00:00,2008-06-03 04:00:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Started cutting PR production riser using auto-feed and 8-12 rpm.,1.25 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 04:00:00+00:00,2008-06-03 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Completed cutting the PR. Pulled out landing string with top part of Tension Joint. Broke connection between DP and Handling Tool. L/D Top part of Tension Joint.,1.0 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 05:00:00+00:00,2008-06-03 08:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed Inflatable Ball inside PR, as a debris barrier for metal swarf during bevelling. Bevelled the PR. + +Simultaneously worked on the BOP.",3.5 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 08:30:00+00:00,2008-06-03 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved the cutting gear to the rig floor and rigged down same.,0.5 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 09:00:00+00:00,2008-06-03 11:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk and rigged down the 5½"" handling equipment, slings and the Spider. Moved the Spider out from the rig floor.",2.0 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 11:00:00+00:00,2008-06-03 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed outer ring and master bushing and rigged up 5½"" handling equipment.",0.5 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 11:30:00+00:00,2008-06-03 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and broke out the riser RT and LO same.,1.0 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 12:30:00+00:00,2008-06-03 12:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to install the Multibowl. Had production to shut down the water inject. on F4.,0.25 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 12:45:00+00:00,2008-06-03 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"M/U the Multibowl and ran in and installed same as per Vetco procedure. +Pressure tested to 35 bar to ensure BT seals intack. Energized plastic in upper and lower BT seals, and pressure tested same to 3000 psi (207 bar) 10 min.",3.25 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 16:00:00+00:00,2008-06-03 16:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved the Multibowl RT and LO same.,0.5 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 16:30:00+00:00,2008-06-03 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed valves on the Multibowl.,0.5 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 17:00:00+00:00,2008-06-03 17:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held time out for safety.,0.75 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 17:45:00+00:00,2008-06-03 19:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for running BOP riser jnt. and picked up same. Build scaffolding around the Multibowl.,2.0 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 19:45:00+00:00,2008-06-03 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran in and installed the BOP riser jnt. and torqued up same. PU 2.5 tons to ensure locking segment were locked.,1.25 +15_9_F_14_2008_06_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-03T00:00:00+02:00,2008-06-04T00:00:00+02:00,2008-06-03 21:00:00+00:00,2008-06-03 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Retrieved slings for running BOP riser jnt. Installed outer ring and master bushing. Installed hatch cover. Started water injection on F4 at 23:55 hours.,1.0 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-03 22:00:00+00:00,2008-06-03 22:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Cleared and cleaned rig floor.,0.5 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-03 22:30:00+00:00,2008-06-03 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held tool box talk prior to rig up and change wash pipe. Rigged up for changing out the wash pipe.,0.5 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-03 23:00:00+00:00,2008-06-04 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Built scaffolding in the Moon Pool to get access to the BOP riser jnt connection. Flushed lines from cmt. to rig floor prior to perform BOP test. + +Simultaneously worked on the BOP.",3.0 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 02:00:00+00:00,2008-06-04 04:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Changed out wash pipe. + + Meanwhile pressure tested the BOP to 20/345 bars for 5/10 min.",2.0 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 04:00:00+00:00,2008-06-04 04:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Completed changing of the wash pipe.,0.75 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 04:45:00+00:00,2008-06-04 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged up and pressure tested the wash pipe and the IBOP 20/345 bars 5/10 mins. + +Meanwhile pressure test the BOP to 20/345 bars for 5/10 min.",2.25 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 07:00:00+00:00,2008-06-04 08:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged down equipment for testing of the wash pipe and IBOP. Installed slings for handling the Diverter. + +Meanwhile checked torque on bolts on annular.",1.0 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 08:00:00+00:00,2008-06-04 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lined up and positioned test joint for testing of annular. Tested annular to 20/345 bar 5/10 mins. + +Meanwhile checked equipment prior to picking up HWDP. Changed dies in flush joint elevators. Held tool box prior to handling of HWDP. Attempted to handle HWDP, not able to open fingers on PDM head.",2.5 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 10:30:00+00:00,2008-06-04 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to nippling of the BOP and Diverter. Nippled down the BOP NT2 connector. + +Meanwhile Changed dies in TDS pipe handler.",2.0 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 12:30:00+00:00,2008-06-04 16:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up the Diverter and landed on the rig floor. Moved the BOP into to well centre and nippled up same.,4.0 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 16:30:00+00:00,2008-06-04 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled master bushing and ran slick jnt into the BOP.,0.5 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 17:00:00+00:00,2008-06-04 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk and installed the Diverter and made up the NT2 connector.,2.5 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 19:30:00+00:00,2008-06-04 20:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared and cleaned rig floor.,0.75 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 20:15:00+00:00,2008-06-04 20:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held tool box talk and installed hang off wires on TDS.,0.5 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 20:45:00+00:00,2008-06-04 21:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Prepared handling equipment for slip and cut of drill line.,0.5 +15_9_F_14_2008_06_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-04T00:00:00+02:00,2008-06-05T00:00:00+02:00,2008-06-04 21:15:00+00:00,2008-06-04 22:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held tool box talk prior to slip and cut drill line.,0.75 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-04 22:00:00+00:00,2008-06-04 23:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Perform slip and cut of drill line.,1.25 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-04 23:15:00+00:00,2008-06-05 02:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,operation failed,Continued slip and cut of drill line.,3.25 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 02:30:00+00:00,2008-06-05 03:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,operation failed,Calibrated top drive.,0.5 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 03:00:00+00:00,2008-06-05 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to install test plug in surface well for testing of BOP riser connection.,1.0 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 04:00:00+00:00,2008-06-05 05:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Made up test plug and RIH and landed off in surface well head.,1.0 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 05:00:00+00:00,2008-06-05 06:30:00+00:00,20.5,m,fixed,drilling -- bop activities,ok,success,Held tool box talk and filled riser to SW and tested BOP connection to 35/345 bars 5/10mins.,1.5 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 06:30:00+00:00,2008-06-05 07:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH with test plug.,0.5 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 07:00:00+00:00,2008-06-05 07:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Held tool box talk and broke out test plug and made up wear bushing RT with Bowl Protector.,0.5 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 07:30:00+00:00,2008-06-05 08:00:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and set Bowl Protector as per Vetco procedure. POOH and laid out Bowl Protector RT.,0.5 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 08:00:00+00:00,2008-06-05 08:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to handling HWDP.,0.25 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 08:15:00+00:00,2008-06-05 08:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Checked dies in PRS, PDM and handling equipment prior to pick up HWDP. Unable to handle HWDP with PDM.",0.5 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 08:45:00+00:00,2008-06-05 09:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Trouble shooted the PDM, found that PDM had to be re-programmed for handling HWDP.",1.0 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 09:45:00+00:00,2008-06-05 11:00:00+00:00,53.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with Annulus Insert RT, while picking up dedicated HWDP landing string from cantilever. Found incompatible tool jnts. with 3mm gab.",1.25 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 11:00:00+00:00,2008-06-05 12:00:00+00:00,53.0,m,fixed,interruption -- repair,ok,equipment failure,POOH and laid out 3 jnt incompatible tool jnts. Picked up and meassured 3 new jnts.,1.0 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 12:00:00+00:00,2008-06-05 13:15:00+00:00,113.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued RIH with Annulus Insert RT, on dedicated HWDP landing string to 113m.",1.25 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 13:15:00+00:00,2008-06-05 14:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up Landing String to TDS. RIH and tagged top of Annulus Insert, +with max. 2 ton. Engaged the J-slot and took 1 ton overpull. Slacked off to neutral string weight. Rotated to the left approx 6 turns, while keeping neutral weight to retrieve Annulus Insert.",0.75 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 14:00:00+00:00,2008-06-05 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH and laid out RRT and Annulus Insert. As POOH with the Annulus Insert passed subsea well head very carefully and surface well head wear bushing very slowly due to small clearances.,1.75 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 15:45:00+00:00,2008-06-05 16:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up Bull nose jet sub and RIH from surface to 140m.,0.75 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 16:30:00+00:00,2008-06-05 19:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Lined up and washed subsea well reciprocating the pipe, pumped 40m³ SW, 10m³ Hi-vis and displaced riser to 1.03 sg Treated Seawater.",2.5 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 19:00:00+00:00,2008-06-05 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH and L/D Bullnose sub.,0.5 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 19:30:00+00:00,2008-06-05 20:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up Primary Bowl Protector RRT on DP. RIH and retrieved Bowl Protector, POOH and laid out Bowl Protector.",0.75 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 20:15:00+00:00,2008-06-05 21:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Held tool box talk and made up Spear assy. using rig-tongs. Racked back Spear assy. in derrick.,1.0 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 21:15:00+00:00,2008-06-05 21:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Cleared and cleaned rig floor.,0.25 +15_9_F_14_2008_06_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-05T00:00:00+02:00,2008-06-06T00:00:00+02:00,2008-06-05 21:30:00+00:00,2008-06-05 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and commenced rig up casing handling equipment and casing tong.,0.5 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-05 22:00:00+00:00,2008-06-05 23:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Continued rigging up casing handling equipment and casing tong.,1.75 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-05 23:45:00+00:00,2008-06-06 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to RIH with 10 3/4"" casing.",0.25 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 00:00:00+00:00,2008-06-06 03:30:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"Picked up and RIH 10 3/4"" Tie-back adapter on 10 3/4"" casing from surface to 108m.",3.5 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 03:30:00+00:00,2008-06-06 03:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Picked up pre-packed 10 3/4"" surface casing hanger assembly with Adjustment Sub and casing hanger Handling tool. Made up assembly with low stick-up.",0.25 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 03:45:00+00:00,2008-06-06 04:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and released Casing Hanger RT with 10 right hand turns.,0.25 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 04:00:00+00:00,2008-06-06 04:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Laid out 10 3/4"" surface casing hanger handling sub. Changed surface handling equipment to DP.",0.5 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 04:30:00+00:00,2008-06-06 05:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,success,"Made up premade spear stand from derrick and stabbed into 10 3/4"" casing.",0.5 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 05:00:00+00:00,2008-06-06 06:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and ran in with 10 3/4"" surface casing hanger from 119m to 140m. Tagged subsea tie back well head. Meanwhile drained riser.",1.0 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 06:00:00+00:00,2008-06-06 06:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Rotated with 3 rpm with torque limit set at 2500 Nm. Observed stall out and Spear released. Engaged Spear again with 12 MT overpull and 2 rpm. Increased torque incrementally in 500 Nm stages. Achieved max torque of 8500 Nm prior to Spear released. Re-engaged with 13 MT overpull and 4 rpm and applied torque. Observed 10,800 Nm make up before spear released.",0.75 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 06:45:00+00:00,2008-06-06 07:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Took 30 MT overpull, observed 0.5 inch stretch.",0.25 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 07:00:00+00:00,2008-06-06 07:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released Spear and POOH to surface. Broke off TDS and racked stand back.,0.75 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 07:45:00+00:00,2008-06-06 08:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and rigged down Odfjell casing tong.,0.5 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 08:15:00+00:00,2008-06-06 08:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Broke off and laid out Spear.,0.5 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 08:45:00+00:00,2008-06-06 10:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and RIH with one stand of 5½"" DP. P/U the 5½"" pre-made stand with Adjustment Sub Setting Tool, and made up same.",1.25 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 10:00:00+00:00,2008-06-06 10:45:00+00:00,28.0,m,fixed,drilling -- casing,ok,success,"RIH with Adjustment Sub Setting Tool to 28,6 m. and engaged Adjustment Sub. Applied 140 bar pressure inside tool. Found that tool was engaged in casing coupling just below latch profile, max OP 2 tons. Bled off pressure and lowered tool down approx. 2 cm. Rotated to the right while PU slowly to engage torque slots in adjustment sub. Rotated and landed surface hanger with 11 MT. Took 30 MT overpull. Attempted to release the Adjustment Sub Setting Tool.",0.75 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 10:45:00+00:00,2008-06-06 12:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Attempted to come up with string and took overpull. Worked string down and rotated 1½ turns. Attempted to pull up and took overpull. Went back down and applied 140 bars to the string, bleed off the pressure and went down, had 10 MT drag going down. Attempted to pull out took overpull immediately. Tool stuck in casing connection just below setting tool latch profile.",1.25 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 12:00:00+00:00,2008-06-06 13:45:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Time out involved town organisation.,1.75 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 13:45:00+00:00,2008-06-06 14:30:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Set down 20 MT and observed tool came free. Picked up and observed overpull, got tool up into latch profile. Pressure up to 140 bars and took 5 MT overpull. Slacked off weight and bled off pressure simultaneously.",0.75 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 14:30:00+00:00,2008-06-06 17:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Worked string up and down attempted to free tool. Took 35 MT overpull and worked string up and down. Rotated the string at 10 rpm continuing working string up and down max overpull of 10 MT. Got tool into casing connection again, unable to pull above, but able to move downwards.",2.5 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 17:00:00+00:00,2008-06-06 21:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Took out bushing and picked up 10 MT overpull, worked string sideways using tuggers two directions. Able to work string 2 inch's up. Continued working string. + +Meanwhile discussed options with onshore, decided to go for a straight pull. +Performed risk analyses prior to carrying out straight pull to free stuck Adjustment Sub Setting Tool. +Drill Quip services hand out of hours.",4.0 +15_9_F_14_2008_06_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-06T00:00:00+02:00,2008-06-07T00:00:00+02:00,2008-06-06 21:00:00+00:00,2008-06-06 22:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Performed derrick inspection prior to perform straight pull with TDS, to free stuck Adjustment Sub Setting Tool. Serviced TDS.",1.0 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-06 22:00:00+00:00,2008-06-07 04:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued derrick-, moon pool- and cantilever inspection prior to performing straight pull with TDS, to free stuck Adjustment Sub Setting Tool. Serviced TDS, FWD and AFT PRS. Laid out DC's and Jars from derrick. Pressure tested FOSV and Gray valve to 30/345 bars 5/10mins.",6.0 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 04:00:00+00:00,2008-06-07 09:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Continued with general maintenance on rig floor and in the moon pool. Greased BOP wing valves.,5.0 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 09:00:00+00:00,2008-06-07 09:15:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Held tool box talk prior to pull stuck Adjustment Sub Setting Tool with straight pull.,0.25 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 09:15:00+00:00,2008-06-07 09:30:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Lined up and filled riser with SW. Closed Annular BOP with 1500 psi. Applied pressure on pistons in tool, by pressuring up well (via kill line) in increments of 10 bars to maximum 50 bars. Reduced annulus pressure to 500 psi.",0.25 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 09:30:00+00:00,2008-06-07 12:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Worked string up and down as per Drill-Quip instructions. Observed string moved up and latching ring engaged setting tool latching profile. Picked up 30 MT overpull. Bled down annulus and opened annular.,2.5 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 12:00:00+00:00,2008-06-07 12:45:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued working string up and down, picked up overpull in 30 MT increments to max overpull of 150 MT.",0.75 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 12:45:00+00:00,2008-06-07 13:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Continued working string up and down to max overpull of 150 MT. While options were discussed with land organisation.,0.25 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 13:00:00+00:00,2008-06-07 14:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,Slacked off string weight to neutral and verified string could be torqued up to 9 kNm. Applied 50 bars inside string to verify setting tool integrity.,1.0 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 14:00:00+00:00,2008-06-07 17:30:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Prepared surface equipment to pull 10 3/4"" Tie back. Checked dies in both PRS's.",3.5 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 17:30:00+00:00,2008-06-07 18:00:00+00:00,28.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk prior to pull 10 3/4"" Tie back and surface hanger.",0.5 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 18:00:00+00:00,2008-06-07 19:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Drained riser. Engaged slot in Adjustment sub with Dril-Quip Tool. Pressured up on HWDP to 140 bars and activated cylinders in tool. Picked up 30 MT to unseat the hanger. Rotated tool 12 turns anti-clockwise to open up the Adjustment sub. Picked up weight to 4 MT over neutral. Rotated tool anti-clockwise with max 2500 Nm torque to back off Tie back connection. Picked up gently on string, with no overpull after 6 turns of rotation. +Continued POOH with 10 3/4"" Tie back and surface hanger and set in manual slips and made up dog collar.",1.5 +15_9_F_14_2008_06_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-07T00:00:00+02:00,2008-06-08T00:00:00+02:00,2008-06-07 19:30:00+00:00,2008-06-07 22:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Inspected the 10 3/4"" surface hanger, found re-run able. Started manufacturing 'C' plate for handling of 5½"" HWDP.",2.5 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-07 22:00:00+00:00,2008-06-07 23:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued manufacturing 'C' plate for handling of 5½"" HWDP. Laid out one DC.",1.75 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-07 23:45:00+00:00,2008-06-08 00:15:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk and SJA prior to run in with 5½"" HWDP and brake out top double and lay out same.",0.5 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 00:15:00+00:00,2008-06-08 00:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Ran in with 5½"" HWDP. Picked up and took weight, not possible move up, found Adjustment sub setting tool hung up in casing collar between casing jnt and space out pup. Continued RIH and positioned HWDP collar above 10 3/4"" surface hanger.",0.5 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 00:45:00+00:00,2008-06-08 01:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Serviced broke HWDP collar, picked up HWDP. Installed 'C' plate and 5½"" DP elevators on top of 10 3/4"" Surface hanger and secured same.",0.75 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 01:30:00+00:00,2008-06-08 01:45:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,Backed out HWDP double and parked same with AFT PRS.,0.25 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 01:45:00+00:00,2008-06-08 02:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk prior to change elevators to 10 3/4"" casing, changing for longer bails and rig up 10 3/4"" casing tong.",0.25 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 02:00:00+00:00,2008-06-08 04:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed elevators to 10 3/4"" casing. Changed for longer bails and rigged up 10 3/4"" casing tong.",2.0 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 04:00:00+00:00,2008-06-08 04:30:00+00:00,103.0,m,fixed,drilling -- casing,ok,equipment failure,"Rigged up 10 3/4"" casing tong.",0.5 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 04:30:00+00:00,2008-06-08 05:00:00+00:00,103.0,m,fixed,drilling -- casing,ok,equipment failure,"Pulled 10 3/4"" surface hanger and space out pup up into the rotary table and broke connection. +Pulled up the 10 3/4"" surface hanger and space out pup with the inner string and surfaced the Adjustment Sub Setting Tool. Inspected the Adjustment Sub Setting Tool and found the engaging ring broken and deformed. Removed the ring.",0.5 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 05:00:00+00:00,2008-06-08 09:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk and made up the 10 3/4"" surface hanger, ran in same and landed off in RT. Changed to BX4 DP elevator and rigged down the 10 3/4"" casing tong. Made up the 5½"" HWDP double. Removed the `C` plate and retrieved the 5½"" HWDP stand and racked back in derrick. Pulled the Adjustment Sub Setting Tool and laid out same. Retrieved the 5½"" HWDP stand below Adjustment Sub Setting Tool and racked back in derrick.",4.5 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 09:30:00+00:00,2008-06-08 10:30:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk and rigged up 10 3/4"" casing tong and changed to BX3 10 3/4"" casing elevators. Pulled the 10 3/4"" surface hanger with space out pup.",1.0 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 10:30:00+00:00,2008-06-08 11:45:00+00:00,103.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk and laid out 10 3/4"" surface hanger with space out pup.",1.25 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 11:45:00+00:00,2008-06-08 13:00:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up new space out pup and back up 10 3/4"" surface hanger and made up same. Ran and landed off in rotary table.",1.25 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 13:00:00+00:00,2008-06-08 14:15:00+00:00,119.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed to 5½"" DP BX4 elevator and made up spear assy. Made up spear to HWDP and RIH and engaged the spear in the 10 3/4"" casing.",1.25 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 14:15:00+00:00,2008-06-08 15:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with surface hanger and tagged Tie back. Rotated the string with 1 rpm and screwed into the Tie back. Torqued up in 500 Nm stages with 13 MT overpull to final torque of 10,500 Nm.",1.25 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 15:30:00+00:00,2008-06-08 16:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,Released the spear and POOH with same. Broke off TDS and racked back spear in derrick.,0.5 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 16:00:00+00:00,2008-06-08 16:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Rigged down 10 3/4"" casing tong.",0.5 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 16:30:00+00:00,2008-06-08 17:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Made up 5½"" HWDP and XO.",0.5 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 17:00:00+00:00,2008-06-08 19:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box talk and picked up the back up Adjustment Sub Setting Tool and made up same to one 5½"" HWDP. RIH with the Adjustment Sub Setting Tool and engaged the Adjustment Sub latch profile. Applied 140 bars inside the Setting Tool, compressed Adjustment Sub as per Dril-Quip instruction, rotated totally 14.4 turns. Took 30 MT overpull. Set down string to neutral weight and bled of the pressure, waited for 5 mins for locking dog to relax.",2.25 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 19:15:00+00:00,2008-06-08 19:45:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"POOH with Adjustment Sub Setting Tool, laid out same and racked back 5½"" HWDP in derrick.",0.5 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 19:45:00+00:00,2008-06-08 20:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Picked up spear assy and broke/laid out same, racked 5½"" HWDP in derrick.",0.25 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 20:00:00+00:00,2008-06-08 21:15:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and picked up the HRT with 2 meter DP handling pup. Inspected threads and O-ring seal. RIH with the HRT and made up HRT to the 10 3/4"" surface hanger by 10 left hand turns.",1.25 +15_9_F_14_2008_06_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-08T00:00:00+02:00,2008-06-09T00:00:00+02:00,2008-06-08 21:15:00+00:00,2008-06-08 22:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Lined up and leak tested the cmt line to rig floor 345 bars 5 mins. Bled of pressure and lined up and leak tested the 10 3/4"" Surface tie back casing against the RTTS at 350m, 345 bars 10 mins with SW, volume pumped 409 litres and had 409 in returns.",0.75 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-08 22:00:00+00:00,2008-06-08 22:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with HRT test tool and laid out same.,0.5 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-08 22:30:00+00:00,2008-06-09 01:30:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and picked up and RIH with 10 3/4"" MS-T seal assy RT. Landed out on 10 3/4"" casing hanger. Locked RT into riser. Set seal assy by applying 4300 psi to setting function. Tested seal assy trough test port in multibowl to 345 bar/10 min.",3.0 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 01:30:00+00:00,2008-06-09 02:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released RT from Casing Hanger and POOH with RT. Laid out same.,0.75 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 02:15:00+00:00,2008-06-09 03:15:00+00:00,20.1,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk and picked up and RIH Bowl protector and landed of in surface wellhead. POOH RT, laid out same.",1.0 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 03:15:00+00:00,2008-06-09 04:00:00+00:00,10.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and picked up RTTS pulling tool and made up same as per Halliburton procedure. Started RIH from surface to 10m.,0.75 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 04:00:00+00:00,2008-06-09 05:00:00+00:00,349.0,m,fixed,drilling -- casing,ok,success,RIH with RTTS pulling tool from 10m to 349m.,1.0 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 05:00:00+00:00,2008-06-09 06:30:00+00:00,349.0,m,fixed,drilling -- casing,ok,success,Held tool box and displaced well above RTTS plug to 1.30 SG OBM.,1.5 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 06:30:00+00:00,2008-06-09 07:00:00+00:00,349.0,m,fixed,drilling -- casing,ok,success,"Took up/down weight 81/78 MT. Tagged RTTS plug, screwed into the RTTS with 5 rpm. Pressure increased with 2 bars when equalizing. Picked up 6 MT overpull and released the RTTS plug.",0.5 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 07:00:00+00:00,2008-06-09 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk and POOH with RTTS plug from 349m to surface.,2.5 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 09:30:00+00:00,2008-06-09 10:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box and laid out RTTS plug.,0.75 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 10:15:00+00:00,2008-06-09 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with 4 std of HWDP and jetting sub.,0.75 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 11:00:00+00:00,2008-06-09 11:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleared and cleaned rig floor. Checked dies in PRS.,0.5 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 11:30:00+00:00,2008-06-09 11:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to pick up 8½"" drilling BHA.",0.25 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 11:45:00+00:00,2008-06-09 16:00:00+00:00,81.0,m,fixed,drilling -- trip,ok,success,"Picked up and made up 8½"" drilling BHA and RIH from surface to 81m.",4.25 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 16:00:00+00:00,2008-06-09 16:30:00+00:00,81.0,m,fixed,drilling -- other,ok,success,Laid out jar from derrick and picked up new jar.,0.5 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 16:30:00+00:00,2008-06-09 19:00:00+00:00,138.0,m,fixed,drilling -- trip,ok,success,"Continued RIH with 8½"" drilling BHA, from 81m to 138m",2.5 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 19:00:00+00:00,2008-06-09 20:30:00+00:00,545.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5"" DP, from 138m to 545m. Using the remote operated cleaning and greasing device for the DP. Trip tme 271m/hour.",1.5 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 20:30:00+00:00,2008-06-09 21:00:00+00:00,545.0,m,fixed,drilling -- other,ok,success,Tested out the MWD/LWD with 1600 lpm.,0.5 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 21:00:00+00:00,2008-06-09 21:30:00+00:00,545.0,m,fixed,drilling -- other,ok,success,Performed pit drill,0.5 +15_9_F_14_2008_06_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-09T00:00:00+02:00,2008-06-10T00:00:00+02:00,2008-06-09 21:30:00+00:00,2008-06-09 22:00:00+00:00,545.0,m,fixed,drilling -- other,ok,success,Started calibration of Schlumberger MWD block height.,0.5 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-09 22:00:00+00:00,2008-06-09 22:30:00+00:00,545.0,m,fixed,drilling -- other,ok,success,Contiuned calibration of Schlumberger MWD block height.,0.5 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-09 22:30:00+00:00,2008-06-09 23:45:00+00:00,953.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5"" DP, from 545m to 953m. Using remote operated cleaning and greasing device for the DP. Trip time 326 m/hour.",1.25 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-09 23:45:00+00:00,2008-06-10 00:30:00+00:00,953.0,m,fixed,drilling -- drill,ok,success,Filled the pipe and emptied the trip tank.,0.75 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 00:30:00+00:00,2008-06-10 01:00:00+00:00,1115.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5"" DP, from 953m to 1115m. Using remote operated cleaning and greasing device for the DP. Trip time 324 m/hour.",0.5 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 01:00:00+00:00,2008-06-10 01:30:00+00:00,1115.0,m,fixed,drilling -- other,ok,success,"Made up 5"" x 5½"" XO. and changed over to 5½"" surface handlig equipment.",0.5 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 01:30:00+00:00,2008-06-10 02:30:00+00:00,1317.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5½"" DP, from 1115m to 1317m. Using remote operated cleaning and greasing device for the DP. Trip time 202 m/hour.",1.0 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 02:30:00+00:00,2008-06-10 02:45:00+00:00,1317.0,m,fixed,drilling -- drill,ok,success,Filled the pipe and emptied the trip tank.,0.25 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 02:45:00+00:00,2008-06-10 04:00:00+00:00,1722.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5½"" DP, from 1317m to 1722m. Using remote operated cleaning and greasing device for the DP. Trip time 324 m/hour.",1.25 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 04:00:00+00:00,2008-06-10 04:15:00+00:00,1722.0,m,fixed,drilling -- other,ok,success,Filled the pipe and emptied the trip tank.,0.25 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 04:15:00+00:00,2008-06-10 05:15:00+00:00,1722.0,m,fixed,drilling -- other,ok,success,Held choke drill with night and day shift.,1.0 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 05:15:00+00:00,2008-06-10 05:30:00+00:00,1722.0,m,fixed,drilling -- other,ok,success,"Held tool box prior to continue RIH with 8½"" drilling BHA on 5½"" DP.",0.25 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 05:30:00+00:00,2008-06-10 08:00:00+00:00,2731.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 8½"" drilling BHA on 5½"" DP, from 1722m to 2731m. Using remote operated cleaning and greasing device for the DP. Trip time 403 m/hour.",2.5 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 08:00:00+00:00,2008-06-10 09:15:00+00:00,2754.0,m,fixed,drilling -- drill,ok,success,"Made up to TDS. Washed down and tagged TOC at 2754m. Tagged with 2 MT, Parameters: Flow 1690 lpm / SPP 128 bar / String RPM 50 / TQ 4-6 kNm. MUD weight 1.3 SG.",1.25 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 09:15:00+00:00,2008-06-10 14:15:00+00:00,2758.0,m,fixed,drilling -- drill,ok,success,Drilled out float from 2754m to 2758m. Drilling parameters: Flow 1690 lpm / SPP 128 bar / String RPM 60 / TQ 5-8 kNm. MUD weight 1.30 SG.,5.0 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 14:15:00+00:00,2008-06-10 16:30:00+00:00,2783.0,m,fixed,drilling -- drill,ok,success,"Drilled out shoe track from 2758m to 2783m. Drilling parameters: Flow 1690 lpm / SPP 128 bar / String RPM 60 / TQ 5-8 kNm. MUD weight 1.30 SG. +Reamed the shoe and pulled back through shoe with no rotation.",2.25 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 16:30:00+00:00,2008-06-10 18:45:00+00:00,2791.0,m,fixed,drilling -- drill,ok,success,Drilled new formation from 2788m to 2791m. Cleaned out rate hole and verified no restrictions. Drilling parameters: Flow 1695 lpm / SPP 124 bar / String RPM 70 / WOB 1-5 MT / TQ 6-11 kNm. MUD weight 1.3 SG.,2.25 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 18:45:00+00:00,2008-06-10 19:30:00+00:00,2785.0,m,fixed,formation evaluation -- rft/fit,ok,success,Circulated to even mud weight of 1.30 SG in/out. Meanwhile held tool box talk prior to perform FIT.,0.75 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 19:30:00+00:00,2008-06-10 19:45:00+00:00,2783.0,m,fixed,formation evaluation -- rft/fit,ok,success,Pulled up in the shoe having the bit out of the shoe.,0.25 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 19:45:00+00:00,2008-06-10 20:00:00+00:00,2783.0,m,fixed,formation evaluation -- rft/fit,ok,success,Flushed the lines from Cmt unit to the rig floor down the string and up annulus using the Cmt unit. Lined up and leak tested the line from Cmt unit to the rig floor 100 bars. 5 mins. Simultaneously closed the pipe ram of the BOP.,0.25 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 20:00:00+00:00,2008-06-10 20:30:00+00:00,2783.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Took FIT equivalent to 1.56 SG, using 1.30 SG heavy OBM. Pumped 70 lpm and applied 71.5 bars to the string and annulus. Shut down the pump. Downhole reading from Schlumberger equivalent to 1,565 SG.",0.5 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 20:30:00+00:00,2008-06-10 21:00:00+00:00,2783.0,m,fixed,formation evaluation -- rft/fit,ok,success,Pumped down the hole with OBM from the Cmt unit. Lined up for drilling.,0.5 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 21:00:00+00:00,2008-06-10 21:30:00+00:00,2789.0,m,fixed,drilling -- survey,ok,success,Took survey at 2789m and set tool.,0.5 +15_9_F_14_2008_06_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-10T00:00:00+02:00,2008-06-11T00:00:00+02:00,2008-06-10 21:30:00+00:00,2008-06-10 22:00:00+00:00,2793.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 2791m to 2793m. Drilling parameters: Flow 1695 lpm / SPP 168 bar / String RPM 100 / WOB 9-10 MT / TQ 10-13 kNm / ROP 8 m/hour / ESD 1.393 SG / MUD weight 1.30 SG.",0.5 +15_9_F_14_2008_06_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-11T00:00:00+02:00,2008-06-12T00:00:00+02:00,2008-06-10 22:00:00+00:00,2008-06-11 04:00:00+00:00,2850.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 2793m to 2850m. Drilling parameters: Flow 1695 lpm / SPP 163-168 bar / String RPM 100 / WOB 9-12 MT / TQ 5-16 kNm / ROP 8-15 m/hour / ESD 1.391-1.401 SG / MUD weight 1.30 SG. Took survey at 2833m.",6.0 +15_9_F_14_2008_06_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-11T00:00:00+02:00,2008-06-12T00:00:00+02:00,2008-06-11 04:00:00+00:00,2008-06-11 14:30:00+00:00,2932.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 2850m to 2932m. Drilling parameters: Flow 1985-2080 lpm / SPP 165-180 bar / String RPM 100-160 / WOB 6-9 MT / TQ 7-15 kNm / ROP 8-18 m/hour / ECD 1.44-1.46 SG / MUD weight 1.30-1.35 SG. Took servey at connections. Increased MW from 1.30 SG to 1.35 SG.",10.5 +15_9_F_14_2008_06_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-11T00:00:00+02:00,2008-06-12T00:00:00+02:00,2008-06-11 14:30:00+00:00,2008-06-11 14:45:00+00:00,2930.0,m,fixed,drilling -- other,ok,success,Took SCR. 1.35 SG OBM at 2930m. 665lpm 31 bars. 890lpm 43 bars.,0.25 +15_9_F_14_2008_06_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-11T00:00:00+02:00,2008-06-12T00:00:00+02:00,2008-06-11 14:45:00+00:00,2008-06-11 17:00:00+00:00,2953.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 2932m to 2953m. Drilling parameters: Flow 2050 lpm / SPP 180 bar / String RPM 160-170 / WOB 6-7 MT / TQ 9-14 kNm / ROP 8-15 m/hour / ECD 1.456-1.459 SG / MUD weight 1.35 SG.",2.25 +15_9_F_14_2008_06_12.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-11T00:00:00+02:00,2008-06-12T00:00:00+02:00,2008-06-11 17:00:00+00:00,2008-06-11 22:00:00+00:00,3012.0,m,fixed,drilling -- drill,ok,success,"Continued to drill 8½"" hole from 2953m to 3012m. Reamed Draupne formation as per procedure. Drilling parameters: Flow 2050 lpm / SPP 160-180 bar / String RPM 170 / WOB 2-7 MT / TQ 9-11 kNm / ROP 8-26 m/hour / ECD 1.454-1.456 SG / MUD weight 1.35 SG.",5.0 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-11 22:00:00+00:00,2008-06-11 23:00:00+00:00,3010.0,m,fixed,drilling -- drill,ok,success,"As making connection observed gas of 5-7% gas coming back with returns. Circulated down gas to 1 % reciprocating the string, with 1940 lpm, 170 bars, 110 rpm.",1.0 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-11 23:00:00+00:00,2008-06-12 02:45:00+00:00,3070.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3012m to 3070m. Drilling parameters: Flow 1950-2050 lpm / SPP 155-190 bar / String RPM 140-170 / WOB 2-7 MT / TQ 9-12 kNm / ROP 8-32 m/hour / ECD 1.454-1.471 SG / MUD weight 1.35 SG.",3.75 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 02:45:00+00:00,2008-06-12 03:00:00+00:00,3053.0,m,fixed,drilling -- other,ok,success,Held pit drill. Took SCR 1.35 SG OBM at 3053m. 443 lpm 23 bars. 665 lpm 34 bars. 886 lpm 47 bars.,0.25 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 03:00:00+00:00,2008-06-12 03:30:00+00:00,3070.0,m,fixed,drilling -- survey,ok,success,Held tool box talk prior to perform pressure points. Simultaneously circulated well clean while reciprocating the pipe.,0.5 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 03:30:00+00:00,2008-06-12 04:00:00+00:00,3050.0,m,fixed,drilling -- survey,ok,success,"Pulled back one stand, racked back same in derrick and prepared for taking pressure points with stethoscope.",0.5 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 04:00:00+00:00,2008-06-12 04:30:00+00:00,3018.0,m,fixed,drilling -- survey,ok,success,"Made up to TDS, correlated depth and positioned bit at 3018m,",0.5 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 04:30:00+00:00,2008-06-12 05:00:00+00:00,3032.0,m,fixed,drilling -- survey,ok,success,"Positioned bit at 3032m and down linked twice, activated the Stethoscop.",0.5 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 05:00:00+00:00,2008-06-12 06:30:00+00:00,3056.7,m,fixed,drilling -- survey,ok,success,"Took pressure point: +Bit depth 3031.7m, test depth 3006m, pressure 286.63 bars, mobility 32.53 mD. +Bit depth 3042.7m, test depth 3017m, pressure 286.94 bars, mobility 164.08 mD. +Bit depth 3056.7m, test depth 3031m, pressure 287.07 bars, mobility 1427.08 mD.",1.5 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 06:30:00+00:00,2008-06-12 07:00:00+00:00,3056.7,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the Stethoscope. Took survey prior to continue drilling ahead.,0.5 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 07:00:00+00:00,2008-06-12 15:30:00+00:00,3214.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3070m to 3214m. Drilling parameters: Flow 1950-2060 lpm / SPP 170-180 bar / String RPM 170 / WOB 4-5 MT / TQ 10-15 kNm / ROP 10-28 m/hour / ECD 1.47-1.48 SG / MUD weight 1.35 SG. +Meanwhile rigged up 7"" casing tong for making up casing in stands.",8.5 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 15:30:00+00:00,2008-06-12 16:15:00+00:00,3185.7,m,fixed,drilling -- survey,ok,success,"Down linked and deactivated Stethoscop. Reciprocated the string while cleaning prior took pressure point. +Bit depth 3185.7m, test depth 3160m, pressure 289.6 bars, mobility 4447.27 mD",0.75 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 16:15:00+00:00,2008-06-12 17:15:00+00:00,3140.7,m,fixed,drilling -- survey,ok,success,"Racked back one stand and positioned string. Took pressure point. +Bit depth 3140.7m, test depth 3115m, pressure 288.69 bars, mobility 272.88 mD",1.0 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 17:15:00+00:00,2008-06-12 17:30:00+00:00,3140.7,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the Stethoscope.,0.25 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 17:30:00+00:00,2008-06-12 18:15:00+00:00,3214.0,m,fixed,drilling -- other,ok,success,Washed down to bottom from 3114m to 3214m. Flow 1960 lpm / SPP 175 bar / String RPM 25 / TQ 6-9 kNm / ECD 1.474 SG / MUD weight 1.35 SG. Took survey prior to continue drilling ahead.,0.75 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 18:15:00+00:00,2008-06-12 20:45:00+00:00,3255.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3214m to 3255m. Drilling parameters: Flow 1960 lpm / SPP 180 bar / String RPM 160 / WOB 4-6 MT / TQ 12-15 kNm / ROP 8-30 m/hour / ECD 1.474-1.485 SG / MUD weight 1.35 SG. +Meanwhile transfered tension cylinders and ring down to the seller deck",2.5 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 20:45:00+00:00,2008-06-12 21:30:00+00:00,3255.0,m,fixed,drilling -- survey,ok,success,Cleaned well prior to take pressure points. Reciprocated the string while cleaning. Parameters: Flow 1960 lpm / SPP 180 bar / String RPM 160 / TQ 9-10 kNm / ECD 1.474 SG / MUD weight 1.35 SG. Racked back one stand.,0.75 +15_9_F_14_2008_06_13.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-12T00:00:00+02:00,2008-06-13T00:00:00+02:00,2008-06-12 21:30:00+00:00,2008-06-12 22:00:00+00:00,3203.7,m,fixed,drilling -- survey,ok,success,Positioned string. Started taking pressure point at 3203.7m.,0.5 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-12 22:00:00+00:00,2008-06-12 23:30:00+00:00,3225.7,m,fixed,drilling -- survey,ok,success,"Continued taking pressure points. +Bit depth 3203.7m, test depth 3178m, pressure 289.71 bars, mobility 217.88 mD +Bit depth 3225.7m, test depth 3200m, pressure 289.99 bars, mobility 162.61 mD +Took survey prior to continue drilling ahead.",1.5 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-12 23:30:00+00:00,2008-06-13 01:45:00+00:00,3295.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3255m to 3295m. Drilling parameters: Flow 1960 lpm / SPP 175 bar / String RPM 80-160 / WOB 3-6 MT / TQ 10-16 kNm / ROP 8-30 m/hour / ECD 1.465-1.471 SG / MUD weight 1.35 SG.",2.25 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 01:45:00+00:00,2008-06-13 02:00:00+00:00,3295.0,m,fixed,drilling -- survey,ok,success,Made connection. Took survey prior to continue drilling ahead.,0.25 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 02:00:00+00:00,2008-06-13 04:00:00+00:00,3335.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3295m to 3335m. Drilling parameters: Flow 1960 lpm / SPP 175 bar / String RPM 160 / WOB 6-8 MT / TQ 14-15 kNm / ROP 12-22 m/hour / ECD 1.465-1.471 SG / MUD weight 1.35 SG.",2.0 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 04:00:00+00:00,2008-06-13 04:30:00+00:00,3335.0,m,fixed,drilling -- survey,ok,success,Cleaned well prior to take pressure points. Reciprocated the string while cleaning. Parameters: Flow 2050 lpm / SPP 190 bar / String RPM 160 / TQ 11 kNm / ECD 1.481 SG / MUD weight 1.35 SG.,0.5 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 04:30:00+00:00,2008-06-13 05:15:00+00:00,3335.0,m,fixed,drilling -- survey,ok,success,"Took pressure point: +Bit depth 3315.7m, test depth 3290mMD/2839TVD, pressure 291.55 bars, mobility 349.54 mD. +Bit depth 3332.7m, test depth 3307mMD/2942,8TVD, pressure 291.83 bars, mobility 55.82 mD.",0.75 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 05:15:00+00:00,2008-06-13 05:45:00+00:00,3335.0,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.5 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 05:45:00+00:00,2008-06-13 15:15:00+00:00,3497.