diff --git "a/processed/ddr/15_9_F_12_activities.csv" "b/processed/ddr/15_9_F_12_activities.csv" new file mode 100644--- /dev/null +++ "b/processed/ddr/15_9_F_12_activities.csv" @@ -0,0 +1,2772 @@ +file,well_name,wellbore_name,report_start,report_end,act_start,act_end,md_m,md_uom,phase,activity_code,state,state_detail,comments,duration_hours +15_9_F_12_2007_06_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 18:00:00+00:00,2007-06-13 21:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed hatches in wellhead module. Removed scaffolding in moonppol. Removed cantilever walkway. Removed conflicting scaffolding. Relocated goods/carriers on maindeck to give way for cantilever and gangway when skidded to F-12.,3.0 +15_9_F_12_2007_06_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 21:00:00+00:00,2007-06-13 21:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held toolbox talk prior to skidding rig.,0.25 +15_9_F_12_2007_06_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-13T00:00:00+02:00,2007-06-14T00:00:00+02:00,2007-06-13 21:15:00+00:00,2007-06-13 22:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded rig from F-4 to F-12.,0.75 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-13 22:00:00+00:00,2007-06-13 23:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed covers/bushings on slot F-12 in wellhead module.,1.75 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-13 23:45:00+00:00,2007-06-14 00:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held toolbox talk prior to making up 36"" hole opener BHA.",0.25 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 00:00:00+00:00,2007-06-14 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Made up 36"" hole opener BHA.",2.5 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 02:30:00+00:00,2007-06-14 03:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Had problems with PRS when picking assembly from derrick. Troubleshot PRS.,0.5 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 03:00:00+00:00,2007-06-14 04:00:00+00:00,85.0,m,fixed,drilling -- trip,ok,success,"Continued to m/u and RIH with 36"" hole opener BHA.",1.0 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 04:00:00+00:00,2007-06-14 04:30:00+00:00,86.0,m,fixed,drilling -- trip,ok,success,"Continued to RIH with 36"" hole opener BHA.",0.5 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 04:30:00+00:00,2007-06-14 04:45:00+00:00,86.0,m,fixed,drilling -- other,ok,success,Held toolbox talk prior to technichans working on TDS.,0.25 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 04:45:00+00:00,2007-06-14 06:15:00+00:00,86.0,m,fixed,drilling -- other,ok,success,Performed dropped object checks on TDS.,1.5 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 06:15:00+00:00,2007-06-14 07:00:00+00:00,86.0,m,fixed,drilling -- other,ok,success,Calibrated MWD depth sensor towards block positions.,0.75 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 07:00:00+00:00,2007-06-14 07:45:00+00:00,86.0,m,fixed,interruption -- maintain,ok,success,Performed dummy connection with TDS. Adjusted make up sequence on TDS to avoid jamming torque wrench. Mærsk maintenance hours.,0.75 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 07:45:00+00:00,2007-06-14 08:00:00+00:00,86.0,m,fixed,interruption -- maintain,ok,success,Held toolbox talk prior to repairs on TDS. Mærsk maintenance hours.,0.25 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 08:00:00+00:00,2007-06-14 09:30:00+00:00,86.0,m,fixed,interruption -- maintain,ok,success,Performed repair work on TDS. Mærsk maintenance hours.,1.5 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 09:30:00+00:00,2007-06-14 10:30:00+00:00,145.0,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 36"" hole opener on 5 1/2"" HWDP. Tagged seabed at 145,2 m MD RT.",1.0 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 10:30:00+00:00,2007-06-14 11:00:00+00:00,145.0,m,fixed,drilling -- drill,ok,success,"Washed down from seabed to 149 m MD at 900 lpm with 36"" hole opener. ROV observed centralizer guide bushing land in template funnel. Parked ROV in top hat before starting to rotate.",0.5 +15_9_F_12_2007_06_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-14T00:00:00+02:00,2007-06-15T00:00:00+02:00,2007-06-14 11:00:00+00:00,2007-06-14 22:00:00+00:00,221.0,m,fixed,drilling -- drill,ok,success,"Drilled 36"" hole section from 149 m to 221 m MD. Drilling parameters : Rotation 80 rpm / WOB 3 MT / Flow 4500 lpm / Torque 4-9 kNm. Swept hole clean with 15 m3 his-vis on conncetion.",11.0 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-14 22:00:00+00:00,2007-06-15 04:00:00+00:00,250.0,m,fixed,drilling -- drill,ok,success,"Continued drillig 36"" hole section from 221 m to 250 m MD. Drilling parameters : Rotation 80 rpm / WOB 3-5 MT / Flow 4500 lpm / Torque 6-13 kNm. Swept hole clean with 15 m3 his-vis on conncetion.",6.0 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 04:00:00+00:00,2007-06-15 05:45:00+00:00,258.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 36"" hole section from 250 to 258 m MD. Drilling parameters : Rotation 80 rpm / WOB 5 MT / flow 4500 lpm / Torque 3-7 kNm.",1.75 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 05:45:00+00:00,2007-06-15 06:30:00+00:00,258.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean at 4500 lpm / SPP 94 bar. Took final survey on TD - 0,15 deg. Swept hole with 25 m3 hi-vis pumping at 4500 lpm.",0.75 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 06:30:00+00:00,2007-06-15 07:15:00+00:00,258.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well to 1,40 sg WBM pumping at 4250 lpm. Pumped at total of 105 m3 WBM.",0.75 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 07:15:00+00:00,2007-06-15 08:15:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,"POOH with 36"" hole opener BHA on 5 1/2"" HWDP to 150 m MD.",1.0 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 08:15:00+00:00,2007-06-15 08:30:00+00:00,150.0,m,fixed,drilling -- drill,ok,success,"Topped up well by pumping 5 m3 of 1,40 sg WBM.",0.25 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 08:30:00+00:00,2007-06-15 11:30:00+00:00,30.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 36"" hole opener BHA. Racked back 5 1/2"" HWDP and DC.",3.0 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 11:30:00+00:00,2007-06-15 12:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out an laid down MWD. Laid out 36"" hole opener BHA, lifted same to maindeck for backload.",0.75 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 12:15:00+00:00,2007-06-15 13:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Performed FG inspection of TDS and derrick.,1.0 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 13:15:00+00:00,2007-06-15 13:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to rigging up 30"" conductor handling/running equipment.",0.25 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 13:30:00+00:00,2007-06-15 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up 30"" conductor handling/running equipment.",2.0 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 15:30:00+00:00,2007-06-15 16:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to running 30"" conductor. Deck crew recieved helicopter.",1.0 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 16:30:00+00:00,2007-06-15 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Halted operations due to PORT FWD crane down.,1.0 +15_9_F_12_2007_06_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-15T00:00:00+02:00,2007-06-16T00:00:00+02:00,2007-06-15 17:30:00+00:00,2007-06-15 22:00:00+00:00,96.0,m,fixed,drilling -- casing,ok,success,"Ran 30"" conductor shoe joint, 6 x intermediate joints and ST-2 x RL-4 x-over from RT to 96 m MD. Checked float - ok.",4.5 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-15 22:00:00+00:00,2007-06-16 00:00:00+00:00,96.0,m,fixed,drilling -- casing,ok,success,"Removed 30"" elevator. Removed long bails. Installed short bails and 5 1/2"" elevator. Brought 30"" conductor housing to catwalk cradles.",2.0 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 00:00:00+00:00,2007-06-16 01:30:00+00:00,96.0,m,fixed,drilling -- casing,ok,success,"Picked up 30"" conductor housing with handling CART. Made up RL-4 connection using manual tongs to 35 000 ft lbs. Engaged anti rotation dogs. Ran in with 30"" conductor and installed top up pipe on XMT deck from 25 m below ML.",1.5 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 01:30:00+00:00,2007-06-16 02:30:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Installed C-plate in rotary and landed 30"" conductor housing in same.",1.0 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 02:30:00+00:00,2007-06-16 03:00:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down handling CART from 30"" conductor housing. Filled 30"" conductor with water. Rigged up C-plate, bowl and slips for running 4 3/4"" aluminium inner string inside 30"" conductor.",0.5 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 03:00:00+00:00,2007-06-16 04:00:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Ran 4 3/4"" aluminium inner string inside 30"" conductor down to 20 m below RT.",1.0 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 04:00:00+00:00,2007-06-16 06:00:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Continued to run 4 3/4"" aluminium inner string inside 30"" conductor down to 91 m below RT. Installed centralizers on joint #3 and #6. Rigged down 4 3/4"" handling equipment.",2.0 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 06:00:00+00:00,2007-06-16 06:15:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to installing CART in 30"" conductor housing.",0.25 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 06:15:00+00:00,2007-06-16 06:45:00+00:00,110.0,m,fixed,drilling -- casing,ok,success,"Installed CART in 30"" conductor housing with 5 lefthand turns. Oceaneering installed inclinometer on CART bracket. Verified filler valve open.",0.5 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 06:45:00+00:00,2007-06-16 09:15:00+00:00,126.0,m,fixed,drilling -- casing,ok,success,"RIH with 30"" conductor on 5 1/2"" HWDP. Installed top up pipe along X-over and conductor housing. Hooked up UWG cement hose to top up pipe. Installed ROV plugs on Centralizer deck.",2.5 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 09:15:00+00:00,2007-06-16 09:30:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,"Continued to RIH with 30"" conductor on 5 1/2"" HWDP. Stabbed into template. Broke circulation and observed for return with ROV - bad visibility. Weight of string in water 105 MT.",0.25 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 09:30:00+00:00,2007-06-16 10:45:00+00:00,225.0,m,fixed,drilling -- casing,ok,success,"Continued to RIH with 30"" conductor. Observed up to 10 MT drag at 225 m MD.",1.25 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 10:45:00+00:00,2007-06-16 12:45:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Broke circulation and washed down with 30"" conductor from 225 m to 251 m MD. Pumped at 200 lpm / 9 bar SPP. Installed cementing stand. Checked datum mark 113,25 m from top conductor housing to machined ring on Centralizer deck - ok.",2.0 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 12:45:00+00:00,2007-06-16 13:15:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Held prejob meeting prior to cementing 30"" conductor.",0.5 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 13:15:00+00:00,2007-06-16 15:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Made up surface cement lines to cement stand. Tested lines against lo-torqe valve to 200 bar / 5 min - ok. Circulated at 2500 lpm / SPP 12 bar. ROV checked for leakage in plugs on 30"" conductor housing - ok. Inserted hotstab with ROV, actuated centralizer dogs in template funnel using minireel hydraulic supply from surface.",1.75 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 15:00:00+00:00,2007-06-16 17:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Pumped 103 m3 of 1,52 sg X-lite cement slurry with cement unit. Pump pressure during displacement 15 bar. Displacement rate 900 lpm. Hook weight fell from 115 MT to 110 MT throughout cement job.",2.0 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 17:00:00+00:00,2007-06-16 17:15:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Displaced cement with seawater at 1200 lpm. Pressure relatively steady around 17 bar. Pumped a total of 8,5 m3 leaving theoretical TOC at 247 m MD inside 30"" conductor.",0.25 +15_9_F_12_2007_06_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-16T00:00:00+02:00,2007-06-17T00:00:00+02:00,2007-06-16 17:15:00+00:00,2007-06-16 22:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Waited on cement to set up. + +Meanwhile : +-Flushed and washed cement unit +-Brought tensioning system parts to Centralizer deck +-Broke out and laid down Drillcollar +-Prepared for running LP riser",4.75 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-16 22:00:00+00:00,2007-06-17 01:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Waited on cement to set up. + +Meanwhile : +-Prepared and tested lines for top up job +-Brought tensioning system parts to Centralizer deck",3.0 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 01:00:00+00:00,2007-06-17 03:30:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to pumping operation. Assessed cool cement sample - still fingersoft. Lined up cement unit to UWG hose and top up pipe. Circulated at 30 lpm to check for potential flow bypass above cement on lower UWG shoe. Pressure built up to 5 bar with linear build, maintained pressure for 5 min, no pressure drop. Volume pumped 193 liter. Halted operation, bled back pressure and continued wating on cement to set up.",2.5 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 03:30:00+00:00,2007-06-17 03:45:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Restarted pumping operation to check cement shoe and burst disk on top up pipe. Pumped down cement unit and top up pipe. Pressured up to 53 bar / 189 l, burst disk at 14 m below ML / 159 m MD ruptured.",0.25 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 03:45:00+00:00,2007-06-17 