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3335m to 3497m. Drilling parameters: Flow 2000 lpm / SPP 170-175 bar / String RPM 170-180 / WOB 6-8 MT / TQ 10-16 kNm / ROP 22-27 m/hour / ECD 1.479-1.494 SG / MUD weight 1.35-1.36+ SG. + +Simultaneously made up 7"" casing in stands as a parallel activity and racked back in derrick.",9.5 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 15:15:00+00:00,2008-06-13 15:45:00+00:00,3497.0,m,fixed,drilling -- survey,ok,success,"Down linked and activated the stethoscope, prior to take pressure points. +Bit depth 3490.7m, test depth 3465mMD/2993,5TVD, pressure 295.13 bars, mobility 0.1 mD.",0.5 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 15:45:00+00:00,2008-06-13 16:00:00+00:00,3497.0,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.25 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 16:00:00+00:00,2008-06-13 17:45:00+00:00,3523.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3497m to 3523m. Drilling parameters: Flow 2000 lpm / SPP 180 bar / String RPM 180 / WOB 8 MT / TQ 10-17 kNm / ROP 21-26 m/hour / ECD 1.485-1.494 SG / MUD weight 1.35-1.36+ SG. + +Due to damaged drag chain of the PDM unable to continue make up 7"" casing in stands.",1.75 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 17:45:00+00:00,2008-06-13 18:00:00+00:00,3523.0,m,fixed,drilling -- drill,ok,success,Took flow check due to unexplainable gain. Well stable.,0.25 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 18:00:00+00:00,2008-06-13 19:15:00+00:00,3537.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3523m to 3537m. Drilling parameters: Flow 1963 lpm / SPP 185 bar / String RPM 180 / WOB 8 MT / TQ 14-17 kNm / ROP 8,8-26 m/hour / ECD 1.487-1.494 SG / MUD weight 1.35-1.36+ SG. Add primex to reduces to control MW and solids.",1.25 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 19:15:00+00:00,2008-06-13 19:45:00+00:00,3537.0,m,fixed,drilling -- survey,ok,success,"Cleaned well prior to take pressure points. Reciprocated the string while cleaning. Parameters: Flow 1963 lpm / SPP 180 bar / String RPM 180 / TQ 11-13 kNm / ECD 1.466-1,484 SG / MUD weight 1.35+ SG.",0.5 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 19:45:00+00:00,2008-06-13 20:45:00+00:00,3525.7,m,fixed,drilling -- survey,ok,success,"Down linked and activated the stethoscope, prior to take pressure points. +Bit depth 3525.7m, test depth 3500mMD/3007,8TVD, pressure 296.21 bars, mobility 5632.91mD.",1.0 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 20:45:00+00:00,2008-06-13 21:00:00+00:00,3537.0,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.25 +15_9_F_14_2008_06_14.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-13T00:00:00+02:00,2008-06-14T00:00:00+02:00,2008-06-13 21:00:00+00:00,2008-06-13 22:00:00+00:00,3556.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3537m to 3556m. Drilling parameters: Flow 1963 lpm / SPP 170 bar / String RPM 180 / WOB 4-6 MT / TQ 12-19 kNm / ROP 17-26 m/hour / ECD 1.447-1.459 SG / MUD weight 1.35+ SG.",1.0 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-13 22:00:00+00:00,2008-06-13 23:00:00+00:00,3577.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3556m to 3577m. Drilling parameters: Flow 1963 lpm / SPP 175 bar / String RPM 180 / WOB 4-5 MT / TQ 13-17 kNm / ROP 18-30 m/hour / ECD 1.456-1.463 SG / MUD weight 1.35+ SG. + +Simultaneously transported flow line Co-flex down to the well head.",1.0 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-13 23:00:00+00:00,2008-06-13 23:30:00+00:00,3577.0,m,fixed,drilling -- survey,ok,success,"Cleaned well prior to take pressure points. Reciprocated the string while cleaning. Parameters: Flow 1963 lpm / SPP 175 bar / String RPM 180 / TQ 11-13 kNm / ECD 1.449-1,461 SG / MUD weight 1.35+ SG.",0.5 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-13 23:30:00+00:00,2008-06-14 00:00:00+00:00,3570.7,m,fixed,drilling -- survey,ok,success,"Down linked and activated the stethoscope, prior to take pressure points. +Bit depth 3570.7m, test depth 3545mMD/3029,3TVD, pressure 297.98 bars, mobility 58.39mD.",0.5 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 00:00:00+00:00,2008-06-14 00:15:00+00:00,3570.7,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 00:15:00+00:00,2008-06-14 02:30:00+00:00,3617.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3577m to 3617m. Drilling parameters: Flow 1963 lpm / SPP 180 bar / String RPM 180 / WOB 5-6 MT / TQ 13-17 kNm / ROP 18-20 m/hour / ECD 1.469-1.471 SG / MUD weight 1.35+ SG.",2.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 02:30:00+00:00,2008-06-14 03:00:00+00:00,3617.0,m,fixed,drilling -- survey,ok,success,"Cleaned well prior to take pressure points. Reciprocated the string while cleaning. Parameters: Flow 1963 lpm / SPP 180 bar / String RPM 180 / TQ 11-14 kNm / ECD 1.461-1,474 SG / MUD weight 1.35+ SG.",0.5 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 03:00:00+00:00,2008-06-14 03:15:00+00:00,3613.7,m,fixed,drilling -- survey,ok,success,"Down linked and activated the stethoscope, prior to take pressure points. +Bit depth 3613.7m, test depth 3588mMD/3053,4TVD, pressure 299.86 bars, mobility 38.08mD.",0.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 03:15:00+00:00,2008-06-14 03:30:00+00:00,3617.0,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 03:30:00+00:00,2008-06-14 03:45:00+00:00,3617.0,m,fixed,drilling -- drill,ok,success,Made up new stand of DP and prepared for drilling ahead.,0.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 03:45:00+00:00,2008-06-14 04:00:00+00:00,3617.0,m,fixed,drilling -- other,ok,success,Rig alarm went of and all personnel mustered. Circulated and rotated pipe.,0.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 04:00:00+00:00,2008-06-14 11:45:00+00:00,3736.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3617m to 3739m. Drilling parameters: Flow 2000 lpm / SPP 180 bar / String RPM 180 / WOB 9-12 MT / TQ 10-20 kNm / ROP 16-26 m/hour / ECD 1.478-1.491 SG / MUD weight 1.35+ SG.",7.75 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 11:45:00+00:00,2008-06-14 12:30:00+00:00,3699.0,m,fixed,drilling -- survey,ok,success,Cleaned well prior to take pressure points. Racked back on stand. Parameters: Flow 1600 lpm / SPP 130 bar / String RPM 25 / TQ 11 kNm / ECD 1.447 SG / MUD weight 1.35+ SG.,0.75 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 12:30:00+00:00,2008-06-14 12:45:00+00:00,3699.0,m,fixed,drilling -- survey,ok,success,Down linked and activated the stethoscope.,0.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 12:45:00+00:00,2008-06-14 13:15:00+00:00,3668.7,m,fixed,drilling -- survey,ok,success,"Took pressure point: +Bit depth 3668,7m, test depth 3643m MD 3089.58m TVD, pressure 302.52 bars, mobility 16.93 mD.",0.5 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 13:15:00+00:00,2008-06-14 13:30:00+00:00,3668.7,m,fixed,drilling -- survey,ok,success,Down linked and deactivated the stethoscope. Took survey prior to continue drilling ahead.,0.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 13:30:00+00:00,2008-06-14 14:30:00+00:00,3750.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3739m to 3750m. Drilling parameters: Flow 1960 lpm / SPP 185 bar / String RPM 180 / WOB 9-13 MT / TQ 14-20 kNm / ROP 9-26 m/hour / ECD 1.475-1.487 SG / MUD weight 1.35+ SG.",1.0 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 14:30:00+00:00,2008-06-14 14:45:00+00:00,3750.0,m,fixed,drilling -- survey,ok,success,Down linked Sonic Vision tool in fast record mode.,0.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 14:45:00+00:00,2008-06-14 17:45:00+00:00,3750.0,m,fixed,drilling -- other,ok,success,Circulated well clean 3 time bottom up. Reciprocated the string while cleaning. Parameters: Flow 1960 lpm / SPP 180 bar / String RPM 180 / TQ 12-13 kNm / ECD 1.466-1.473 SG / MUD weight 1.36 SG.,3.0 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 17:45:00+00:00,2008-06-14 18:00:00+00:00,3750.0,m,fixed,drilling -- other,ok,success,Flow checked the well stable.,0.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 18:00:00+00:00,2008-06-14 18:15:00+00:00,3745.0,m,fixed,drilling -- other,ok,success,"Took drag and torque reading. 10 rpm = 7.7 kNm, 20 rpm = 7.9 kNm and 30 rpm = 8.6 kNm. Up/down weight 186/145 MT rotation 159 MT, stretch 2.5m.",0.25 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 18:15:00+00:00,2008-06-14 19:45:00+00:00,3536.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk and started POOH with 8½"" drilling BHA wet 5 std. from 3750m to 3536m. +Held kick drill. Trip time in open hole 142 m/hours",1.5 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 19:45:00+00:00,2008-06-14 20:15:00+00:00,3536.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well stable. Simultaneously made up to TDS and pumped 5m³ 1.56 SG slug.",0.5 +15_9_F_14_2008_06_15.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-14T00:00:00+02:00,2008-06-15T00:00:00+02:00,2008-06-14 20:15:00+00:00,2008-06-14 22:00:00+00:00,3092.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 8½"" drilling BHA from 3536m to 3092m. Trip time in open hole 253 m/hour.",1.75 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-14 22:00:00+00:00,2008-06-14 23:00:00+00:00,2689.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 8½"" drilling BHA from 3092m to 2689m into 9 5/8 casing. Trip time in open hole 403 m/hour.",1.0 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-14 23:00:00+00:00,2008-06-14 23:15:00+00:00,2689.0,m,fixed,drilling -- trip,ok,success,"Took flow check. In the 9 5/8"" shoe.",0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-14 23:15:00+00:00,2008-06-14 23:30:00+00:00,2689.0,m,fixed,interruption -- maintain,ok,success,Function tested BOP. Started service the TDS.,0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-14 23:30:00+00:00,2008-06-14 23:45:00+00:00,2689.0,m,fixed,drilling -- trip,ok,success,"Took drag and torque reading. 10 rpm = 5.0 kNm, 20 rpm = 5.0 kNm and 30 rpm = 6.0 kNm. Up/down weight 154/135 MT rotation 142 MT, stretch 1.5m.",0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-14 23:45:00+00:00,2008-06-15 02:00:00+00:00,2689.0,m,fixed,interruption -- maintain,ok,success,Continued servicing TDS and both PRS's. Meanwhile flushed choke and kill lines.,2.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 02:00:00+00:00,2008-06-15 04:00:00+00:00,2.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 8½"" drilling BHA from 2689m to 1919m. Trip time 385 m/hour. Dropped 2 3/4"" drift in std # 40.",2.0 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 04:00:00+00:00,2008-06-15 06:15:00+00:00,1116.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 8½"" drilling BHA from 1919m to 1116. Trip time in open hole 357 m/hour.",2.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 06:15:00+00:00,2008-06-15 06:30:00+00:00,1116.0,m,fixed,drilling -- trip,ok,success,"Changed to 5"" DP handling equipment.",0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 06:30:00+00:00,2008-06-15 07:45:00+00:00,138.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 8½"" drilling BHA from 1116m to 138m. Trip time 782 m/hour.",1.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 07:45:00+00:00,2008-06-15 08:00:00+00:00,138.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well static. Simultaneously held tool box talk prior to POOH and lay out 8½"" drilling BHA.",0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 08:00:00+00:00,2008-06-15 08:15:00+00:00,91.0,m,fixed,drilling -- trip,ok,success,POOH and racked back HWDP std's.,0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 08:15:00+00:00,2008-06-15 09:00:00+00:00,91.0,m,fixed,drilling -- other,ok,success,Removed PS-21 slips and installed master bushing.,0.75 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 09:00:00+00:00,2008-06-15 09:30:00+00:00,91.0,m,fixed,drilling -- other,ok,success,Cleared and cleaned rig floor.,0.5 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 09:30:00+00:00,2008-06-15 09:45:00+00:00,91.0,m,fixed,drilling -- other,ok,success,Installed elevator rotator.,0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 09:45:00+00:00,2008-06-15 10:00:00+00:00,81.0,m,fixed,drilling -- trip,ok,success,Laid out jars.,0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 10:00:00+00:00,2008-06-15 10:15:00+00:00,62.0,m,fixed,drilling -- trip,ok,success,POOH and racked back HWDP std.,0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 10:15:00+00:00,2008-06-15 13:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH and laid out 8½"" drilling BHA.",3.0 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 13:15:00+00:00,2008-06-15 13:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleared and cleaned rig floor.,0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 13:30:00+00:00,2008-06-15 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box and rigged up 7"" liner handling equipment.",2.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 15:45:00+00:00,2008-06-15 17:00:00+00:00,25.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk and picked/made up 7"" shoe and intermediate.",1.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 17:00:00+00:00,2008-06-15 17:30:00+00:00,25.0,m,fixed,drilling -- casing,ok,success,"Held tool/SJA box talk prior to RIH with 7"" liner.",0.5 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 17:30:00+00:00,2008-06-15 17:45:00+00:00,25.0,m,fixed,drilling -- casing,ok,success,Night shift held BOP drill.,0.25 +15_9_F_14_2008_06_16.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-15T00:00:00+02:00,2008-06-16T00:00:00+02:00,2008-06-15 17:45:00+00:00,2008-06-15 22:00:00+00:00,217.0,m,fixed,drilling -- casing,ok,success,"Flow checked 7"" float prior. RIH with 7"" liner from surface to 217m. Filled first 5 singles, and after every 5'th jnt. Trip time 51m/hour.",4.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-15 22:00:00+00:00,2008-06-16 01:45:00+00:00,553.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" liner from 217 to 553m. Filled every 5'th jnt. Trip time 90 m/hour. Had unexplainable minor gain.",3.75 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 01:45:00+00:00,2008-06-16 02:00:00+00:00,553.0,m,fixed,drilling -- casing,ok,success,"Flow checked well, well static.",0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 02:00:00+00:00,2008-06-16 02:30:00+00:00,600.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" liner from 553 to 600m. Filled every 5'th jnt. Trip time 82 m/hour. Simultaneously continued investigating the leakage. Found Overshot Packer leaking fluid and Koomy unit level dropped.",0.5 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 02:30:00+00:00,2008-06-16 04:00:00+00:00,600.0,m,fixed,drilling -- bop/wellhead equipment,ok,equipment failure,Held tool/SJA box talk and actuated the Overshot Packer mechanically. Tightened the 16 actuating screws with a max. torque 200 ft-lbs.,1.5 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 04:00:00+00:00,2008-06-16 04:30:00+00:00,600.0,m,fixed,drilling -- bop/wellhead equipment,ok,equipment failure,Continued actuating the Overshot Packer mechanically. By tightened the 16 actuating screws with a max. torque 200 ft-lbs.,0.5 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 04:30:00+00:00,2008-06-16 06:30:00+00:00,708.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" liner from 600m to 708m. filled every 5'th jnt. Trip time 54 m/hour.",2.0 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 06:30:00+00:00,2008-06-16 06:45:00+00:00,708.0,m,fixed,drilling -- casing,ok,success,"Flow checked well, well static.",0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 06:45:00+00:00,2008-06-16 13:00:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" liner from 708m to 1068m. filled every 5'th jnt. Trip time 58 m/hour.",6.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 13:00:00+00:00,2008-06-16 13:15:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up Liner Hanger.,0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 13:15:00+00:00,2008-06-16 13:30:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,"Changed to 5"" DP handling equipment.",0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 13:30:00+00:00,2008-06-16 15:00:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,"Picked up and installed 7"" liner hanger/packer assy according to Weatherford liner hanger procedure. Up/down weight 108/104 MT. Liner weight 36 MT.",1.5 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 15:00:00+00:00,2008-06-16 15:30:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,Changed out FMS slips to PS-21 slips.,0.5 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 15:30:00+00:00,2008-06-16 15:45:00+00:00,1068.0,m,fixed,drilling -- casing,ok,success,"Installed radioactive pip tag blow 7"" liner hanger/packer.",0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 15:45:00+00:00,2008-06-16 16:00:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,Rigged down casing tong.,0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 16:00:00+00:00,2008-06-16 16:15:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,Picked up and installed Weatherford x-over and pup jnt.,0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 16:15:00+00:00,2008-06-16 16:30:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,"Changed to 5½"" DP handling equipment.",0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 16:30:00+00:00,2008-06-16 17:00:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,"Installed two 6m 5½"" pup jnt's.",0.5 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 17:00:00+00:00,2008-06-16 17:15:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to trip in with 7"" line on 5½"" DP.",0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 17:15:00+00:00,2008-06-16 17:30:00+00:00,1082.0,m,fixed,drilling -- casing,ok,success,"Checked surface equipment and prepared rig floor for RIH with 7"" liner on 5½"" DP.",0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 17:30:00+00:00,2008-06-16 17:45:00+00:00,1076.0,m,fixed,drilling -- casing,ok,success,Laid out one 6m pup jnt.,0.25 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 17:45:00+00:00,2008-06-16 18:30:00+00:00,1294.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" line on 5½"" DP from 1092m to 1294m. Restricted RIH speed when running through Surface and subsea well heads. Trip time 270 m/hour.",0.75 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 18:30:00+00:00,2008-06-16 21:15:00+00:00,2222.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" line on 5½"" DP from 1294m to 2222m. Filled every 5'th stand, duration for filling 10-15min. Trip time 338 m/hour. Iron roughneck spinner failed.",2.75 +15_9_F_14_2008_06_17.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-16T00:00:00+02:00,2008-06-17T00:00:00+02:00,2008-06-16 21:15:00+00:00,2008-06-16 22:00:00+00:00,2222.0,m,fixed,interruption -- other,ok,equipment failure,Found error in software. Cycled the Iron roughneck and re-booted the software.,0.75 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-16 22:00:00+00:00,2008-06-16 23:00:00+00:00,2665.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" line on 5½"" DP from 2222m to 2665m. Filled every 5'th stand, duration for filling 10-15min. Trip time 443 m/hour.",1.0 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-16 23:00:00+00:00,2008-06-17 00:00:00+00:00,2665.0,m,fixed,drilling -- casing,ok,success,"Broke circulation carefully and circulate one liner volume = 21.3 m3, 1300 lpm 48 bars. Took up/down weight 158/140 MT.",1.0 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 00:00:00+00:00,2008-06-17 03:30:00+00:00,3685.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 7"" line on 5½"" DP from 2665m to 3685 Filled every 5'th stand, duration for filling 10-15min. Trip time 291/hour. Took weight at 3685m",3.5 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 03:30:00+00:00,2008-06-17 04:00:00+00:00,3.0,m,fixed,drilling -- casing,ok,success,Made up to TDS. Broke circulation and washed down from 3680m to 3700m. 450 lpm 38 bars. Washed through tight spots at 3685m - 3687m and at 3696m. Pressure increased from 38-68 bar at 3700m.,0.5 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 04:00:00+00:00,2008-06-17 04:30:00+00:00,3701.0,m,fixed,drilling -- casing,ok,success,Continued washing down from to 3700m. 450 lpm 38 bars. Took 10 mt wt at 3700m. Hole packed off and pump pressure increased from 38 bars to 68 bars.,0.5 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 04:30:00+00:00,2008-06-17 07:00:00+00:00,3694.0,m,fixed,drilling -- casing,ok,success,"Pulled back to 3694m. Circulated well 650 lpm, SPP 40 bars, torque 7-8 kNm. Reciprocated the string during circulation. Evaluated situation with Petek for setting 7"" liner shallow to reduce risk and conseqences in continuing working liner to TD..",2.5 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 07:00:00+00:00,2008-06-17 07:15:00+00:00,3690.0,m,fixed,drilling -- casing,ok,success,Racked back one double. Installed 6 m pup jnt.,0.25 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 07:15:00+00:00,2008-06-17 08:00:00+00:00,3690.0,m,fixed,drilling -- casing,ok,success,Picked up and installed Cmt head.,0.75 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 08:00:00+00:00,2008-06-17 08:15:00+00:00,3690.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to space out and circulate.,0.25 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 08:15:00+00:00,2008-06-17 08:30:00+00:00,3690.0,m,fixed,drilling -- casing,ok,success,Displaced Cmt line to drill water.,0.25 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 08:30:00+00:00,2008-06-17 09:15:00+00:00,3694.0,m,fixed,drilling -- casing,ok,success,"Established circulation at 3694m: 1220 lpm, 73 bars, 10 rpm, up weight 150 MT. +Simultaneously held tool box prior to perform Cmt job of 7"" liner.",0.75 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 09:15:00+00:00,2008-06-17 10:00:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,"Dropped ball and chased ball with 460 lpm and 22 bars. Ball seated, applied 161 bars to set Weatherford hanger.",0.75 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 10:00:00+00:00,2008-06-17 10:15:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,"Released RT with 8 right hand turn 5 kNm. Slacked of to 100 MT, pressured up to shear out ball seat with 230 bars.",0.25 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 10:15:00+00:00,2008-06-17 10:45:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,"Established circulation: 500 lpm - 27 bars, 1000 lpm - 57 bars, 1500 lpm - 108 bars. Reduced flow to 1000 lpm.",0.5 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 10:45:00+00:00,2008-06-17 11:30:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,"Circulated bottoms up 1490 lpm, 105 bars, 15 rpm and 9-13 kNm torque.",0.75 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 11:30:00+00:00,2008-06-17 12:00:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Pumped 5m³ Base oil - 15m³ spacer - 4m³ OBM.,0.5 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 12:00:00+00:00,2008-06-17 12:30:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Closed IBOP had 11 bars behind IBOP. Opened the Cmt head low torque valve and re-set flag. Released bottom plug.,0.5 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 12:30:00+00:00,2008-06-17 13:00:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Mixed and pumped 22.6m³ cmt. Rotated the string 20 rpm 8-13 kNm. Displaced lines from Cmt unit to Cmt head with 890 litres of fresh water.,0.5 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 13:00:00+00:00,2008-06-17 13:45:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Displaced cmt with mud pumps at 1200 LPM. Plug bumped at 2229 stroks. Pressured up to 150 bars and held for 2 min. Pump efficiency 96%.,0.75 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 13:45:00+00:00,2008-06-17 14:00:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Bled down to 15 bars on stand pipe manifold. Bled back rest to Cmt unit checked for back flow.,0.25 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 14:00:00+00:00,2008-06-17 14:15:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Set packer as per Weatherford instruction. Picked up new pick up weight 150 MT + 4.2 m and slackt of to 100 MT. Observed sheare at 20 MT. Picked up to neutral weight 140 MT.,0.25 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 14:15:00+00:00,2008-06-17 15:15:00+00:00,3695.0,m,fixed,drilling -- casing,ok,success,Verified line up and pressure tested packer to 310 bars with 1.36 SG OBM. Pumped 1344 litres returns 1305 litres.,1.0 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 15:15:00+00:00,2008-06-17 16:00:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Released RT as per Weatherford instructions. Circulated bottoms up 2000 lpm 87 bars. Reduced pump rate due to spacer and cmt at shakers.,0.75 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 16:00:00+00:00,2008-06-17 16:15:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Installed two sponge balls in string.,0.25 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 16:15:00+00:00,2008-06-17 17:30:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Circulated DP clean up at 2000 lpm 72 bars.,1.25 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 17:30:00+00:00,2008-06-17 18:00:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,"Flow checked well, well static. Simultaneously held tool box talk prior to lay out Cmt head.",0.5 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 18:00:00+00:00,2008-06-17 18:15:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Pumped 5m³ slug 1.67 SG.,0.25 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 18:15:00+00:00,2008-06-17 18:45:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Cleared and cleaned the rig floor,0.5 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 18:45:00+00:00,2008-06-17 20:00:00+00:00,2616.0,m,fixed,drilling -- casing,ok,success,Broke out and laid out the Cmt head with 6 pup.,1.25 +15_9_F_14_2008_06_18.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-17T00:00:00+02:00,2008-06-18T00:00:00+02:00,2008-06-17 20:00:00+00:00,2008-06-17 22:00:00+00:00,1122.0,m,fixed,drilling -- casing,ok,success,"POOH with 7"" line hanger RT 5½"" DP from 2616m to 1122m. Trip time 747 m/hour",2.0 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-17 22:00:00+00:00,2008-06-17 23:00:00+00:00,216.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with 7"" line hanger RT 5½"" DP from 1122m to 216m. Trip time 906 m/hour",1.0 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-17 23:00:00+00:00,2008-06-17 23:45:00+00:00,216.0,m,fixed,drilling -- casing,ok,success,"Picked up Cmt head with 6 pup, made up same and broke out the 6 m pup and laid out the Cmt head.",0.75 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-17 23:45:00+00:00,2008-06-18 00:15:00+00:00,10.0,m,fixed,drilling -- casing,ok,success,"Continued POOH with 7"" line hanger RT 5½"" DP from 216m to surface. Trip time 432 m/hour.",0.5 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 00:15:00+00:00,2008-06-18 00:45:00+00:00,10.0,m,fixed,drilling -- casing,ok,success,Changed out PS-21 slip to master bushing. Cleaned around RT.,0.5 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 00:45:00+00:00,2008-06-18 01:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Racked back last stand of DP. Broke out 6m pup and laid out the Liner hanger RT.,0.75 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 01:30:00+00:00,2008-06-18 01:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to run with BOP/surface well head cleaning assy.,0.25 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 01:45:00+00:00,2008-06-18 03:00:00+00:00,72.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made up BOP/Surface well head cleaning assy.,1.25 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 03:00:00+00:00,2008-06-18 04:00:00+00:00,87.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Started cleaning/jetting the BOP/Surface well head with 3100 lpm 70 bars.,1.0 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 04:00:00+00:00,2008-06-18 04:15:00+00:00,82.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued Jet washing the BOP/Surface well head, 3100 lpm, 65 bars. Opened and closed BOP rams.",0.25 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 04:15:00+00:00,2008-06-18 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with Well protector and washing assy and laid out same.,1.0 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 05:15:00+00:00,2008-06-18 06:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up one 5½"" DP stand ran in and displaced BOP surface lines to water.",1.25 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 06:30:00+00:00,2008-06-18 07:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up wear bushing RT. Ran in and retrieved the Wear bushing after two attempts.,0.75 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 07:15:00+00:00,2008-06-18 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up BOP test assy. Ran in and set same.,1.75 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 09:00:00+00:00,2008-06-18 09:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lined up for BOP testing. Flushed surface lines.,0.25 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 09:15:00+00:00,2008-06-18 14:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Pressure tested the BOP as per Maersk procedure. 20/345 bars 5/10 mins. +Simultaneously tested the Rotary hose, auto IBOP and manually IBOP.",4.75 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 14:00:00+00:00,2008-06-18 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged down pressure test equipment and POOH with the test plug.,1.0 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 15:00:00+00:00,2008-06-18 15:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up Wear bushing RT to one DP stand installed Wear bushing. Made up to TDS.,0.5 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 15:30:00+00:00,2008-06-18 16:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with Wear bushing. Washed surface well head, 3700 lpm, 86 bars and 5 rpm. Installed the Wear bushing. POOH with Wear bushing RT.",1.0 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 16:30:00+00:00,2008-06-18 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Lined up for pressure test the well/7"" liner against Shear ram.",0.5 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 17:00:00+00:00,2008-06-18 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to rig up for RIH with cleaning assy. on 3½"" DP. Checked line up to pressure test the well/7"" liner.",0.5 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 17:30:00+00:00,2008-06-18 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleared and cleaned rig floor. Started rig up for RIH with cleaning assy. on 3½"" DP. + +Simultaneously pressure tested the well/7"" liner to 310 bars 10 min 1.36 SG OBM. Pumped 2375 litres had 2375 litres in return.",1.0 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 18:30:00+00:00,2008-06-18 19:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued rigging up for RIH with cleaning assy. on 3½"" DP. Checked out all equipment for loose items. Function tested auto slips. Problems with HTS.",1.0 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 19:30:00+00:00,2008-06-18 20:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Repaired Power Rollers (HTS).,0.5 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 20:00:00+00:00,2008-06-18 20:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up cleaning assy. and made up same as per SPS instructions. PDM could not be operated from dog house.,0.5 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 20:30:00+00:00,2008-06-18 21:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Electric technician repaired PDM.,0.5 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 21:00:00+00:00,2008-06-18 21:45:00+00:00,100.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up cleaning assy. RIH same on 3 ½"" DP from surface to 100m. Picked up 3½"" DP singles from cantilever. Trip time 133 m/hour.",0.75 +15_9_F_14_2008_06_19.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-18T00:00:00+02:00,2008-06-19T00:00:00+02:00,2008-06-18 21:45:00+00:00,2008-06-18 22:00:00+00:00,100.0,m,fixed,completion -- circulating conditioning,ok,success,Held tool box talk prior to remove master bushing and install auto slip.,0.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-18 22:00:00+00:00,2008-06-18 22:15:00+00:00,100.0,m,fixed,completion -- circulating conditioning,ok,success,Remove master bushing and installed auto slip.,0.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-18 22:15:00+00:00,2008-06-19 02:45:00+00:00,600.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued RIH w/cleaning assy. on 3 ½"" DP from 100 to 600m. Picked up 3½"" DP singles from cantilever. Trip time 111 m/hour. Problems with tail arm of HTS. + +UP/Down weight at 500m 80/75 MT. + +Simultaneously started pressure testing of rig manifold.",4.5 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 02:45:00+00:00,2008-06-19 04:00:00+00:00,630.0,m,fixed,interruption -- other,ok,equipment failure,Electric technician trouble shooted HTS.,1.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 04:00:00+00:00,2008-06-19 05:00:00+00:00,621.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HTS trailing arm.,1.0 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 05:00:00+00:00,2008-06-19 05:15:00+00:00,621.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox talk / shift handover.,0.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 05:15:00+00:00,2008-06-19 05:45:00+00:00,660.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH with cleaning string on 3 1/2"" singles from 621 m to 660 m MD. Restriced running speed due to problems with HTS trailing arm / elevator.",0.5 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 05:45:00+00:00,2008-06-19 07:00:00+00:00,660.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HTS trailing arm and DP elevator. Removed and replaced DP elevator.,1.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 07:00:00+00:00,2008-06-19 10:00:00+00:00,1015.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH with cleaning string on 3 1/2"" singles from 660 m to 1015 m MD. Trip speed: 118 m/hrs",3.0 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 10:00:00+00:00,2008-06-19 10:15:00+00:00,1015.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk prior to picking up cleaning assemblies #3, #4 and #5. Meanwhile counted 3 1/2"" DP joints left on deck.",0.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 10:15:00+00:00,2008-06-19 11:00:00+00:00,1022.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up 3 1/2"" DP pup and cleaning assembly #3 top dress mill. Took up/down weight 90/85 MT.",0.75 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 11:00:00+00:00,2008-06-19 11:45:00+00:00,1022.0,m,fixed,completion -- circulating conditioning,ok,success,Removed automatic slips. Installed master bushing. Found broken safety chain on elevator.,0.75 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 11:45:00+00:00,2008-06-19 12:15:00+00:00,1022.0,m,fixed,interruption -- other,ok,equipment failure,Removed segment and repaired/welded safety chain on elevator.,0.5 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 12:15:00+00:00,2008-06-19 12:45:00+00:00,1040.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up cleaning assembly #4 top dress mill / well commisioner / well patroller / 9 5/8"" razor back and cleaning assembly #5 well sweep magnets.",0.5 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 12:45:00+00:00,2008-06-19 15:45:00+00:00,2073.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5"" DP from 1041 m to 2073 m MD. Trip speed: 344 m/hrs",3.0 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 15:45:00+00:00,2008-06-19 17:00:00+00:00,2088.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up 5"" DP pup and cleaning assembly #6 10 3/4"" razor back / posi drift / well sweep magnets / well patroller.",1.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 17:00:00+00:00,2008-06-19 17:15:00+00:00,2088.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk for changing to 5 1/2"" DP handling equipment.",0.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 17:15:00+00:00,2008-06-19 17:30:00+00:00,2088.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed elevator insert to 5 1/2"".",0.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 17:30:00+00:00,2008-06-19 17:45:00+00:00,2090.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up 5"" x 5 1/2"" x-over.",0.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 17:45:00+00:00,2008-06-19 18:00:00+00:00,2090.0,m,fixed,completion -- circulating conditioning,ok,success,Broke circulation. Flow 1100 lpm / SPP 138 bar.,0.25 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 18:00:00+00:00,2008-06-19 18:30:00+00:00,2090.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed slips inserts to 5 1/2"". Greased and checked automatic slips. Changed die carriers in iron roughneck.",0.5 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 18:30:00+00:00,2008-06-19 20:00:00+00:00,2590.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies from 2090 m MD to 2590 m MD on 5 1/2"" DP. Trip speed: 333 m/hrs Had to make up TDS while running in due to increased backflow from pipe.",1.5 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 20:00:00+00:00,2008-06-19 20:45:00+00:00,2605.0,m,fixed,completion -- circulating conditioning,ok,success,"Scraped and washed FLX packer setting area with 10 3/4"" Razor back scraper reciprocating in interval from 500 to 530 m MD. Flow 1850 lpm / SPP 300 bar. Took up/down weights 135/124 MT. Pumped another 50 m3 to condition mud.",0.75 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 20:45:00+00:00,2008-06-19 21:30:00+00:00,2616.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5 1/2"" DP from 2605 m to 2695 m MD. Made up TDS. RIH while pumping 500 lpm / SPP 30 bar and passed though liner PBR at 2616 m MD - no obstruction observed.",0.75 +15_9_F_14_2008_06_20.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-19T00:00:00+02:00,2008-06-20T00:00:00+02:00,2008-06-19 21:30:00+00:00,2008-06-19 22:00:00+00:00,3449.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assembliies on 5 1/2"" DP from 2615 m to 2855 m MD. Trip speed: 480 m/hrs",0.5 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-19 22:00:00+00:00,2008-06-19 23:15:00+00:00,3245.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assembliies on 5 1/2"" DP from 2855 m to 3245 m MD. Tagged obstruction with ~5 MT WOB at 3245 m MD.",1.25 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-19 23:15:00+00:00,2008-06-20 00:00:00+00:00,3250.0,m,fixed,completion -- circulating conditioning,ok,success,Made up TDS and broke circulation. Established parameters : Flow 1100 lpm / SPP 130 bar / 20 RPM. RIH and passed thight spot.,0.75 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 00:00:00+00:00,2008-06-20 01:15:00+00:00,3583.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with cleaning assemblies on 5 1/2"" DP from 3250 m to 3583 m MD.",1.25 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 01:15:00+00:00,2008-06-20 02:30:00+00:00,3630.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS. Scraped and washed production packer setting area with 9 5/8"" Razor back scraper reciprocating in interval from 2575 m to 2605 m MD. Flow 1700 lpm / SPP 300 bar.",1.25 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 02:30:00+00:00,2008-06-20 03:00:00+00:00,3640.0,m,fixed,completion -- circulating conditioning,ok,success,"Set torque limit to 16 kNm. Took up/down weights 149/130 MT. Established parameters : Flow 800 lpm / SPP 108 bar / 40 RPM. Free rotating torque 6 kNm. RIH and tagged top of PBR at 2616,6 m MD. Set down 1-2 MT to dress top of PBR. Max torque 8 kNm. Repeated dressing sequence.",0.5 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 03:00:00+00:00,2008-06-20 04:00:00+00:00,3635.0,m,fixed,completion -- circulating conditioning,ok,success,Picked 5 m off bottom and marked pipe for lowest reciprocation depth. Circulated to clean wellbore and condtion mud while reciprocating string. Flow 1760 lpm / SPP 302 bar / 40 rpm.,1.0 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 04:00:00+00:00,2008-06-20 06:45:00+00:00,3635.0,m,fixed,completion -- circulating conditioning,ok,success,"Circulated to clean wellbore and condition mud while reciprocating string. Flow 1780 lpm / SPP 297 bar / 40 rpm. Obtained even mudweight in out 1,37 sg.",2.75 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 06:45:00+00:00,2008-06-20 07:00:00+00:00,3640.0,m,fixed,drilling -- casing,ok,success,"Entered PBR at 2616,5 m. Set well commisioner packer by setting down 12 MT.",0.25 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 07:00:00+00:00,2008-06-20 07:45:00+00:00,3640.0,m,fixed,drilling -- casing,ok,success,Closed UPR. Lined up to pump in kill line. Pressure tested well commisioner packer from above using mudpumps 70 bar / 10 min - ok.,0.75 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 07:45:00+00:00,2008-06-20 08:15:00+00:00,3637.0,m,fixed,completion -- circulating conditioning,ok,success,Bled off pressure through choke and opened UPR. Picked up to neutral weight and unset the well commissioner packer. Pulled back 3 m to 3637 m MD. Found guide for die-holder on drillfloor.,0.5 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 08:15:00+00:00,2008-06-20 09:00:00+00:00,3637.0,m,fixed,interruption -- other,ok,equipment failure,Prepared for inspection of torque wrench on TDS. Had to abort due to wind speeds above 34 knots. Evaluated situation and decided to continue operations.,0.75 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 09:00:00+00:00,2008-06-20 10:15:00+00:00,3637.0,m,fixed,drilling -- casing,ok,success,Displaced DP to 25 m3 to base oil. Chased with 4 m3 seawater. Flow 440-1000 lpm / SPP 36-160 bar. Obtained 127 bar static u-tube pressure.,1.25 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 10:15:00+00:00,2008-06-20 10:30:00+00:00,3640.0,m,fixed,drilling -- casing,ok,success,"Set well commissioner packer by setting down 10 MT on liner top. Bled off DP pressure to 4 bar and commenced inflow test of 7"" liner.",0.25 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 10:30:00+00:00,2008-06-20 11:15:00+00:00,3640.0,m,fixed,drilling -- casing,ok,success,"Inflow tested liner for 50 min. Pressure increased from 4 to 8,8 bar but levelling out towards the end of the test - ok.",0.75 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 11:15:00+00:00,2008-06-20 11:30:00+00:00,3634.0,m,fixed,drilling -- casing,ok,success,Equalised pressure across packer by applying 125 bar DP pressure. Picked up string 6 m to 3634 m MD to ensure polish mill out of PBR.,0.25 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 11:30:00+00:00,2008-06-20 12:00:00+00:00,3634.0,m,fixed,completion -- circulating conditioning,ok,success,Lined up for circulating wash pills. Displaced 11 m3 of dope cleaning pill and 6 m3 Hi-vis pill at 1500 lpm / SPP ~275 bar. Observed leakage on TDS wash pipe.,0.5 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 12:00:00+00:00,2008-06-20 13:00:00+00:00,3634.0,m,fixed,interruption -- other,ok,equipment failure,Stopped displacement. SIDPP 136 bar. Discussed situation and way forward.,1.0 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 13:00:00+00:00,2008-06-20 13:15:00+00:00,3634.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk with relevant personnel.,0.25 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 13:15:00+00:00,2008-06-20 13:45:00+00:00,3634.0,m,fixed,interruption -- other,ok,equipment failure,"Bled back dope cleaning pill, Hi-vis and base oil as determined by u-tube pressure. Routed returns back to relevant pits.",0.5 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 13:45:00+00:00,2008-06-20 17:15:00+00:00,3628.0,m,fixed,interruption -- other,ok,equipment failure,Racked back stand. Parked TDS and lowered work platform. Changed wash pipe. Inspected die holder on TDS - no parts missing. Meanwhile mixed new well cleaning pills.,3.5 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 17:15:00+00:00,2008-06-20 17:30:00+00:00,3634.0,m,fixed,interruption -- other,ok,equipment failure,Tested TDS/washpipe against IBOP - ok. Picked up stand and RIH to displacement depth. Meanwhile held toolbox talk prior to displacment.,0.25 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 17:30:00+00:00,2008-06-20 18:45:00+00:00,3634.0,m,fixed,completion -- circulating conditioning,ok,success,"Lined up for circulating wash pills. Pumped ~25 m3 base oil, 10 m3 dope cleaner, 30 m3 1,37 sg Hi-vis push pill, 15 m3 Hi-vis soap pill, 10 m3 seawater and 15 m3 Hi-vis soap pill. Flow ~2000 l / SPP 100-200 bar. Took returns of OBM to pits.",1.25 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 18:45:00+00:00,2008-06-20 21:30:00+00:00,3634.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced wash pills with 180 m3 seawater. Stopped pumping and closed annular. Flushed through choke and kill line by pumping addtional 40 m3 seawater. Flow 2200 lpm / SPP ~200 bar. Opened annular.,2.75 +15_9_F_14_2008_06_21.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-20T00:00:00+02:00,2008-06-21T00:00:00+02:00,2008-06-20 21:30:00+00:00,2008-06-20 22:00:00+00:00,3634.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 1,03 sg packer fluid at 2800 lpm / SPP 297 bar.",0.5 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-20 22:00:00+00:00,2008-06-20 23:00:00+00:00,3634.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 1,03 sg packed fluid at 2800 lpm / SPP 297 bar. Pumped a total of 222 m3 1,03 sg packer fluid. Measured NTU at end of displacment : 674/527/471/434/386/929/450/365/270.",1.0 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-20 23:00:00+00:00,2008-06-21 00:45:00+00:00,3634.0,m,fixed,drilling -- casing,ok,success,"Flushed line to cement unit and transferred 1,03 sg packer fluid to cement unit. Positioned tooljoint underneath UPR and closed same. Lined up to test casing/liner through standpipe. Tested production casing/liner to 35/345 bar 5 /10 min - ok. Meanwhile mixed new packer fluid for filling trip tanks.",1.75 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 00:45:00+00:00,2008-06-21 01:15:00+00:00,3622.0,m,fixed,completion -- circulating conditioning,ok,success,Flowchecked visually using flowline camera - well static. Meanwhile mixed new packer fluid - dumped 1 batch due to contaminated water.,0.5 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 01:15:00+00:00,2008-06-21 04:00:00+00:00,3622.0,m,fixed,completion -- circulating conditioning,ok,success,Mixed new batch of packer fluid in pit#2 - observed percipitate and NTU > 400 when adding Sodium bicarbonate. Suspected contamination from dry additive system (hopper/conveyer). Dumped contaminated packer fluid from pit#2. Prepared for mixing new batch of packer fluid bypassing the dry additive system. Meanwhile serviced and greased TDS.,2.75 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 04:00:00+00:00,2008-06-21 05:00:00+00:00,3622.0,m,fixed,completion -- circulating conditioning,ok,success,"Mixed new batch of packer fluid in pit#2. Bypassed dry additive system (hopper) when adding Sodium bicarbonate, got clean fluid.",1.0 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 05:00:00+00:00,2008-06-21 05:15:00+00:00,3622.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox talk prior to filling trip tanks.,0.25 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 05:15:00+00:00,2008-06-21 05:30:00+00:00,3622.0,m,fixed,completion -- circulating conditioning,ok,success,Lined up and filled trip tanks via standpipe bleed line.,0.25 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 05:30:00+00:00,2008-06-21 09:15:00+00:00,2090.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5 1/2"" DP from 3622 m to 2090 m MD. Checked intervall 3240-3250 m MD for obstruction - none observed. Trip speed: 410 m/hrs",3.75 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 09:15:00+00:00,2008-06-21 09:30:00+00:00,2090.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox talk prior to laying out cleaning assembly #6.,0.25 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 09:30:00+00:00,2008-06-21 10:30:00+00:00,2070.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out and laid down cleaning assembly #6 - 10 3/4"" razor back scrapers / posi drift / well sweep magnets / well patroller. Moderate amounts of swarf recovered on magnets, but no large chunks. Changed from 5 1/2"" to 5"" handing equipment.",1.0 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 10:30:00+00:00,2008-06-21 13:30:00+00:00,1054.