04:00:00+00:00,251.0,m,fixed,drilling -- casing,ok,equipment failure,"Attempted to do circulation test through UWG cement hose/ top up pipe. Got alarm on overpressured cement unit. Released pressure, but control screen froze up.",0.25 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 04:00:00+00:00,2007-06-17 04:15:00+00:00,251.0,m,fixed,drilling -- casing,ok,equipment failure,Troubleshooting on Halliburton control screen. Unable to sign out alarms / system freeze.,0.25 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 04:15:00+00:00,2007-06-17 04:30:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"By manual operation of cement unit. Stepped up rate through cement hose / top up pipe to 500 lpm, obtained same pressure drop as previously i.e. 50 bar at 500 lpm indicating open flow above bursted disk at 14 m below ML / 159 m TVD.",0.25 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 04:30:00+00:00,2007-06-17 05:15:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Held pre job meeting. Prepared for cement job. Got ROV in position to operate centralizing rods in funnel, shifted handles and pressured up thorugh minireel to retract rods - ok. Started mixing cement.",0.75 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 05:15:00+00:00,2007-06-17 05:45:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Performed remedial cement job. Pumped 10 m3 1,56 G-cement slurry. Pump pressure during cementing 70 bar. Pump rate 500 lpm. Displaced cement down cement hose and top up pipe with 1,1 m3 SW.",0.5 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 05:45:00+00:00,2007-06-17 06:30:00+00:00,251.0,m,fixed,drilling -- casing,ok,success,"Broke cement hose in moonpool, inserted cement hose release ball. Let ball drop by gravity. Pressured up on cement unit and released cement hose. Flushed through manifold and cement hose. Flushed and cleaned cement unit.",0.75 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 06:30:00+00:00,2007-06-17 06:45:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to pulling CART.,0.25 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 06:45:00+00:00,2007-06-17 07:00:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,"Released CART from 30"" conductor housing with 5 righthand turns. + +Readings on inclinometer before release: +Pitch 0,25 / Roll 0,021",0.25 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 07:00:00+00:00,2007-06-17 07:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Broke out cement stand and laid out same. Pulled CART clear of template.,0.5 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 07:30:00+00:00,2007-06-17 08:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Pumped sponge for cleaning the 5 1/2 HWDP landing string.,0.5 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 08:00:00+00:00,2007-06-17 09:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Held prejob/information meeting for running LP drilling riser. Whole crew attended.,1.0 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 09:00:00+00:00,2007-06-17 09:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to pulling CART.,0.5 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 09:30:00+00:00,2007-06-17 10:00:00+00:00,140.0,m,fixed,interruption -- other,ok,equipment failure,Repaired hydraulic leak on TDS.,0.5 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 10:00:00+00:00,2007-06-17 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with CART on 5 1/2"" HWDP. Laid out CART. Rigged handling equipment for 4 3/4"" inner string.",2.0 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 12:00:00+00:00,2007-06-17 12:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to pulling 4 3/4"" aluminium cement stinger.",0.25 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 12:15:00+00:00,2007-06-17 13:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with 4 3/4"" aluminium cement stinger and centralizers, laid down on pipe deck.",1.0 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 13:15:00+00:00,2007-06-17 14:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleaned and tidied drillflloor. Removed handling equipment for 30"" condcutor and innerstring.",1.0 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 14:15:00+00:00,2007-06-17 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to installing cradles in HTS.,0.25 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 14:30:00+00:00,2007-06-17 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed cradles on HTS. Installed protector busing in Tensioner deck.,0.5 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 15:00:00+00:00,2007-06-17 15:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to installing riser spider.,0.25 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 15:15:00+00:00,2007-06-17 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed master bushing and installed riser spider. Installed hydraulic lines and function tested spider. Installed protector bushing and tension ring in Centralizer deck.,4.25 +15_9_F_12_2007_06_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-17T00:00:00+02:00,2007-06-18T00:00:00+02:00,2007-06-17 19:30:00+00:00,2007-06-17 22:00:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up Stress joint / DCI joint - 1st double, by simultaneous lift by deckcrane and TDS. Landed double in spider. Removed handling flange and installed guide rods on flange, installed gasket ring. Picked up 2nd double and landed on flange. Made up nuts according to Bandak procedure.",2.5 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-17 22:00:00+00:00,2007-06-17 23:15:00+00:00,21.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued making up flange according to Bandak procedure. Removed hatch covers on slot #11 and #13. Rearranged sheaves for guidewires and ran guidewires to Centralizer deck.,1.25 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-17 23:15:00+00:00,2007-06-18 01:30:00+00:00,50.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with LPDR to 30 m MD, stopped when guide sling in level with scaffolding below Centralizer deck. Ran out guidewire and hooked guidewires into slings above RL-4 connector. Ran aft guidewire and hooked onto eagle clamp on template by ROV. Ran in to 80 m MD and landed LPDR in spider. + +Strilhav on near standby from 01.30 to 04.00 due to personnel working on scaffolding deck below Centralizer deck.",2.25 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 01:30:00+00:00,2007-06-18 03:45:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up 3rd double. Installed guide rods on flange, installed gasket ring. Landed double on flange. Made up nuts according to Bandak procedure. RIH with LPDR to 80 m MD. Removed handling flange. ROV hooked up FWD guidewire to eagle clamp on template.",2.25 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 03:45:00+00:00,2007-06-18 04:00:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up splash zone / upper pup - 4th double. Installed guide rods on flange, installed gasket ring. Landed double on flange.",0.25 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 04:00:00+00:00,2007-06-18 06:00:00+00:00,105.