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5"" DP from 2070 m to 1054 m MD. Trip speed: 346 m/hrs.",3.0 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 13:30:00+00:00,2008-06-21 14:30:00+00:00,1016.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke and laid out cleaning assembly #5 - well sweep magnets. Assembly #4 - polish mill / well commissioner / 9 5/8"" Razor back and assembly #3 - top dress mill was laid out together. Moderate amounts of swarf recovered on magnets, but no large chunks. Changed from 5"" to 3 1/2"" handling equipment. POOH with cleaning string on 3 1/2"" DP from 1054 m to 1016 m MD. Got problems with HTS rollers.",1.0 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 14:30:00+00:00,2008-06-21 15:00:00+00:00,1016.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problem with HTS rollers.,0.5 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 15:00:00+00:00,2008-06-21 20:00:00+00:00,230.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to POOH with cleaning string on 3 1/2"" DP from 1016 m to 230 m MD. Laid down 3 1/2"" singles. Got problems with HTS tailing arm. Trip speed: 160 m/hrs.",5.0 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 20:00:00+00:00,2008-06-21 20:30:00+00:00,230.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HTS tailing arm.,0.5 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 20:30:00+00:00,2008-06-21 21:00:00+00:00,150.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to POOH with cleaning string on 3 1/2"" DP from 230 m to 150 m MD. Laid down 3 1/2"" singles.",0.5 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 21:00:00+00:00,2008-06-21 21:15:00+00:00,150.0,m,fixed,completion -- circulating conditioning,ok,success,Removed PS-21 automatic slips. Installed masterbushing and bowl.,0.25 +15_9_F_14_2008_06_22.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-21T00:00:00+02:00,2008-06-22T00:00:00+02:00,2008-06-21 21:15:00+00:00,2008-06-21 22:00:00+00:00,20.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to POOH with cleaning string on 3 1/2"" DP from 150 m to 20 m MD. Laid down 3 1/2"" singles.",0.75 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-21 22:00:00+00:00,2008-06-21 23:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out and laid out cleaning assembly #2 - 7"" Razor back / well sweep magnets. Laid out cleaning assembly #1 - 6"" PDC bit and pup. Small/moderate amounts of swarf recovered on magnets.",1.25 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-21 23:15:00+00:00,2008-06-21 23:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk for pulling bowl protector. Cleared and tidied drillfloor.,0.5 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-21 23:45:00+00:00,2008-06-22 00:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with bowl protector pulling tool and jet sub on 5 1/2"" stand. Engaged tool at 20,1 m MD according to Vetco instructions. Picked up 0,3 m and circulated to clean wellhead. Flow 3500 lpm / SPP 65 bar. Pumped a total of 10 m3 packer fluid. POOH with bowl protector running tool - no bowl protector recovered.",0.5 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 00:15:00+00:00,2008-06-22 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Ran back in with bowl protector pulling tool and jet sub on 5 1/2"" stand. Broke off TDS. Landed pulling tool at 20,1 m MD. Engaged pulling tool using chain tongs. Made up TDS. Picked up 0,3 m and circulated clean wellhead while picking up slowly. Flow 3500 lpm / SPP 65 bar. Pumped a total of 10 m3 packer fluid. POOH with bowl protector running tool. Broke of bowl protector. Broke out and laid down bowl protector pulling tool.",0.75 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 01:00:00+00:00,2008-06-22 01:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Made up 5 1/2"" FH x 7"" VT swadge to stand of 5 1/2"" DP and racked back in derrick.",0.25 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 01:15:00+00:00,2008-06-22 01:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Made up 5 1/2"" FH x 7"" VT swadge to FOSV's with side entry sub (top of landing stand). Made up top of landing stand to 5 1/2"" singel and hung off in aft PRS.",0.5 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 01:45:00+00:00,2008-06-22 02:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk for rigging up tubing running equipment.,0.25 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 02:00:00+00:00,2008-06-22 04:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Parked IR. Installed and hooked up Odfjell tubing running tong.,2.0 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 04:00:00+00:00,2008-06-22 06:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Made up tubing hanger landing string comprising of 1 x 12 m 7"" tubing, 1 x 6 m 7"" tubing, 1 x 1 m 7"" tubing, THRT, Swadge with FOSV's and side entry. Used single joint elevator to pick up tubing. Observed damage on pin end of 7"" tubing joint in landing string. Observed damage on rig floor tugger wire.",2.0 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 06:00:00+00:00,2008-06-22 07:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Checked rig floor tugger for damaged and respooled same.,1.25 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 07:15:00+00:00,2008-06-22 08:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Laid out damaged tubing joint (#240) in landing string. Picked up and made up new 7"" tubing joint (#196).",0.75 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 08:00:00+00:00,2008-06-22 10:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Made up THRT and racked back TH landing string in derrick. Continued rigging tubing running equipment.,2.0 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 10:00:00+00:00,2008-06-22 10:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Cleared and tidied drillfloor prior to bringing in control line reels.,0.5 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 10:30:00+00:00,2008-06-22 10:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk with rig and completion crews.,0.25 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 10:45:00+00:00,2008-06-22 12:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Spotted WD and BOT control line reels on stb fwd setback. Suspened control line sheave in fwd PRS using PRS lifting tool. Dressed BX elevator with 7"" inserts. Dressed slips and dogcollars.",2.0 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 12:45:00+00:00,2008-06-22 13:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk with rig and completion crews.,0.5 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 13:15:00+00:00,2008-06-22 16:30:00+00:00,74.0,m,fixed,completion -- completion string,ok,success,"Picked up of and hung off assy#1 Ratcheting muleshoe / stinger. Picked up and made up assy#2 - 9 5/8"" Granite packer. Picked up and made up assy#3- 20"" completion PBR. Made up and ran 3 x 7"" tubing joint.",3.25 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 16:30:00+00:00,2008-06-22 17:00:00+00:00,88.0,m,fixed,completion -- completion string,ok,success,Picked up and made up assy#4 DHPG/CIV. Made up joint on top of completion assy#4 to ease termination of controlines.,0.5 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 17:00:00+00:00,2008-06-22 17:15:00+00:00,88.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk prior to terminating DHPG/CIV completion assemblies.,0.25 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 17:15:00+00:00,2008-06-22 20:00:00+00:00,88.0,m,fixed,completion -- completion string,ok,success,Stripped and splitted control line. Terminated DHPG cable according to WD procedure. Tested conductivity - ok. Tested cable fitting to 10.000 psi through test port - ok.,2.75 +15_9_F_14_2008_06_23.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-22T00:00:00+02:00,2008-06-23T00:00:00+02:00,2008-06-22 20:00:00+00:00,2008-06-22 22:00:00+00:00,88.0,m,fixed,completion -- completion string,ok,success,"RIH with tubing to place in working height for terminatining CIV control line. Stripped and bevelled control line. Installed CIV in carrier. Tested control line termination fitting to 10.000 psi through test port - ok. Tried to obtain ~50 bar on control line, hydraulic pump not suited for supplying low pressure (spiked when pressuring up). Pressure up several time to obtain stable pressue. Hard to determine if there was a leakage on fitting closest to the carrier.",2.0 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-22 22:00:00+00:00,2008-06-22 23:00:00+00:00,88.0,m,fixed,completion -- completion string,ok,success,Cleaned and air blasted check valve assembly and fittings to check for leaks. Observed no leaks - control line pressure steady on 25 bar - ok.,1.0 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-22 23:00:00+00:00,2008-06-23 00:30:00+00:00,100.0,m,fixed,completion -- completion string,ok,success,"Made up 7"" tubing joint (#234). High and erratic thread torque. Backed out connection, cleaned threads and observed gaulling. Laid out joint #234. Refreshed box on joint #235. Picked up and made up next tubing joint - ok.",1.5 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 00:30:00+00:00,2008-06-23 01:00:00+00:00,100.0,m,fixed,completion -- completion string,ok,success,Removed masterbushing. Installed and hooked up FMS. Had problems with HTS tailing arm.,0.5 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 01:00:00+00:00,2008-06-23 02:00:00+00:00,100.0,m,fixed,interruption -- other,ok,equipment failure,Troublehshot HTS tailing arm.,1.0 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 02:00:00+00:00,2008-06-23 04:00:00+00:00,250.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 100 m to 240 MD. Installed control line clamp/protector on every collar.",2.0 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 04:00:00+00:00,2008-06-23 05:00:00+00:00,300.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 240 m to 300 m MD. Installed control line clamp/protector on every collar.",1.0 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 05:00:00+00:00,2008-06-23 05:30:00+00:00,300.0,m,fixed,completion -- completion string,ok,success,Held toolbox/handover meeting. Checked and greased equipment.,0.5 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 05:30:00+00:00,2008-06-23 14:30:00+00:00,785.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 300 m to 785 m MD. Installed control line clamp/protector on every collar. Average running speed 54 m/hrs.",9.0 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 14:30:00+00:00,2008-06-23 16:00:00+00:00,842.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 785 m to 842 m MD. Installed control line clamp/protector on every collar. Tested combination of tubing tong die inserts with regards to marks/damage on tubing. Decided to run with standard die inserts below GLV. Average running speed 13 m /hrs (due to die trials),",1.5 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 16:00:00+00:00,2008-06-23 20:00:00+00:00,1081.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 842 m to 1081 m MD. Installed control line clamp/protector on every collar. Average running speed 60 m/hrs.",4.0 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 20:00:00+00:00,2008-06-23 20:45:00+00:00,1081.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HTS tailing arm.,0.75 +15_9_F_14_2008_06_24.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-23T00:00:00+02:00,2008-06-24T00:00:00+02:00,2008-06-23 20:45:00+00:00,2008-06-23 22:00:00+00:00,1177.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1081 m to 1177 m MD. Installed control line clamp/protector on every collar. Average running speed 77 m/hrs.",1.25 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-23 22:00:00+00:00,2008-06-23 23:00:00+00:00,1249.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1177 m to 1249 m MD. Installed control line clamp/protector on every collar. Average running speed 72 m/hrs.",1.0 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-23 23:00:00+00:00,2008-06-24 02:00:00+00:00,1269.0,m,fixed,completion -- completion string,ok,success,Picked up and made up assy#4 Schlumberger gas lift mandrel. Counted joints left on deck - 138 - ok. Removed FMS and installed masterbushing for using manual slips. Made up tubing joint on top og assy#4 to ease bypassing with control line. Stripped control line mantle. Installed clamps and inserts across GLV slot. Installed extra clamp on #assy4 upper pup joint due to bend on controll line. Removed masterbushing and installed FMS. Dressed tong with low marking dies.,3.0 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 02:00:00+00:00,2008-06-24 03:45:00+00:00,1400.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1269 m to 1400 m MD. Installed control line clamp/protector on every collar. Got problems with HTS conveyer belt. Average running speed 75 m/hrs.",1.75 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 03:45:00+00:00,2008-06-24 04:00:00+00:00,1394.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problem with conveyer belt. Meanwhile greased slips and elevator.,0.25 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 04:00:00+00:00,2008-06-24 06:30:00+00:00,1400.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot HTS. Found burned power distribution circuit. Made repair as required.,2.5 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 06:30:00+00:00,2008-06-24 08:45:00+00:00,1565.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1400 m to 1565 m MD. Installed control line clamp/protector on every collar. Average running speed 73 m/hrs. Observed leakage from BX elevator.",2.25 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 08:45:00+00:00,2008-06-24 09:15:00+00:00,1565.0,m,fixed,interruption -- other,ok,equipment failure,Changed damaged hose on BX-elevator.,0.5 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 09:15:00+00:00,2008-06-24 12:15:00+00:00,1732.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1565 m to 1732 m MD. Installed control line clamp/protector on every collar. Average running speed 55 m/hrs.",3.0 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 12:15:00+00:00,2008-06-24 15:00:00+00:00,1851.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1732 m to 1851 m MD. Installed control line clamp/protector on every collar. Reduced running speed due to increasig drag ~5 MT in well when completion assemblies enetered 9 5/8"" casing. Average running speed 43 m/hrs.",2.75 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 15:00:00+00:00,2008-06-24 18:45:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%Cr110 tubing from 1851 m to 2100 m MD. Installed control line clamp/protector on every collar. Average running speed 66 m/hrs.",3.75 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 18:45:00+00:00,2008-06-24 19:00:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,Held toolbox talk prior to lifting in assy#6 FLX/ASV. Counted joints left on deck - 67 - ok.,0.25 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 19:00:00+00:00,2008-06-24 19:45:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,Removed FMS and installed masterbushing. Lifted assy#6 FLX/ASV onto HTS. Lifted in assy#6 with elevator and drillfloor tugger and made up same.,0.75 +15_9_F_14_2008_06_25.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-24T00:00:00+02:00,2008-06-25T00:00:00+02:00,2008-06-24 19:45:00+00:00,2008-06-24 22:00:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,"Took measurements. Cut, stripped and splitted control line. Dressed DHPG control line ends. Installed and made up splice cylinder according to WD procedure. Installed lower connector on chemical injection line.",2.25 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-24 22:00:00+00:00,2008-06-25 00:00:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,Tested fittings on DHPG lower spilce fitting through dedicated test port 10 min / 10000 psi - ok. Got problem with chart recorder. Continued testing by visual observation. Tested upper DHPG splice fitting 10 min / 10000 psi - ok.,2.0 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 00:00:00+00:00,2008-06-25 02:00:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,Tested fitting on chemical injection line lower connector 10 min / 10000 psi - ok. Installed upper conncetor on chemical injection line. Mated chemical injection line connectors. Tested upper fitting on chemical injection line 10 min / 10000 psi - ok. Meanwhile lowered sheave suspended in PRS due to hydraulic leak from PRS.,2.0 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 02:00:00+00:00,2008-06-25 03:45:00+00:00,2100.0,m,fixed,completion -- completion string,ok,success,Installed connector protection clamp and adjusted same. Picked up and took in slack on control line by adjusting standard clamp below. Rigged up sheave for DHSV/ASV control line. Blinded off redundant hydraulic line from FLX/ASV and secured same in connector protection clamp. Ran FLX/ASV through RT and checked same according to BOT procedure.,1.75 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 03:45:00+00:00,2008-06-25 04:00:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,"Made up 7"" tubing joint to assy#6. Cut and dressed control lines for splicing.",0.25 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 04:00:00+00:00,2008-06-25 06:45:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Dressed dual control line for ASV/DHSV and fed through sheave. Made up ASV control line according to BOT procedure. Tested ASV control line to 570 bar / 10 min - ok. Tested redundant control line to 345 bar / 10 min - ok. Installed blind fitting on redundant line.,2.75 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 06:45:00+00:00,2008-06-25 09:00:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Flushed chemcial injection line and confirmed correct line up. Installed chemical injection lower connector and tested fitting to 10000 psi / 10 min - ok.,2.25 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 09:00:00+00:00,2008-06-25 11:00:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Spliced DHPG control line above FLX/ASV according to WD procedure. Tested conductivity - ok.,2.0 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 11:00:00+00:00,2008-06-25 12:00:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Pressure tested uppr/lower fitting on DHPG splice to 10000 psi / 10 min -ok. Connected chemical injection line and tested fitting on upper connector to 10000 psi / 10 min - ok.,1.0 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 12:00:00+00:00,2008-06-25 13:00:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Installed protectors/clamps and adjusted to take slack on control lines.,1.0 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 13:00:00+00:00,2008-06-25 13:15:00+00:00,2108.0,m,fixed,completion -- completion string,ok,success,Function tested ASV according to BOT procedure - ok.,0.25 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 13:15:00+00:00,2008-06-25 14:30:00+00:00,2018.0,m,fixed,completion -- completion string,ok,success,"Picked and made up assy#7 DHSV. Picked up 7"" joint (#62) and made up same to ease installation of control line and protectors/clamps.",1.25 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 14:30:00+00:00,2008-06-25 16:30:00+00:00,2130.0,m,fixed,completion -- completion string,ok,success,Installed and fitted control line special clamps accross DHSV. Flushed DHSV control line and made up same to DHSV according to BOT procedure. Tested DHSV contrrol line to 570 bar / 10 min - ok.,2.0 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 16:30:00+00:00,2008-06-25 17:00:00+00:00,2156.0,m,fixed,completion -- completion string,ok,success,Removed master bushing and installed FMS in rotary. Ran 1 joint of tubing.,0.5 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 17:00:00+00:00,2008-06-25 17:30:00+00:00,2156.0,m,fixed,completion -- completion string,ok,success,Perfomed toolbox talk / handover meeting (new Mærsk drilling crew).,0.5 +15_9_F_14_2008_06_26.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-25T00:00:00+02:00,2008-06-26T00:00:00+02:00,2008-06-25 17:30:00+00:00,2008-06-25 22:00:00+00:00,2498.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%cr110 tubing from 2156 m MD to 2498 m MD. Installed control line clamp/protector on every collar. Average running speed 76 m/hrs.",4.5 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-25 22:00:00+00:00,2008-06-25 23:30:00+00:00,2596.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" 29# S13%cr110 tubing from 2498 m MD to 2596 m MD. Installed control line clamp/protector on every collar. Average running speed 65 m/hrs.",1.5 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-25 23:30:00+00:00,2008-06-26 01:15:00+00:00,2620.0,m,fixed,completion -- completion string,ok,success,"Changed insert in BX elevator to 5 1/2"". Counted joints on deck - 27 - ok. Picked up landing stand with 7"" swadge. Installed control line clamp. Made up landing stand to completion string. Made up TDS. RIH with completion on 5 1/2"" landing stand. Started pumping at 200 lpm when passing 2610 m MD. Tagged with ~5 MT at 2615,4 m MD without observing pressure build up. Picked up ~2 m to index ratcheting muleshoe and tried to enter PBR twice more - nogo. Picked up 3-4 m, ran in and entered PBR on 4th attempt. Observed pressure bulid up and reduced fluid returns when entering PBR, shut down pump. Tagged top of PBR with end of string at 2620 m MD.",1.75 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 01:15:00+00:00,2008-06-26 02:45:00+00:00,2596.0,m,fixed,completion -- completion string,ok,success,"Pulled out with landing stand. Broke out landing stand and racked back same. Changed inserts in BX elvevator to 7"". Meanwhile performed space out calculation.",1.5 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 02:45:00+00:00,2008-06-26 04:00:00+00:00,2596.0,m,fixed,completion -- completion string,ok,success,"Laid out joint #16 and replaced with joint #21 to put stinger no-go 0,35 m above PBR. Prepared for picking up tubing hanger.",1.25 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 04:00:00+00:00,2008-06-26 05:00:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up 13 5/8"" TH with handling tool. Cut, stripped and prepared control lines for pulling through TH.",1.0 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 05:00:00+00:00,2008-06-26 09:00:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed fittings on control lines and pulled control lines through TH. Made up fittings on control lines on bottom/top of TH. Unable to get good test on TH penetration fittings.,4.0 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 09:00:00+00:00,2008-06-26 14:30:00+00:00,2596.0,m,fixed,interruption -- repair,ok,equipment failure,Found leakage across fittings for DHSV. Made several attempts to fix fitting with locktite - negative. Took out DHSV control line. Removed fittings and installed new ones. Applied lock tite to fitting threads.,5.5 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 14:30:00+00:00,2008-06-26 15:15:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Allowed locktite thread compound to harden prior to pressure test.,0.75 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 15:15:00+00:00,2008-06-26 16:15:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested TH fittings to 35 / 345 bar 5 / 10 min - ok.,1.0 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 16:15:00+00:00,2008-06-26 16:30:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed C-plate. Landed TH in C-plate.,0.25 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 16:30:00+00:00,2008-06-26 16:45:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Broke off TH handling tool and laid down same.,0.25 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 16:45:00+00:00,2008-06-26 18:00:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Wrapped control lines around tubing hanger neck. Installed communication collar and teminated 3 ea hydraulic lines in same. Changed to 5 1/2"" inserts in BX elevator.",1.25 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 18:00:00+00:00,2008-06-26 19:30:00+00:00,2596.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up TH landing stand. Made up THRT to TH with 9 counterclockwise turns using chain tongs. Made up control lines for chemical injection, ASV and DHSV to THRT. Pressure tested DHSV/ASV control lines. Made up control lines for THRT activation.",1.5 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 19:30:00+00:00,2008-06-26 20:45:00+00:00,2613.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed C-plate and masterbushing. Ran TH/THRT through rotary. Installed masterbushing. Positioned stinger at 2613 m MD approx 3 m above PBR at 2615,4 m. Made up cement hose to side entry on landing string. Marked tubing with TH landing point.",1.25 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 20:45:00+00:00,2008-06-26 21:15:00+00:00,2613.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up for pumping baseoil down tubing taking returns to pits. Checked out alarm on mud pump liner spray.,0.5 +15_9_F_14_2008_06_27.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-26T00:00:00+02:00,2008-06-27T00:00:00+02:00,2008-06-26 21:15:00+00:00,2008-06-26 22:00:00+00:00,2613.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pumped baseoil in to tubing at 200 lpm to obtain underbalance in well.,0.75 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-26 22:00:00+00:00,2008-06-26 23:00:00+00:00,2613.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pumped baseoil in to tubing at 200 lpm to obtain underbalance in well. Pressure increased from 0,5 bar to 6,9 bar during displacement. Pumped a total of 10 m3. Took up/down weight 170/150 MT.",1.0 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-26 23:00:00+00:00,2008-06-27 00:30:00+00:00,2613.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ran in and attempted to land TH in wellhead. Unable to enter PBR at 2615,4 m MD. Picked up and attempted several (12) times to enter PBR - negative. Set down max 7 MT. At last attempt, observed that string moved incrementallly (2-3 cm) for each time weight was set down. Discussed situation - meanwhile maintained ~5 MT downweight. Observed sudden drop in applied weight - stinger free to move downwards. Drained riser. Landed tubing hanger at correct datum mark. Observed pressure buliding up from 6 bar to 11 bar indicating sealstem travel.",1.5 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 00:30:00+00:00,2008-06-27 01:15:00+00:00,2620.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Tested tubing hanger through port#1 and #2 in multibowl, 35 bar / 5 min - ok. Pressured up TH function line to enagage tubing hanger lock ring. Performed overpull test to 185 MT, i.e. 15 MT above last upweight. Lined up cement unit and performed line test against closed lo-torque valve on landing stand, 345 bar / 5 min - ok.",0.75 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 01:15:00+00:00,2008-06-27 01:30:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,Pressure tested tubing/sealstem to 50 bar / 5 min - ok. Volume pumped 149 liter.,0.25 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 01:30:00+00:00,2008-06-27 01:45:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,Closed DHSV and bled off pressure above to ~3 bar. Bled back 30 liter. Held inflow test for 10 min - ok. Equalized across DHSV and opened same. Volume pumped 50 liter.,0.25 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 01:45:00+00:00,2008-06-27 02:30:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Pressured up to 345 bar at 120 lpm to set production packer and test tubing. Held test for 25 min - improving trend last 15 min (5 min 1,3 bar => 5 min 0,7 bar => 5 min 0,5 bar) - ok. Pumped a total of 1088 liter. Packer installed at 2598 mMDRT.",0.75 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 02:30:00+00:00,2008-06-27 03:00:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Bled down tubing pressure to 280 bar, bled back volume 180 liter. Closed DHSV and bled off pressure above to 156 bar, bled back volume 90 liter. Not able to adjust the choke to the intended 210 bar. Inflow tested DHSV to 125 bar differential. Held test for 15 min - increased 0,2 bar last 5 min with improving trend - ok.",0.5 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 03:00:00+00:00,2008-06-27 04:00:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Bled down tubing pressure from 156 bar to 10 bar to put 270 bar differential across the DHSV. Bled back 100 liter. Held inflow test for 30 min - test improving by time, last 5 min 0,02 bar increase. Equalised pressure (280 bar) accross DHSV and opened same. Pumped 190 liter. Bled back pressure on tubing to line up for pressure testing annulus. Total bled back volume 940 liter.",1.0 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 04:00:00+00:00,2008-06-27 05:00:00+00:00,3620.0,m,fixed,completion -- test scsssv,ok,success,Lined up to maintain pressure on string while pressuring up tubng x casing annulus. Rigged down kill hose from F-12 and attached to hose on F-14 A-annulus. Pressured up to 100 bar on tubing.,1.0 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 05:00:00+00:00,2008-06-27 05:30:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Lined up cement unit and performed line test against closed lo-torque on A-annulus, 35/345 bar 5/10 min - ok.",0.5 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 05:30:00+00:00,2008-06-27 06:45:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Pressured up to 330 bar on A-annulus to set FLX packer and test production packer from above. maintained pressrue on tubing >100 bar. Held pressure for 15 min / 0,2 bar drop - ok. Total volume pumped 1107 liter. Vented B-annulus while performing test.",1.25 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 06:45:00+00:00,2008-06-27 07:15:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Bled down pressure on A-annulus to 270 bar, bled back 60 liters. Closed ASV and bled off pressure above to 200 bar to put 70 bar differential across ASV, bled back 160 liters. Inflow tested ASV for 15 mins - ok.",0.5 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 07:15:00+00:00,2008-06-27 08:00:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Bled down pressure above ASV to 10 bar to put 260 bar differential across ASV, bled back 160 liters. Maintained ~90 bar in tubing. Inflow tested ASV for 30 mins - ok.",0.75 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 08:00:00+00:00,2008-06-27 09:15:00+00:00,2620.0,m,fixed,completion -- test scsssv,ok,success,"Equlized accross ASV by pressuring up on A-annulus to 270 bar, pumped 220 liters. Bled off annulus pressure to zero. Bled off pressure on tubing from 90 bar to zero.",1.25 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 09:15:00+00:00,2008-06-27 10:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Disconnected cement hose from cement manifold. Released THRT by 9 clokwise turn and picked up 1 m. Secured cement hose on landing string.,0.75 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 10:00:00+00:00,2008-06-27 10:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Displaced landing string and riser to seawater pumping 15 m3 at 2000 lpm. Rigged down cement line. POOH with THRT and detached control lines from same.,0.75 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 10:45:00+00:00,2008-06-27 12:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Broke THRT from landing string. Broke landing string and laid down 2 x pup and 1 full joint.,1.5 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 12:15:00+00:00,2008-06-27 14:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Rig down and removed tubing running equipment, sheaves and reels from drillfloor.",2.0 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 14:15:00+00:00,2008-06-27 15:15:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Made up BPV setting tool. RIH with BPV and set same at 20,4 m MD according to Vetco instructions. POOH with BPV setting tool and laid down same.",1.0 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 15:15:00+00:00,2008-06-27 17:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"RIH with 5 1/2"" DP stand to 19,5 m MD. Attached air hose fitting to 1502 hub on standpipe. Displaced riser to air.",1.75 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 17:00:00+00:00,2008-06-27 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held handover meeitng / toolbox prior to nippling down diverter, BOP and riser.",0.5 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 17:30:00+00:00,2008-06-27 18:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out tubing single and 2 x pups form landing string. Undid nuts on slick joint.,0.75 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 18:15:00+00:00,2008-06-27 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed master bushing and outer ring from rotary.,0.5 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 18:45:00+00:00,2008-06-27 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Changed to 5"" inserts in elevator to accommodate conductor housing pulling tool. Released mechanical seals on overshot.",1.25 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 20:00:00+00:00,2008-06-27 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed 10"" split inserts in diverter. Picked up diverter release tool. Not able to engage and release diverter.",1.0 +15_9_F_14_2008_06_28.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-27T00:00:00+02:00,2008-06-28T00:00:00+02:00,2008-06-27 21:00:00+00:00,2008-06-27 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Attempted several times to engage and release diverter - negative. Laid down diverter release tool.,1.0 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-27 22:00:00+00:00,2008-06-27 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed elevator and attached slings to bails. Pulled diverter using slings and set back same.,1.0 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-27 23:00:00+00:00,2008-06-28 00:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled overshot joint using slings. Installed outer ring and masterbushing.,1.0 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 00:00:00+00:00,2008-06-28 01:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Dismanteled BOP tension cylinder and pulled aside. Racked back overshot joint. Cleared drillfloor for pulling BOP riser joint.,1.25 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 01:15:00+00:00,2008-06-28 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Disconnected NT-2 on BOP. Installed cradle in HTS. Installed slings for pulling riser BOP riser joint.,1.75 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 03:00:00+00:00,2008-06-28 03:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Skidded BOP to stb storage. Attached 2 ea 10 MT slings to BOP riser joint padeyes.,0.5 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 03:30:00+00:00,2008-06-28 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Disconnected BOP riser joint NT-2 on wellhead. Removed scaffolding on weather deck.,0.5 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 04:00:00+00:00,2008-06-28 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed scaffloding on weather deck. Removed split hatches in weather deck. Removed masterbushing. Confirmed well F-4 shut in with no pressure. Picked up riser and drained out seawater inside.,1.0 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 05:00:00+00:00,2008-06-28 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to pulling riser.,0.25 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 05:15:00+00:00,2008-06-28 05:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Pulled BOP riser through wellhead moudule, moonpool and rotary. Laid out riser on HTS cradle.",0.5 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 05:45:00+00:00,2008-06-28 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed and secured hatch on weather deck. Installed dart in BPV.,0.25 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 06:00:00+00:00,2008-06-28 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed communication collar and unwrapped control lines as required. Fitted graphoil seals and fed control lines through dedicated ports in wellhead. Made up external fittings on control lines to energize graphoil seals. Installed VG137 seal on multibowl and VG63 seal on top of tubing hanger. Filled void with hydraulic oil. Meanwhile cleaned and tidied wellhead and prepared for lifting down XMT spool.,4.0 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 10:00:00+00:00,2008-06-28 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Transferred and installed XMT spool on wellhead according to Vetco instructions. Made up NT-2 connector. Energized BT seal pumping plastic sealant through port #7/#8 (up to 5000 psi). Tested VG63 seal by applying 500 psi through port #9/#10. Tested TH void through test port #5/#6 to 345 bar / 15 min - ok. + +Meanwhile attached slings onto TDS bails for lifting XMT.",4.0 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 14:00:00+00:00,2008-06-28 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up XMT with port overhead crane in moonpool and landed XMT on Weatherdeck. Transferred XMT to slings from drillfloor. Backed up lift sideways using 6 T moonpool tugger.,1.25 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 15:15:00+00:00,2008-06-28 16:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed F-9 hatch and beam for passing through XMT.,0.75 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 16:00:00+00:00,2008-06-28 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lifted XMT though weather deck and placed onto spool pice on XMT deck. Orientated tree according to instructions from Vecto/production dept. Made up Graylock connection.,2.0 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 18:00:00+00:00,2008-06-28 20:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed hatches on weatherdeck. Pressure tested seal ring between spool and XMT to 35 bar / 10 min through test ports #3 and #4. Installed teflon seal rings and made up exit blocks for hydraulic lines.,2.5 +15_9_F_14_2008_06_29.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-28T00:00:00+02:00,2008-06-29T00:00:00+02:00,2008-06-28 20:30:00+00:00,2008-06-28 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed exit block for DHPG control ine. Had problems with broken allen bolt, installed new bolt. Tested exit block to 10000 psi according to WD procedure - not able to get good test. Discussed situation - test in SH procedure specified 5000 psi test. Re-tested exit block to 5000 psi, but still not able to get good test. Broke off exit block and removed excess paint from WH and exit block. Polished exit block seal surface. Installed exit block, hooked up Vetco pump with recorder and tested exit block to 500/5000 psi 5/10 min -ok. + +Meanwhile pulled and laid down diverter.",1.5 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-28 22:00:00+00:00,2008-06-29 00:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Spliced DHPG cable. Made up DHPG wellhead outlet to exit block according to WD procedure. Pressure tested wellhead outlet - negative. Observed leakage around threads between wellhead outlet and exit block. Dismanteled wellhead outlet and found damage on primary metal seal around threads. Discussed situation. Decided to go ahead with XMT hook up activities. + +Meanwhile serviced TDS.",2.0 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 00:00:00+00:00,2008-06-29 01:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed flow spool on XMT with tugger support from drillfloor according to instructions from production.,1.5 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 01:30:00+00:00,2008-06-29 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up XMT flow spool with hy-torq kit. Worked to hook up coflex hose to wellhead module production hub. Used slings, chainhoists and eagle clamps as required to support/jack coflex hose. + +Meanwhile hung off travelling block for 6 month maintenance of crown block.",2.5 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 04:00:00+00:00,2008-06-29 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Hooked up coflex hose to hub in wellhead module. Made up clamp with Hy-torq kit.,2.5 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 06:30:00+00:00,2008-06-29 07:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed hatches and transferred flowline support bracket to XMT deck. Installed hatches,0.75 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 07:15:00+00:00,2008-06-29 08:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed DHPG wellhead outlet. Cut and reterminated DHPG conductor. Replaced seals and re-installed DHPG wellhead outlet according to WD procedure. Tested wellhead outlet through exit block to 345 bar / 10 min - ok. Hooked up DHPG to wellhead junction box. Found that flow spool on XMT had wrong allignement.,1.5 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 08:45:00+00:00,2008-06-29 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Broke bolts on flowline spool. Re-alligned flowline spool.,1.75 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 10:30:00+00:00,2008-06-29 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed flowline hub support bracket on XMT. Found that it was the wrong bracket, even though it was marked F-14.",1.0 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 11:30:00+00:00,2008-06-29 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Reverted to testing hydraulic control lines. Hooked up BOT pump. Tested DHSV line and exit block to 570 bar / 15 min - ok. Tested ASV line and exit block to 570 bar / 15 min - ok.,3.75 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 15:15:00+00:00,2008-06-29 16:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed chain hoists and slings from flowlines and repalced with 5 MT chainhoists and slings.,1.0 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 16:15:00+00:00,2008-06-29 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed wellhead bracket from XMT and put on weatherdeck. Meanwhile cut bolt holes in F-14 support bracket in mechanical workshop.,1.75 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 18:00:00+00:00,2008-06-29 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged chainblocks and slings in moonpool for supporting tugger when pulling in coflex flowline Made up bolts on flow spool with Hy-torq kit.,2.0 +15_9_F_14_2008_06_30.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-29T00:00:00+02:00,2008-06-30T00:00:00+02:00,2008-06-29 20:00:00+00:00,2008-06-29 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled/jacked coflex flowline hose using chain hoists, slings and tugger from drillfloor. Brought modified support bracket to XMT deck. Installled support bracket on XMT. + +Meanwhile serviced fwd PRS.",2.0 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-29 22:00:00+00:00,2008-06-29 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Jacked coflex flowline hub in place and made up graylock clamp with handtools.,1.0 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-29 23:00:00+00:00,2008-06-30 02:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up bolts on graylock clamp with Hy-torq kit. Attmepted to fit support bracket shoe/clamp - observed to narrow angle/gap between support bracket and shoe/clamp. Discussed situation- decided to continue operation as modification of the shoe/clamp would be needed. Suspended flowline in 2 ea 5 MT slings/chainhoists. Removed tugger from flowline. Removed kill line on F-12 and moved to F-14. Flushed packer fluid from cement unit and displaced line to drillwater. Pulled hydraulic line from well control panel to XMT deck. Installed hatches and cover. + +Meanwhile serviced TDS and drawworks.",3.0 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 02:00:00+00:00,2008-06-30 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held toolbox talk prior to XMT bodytest and filling coflex flowline. Lined up cement unit. Performed line test against closed kill wing valve 30/345 bar 5 /10 min - ok. Opened kill wing valve, hydraulic master valve and manual master valve. Vented flowline on flow spool. Performed body test of XMT to 30/345 bar 5/10 min - ok. Lined up for filling coflex flowline from cement unit.",2.0 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 04:00:00+00:00,2008-06-30 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up for filling coflex flowline. Filled coflex flowline with drillwater pumping from cement unit via KWV and HWV on XMT.,1.0 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 05:00:00+00:00,2008-06-30 05:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held handover meeting / toolbox. Prepared for pulling dart and BPV.,0.5 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 05:30:00+00:00,2008-06-30 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Made up BPV retrieval rod. Pulled BPV and dart.,0.5 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 06:00:00+00:00,2008-06-30 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Transferred Well Dynamics pump to wellhead. Ran DHSV control hose from hydraulic panel in moonpool.,0.5 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 06:30:00+00:00,2008-06-30 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed line test agains KWV to 30 bar / 5 min - ok. Attempted to test coflex flowline to 99 bar. Pressured up on cement unit. Walked lines and observed leakage in production manifold system. + +Meanwhile prepared for running WL.",2.0 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 08:30:00+00:00,2008-06-30 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Attached hydrualic control hoses from well control panel to DHSV exit block and HMV actuator. Made up WD chemical injection manifold on wellhead. Re-arranged WD test pump and hooked up to checmical injection mainfold. Opened KWV and HMV from local control panel. + +Meanwhile prepared for running WL.",3.0 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 11:30:00+00:00,2008-06-30 12:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressured up tubing to 35 bar and opened DHSV. Continued to pressure up on tubing to 220 bar / (750 liters). Closed LMV and bled off pressure above to 5 bar. Observed inflow test for 10 min - ok. Pressured up chemical injection line while maintaining pressure on tubing - held test for 10 min - ok. Equalize across LMV and opened same. + +Meanwhile prepared for running WL.",1.25 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 12:45:00+00:00,2008-06-30 13:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Closed HMV and bled off pressure above to 5 bar. Inflow tested HMV for 10 min - ok.,0.25 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 13:00:00+00:00,2008-06-30 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Bled of tubing pressure while maintaining pressure on chemical injection line. Observed rupture disc shearing at 70 bar tubing pressure. Chemical injection line pressure stabilized at ~50 bar. Pressured up on tubing to 100 bar to confirm checmical injection check valve holding - ok.,0.5 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 13:30:00+00:00,2008-06-30 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Closed KWV, SHV and HMV. Rigged down testing equipment.",0.25 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 13:45:00+00:00,2008-06-30 14:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed XMT cap.,0.5 +15_9_F_14_2008_07_01.xml,NO 15/9-F-14,NO 15/9-F-14,2008-06-30T00:00:00+02:00,2008-07-01T00:00:00+02:00,2008-06-30 14:15:00+00:00,2008-06-30 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. + +Meanwhile prepared for running WL : +-Re-arranged toolcatcher +-Bulit grease injection +-Built cable head +-Checked and tested equipment",7.75 +15_9_F_14_2008_07_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-01T00:00:00+02:00,2008-07-02T00:00:00+02:00,2008-06-30 22:00:00+00:00,2008-07-01 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Comissioned XMT. Tested coflex hose 100 bar / 15 min - test approved by production. + +Meanwhile prepared for running WL : +-Changed IBOP on TDS +-Performed service on drawwork +-Cleaned and tidied drillfloor +-Removed support bracket from flowline for modifications +-Checked and tested equipment +-Made up lubricator sections on cantilever +-Spotted grease injection skid and well control skid on drillfloor",6.0 +15_9_F_14_2008_07_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-01T00:00:00+02:00,2008-07-02T00:00:00+02:00,2008-07-01 04:00:00+00:00,2008-07-01 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. + +Meanwhile : +-Dismantled IBOPs +-Maintenance on diverter +-Mounted and commissioned manrider on drillfloor +-Cleaned lower shakers +-Performed derrick inspection",6.0 +15_9_F_14_2008_07_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-01T00:00:00+02:00,2008-07-02T00:00:00+02:00,2008-07-01 10:00:00+00:00,2008-07-01 11:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. + +Meanwhile : +-Installed WL riser spool / x-over on XMT. +-Installed WL BOP's +-Fitted hole cover around WL riser spool on weatherdeck",1.0 +15_9_F_14_2008_07_02.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-01T00:00:00+02:00,2008-07-02T00:00:00+02:00,2008-07-01 11:00:00+00:00,2008-07-01 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. + +Meanwhile : +-Mounted IBOPs +-Prepared for running WL +-Cleaned in drilling areas",11.0 +15_9_F_14_2008_07_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-02T00:00:00+02:00,2008-07-03T00:00:00+02:00,2008-07-01 22:00:00+00:00,2008-07-02 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. + +Meanwhile : +-Tested IBOP.s to 30345 bar 5/10 min - ok +-Spotted WL BOP control unit +-Built sacffolding around WL BOPs in moonpool +-Hooked up and functioned WL BOPs +-Ran WL riser and connected to WL BOPs +-Tested/checked WL logging tools and WL tractor +-Rigged lo-torques and check valve on F-14 XMT",6.0 +15_9_F_14_2008_07_03.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-02T00:00:00+02:00,2008-07-03T00:00:00+02:00,2008-07-02 04:00:00+00:00,2008-07-02 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. + +Meanwhile : +-Cleaned drillfloor +-Maintenance on diverter +-Tidied in moonpool and wellhead module +-Cleaned sackstore, pumproom and lower shakers +-Rigged slings for WL sheaves",18.0 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-02 22:00:00+00:00,2008-07-03 00:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Commissioned XMT. + +Meanwhile : +-Cleaned drillfloor +-Maintenance on diverter",2.75 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 00:45:00+00:00,2008-07-03 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk prior to pressure testing WL rig up.,0.25 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 01:00:00+00:00,2008-07-03 01:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lined up cement unit. Performed line test against KWV on XMT 30/345 bar 5/10 min - ok. Bled off pressure in line to cement unit. Bled off pressure in XMT to closed drain.,0.5 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 01:30:00+00:00,2008-07-03 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Hooked up local control on XMT. Removed hydraulic tube from HMV and drained hydraulic fluid. Hooked up and tested DHSV control hose to hose on XMT, tested to 520 bar / 10 min - ok. Hooked up HMV control hose and valve block. Had problems with leaking fitting on instrument valve block on HMV control hose. Reterminated fitting and tested hose 207 bar / 15 min - ok.",2.5 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 04:00:00+00:00,2008-07-03 06:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested rig up to rig floor to 30/185 bar 5/10 min using cmt pump and packer fluid. Ok. Bled off pressure to zero. Meanwhile held tool box talk for PU WL lubricator.,2.0 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 06:00:00+00:00,2008-07-03 09:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Lifted in pre-made lubricator assembly from cantiliver to rig floor using crane and conveyer belt. Lifted lubricator vertically using T-bar in TDS and lifting slings. RU Welltech WL-tractor assembly in lower riser and GR-CCL, shock absorber and cable head in upper riser. MU entire toolstring and lifted into toolcatcher. MU lubricator to lower riser.",3.75 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 09:45:00+00:00,2008-07-03 10:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened SV (43 turns) and filled riser and lubricator with packer fluid using cmt pump. Meanwhile hoisted down bracket from XMT,0.5 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 10:15:00+00:00,2008-07-03 11:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested rig up to 30/185 bar 5/10 min using cmt pump and packer fluid. Ok.,1.25 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 11:30:00+00:00,2008-07-03 13:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Drained riser and flushed lines from cmt unit to closed drain with MEG.,2.25 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 13:45:00+00:00,2008-07-03 14:45:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Worked to free WL toolstring from toolcatcher.,1.0 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 14:45:00+00:00,2008-07-03 16:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Filled riser with 200 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure.,1.25 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 16:00:00+00:00,2008-07-03 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Filled riser/lubricator with 180 ltrs of 100% MEG using cmt unit. Leak tested in-situ sub to 30/185 bar 5/10 min using Seawell pumpe and 100% MEG. Ok.,1.0 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 17:00:00+00:00,2008-07-03 17:45:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,Open HMV and SV (43 turns). Equalized and opened DHSV. RIH with BHA #1 to perforate interval #1 from surface to 250 m. Powered up logging unit with guns 70 m below seabed.,0.75 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 17:45:00+00:00,2008-07-03 21:15:00+00:00,3081.5,m,wire line,workover -- wire line,ok,success,"RIH with BHA #1 from 250 to 3081,5 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open. Up weigh 480kg / hanging weight 466 kg at 493 m MDRT. Weights while RIH was according to tension simulations. Correlated and adjusted depth by 1 m before starting tractor.",3.5 +15_9_F_14_2008_07_04.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-03T00:00:00+02:00,2008-07-04T00:00:00+02:00,2008-07-03 21:15:00+00:00,2008-07-03 22:00:00+00:00,3400.0,m,wire line,workover -- wire line,ok,success,"Powered up WL tractor and continued RIH with BHA #1 to perforate interval #1 from 3081,5 to 3400 m. Running speed 12 m/min.",0.75 +15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-03 22:00:00+00:00,2008-07-03 22:45:00+00:00,3400.0,m,wire line,workover -- perforate,ok,success,Performed correlation log from 3400 m to 3200 m. Powered up WL tractor and ran back down to 3400 m. Schlumberger tools would not operate properly.,0.75 +15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-03 22:45:00+00:00,2008-07-04 04:00:00+00:00,3400.0,m,wire line,interruption -- other,ok,equipment failure,"Trouble shoot power problem with downhole tools. Could not operate GR and switches, but were able to operate WL tractor. Attempted to locate error in surface system.",5.25 +15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-04 04:00:00+00:00,2008-07-04 06:30:00+00:00,3400.0,m,wire line,interruption -- other,ok,equipment failure,"Continued to trouble shoot power problem with downhole tools. Could not operate GR and switches, but were able to operate WL tractor.",2.5 +15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-04 06:30:00+00:00,2008-07-04 09:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,"POOH with BHA #1 from 3400 m to 250 m. Powered down logging unit with guns 70 m below seabed. Closed DHSV, HMV and SV. Broke lubricator at in-situ sub and LD toolstring.",3.0 +15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-04 09:30:00+00:00,2008-07-04 15:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Continiued to trouble shoot power problem with toolstring. Had same problem with tools at surface. Found lower part of Welltec tractor drained for hydraulic oil. This may have affected tools below because the power situation in the toolstring was altered.,6.0 +15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-04 15:30:00+00:00,2008-07-04 17:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,"MU and installed BHA #2 to perforate #1 with back-up WL tractor, back-up GR tool (non-modified PGGT) and changed out Schlumberger switches. Unable to move toolstring due to power shut down on WL winch.",2.0 +15_9_F_14_2008_07_05.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-04T00:00:00+02:00,2008-07-05T00:00:00+02:00,2008-07-04 17:30:00+00:00,2008-07-04 22:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Made and installed new re-set handle for WL winch 380 V power supply. Trouble shoot problem with power supply.,4.5 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-04 22:00:00+00:00,2008-07-04 23:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Continued trouble shooting problem with power supply and found loose rele. Fastened rele and installed ex-cover on WL winch.,1.5 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-04 23:30:00+00:00,2008-07-05 00:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Filled riser with 200 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure.,1.0 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 00:30:00+00:00,2008-07-05 02:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Leak tested in-situ sub to 30/185 bar 5/10 min using Seawell pumpe and 100% MEG. Ok. Bled down grease pressure and filled riser/lubricator with 253 ltrs of 100% MEG using cmt unit. Unable to start RIH with BHA #1 due to power shut down on WL winch.,2.0 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 02:30:00+00:00,2008-07-05 04:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Trouble shoot problem with power supply on WL winch.,1.5 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 04:00:00+00:00,2008-07-05 05:00:00+00:00,233.0,m,wire line,interruption -- other,ok,equipment failure,Open HMV and SV (43 turns). Equalized and opened DHSV. RIH with BHA #2 to perforate interval #1 from surface to 233 m. Powered up logging unit with guns 70 m below seabed.,1.0 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 05:00:00+00:00,2008-07-05 08:00:00+00:00,3122.0,m,wire line,interruption -- other,ok,equipment failure,RIH with BHA #2 from 233 to 3122 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open. Up weigh 480kg / hanging weight 466 kg at 493 m MDRT. Weights while RIH was according to tension simulations. Correlated and adjusted depth by 1 m before starting tractor.,3.0 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 08:00:00+00:00,2008-07-05 08:45:00+00:00,3400.0,m,wire line,interruption -- other,ok,equipment failure,Powered up WL tractor and continued RIH with BHA #2 to perforate interval #1 from 3122 to 3400 m. Running speed 12 m/min.,0.75 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 08:45:00+00:00,2008-07-05 09:30:00+00:00,3400.0,m,wire line,interruption -- other,ok,equipment failure,Performed correlation log from 3400 m to 3200 m using GR. Powered up WL tractor and ran back down to 3400 m.,0.75 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 09:30:00+00:00,2008-07-05 09:45:00+00:00,3358.0,m,wire line,workover -- perforate,ok,success,"Fired guns and perforated interval #1, from 3345 - 3354.2 m MDRT. Good indication of firing on DHPG.",0.25 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 09:45:00+00:00,2008-07-05 11:15:00+00:00,2560.0,m,wire line,workover -- wire line,ok,success,Performed GR-CCL log from 3266 m to 2450 m MDRT.,1.5 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 11:15:00+00:00,2008-07-05 13:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #1 from 2450 m to 250 m. Powered down logging unit with guns 70 m below seabed. Closed HMV and SV.,1.75 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 13:00:00+00:00,2008-07-05 15:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator at in-situ sub and LD toolstring.,2.25 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 15:15:00+00:00,2008-07-05 16:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened KWV and HMV and attempted to bullehead baseoil using cmt unit. Stopped when pressure reached 100 bar at 80 lpm. 2.9 m3 baseoil pumped in total. + +Meanwhile performed surface checks on Wellteck tractor and removed PGGT and chock absorber from toolstring.",0.75 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 16:00:00+00:00,2008-07-05 18:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued to perform surface checks on Welltech tractor. Lost contact with Schlumberger logging unit. Meanwhile held time-out for safety with drill crew with focus on the dropped object.,2.0 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 18:00:00+00:00,2008-07-05 19:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Schlumberger unit experienced power shut down and had to restart all systems.,1.0 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 19:00:00+00:00,2008-07-05 20:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Went through Schlumberger and Welltech checklists. Checked CCL and gun switches.,1.0 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 20:00:00+00:00,2008-07-05 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,MU and installed BHA #3 to perforate interval #2.,1.0 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 21:00:00+00:00,2008-07-05 21:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Filled riser with 200 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure.,0.75 +15_9_F_14_2008_07_06.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-05T00:00:00+02:00,2008-07-06T00:00:00+02:00,2008-07-05 21:45:00+00:00,2008-07-05 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pumpe and 100% MEG. Ok.,0.25 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-05 22:00:00+00:00,2008-07-05 22:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled down grease pressure and filled riser/lubricator with 250 ltrs of baseoil using cmt unit.,0.25 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-05 22:15:00+00:00,2008-07-05 22:45:00+00:00,236.0,m,wire line,workover -- wire line,ok,success,Open HMV and SV (43 turns). Equalized and opened DHSV. RIH with BHA #3 to perforate interval #2 from surface to 236 m. Powered up logging unit with guns 70 m below seabed.,0.5 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-05 22:45:00+00:00,2008-07-06 01:45:00+00:00,3120.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #3 from 236 to 3157 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open. Up weigh 480kg / hanging weight 465 kg at 493 m MDRT. Weights while RIH was according to tension simulations. Correlated and adjusted depth by 1 m before starting tractor.,3.0 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 01:45:00+00:00,2008-07-06 02:15:00+00:00,3400.0,m,wire line,workover -- wire line,ok,success,Powered up WL tractor and continued RIH with BHA #3 to perforate interval #2 from 3157 to 3400 m. Running speed 12 m/min.,0.5 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 02:15:00+00:00,2008-07-06 04:00:00+00:00,3400.0,m,wire line,workover -- perforate,ok,success,"Performed correlation log from 3400 m to 2975 m using CCL. Powered up WL tractor and ran back down to 3400 m. Fired guns and perforated interval #2, from 3312 - 3321.2 m MDRT. Good indication of firing on DHPG.",1.75 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 04:00:00+00:00,2008-07-06 06:45:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,"POOH with BHA #3 from 3309.7 m to 250 m. Powered down logging unit with guns 70 m below seabed. Closed DHSV, HMV and SV.",2.75 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 06:45:00+00:00,2008-07-06 07:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator at in-situ sub and LD toolstring.,1.0 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 07:45:00+00:00,2008-07-06 09:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened KWV and HMV and bullheaded 17.2 m3 baseoil at 137 lpm / 99.6 bar using cmt unit. Shut down pumps and observed pressure levelled out at 19 bar. Closed HMV. Bled down pressure above and inflow tested HMV. Ok. + +Meanwhile performed torture test on logging cable. Cut off 60 m of cable and rebuilt cable head.",2.0 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 09:45:00+00:00,2008-07-06 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued building cable head and performed surface checks on Wellteck tractor.,2.25 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 12:00:00+00:00,2008-07-06 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued to perform surface checks on Welltech tractor. Went through Schlumberger and Welltech checklists. + +Meanwhile installed test cap on lubricator. Opened KWV and pumped up to 19 bar above HMV using baseoil and cmt unit. Tested SV to 19 bar / 5 min. Opened HMV and read 19 bar WHP, 255 bar on DHPG. + +Displaced cmt line to 100% MEG at 50 lpm / 49 bar and got a final WHP of 20 bar. Closed HMV and bled off pressure to 5 bar above. Inflow tested HMV for 10 min. Ok. Bled off pressure above HMV and closed KWV and LT2.",1.5 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 13:30:00+00:00,2008-07-06 14:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued to go through Schlumberger and Welltech checklists. Checked CCL and gun switches.,1.25 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 14:45:00+00:00,2008-07-06 16:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed BHA #4 to perforate interval #3. Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Filled riser with 200 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure.,1.75 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 16:30:00+00:00,2008-07-06 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pumpe and 100% MEG. Ok. Bled down grease pressure and filled riser/lubricator with 250 ltrs of 100% MEG using cmt unit.,0.5 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 17:00:00+00:00,2008-07-06 17:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed time-out for safety with focus on dropped object. Pressured up to 20 bar and equalized pressure above HMV.Open HMV and SV (43 turns). Equalized and opened DHSV. RIH with BHA #4 to perforate interval #3 from surface to 235 m. Powered down logging unit with guns 70 m below seabed.,0.75 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 17:45:00+00:00,2008-07-06 19:45:00+00:00,2500.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #4 from 235 to 2500 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open. Weights while RIH was according to tension simulations. Schlumberger was unable to communicate with gun switches.,2.0 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 19:45:00+00:00,2008-07-06 21:30:00+00:00,1500.0,m,wire line,interruption -- other,ok,equipment failure,"Trouble shoot problem with gun switches. POOH with BHA #4 from 2500 m to 1500 m and re-tried to communicate with the switches, because they worked at this depth while RIH. Negative.",1.75 +15_9_F_14_2008_07_07.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-06T00:00:00+02:00,2008-07-07T00:00:00+02:00,2008-07-06 21:30:00+00:00,2008-07-06 22:00:00+00:00,250.0,m,wire line,interruption -- other,ok,equipment failure,POOH with BHA #4 from 1500 m to 250 m. Powered down logging unit with guns 70 m below seabed.,0.5 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-06 22:00:00+00:00,2008-07-06 22:30:00+00:00,86.0,m,wire line,interruption -- other,ok,equipment failure,Continued to POOH with BHA #4 from 250 m to 86 m. Unable to move toolstring due to power shut down on WL winch.,0.5 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-06 22:30:00+00:00,2008-07-06 23:15:00+00:00,86.0,m,wire line,interruption -- other,ok,equipment failure,Electrican opened ex-panel and re-sat main switch.,0.75 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-06 23:15:00+00:00,2008-07-06 23:30:00+00:00,17.0,m,wire line,interruption -- other,ok,equipment failure,Continued to POOH with BHA #4 from 86 m to 17 m. Unable to move toolstring due to power shut down on WL winch.,0.25 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-06 23:30:00+00:00,2008-07-07 00:15:00+00:00,17.0,m,wire line,interruption -- other,ok,equipment failure,Electrican opened ex-panel and re-sat level sensor.,0.75 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 00:15:00+00:00,2008-07-07 02:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Continued to POOH with BHA #4 from 17 m to OOH. Closed SV and HMV. Inflow tested HMV to 20-5 bar/10 min. Ok. Bled off pressure. Held tool box meeting prior to LO guns and tractor. Cleaned rig floor due to slipping hazard. Broke lubricator at in-situ sub and hung off gun in riser.,1.75 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 02:00:00+00:00,2008-07-07 02:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Trouble shoot problem with gun switch and found faulty switch. Changed to back-up switches. Checked toolstring with tractor and switches installed.,0.75 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 02:45:00+00:00,2008-07-07 04:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,LO guns and WL tractor. Checked WL tractor oil level.,1.25 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 04:00:00+00:00,2008-07-07 05:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Continued to perform checkes on WL tractor. Lifted WL tractor on to drill floor. +Meanwhile cleaned drillfloor.",1.5 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 05:30:00+00:00,2008-07-07 07:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,MU and installed BHA #5 to perforate interval #3. Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Drained riser and filled it with 200 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure. Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pumpe and 100% MEG. Ok.,2.0 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 07:30:00+00:00,2008-07-07 08:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Bled down grease pressure and filled riser/lubricator with 250 ltrs of 100% MEG using cmt unit. Pressured up to 20 bar and equalized above HMV.,0.5 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 08:00:00+00:00,2008-07-07 08:30:00+00:00,235.0,m,wire line,interruption -- other,ok,equipment failure,Open HMV and SV (44 turns). 19.6 bar WHP and 255 bar on DHPG. RIH with BHA #5 to perforate interval #3 from surface to 235 m. Powered up logging unit with guns 70 m below seabed.,0.5 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 08:30:00+00:00,2008-07-07 10:45:00+00:00,2500.0,m,wire line,interruption -- other,ok,equipment failure,RIH with BHA #5 from 235 to 2500 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open.,2.25 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 10:45:00+00:00,2008-07-07 11:30:00+00:00,3180.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #5 from 2500 to 3180 m. PU 50 m every 500 m due to new cable. Weights while RIH was according to tension simulations. Correlated and adjusted depth before starting tractor.,0.75 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 11:30:00+00:00,2008-07-07 12:00:00+00:00,3330.0,m,wire line,workover -- wire line,ok,success,Powered up WL tractor and continued RIH with BHA #5 to perforate interval #3 from 3180 to 3330 m. Running speed 11 m/min.,0.5 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 12:00:00+00:00,2008-07-07 13:00:00+00:00,3400.0,m,wire line,workover -- perforate,ok,success,"Performed correlation log from 3330 m to 2975 m using CCL. Had 10 min power shut-down on WL winch. Powered up WL tractor and ran back down to 3330 m. Fired guns and perforated interval #3, from 3287 - 3296.2 m MDRT. Good indication of firing on DHPG.",1.0 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 13:00:00+00:00,2008-07-07 15:30:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #5 from 3250 m to 250 m. Powered down logging unit with guns 70 m below seabed.,2.5 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 15:30:00+00:00,2008-07-07 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to POOH with BHA #5 from 250 m to OOH. Closed SV and HMV. Bled off XMT cross to 5.8 bar. Inflow tested HMV to 20-5.8 bar/10 min. Ok. Bled off pressure and drained riser. Cleaned rig floor due to slipping hazard.,1.5 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 17:00:00+00:00,2008-07-07 18:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to LO guns and tractor. Broke lubricator at in-situ sub and LD guns and toolstring.,1.25 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 18:15:00+00:00,2008-07-07 19:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting before LD lubricator. LD lubricator on drill floor and removed tool catcher for Welltec cable head.,1.25 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 19:30:00+00:00,2008-07-07 21:30:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Inspected grease head and line wiper. Found kink on return hose and missing plug for grease head. Changed out grease return system on grease head.,2.0 +15_9_F_14_2008_07_08.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-07T00:00:00+02:00,2008-07-08T00:00:00+02:00,2008-07-07 21:30:00+00:00,2008-07-07 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed tool catcher for Schlumberger cable head.,0.5 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-07 22:00:00+00:00,2008-07-07 22:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Continued to install tool catcher for Schlumberger cable head.,0.5 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-07 22:30:00+00:00,2008-07-08 02:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Built new cable head on 7/16"" cable for BHA #6. Checked CCL and toolstring. Prepared to RU lubricator. + +Meanwhile trouble shoot bleed off valve on grease skid.",3.5 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 02:00:00+00:00,2008-07-08 02:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting and PU lubricator to vertical position on rig floor. Observed incorrect installation of hoses on lubricator.,0.75 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 02:45:00+00:00,2008-07-08 03:15:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,LD lubricator and re-arranged hoses.,0.5 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 03:15:00+00:00,2008-07-08 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,PU lubricator to vertical position on rig floor. MU lubricator to lower riser.,0.75 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 04:00:00+00:00,2008-07-08 06:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Filled riser with 450 ltrs 100% MEG and pressure tested rig up to 30/185 bar 5/10 min. Ok. Broke lubricator at in-situ sub and checked CCL.,2.5 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 06:30:00+00:00,2008-07-08 08:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"MU and installed BHA #6 to perforate interval #4. Lowered orientating weight, 20 ft gun section and 30 ft gun section into lower riser section and hung off in C-plate. Filled it with 185 ltrs of Ramex. Connected and armed perforating guns according to Schlumberger procedure. Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pump and 100% MEG. Ok.",2.25 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 08:45:00+00:00,2008-07-08 09:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled down grease pressure and filled riser/lubricator with 280 ltrs of 100% MEG using cmt unit. Pressured up to 20 bar and equalized above HMV. Drain hose on lubricator parted.,0.5 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 09:15:00+00:00,2008-07-08 09:45:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,Re-united and fixed splize on drain hose on lubricator.,0.5 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 09:45:00+00:00,2008-07-08 10:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Open HMV and SV (44 turns). 22.2 bar WHP and 256 bar on DHPG. RIH with BHA #6 to perforate interval #4 from surface to 235 m. Powered up logging unit with guns 70 m below seabed.,0.5 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 10:15:00+00:00,2008-07-08 12:00:00+00:00,3100.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #6 from 235 to 3100 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open.,1.75 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 12:00:00+00:00,2008-07-08 13:00:00+00:00,3075.0,m,wire line,workover -- perforate,ok,success,"Performed correlation log from 3100 m to 2975 m using CCL. Ran back down to 3048 m. Fired guns and perforated interval #4, from 3044 - 3059.2 m MDRT. Good indication of firing on DHPG.",1.0 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 13:00:00+00:00,2008-07-08 15:00:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #6 from 3250 m to 250 m. Powered down logging unit with guns 70 m below seabed.,2.0 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 15:00:00+00:00,2008-07-08 16:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to POOH with BHA #5 from 250 m to OOH. WHP 33.7 bar and 263 bar on DHPG. Closed SV and HMV. Bled off XMT cross to 5.3 bar. Inflow tested HMV to 20-5.3 bar/10 min. Ok. Bled off pressure and flushed riser/lubricator with nitrogen. Cleaned rig floor due to slipping hazard.,1.25 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 16:15:00+00:00,2008-07-08 18:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to LO guns and tractor. Isolated gas detector on rig floor. Broke lubricator at in-situ sub and LD guns and toolstring. All shots fired.,1.75 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 18:00:00+00:00,2008-07-08 20:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Changed to backup head without rebuilding rope socket, due to ECRD weak point. Checked CCL and toolstring.",2.75 +15_9_F_14_2008_07_09.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-08T00:00:00+02:00,2008-07-09T00:00:00+02:00,2008-07-08 20:45:00+00:00,2008-07-08 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,MU and installed BHA #7 to perforate interval #5. Lowered 30 ft gun section into lower riser section and hung off in C-plate. Connected and armed perforating gun according to Schlumberger procedure.,1.25 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-08 22:00:00+00:00,2008-07-08 23:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,MU and installed BHA #7 to perforate interval #5. Lowered orientating weight and 20 ft gun section into lower riser section and hung off in C-plate. Connected and armed perforating guns according to Schlumberger procedure. Filled it with 180 ltrs of Ramex. Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pumpe and 100% MEG. Ok.,1.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-08 23:30:00+00:00,2008-07-09 00:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled down grease pressure and filled riser/lubricator with 270 ltrs of 100% MEG using cmt unit. Pressured up to 34 bar and equalized above HMV.,0.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 00:00:00+00:00,2008-07-09 00:30:00+00:00,255.0,m,wire line,workover -- wire line,ok,success,Open HMV and SV (44 turns). 42.3 bar WHP and 267 bar on DHPG. RIH with BHA #7 to perforate interval #5 from surface to 255 m. Powered up logging unit with guns 70 m below seabed.,0.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 00:30:00+00:00,2008-07-09 03:30:00+00:00,3055.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #7 from 255 to 3055 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open. Had 10 min power shut-down on WL winch. Had to use Schlumberger tension and depth system due to software problem in WL winch.,3.0 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 03:30:00+00:00,2008-07-09 04:00:00+00:00,3050.0,m,wire line,workover -- perforate,ok,success,"Performed correlation log from 3050 m to 2975 m using CCL. Ran back down to 3050 m. Adjusted brakes on WL winch. Fired guns and perforated interval #5, from 3021 - 3036.2 m MDRT. Good indications of firing.",0.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 04:00:00+00:00,2008-07-09 06:00:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #7 from 3250 m to 250 m. Powered down logging unit with guns 70 m below seabed.,2.0 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 06:00:00+00:00,2008-07-09 07:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to POOH with BHA #7 from 250 m to OOH. WHP 46.2 bar and 265 bar on DHPG. Closed SV and HMV. Bled off XMT cross to 5 bar. Inflow tested HMV to 46-5 bar/10 min. Ok. Bled off pressure and flushed riser/lubricator with nitrogen.,1.25 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 07:15:00+00:00,2008-07-09 09:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to LO guns. Broke lubricator at in-situ sub and LD guns and toolstring. All shots fired.,2.25 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 09:30:00+00:00,2008-07-09 11:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Changed to backup head without rebuilding rope socket, due to ECRD weak point. Checked CCL and toolstring.",1.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 11:00:00+00:00,2008-07-09 12:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"MU and installed BHA #8 to perforate interval #6. Lowered 30 ft gun section, orientating weight and 20 ft gun section into lower riser section and hung off in C-plate. Connected and armed perforating guns according to Schlumberger procedure. Filled it with 180 ltrs of Ramex.",1.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 12:30:00+00:00,2008-07-09 13:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled down grease pressure and filled riser/lubricator with 270 ltrs of 100% MEG using cmt unit. Pressured up to 46 bar and equalized above HMV. Leak tested in-situ sub to 30/150 bar 5/10 min using Seawell pumpe and 100% MEG. Ok.,0.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 13:00:00+00:00,2008-07-09 13:30:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,Open HMV and SV (44 turns). 50 bar WHP and 267 bar on DHPG. RIH with BHA #8 to perforate interval #6 from surface to 250 m. Powered up logging unit with guns 70 m below seabed.,0.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 13:30:00+00:00,2008-07-09 15:30:00+00:00,3040.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #8 from 250 to 3040 m. PU 50 m every 500 m due to new cable. Ran carefully through DHSV and pulled back up to confirm that it was fully open.,2.0 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 15:30:00+00:00,2008-07-09 17:15:00+00:00,3040.0,m,wire line,workover -- perforate,ok,success,"Performed correlation log from 3040 m to 2975 m using CCL. Had problems running back down to 3040 m because toolstring stopped in previous perforation interval #5, 3021-3036.2 m.",1.75 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 17:15:00+00:00,2008-07-09 17:45:00+00:00,3040.0,m,wire line,interruption -- other,ok,operation failed,Seawell failed to stop on shooting depth twice and another correlation run had to be made because the guns had become off depth in the attempts.,0.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 17:45:00+00:00,2008-07-09 18:00:00+00:00,3040.0,m,wire line,workover -- perforate,ok,success,"Fired guns and perforated interval #6, from 3005 - 3020.2 m MDRT. Good indications of firing.",0.25 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 18:00:00+00:00,2008-07-09 19:30:00+00:00,1562.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #8 from 2980 m to 1562 m. Unable to move toolstring due to power shut down on WL winch.,1.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 19:30:00+00:00,2008-07-09 20:15:00+00:00,1562.0,m,wire line,interruption -- other,ok,equipment failure,Electrican opened ex-panel and re-sat main switch.,0.75 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 20:15:00+00:00,2008-07-09 20:45:00+00:00,250.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #8 from 1562 m to 250 m. Powered down logging unit with guns 70 m below seabed.,0.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 20:45:00+00:00,2008-07-09 21:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to POOH with BHA #8 from 250 m to OOH. WHP 67.3 bar and 267 bar on DHPG.,0.5 +15_9_F_14_2008_07_10.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-09T00:00:00+02:00,2008-07-10T00:00:00+02:00,2008-07-09 21:15:00+00:00,2008-07-09 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held tool box meeting before operating valves due to new drilling- and production crews. Closed SV and HMV. Bled off XMT cross to 5 bar.,0.75 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-09 22:00:00+00:00,2008-07-10 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Inflow tested HMV to 67-5 bar/10 min. Ok. Bled off pressure. Opened KWV and equalized and opened HMV using 100% MEG and cmt unit. Closed DHSV. Bullheaded 3 m3 100% MEG followed by 6.3 m3 of basoil at 500 lpm / 77 bar. Bled off pressure above DHSV to 5 bar and inflow tested DHSV to 67-5 bar for 30 min. Ok. Bled off pressure above DHSV to zero.,3.0 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 01:00:00+00:00,2008-07-10 01:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Closed HMV. Flushed XMT, riser and lubricator with nitrogen to closed drain.",0.75 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 01:45:00+00:00,2008-07-10 03:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to LO guns. Broke lubricator at in-situ sub and LD guns and toolstring. All shots fired.,1.5 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 03:15:00+00:00,2008-07-10 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Closed all XMT valves. Cut 7/16"" cable and started to RD WL lubricator on rig floor.",0.75 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 04:00:00+00:00,2008-07-10 08:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD lubricator and WL upper risers sections.,4.0 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 08:00:00+00:00,2008-07-10 08:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed scaffolding from WL BOP and shut down F-4 injection due to need of changing actuator.,0.5 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 08:30:00+00:00,2008-07-10 10:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD WL BOP's and placed below moonpool hatch. Removed lower riser sections from XMT and lifted to rig floor.,2.0 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 10:30:00+00:00,2008-07-10 12:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed XMT tree cap. Transferred operation of HMV and DHSV from WL controlled panel to Mærsk production. Removed kill line hose and installed 1502 weco blind cap outside KWV.,1.75 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 12:15:00+00:00,2008-07-10 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed half moon hatch and lowered down actuator for F-4. Installed full hatch on F-14.,1.25 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 13:30:00+00:00,2008-07-10 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Leak tested tree cap, XMT cross and KWV cap to 35/345 bar for 5/10 min using Seawell pump and 100% MEG. Ok. Bled off pressure. + +Meanwhile removed WL BOP's from moonpool and performed skidding checks.",1.5 +15_9_F_14_2008_07_11.xml,NO 15/9-F-14,NO 15/9-F-14,2008-07-10T00:00:00+02:00,2008-07-11T00:00:00+02:00,2008-07-10 15:00:00+00:00,2008-07-10 16:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Performed well hand over activities. Verified that all valves on XMT and DHSV were closed. Meanwhile continued to remove WL equipment from rig floor. + +Handed well over to Maersk production at 18:00. ****************END OF OPERATIONS****************",1.0 +15_9_F_14_2009_03_07.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 17:30:00+00:00,2009-03-06 19:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Re-arranged hatches on weather deck.,2.0 +15_9_F_14_2009_03_07.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 19:30:00+00:00,2009-03-06 19:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk prior to skidding from F-15 to F-14.,0.25 +15_9_F_14_2009_03_07.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 19:45:00+00:00,2009-03-06 20:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed scaffoling on Weather deck and bridge from production module to cantilever.,0.75 +15_9_F_14_2009_03_07.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 20:30:00+00:00,2009-03-06 21:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Skidded rig from F-15 to F-14. Made adjustments as required to put rotary in line with F-14 XMT.,0.75 +15_9_F_14_2009_03_07.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-06T00:00:00+01:00,2009-03-07T00:00:00+01:00,2009-03-06 21:15:00+00:00,2009-03-06 23:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on handover of well F-14. + +Meanwhile : +-Landed WL riser/BOP on Weather deck hatch and secured same +-Built scaffolding/rails on Weather deck +-Performed general PMs in drilling areas +-Dismantled drilling BOP +-Re-terminated ROV umbilical",1.75 +15_9_F_14_2009_03_08.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-07T00:00:00+01:00,2009-03-08T00:00:00+01:00,2009-03-06 23:00:00+00:00,2009-03-07 05:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on handover of well F-14. + +Meanwhile : +-Performed general PMs in drilling areas +-Dismantled drilling BOP +-Re-terminated ROV umbilical +-Performed checks on WL equipment",6.0 +15_9_F_14_2009_03_08.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-07T00:00:00+01:00,2009-03-08T00:00:00+01:00,2009-03-07 05:00:00+00:00,2009-03-07 23:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on handover of well F-14. + +Meanwhile : +-Worked on choke manifold valves +-Bled of pressure on drilling BOP control system +-PM on mudpump #3 +-Changed valves XCV1/XC2 on trip tanks +-Managed DROPS punch items in derrick +-Performed general housekeeping in drillng areas",18.0 +15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-07 23:00:00+00:00,2009-03-08 05:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on handover of well F-14. + +Meanwhile : +-Dismantled drilling BOP components",6.0 +15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 05:00:00+00:00,2009-03-08 18:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on handover of well F-14. + +Meanwhile : +-Prepeared for WL operation +-Dismantled drilling BOP components",13.0 +15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 18:00:00+00:00,2009-03-08 18:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Performed toolbox for commencing WL operations.,0.5 +15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 18:30:00+00:00,2009-03-08 19:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Hooked up local control to HMV and DHSV. Shifted valve on HMV quick dump. Removed cap on KVW and rigged up bleed off line/manifold. Checked for pressure and removed treecap.,1.0 +15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 19:30:00+00:00,2009-03-08 20:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed lid on WL hatch and came down with WL riser. Adjusted WL hatch a few inches to starboard due to clash with WL riser. Landed WL riser on top of XMT and made up quick union. Hooked up BOP and tested hoses / calibrated rams (function test) - ok.,1.0 +15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 20:30:00+00:00,2009-03-08 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lined up to flush cement line. Flushed line from cement unit to XMT with MEG taking returns through closed drain.,0.5 +15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 21:00:00+00:00,2009-03-08 22:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Performed line test to 30/200 bar 5/10 min against closed KWV. Obtained test <1% drop 10 min. Bled off pressure to closed drain. Bled off pressure on production flowline and vented same for continued testing.,1.5 +15_9_F_14_2009_03_09.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-08T00:00:00+01:00,2009-03-09T00:00:00+01:00,2009-03-08 22:30:00+00:00,2009-03-08 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed cap on WL riser. Lined up and filled WL riser with MEG from cement unit. Filled riser until fluid returns through needle valve on riser cap.,0.5 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-08 23:00:00+00:00,2009-03-08 23:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed SV. Pressure tested XMT flowcross (PVW/HMV/SV) to 30/200 bar 5/10 min - ok. Bled off pressure to closed drain and closed KWV.,0.5 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-08 23:30:00+00:00,2009-03-08 23:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held toolbox talk for rigging up WL.,0.25 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-08 23:45:00+00:00,2009-03-09 01:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lifted up WL lubricator and upper sheave. Rigged up lower sheave. Connected cable head to WL tractor and pulled same into lubricator. Built PLT toolstring using tugger. Stabbed PLT toolstring into WL riser and connected to WL tractor.,2.0 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 01:45:00+00:00,2009-03-09 02:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Performed electrical checks of PLT and WL tractor according to Schlumberger/Welltech procedures.,0.75 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 02:30:00+00:00,2009-03-09 04:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Made up quick union between WL riser and lubricator. Lined up to pump from cement unit. Filled lubricator with MEG. Pressure tested WL rig up to 30/200 bar 5/10 min - ok. Bled off pressure to cement unit and inflow tested check valve in bleed off line to 200 bar differential - ok. Meanwhile held wellcontrol drill/brief and toolbox talk prior to RIH. Bled off pressure to 20 bar to closed drain. Closed KWV. Opened HMV, pressure above DHSV 0,5 bar. Opened KVW.",1.75 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 04:15:00+00:00,2009-03-09 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Pumped MEG to equalize across DHSV. Pumprate 130 l/min.,0.75 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 05:00:00+00:00,2009-03-09 05:30:00+00:00,22.0,m,wire line,workover -- rig up/down,ok,success,"Pumped MEG to equalize DSHV. Pumprate 130 lpm. Got pressure build up and pressure levelled out at 103,9 bar. Total volume pumped 6,3 m3. Equalised across SV with Seawell pump and opened same. Closed KWV and bled down pressure on line to closed drain.",0.5 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 05:30:00+00:00,2009-03-09 06:00:00+00:00,500.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT/tractor toolstring on 7/16"" EWL from 22 m to 500 m MD. Ran carfully through DHSV at 492 m MD.",0.5 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 06:00:00+00:00,2009-03-09 07:00:00+00:00,500.0,m,wire line,workover -- wire line,ok,success,Performed toolbox talk/handover meeting. Conducted well control drill.,1.0 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 07:00:00+00:00,2009-03-09 08:00:00+00:00,2543.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT/tractor toolstring on 7/16"" EWL from 500 m to 2543 m MD.",1.0 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 08:00:00+00:00,2009-03-09 08:30:00+00:00,2982.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT/tractor toolstring on 7/16"" EWL from 2543 m to 2982 m MD. Correlated depth against reference log.",0.5 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 08:30:00+00:00,2009-03-09 09:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Performed PLT calibration passes from 2840 m to 2900 m MD.,0.5 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 09:00:00+00:00,2009-03-09 09:15:00+00:00,3092.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT/tractor toolstring on 7/16"" EWL from 2900 m to 3092 m MD. Not able to progress further with out tractor.",0.25 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 09:15:00+00:00,2009-03-09 10:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"Powered up tractor and RIH with PLT/tractor toolstring on 7/16"" EWL from 3092 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 10:00:00+00:00,2009-03-09 11:00:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 3395 m to 2950 m MD. + +Took stationary PLT readings at : +3333 m MD +3304 m MD +3173 m MD +3040 m MD +2950 m MD + +No x-flow recorded.",1.0 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 11:00:00+00:00,2009-03-09 11:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3057 m MD and powerd up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3057 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 11:45:00+00:00,2009-03-09 12:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 10 m/min.,0.75 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 12:30:00+00:00,2009-03-09 13:15:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3006 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3006 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 13:15:00+00:00,2009-03-09 13:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 20 m/min.,0.25 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 13:30:00+00:00,2009-03-09 14:15:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3005 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3005 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 14:15:00+00:00,2009-03-09 14:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 30 m/min.,0.25 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 14:30:00+00:00,2009-03-09 15:15:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3016 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3016 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 15:15:00+00:00,2009-03-09 16:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 30 m/min. Picked up to 2900 m MD. WL stand-by for flowing well. Equalised across and opened PVW.,0.75 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 16:00:00+00:00,2009-03-09 17:30:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Beaned up well in increments to 1500 Sm3/d. Got production shut down due to high level on separator.,1.5 +15_9_F_14_2009_03_10.