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to make up 3rd and 4th double LPDR according to Bandak procedure. RIH with LPDR to 105 m MD, landed on spider, removed handling tool.",2.0 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 06:00:00+00:00,2007-06-18 09:00:00+00:00,122.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up tensioner joint - last single. Installed guide rods on flange, installed gasket ring. Landed tensioner joint on flange in riser spider. Made up flange according to Bandak procedure. RIH with LPDR to 122 m MD.",3.0 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 09:00:00+00:00,2007-06-18 09:15:00+00:00,122.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to making up landing string.,0.25 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 09:15:00+00:00,2007-06-18 10:00:00+00:00,122.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up to joints/connections in landing string to 67500 Nm, applied threadlock.",0.75 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 10:00:00+00:00,2007-06-18 12:00:00+00:00,122.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up landing string to LPDR running tool / flange, applied threadlock. Removed riser spider and installed master bushing.",2.0 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 12:00:00+00:00,2007-06-18 14:45:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with LPDR on landing string to 2 m above 30"" conductor housing. Tensioned up guidewires. While observing with ROV, stabbed LPDR RL-4 connector onto 30"" conductor housing. Using rig tongs, made up RL-4 connection to 40650 Nm with CCW rotation. Performed overpull test with 10 MT and maintained overpull.",2.75 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 14:45:00+00:00,2007-06-18 15:00:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to assembling tensioning system.,0.25 +15_9_F_12_2007_06_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-18T00:00:00+02:00,2007-06-19T00:00:00+02:00,2007-06-18 15:00:00+00:00,2007-06-18 22:00:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Elevated Tension ring with chain hoists on Centralizer deck. Installed brass bushing and Boat collision stool on Centralizer deck. + +Meanwhile=>During ROV inspection on 30"" conductor housing, observed that steel band for conductor ROV plugs was misalligned. Two ringbolts were missing. Assessed situation, conferred with shore and made contingency plan for getting the band back in place. Moved steelband back in place using ROV manipulator arm - obtained good fit on bolt holes and verified that steelband still was thight.",7.0 +15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-18 22:00:00+00:00,2007-06-19 01:00:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installled Contact ring and tensioner ring assembly on Centralizer deck. + +Meanwhile performed repair activities on conductor housing steelband. Welded/prepared threaded T- bars for replacing lost eyebolts on steelband. Dove ROV, inserted and made up threaded T-bars in steelband / ROV plug boltholes. + +Cut slings on guidewires using hydraulic cutter. Retrieved FWD and AFT guidewire. Installed and secured hatches on F-11 and F-13 openings on Centralizer deck, removed scaffolding. Tided Centralizer deck.",3.0 +15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 01:00:00+00:00,2007-06-19 04:00:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Elevated and made up contact ring to serrated area on tensioning joint. Made up Tensioner ring assembly and made up to Tension ring. Mounted 2 tensioning cylinders to tensioning assembly.,3.0 +15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 04:00:00+00:00,2007-06-19 10:15:00+00:00,141.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued to work on tensioning system on Centralizer deck. Mounted tensioning cylinders. Made up nuts on Contact ring. Tested hydrualic system. Tranferred tension to tensioning cylinders by applying 90 bar pressure on each equivalent to 150 MT total tension.,6.25 +15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 10:15:00+00:00,2007-06-19 11:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Slacked off weight on block. Broke out Tension joint running tool/flange on Tensioning deck.,1.0 +15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 11:15:00+00:00,2007-06-19 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to pulling LPDR running tool/flange.,0.25 +15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 11:30:00+00:00,2007-06-19 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with landing string, broke and laid down same. Broke out running tool/flange.",1.5 +15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 13:00:00+00:00,2007-06-19 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed cradles on HTS for handling overshot joint. Picked up overshot joint and landed off on top of LPDR Tension joint. Torqued up bolts in overshot.,3.0 +15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 16:00:00+00:00,2007-06-19 20:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Made repairs on TDS. Serviced TDS counterbalance and rotating head. Meanwhile installed new actuator on flowline isolation valve.,4.5 +15_9_F_12_2007_06_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-19T00:00:00+02:00,2007-06-20T00:00:00+02:00,2007-06-19 20:30:00+00:00,2007-06-19 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged TDS with long slings for running diverter. Removed master bushing. Lifted diverter into diverter housing.,1.5 +15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-19 22:00:00+00:00,2007-06-19 23:30:01+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Secured overshot joint with tugger in moonpool due to movements in same. Landed diverter on overshot joint. Made up diverter to overshot joint.,1.5002777777777778 +15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-19 23:30:01+00:00,2007-06-20 00:30:01+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Changed dye block retaining plate on TDS. + +Meanwhile worked to function flowline isolation valve.",1.0 +15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 00:30:01+00:00,2007-06-20 01:30:01+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Filled conductor with seawater. Observed leakage above diverter (environmental barrier). + +Meanwhile worked to function flowline isolation valve.",1.0 +15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 01:30:01+00:00,2007-06-20 02:00:01+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held handover meeting on drillfloor. Held toolbox talk prior to picking up 26"" drillout BHA.",0.5 +15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 02:00:01+00:00,2007-06-20 03:00:01+00:00,9.0,m,fixed,drilling -- trip,ok,success,"Picked up and installed 12 1/4"" x 17 1/2"" x 26"" drillout BHA. Gauged bit. + +Meanwhile worked to function flowline isolation valve.",1.0 +15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 03:00:01+00:00,2007-06-20 04:00:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,"Pick up and make up 9 