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-09T00:00:00+01:00,2009-03-10T00:00:00+01:00,2009-03-09 17:30:00+00:00,2009-03-09 23:00:00+00:00,2900.0,m,wire line,workover -- wait,ok,success,Waited on production department to start up production. Production on F-14 commenced at 23:15.,5.5 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-09 23:00:00+00:00,2009-03-09 23:45:00+00:00,2900.0,m,wire line,workover -- wait,ok,success,Waited on production department to start up production.,0.75 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-09 23:45:00+00:00,2009-03-10 03:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Produced well at 1600 Sm3/d. WL stand-by for flowing well / stabilizing FBHP (<0,1 bar variance 1 hr). Obtained stable FBHP of ~283 bar at DHPG.",3.25 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 03:00:00+00:00,2009-03-10 04:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 2973 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 2973 m to 3395 m MD.",1.0 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 04:00:00+00:00,2009-03-10 05:00:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 3395 m to 2950 m MD. + +Took stationary PLT readings at : +3333 m MD +3304 m MD +3173 m MD +3040 m MD +2950 m MD",1.0 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 05:00:00+00:00,2009-03-10 05:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3038 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3038 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 05:45:00+00:00,2009-03-10 06:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 10 m/min.,0.75 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 06:30:00+00:00,2009-03-10 07:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3033 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3033 m to 3395 m MD.",0.5 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 07:00:00+00:00,2009-03-10 07:15:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 20 m/min.,0.25 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 07:15:00+00:00,2009-03-10 08:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3049 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3049 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 08:00:00+00:00,2009-03-10 08:15:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 30 m/min.,0.25 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 08:15:00+00:00,2009-03-10 08:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3053 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3053 m to 3395 m MD.",0.5 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 08:45:00+00:00,2009-03-10 09:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 40 m/min. Picked up to 2900 m MD.,0.25 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 09:00:00+00:00,2009-03-10 14:15:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Beaned up well in increments to 3000 Sm3/d. WL stand-by for flowing well / stabilizing FBHP (<0,2 bar variance 1 hr). Obtained stable FBHP of ~273 bar at DHPG.",5.25 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 14:15:00+00:00,2009-03-10 15:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3001 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3001 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 15:00:00+00:00,2009-03-10 16:00:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 3395 m to 2950 m MD. + +Took stationary PLT readings at : +3333 m MD +3304 m MD +3173 m MD +3040 m MD +2950 m MD",1.0 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 16:00:00+00:00,2009-03-10 16:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3005 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3005 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 16:45:00+00:00,2009-03-10 17:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 10 m/min.,0.75 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 17:30:00+00:00,2009-03-10 18:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3017 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3017 m to 3395 m MD.",0.5 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 18:00:00+00:00,2009-03-10 18:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 20 m/min.,0.5 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 18:30:00+00:00,2009-03-10 19:15:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3057 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3057 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 19:15:00+00:00,2009-03-10 19:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 30 m/min.,0.25 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 19:30:00+00:00,2009-03-10 20:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3082 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3082 m to 3395 m MD.",0.5 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 20:00:00+00:00,2009-03-10 21:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 40 m/min. Picked up to 2900 m MD. PLT data checked by PETEK engineer - ok.,1.5 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 21:30:00+00:00,2009-03-10 22:15:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Beaned up well to 4000 Sm3/d. Meanwhile RIH to 3027 m MD. Took p/u weight at 10 m/min to verify simulations. P/u weight ~3100 lbs in correspondance with simulated values. Picked up to 2900 m MD,0.75 +15_9_F_14_2009_03_11.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-10T00:00:00+01:00,2009-03-11T00:00:00+01:00,2009-03-10 22:15:00+00:00,2009-03-10 23:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Beaned up well to 4500 Sm3/d.,0.75 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-10 23:00:00+00:00,2009-03-11 00:45:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Beaned up well to 4500 Sm3/d. Meanwhile RIH to 3056 m MD. Took p/u weight at 10 m/min to verify simulations. P/u weight 3000-3100 lbs in correspondance with simulated values. Picked up to 2900 m MD. Had problems maintaining rate at 4500 Sm3/d due to high separator levels. Cut back rate to 4250 Sm3/d.,1.75 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 00:45:00+00:00,2009-03-11 03:15:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Allowed downhole pressure to stabilize at 4250 Sm3/d to <0,2 bar/hr FBHP variance. Obtained stable FBHP of ~267,5 bar at DHPG.",2.5 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 03:15:00+00:00,2009-03-11 04:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3027 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3027 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 04:00:00+00:00,2009-03-11 04:15:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 40 m/min.,0.25 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 04:15:00+00:00,2009-03-11 04:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3038 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3038 m to 3395 m MD.",0.5 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 04:45:00+00:00,2009-03-11 05:00:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 30 m/min.,0.25 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 05:00:00+00:00,2009-03-11 05:30:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3060 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3060 m to 3395 m MD.",0.5 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 05:30:00+00:00,2009-03-11 06:00:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 20 m/min.,0.5 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 06:00:00+00:00,2009-03-11 06:45:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3030 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3030 m to 3395 m MD.",0.75 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 06:45:00+00:00,2009-03-11 07:30:00+00:00,2950.0,m,wire line,workover -- wire line,ok,success,Made upwards logging pass from 3395 m to 2950 m MD at 10 m/min.,0.75 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 07:30:00+00:00,2009-03-11 08:00:00+00:00,3395.0,m,wire line,workover -- wire line,ok,success,"RIH to 3030 m MD and powered up tractor. RIH with PLT/tractor toolstring on 7/16"" EWL from 3030 m to 3333 m MD.",0.5 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 08:00:00+00:00,2009-03-11 09:00:00+00:00,3333.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 3333 m to 2950 m MD. + +Took stationary PLT readings at : +3333 m MD +3304 m MD +3173 m MD +3040 m MD +2950 m MD",1.0 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 09:00:00+00:00,2009-03-11 10:00:00+00:00,2547.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 2950 m to 2547,5 m MD. Checked PLT sensors towards DHPG. Checked PLT data. Shut- in well.",1.0 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 10:00:00+00:00,2009-03-11 11:30:00+00:00,11.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT/tractor toolstring on 7/16"" EWL from 2547 m MD to surface. Ran carefully through DHSV at 492 m MD. Ran cable head into toolcatcher.",1.5 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 11:30:00+00:00,2009-03-11 13:30:00+00:00,11.0,m,wire line,workover -- rig up/down,ok,success,"Closed SV partly and verified toolstring out of hole. Recorded SIWHP 120 bar. Closed HMV, bled down pressure above to 5 bar and inflow tested - ok. Bled off pressure to zero to closed drain and purged riser with Nitrogen. Lined up cement unit and filled riser with MEG. Closed SV and tested flow cross to 30/200 bar 5/10 min - ok. Hooked up permanent hydraulic controls to HMV and DHSV. Re-opened DHSV.",2.0 +15_9_F_14_2009_03_12.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-11T00:00:00+01:00,2009-03-12T00:00:00+01:00,2009-03-11 13:30:00+00:00,2009-03-11 23:00:00+00:00,11.0,m,wire line,workover -- wait,ok,success,Equalised across PVW and beaned up well. Stand by for rigging down WL until scheduled shut-in.,9.5 +15_9_F_14_2009_03_13.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-12T00:00:00+01:00,2009-03-13T00:00:00+01:00,2009-03-11 23:00:00+00:00,2009-03-12 05:00:00+00:00,11.0,m,wire line,workover -- wait,ok,success,Stand by for rigging down WL until scheduled shut-in.,6.0 +15_9_F_14_2009_03_13.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-12T00:00:00+01:00,2009-03-13T00:00:00+01:00,2009-03-12 05:00:00+00:00,2009-03-12 16:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Stand by for rigging down WL until scheduled shut-in. Monitored lubricator and WL riser for pressure build up every 15 min. + +Meanwhile +- prepared skid list +- performed 5-yearly on choke manifold +- dismantled hydraulic hoses on tension cylinders +- cleaned wellhead and moonpool area. +- screened slops",11.0 +15_9_F_14_2009_03_13.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-12T00:00:00+01:00,2009-03-13T00:00:00+01:00,2009-03-12 16:00:00+00:00,2009-03-12 18:30:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,Waiting on MDN. Unable to proceed with WL operation due to ongoing 5-yearly work on tension cylinders in moonpool.,2.5 +15_9_F_14_2009_03_13.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-12T00:00:00+01:00,2009-03-13T00:00:00+01:00,2009-03-12 18:30:00+00:00,2009-03-12 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Waited on Mærsk Production to shut in well and inflow test HMV to 119-5 bar/10 min and DHSV to 119-5 bar/30 min. Had 0.7 bar drop/10 min on HMV and 0.3 bar drop/30 min on DHSV. Bled off pressure to 0 bar above DHSV. Isolated HMV. Confirmed valve status and handed over well to drilling at midnight. + +Meanwhile cleaned in moonpool area and injected slop. Held tool box meeting for RD lubricator, LD toolstring and performe dual lift of WL riser. Sorted out problem with exhaust fumes on drillfloor.",4.5 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-12 23:00:00+00:00,2009-03-13 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Released tool from tool catcher and verified no pressure in lubricator. Opened SV. Drained WL riser to closed drain and flushed with nitrogen.,2.0 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 01:00:00+00:00,2009-03-13 02:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke lubricator above in-situ sub and LD Schlumberger tools and Welltech tractor. No marks or damage to toolstring.,1.0 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 02:00:00+00:00,2009-03-13 03:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Ran cable through WL BOP and attempted to test to 20/345 bar for 5/10 min. Not able to pressure up to more than 160 bar. Ran test rod on rope through WL BOP and tested to 20/345 bar for 5/10 min using drill water. Ok.,1.75 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 03:45:00+00:00,2009-03-13 04:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,LD lubricator onto HTS to be able to change grease tubes while skidding.,1.0 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 04:45:00+00:00,2009-03-13 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed 10 MT lifting cap on WL riser and installed elevator on riser section.,0.25 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 05:00:00+00:00,2009-03-13 05:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Disconneced WL riser and BOP from XMT and lifted off with TDS. Secured lift with slips in rotary and kept suspended from rig floor.,0.25 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 05:15:00+00:00,2009-03-13 07:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"RU to move hatches in moonpool. Removed WL hatch and moved hatches 14, 13 and 12 to cover all openings on weather deck.",2.25 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 07:30:00+00:00,2009-03-13 08:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD surface lines from KWV. RU HP hose from cmt unit to KWV.,0.75 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 08:15:00+00:00,2009-03-13 12:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Performed line test from KWV to cmt unit. Ok. +Opened SV and KWV. Leak tested tree cap and XMT cross to 30/345 bar for 5/10 min using cmt unit. Ok. Bled off pressure. Closed SV. Leak tested SV to 30/345 bar for 5/10 min using cmt unit. Ok. Bled off pressure. Closed KWV and RD surface lines on KWV. Installed cap on KWV and removed 1/2"" plug. + +Opened SV. Leak tested KWV to 30/345 bar for 5/10 min using Seawell pump. Ok. Bled off pressure. Opened KWV. Installed 1/2"" plug in KWV cap. Leak tested KWV cap to 30/345 bar for 5/10 min using Seawell pump. Ok. Bled off pressure. Disconnected Seawell test pump from WH cap and closed needle valve.",4.25 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 12:30:00+00:00,2009-03-13 13:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"De-isolated HMV and re-established platform permanent control system. Filled in and signed ""Well handover document"" and handed over well from Volve D&W to Mærsk Production at 14:00. + +Meanwhile held tool box talk for skidding from F-15 to F-12.",0.5 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 13:00:00+00:00,2009-03-13 13:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed stair cases from cantiliver to main deck and scaffolding in moonpool.,0.5 +15_9_F_14_2009_03_14.xml,NO 15/9-F-14,NO 15/9-F-14,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 13:30:00+00:00,2009-03-13 14:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded rig from F-14 4.5 m fwd to F-12. + +***Operation transferrred to F-12***",0.5 +15_9_F_14_2010_09_11.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-10T00:00:00+02:00,2010-09-11T00:00:00+02:00,2010-09-10 13:30:00+00:00,2010-09-10 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Spotted wire line equipment on cantilever deck.,3.5 +15_9_F_14_2010_09_11.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-10T00:00:00+02:00,2010-09-11T00:00:00+02:00,2010-09-10 17:00:00+00:00,2010-09-10 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Hooked up electricity to Schlumberger logging unit and dog house. Meanwhile leak tested WL BOP on stump. Unpacked risers and grease head from rack.,5.0 +15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-10 22:00:00+00:00,2010-09-11 00:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Made up Grease Injection Head with 7/16"" cable.. Meanwhile moved WL BOP to moon pool area and started to hook up electricity to AWS equipment.",2.75 +15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 00:45:00+00:00,2010-09-11 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to assemble the lubricator and riser.,0.25 +15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 01:00:00+00:00,2010-09-11 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Assembled lubricator and riser on rig floor. Meanwhile built cable head and megged same.,3.0 +15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 04:00:00+00:00,2010-09-11 05:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Assembled lubricator and riser on rig floor.,1.5 +15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 05:30:00+00:00,2010-09-11 07:15:00+00:00,0.0,m,wire line,workover -- wait,ok,success,All personnel mustered to life boat drill and attended OIM's HSE meeting.,1.75 +15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 07:15:00+00:00,2010-09-11 09:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Prepared hoses for BOP, hooked up remote control unit in WL winch and completed lubricator.",2.25 +15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 09:30:00+00:00,2010-09-11 15:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Tested PLT and 2 1/8"" Tractor (Primary and back-up).",6.25 +15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 15:45:00+00:00,2010-09-11 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Completed hook up of electric power to winch power pack.,1.25 +15_9_F_14_2010_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-11T00:00:00+02:00,2010-09-12T00:00:00+02:00,2010-09-11 17:00:00+00:00,2010-09-11 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Hooked up hoses to GIH and prepared hoses for local control of HMV and DHSV, while production dept. prepared well for handover to well service.",5.0 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-11 22:00:00+00:00,2010-09-11 22:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Handed well over from production to well service. SIWHP 92 bar.,0.5 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-11 22:30:00+00:00,2010-09-11 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to test of x-mas tree and installation of manifold on TKV.,0.5 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-11 23:00:00+00:00,2010-09-12 00:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Waited on production dept. for activation of work permit.,1.0 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 00:00:00+00:00,2010-09-12 01:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Leak tested x-mas tree to 20/ 170 bar for 5/ 10 min, against HMV, PWV, TKV and SV.",1.5 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 01:30:00+00:00,2010-09-12 02:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Installed manifold on TKV and leak tested same to 20/ 170 bar for 5/ 10 min, against TKV.",1.25 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 02:45:00+00:00,2010-09-12 03:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to removing tree cap and R/U of riser and BOP.,0.25 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 03:00:00+00:00,2010-09-12 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed tree cap and rigged up riser and BOP.,1.0 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 04:00:00+00:00,2010-09-12 07:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested connections between BOP and XMT as well as LTV and bleed off hose outside TKV. All tests done to 20/170 bar for 5/10 min.,3.0 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 07:00:00+00:00,2010-09-12 09:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Held tool box talk and hoisted down upper riser through RT and stabbed same onto BOP. Installed upper sheave wheel with 7/16"" cable and hoisted up lubrikator and GIH in elevator. +Lifted up tractor and hung off in riser. WL winch suddenly stopped. Unable to find and correct problem. LD tractor.",2.25 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 09:15:00+00:00,2010-09-12 15:00:00+00:00,0.0,m,wire line,interruption -- rig up/down,ok,equipment failure,"Troubleshot winch problem, Mærsk electrician assisted. Bypassed relay, restarted power pack and let it run for two hours without any problem. Decided to continue acc. to program.",5.75 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 15:00:00+00:00,2010-09-12 17:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Made up BHA # 1 with PLT and 2 1/8"" Tractor, stabbed on lubricator and lined up for filling of rig-up with productions MEG pump.",2.25 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 17:15:00+00:00,2010-09-12 17:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting prior to test of rig-up.,0.5 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 17:45:00+00:00,2010-09-12 19:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Filled rig-up using productions MEG pump. Leak tested rig-up to 20/ 170 bar for 5/ 10 min.,1.25 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 19:00:00+00:00,2010-09-12 19:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held pre-job meeting and reviewed program for PLT logging with involved personnel.,0.75 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 19:45:00+00:00,2010-09-12 21:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Opened HMV and pumped 6,5 m³ of MEG to equalize and open DHSV.",1.75 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 21:30:00+00:00,2010-09-12 21:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Equalized and opened Swab valve. SIWHP 75,8 bar, DHPG 292,5 bar and DHTG 102,3 deg C.",0.25 +15_9_F_14_2010_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-12T00:00:00+02:00,2010-09-13T00:00:00+02:00,2010-09-12 21:45:00+00:00,2010-09-12 22:00:00+00:00,150.0,m,wire line,workover -- wire line,ok,success,RIH with PLT/ RST logging tool and tractor at 10 m/ min to 150 m.,0.25 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-12 22:00:00+00:00,2010-09-12 22:15:00+00:00,450.0,m,wire line,workover -- wire line,ok,success,Continued to RIH with PLT/ RST logging tool and tractor at 10 m/ min. Increased speed to 20 m/ min at 300 m MDRKB.,0.25 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-12 22:15:00+00:00,2010-09-12 22:30:00+00:00,450.0,m,wire line,workover -- wire line,ok,success,Stopped at 450 m MDRKB and powered up minitron and checked tools.,0.25 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-12 22:30:00+00:00,2010-09-13 00:00:00+00:00,2556.0,m,wire line,workover -- wire line,ok,success,Continued to RIH with PLT/ RST logging tools and tractor at 40 m/ min.,1.5 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 00:00:00+00:00,2010-09-13 00:15:00+00:00,2675.0,m,wire line,workover -- perforate,ok,success,Performed depth correlation across interval 2556 - 2675 m MDRKB.,0.25 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 00:15:00+00:00,2010-09-13 00:30:00+00:00,2542.0,m,wire line,workover -- wire line,ok,success,"Positioned PLT at P/T sensors in DHG at 2542 m MDRKB. PLT readings: 4242,9 psi (292,55 bar), 102 deg C. DHG readings: 292,56 bar, 102,22 Deg C.",0.25 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 00:30:00+00:00,2010-09-13 01:30:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Performed spinner calibration across interval 2850-2900 m MDRKB at 10, 20, 30 and 40 m/ min up/down.",1.0 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 01:30:00+00:00,2010-09-13 02:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Verified inline and full bore spinner calibration and positioned full bore spinner at 2900 m MDRKB. SIWHP 74,9 bar, DHP 292,59 bar, DHT 102,14 deg C.",0.5 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 02:00:00+00:00,2010-09-13 02:30:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Equalized and opened PWV.,0.5 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 02:30:00+00:00,2010-09-13 04:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Started to bean up well to test separator. At 06:00 hrs: Choke 19%, FWHP 64 bar, DHP 285,3 bar, DHT 105,6 deg C.",1.5 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 04:00:00+00:00,2010-09-13 08:15:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,"Continued beaning up well until choke size at 40,2 %. Stabilized flow rate at appr. 5200 Sm³/d.",4.25 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 08:15:00+00:00,2010-09-13 13:00:00+00:00,3380.0,m,wire line,workover -- wire line,ok,success,"RIH 30 m and tool string stopped. Started tractor and RIH to 3380 m. Logged flowing up-passes with PLT tools between 3380 and 2970 m at 10/20/30/40 m/min. Tractored down each time. Took stationary readings at 3200, 3040 and 2970 m. Positioned tool string with full bore spinner at 2900 m.",4.75 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 13:00:00+00:00,2010-09-13 15:00:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Choked back flow rate to 3300 Sm³/d and stabilized.,2.0 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 15:00:00+00:00,2010-09-13 19:30:00+00:00,3380.0,m,wire line,workover -- wire line,ok,success,"Started tractor and RIH to 3380 m. Logged flowing up-passes with PLT tools between 3380 and 2970 m at 10/20/30/40 m/min. Tractored down each time. Took stationary readings at 3200, 3040 and 2970 m. Positioned tool string with full bore spinner at 2900 m.",4.5 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 19:30:00+00:00,2010-09-13 21:30:00+00:00,2900.0,m,wire line,workover -- wire line,ok,success,Choked back flow rate to 1800 Sm³/d and stabilized.,2.0 +15_9_F_14_2010_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-13T00:00:00+02:00,2010-09-14T00:00:00+02:00,2010-09-13 21:30:00+00:00,2010-09-13 22:00:00+00:00,3380.0,m,wire line,workover -- wire line,ok,success,Started tractor and RIH to 3380 m.,0.5 +15_9_F_14_2010_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-14T00:00:00+02:00,2010-09-15T00:00:00+02:00,2010-09-13 22:00:00+00:00,2010-09-14 02:00:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,"Logged flowing up-passes with PLT tools between 3380 and 2970 m. Tractored down each time. Took stationary readings at 3200, 3042 and 2970 m.",4.0 +15_9_F_14_2010_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-14T00:00:00+02:00,2010-09-15T00:00:00+02:00,2010-09-14 02:00:00+00:00,2010-09-14 03:00:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,"Choked back and shut in well on PWV. SIWHP 93,9 bar, DHP 293,5 bar, DHT 105,7 deg C.",1.0 +15_9_F_14_2010_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-14T00:00:00+02:00,2010-09-15T00:00:00+02:00,2010-09-14 03:00:00+00:00,2010-09-14 03:45:00+00:00,3642.0,m,wire line,workover -- wire line,ok,success,Started tractor and RIH to 3642 m.,0.75 +15_9_F_14_2010_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-14T00:00:00+02:00,2010-09-15T00:00:00+02:00,2010-09-14 03:45:00+00:00,2010-09-14 04:00:00+00:00,3637.0,m,wire line,workover -- wire line,ok,success,"Powered up minitron source and started to log up with RST in IC mode at 0,5 m/min.",0.25 +15_9_F_14_2010_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-14T00:00:00+02:00,2010-09-15T00:00:00+02:00,2010-09-14 04:00:00+00:00,2010-09-14 22:00:00+00:00,3103.0,m,wire line,workover -- wire line,ok,success,"Continued logging RST in IC mode at 0,5 m/min.",18.0 +15_9_F_14_2010_09_16.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-15T00:00:00+02:00,2010-09-16T00:00:00+02:00,2010-09-14 22:00:00+00:00,2010-09-15 03:15:00+00:00,2975.0,m,wire line,workover -- wire line,ok,success,"Continued logging RST in IC mode at 0,5 m/min up to 2975 m.",5.25 +15_9_F_14_2010_09_16.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-15T00:00:00+02:00,2010-09-16T00:00:00+02:00,2010-09-15 03:15:00+00:00,2010-09-15 03:45:00+00:00,3642.0,m,wire line,workover -- wire line,ok,success,Started tractor and RIH to 3642 m.,0.5 +15_9_F_14_2010_09_16.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-15T00:00:00+02:00,2010-09-16T00:00:00+02:00,2010-09-15 03:45:00+00:00,2010-09-15 04:00:00+00:00,3642.0,m,wire line,workover -- wire line,ok,success,Powered up minitron source.,0.25 +15_9_F_14_2010_09_16.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-15T00:00:00+02:00,2010-09-16T00:00:00+02:00,2010-09-15 04:00:00+00:00,2010-09-15 22:00:00+00:00,3150.0,m,wire line,workover -- wire line,ok,success,"Logged RST in IC mode at 0,5 m/min from 3642 to 3150 m.",18.0 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-15 22:00:00+00:00,2010-09-16 00:15:00+00:00,3098.0,m,wire line,workover -- wire line,ok,success,"Logged RST in IC mode at 0,5 m/min from 3150 to 3101 m. RST far detector stopped working.",2.25 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 00:15:00+00:00,2010-09-16 00:45:00+00:00,3116.0,m,wire line,workover -- wire line,ok,success,Tractored back into well 15 m and stopped at 3116 m. Troubleshot and made several attempts to get the detector to work. Neg.,0.5 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 00:45:00+00:00,2010-09-16 01:00:00+00:00,3390.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated to 3390 m.,0.25 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 01:00:00+00:00,2010-09-16 01:45:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,Ran PLT logging pass from 3390 m up to 2970 m at speed 10 m/min.,0.75 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 01:45:00+00:00,2010-09-16 02:45:00+00:00,3390.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated to 3390 m.,1.0 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 02:45:00+00:00,2010-09-16 03:15:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,Ran PLT logging pass from 3390 m up to 2970 m at speed 20 m/min.,0.5 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 03:15:00+00:00,2010-09-16 03:45:00+00:00,3390.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated to 3390 m.,0.5 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 03:45:00+00:00,2010-09-16 04:00:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,Ran PLT logging pass from 3390 m up to 2970 m at speed 30 m/min.,0.25 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 04:00:00+00:00,2010-09-16 04:30:00+00:00,3390.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated to 3390 m.,0.5 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 04:30:00+00:00,2010-09-16 04:45:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,Ran PLT logging pass from 3390 m up to 2970 m at speed 40 m/min.,0.25 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 04:45:00+00:00,2010-09-16 05:00:00+00:00,3200.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated to 3200 m.,0.25 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 05:00:00+00:00,2010-09-16 06:15:00+00:00,2970.0,m,wire line,workover -- wire line,ok,success,"Took stationary readings at 3200, 3040 and 2970 m. Evaluated data.",1.25 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 06:15:00+00:00,2010-09-16 08:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #1. Lost communication with PLT/RST on the way OOH.,2.0 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 08:15:00+00:00,2010-09-16 11:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,OOH. SIWHP 103 bar. Closed well and bled off pressure. Flushed riser/lubricator with N2. Inflow tested HMV. LD BHA #1.,3.0 +15_9_F_14_2010_09_17.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-16T00:00:00+02:00,2010-09-17T00:00:00+02:00,2010-09-16 11:15:00+00:00,2010-09-16 22:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"Waited on plug equipment from shore. Boat departure cancelled due to poor weather forecast. Meanwhile produced well and prepared 5/16"" cable equipment due to loose strand on 7/16"" cable.",10.75 +15_9_F_14_2010_09_18.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-17T00:00:00+02:00,2010-09-18T00:00:00+02:00,2010-09-16 22:00:00+00:00,2010-09-17 04:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"Waited on plug equipment from shore. Meanwhile produced well and prepared 5/16"" cable equipment.",6.0 +15_9_F_14_2010_09_18.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-17T00:00:00+02:00,2010-09-18T00:00:00+02:00,2010-09-17 04:00:00+00:00,2010-09-17 22:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,"Waited on plug equipment from shore. Meanwhile produced well and prepared 5/16"" cable equipment. Rigged up lubricator with grease inj. head. Function tested tractor through cable. Held SJA meeting regarding RD of wireline equipment and skidding preparations.",18.0 +15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-17 22:00:00+00:00,2010-09-18 04:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,Waited on plug equipment from shore. Meanwhile produced well. Held SJA meeting regarding RD wireline equipment and prepare for skidding.,6.0 +15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 04:00:00+00:00,2010-09-18 13:30:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,Waited on plug equipment from shore. Meanwhile produced well. Held pre-job meeting with involved personnel.,9.5 +15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 13:30:00+00:00,2010-09-18 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Received plug equipment from boat. Unloaded basket and checked DPU. Transferred plug to drill floor with rig crane (appr. 125 kg).,3.5 +15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 17:00:00+00:00,2010-09-18 18:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Closed in well. Meanwhile held prejob meeting with all personnel involved regarding RU BHA, install plug and RD WL equipment.",1.0 +15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 18:00:00+00:00,2010-09-18 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Took over controll of HMV and DHSV. Opened WL BOP. Installed BHA#2 into lubricator. Added 50 litres of Ramex into riser. Leak tested rig up. 20/170 bar for 5/10 min. Pumped totally 700 litres. Opened well. WHP = 97.5 bar.,3.0 +15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 21:00:00+00:00,2010-09-18 21:30:00+00:00,490.0,m,wire line,workover -- wire line,ok,success,"RIH with BHA#2, EVO plug on tractor. Stopped into DHSV. Attempted several times to pass. Neg.",0.5 +15_9_F_14_2010_09_19.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-18T00:00:00+02:00,2010-09-19T00:00:00+02:00,2010-09-18 21:30:00+00:00,2010-09-18 22:00:00+00:00,490.0,m,wire line,workover -- wire line,ok,success,Started to equalize DHSV by pumping MEG into well.,0.5 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-18 22:00:00+00:00,2010-09-18 23:30:00+00:00,490.0,m,wire line,workover -- wire line,ok,success,"Continued pumping MEG into well to equalize DHSV. Pressure increased from 97,5 bar to 100 bar.",1.5 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-18 23:30:00+00:00,2010-09-18 23:45:00+00:00,525.0,m,wire line,workover -- wire line,ok,success,RIH with BHA #2 and passed DHSV. Stopped in Baker AVLDM tubing hanger at 510 m. Had to work BHA from 510 to 525 m in order to pass.,0.25 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-18 23:45:00+00:00,2010-09-19 01:45:00+00:00,2630.0,m,wire line,workover -- wire line,ok,success,Continued RIH with EVO plug. Lost CCL signal at 2630 m.,2.0 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 01:45:00+00:00,2010-09-19 02:30:00+00:00,2630.0,m,wire line,interruption -- other,ok,equipment failure,Troubleshot and found short in downhole circuit.,0.75 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 02:30:00+00:00,2010-09-19 04:00:00+00:00,472.0,m,wire line,interruption -- other,ok,equipment failure,POOH with BHA #2 to 472 m.,1.5 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 04:00:00+00:00,2010-09-19 04:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH from 472 m to surface.,0.5 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 04:30:00+00:00,2010-09-19 07:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,OOH. SIWHP 102 bar. Closed well and bled off pressure. Inflow tested HMV. Flushed riser/lubricator with N2. LD BHA #2.,2.5 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 07:00:00+00:00,2010-09-19 10:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,RU backup tractor and plug. Plug from BHA #2 was slightly gassed up and too large to be run. Stabbed on and leak tested QTS to 170 bar. Equalized across SV and HMV with MEG and opened well. SIWHP 102 bar.,3.5 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 10:30:00+00:00,2010-09-19 12:45:00+00:00,2980.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with BHA #3, 7"" EVO plug on tractor to 2980 m MDRKB. Had to work BHA through Baker AVLDM tubing hanger at 510 m.",2.25 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 12:45:00+00:00,2010-09-19 13:00:00+00:00,3030.0,m,wire line,workover -- wire line,ok,success,Activated tractor and RIH from 2980 to 3030 m.,0.25 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 13:00:00+00:00,2010-09-19 15:15:00+00:00,3264.6,m,wire line,workover -- wire line,ok,success,"Performed correlation passes. Set EVO plug with pkg. element at 3274,8 m and top plug at 3274,25 m.",2.25 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 15:15:00+00:00,2010-09-19 16:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #3.,1.5 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 16:45:00+00:00,2010-09-19 19:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed well. WHP = 99 bar. Held toolbox meeting on drill floor. Inflow tested HMV. Bled off and flushed lubricator with N2. LD and checked toolstring.,3.0 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 19:45:00+00:00,2010-09-19 20:30:00+00:00,0.0,m,wire line,workover -- wait,ok,success,Time out meeting in PCR with focus on communication.,0.75 +15_9_F_14_2010_09_20.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-19T00:00:00+02:00,2010-09-20T00:00:00+02:00,2010-09-19 20:30:00+00:00,2010-09-19 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held SJA meeting on drill floor regarding RD. Closed DHSV and bled down pressure above to 63 bar through flowline to test sep. Meanwhile LD lubricator onto HTS.,1.5 +15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-19 22:00:00+00:00,2010-09-20 00:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled down pressure above DHSV from 63 to 10 bar through flowline to test sep. Inflow tested DHSV.,2.25 +15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 00:15:00+00:00,2010-09-20 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off pressure above DHSV and closed HMV. Opened BOP.,0.75 +15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 01:00:00+00:00,2010-09-20 02:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Held toolbox meeting regarding RD WL equipment. Mærsk prod. dep. activated isolation plan, on all valves on wellhead.",1.5 +15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 02:30:00+00:00,2010-09-20 03:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Used top drive and lifted upper riser to drill floor. Rigged away WL BOP. Lifted lower riser by use of two tuggers.,0.75 +15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 03:15:00+00:00,2010-09-20 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed Chiksan equipment on KWV and installed end cap. Installed x-mas tree top cap. Leak tested x-mas tree cross to 20 bar for 5 min.,0.75 +15_9_F_14_2010_09_21.xml,NO 15/9-F-14,NO 15/9-F-14,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 04:00:00+00:00,2010-09-20 06:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Leak tested x-mas tree cross. 170 bar for 10 min. Leak tested KWV end cap and XMT top cap to 20/345 bar for 5/10 min. Handed well over to Production Department. +______________________END OF OPERATION______________________",2.5 +15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 14:00:00+00:00,2012-01-27 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Received and spotted equipment in work area.,1.0 +15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 15:00:00+00:00,2012-01-27 16:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held prejob meeting with all involved personnel.,1.0 +15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 16:00:00+00:00,2012-01-27 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted equipment in work area. Hooked up winch to power and F&G.,2.0 +15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 18:00:00+00:00,2012-01-27 20:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted equipment in work area. Hooked up WellTec logging container to power and F&G. Prepared for testing of BOP.,2.75 +15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 20:45:00+00:00,2012-01-27 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held brief prior to testing of WL BOP.,0.25 +15_9_F_14_2012_01_28.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-27T00:00:00+01:00,2012-01-28T00:00:00+01:00,2012-01-27 21:00:00+00:00,2012-01-27 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Leak and function tested BOP to 20/180 bar for 5/10 min. Meanwhile pulled out all cables and hoses needed.,2.0 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-27 23:00:00+00:00,2012-01-28 00:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Completed BOP testing.,1.0 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 00:00:00+00:00,2012-01-28 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held prejob meeting with all involved personnel.,1.0 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 01:00:00+00:00,2012-01-28 01:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held brief regarding building of upper riser and lubricator. No crane driver on night shift due to cancelled helikopter.,0.25 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 01:15:00+00:00,2012-01-28 03:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Built riser and lubricator on main deck. Used fork lift to assemble sections.,2.4166666666666665 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 03:40:00+00:00,2012-01-28 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Built GIH for 5/16"" mono conductor cable.",1.3333333333333333 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 05:00:00+00:00,2012-01-28 06:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Completed GIH.,1.5 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 06:30:00+00:00,2012-01-28 07:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Held platform muster drill. Everybody attended.,0.5 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 07:00:00+00:00,2012-01-28 12:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Hoisted down BOP into moonpool area through hatch on drill floor. Lifted up upper/lower riser, lubricator and grease head from main deck to drill floor. Completed assembling of riser/lub. Found that 5/16""cable drum chain was broken. Disassembled chain and ordered spares from shore with helicopter.",5.5 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 12:30:00+00:00,2012-01-28 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Prepared miscellaneous hoses prior to rig-up. WellTec built new cable head. +Meanwhile Halliburton checked DPU's.",5.5 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 18:00:00+00:00,2012-01-28 18:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Held platform muster drill. Everybody attended.,0.5 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 18:30:00+00:00,2012-01-28 19:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"WellTec tested counter system. +Meanwhile AWS repaired chain on 5/16""cable drum.",1.0 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 19:30:00+00:00,2012-01-28 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Connected cables to winch BOP screen and smart skid. Secured hoses/cables over sharp edges. Checked chiksan at wellhead. WellTec checked tractors. +Meanwhile Mærsk electrician repaired faulty hydr. sensor om WL winch.",2.5 +15_9_F_14_2012_01_29.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-28T00:00:00+01:00,2012-01-29T00:00:00+01:00,2012-01-28 22:00:00+00:00,2012-01-28 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Flushed DHSV hose and filled pump tank with hydr. oil from platform. Filled MEG on test pump. Started wireline winch OK.,1.0 +15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-28 23:00:00+00:00,2012-01-29 00:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Installed cover over drop-in-drum. Calibrated counters and pulled out 5/16"" cable to test BHA.",1.75 +15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 00:45:00+00:00,2012-01-29 02:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected cable to BHA and tested tractors and DPU setting tools.,1.8333333333333333 +15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 02:35:00+00:00,2012-01-29 05:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Closed in well to prepare for handover. +Meanwhile: Tided area and completed check lists.",2.4166666666666665 +15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 05:00:00+00:00,2012-01-29 09:15:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited for Production Department to prepare well for handover.,4.25 +15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 09:15:00+00:00,2012-01-29 14:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Took over well and leak tested XMT cross to 20/200 bar. Took off XMT cap and installed X-over/lower riser. RU BOP and function tested same. Leak tested connections against SV.,4.75 +15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 14:00:00+00:00,2012-01-29 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted down upper riser and connected to BOP. RU lubricator and upper sheave wheel in elevator.,1.0 +15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 15:00:00+00:00,2012-01-29 18:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Installed BHA #1, EV0 plug and 3 1/8"" tractor, into lubricator in three parts. Pumped MEG through production chemical line to fill lubricator and leak tested lubricator and QTS 5/10 min to 20/170 bar with AWS PT pump.",3.0 +15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 18:00:00+00:00,2012-01-29 20:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Opened HMV and pump MEG through production chemical line to equalize across DHSV and opened DHSV.,2.0 +15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 20:00:00+00:00,2012-01-29 20:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Equalized and opened SV 44 turn.,0.5 +15_9_F_14_2012_01_30.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-29T00:00:00+01:00,2012-01-30T00:00:00+01:00,2012-01-29 20:30:00+00:00,2012-01-29 23:00:00+00:00,510.0,m,wire line,workover -- other,ok,success,"Opened well and RIH with BHA#1 EV0 plug. Lost some weight, indicating small restriction.",2.5 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-29 23:00:00+00:00,2012-01-29 23:50:00+00:00,2945.0,m,wire line,workover -- other,ok,success,Continued RIH with BHA#1 to set EV0 plug. BHA stopped due to deviation/friction.,0.8333333333333334 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-29 23:50:00+00:00,2012-01-30 00:10:00+00:00,3140.0,m,wire line,workover -- wire line,ok,success,Started tractor and continued RIH to 3140 meter.,0.3333333333333333 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 00:10:00+00:00,2012-01-30 02:10:00+00:00,3140.0,m,wire line,workover -- other,ok,success,Performed correlation passes with CCL. Pulled up to CCL setting depth.,2.0 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 02:10:00+00:00,2012-01-30 02:30:00+00:00,3041.0,m,wire line,workover -- other,ok,success,"Set EV0 plug and lost 500 lbs. Mid element set at 3040 m and top plug at 3039,22 m.",0.3333333333333333 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 02:30:00+00:00,2012-01-30 05:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,POOH to surface with BHA #1.,2.5 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 05:00:00+00:00,2012-01-30 08:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,OOH. Closed well and bled off pressure. Flushed with N2 and inflow tested SV and HMV. L/D BHA #1 and verfied plug setting OK.,3.5 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 08:30:00+00:00,2012-01-30 10:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Closed upper BOP ram, bled off above DHSV and inflow tested same. Meanwhile held brief and LD lubricator and sheave wheels on rig floor.",1.5 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 10:00:00+00:00,2012-01-30 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Disconnected upper riser from BOP and LD same on rig floor. RD BOP and lower riser. Installed XMT cap and weco cap on TKV. Leak tested both to 20/345 bar for 5/10 min. Leak tested XMT cross to 20/170 bar for 5/10 min. +Handed well over to production.",5.5 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 15:30:00+00:00,2012-01-30 18:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Packed WL equipment for backload. Meanwhile Production Department flowed well to verify water shut off from plug setting.,2.75 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 18:15:00+00:00,2012-01-30 18:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed Pre-job Meeting prior to rig down last items and clean area.,0.4166666666666667 +15_9_F_14_2012_01_31.