3/4"" DC. + +Meanwhile worked to function flowline isolation valve.",0.9997222222222222 +15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 04:00:00+00:00,2007-06-20 07:00:00+00:00,180.0,m,fixed,drilling -- trip,ok,success,"Continued making up 26"" drillout BHA. RIH with 26"" drillout BHA to 180 m MD. + +Meanwhile worked to function flowline isolation valve.",3.0 +15_9_F_12_2007_06_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-20T00:00:00+02:00,2007-06-21T00:00:00+02:00,2007-06-20 07:00:00+00:00,2007-06-20 22:00:00+00:00,180.0,m,fixed,interruption -- other,ok,equipment failure,"Worked to function flowline isolation valve. + +Meanwhile : +-Changed conveyer belt on HTS +-Treated pit #5,#6 and #7 with H2S scavanger +-Laid out HPDR on pipedeck",15.0 +15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-20 22:00:00+00:00,2007-06-21 04:00:00+00:00,180.0,m,fixed,interruption -- other,ok,equipment failure,"Worked to function flowline isolation valve. + +Meanwhile . +-Preparing for making up HPDR in doubles on pipedeck +-Transferred slop from pit #6 to DCI holding tank",6.0 +15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 04:00:00+00:00,2007-06-21 12:00:00+00:00,180.0,m,fixed,interruption -- other,ok,equipment failure,"Function tested flowline isolation valve from Koomey unit. Could not operate valve from BOP panel due to lacking signal from PLC. Managed to operate flowline isolation valve manually. + +Meanwhile . +-Worked on TDS and flowline actuator. +-Performed daily maintenace, PMs and housekeeping. +-Emptied flowline to trip tank. +-Greased flowline isolation valve periodically during testing.",8.0 +15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 12:00:00+00:00,2007-06-21 12:30:00+00:00,180.0,m,fixed,drilling -- drill,ok,success,Held tool box meeting prior to drilling out shoe track. Focused on potential for stuck pipe.,0.5 +15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 12:30:00+00:00,2007-06-21 13:00:00+00:00,250.0,m,fixed,drilling -- drill,ok,success,"RIH with 26"" hole opner BHA from 180 m to 222 m. Washed down from 222 m with 2000 lpm, 12 bar. Tagged cement at 250 m with 3 ton. Up weight 94 t/ Down weight 97 t.",0.5 +15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 13:00:00+00:00,2007-06-21 14:30:00+00:00,250.0,m,fixed,drilling -- drill,ok,success,"Drilled cmt/shoe track with 26"" hole opner BHA; 3000 lpm, 50 rpm and 1-3 ton wob. Picked bit off bottom and stopped pumps.",1.5 +15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 14:30:00+00:00,2007-06-21 15:30:00+00:00,250.0,m,fixed,drilling -- trip,ok,success,"Function tested diverter system. Ran diverting sequence on port and aft overboard lines from BOP panel. Verified visually that diverter element closed, flowline isolation valve closed and diverter line valve opened.",1.0 +15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 15:30:00+00:00,2007-06-21 20:30:00+00:00,258.0,m,fixed,drilling -- drill,ok,success,"Continued to drill cmt/shoe track from 250 m until 26"" hole opener was out of 30"" conductor shoe; 3000 lpm, 50 rpm and 1-3 ton wob. Reamed shoe track every 1-2 m. Pumped 15 m3 1.12 sg hi-vis pill and circulated out same. Noticable increase in cuttings observed.",5.0 +15_9_F_12_2007_06_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-21T00:00:00+02:00,2007-06-22T00:00:00+02:00,2007-06-21 20:30:00+00:00,2007-06-21 22:00:00+00:00,260.0,m,fixed,drilling -- drill,ok,success,"Drilled 2 m new formation with 26"" hole opner BHA; 3000 lpm, 55 rpm and 1 ton wob. Reamed rate hole and shoe track.",1.5 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-21 22:00:00+00:00,2007-06-21 23:30:00+00:00,261.4,m,fixed,drilling -- drill,ok,success,"Drilled 1,5 m new formation with 26"" hole opner BHA; 3000 lpm, 55 rpm and 0.5-1 ton wob. Reamed rat hole. Pumped 15 m3 1.12 sg hi-vis pill and circulated out same. Meanwhile held tool box meeting for manual handling of BHA.",1.5 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-21 23:30:00+00:00,2007-06-22 00:30:00+00:00,141.0,m,fixed,drilling -- drill,ok,success,Pulled through shoe track without rotation to verify no restrictions and continued POOH to 141 m.,1.0 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 00:30:00+00:00,2007-06-22 01:00:00+00:00,141.0,m,fixed,interruption -- other,ok,equipment failure,Malfunction of forward PRS. Trouble-shooted same and found failure on proximity switch.,0.5 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 01:00:00+00:00,2007-06-22 02:30:00+00:00,29.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 26"" HO BHA and racked back same.",1.5 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 02:30:00+00:00,2007-06-22 03:30:00+00:00,29.0,m,fixed,drilling -- drill,ok,success,Held tool box meeting prior to removing master bushing and diverter inserts. Removed inserts.,1.0 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 03:30:00+00:00,2007-06-22 04:00:00+00:00,29.0,m,fixed,drilling -- drill,ok,success,"Continued POOH with 26"" HO BHA and racked back same.",0.5 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 04:00:00+00:00,2007-06-22 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH with 26"" HO BHA from 29 m to 8 m and racked back same. Held tool box meeting prior to POOH with 12 1/4"" x 17 1/2"" x 26"" hole opener assembly. Removed master bushing and LO 26"" HO BHA. Cleared rig floor.",2.0 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 06:00:00+00:00,2007-06-22 08:30:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"Held pre-job meeting. PU and RIH with 8 1/2"" pilot hole BHA to 32 m.",2.5 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 08:30:00+00:00,2007-06-22 09:30:00+00:00,32.0,m,fixed,drilling -- trip,ok,success,"Held tool box meeting prior to installing radioactive source. Barried off wellhead, moonpool and rigfloor. Installed radioactive source into ADN according to Schlumberger procedure.",1.0 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 09:30:00+00:00,2007-06-22 15:30:00+00:00,225.0,m,fixed,drilling -- trip,ok,success,"Continued to PU and RIH with 8 1/2"" pilot hole BHA from 32 m to 225 m. Meanwhile recovered ROV to surface to repair camera.",6.0 +15_9_F_12_2007_06_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-22T00:00:00+02:00,2007-06-23T00:00:00+02:00,2007-06-22 15:30:00+00:00,2007-06-22 22:00:00+00:00,112.0,m,fixed,drilling -- wait,ok,success,"Raw water pumpe failed and left rig with only 1 out of 3 pumpes available. Due to the criticality of the pump delivering firewater, cooling water etc the drilling operation is postphoned until the pump is replaced. + +-Meanwhile held tool box meeting to install diverter elements. Removed master bushing and replaced torn 22"" outer diverter elements by new 18"" elements. +-Meanwhile held tool box meeting prior to POOH. POOH with 8 1/2"" BHA from 212 m to 32 m. +-Meanwhile cleared rig floor before handling radioactive sources. Removed batteries. +- Meanwhile continued POOH to 17 m.",6.5 +15_9_F_12_2007_06_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-23T00:00:00+02:00,2007-06-24T00:00:00+02:00,2007-06-22 