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-30T00:00:00+01:00,2012-01-31T00:00:00+01:00,2012-01-30 18:40:00+00:00,2012-01-30 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Packed WL equipment for backload. Meanwhile Production Department flowed well to verify water shut off from plug setting.,4.333333333333333 +15_9_F_14_2012_02_01.xml,NO 15/9-F-14,NO 15/9-F-14,2012-01-31T00:00:00+01:00,2012-02-01T00:00:00+01:00,2012-01-30 23:00:00+00:00,2012-01-31 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Prepared all equipment for backload. Cleaned and tidied work area. + +-------------------------------------------END OF OPERATION----------------------------------------------------------",3.0 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 02:15:00+00:00,2016-07-30 03:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Completed checklists and permits for skidding operations. +Prepared cantilever for skidding",1.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 03:30:00+00:00,2016-07-30 03:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding rig to F-14,0.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 03:45:00+00:00,2016-07-30 04:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed access stairs and bridge between produciton unit and cantilever,0.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 04:00:00+00:00,2016-07-30 05:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig to F-14,1.0 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 05:00:00+00:00,2016-07-30 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew for pulling hatch on F-14,0.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 05:15:00+00:00,2016-07-30 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared to pull hatch. Lowered halv moon hatch on position. +Meanwhile: Built scaffolding around XT.",0.75 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 06:00:00+00:00,2016-07-30 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued building scaffolding around XT. +Meanwhile: Continued preparing for pulling hatch.",1.0 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 07:00:00+00:00,2016-07-30 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled hatch on well F-14. +Installed half moon hatch.",1.5 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 08:30:00+00:00,2016-07-30 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted cement spool onto XT and M/U bolts. +Installed hole covers in moonpool. +Built scaffiling to access cement spool valves. + +Installed gauge and bleed off line on top of cement spool. +Meanwhile: Performed maintenance on BOP and drilling equipment.",3.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 11:45:00+00:00,2016-07-30 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned and cleared moonpool. +Meanwhile: Topped up A - and B annulus with SW.",0.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 12:00:00+00:00,2016-07-30 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pressure testing cement spool and lines.,0.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 12:15:00+00:00,2016-07-30 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Confirmed line-ups and valve positions, walked the lines. +Prepared cement unit for pressure test. +Meanwhile: Barriered off areas prior to pressure testing.",0.5 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 12:45:00+00:00,2016-07-30 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Applied 20 bar against closed LTV15, opened LTV15 and confirmed correct line-up.",0.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 13:00:00+00:00,2016-07-30 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Flushed cement spool. +Pressure tested cement spool to 20/310 bar for 5/10 min. Bled off pressure.",1.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 14:15:00+00:00,2016-07-30 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for line-up and bullheading operations.,0.75 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 15:00:00+00:00,2016-07-30 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined-up rig pumps and confirmed line-up. +Opened HMV and SV. Pressurized DHSV control line to 520 bar.",0.5 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 15:30:00+00:00,2016-07-30 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up well to equalize DHSV by pumping 3m3 50/50 MEG/SW. +Pumped 3,8m3 wash pill. Stopped pumping due to indications of DHSV not opening.",1.5 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 17:00:00+00:00,2016-07-30 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Investigated issue with DHSV. +Kept 520 bar on DHSV control line and bled of pressure from well through closed drain. Monitored pressure on DHPG and observed pressure dropping 1 bar / 10 min while bleeding off well. Closed bleed-off valve and observed DHPG pressure increase, indicating that DHSV was in open position.",0.5 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 17:30:00+00:00,2016-07-30 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Staged up rig pumps to 1300lpm/71bar and bullheaded remaining 6,2m3 of wash pill followed by 208 m3 SW. +Meanwhile: Performed TBT for cement job. + +After bullheading 118 m3 of SW the pressure increased from 71 bar to 91 bar rapidly. Continued bullheading SW at 1300lpm, pressure stabilized at 90 bar with a slightly decreasing trend. +After bullheading 208 m3 of SW the pressure increased again from 90 bar to 100 bar rapidly. Pressure stabilized with steady trend at 100 bar.",3.0 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 20:30:00+00:00,2016-07-30 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued bullheading SW at 1300 lpm / 100 bar. +Meanwhile: Mixed cement.",0.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 20:45:00+00:00,2016-07-30 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lined up and released bottom dart. +Mixed and pumped 6,6 m3 1,90sg cement slurry at 600 lpm.",0.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 21:00:00+00:00,2016-07-30 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Displaced surface lines with 0,9 m3 hi-vis pill from cement unit. +Released top dart and continued to bullhead 6,9 m3 hi-vis with cement unit.",0.25 +15_9_F_14_2016_07_31.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-30T00:00:00+02:00,2016-07-31T00:00:00+02:00,2016-07-30 21:15:00+00:00,2016-07-30 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Displaced cement with 41,5 m3 SW from cement unit at 1300 lpm / 85 bar, cycled DHSV 3x after bullheading 30 m3 of SW (while still pumping at 1300lpm). + +Continued displacement by pumping 3 m3 contamination pill at 600lpm / 56 bar with cement unit. After bullheading 2,7 m3 contamination pill the formation started to pack off, pressure increased from 56 bar to a final squeeze pressure of 95 bar. Stopped pumping, final static pressure 57 bar. +Estimated TOC 2700 mMD.",0.75 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-30 22:00:00+00:00,2016-07-31 01:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC. +Closed SV and bled off pressure on cement unit and surface lines. +Monitored pressure in XT cross from prod. control room. +Meanwhile: Flushed lines from cement unit. Performed maintenance on BOP. Prepared to change out wires on FWD PRS. + +Bled off pressure in XT cross from 100 bar to 55 bar at 02:00.",3.5 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 01:30:00+00:00,2016-07-31 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Continued performing maintenance on BOP and FWD PRS. + +Bled off pressure in XT cross from 100 bar to 56 bar at 03:45 +Bled off pressure in XT cross from 100 bar to 54 bar at 06:10",3.5 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 05:00:00+00:00,2016-07-31 10:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Continued maintenance on BOP and FWD PRS. +Tested kill manifold to 20/310bar for 5/10min. + +Bled off pressure in XT cross from 97 bar to 55 bar at 10:40.",5.0 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 10:00:00+00:00,2016-07-31 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pressure testing and inflow testing cement plug,0.25 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 10:15:00+00:00,2016-07-31 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed HMV and bled off pressure between HMV and SV to closed drain. +Opened SV and equalized above HMV. Opened HMV and pressure tested cement plug to 300bar / 10min. +Volume pumped 560 ltrs from 67 bar to 300 bar. +Monitored pressure from production control room.",1.25 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 11:30:00+00:00,2016-07-31 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Bled off pressure on well from 300 bar to 10 bar via closed drain.,0.25 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 11:45:00+00:00,2016-07-31 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed 23 bar inflow test of cement plug for 20 min. +Monitored pressure from production control room. +Observed increasing trend. Pressure increased from 10 bar to 18 bar in 45 min (1,7 bar/10min), slightly flattening. +Consulted town, agreed to continue inflow testing. + +Bled off pressure in well from 18 bar to 10 bar via closed drain. Performed new inflow test of cement plug. +Pressure increased from 10 to 20 bar in 1,5 hrs (1,1 bar/10min), slightly flattening. + +Meanwhile: Pressure tested BOP. Continued maintenance on FWD PRS.",2.75 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 14:30:00+00:00,2016-07-31 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed new inflow test of cement plug for 3 hrs. Pressure increased from 10 bar to 27bar (0,95 bar/10min). +Meanwhile: Continued pressure testing BOP.",3.0 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 17:30:00+00:00,2016-07-31 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled down pressure in well to 10 bar and performed new inflow test of cement plug. +Monitored pressure for 30 min. Pressure increased 0,7 bar / 10min, flattening trend.",1.75 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 19:15:00+00:00,2016-07-31 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Finished ongoing BOP test.,0.25 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 19:30:00+00:00,2016-07-31 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up well to 310 bar with cement unit. Pumped 715 ltrs from 13 bar to 310 bar. +Bled off pressure in DHSV control line. Bled off pressure in well to 240 bar. DHPG indicated DHSV in closed position. +Performed 70 bar low-pressure inflow test of DHSV for 30 min.",1.5 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 21:00:00+00:00,2016-07-31 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled down pressure in well to 10 bar. +Performed 300 bar hi-pressure inflow test of DHSV for 30min.",0.5 +15_9_F_14_2016_08_01.xml,NO 15/9-F-14,NO 15/9-F-14,2016-07-31T00:00:00+02:00,2016-08-01T00:00:00+02:00,2016-07-31 21:30:00+00:00,2016-07-31 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up well to 310 bar with cement unit, pumped 207 ltr from 12 bar to 310 bar. Observed DHSV opened at ~288 bar (after 150ltrs pumped). +Applied 520 bar pressure on DHSV control line. +Bled off well to 20 bar through closed drain. Bled off pressure in DHSV control line.",0.5 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-07-31 22:00:00+00:00,2016-07-31 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed swab valve and continued bleeding off remaining pressure in well back to cement unit. +Read 274 bar on DHPG, indicating DHSV in closed position.",0.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-07-31 22:15:00+00:00,2016-07-31 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Rigged up lifting arrangement to lift off cement spool,0.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-07-31 22:30:00+00:00,2016-08-01 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released connection between XT and cement spool. +Lifted cement spool off of XT and landed cement spool in moonpool.",1.5 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 00:00:00+00:00,2016-08-01 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U BPV plug from HTS. +RIH and installed BPV plug in TH. +Meanwhile: Pressure tested BOP.",0.75 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 00:45:00+00:00,2016-08-01 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed lifting cap on XT. +R/D and removed production flange from XT. +Meanwhile: Pressured up ASV control line to 520 bar, no pressure increase on A-annulus observed. Pressure tested BOP.",1.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 02:00:00+00:00,2016-08-01 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with new ongoing crew,0.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 02:15:00+00:00,2016-08-01 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D chicksan and piping from XT,0.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 02:30:00+00:00,2016-08-01 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed instrumentation on XT and R/D scaffolding,0.5 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 03:00:00+00:00,2016-08-01 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled split hatch. Pulled hatch on nabour well and R/D support beam. +Built scaffolding (fence) around open hatches.",1.0 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 04:00:00+00:00,2016-08-01 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for lifting XT,0.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 04:15:00+00:00,2016-08-01 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U lifting arrachement on TDS,0.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 04:30:00+00:00,2016-08-01 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted XT from XT-deck to moonpool. +Meanwhile: Pulled foxhole",0.5 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 05:00:00+00:00,2016-08-01 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load transfered XT from TDS to moonpool gantry crane. Moved XT into moonpool and landed on skid. +Secured XT on skid. +Meanwhile: Prepared to lift spool piece from WH.",1.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 06:15:00+00:00,2016-08-01 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed master bushing and hole cover.,0.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 06:30:00+00:00,2016-08-01 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Verified no pressure in TH void ports. +Removed hatck on XT-deck. +Meanwhile: Installed foxhole.",1.0 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 07:30:00+00:00,2016-08-01 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing and lowered lifting arrangement from TDS. Attached lifting arrangement to spacer spool. +Lifted spacer spool from WH to drill floor and L/D same.",0.75 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 08:15:00+00:00,2016-08-01 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed support beam and hatches. Installed split hatch on F-14. +Installed master bushing and hole cover.",0.75 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 09:00:00+00:00,2016-08-01 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cut control lines in multibowl. Prepared to install communication collar. +Installed dart in BPV plug",3.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 12:15:00+00:00,2016-08-01 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed communication collar. +Meanwhile: Pressure tested BOP.",1.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 13:30:00+00:00,2016-08-01 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U surface hi-pressure riser. Attached lifting arrangement to TDS, using double securing.",0.5 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 14:00:00+00:00,2016-08-01 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed hatch cover in moonpool. Removed master bushing. +Installed scaffolding (fence) around rotary.",0.5 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 14:30:00+00:00,2016-08-01 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered surface hi-pressure riser onto multibowl.,0.5 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 15:00:00+00:00,2016-08-01 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built scaffold around BOP test stump. +Meanwhile: Prepared BOP for moving to well center.",0.75 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 15:45:00+00:00,2016-08-01 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Disconnected NT2 connector on test stump and removed test mandrel from BOP.,0.75 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 16:30:00+00:00,2016-08-01 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted BOP from test stump and moved BOP approximately 1m towards well center.,0.5 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 17:00:00+00:00,2016-08-01 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for inspecting NT2 connector,0.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 17:15:00+00:00,2016-08-01 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Inspected NT2 connector. +Meanwhile: Built scaffolding around HP riser in moonpool. Cleaned and cleared moonpool. Removed flange from kill wing on XT.",2.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 19:30:00+00:00,2016-08-01 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for skidding BOP,0.25 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 19:45:00+00:00,2016-08-01 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Skidded BOP over well center. Installed seal ring. +Landed BOP on connector.",0.5 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 20:15:00+00:00,2016-08-01 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed slick joint.,0.5 +15_9_F_14_2016_08_02.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-01T00:00:00+02:00,2016-08-02T00:00:00+02:00,2016-08-01 20:45:00+00:00,2016-08-01 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed master bushing. +Lifted diverter with TDS. Removed master bushing and lowered diverter.",1.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-01 22:00:00+00:00,2016-08-01 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Landed diverter.,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-01 22:15:00+00:00,2016-08-02 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D lifting equipment. Installed master bushing. +M/U slick joint and installed tension cylinders. +Meanwhile: Performed maintenance on drilling equipment.",4.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 02:30:00+00:00,2016-08-02 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Filled BOP and riser. +Attempted to perform connector test to 310bar/10min. Pressure started to drop at 296 bar, stopped pumping. +Trip tank steady during testing. + +Performed line test to 310bar/10min against kill valve on BOP, no leakages observed.",1.0 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 03:30:00+00:00,2016-08-02 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Evaluated situation. +Meanwhile: Performed housekeeping on drill floor.",1.5 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 05:00:00+00:00,2016-08-02 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Prepared to retrieve BPV dart and plug. +Lifted equipment to drill floor.",0.5 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 05:30:00+00:00,2016-08-02 05:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed TBT for retrieving BPV dart and plug.,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 05:45:00+00:00,2016-08-02 06:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,P/U retrieval tool.,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 06:00:00+00:00,2016-08-02 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to M/U 3 1/2"" DP. Changed dies carrier in AFT IRN.",0.75 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 06:45:00+00:00,2016-08-02 07:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"RIH with dart retrieval tool to 19,7m. Made 3 attemptes. +Released and retrieved dart.",0.5 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 07:15:00+00:00,2016-08-02 07:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"RIH with BPV retrieval tool to 19,9m. Retrieved BPV plug to surface.",0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 07:30:00+00:00,2016-08-02 08:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Inspected BPV, no signs of damage. +P/U new BPV plug and dart. +RIH to 19,1m and installed BPV plug. POOH. +RIH to 19,3m with dart and installed same. POOH.",0.75 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 08:15:00+00:00,2016-08-02 08:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed TBT for new connector test.,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 08:30:00+00:00,2016-08-02 08:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed line-up test to 20 bar.,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 08:45:00+00:00,2016-08-02 09:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Performed connection test to 20bar/310bar for 5/10min. +Volume pumped from 20 bar to 310 bar, 60 ltrs. Bled back same.",0.5 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 09:15:00+00:00,2016-08-02 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH and retrieved dart and BPV plug. POOH.,0.5 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 09:45:00+00:00,2016-08-02 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,B/O and L/O retrieval tool.,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 10:00:00+00:00,2016-08-02 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U to pressure test TDS,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 10:15:00+00:00,2016-08-02 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U pump-in sub to TDS and connected cement hose.,0.5 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 10:45:00+00:00,2016-08-02 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pressure testing TDS.,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 11:00:00+00:00,2016-08-02 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressure tested lower and upper IBOP, Kelly hose and S12 valve to 310bar/10min. +R/D pump-in sub and cement hose.",2.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 13:15:00+00:00,2016-08-02 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared hoses and equipment for THRT. +Meanwhile: Installed lifting tool in FWD PRS. Tightened fittings on FWD PRS.",0.5 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 13:45:00+00:00,2016-08-02 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U casing handling equipment, dressed for 7"".",1.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 15:00:00+00:00,2016-08-02 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for RIH with THRT and landing string.,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 15:15:00+00:00,2016-08-02 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U tubing hanger running tool. +M/U and RIH with landing string. POOH. +M/U control lines and flushed same.",1.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 16:30:00+00:00,2016-08-02 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lined-up to pressure test kill manifold.,0.5 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 17:00:00+00:00,2016-08-02 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested kill manifold (body test) 20/345bar for 5/10min.,2.0 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 19:00:00+00:00,2016-08-02 19:45:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,"RIH with THRT to 21m and landed on TH. Orientated J-slot 90 deg. Took 2 ton overpull. +Applied 14 - 21 bar on tool, string dropped approx. 2"". +Engaged communication collar by turning string 8 turns LH.",0.75 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 19:45:00+00:00,2016-08-02 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rigged up hose on A-annulus wing on multibowl. +Meanwhile: Changed elevator.",0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 20:00:00+00:00,2016-08-02 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for installing swedge and open DHSV,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 20:15:00+00:00,2016-08-02 20:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Changed fittings on hose for elevator due to leakage.,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 20:30:00+00:00,2016-08-02 21:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Inspected swedge and found mark on seal face. Filed sealface. M/U swedge on 7"" landing string.",0.75 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 21:15:00+00:00,2016-08-02 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed cement hose and lo-torque valve. Pressure same to 100bar.,0.25 +15_9_F_14_2016_08_03.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-02T00:00:00+02:00,2016-08-03T00:00:00+02:00,2016-08-02 21:30:00+00:00,2016-08-02 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Applied 520 bar on DHSV control line. +Pressured up tubing with rig pumps. DHSV opened at 75 bar. +Bled down pressure through mud-gas separator. Monitored for pressure build up for 5 min.",0.5 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-02 22:00:00+00:00,2016-08-02 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Applied 420 bar on ASV control line. Pressured up A-annulus to 50 bar from cement unit. +Pumped 16ltrs from 10 bar to 50 bar, ASV not open. + +Closed lo-torque valve on A-annulus wing on multibowl. Pressured up lines to 20 bar and opened lo-torque valve, no pressure drop observed. +Troubleshot A-annulus valve on multibowl, both A-annulus valves in open position.",1.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-02 23:15:00+00:00,2016-08-03 00:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Re-attempted to pressure up A-annulus to 50 bar from cement unit. +Pumped 18ltrs from 10 bar to 50 bar. No indication of ASV opening. +Performed new line-up test and checked all valves.",1.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 00:30:00+00:00,2016-08-03 01:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Attempted to increase A-annulus pressure in stages of 10 bar to 120 bar with control line pressure of 480 bar. No indications of ASV opening. Pressure leaked off 1,5 bar/min. Bled off pressure. +Volume pumped to 120 bar, 23ltrs. Bled back same.",0.5 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 01:00:00+00:00,2016-08-03 02:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Pressured up A-annulus to 120 bar, then applied 480 bar pressure on control line. No indication of ASV opening. Pressure leaked off 1,5bar/min. Bled off control line and A-annulus. +Volume pumped 23 ltrs. Bled back same. + +Performed line-up test to 120 bar, opened lo-torque valve. No pressure drop seen when opening lo-torque. +Checked all valves and hoses. R/D hose on A-annulus wing and observed cement residues coming out from hose. +Replaced hose.",1.75 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 02:45:00+00:00,2016-08-03 03:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Pressured up ASV control line to 420 bar. Pressured up A-annulus from cement unit to 50 bar. Pumped 136 ltrs from 10 bar to 50 bar (expected volume to pump 82 ltrs). Possible air/gas. +Bled off pressure through mud-gas separator. +Pressured up A-annulus again to 50 bar while applying 420 bar on ASV control line. Pumped 129 ltrs from 10 bar to 50 bar. Bled down pressure through mud-gas separator.",0.75 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 03:30:00+00:00,2016-08-03 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D cement hose and 7"" swadge.",0.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 03:45:00+00:00,2016-08-03 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U WL,0.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 04:00:00+00:00,2016-08-03 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U wireline equipment.,1.0 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 05:00:00+00:00,2016-08-03 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for handling explosives and P/U toolstring,0.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 05:15:00+00:00,2016-08-03 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U cutter toolstring. Armed the cutter.,0.75 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 06:00:00+00:00,2016-08-03 06:45:00+00:00,520.0,m,fixed,plug abandon -- other,ok,success,RIH w/ cutter toolstring from surface to 520 mMD,0.75 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 06:45:00+00:00,2016-08-03 07:15:00+00:00,505.6,m,fixed,plug abandon -- other,ok,success,"Correlated. Positioned cutter at 505,6 m. Performed cut. Indications of positive cut, heard shot at surface.",0.5 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 07:15:00+00:00,2016-08-03 07:30:00+00:00,70.0,m,fixed,plug abandon -- other,ok,success,"POOH from 505,6 m to 70 m . Average pulling speed 30 m/min.",0.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 07:30:00+00:00,2016-08-03 07:40:00+00:00,70.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for L/D toolstring,0.16666666666666666 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 07:40:00+00:00,2016-08-03 07:50:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D WL toolstring,0.16666666666666666 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 07:50:00+00:00,2016-08-03 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D wireline equipment.,0.16666666666666666 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 08:00:00+00:00,2016-08-03 08:15:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling TH and tubing,0.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 08:15:00+00:00,2016-08-03 09:15:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,R/U C/L spool and built scaffold shelter for operator. Prepared slips.,1.0 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 09:15:00+00:00,2016-08-03 09:45:00+00:00,489.0,m,fixed,plug abandon -- other,ok,success,"Released and pulled TH, 25 ton overpull. Pulled hanger to surface and disconnected control lines from THRT.",0.5 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 09:45:00+00:00,2016-08-03 10:45:00+00:00,489.0,m,fixed,plug abandon -- other,ok,success,RIH again with landing string. POOH and L/D landing string.,1.0 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 10:45:00+00:00,2016-08-03 11:45:00+00:00,489.0,m,fixed,plug abandon -- other,ok,success,"Cut control lines. Blinded off chemical injection line. +Rigged up spooling unit. +Installed FMS slips.",1.0 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 11:45:00+00:00,2016-08-03 12:00:00+00:00,489.0,m,fixed,plug abandon -- other,ok,success,L/D down tubing hanger and running tool,0.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 12:00:00+00:00,2016-08-03 12:15:00+00:00,477.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 489 mMD to 477 mMD.",0.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 12:15:00+00:00,2016-08-03 13:00:00+00:00,477.0,m,fixed,plug abandon -- other,ok,success,Spooling unit not equipped with break. Attached carabiner to avoid spooling out control line when setting slips.,0.75 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 13:00:00+00:00,2016-08-03 14:30:00+00:00,465.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 477 mMD to 465 mMD. Adjusted slips alignment to avoid clamps haning up on slips while POOH. +Rigged up remote control panel outside driller's cabin.",1.5 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 14:30:00+00:00,2016-08-03 17:00:00+00:00,237.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 465 mMD to 237 mMD. Average pulling speed 6,8 jnt/hr.",2.5 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 17:00:00+00:00,2016-08-03 17:15:00+00:00,237.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling tubing with ongoing crew,0.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 17:15:00+00:00,2016-08-03 19:30:00+00:00,8.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 237 mMD to 8 mMD. Average pulling speed 7,5 jnt/hr.",2.25 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 19:30:00+00:00,2016-08-03 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cut control lines and secured same on spool. L/O DHSV. +Marked DHSV. + +Measured length from top box down to cut 10,97 m.",0.5 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 20:00:00+00:00,2016-08-03 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D casing handling equipment. +Meanwhile: Changed inserts in elevator. Installed PS-21 slips",1.75 +15_9_F_14_2016_08_04.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-03T00:00:00+02:00,2016-08-04T00:00:00+02:00,2016-08-03 21:45:00+00:00,2016-08-03 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-03 22:00:00+00:00,2016-08-03 22:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U and M/U cutter BHA. Inspected and set slips. +M/U XO for surface test of cutters.",0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-03 22:30:00+00:00,2016-08-03 23:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"M/U XO with wrong threads (NC38 Vam Eis - DS38). B/O XO and observed damage on XO. +Changed inserts in elevator and P/U single w/ XO from cantilever. M/U same to BHA.",1.0 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-03 23:30:00+00:00,2016-08-03 23:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Lined up for testing cutter,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-03 23:45:00+00:00,2016-08-04 00:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS and tested cutter in rotary. Knives opened at 170 lpm/ 12,5 bar. Secured knives and B/O TDS.",0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 00:15:00+00:00,2016-08-04 00:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,B/O XO and single. L/D same,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 00:30:00+00:00,2016-08-04 00:45:00+00:00,12.0,m,fixed,plug abandon -- cut,ok,success,"RIH with cutter BHA from surface to 12 mMD. +Installed PS-21 slips.",0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 00:45:00+00:00,2016-08-04 02:15:00+00:00,282.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 3 1/2"" DP from 12 m to 282 m. Avg. tripping speed 180 m/hr. +Re-arranged 3 1/2"" HWDP in set-back in order to access 3 1/2"" DP.",1.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 02:15:00+00:00,2016-08-04 02:45:00+00:00,282.0,m,fixed,plug abandon -- cut,ok,success,"Changed to 5 1/2"" handling equipment",0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 02:45:00+00:00,2016-08-04 03:00:00+00:00,363.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 5 1/2"" DP from 282 m to 363 m.",0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 03:00:00+00:00,2016-08-04 03:15:00+00:00,363.0,m,fixed,plug abandon -- other,ok,success,Function tested BOP,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 03:15:00+00:00,2016-08-04 04:15:00+00:00,722.0,m,fixed,plug abandon -- cut,ok,success,"Continued RIH w/ cutter BHA on 5 1/2"" DP from 363 m to 722 m. Average tripping speed 360 m/hr. +Entered 7"" cut carefully at 505,6 m.",1.0 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 04:15:00+00:00,2016-08-04 05:15:00+00:00,736.0,m,fixed,plug abandon -- cut,ok,success,M/U TDS and filled pipe 500 lpm.,1.0 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 05:15:00+00:00,2016-08-04 06:00:00+00:00,754.3,m,fixed,plug abandon -- cut,ok,success,"Recorded paramters: +80 rpm/1-4 kNm; 100 rpm/1-4 kNm +Up/down weight 82/80 ton +200 lpm/58 bar + +Positioned cutter at 754,3 mMD and cut tubing. Observed clear indication of cut, pressure dropped.",0.75 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 06:00:00+00:00,2016-08-04 06:15:00+00:00,754.3,m,fixed,plug abandon -- cut,ok,success,"Lined up on TT and flowchecked well for 10 min, initial loss rate 600 ltr/min. Lost for 7 to 8 min, then static. +Meanwhile: Performed TBT for POOH",0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 06:15:00+00:00,2016-08-04 06:30:00+00:00,684.0,m,fixed,plug abandon -- cut,ok,success,POOH wet w/ cutter BHA from 754 mMD to 684 mMD.,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 06:30:00+00:00,2016-08-04 06:45:00+00:00,684.0,m,fixed,plug abandon -- cut,ok,success,R/U mud bucket,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 06:45:00+00:00,2016-08-04 07:15:00+00:00,280.0,m,fixed,plug abandon -- cut,ok,success,"Continued POOH wet w/ cutter BHA on 5 1/2"" DP from 684 m to 280 m . Avg. tripping speed 800 m/hr.",0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 07:15:00+00:00,2016-08-04 08:15:00+00:00,280.0,m,fixed,plug abandon -- cut,ok,success,"B/O and L/D 3 1/2"" x 5 1/2"" XO +Changed to 3 1/2"" handling equipment.",1.0 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 08:15:00+00:00,2016-08-04 09:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ cutter BHA on 3 1/2"" DP from 280 m to surface . Avg. tripping speed 270 m/hr.",1.0 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 09:15:00+00:00,2016-08-04 09:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutter BHA to HTS,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 09:30:00+00:00,2016-08-04 10:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U FLX cutter BHA assy #1 from cantilever +Meanwhile: Performed TBT for M/U and RIH with BHA",0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 10:00:00+00:00,2016-08-04 10:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Changed inserts in elevator to 5 1/2"".",0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 10:15:00+00:00,2016-08-04 10:45:00+00:00,16.0,m,fixed,plug abandon -- cut,ok,success,"P/U and M/U FLX cutter BHA assy #2. +L/D 2 ea 3 1/2"" pups.",0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 10:45:00+00:00,2016-08-04 12:00:00+00:00,499.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ FLX cutter BHA on 5 1/2"" DP from 16 m to 499 m. Avg. tripping speed 386 m/hr.",1.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 12:00:00+00:00,2016-08-04 12:30:00+00:00,517.0,m,fixed,plug abandon -- cut,ok,success,"Tagged no-go at 517 mMD with 2 ton. +Verified pipe count and marked pipe.",0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 12:30:00+00:00,2016-08-04 12:45:00+00:00,517.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS. +Filled pipe at 500lpm, reduced rate to 250 lpm before full pipe.",0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 12:45:00+00:00,2016-08-04 14:15:00+00:00,516.0,m,fixed,plug abandon -- cut,ok,success,"Recorded parameters: up/down weight 83/79 ton; free rot. torque 1 - 7kNm; 200 lpm / 53 bar, 250 lpm / 90 bar. +Spaced out and placed cutter at 514,8 mMD. +Cut FLX inner mandrel at 514,8 mMD, observed pressure drop. +Stopped rotation and set down 2 ton. Pulled up 6cm and observed pressure increase.",1.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 14:15:00+00:00,2016-08-04 14:30:00+00:00,338.0,m,fixed,plug abandon -- cut,ok,success,"Lined up to TT. +POOH wet w/ cutter BHA on 5 1/2"" DP from 516 m to 338 m. Avg. tripping speed 712 m/hr.",0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 14:30:00+00:00,2016-08-04 14:45:00+00:00,338.0,m,fixed,plug abandon -- cut,ok,success,Performed kick drill,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 14:45:00+00:00,2016-08-04 15:15:00+00:00,16.0,m,fixed,plug abandon -- cut,ok,success,"POOH wet w/ cutter BHA on 5 1/2"" DP from 338 m to 16 m. Avg. tripping speed 644 m/hr.",0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 15:15:00+00:00,2016-08-04 15:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Inspected cutter and L/D BHA.,0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 15:45:00+00:00,2016-08-04 16:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared drill floor.,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 16:00:00+00:00,2016-08-04 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Serviced and greased TDS.,0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 16:30:00+00:00,2016-08-04 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed inserts in elevator. Retrieved spear assy from fingerboard.,0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 17:00:00+00:00,2016-08-04 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for RIH with spear BHA,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 17:15:00+00:00,2016-08-04 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U spear BHA. +Inspected grapple and greased helix.",0.5 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 17:45:00+00:00,2016-08-04 18:00:00+00:00,41.0,m,fixed,plug abandon -- trip,ok,success,P/U and M/U single,0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 18:00:00+00:00,2016-08-04 18:45:00+00:00,498.0,m,fixed,plug abandon -- trip,ok,success,"RIH w/ spear BHA on 5 1/2"" DP from 41 m to 498 m . Avg. tripping speed 610 m/hr.",0.75 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 18:45:00+00:00,2016-08-04 20:00:00+00:00,511.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS and took up/down weights 82/74 ton. +Engaged fish. Worked string up/down several times with max 22 ton OP/WOB. +Pulled FLX free with 23 ton OP. +Pulled up 3 m and waited 30 min for elements to retract.",1.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 20:00:00+00:00,2016-08-04 21:15:00+00:00,58.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ spear BHA and FLX/tubing on 5 1/2"" DP from 508 m to 58 m . Avg. tripping speed 360 m/hr.",1.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 21:15:00+00:00,2016-08-04 21:30:00+00:00,43.0,m,fixed,plug abandon -- trip,ok,success,"L/D 5 1/2"" DP single.",0.25 +15_9_F_14_2016_08_05.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-04T00:00:00+02:00,2016-08-05T00:00:00+02:00,2016-08-04 21:30:00+00:00,2016-08-04 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with fish and set slips on tubing. +Removed clamps and released spear.",0.5 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-04 22:00:00+00:00,2016-08-04 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Inspected and greased grapple. +R/B spear BHA.",0.5 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-04 22:30:00+00:00,2016-08-04 22:45:00+00:00,249.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/U csg handling equipment.,0.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-04 22:45:00+00:00,2016-08-04 23:30:00+00:00,249.0,m,fixed,plug abandon -- other,ok,success,"R/U handling equipment for pulling 7"" tubing. +Installed spooler unit.",0.75 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-04 23:30:00+00:00,2016-08-05 00:30:00+00:00,236.0,m,fixed,plug abandon -- other,ok,success,"Pulled out with ASV/FLX assy. +Installed FMS slips. +L/D ASV/FLX and pup joint. +Performed LRA readings.",1.0 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 00:30:00+00:00,2016-08-05 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7"" tubing from 236 to surface. Average pulling speed 8 jnts/hr. +Performed LRA readings every 5th joint.",2.75 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 03:15:00+00:00,2016-08-05 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed FMS slips and installed master bushing +R/D casing tong.",0.75 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 04:00:00+00:00,2016-08-05 04:15:00+00:00,41.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U spear BHA (run#13), RIH to 41m",0.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 04:15:00+00:00,2016-08-05 05:45:00+00:00,754.0,m,fixed,plug abandon -- trip,ok,success,"RIH w/ spear BHA (run#13) on 5,5in DP from 41 m to 754m. RIH speed 475m/h",1.5 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 05:45:00+00:00,2016-08-05 06:00:00+00:00,754.0,m,fixed,plug abandon -- trip,ok,success,"Recorded weights up-92t, down-86t",0.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 06:00:00+00:00,2016-08-05 06:30:00+00:00,754.0,m,fixed,plug abandon -- other,ok,success,"Engaged spear, pulled tubing free at 168t hook weight. No indication of pins shearing noticed when tubing went free",0.5 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 06:30:00+00:00,2016-08-05 07:00:00+00:00,754.0,m,fixed,plug abandon -- trip,ok,success,Observed backflow from the tubing. Pulled one stand and monitored backflow. No change,0.5 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 07:00:00+00:00,2016-08-05 08:30:00+00:00,81.0,m,fixed,plug abandon -- trip,ok,success,Continued to POOH wet from 754m to 81m,1.5 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 08:30:00+00:00,2016-08-05 08:45:00+00:00,81.0,m,fixed,plug abandon -- trip,ok,success,Flowchecked well for 15 min. Stable,0.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 08:45:00+00:00,2016-08-05 09:00:00+00:00,41.0,m,fixed,plug abandon -- trip,ok,success,POOH w/ fish from 81m to 41 m. Meanwhile held TBT for rigging up casing tongs,0.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 09:00:00+00:00,2016-08-05 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed casgin tongs over well center, changed PS21 slips to master bushing",1.0 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 10:00:00+00:00,2016-08-05 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to release spear from the fish,0.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 10:15:00+00:00,2016-08-05 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Released spear and inspected grapple. Grapple in good condition. R/B spear BHA (run#13) in derrick,0.5 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 10:45:00+00:00,2016-08-05 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Broke off cut. Observed high torque. Changed elevator inserts and pulled out 1x single, removed clamp and L/D same",1.0 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 11:45:00+00:00,2016-08-05 12:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Cleaned and inspected swage before M/U,0.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 12:00:00+00:00,2016-08-05 13:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,M/U swage. Overtorqued connection due to wrong setting on casing tongs. Broke off swedge and inspected connection. Performed TBT prior to pull out overtorqued box,1.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 13:15:00+00:00,2016-08-05 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"POOH w/ tubing with overtorqued box, arranged double securing to box. Set slips, removed double securing to box. Removed clamp and broke off single, L/D same",0.75 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 14:00:00+00:00,2016-08-05 15:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Inspected box treads. P/U backup 7in pup w/ expandable plug. Alligned pup over stump, made up 2x turns with chain tong, removed elevators and M/U connection w/ casing tong",1.0 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 15:00:00+00:00,2016-08-05 15:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,M/U swedge to 7in tubing,0.5 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 15:30:00+00:00,2016-08-05 16:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,R/D casing tong,0.75 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 16:15:00+00:00,2016-08-05 16:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,M/U stand of 5.5in DP to swedge. Changed out master bushing to PS21 slips,0.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 16:30:00+00:00,2016-08-05 18:45:00+00:00,2541.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ 7in tubing on 5,5in DP from 1816m to 2541m . Filled pipe every 250m",2.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 18:45:00+00:00,2016-08-05 19:00:00+00:00,2578.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS, RIH to 2578m",0.