22:00:00+00:00,2007-06-23 02:00:00+00:00,8.0,m,fixed,drilling -- wait,ok,success,"Waited on boat to arrive with raw water pump. Meanwhile continued to LO BHA from 17 m to surface. Cleaned and cleared rig floor of excess equipment. Lowered foldable finger board, changed inserts in fox hole and arranged equipment in set back prior to PU 3 1/2"" DP. Held tool box meeting prior to MU 3 1/2"" DP.",4.0 +15_9_F_12_2007_06_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-23T00:00:00+02:00,2007-06-24T00:00:00+02:00,2007-06-23 02:00:00+00:00,2007-06-23 04:00:00+00:00,8.0,m,fixed,drilling -- trip,ok,success,"MU and RB 3 1/2"" DP. Changed dies in aft PRS. Meanwhile started installation of raw water pump.",2.0 +15_9_F_12_2007_06_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-23T00:00:00+02:00,2007-06-24T00:00:00+02:00,2007-06-23 04:00:00+00:00,2007-06-23 10:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MU and RB 3 1/2"" DP. Meanwhile trouble-shooted raw water pump failure and performed rig maintenance, housekeeping and monitored well on trip tank. Found leak rate of 200 l/hour.",6.0 +15_9_F_12_2007_06_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-23T00:00:00+02:00,2007-06-24T00:00:00+02:00,2007-06-23 10:00:00+00:00,2007-06-23 22:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,"Waiting on trouble-shooting of raw water pump failure. + +-Meanwhile removed master busing, installed 18"" and 10"" diverter inserts and re-installed master bushing. +-Meanwhile worked with mechanic on TDS. +-Meanwhile observed leak rate of 250 l/hour. Found leaking valve on flowline valve. Actuator misaligned and unable to fully close flowline +-Meanwhile dumped pit 6 (active) and filled with fresh seawater. Dressed all 6 shakers with 20/80 mesh screens.",12.0 +15_9_F_12_2007_06_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-24T00:00:00+02:00,2007-06-25T00:00:00+02:00,2007-06-23 22:00:00+00:00,2007-06-24 04:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Waiting on trouble-shooting of raw water pump failure. Meanwhile worked on flowline valve and actuator and stopped observed leakage.,6.0 +15_9_F_12_2007_06_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-24T00:00:00+02:00,2007-06-25T00:00:00+02:00,2007-06-24 04:00:00+00:00,2007-06-24 17:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,"Waiting of raw water pump repair. + +-Meanwhile performed rig maintenance, performed dropped object survey punch items and prepared equipment for 26"" section. +- Meanwhile monitored well on trip tank. Loss rate of approx. 100 l/hour recorded. +- Meanwhile performed man ride service on TDS and 2 PRS and changed out valve on diverter system. +-Meanwhile had derrick inspection.",13.0 +15_9_F_12_2007_06_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-24T00:00:00+02:00,2007-06-25T00:00:00+02:00,2007-06-24 17:00:00+00:00,2007-06-24 22:00:00+00:00,246.0,m,fixed,drilling -- wait,ok,success,"Waiting of raw water pump repair. Meanwhile PU and RIH with 8 1/2"" pilot hole BHA to 246 m. Schlumberger fitted fresh batteries and loaded RA source.",5.0 +15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-24 22:00:00+00:00,2007-06-24 22:15:00+00:00,251.0,m,fixed,drilling -- wait,ok,success,"Waiting of raw water pump repair. Meanwhile PU and RIH with 8 1/2"" pilot hole BHA from 246 to 251 m.",0.25 +15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-24 22:15:00+00:00,2007-06-24 23:30:00+00:00,251.0,m,fixed,drilling -- drill,ok,success,"Had pre-job meeting with all personnel on shallow gas procedure. Performed shallow gas drill inside shoe at 251 m. Pumped 900 lpm, 15 bar and operated diverter bag and observed flow being re-directed through port overboard line. Switched between pits on the fly.",1.25 +15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-24 23:30:00+00:00,2007-06-25 04:00:00+00:00,251.0,m,fixed,drilling -- drill,ok,success,"Pumped 27m3 1.60 sg mud at 2000 lpm, 110 bar and displaced out of bit using seawater. Flow checked well for 1 hour. Had stable loss rate of 120 l/hour eqvivalent to the loss rate monitored on the trip tank prior to the FIT. Picked up 1 stand and circulated out upper part of 1.60 sg mud, 2000 lpm and 84.5 bar. RIH with 1 stand and circulated out remaining 1.60 sg mud.",4.5 +15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 04:00:00+00:00,2007-06-25 09:30:00+00:00,296.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole BHA from 261.4 m to 296 mMD, 2000 lpm, 89 bar, 60 rpm, 1-4 kNm, 1-3 MT wob, ECD 1.19 SG, ROP 9 m/hr. BHA WT 23 MT. WT below jar 15 MT.",5.5 +15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 09:30:00+00:00,2007-06-25 10:30:00+00:00,251.0,m,fixed,drilling -- drill,ok,success,"PU off bottom and circulated due to riser leak. Pumped out to shoe from 296 m to 251 m, 890 lpm and 10 rpm. Located leak to be in wellhead connector, 70-80 l/hr.",1.0 +15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 10:30:00+00:00,2007-06-25 12:00:00+00:00,251.0,m,fixed,drilling -- drill,ok,success,Flow checked well over trip tank while waiting on decision. Leakage stopped and well flow checked ok. Meanwhile performed general maintenance and houskeeping.,1.5 +15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 12:00:00+00:00,2007-06-25 19:30:00+00:00,399.0,m,fixed,drilling -- drill,ok,success,"RIH with 8 1/2"" pilot hole BHA from 251 to 290 m. MU TDS and washed down from 290 m to 296 m. Drilled 8 1/2"" pilot hole from 296 m to 399 mMD, 2000 lpm, 90-98 bar, 60-120 rpm, 1-4 kNm, 1-3 MT wob, ECD 1.20 SG, ROP 15-20 m/hr.",7.5 +15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 19:30:00+00:00,2007-06-25 20:15:00+00:00,399.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated and reciprocated btms up, 2000/2250 lpm, 100/114 bar, due to rapide increase in ECD to 1.23 SG. Diluted and conditioned mud from 1.14 sg to 1.12 sg.",0.75 +15_9_F_12_2007_06_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-25T00:00:00+02:00,2007-06-26T00:00:00+02:00,2007-06-25 20:15:00+00:00,2007-06-25 22:00:00+00:00,415.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 399 m to 415 mMD, 2250 lpm, 112 bar, 120 rpm, 2-3 kNm, 1-3 MT wob, ECD 1.21-1.23 SG, ROP 10-46 m/hr, Inc 0.46 deg.",1.75 +15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-25 22:00:00+00:00,2007-06-26 00:00:00+00:00,467.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 415 m to 467 mMD, 2272 lpm, 116 bar, 120 rpm, 2-3 kNm, 1-3 MT wob, ECD 1.23-1.25 SG, ROP 36 m/hr.",2.0 +15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 00:00:00+00:00,2007-06-26 00:15:00+00:00,467.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated and reciprocated btms up, 2272 lpm, 116 bar, due to rapide increase in ECD to 1.27 SG. Diluted and conditioned mud from 1.15 sg to 1.12 sg.",0.25 +15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 00:15:00+00:00,2007-06-26 01:00:00+00:00,473.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 467 m to 473 mMD, 2272 lpm, 116 bar, 120 rpm, 2-3 kNm, 1-2 MT wob, ECD 1.25 SG, ROP 37 m/hr. Observed gain of 1 m3 in active. PU off btm and flow checked well static for 15 min. Ok.",0.75 +15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 01:00:00+00:00,2007-06-26 02:00:00+00:00,476.