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 19:00:00+00:00,2016-08-05 19:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting for cement operation,0.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 19:15:00+00:00,2016-08-05 20:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed cement stand, M/U TDS again, installed cement hose. End of tubing is at 2581m before started pumping",1.25 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 20:30:00+00:00,2016-08-05 21:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Circulated 45m3 of SW at 3000lpm/89bar. When 40m3 pumped pulled string to 2580m. 0.3% HC gas observed in returns. Circulated additional 10m3 of SW. Totally circulated 55m3 of SW. Pumped 20m3 of wash pill at 2700lpm/76bar,0.75 +15_9_F_14_2016_08_06.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-05T00:00:00+02:00,2016-08-06T00:00:00+02:00,2016-08-05 21:15:00+00:00,2016-08-05 22:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Pressure tested last line connection to pump in sub to 310bar for 3 min. Good test. Bled off pressure to 20bar. Opened LTV and confirmed line up.,0.75 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-05 22:00:00+00:00,2016-08-05 23:00:00+00:00,2580.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (2330 m - 2580 m ): Mixed and pumped 9,2 m3 of 1,9 SG cement slurry, 630 l/min. Displaced the cement to the rig floor with 2900 l of drill water. Zeroed volume counters. Displaced the cement with 30,7 m3 (1386 strokes) of SW, 2000 l/min/ 3 bar.",1.0 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-05 23:00:00+00:00,2016-08-05 23:45:00+00:00,2295.0,m,fixed,plug abandon -- cement plug,ok,success,Pulled out of cement to 2295 m MD. Theoretical TOC 2330 m MD.,0.75 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-05 23:45:00+00:00,2016-08-06 01:00:00+00:00,2287.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed sponge ball, M/U TDS, pulled to 2287m. Pumped 10m3 of hi-vis pill. Circulated total of 74m3 at 2700lpm-38bar until clear returns observed.",1.25 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 01:00:00+00:00,2016-08-06 01:15:00+00:00,2219.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 2287m to 2219m.,0.25 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 01:15:00+00:00,2016-08-06 02:45:00+00:00,2219.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed BOP jetting tool, washed BOP cavitied with 1450lpm, 8bar, made 5 passes. Function tested BOP and washed another 5 passes.",1.5 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 02:45:00+00:00,2016-08-06 03:45:00+00:00,1843.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 2215m to 1843m.,1.0 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 03:45:00+00:00,2016-08-06 05:45:00+00:00,1843.0,m,fixed,plug abandon -- other,ok,success,Removed PS21 slips and R/U casing pulling equipment,2.0 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 05:45:00+00:00,2016-08-06 06:00:00+00:00,1843.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for pulling tubing,0.25 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 06:00:00+00:00,2016-08-06 06:30:00+00:00,1843.0,m,fixed,plug abandon -- other,ok,success,"Broke swage, R/B stand of drill pipe and changed BX elevator inserts",0.5 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 06:30:00+00:00,2016-08-06 11:45:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7in tubing from 1816m to 1366m (38 joints or 450m of tubing), removed clamps and spooled control line. Average pulling speed 7.2 joints/hour, max pulling speed 10 joints/hour. +Cut control line and secured to tubing with clamp on the last joint. Observed fluid spraying out of control line",5.25 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 11:45:00+00:00,2016-08-06 12:00:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for engaging spear and R/D casing pulling equipment. Observed fluid spraying out of control line,0.25 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 12:00:00+00:00,2016-08-06 12:30:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,Crimped control line to stop fluid spraying out. Removed spooler and scaffold shelter from setback area,0.5 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 12:30:00+00:00,2016-08-06 13:00:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,P/U spear and engaged in 7in tubing. RIH w/ spear below rotary to change slips,0.5 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 13:00:00+00:00,2016-08-06 14:30:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,R/D casing equipment and installed PS21 slips. Removed tong from frame in preparation for next operation. Meanwhile change BX elevators out for offline inspection and inspected and greased 10 3/4in grapple,1.5 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 14:30:00+00:00,2016-08-06 15:15:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,Serviced both PRSs,0.75 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 15:15:00+00:00,2016-08-06 15:30:00+00:00,1366.0,m,fixed,plug abandon -- other,ok,success,"Cleared rig floor, meanwhile Installed inserts in BX elevators. Doped pipe in derrick",0.25 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 15:30:00+00:00,2016-08-06 17:00:00+00:00,2278.0,m,fixed,plug abandon -- trip,ok,success,RIH w/ tubing on spear to 2278m. Avg. tripping speed 680 m/hr.,1.5 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 17:00:00+00:00,2016-08-06 18:15:00+00:00,2359.0,m,fixed,plug abandon -- trip,ok,success,Washed down from 2247m to 2320m with 560l/min and 6 bar. Did not find hard cement. Decreased flow to 222lt/min 1.2bar and continued to wash down to 2359m,1.25 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 18:15:00+00:00,2016-08-06 19:30:00+00:00,2335.0,m,fixed,plug abandon -- trip,ok,success,"POOH from 2359m to 2335m and circulated bottom up with 1350l/min 53bar and then increased to 2020l/min 109bar. In the end of circulation some loose cement was observed in the shakers along with consolidated clumps of cement. Otherwise mostly clean fluid in returns. +Meanwhile recalculated BHA figures after discrepancy was found",1.25 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 19:30:00+00:00,2016-08-06 20:30:00+00:00,2420.0,m,fixed,plug abandon -- trip,ok,success,"Washed down from 2335m to 2420m with 560l/min 7,4 bar. Did not encounter hard cemtent. 60m left to go before hitting minimum length of plug (at 2480m). +When making connections observed back flow from DP indicating heavier fluid in annulus",1.0 +15_9_F_14_2016_08_07.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-06T00:00:00+02:00,2016-08-07T00:00:00+02:00,2016-08-06 20:30:00+00:00,2016-08-06 22:00:00+00:00,2398.0,m,fixed,plug abandon -- trip,ok,success,"POOH from 2420m to 2398m and circulated BTM up with 2020 l/min, 106bar. Reduced flow just before BTM up due to possible cement in returns. After BTM up , increased flow to 2660 l/min and 180bar and continued to circulate. Observed some loose cement in returns on shakers.",1.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-06 22:00:00+00:00,2016-08-06 23:00:00+00:00,2398.0,m,fixed,plug abandon -- other,ok,success,Evaluated situation. Discussed situation w/ cementing support onshore organisation. 24 hours WOC by now. Agreed to continue attempting to tag cement,1.0 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-06 23:00:00+00:00,2016-08-07 00:30:00+00:00,2456.5,m,fixed,plug abandon -- trip,ok,success,"Continued to wash down from 2398m with 560l/min 20-25bar, observed pressure spikes up to 85 bar. +Tagged hard cement at 2456,5m with 12t, 530l/min, 22bar. +Length of cement plug 123,5m (2456,5m - 2580m)",1.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 00:30:00+00:00,2016-08-07 00:45:00+00:00,1096.5,m,fixed,plug abandon -- trip,ok,success,"Released spear from tubing: set down 30ton, 2x turns right, pull up 200m to confirm free. Top of tubing in the well at 1096,5m",0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 00:45:00+00:00,2016-08-07 02:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ spear BHA (run#16) on 5,5in DP to surface. Average pulling speed 703m/hour",1.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 02:15:00+00:00,2016-08-07 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ spear BHA (run#16), inspected and R/B same",0.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 02:45:00+00:00,2016-08-07 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed PS 21 and installed master bushing,0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 03:00:00+00:00,2016-08-07 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting for retrieve MS-T surface seal assy,0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 03:15:00+00:00,2016-08-07 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U MS-T seal retrieving tool. M/U to stand and function tested tool,1.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 04:45:00+00:00,2016-08-07 05:00:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ MS-T seal retrieving tool. Landed of at 20, 5m",0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 05:00:00+00:00,2016-08-07 05:15:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting for retrieve MS-T surface seal assy w/ new crew,0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 05:15:00+00:00,2016-08-07 06:00:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,Attempted to engage tool by rotating 5 turns to the left with chain tongs. No go,0.75 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 06:00:00+00:00,2016-08-07 07:00:00+00:00,21.0,m,fixed,plug abandon -- other,ok,success,"Discussed forward plan, removed double from stand above retrieval tool, picked up 1.5m pup and 3m pup",1.0 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 07:00:00+00:00,2016-08-07 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Attempted to engage tool by rotating 5 turns to the left using chain tongs. Only able to get Approx. 1 ¼ turns,0.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 07:30:00+00:00,2016-08-07 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rotated tool out and retrieved to surface, inspected same. Marks observed on the outside of the tool",0.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 08:00:00+00:00,2016-08-07 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Evaluated situation,0.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 08:30:00+00:00,2016-08-07 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U wash tool, M/U to FOSV then to double and measured in hole. Jetted BOP 1500 l/min, 8.7 Bar, 5 RPM, TQ 0-1 KNM. Function tested BOP",1.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 10:00:00+00:00,2016-08-07 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to jet BOP after function test. 1500 l/min, 8.7 Bar, 5 RPM, TQ 0-1 KNM",0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 10:15:00+00:00,2016-08-07 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"B/O TDS and measured in to top of well head, M/U to TDS and jetted wellhead seal area 1500 l/min, 8.7 Bar, 5 RPM, TQ 0-1 KNM",0.75 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 11:00:00+00:00,2016-08-07 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with wash tool and lay out same,0.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 11:30:00+00:00,2016-08-07 11:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Repaired elevator leak. Replaced valve on same,0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 11:45:00+00:00,2016-08-07 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Transfered MS-T seal retrieval tool to TDS and re-positioned hose spools,0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 12:00:00+00:00,2016-08-07 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with retrieval tool and attempted to engage tool by rotating 5 turns to the left. Approx. 3,5 - 3,75 turns",1.0 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 13:00:00+00:00,2016-08-07 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released tool and POOH, inspected same. Marks observed on the outside of the tool",0.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 13:30:00+00:00,2016-08-07 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Contacted wellhead support organization regarding forward plan for pulling the MS-T seal. +Meanwhile inspect TDS, covered electrical equipment on drill floor in preparation for deluge test. Performed deluge test on rig floor. +Crane operator moved equipment to rig floor due to high wind forecast in preparation for next ops. Re-arranged link tilt arms on TDS",2.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 15:45:00+00:00,2016-08-07 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH and engaged by rotating the retrieval tool 3,75 turns to the left. Connected hose to pump and energize lock ring and bled off pressure. Then pressured up MS-T seal. M/U TDS and retrieved MS-T seal w/ 87T overpull observed. POOH with MS-T seal",1.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 17:00:00+00:00,2016-08-07 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Released seal assembly from tool. L/D retrieval tool,1.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 18:30:00+00:00,2016-08-07 19:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to high winds (48knot) for crane operations. Meanwhile serviced drilling equipment and performed housekeeping. Prepared work permits for crane work in high winds,0.5 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 19:00:00+00:00,2016-08-07 19:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U cutter assembly and inspected same (BHA#18),0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 19:15:00+00:00,2016-08-07 20:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"M/U to 5,5in DP stand and TDS and RIH to position cutters at 23.6m , recorded drilling parameters 300l/min - 29bar, 500l/min - 90bar, 70t up / 65t down",0.75 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 20:00:00+00:00,2016-08-07 20:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Cut 10 3/4in surface tie back at 23,6m with 300l/m and 80 rpm 2 - 12 torque. Good sound indication of successful cut heard on surface",0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 20:15:00+00:00,2016-08-07 20:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH with cutter (BHA#18) from 23.6m, inspect knives, L/D BHA",0.25 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 20:30:00+00:00,2016-08-07 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U w/ ITCO spear (BHA#19). RIH, took up/down weights: 70t up/67t down. Engaged fish",1.0 +15_9_F_14_2016_08_08.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-07T00:00:00+02:00,2016-08-08T00:00:00+02:00,2016-08-07 21:30:00+00:00,2016-08-07 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Released spear from fish and R/B same, L/D fish",0.5 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-07 22:00:00+00:00,2016-08-07 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed prejob meeting to P/U torque tool,0.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-07 22:15:00+00:00,2016-08-07 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U torque tool (BHA#20),0.5 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-07 22:45:00+00:00,2016-08-08 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ torque tool (BHA#20) to 135m. Washed down from 135m to 140,5m w/ 150lpm - 12 bar. Positioned tool at no-go (140,34m), applied torque gradually to 30 kNm and rotated 6 turns left to release adapter. Observed break in string",2.0 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 00:45:00+00:00,2016-08-08 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Rotated 6 turns right to make up possibly broken connection in the string w/ torque limit of 5kNm. POOH and checked every connection. Discovered broken 5.5in DP connection below rotary table. Continued to POOH, checked all connections on the way out. Inspected torque tool.",0.5 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 01:15:00+00:00,2016-08-08 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ torque tool on 5.5in DP. DP torqued to 52kNm. +Repeated sequence to release tieback adapter. Observed string broke at 30kNm and rotated 6 turns left to release adapter. Rotated 6 turns right to make up possibly broken connection in the string w/ torque limit of 5kNm. POOH and checked every connection. Discovered broken 5.5in DP connection below rotary table. Continued to POOH, checked all connections on the way out. Inspected torque tool.",1.75 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 03:00:00+00:00,2016-08-08 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ torque tool on5,5in HWDP. Connection torqued up to 67kNm. P/U last stand with overtorqued 5,5in DP and M/U connection to 57kNm. Attempted to release tieback adapter. Observed saver sub backing off at 30kNm",1.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 04:15:00+00:00,2016-08-08 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Evaluated situation. Decided to make another attempt using rig tongs,0.75 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 05:00:00+00:00,2016-08-08 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for using rig tongs,0.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 05:15:00+00:00,2016-08-08 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to release tieback adapter using rig tongs. Applied up to 40kNm, observed break in the string. Turned 4 turns left and measured, no noticable change. Screw string back 4 turns",0.75 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 06:00:00+00:00,2016-08-08 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH and checked every connection. Discovered broken 5.5in DP connection between HWDP and DP, M/U connection to 57kNm. Continued to POOH, checked all connections on the way out. Inspected torque tool",1.5 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 07:30:00+00:00,2016-08-08 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Broke off torque tool and L/D same. Meanwhile discussed forward plan,0.75 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 08:15:00+00:00,2016-08-08 08:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U 10 3/4in casing cutter and RIH same,0.5 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 08:45:00+00:00,2016-08-08 09:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to RIH w/ high wind and wind direction affecting running equipment,0.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 09:00:00+00:00,2016-08-08 09:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,RIH w/ 10 3/4in csg cutter BHA to 87m. Stopped operation due to high wing causing the drag chains to twist laterally,0.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 09:15:00+00:00,2016-08-08 11:15:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW. Meanwhile changed dies and dies holder in IR,2.0 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 11:15:00+00:00,2016-08-08 12:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 10 3/4in csg cutter BHA from 87m to 127m. M/U TDS, filled string, recorded parameters: 300 l/min - 27bar, 400l/min - 53bar, 500l/min - 84bar, up/down 73t/70t. RIH to 136m",0.75 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 12:00:00+00:00,2016-08-08 12:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Cut casing at 136m with 300l/min - 27,5bar - 80rpm - 2-10kNm. Observed pressure droped to14 bar. Increased slowly to 26,5bar. Increased rate to 400l/min - 45 bar. Confirmed cut by no rotation and 500l/min - 83bar. Lifted casing on knifes +/- 15cm w/ 8t overpull",0.5 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 12:30:00+00:00,2016-08-08 13:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ cutter from 136m to surface. Meanwhile performed kick drill 31 sek. L/D cutter,0.75 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 13:15:00+00:00,2016-08-08 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U spear BHA,0.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 13:30:00+00:00,2016-08-08 14:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,RIH w/ spear to 34m. Took up/down weights 72t/68t,0.5 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 14:00:00+00:00,2016-08-08 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Engaged fish w/ 1 turn left, pulled up to 82 ton on hook load",0.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 14:15:00+00:00,2016-08-08 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with fish from 34m. Released spear. Closed annular with 270psi and pulled slowly out of fish. R/B spear. Meanwhile performed TBT for R/U casing equipment,1.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 15:30:00+00:00,2016-08-08 17:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U handling equipment for 10 3/4in csg,1.5 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 17:00:00+00:00,2016-08-08 17:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to pull casing,0.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 17:15:00+00:00,2016-08-08 17:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Broke out and L/D casing cut and pup,0.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 17:30:00+00:00,2016-08-08 17:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Installed BX3 elevator w/ 10 3/4in inserts,0.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 17:45:00+00:00,2016-08-08 20:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,POOH w/ 10 3/4in csg tieback from 136m to surface. Totally 10 joints pulled,2.5 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 20:15:00+00:00,2016-08-08 20:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/D csg tong,0.25 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 20:30:00+00:00,2016-08-08 21:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D csg tong,0.5 +15_9_F_14_2016_08_09.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-08T00:00:00+02:00,2016-08-09T00:00:00+02:00,2016-08-08 21:00:00+00:00,2016-08-08 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U torque tool and RIH on 3x stands of 5,5in HWDP and 1x stand overtorqued 5,5in DP. M/U all connections to 67kNm",1.0 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-08 22:00:00+00:00,2016-08-08 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to use manual rig tong,0.25 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-08 22:15:00+00:00,2016-08-09 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to release tieback adapter w/ manual tongs several times. Applied left hand torque in steps. Used TDS brake to lock in torque when making new bite with manual tong. Adapter came loose at 42kNm torque. Rotated string approximately 6 turns left, observed mark on pipe moved 3 inches up",1.75 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 00:00:00+00:00,2016-08-09 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ torque tool, L/D same",0.75 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 00:45:00+00:00,2016-08-09 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U ITCO spear (BHA#24). RIH same on 5,5 DP to top of the fish at 136m. Engaged spear to fish.",1.0 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 01:45:00+00:00,2016-08-09 02:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH w/ fish from 136m to surface,0.75 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 02:30:00+00:00,2016-08-09 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Set slips on 10 3/4in tieback casing stump. Released spear and R/B same. L/D tieback adapter fish,0.75 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 03:15:00+00:00,2016-08-09 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.5 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 03:45:00+00:00,2016-08-09 04:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to handle guns,0.25 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 04:00:00+00:00,2016-08-09 05:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,M/U gun (BHA#25),1.0 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 05:00:00+00:00,2016-08-09 05:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to RIH w/ gun,0.25 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 05:15:00+00:00,2016-08-09 06:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,RU to run gun. Changed handling equipment,1.0 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 06:15:00+00:00,2016-08-09 07:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,RIH w/ gun (BHA#25) to 140m. Installed gog collar on all stands. P/U 3m pup,1.0 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 07:15:00+00:00,2016-08-09 07:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"M/U TDS. Took up/down weights: 73t/69t, RIH to 148,5m bottom shot",0.25 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 07:30:00+00:00,2016-08-09 08:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Closed UPR, opened choke. Applied 10 bar on IBOP. Opened IBOP to confirm line up. Filled string. Opened UPR, Broke off TDS and droped 1 1/8 ball in string. M/U TDS. Closed UPR and opened choke. Fired guns with 130 L/m, 137 bar. Top shot at 145,5m, bottom shot at 148,5m +Continued to circulate w/ 160l/min - 4,8 bar. Mud in returns",1.0 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 08:30:00+00:00,2016-08-09 09:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Increased pump rate to 1000l/min -7,6 bar. Pressure droped to 2,7 Bar. Observed only water in returns. Circulated 2x bottom up, max gas 0,1%. Stoped pumps. +Observed H2S readings after 2 min. Continued to circulate w/ 1000l/min - 2,7 bar. Max H2S gas in return fluid 8ppm",0.75 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 09:15:00+00:00,2016-08-09 09:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Flowchecked well over choke. Static,0.25 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 09:30:00+00:00,2016-08-09 09:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Flowchecked well over trip tank. Static,0.25 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 09:45:00+00:00,2016-08-09 10:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"L/D 3m pup. POOH w/ gun (BHA#25) from 148,5m to 14,4m",0.75 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 10:30:00+00:00,2016-08-09 11:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Broke off firing head, recovered blank, L/D BHA and single. All shots fired",1.0 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 11:30:00+00:00,2016-08-09 11:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Changed handling equipment,0.25 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 11:45:00+00:00,2016-08-09 12:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting to P/U milling assy (BHA#26),0.25 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 12:00:00+00:00,2016-08-09 14:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U cutter assy (BHA#21), broke off float sub, L/D cutter assy (BHA#21). +M/U taper mill and hanger mill (BHA#26), changed handling equipment. P/U Shock tool and M/U to taper/hanger mill. Installed float sub, installed string magnet and x-over",2.0 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 14:00:00+00:00,2016-08-09 16:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U 9x 8,25in DC from cantilever and RIH. +RIH to 135M w/ 1x stand of overtorqued 5,5in DP",2.5 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 16:30:00+00:00,2016-08-09 17:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Carried out drop check on TDS. Serviced drilling equipment,0.75 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 17:15:00+00:00,2016-08-09 18:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U single. Recorded parameters: up/down weights - 86t/82t, 80 rpm, 2000l/min - 11bar. Tagged at 140,44m",0.75 +15_9_F_14_2016_08_10.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-09T00:00:00+02:00,2016-08-10T00:00:00+02:00,2016-08-09 18:00:00+00:00,2016-08-09 22:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Mill 10 3/4in subsea csg hanger. 1970l/min, 9bar, 80-120rpm, 5-13kNm, 1-8t WOB",4.0 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-09 22:00:00+00:00,2016-08-09 22:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Continued milling 10 3/4in subsea csg hanger. 1970l/min, 9bar, 80-120rpm, 5-13kNm, 1-8t WOB. Heard sound and observed loss of WOB indicating casing parted from hanger. Total of 27cm milled.",0.75 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-09 22:45:00+00:00,2016-08-09 23:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Passed up/down several times through hanger area with and without rotation. Max 4t overpull without rotation. Tagged casing stump at 141,84m w/ 4t.",0.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-09 23:00:00+00:00,2016-08-10 00:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Dressed off top of casing from 141,84m to 141,91m (7cm). Parameters: 1970l/min, 80-120rpm, 5-13kNm, WOB 1-6t",1.75 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 00:45:00+00:00,2016-08-10 01:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Circulated 2x BU 3000l/min - 23bar,0.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 01:00:00+00:00,2016-08-10 01:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,L/D 1x DP single,0.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 01:15:00+00:00,2016-08-10 01:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Performed drops inspection and service on TDS. Observed loss in TT of +/- .8m3/hour. +Inspected and confirmed no leak on surface",0.5 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 01:45:00+00:00,2016-08-10 03:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Continued monitoring well on TT while discussing way forward. Meanwhile TBT for POOH. Constant loss rate of 0,8m3/hour",1.5 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 03:15:00+00:00,2016-08-10 04:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"POOH w/ milling BHA to surface. Losses decreased to +/- 0,4m3/hour while POOH",1.0 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 04:15:00+00:00,2016-08-10 05:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"L/D milling BHA. Inspected magnet. Very fine swarf observed, not possible to weigh. +Loss rate less than 0,1m3/hour",0.75 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 05:00:00+00:00,2016-08-10 05:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Cleaned and cleared rig floor,0.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 05:15:00+00:00,2016-08-10 05:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to P/U cutting assembly,0.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 05:30:00+00:00,2016-08-10 07:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,M/U cutting assembly,1.75 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 07:15:00+00:00,2016-08-10 07:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Installed PS21,0.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 07:30:00+00:00,2016-08-10 08:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH with cutting assy from 16M on 5,5in DP to 767M",1.0 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 08:30:00+00:00,2016-08-10 10:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"LD 1x DP single. M/U spear assy. Removed PS21, installed master bushing. +Inspected and greased up spear. +RIH 1x stand of DC",2.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 10:45:00+00:00,2016-08-10 11:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,RIH from 821m to 900m on DP. Filled string. Up/down weights 106t/100t. RIH to 918.9m,0.75 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 11:30:00+00:00,2016-08-10 12:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Pulled up to 170t on hook load (10 ton overpull) in order to engage spear inside 10 3/4in csg and put casing in tension +Started cutting casing: 1700l/min - 92 bar, 1800l/min - 97 bar, 1900l/min - 101 bar, 2000l/min - 104 bar. +Pulled up to 187t on hook load (25t overpull). Increased to 2200l/min - 124 bar. Casing cut at 915.2m",1.0 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 12:30:00+00:00,2016-08-10 12:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Pulled up through 10 3/4 hanger with 10 3/4in casing, ok to pass. +RIH back, released spear from 10 3/4in casing fish",0.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 12:45:00+00:00,2016-08-10 16:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Pulled free of fish, hung up with grapple at 139.4m through hanger. Troubleshoot to get through. +Attempted to pull with max 10 ton overpull - no success. +Pulled up slowly and rotate to the right - no success. Tried to rotate to the left and pull - no success. +Pulled and pumped with 200l/min - 4 bar, pressure increased to 30bar when took weight at 139.4m. +RIH and engaged spear inside 10 3/4in csg, pulled same through the hanger - ok. +Rotated it 4.5 turns to the left (2-3k torq) to reposition casing fish inside the well. Landed fish in the well and released spear. +Attempted to pull spear through hanger - no success. Pulled up total of 3,4m from top of csg stump at 141.9m",3.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 16:00:00+00:00,2016-08-10 19:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Evaluated situation. Discussed w/ onshore organisation. Meanwhile manufacturing c-plate to be able to hang off weight of the inner string +Decided way forward: +- pull csg fish on spear +- release spear from fish +- instal string stab above spear +- engage spear on surface, RIH fish on spear +- release spear, POOH",3.5 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 19:30:00+00:00,2016-08-10 19:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed Pre-job Meeting to pull out fish on spear to surface,0.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 19:45:00+00:00,2016-08-10 21:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Engaged spear to fish. POOH fish slowly. +Top of fish hang up in hanger area. Rotated string 180 deg left, pulled up. Went through +When POOH observed overpull spikes on weight indicator several times. Max spike value of 40t",1.25 +15_9_F_14_2016_08_11.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-10T00:00:00+02:00,2016-08-11T00:00:00+02:00,2016-08-10 21:00:00+00:00,2016-08-10 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"R/B 1x stand of DC, L/D bumper sub and string stab",1.0 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-10 22:00:00+00:00,2016-08-10 23:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Installed lifting sub, P/U string and set slips on casing. Released spear from fish. +Inspected spear grapple. No signs of impact on grapple observed. Grapple in good condition",1.0 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-10 23:00:00+00:00,2016-08-10 23:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Installed C-plate and additional BX-elevator as false rotary on top of casing stump. +Set of weight of string in BX-elevator and broke connection above. +L/D Spear assembly on HTS",0.5 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-10 23:30:00+00:00,2016-08-10 23:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed Pre-job Meeting to rearrange BHA,0.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-10 23:45:00+00:00,2016-08-11 01:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Rearanged spear BHA in foxhole to include 1x string stab (12in OD) above the spear grapple,1.75 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 01:30:00+00:00,2016-08-11 02:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"P/U spear assembly and M/U to DP in well center +Engaged spear to 10 3/4in csg fish",0.5 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 02:00:00+00:00,2016-08-11 03:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,RIH w/ 10 3/4in csg fish on spear. Released spear from the fish,1.0 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 03:00:00+00:00,2016-08-11 04:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Attempted to pull spear several times. Max overpull of 10t, with and without torque. No success",1.5 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 04:30:00+00:00,2016-08-11 07:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Engaged fish on spear. Evaluated situation. Discussed way forward. Reviewed BHA/well schematic and concluded that it was not grapple that hung off, but taper mill hung off. +Meanwhile cleared rig floor, serviced drilling equipment, removed scaffold from forward RPS",3.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 07:45:00+00:00,2016-08-11 08:30:00+00:00,918.9,m,fixed,interruption -- repair,ok,success,Released fish. Pulled gradually to 170t weight on hook (65t overpull). Observed drop on hook load to 103t indicating string free.,0.75 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 08:30:00+00:00,2016-08-11 09:30:00+00:00,918.9,m,fixed,plug abandon -- cut,ok,success,"POOH w/ BHA#27 on 5,5in DP from 910 m to 789m.",1.0 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 09:30:00+00:00,2016-08-11 11:00:00+00:00,789.0,m,fixed,plug abandon -- cut,ok,success,"Removed Xover and pup above drill collar. Installed bumper sub. +Inspected, cleaned and serviced grapple. Broke out Xover below spear and installed ball sub.",1.5 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 11:00:00+00:00,2016-08-11 11:30:00+00:00,774.0,m,fixed,plug abandon -- cut,ok,success,"R/B spear assy, L/D pup joints, P/U single",0.5 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 11:30:00+00:00,2016-08-11 11:45:00+00:00,774.0,m,fixed,plug abandon -- cut,ok,success,Installed PS 21,0.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 11:45:00+00:00,2016-08-11 12:45:00+00:00,16.0,m,fixed,plug abandon -- cut,ok,success,POOH from 741m w/ cutter using mud bucked to 16m,1.0 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 12:45:00+00:00,2016-08-11 13:00:00+00:00,16.0,m,fixed,plug abandon -- cut,ok,success,Removed PS 21 and installed master bushing,0.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 13:00:00+00:00,2016-08-11 14:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ cutter assy. L/D same. Inspected cutter. Signes of wear on the knives. Piece of taper mill missing (size of 2-3cm),1.0 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 14:00:00+00:00,2016-08-11 14:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleared and cleaned rig floor,0.5 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 14:30:00+00:00,2016-08-11 14:45:00+00:00,27.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U spear BHA (run#28). Inspected and serviced grapple,0.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 14:45:00+00:00,2016-08-11 15:00:00+00:00,108.0,m,fixed,plug abandon -- trip,ok,success,RIH w/ spear assy from 27m to 108m,0.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 15:00:00+00:00,2016-08-11 15:15:00+00:00,144.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS. Up /down weights 75t/71t. RIH to 144m to engage fish. Took 5 ton over pull to confirm fish engaged +Pulled to 130t on hook load. Casing free",0.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 15:15:00+00:00,2016-08-11 15:45:00+00:00,771.0,m,fixed,plug abandon -- trip,ok,success,POOH w/ 10 3/4in csg fish on spear until spear on surface,0.5 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 15:45:00+00:00,2016-08-11 16:00:00+00:00,771.0,m,fixed,plug abandon -- trip,ok,success,Pulled spear assy and set casing fish in slips,0.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 16:00:00+00:00,2016-08-11 16:30:00+00:00,771.0,m,fixed,plug abandon -- other,ok,success,"Released spear, inspected and R/B",0.5 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 16:30:00+00:00,2016-08-11 18:15:00+00:00,771.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U handling equipment for 10 3/4in casing,1.75 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 18:15:00+00:00,2016-08-11 18:30:00+00:00,769.0,m,fixed,plug abandon -- equipment recovery,ok,success,Broke out 10 3/4in pup joint and L/D same,0.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 18:30:00+00:00,2016-08-11 18:45:00+00:00,769.0,m,fixed,plug abandon -- equipment recovery,ok,success,Removed master bushing and installed FMS slips,0.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 18:45:00+00:00,2016-08-11 19:00:00+00:00,769.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to pull 10 3/4in csg,0.25 +15_9_F_14_2016_08_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-11T00:00:00+02:00,2016-08-12T00:00:00+02:00,2016-08-11 19:00:00+00:00,2016-08-11 22:00:00+00:00,410.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4in casing from 769m to 410 m. Average 10,7 joints/hr. Max 13 joints/hr +Inspected perforated csg joint. Good flow area through perforation is observed",3.0 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-11 22:00:00+00:00,2016-08-11 23:30:00+00:00,230.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4in casing from 410m to 230 m. Average pulling speed 12 joints/hr. Max 14 joints/hr. +Totally 50x joints pulled",1.5 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-11 23:30:00+00:00,2016-08-12 00:00:00+00:00,230.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Removed FMS slips, installed master bushing",0.5 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 00:00:00+00:00,2016-08-12 02:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4in casing from 410m to surface. Used manual slips and dog collar. Average pulling speed 8 joints/hr. +Totally 68x joints pulled",2.25 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 02:15:00+00:00,2016-08-12 02:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/D csg handling equipment,0.25 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 02:30:00+00:00,2016-08-12 03:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D handling equipment for 10 3/4in csg,1.0 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 03:30:00+00:00,2016-08-12 04:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Cleaned and cleared rig floor. TBT for BHA handling,0.5 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 04:00:00+00:00,2016-08-12 05:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U combined EZSV/cutting BHA (run#29),1.0 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 05:00:00+00:00,2016-08-12 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to change/adjust knives and use rig tongs,0.25 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 05:15:00+00:00,2016-08-12 06:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Changed/adjust knives. Meanwhile cleared rig floor for csg equipment,0.75 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 06:00:00+00:00,2016-08-12 08:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Broke spear assembly. Attempted to make tongs to fit spear assembly,2.0 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 08:00:00+00:00,2016-08-12 08:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Broke off taper mill, M/U Xover and EZSV running tool",0.5 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 08:30:00+00:00,2016-08-12 08:45:00+00:00,57.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U EZSV to running tool. RIH to 57m,0.25 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 08:45:00+00:00,2016-08-12 09:00:00+00:00,57.0,m,fixed,plug abandon -- other,ok,success,Installed PS21,0.25 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 09:00:00+00:00,2016-08-12 12:30:00+00:00,902.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ EZSV-cutting BHA on 5,5in DP from 57m to 902m. Avg. tripping speed 240 m/hr",3.5 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 12:30:00+00:00,2016-08-12 13:00:00+00:00,912.0,m,fixed,plug abandon -- mechanical plug,ok,success,Set EZSV at 912m w/ 36 turns to right. Took overpull in steps of 10t. Pulled free at 26t overpull. Set down 10t on EZSV. Pulled up 4m to extract setting tool,0.5 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 13:00:00+00:00,2016-08-12 13:30:00+00:00,912.0,m,fixed,plug abandon -- other,ok,success,Filled the string,0.5 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 13:30:00+00:00,2016-08-12 14:30:00+00:00,912.0,m,fixed,interruption -- other,ok,success,"Filled the pipe more than expected. Checked surface equipment, pumps, lines, BOP and wellhead area. Observed level in the riser/BOP dropped around 20m. Lined up to trip tank and filled the well. Flow checked on trip tank. Attempted to fill string again. Total lost 11m3",1.0 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 14:30:00+00:00,2016-08-12 14:45:00+00:00,912.0,m,fixed,plug abandon -- cut,ok,success,"Recorded parameters for cutting: 600l/min - 74bar, 400l/min - 33,5bar, up/down weights 100t/94t",0.25 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 14:45:00+00:00,2016-08-12 15:45:00+00:00,902.0,m,fixed,plug abandon -- cut,ok,success,"Cut 14in csg at 80rpm, 2-5kNm, 220l/min, 7 bar. Increased to 300l/min, 12bar, 2-10kNm, 80rpm, then 400l/min, 32bar +Pressure slowly decreased to 11bar. Stopped pumping. Checked cut gap. Continued to cut to make sure csg is cut. +Increased to 120rpm, 2-11kNm. Pressure dropped to 1bar. Casing cut @ 902m",1.0 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 15:45:00+00:00,2016-08-12 16:00:00+00:00,902.0,m,fixed,plug abandon -- cut,ok,success,Circulated fluid in the well due to H2S readings in the return fluid on Baker sensor (7ppm),0.25 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 16:00:00+00:00,2016-08-12 16:15:00+00:00,902.0,m,fixed,interruption -- repair,ok,success,"Flow checked well on trip tank. Well not static. Losses of 10,5m3/hour",0.25 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 16:15:00+00:00,2016-08-12 19:30:00+00:00,902.0,m,fixed,interruption -- repair,ok,success,"Evaluated situation. Meanwhile checked tension system on well head, +Checked moon poll, well head, under cantilever for leals. No leaks observed. +Stopped trip tank pump. Observed level in riser slowly dropping +Meanwhile performed daily maintenance in red zone",3.25 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 19:30:00+00:00,2016-08-12 20:45:00+00:00,902.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ BHA (run#29) from 908m to 17m without filling the hole. Average pulling speed 712m/hour,1.25 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 20:45:00+00:00,2016-08-12 21:15:00+00:00,17.0,m,fixed,plug abandon -- cut,ok,success,"Removed PS21 and installed master bushing, meanwhile performed TBT for BHA handling",0.5 +15_9_F_14_2016_08_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-12T00:00:00+02:00,2016-08-13T00:00:00+02:00,2016-08-12 21:15:00+00:00,2016-08-12 22:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D BHA (run#29),0.75 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-12 22:00:00+00:00,2016-08-12 22:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared rig floor,0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-12 22:15:00+00:00,2016-08-12 22:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Changed BX inserts to 5in and prepared RTTS BHA components to P/U,0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-12 22:30:00+00:00,2016-08-12 23:45:00+00:00,74.0,m,fixed,interruption -- other,ok,success,"M/U RTTS BHA and RIH with 2x stands of 8,25 DC to 74m",1.