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated btms up, 2272 lpm, 116 bar. No gas observed. Meanwhile diluted and conditioned mud to 1.12 sg.",1.0 +15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 02:00:00+00:00,2007-06-26 04:00:00+00:00,525.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 476 m to 525 mMD, 2272 lpm, 116 bar, 120 rpm, 2-3 kNm, 1-2 MT wob, ECD 1.23 SG. Reduced ROP from 36 m/hr to 30 m/hr at 500 m according to program.",2.0 +15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 04:00:00+00:00,2007-06-26 10:00:00+00:00,618.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 525 m to 618 mMD, 2250 lpm/115 bar, 120 rpm/1-6 kNm, 2-15 MT wob, ECD 1.21-1.23 SG. Limited 30 m/hr according to program. ROV monitored wellhead connector.",6.0 +15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 10:00:00+00:00,2007-06-26 11:30:00+00:00,578.0,m,fixed,drilling -- circulating conditioning,ok,success,"Reamed full stand and circulated well clean, 2250 lpm 115 bar. Racked back one stand.",1.5 +15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 11:30:00+00:00,2007-06-26 12:30:00+00:00,578.0,m,fixed,drilling -- drill,ok,success,"MU TDS, rotated 10 rpm and flow checked well. Total loss 140 l over 1.5 hr. Meanwhile checked rollers and dies on AFT PRS.",1.0 +15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 12:30:00+00:00,2007-06-26 13:00:00+00:00,578.0,m,fixed,drilling -- drill,ok,success,Prepared to wash std down. Unable to open flowline isolation valve.,0.5 +15_9_F_12_2007_06_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-26T00:00:00+02:00,2007-06-27T00:00:00+02:00,2007-06-26 13:00:00+00:00,2007-06-26 22:00:00+00:00,251.0,m,fixed,interruption -- other,ok,equipment failure,Trouble-shooted and repaired flowline isolation valve. Meanwhile POOH from 578 m to shoe at 251 m.,9.0 +15_9_F_12_2007_06_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-27T00:00:00+02:00,2007-06-28T00:00:00+02:00,2007-06-26 22:00:00+00:00,2007-06-27 04:00:00+00:00,251.0,m,fixed,interruption -- other,ok,equipment failure,Trouble-shooted and repaired flowline isolation valve. Meanwhile performed general housekeeping.,6.0 +15_9_F_12_2007_06_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-27T00:00:00+02:00,2007-06-28T00:00:00+02:00,2007-06-27 04:00:00+00:00,2007-06-27 13:30:00+00:00,251.0,m,fixed,interruption -- other,ok,equipment failure,Repaired flowline isolation valve. Meanwhile performed general maintenance and housekeeping. Performed derrick inspection and monitored well on trip tank. Stable loss rate 170 l/hr (LPDR connector).,9.5 +15_9_F_12_2007_06_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-27T00:00:00+02:00,2007-06-28T00:00:00+02:00,2007-06-27 13:30:00+00:00,2007-06-27 18:00:00+00:00,618.0,m,fixed,interruption -- other,ok,equipment failure,"Washed down from 251 m to 618 m, 2250 lpm/109 bar. No fill.",4.5 +15_9_F_12_2007_06_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-27T00:00:00+02:00,2007-06-28T00:00:00+02:00,2007-06-27 18:00:00+00:00,2007-06-27 18:30:00+00:00,618.0,m,fixed,drilling -- drill,ok,success,Had pre-job meeting with new night crew on shallow gas procedure and function tested flowline isolation valve 5 times.,0.5 +15_9_F_12_2007_06_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-27T00:00:00+02:00,2007-06-28T00:00:00+02:00,2007-06-27 18:30:00+00:00,2007-06-27 22:00:00+00:00,685.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 618 m to 685 m, 2250 lpm/114 bar, 120 rpm/1-3 kNm, 1-3 MT wob, ECD 1.21-1.24 SG. Observed losses, 3 m3/15 min at 655 m. Circulated with reduced flow, 1800 lpm. Increased flow rate to 2250 lpm and observed loss of 200 l/min. Total loss was 10 m3.",3.5 +15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-27 22:00:00+00:00,2007-06-28 04:00:00+00:00,780.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 685 m to 780 m, 2250 lpm/115 bar, 120 rpm/1-4 kNm, 1-3 MT wob, ECD 1.21-1.25 SG. Circulated and reamed one std every 3 hours due to high ECD reading of 1.27 SG. No loss observed.",6.0 +15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 04:00:00+00:00,2007-06-28 11:30:00+00:00,870.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 780 m to 870 m, 2250 lpm/117 bar, 120 rpm/1-3 kNm, 3-4 MT wob, ECD 1.25 SG.",7.5 +15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 11:30:00+00:00,2007-06-28 12:00:00+00:00,870.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean prior to drilling through Utsira formation, 2250 lpm/113 bar, 120 rpm/1-3 kNm.",0.5 +15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 12:00:00+00:00,2007-06-28 13:00:00+00:00,890.0,m,fixed,drilling -- drill,ok,success,"Continue to drill 8 1/2"" pilot hole from 870 m to 890 m, 2250 lpm/117 bar, 120 rpm/1-3 kNm, 0-6 MT wob, ECD 1.25 SG. Observed increasing WOB from 880 to 882 followed by no WOB from 882 m to 886 m.",1.0 +15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 13:00:00+00:00,2007-06-28 14:00:00+00:00,890.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean, 2250 lpm/113 bar, 120 rpm/1-3 kNm.",1.0 +15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 14:00:00+00:00,2007-06-28 16:30:00+00:00,890.0,m,fixed,drilling -- drill,ok,success,"Function tested flowline isolation valve 5 times. Displaced well to seawater, 2250 lpm/102 bar, 100 rpm/1-3 kNm. Flow checked well and observed loss of 500 l/hr. Observed increasing leak rate on connector using seawater.",2.5 +15_9_F_12_2007_06_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-28T00:00:00+02:00,2007-06-29T00:00:00+02:00,2007-06-28 16:30:00+00:00,2007-06-28 22:00:00+00:00,941.0,m,fixed,drilling -- drill,ok,success,"Pumped 10 m3 hi-vis pill and started drilling 8 1/2"" pilot hole from 890 m to 941 m2250 lpm/105 bar, 120 rpm/1-3 kNm, 0-1 MT wob, ECD 1.12 - 1.20 SG . Pumped 10 m3 hi-vi pills according to program. Had to back-ream 1 std every 5-10 m due to high ECD readings. Meanwhile decided to displace well to WBM.",5.5 +15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-28 22:00:00+00:00,2007-06-29 00:00:00+00:00,941.0,m,fixed,drilling -- drill,ok,success,"Prepared for connection at 941 m and had 10 MT WOB at 934 m, 120 rpm. Slowed down to 30 rpm and re-ran in and got 5 MT WOB at 934 m (had 0-1 MT WOB while drilling this section). Pulled back to 910 m and circulated and swept 2 x 5m3 hi-vis pills. Took time-out to discuss further action. Meanwhile had boat delivering drillwater for mixing mud.",2.0 +15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-29 00:00:00+00:00,2007-06-29 04:00:00+00:00,941.0,m,fixed,drilling -- drill,ok,success,"Mixed 1.08 sg mud and displaced well to same, 2250 lpm/105 bar, 30 rpm/1-3 kNm.",4.0 +15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-29 04:00:00+00:00,2007-06-29 18:00:00+00:00,1178.