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-12 23:45:00+00:00,2016-08-13 00:00:00+00:00,147.0,m,fixed,interruption -- other,ok,success,RIH w/ 2x stands of DP from 74m to 147m,0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 00:00:00+00:00,2016-08-13 00:15:00+00:00,147.0,m,fixed,interruption -- other,ok,success,M/U TDS and set RTTS packer at 147m,0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 00:15:00+00:00,2016-08-13 00:45:00+00:00,147.0,m,fixed,interruption -- other,ok,success,"Filled riser w/ 7.3m3. Observed level dropped in riser +/- 1 meter before stabilizing. +Lined up TT pump and observed well - static",0.5 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 00:45:00+00:00,2016-08-13 01:00:00+00:00,147.0,m,fixed,interruption -- other,ok,success,"Performed line test and closed BOP prior to pressure test above RTTS. Pressured up well to 6 bar and observe pressure bleeding off. +Stop cement pump - pressure dropped to zero",0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 01:00:00+00:00,2016-08-13 01:30:00+00:00,147.0,m,fixed,interruption -- other,ok,success,"Opened BOP and monitored well on TT. +TT level drop +/-1m3 over 20 min before stabilizing",0.5 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 01:30:00+00:00,2016-08-13 02:00:00+00:00,147.0,m,fixed,interruption -- other,ok,success,"Attempted to pressure test again. Good low pressure test at 20bar/5min. +Continued to pressured up to 25 bar and observed pressure bleeding off. Stopped cement pump and pressure dropped to zero",0.5 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 02:00:00+00:00,2016-08-13 02:30:00+00:00,147.0,m,fixed,interruption -- other,ok,success,"Opened BOP and monitored well on TT. Observed loss rate 4.8m3/hr. Released RTTS packer, loss rate increased to 10.8m3/hr",0.5 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 02:30:00+00:00,2016-08-13 03:00:00+00:00,142.5,m,fixed,interruption -- other,ok,success,"Picked up w/ RTTS packer to 142.5m (the depth above top shot of 10 3/4in csg perforation) +Set RTTS at 142,5m. Well static. Pressure tested above RTTS to 20bar/5min and 50bar/5min. Good test. +Released RTTS. Loss rate 10m3/hr",0.5 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 03:00:00+00:00,2016-08-13 03:45:00+00:00,155.0,m,fixed,interruption -- other,ok,success,"M/U new stand. RIH and RTTS packer at 155m. (the depth below bottom shot of 10 3/4in csg perforation) +Loss rate 10m3/hr. Stopped TT pump and let level drop",0.75 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 03:45:00+00:00,2016-08-13 04:15:00+00:00,155.0,m,fixed,interruption -- other,ok,success,"Filled pipe, performed line test. Attempted to pressure test below RTTS. No success. Pumped 1 m3, not able to achieve pressure build up",0.5 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 04:15:00+00:00,2016-08-13 04:30:00+00:00,155.0,m,fixed,interruption -- other,ok,success,Released RTTS,0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 04:30:00+00:00,2016-08-13 05:30:00+00:00,8.0,m,fixed,interruption -- other,ok,success,POOH on DP from 155m to 8m,1.0 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 05:30:00+00:00,2016-08-13 05:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Changed inserts in elevator,0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 05:45:00+00:00,2016-08-13 06:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,L/D RTTS BHA,0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 06:00:00+00:00,2016-08-13 06:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Cleaned and cleared rig floor,0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 06:15:00+00:00,2016-08-13 09:30:00+00:00,0.0,m,fixed,interruption -- lost circulation,ok,success,"Evaluated situation. Discussed situation w/ onshore organisation. Agreed way forward to attempt to cure losses w/ LCM pill +Meanwhile serviced drilling equipment. Housekeeping. Adjusted link tilt, +Performed maintenance on PS21, TDS, greased both PRSs.",3.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 09:30:00+00:00,2016-08-13 10:00:00+00:00,0.0,m,fixed,interruption -- lost circulation,ok,success,"Filled the well w/ sea water, observed returns at surface after 8,7 m3 pumped. +Prepared and start mixing 400kg/m3 LCM pill in pump room",0.5 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 10:00:00+00:00,2016-08-13 10:15:00+00:00,0.0,m,fixed,interruption -- lost circulation,ok,success,"Continued mixing 400kg/m3 LCM pill in pump room. Hopper is packing off while mixing. Continued to mix manually. Worked good +Flow checked on TT. Loss rate 10m3/hr",0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 10:15:00+00:00,2016-08-13 10:45:00+00:00,0.0,m,fixed,interruption -- lost circulation,ok,success,"Continued mixing 400kg/m3 LCM pill in pump room +Changed handling equipment and prepared to RIH w/ drill pipe",0.5 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 10:45:00+00:00,2016-08-13 12:00:00+00:00,845.0,m,fixed,interruption -- other,ok,success,"Continued mixing 400kg/m3 LCM pill in pump room +RIH w/ 5,5in DP from surface to 845m",1.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 12:00:00+00:00,2016-08-13 17:30:00+00:00,845.0,m,fixed,interruption -- lost circulation,ok,success,"Continued mixing LCM pill while monitoring well. Loss rate 11m3/hrs. +Meanwhile isolated and removed suction strainers in MP#2",5.5 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 17:30:00+00:00,2016-08-13 19:30:00+00:00,900.0,m,fixed,interruption -- lost circulation,ok,success,"Pumped 15m3 1.3sg 400kg/m3 LCM pill @ 550 LPM. +When pill starts to exit string, decreased pump rate to 160l/min. Lined up TT and kept volume in TT static by adjusting pump rate between 160-200l/min to avoid LCM going up annulus and avoid SW from annulus dropping down and mix with LCM. +Pumped and pulled to top of stand when +/- 2 m3 LCM left in the DP string. Stopped pumping after all LCM volume out of the DP string. +Loss rate during pumping and displacing LCM pill +/- 11m3/hr",2.0 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 19:30:00+00:00,2016-08-13 20:15:00+00:00,900.0,m,fixed,interruption -- lost circulation,ok,success,Stop pumping and monitor well on TT for 30 min. Loss rate +/- 10 m3/hr,0.75 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 20:15:00+00:00,2016-08-13 21:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"POOH w/ 5,5in DP from 900m to surface. Average pulling speed 1200 m/hour",0.75 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 21:00:00+00:00,2016-08-13 21:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Removed PS21, installed master bushing",0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 21:15:00+00:00,2016-08-13 21:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Performed Pre-job Meeting to RIH w/ RTTS,0.25 +15_9_F_14_2016_08_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-13T00:00:00+02:00,2016-08-14T00:00:00+02:00,2016-08-13 21:30:00+00:00,2016-08-13 22:00:00+00:00,88.0,m,fixed,interruption -- other,ok,success,M/U RTTS BHA from surface to 88m,0.5 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-13 22:00:00+00:00,2016-08-13 23:30:00+00:00,126.0,m,fixed,interruption -- other,ok,success,M/U RTTS BHA from 88 to 126m,1.5 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-13 23:30:00+00:00,2016-08-14 00:00:00+00:00,142.0,m,fixed,interruption -- other,ok,success,RIH w/ RTTS slowly to 142m,0.5 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 00:00:00+00:00,2016-08-14 00:30:00+00:00,142.0,m,fixed,interruption -- other,ok,success,"Set RTTS packer at 142m. Release setting tool from RTTS. +3x stands of 8 1/4in DC and 1x stand of 6 3/4in DC left hanging under RTTS (18ton)",0.5 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 00:30:00+00:00,2016-08-14 01:30:00+00:00,142.0,m,fixed,interruption -- other,ok,success,Lined up and pressure tested RTTS packer from above 20bar/5min and 50bar/5min,1.0 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 01:30:00+00:00,2016-08-14 01:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"POOH w/ 5,5in DP. L/D RTTS setting tool",0.25 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 01:45:00+00:00,2016-08-14 02:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Cleaned and cleared drill floor,0.25 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 02:00:00+00:00,2016-08-14 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pull diverter,0.25 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 02:15:00+00:00,2016-08-14 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared to N/D diverter. Removed BX-elevator, installed chains for pulling diverter. Bled off diverter system",0.5 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 02:45:00+00:00,2016-08-14 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed MB and outer ring,0.25 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 03:00:00+00:00,2016-08-14 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed lifting eyes to top of diverter. Loosened studs on bell nipple,0.5 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 03:30:00+00:00,2016-08-14 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Attempted to pull diverter. No success. Pulled 10t overpull, diverter not moving. Troubleshoot same, removed eye bolts and cleaned, continued to attempt to pull diverter",1.5 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 05:00:00+00:00,2016-08-14 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pull diverter,0.25 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 05:15:00+00:00,2016-08-14 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Attempted to pull diverter. Max 15t overpull. No success. Discussed plan forward,0.25 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 05:30:00+00:00,2016-08-14 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Disconnected NT2 connector and loosened slick joint. Loadshifted BOP from tensioning system to BOP carrier,2.0 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 07:30:00+00:00,2016-08-14 09:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Attempted to pull diverter w/ max 15t overpull. Lifted BOP and observed slick joint loosened in overshot. Cleaned around hold down dogs and observed one dog slightly engaged. Wedged in hold down dog and pulled diverter up passed dogs. Max overpull 12 Ton,1.5 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 09:00:00+00:00,2016-08-14 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled diverter to rig floor. Installed master bushing and secured diverter on drill floor,0.75 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 09:45:00+00:00,2016-08-14 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled slick joint. Prepared to disconnect tension system,0.75 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 10:30:00+00:00,2016-08-14 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed tension cylinder and prepared to lift and skid BOP,0.75 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 11:15:00+00:00,2016-08-14 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted BOP and skidded to stump. Landed on stump,0.75 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 12:00:00+00:00,2016-08-14 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed scaffolding in moon pool. Meanwhile M/U NT2 connector,0.75 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 12:45:00+00:00,2016-08-14 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing and lowered down chain from TDS, made up to HPR. Meanwhile loosened connector on well head (HPR). Same time removed scaffolding under BOP stump",1.0 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 13:45:00+00:00,2016-08-14 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled HPR to drillfloor and installed master bushing,0.25 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 14:00:00+00:00,2016-08-14 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to L/D HPR using crane to tail out and back up tugger,0.25 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 14:15:00+00:00,2016-08-14 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,LD HPR. Meanwhile strated to prepare to skid cantilever,0.75 +15_9_F_14_2016_08_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 15:00:00+00:00,2016-08-14 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed cover on top deck in moon pool and lower deck. Meanwhile removed lifting equipment from TDS. +CONTINUED REPORTING ON 15/9-F-12",1.5 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 10:45:00+00:00,2016-09-11 12:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Prepared for skidding. Removed hatched in moonpool. +Meanwhile: Checked all skidding areas.",1.5 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 12:15:00+00:00,2016-09-11 12:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding operation.,0.25 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 12:30:00+00:00,2016-09-11 13:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig from well F-5 to F-14.,0.5 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 13:00:00+00:00,2016-09-11 13:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Installed cantilever access stairs. +Performed post-skidding checks.",0.5 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 13:30:00+00:00,2016-09-11 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed hatch on F-5. Installed halfmoon hatch.,1.0 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 14:30:00+00:00,2016-09-11 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled master bushing and outer ring.,0.25 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 14:45:00+00:00,2016-09-11 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed HP riser. M/U connector between HP riser and WH. +Detached HP riser lifting equipment and pulled same to drill floor.",0.75 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 15:30:00+00:00,2016-09-11 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed master bushing and outer ring. +Meanwhile: Performed TBT with scaffolders",0.5 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 16:00:00+00:00,2016-09-11 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built scaffolding around HP riser. +Meanwhile: Prepared diverter and slipjoint.",1.0 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 17:00:00+00:00,2016-09-11 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued building scaffolding around riser. +Meanwhile: Cleaned cement from inside of diverter",1.5 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 18:30:00+00:00,2016-09-11 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Moved BOP over well center,1.0 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 19:30:00+00:00,2016-09-11 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Checked cantilever alignment over well center. +Skidded rig 4"" aft to align HP riser and BOP.",0.75 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 20:15:00+00:00,2016-09-11 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Landed BOP on riser.,0.25 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 20:30:00+00:00,2016-09-11 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U connector between BOP and HP riser. +Meanwhile: Aligned tension cylinders with BOP.",1.0 +15_9_F_14_2016_09_12.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-11T00:00:00+02:00,2016-09-12T00:00:00+02:00,2016-09-11 21:30:00+00:00,2016-09-11 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed tension cylinders,0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-11 22:00:00+00:00,2016-09-11 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued installing tension cylinders.,0.75 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-11 22:45:00+00:00,2016-09-11 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing. +Installed slip joint",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-11 23:15:00+00:00,2016-09-11 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed master bushing. +M/U nuts on slipjoint. +Meanwhile: Prepared to install diverter.",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-11 23:45:00+00:00,2016-09-12 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing +Installed diverter",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 00:15:00+00:00,2016-09-12 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D lifting equipment for diverter. +Installed BX-4 elevator.",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 00:45:00+00:00,2016-09-12 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressurized BOP control system.,0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 01:00:00+00:00,2016-09-12 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Filled riser, BOP and diverter with clean SW from trip tank.",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 01:15:00+00:00,2016-09-12 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for connector test,0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 01:30:00+00:00,2016-09-12 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to pressure test BOP connector to 20/90 bar for 5/10min. +Leakage observed on DHSV control line port on WH. +Closed needle valve on DHSV control line port and installed blind plug.",1.0 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 02:30:00+00:00,2016-09-12 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed BOP connector test to 20/90 bar for 5/10min.,0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 03:00:00+00:00,2016-09-12 03:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U RTTS RT. Inspected and serviced tool.,0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 03:30:00+00:00,2016-09-12 03:45:00+00:00,134.5,m,fixed,plug abandon -- other,ok,success,"RIH w/ RTTS RT on 5 1/2"" DP from surface to 134,5 m.",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 03:45:00+00:00,2016-09-12 04:15:00+00:00,134.5,m,fixed,plug abandon -- other,ok,success,"Closed annular preventer. +Attempted to take up/down weight, not enough weight of DP to strip through annular. +Opened annular preventer.",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 04:15:00+00:00,2016-09-12 05:00:00+00:00,134.5,m,fixed,plug abandon -- mechanical plug,ok,success,Attempted to sting into RTTS while pumping 90 lpm. No pressure increase observed.,0.75 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 05:00:00+00:00,2016-09-12 05:15:00+00:00,134.5,m,fixed,plug abandon -- mechanical plug,ok,success,"Increased flow rate to 150 lpm. Stung into RTTS packer and M/U 20 turns / 2500 Nm. +No pressure in string observed.",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 05:15:00+00:00,2016-09-12 05:45:00+00:00,246.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Closed annular preventer and lined up to monitor pressure. +Released RTTS packer, 25 ton OP. +No pressure observed below RTTS packer. +Opened annular preventer. Losses 13 m3/hr static.",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 05:45:00+00:00,2016-09-12 06:15:00+00:00,111.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ RTTS packer on 5 1/2"" DP from 134 m to 111m.",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 06:15:00+00:00,2016-09-12 07:00:00+00:00,111.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U lift sub and L/D the RTTS packer and RT.,0.75 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 07:00:00+00:00,2016-09-12 07:15:00+00:00,111.0,m,fixed,plug abandon -- other,ok,success,"Changed handling equipment for handling 6 3/4"" DC.",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 07:15:00+00:00,2016-09-12 08:00:00+00:00,83.0,m,fixed,plug abandon -- other,ok,success,"L/O singles 6 3/4"" DC while POOH from 111 m to 83 m.",0.75 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 08:00:00+00:00,2016-09-12 08:15:00+00:00,83.0,m,fixed,plug abandon -- other,ok,success,"Changed handling equipment for handling 8 1/2"" DC.",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 08:15:00+00:00,2016-09-12 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O singles 8 1/2"" DC while POOH from 83 m to surface.",1.75 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 10:00:00+00:00,2016-09-12 10:45:00+00:00,6.0,m,fixed,plug abandon -- mechanical plug,ok,success,"P/U 14"" EZSV plug and pup. M/U BHA.",0.75 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 10:45:00+00:00,2016-09-12 11:00:00+00:00,84.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ 14"" EZSV plug on 5 1/2"" DP from 6 m to 84 m. Restricted running speed 2 min/std.",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 11:00:00+00:00,2016-09-12 11:30:00+00:00,84.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing. +Installed PS-21 slips.",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 11:30:00+00:00,2016-09-12 13:00:00+00:00,866.0,m,fixed,plug abandon -- other,ok,success,"Continued RIH w/ 14"" EZSV plug on 5 1/2"" DP from 84 m to 866 m. Restricted running speed 2 min/std.",1.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 13:00:00+00:00,2016-09-12 13:15:00+00:00,866.0,m,fixed,plug abandon -- other,ok,success,Pulled PS-21 slips. Installed master bushing.,0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 13:15:00+00:00,2016-09-12 13:30:00+00:00,866.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pumping brine and cement.,0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 13:30:00+00:00,2016-09-12 13:45:00+00:00,891.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ 14"" EZSV plug on 5 1/2"" DP from 866 m to 891 m. Restricted running speed 2 min/std",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 13:45:00+00:00,2016-09-12 14:30:00+00:00,892.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Took up/down weight 96/90 ton. +Set 14"" EZSV plug at 892 m. Tagged EZSV w/ 5 ton. +Meanwhile: Lined up for pumping brine.",0.75 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 14:30:00+00:00,2016-09-12 15:00:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"L/D single 5 1/2"" DP. P/U and M/U 1,5m pup joint and pump-in sub. +M/U cement hose and lo-torque valve.",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 15:00:00+00:00,2016-09-12 15:15:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,Leak tested from cement unit against lo-torque on pump-in sub to 100 bar.,0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 15:15:00+00:00,2016-09-12 16:45:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"Closed UPR and staged up pumps. +200 lpm / 3 bar, 300 lpm / 7 bar, 500 lpm / 36 bar. +At 750 lpm the SPP increased to 81 bar, then dropped to 41 bar. +SPP slowly increased to 60 bar and remained stable between 58 bar and 60 bar.",1.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 16:45:00+00:00,2016-09-12 17:00:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"Pumped 15 m3 1,36sg CaCl2 brine at 750 lpm / 61 bar. +SPP decreased gradually to 37 bar at the end.",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 17:00:00+00:00,2016-09-12 17:15:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"Displaced brine by pumping 11,2 m3 of SW at 750 lpm / 37 bar. +SPP increased gradually to 48 bar at the end. +Stopped pumping",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 17:15:00+00:00,2016-09-12 17:30:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"Monitored for pressure build up. SPP 4,6 bar after shutting down pumps. +Bled off to trip tank. No increase in TT observed.",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 17:30:00+00:00,2016-09-12 18:00:00+00:00,892.0,m,fixed,plug abandon -- other,ok,success,"Evaluated pressure trends. +Loss zone above 14"" casing cut.",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 18:00:00+00:00,2016-09-12 18:15:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,Performed TBT for cement job.,0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 18:15:00+00:00,2016-09-12 18:30:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,Prepared for cement job on drill floor and pump room.,0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 18:30:00+00:00,2016-09-12 19:00:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 20 m3 wash pill at 750 lpm. SPP increased to 78 bar. +Decreased flow rate to 660 lpm, pressure stabilized at 75 bar.",0.5 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 19:00:00+00:00,2016-09-12 20:00:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,"Stopped pumps and observed 17 bar back pressure. +Evaluated situation. Back pressure indicated heavy fluid moving upwards in annulus.",1.0 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 20:00:00+00:00,2016-09-12 21:00:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped SW down drillstring, taking returns through choke into pit. +Pumped 11 m3 SW before observing returns. +After returns, pumped with 600 lpm / 11,9 bar. 66% return.",1.0 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 21:00:00+00:00,2016-09-12 21:15:00+00:00,892.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed choke and IBOP. Applied 20 bar behind IBOP. +Applied 20 bar from cement unit to lo-torque on pump-in sub. Opened lo-torque and confirmed line-up.",0.25 +15_9_F_14_2016_09_13.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-12T00:00:00+02:00,2016-09-13T00:00:00+02:00,2016-09-12 21:15:00+00:00,2016-09-12 22:00:00+00:00,892.0,m,fixed,plug abandon -- squeeze,ok,success,"Mixed and pumped 14m3 1,95sg cement slurry at 600 lpm. Added well life 10kg/m3. +Displaced cement with 12,2 m3 SW at 750 lpm from cement unit.",0.75 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-12 22:00:00+00:00,2016-09-12 22:15:00+00:00,892.0,m,fixed,plug abandon -- squeeze,ok,success,"Continued displacing cement w/ 12,2 m3 SW. +Stopped pumping. Observed 14 bar back pressure in DP, no pressure on annulus.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-12 22:15:00+00:00,2016-09-12 23:30:00+00:00,850.0,m,fixed,plug abandon -- cement plug,ok,success,"Opened BOP and stung out of EZSV plug. +B/O and L/D pump-in sub. +Installed sponge ball and pumped 9,5 m3 SW at 1500 lpm / 7 bar.",1.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-12 23:30:00+00:00,2016-09-12 23:45:00+00:00,850.0,m,fixed,plug abandon -- cement plug,ok,success,"R/B 1 std. +Dropped 3"" drift.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-12 23:45:00+00:00,2016-09-13 00:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed master bushing. Installed PS-21 slips. +Turned off TT pump",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 00:00:00+00:00,2016-09-13 01:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 850 m to surface. Average pulling speed 680 m/hr.",1.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 01:15:00+00:00,2016-09-13 01:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed drift. +Installed master bushing",0.5 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 01:45:00+00:00,2016-09-13 02:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"L/D EZSV RT. +Found 1 bow on EZSV RT bow-centralizer missing.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 02:00:00+00:00,2016-09-13 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: Serviced drilling equipment.",3.0 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 05:00:00+00:00,2016-09-13 08:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +- Serviced drilling equipment and prepared fishing tools +- Removed masterbushing and inspected diverter and BOP for lost centralizer piece. No findings. +- Performed periodic maintenace on drilling equipment",3.5 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 08:30:00+00:00,2016-09-13 08:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Performed TBT for building magnet BHA and retrieving centralizer piece.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 08:45:00+00:00,2016-09-13 10:15:00+00:00,7.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +P/U casing hanger mill assy. B/O string magnet, L/D milling assy. +Installed bitsub and flat bottom magnet in fox hole. +M/U magnet BHA in rotary.",1.5 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 10:15:00+00:00,2016-09-13 10:30:00+00:00,7.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Removed master bushing. Installed PS-12 slips",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 10:30:00+00:00,2016-09-13 12:15:00+00:00,879.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +RIH w/ magnet BHA on 5 1/2"" DP from 7 m to 879m. Restricted running speed 2 min/std.",1.75 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 12:15:00+00:00,2016-09-13 12:30:00+00:00,889.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Recorded up/down weight 95/89 ton. +Continued RIH, took 12 ton weight 2,5 m shallower than EZSV plug at 889m +Observed WOB decreased, possibly soft cement on top of EZSV plug.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 12:30:00+00:00,2016-09-13 13:45:00+00:00,47.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +POOH w/ magnet BHA on 5 1/2"" DP from 889 m to 47 m. Restricted pulling speed 2 min/std.",1.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 13:45:00+00:00,2016-09-13 14:00:00+00:00,47.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Removed PS-21 slips. Installed master bushing.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 14:00:00+00:00,2016-09-13 14:15:00+00:00,7.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +POOH w/ magnet BHA on 5 1/2"" DP from 47 m to 7 m.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 14:15:00+00:00,2016-09-13 14:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Insptected magnets, no centralizer piece found. Found cement residues on bottom magnet.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 14:30:00+00:00,2016-09-13 14:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +B/O bitsub and flat bottom magnet. L/D BHA.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 14:45:00+00:00,2016-09-13 15:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +R/U equipment for handling guns.",0.5 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 15:15:00+00:00,2016-09-13 15:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Performed TBT for handling explosives",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 15:30:00+00:00,2016-09-13 16:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +P/U and M/U 14"" perforation guns.",1.0 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 16:30:00+00:00,2016-09-13 17:00:00+00:00,108.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +RIH w/ 14"" guns on 5 1/2"" DP to 108m",0.5 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 17:00:00+00:00,2016-09-13 17:15:00+00:00,108.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Performed TBT with ongoing crew",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 17:15:00+00:00,2016-09-13 17:30:00+00:00,147.5,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Continued RIH w/ 14"" guns on 5 1/2"" DP from 108 m to 147,5 m. +Recorded up/down weight 71/67 ton. +P/U XO and M/U TDS",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 17:30:00+00:00,2016-09-13 18:00:00+00:00,147.5,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Filled well from trip tank. No losses observed. +Closed UPR +Confirmed line-up and filled pipe.",0.5 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 18:00:00+00:00,2016-09-13 18:45:00+00:00,147.5,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Opened UPR and B/O TDS. +Dropped ball. +M/U TDS and closed UPR. +Pumped with 160 lpm. Guns fired at 132 bar SPP, perforation interval: 144,5m - 147,5m. +Continued to circulate w/ 160 lpm / 3 bar. +Increased flow rate in steps to 1000 lpm / 10 bar. Observed losses. +Reduced rate to 750 lpm / 6 bar, loss rate 12 m3/hr. Max 0,65% gas during circulation in gas trap. +Circulated 2,5 x B/U, until decreasing gas trend.",0.75 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 18:45:00+00:00,2016-09-13 19:00:00+00:00,147.5,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: +Opened UPR +Flowchecked well for 10 min, static losses 12 m3/hr.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 19:00:00+00:00,2016-09-13 19:45:00+00:00,28.0,m,fixed,interruption -- other,ok,success,"POOH w/ 14"" guns on 5 1/2"" DP from 147,5 m to 28m.",0.75 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 19:45:00+00:00,2016-09-13 20:00:00+00:00,28.0,m,fixed,interruption -- other,ok,success,Changed handling equipment to handle guns,0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 20:00:00+00:00,2016-09-13 20:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,L/D perforation guns and XO.,0.75 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 20:45:00+00:00,2016-09-13 21:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Cleaned and cleared drill floor +Changed handling equipment.",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 21:00:00+00:00,2016-09-13 21:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Performed TBT for cutting 14"" casing",0.25 +15_9_F_14_2016_09_14.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-13T00:00:00+02:00,2016-09-14T00:00:00+02:00,2016-09-13 21:15:00+00:00,2016-09-13 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"P/U 14"" cutter BHA. +Replaced 12 1/8"" gauge stab with 12"" string mill. +Checked knifes and secured same.",0.75 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-13 22:00:00+00:00,2016-09-13 22:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Continued M/U 14"" cutter BHA",0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-13 22:15:00+00:00,2016-09-13 22:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Removed master bushing. Installed PS-21 slips.,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-13 22:30:00+00:00,2016-09-13 23:00:00+00:00,170.0,m,fixed,interruption -- repair,ok,success,"RIH w/ 14"" cutter BHA on 5 1/2"" DP from surface to 170m. RIH restricted until BHA below 14"" subsea casing hanger.",0.5 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-13 23:00:00+00:00,2016-09-14 00:00:00+00:00,868.0,m,fixed,interruption -- repair,ok,success,"RIH w/ 14"" cutter BHA on 5 1/2"" DP from 170 m to 868 m. Avg running speed 840 m/hr.",1.0 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 00:00:00+00:00,2016-09-14 00:30:00+00:00,868.0,m,fixed,interruption -- repair,ok,success,"M/U TDS and filled pipe. +Recorded up/down weight 96/92 ton. +Recorded paramters.",0.5 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 00:30:00+00:00,2016-09-14 00:45:00+00:00,878.0,m,fixed,interruption -- repair,ok,success,"Positioned cutter at 878m. +Cut 14"" casing at 878m, 450 lpm / 43 bar. Observed pressure drop in SPP, good indication of cut. +Pulled up 1m with flow, observed pressure increased. RIH slowly and measured 10 cm window.",0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 00:45:00+00:00,2016-09-14 01:00:00+00:00,878.0,m,fixed,interruption -- repair,ok,success,"Filled well from trip tank +Flowchecked well, 12m3/hr static losses.",0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 01:00:00+00:00,2016-09-14 01:45:00+00:00,170.0,m,fixed,interruption -- repair,ok,success,"POOH w/ 14"" cutter BHA on 5 1/2"" DP from 878 m to 170 m . Avg. pulling speed 700 m/hr.",0.75 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 01:45:00+00:00,2016-09-14 02:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Continued POOH restricted until BHA at surface.,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 02:00:00+00:00,2016-09-14 02:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Removed PS-21 slips. Installed master bushing,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 02:15:00+00:00,2016-09-14 02:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,L/D cutter BHA,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 02:30:00+00:00,2016-09-14 03:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"P/U and M/U 14"" EZSV plug. Inspected packer element.",1.0 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 03:30:00+00:00,2016-09-14 03:45:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Installed PS-21 slips.,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 03:45:00+00:00,2016-09-14 05:00:00+00:00,666.0,m,fixed,interruption -- other,ok,success,"RIH w/ 14"" EZSV plug on 5 1/2"" DP from surface to 666 m. Restricted running speed 2 min/std.",1.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 05:00:00+00:00,2016-09-14 05:15:00+00:00,827.0,m,fixed,interruption -- other,ok,success,"Continued RIH w/ 14"" EZSV plug on 5 1/2"" DP from 666 m to 827 m. Restricted running speed 2 min/std.",0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 05:15:00+00:00,2016-09-14 05:45:00+00:00,868.0,m,fixed,interruption -- other,ok,success,"Established circulation and washed the setting area, 800 lpm. +Installed 14"" EZSV plug at 868 m. Load tested the plug with 5 T down weight.",0.5 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 05:45:00+00:00,2016-09-14 06:30:00+00:00,868.0,m,fixed,interruption -- other,ok,success,"B/O and R/B 1 stand. +P/U and M/U pump-in sub. +Stung into EZSV plug. +Meanwhile: Filled well with trip tank.",0.75 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 06:30:00+00:00,2016-09-14 07:00:00+00:00,868.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Performed TBT for injection test and cement job +Meanwhile: Leak tested cement hose to 100 bar.",0.5 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 07:00:00+00:00,2016-09-14 07:45:00+00:00,868.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Lined up and attempted to perform injection test. SPP increased immediately to 20 bar, stopped pumps. +Checked line-up. Lined up to cement hose, applied 20 bar and opened lo-torqe, no pressure drop observed. Correct line-up. +Bled off pressure.",0.75 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 07:45:00+00:00,2016-09-14 09:00:00+00:00,868.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed 20 bar pressure test down DP/below EZSV plug from cement unit. Pressure leaked off slowly. +Meanwhile: Filled hole (annulus) with trip tank pump, filled 10,61 m3. Montored well on TT, 11 m3/hr static losses. No change in pressure on cement unit.",1.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 09:00:00+00:00,2016-09-14 10:00:00+00:00,868.0,m,fixed,plug abandon -- cement plug,ok,success,"Applied 5 bar pressure down drill string/below EZSV from cement unit. Observed stable pressure (5 bar) for 10 min. +Closed UPR and lined up to pump down kill line and monitor pressure on choke. +Staged up pumps to 300 lpm / 7 bar. Increased flow to 500 lpm / 37,4 bar/10 min. +Observed pressure below EZSV increased from 5 bar to 6 bar. +Stopped pumping down kill line, observed pressure below EZSV dropped back to 5 bar and stable. Concluded with good leak test of cement in annulus to 31,4 bar.",1.0 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 10:00:00+00:00,2016-09-14 10:15:00+00:00,866.0,m,fixed,plug abandon -- cement plug,ok,success,Stung out of EZSV plug and P/U 2 m.,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 10:15:00+00:00,2016-09-14 11:30:00+00:00,866.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up and pumped 10m3 wash pill, 900 lpm / 3,5 bar. +Placed 100m balanced cement plug on top of EZSV: +Mixed and pumped 8,2 m3 1,95sg cement slurry, 600 lpm. +Displaced cement with 8,3 m3 drill water from cement unit 940 lpm / 10 bar.",1.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 11:30:00+00:00,2016-09-14 11:45:00+00:00,866.0,m,fixed,plug abandon -- cement plug,ok,success,B/O and L/O pump-in sub.,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 11:45:00+00:00,2016-09-14 12:45:00+00:00,700.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH to 700m. M/U pup joint with pre-loaded sponge ball. +Circulated SW until clean returns (less than 30ppm oil in water concentration) at 3500 lpm / 31 bar while rotating 50 rpm / 1 - 4 kNm. +Pumped totally 75 m3 of SW.",1.0 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 12:45:00+00:00,2016-09-14 13:00:00+00:00,626.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 700 m to 626 m.",0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 13:00:00+00:00,2016-09-14 13:15:00+00:00,626.0,m,fixed,plug abandon -- cement plug,ok,success,Installed master bushing.,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 13:15:00+00:00,2016-09-14 14:30:00+00:00,626.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed FOSV and BOP wash tool. +Jetted BOP 3 x passes at 1600 lpm / 14 bar, 60 rpm / 1 - 4 kNm. +Functioned BOP rams +Jetted BOP additional 3 x passes 1600 lpm / 14 bar, 60 rpm / 1 - 4 kNm. +L/O BOP wash tool and FOSV.",1.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 14:30:00+00:00,2016-09-14 15:00:00+00:00,626.0,m,fixed,plug abandon -- cement plug,ok,success,Installed PS-21 slips,0.5 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 15:00:00+00:00,2016-09-14 15:30:00+00:00,22.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 626 m to 22 m. Avg. pulling speed 1200 m/hr.",0.5 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 15:30:00+00:00,2016-09-14 15:45:00+00:00,22.0,m,fixed,plug abandon -- cement plug,ok,success,Installed master bushing,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 15:45:00+00:00,2016-09-14 16:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,L/D EZSV RT.,0.75 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 16:30:00+00:00,2016-09-14 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D rotator and elevator. +R/U diverter chains and bridle.",0.5 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 17:00:00+00:00,2016-09-14 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for N/D BOP,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 17:15:00+00:00,2016-09-14 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing +Installed lifting equipment on diverter. Released bolts on slipjoint. +Depressurized diverter system. +Lifted diverter and slipjoint to drill floor.",1.75 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 19:00:00+00:00,2016-09-14 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed tension cylinders and disconnected BOP connector.,0.75 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 19:45:00+00:00,2016-09-14 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted BOP with carrier and skidded over to test stump.,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 20:00:00+00:00,2016-09-14 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected lifting equipment to hi-pressure riser. Removed scaffolding in moonpool and disconnected hi-pressure riser from WH. +Meanwhile: Performed pre-skidding checks prior to skidding cantilever.",1.0 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 21:00:00+00:00,2016-09-14 21:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted HP riser to drill floor.,0.25 +15_9_F_14_2016_09_15.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-14T00:00:00+02:00,2016-09-15T00:00:00+02:00,2016-09-14 21:15:00+00:00,2016-09-14 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatches in moonpool on well F-14. +Installed master bushing.",0.75 +15_9_F_14_2016_09_16.xml,NO 15/9-F-14,NO 15/9-F-14,2016-09-15T00:00:00+02:00,2016-09-16T00:00:00+02:00,2016-09-14 22:00:00+00:00,2016-09-14 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued installing hatch on well F-14. + +******** END OF REPORT *******",0.5 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 09:45:00+00:00,2016-10-18 10:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding rig to well F-14,0.25 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 10:00:00+00:00,2016-10-18 11:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded cantilever to well F-14 +Removed hatch. +Built scaffolding in moonpool +Installed hole covers on well F-15. + +Meanwhile: R/U return hoses.",1.5 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 11:30:00+00:00,2016-10-18 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled master bushing and lowered NT2 connector down to Multibowl. Installed NT2 connector to Multibowl. +Changed to BX-elevator.",1.0 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 12:30:00+00:00,2016-10-18 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U cutter BHA. B/O and R/B handling pup and pup joint.,1.25 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 13:45:00+00:00,2016-10-18 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U Multibowl RT. RIH and engaged RT to Multibowl. Confirmed by taking 20 ton overpull.,0.5 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 14:15:00+00:00,2016-10-18 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/D tension cylinders,0.25 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 14:30:00+00:00,2016-10-18 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load shifted weight to TDS. +R/D tension cylinders.",2.5 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 17:00:00+00:00,2016-10-18 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for R/D boat collision stool,0.25 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 17:15:00+00:00,2016-10-18 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D boat collision stool and centralizer,0.75 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 18:00:00+00:00,2016-10-18 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Increased flow rate in steps to 2300 lpm / 82 bar. +Cut riser at 134,9m",0.5 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 18:30:00+00:00,2016-10-18 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D hoses and valve outlets from Multibowl.,1.0 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 19:30:00+00:00,2016-10-18 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser and inner string to drill floor. +Removed master bushing and installed C-plate.",0.5 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 20:00:00+00:00,2016-10-18 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"B/O Multibowl RT and parked same in AFT PRS. +Rigged up false rotary.",0.25 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 20:15:00+00:00,2016-10-18 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled inner string. +R/B cutter BHA.",0.5 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 20:45:00+00:00,2016-10-18 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U Multibowl RT and removed C-plate.,0.25 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 21:00:00+00:00,2016-10-18 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled Multibowl and tensioner joint. Stopped every meter to clean off marine growth on centralizer deck. +Installed master bushing and elevator. Landed off riser onto elevator.",0.75 +15_9_F_14_2016_10_19.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-18T00:00:00+02:00,2016-10-19T00:00:00+02:00,2016-10-18 21:45:00+00:00,2016-10-18 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Started cutting tensioner joint.",0.25 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-18 22:00:00+00:00,2016-10-18 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cut tensioner joint. Significant wave height 1 m. +R/D cutter",1.25 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-18 23:15:00+00:00,2016-10-18 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O tensioner joint (Lift #1),0.5 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-18 23:45:00+00:00,2016-10-19 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D Multibowl RT and NT2 connector,0.5 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 00:15:00+00:00,2016-10-19 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #2). Cleaned off marine growth on centralizer deck. +Installed master bushing and elevator. Landed riser onto elevator.",0.75 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 01:00:00+00:00,2016-10-19 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser. Significant wave height 1m. +R/D cutting machine.",0.5 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 01:30:00+00:00,2016-10-19 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O splash zone joint and upper pup.,0.25 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 01:45:00+00:00,2016-10-19 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #3). Cleaned off marine growth on centralizer deck. +Installed master bushing and elevator. Landed riser onto elevator.",0.5 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 02:15:00+00:00,2016-10-19 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser. Significant wave height 0,9m +R/D cutting machine.",0.75 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 03:00:00+00:00,2016-10-19 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/O riser joint (Lift #3),0.25 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 03:15:00+00:00,2016-10-19 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #4). Cleaned off marine growth on centralizer deck. +Installed master bushing and elevator. Landed riser onto elevator. +Riser out of splash zone at 05:30",0.25 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 03:30:00+00:00,2016-10-19 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser +R/D cutting machine",1.5 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 05:00:00+00:00,2016-10-19 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed TBT for pull, cut and L/O riser",0.25 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 05:15:00+00:00,2016-10-19 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #4) +Latched onto elevator (Lift #5) +Pulled riser. Landed same onto elevator.",0.5 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 05:45:00+00:00,2016-10-19 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser +R/D cutting machine",0.75 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 06:30:00+00:00,2016-10-19 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #5) +Latch onto riser (Lift #6) and pulled riser. +Landed off riser onto elevator.",0.25 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 06:45:00+00:00,2016-10-19 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser +R/D cutting machine",0.75 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 07:30:00+00:00,2016-10-19 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #6). +Pulled riser (Lift #7).",0.25 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 07:45:00+00:00,2016-10-19 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing and POOH with riser (Lift #7). +L/O riser joint.",0.5 +15_9_F_14_2016_10_20.xml,NO 15/9-F-14,NO 15/9-F-14,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 08:15:00+00:00,2016-10-19 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatches. +Removed scaffolding. +Meanwhile: Completed skidding checklists. + +**** END OF REPORT ****",0.75