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 941 m to 1178 m, 2250 lpm/111 bar, 120 rpm/1-5 kNm, 1-2 MT wob, ECD 1.14-1.20 SG. Reamed each stand. Took weight at 978 m, 1027 m, 1040 m and 1060 m, while reaming. Worked through tight spots and continued drilling. Observed max gas reading of 0.6%. Stringer at 1002-1003 m.",14.0 +15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-29 18:00:00+00:00,2007-06-29 19:00:00+00:00,1178.0,m,fixed,interruption -- other,ok,equipment failure,Rig ESD system had shut-down. Managed to rotate string 10 rpm and pump 200 lpm with cement unit.,1.0 +15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-29 19:00:00+00:00,2007-06-29 20:00:00+00:00,1178.0,m,fixed,interruption -- other,ok,equipment failure,"Reamed 1 std and circulated btms up, 2250 lpm/101 bar, 125 rpm/1-5 kNm. Lost 2 m3/hr over shakers due to high amount of cuttings.",1.0 +15_9_F_12_2007_06_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-29T00:00:00+02:00,2007-06-30T00:00:00+02:00,2007-06-29 20:00:00+00:00,2007-06-29 22:00:00+00:00,1178.0,m,fixed,interruption -- repair,ok,equipment failure,Waiting on Geoservices to have their sensors reading data. Meanwhile reamed and circulated 2250 lpm/101 bar.,2.0 +15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-29 22:00:00+00:00,2007-06-30 00:30:00+00:00,1178.0,m,fixed,interruption -- repair,ok,equipment failure,Waiting on Geoservices to have their sensors reading data. Meanwhile reamed and circulated 2250 lpm/101 bar.,2.5 +15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 00:30:00+00:00,2007-06-30 04:00:00+00:00,1262.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 1178 m to 1262 m, 2250 lpm/105 bar, 125 rpm/2-3 kNm, 1-4 MT wob, ECD 1.19-1.28 SG. Reamed each stand. Reamed and circulated when experienced high ECD readings.",3.5 +15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 04:00:00+00:00,2007-06-30 10:00:00+00:00,1353.0,m,fixed,drilling -- drill,ok,success,"Drilled 8 1/2"" pilot hole from 1262 m to 1353 m, 2250 lpm/108 bar, 125 rpm/2-5 kNm, 1-4 MT wob, ECD 1.19-1.28 SG. Reamed each stand. Reamed and circulated when experienced high ECD.",6.0 +15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 10:00:00+00:00,2007-06-30 12:00:00+00:00,1353.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated 2 x btms up, 2250 lpm/108 bar, 125 rpm/2-5 kNm.",2.0 +15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 12:00:00+00:00,2007-06-30 12:30:00+00:00,1353.0,m,fixed,drilling -- drill,ok,success,Flow check well prior to displace well to 1.40 sg WBM. Meanwhile held tool-box talk for displacement.,0.5 +15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 12:30:00+00:00,2007-06-30 13:30:00+00:00,1353.0,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well to 50 m3 of 1.40 sg WBM, 1200 lpm/8 bar, 80 rpm/1-4 kNm. Max ECD 1.21 sg.",1.0 +15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 13:30:00+00:00,2007-06-30 18:00:00+00:00,290.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" BHA from 1353 m to 294 m. Observed 2 MT max drag. Meanwhile placed cuttings funnel on F-4 using moonpool tugger.",4.5 +15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 18:00:00+00:00,2007-06-30 18:30:00+00:00,290.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 13 m3 of 1.40 sg WBM at 290 m, 900 lpm/11 bar, 10 rpm/1-3 kNm, to displace lower part of 30"" conductor to heavy mud.",0.5 +15_9_F_12_2007_07_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-06-30T00:00:00+02:00,2007-07-01T00:00:00+02:00,2007-06-30 18:30:00+00:00,2007-06-30 22:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"POOH with 8 1/2"" BHA from 294 m to 32 m. RB 5.5"" HWDP and 6 3/4"" DC.",3.5 +15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-06-30 22:00:00+00:00,2007-07-01 01:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"POOH and LO 8 1/2"" BHA from 32 m to OOH. Removed RA source from MWD tool and dumped memory data.",3.0 +15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 01:00:00+00:00,2007-07-01 04:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleared and cleaned drill floor. Prepared removal of diverter. Installed sadle and cradle on HTS. Held tool-box talk with crew. Installed lifting bolts on diverter.,3.0 +15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 04:00:00+00:00,2007-07-01 07:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Removed broken stud from diverter locking dog. Installed new lifting bolt. Bled off pressure in tension system from 90 bar to 60 bar and observed easier movement of locking dog.,3.5 +15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 07:30:00+00:00,2007-07-01 09:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held tool-box meeting prior to lifting diverter to rig floor. Lifted with weight of diverter (10 MT) + overpull (2 MT) and diverter came free. RB same in set back area and secured.,1.5 +15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 09:00:00+00:00,2007-07-01 12:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Attached slings to chackles in bails in TDS to overshot joint. Removed tension bolts using Bandak Bolt Tensioning Tool. LO overshot joint and removed slings.,3.5 +15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 12:30:00+00:00,2007-07-01 15:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held tool-box meeting. RIH and MU up flange connection to tensioner joint using 19 studs on B-type flange. Meanwhile installed riser spider and function tested same.,3.0 +15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 15:30:00+00:00,2007-07-01 21:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Held tool-box meeting. Reduced pressure on tensioner cylinders in 20 bar steps from 150 MT to 55 MT (weight of LPDR when ran was 42 MT). Picked up 60 MT + block weight with TDS (reading 130 MT). Bled off all pressure on tensioner cylinders, leaving all riser tension in TDS. Dismantled tensioner system.",6.0 +15_9_F_12_2007_07_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-01T00:00:00+02:00,2007-07-02T00:00:00+02:00,2007-07-01 21:30:00+00:00,2007-07-01 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW to disconnect and POOH with LPDR.,0.5 +15_9_F_12_2007_07_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-02T00:00:00+02:00,2007-07-03T00:00:00+02:00,2007-07-01 22:00:00+00:00,2007-07-02 04:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW to disconnect and POOH with LPDR. Meanwhile prepared equipment for LO 6 3/4"" DC. LD 1 std 6 3/4"" DC in singles.",6.0 +15_9_F_12_2007_07_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-02T00:00:00+02:00,2007-07-03T00:00:00+02:00,2007-07-02 04:00:00+00:00,2007-07-02 08:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW to disconnect and POOH with LPDR. Meanwhile LO 6 3/4"" DC.",4.5 +15_9_F_12_2007_07_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-02T00:00:00+02:00,2007-07-03T00:00:00+02:00,2007-07-02 08:30:00+00:00,2007-07-02 10:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Re-installed riser trolly and cradle onto HTS. RD remainder of tensioner system prior to pulling LPDR. Held pre-job meeting prior to pulling LPDR.,1.5 +15_9_F_12_2007_07_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-02T00:00:00+02:00,2007-07-03T00:00:00+02:00,2007-07-02 10:00:00+00:00,2007-07-02 12:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Used rig tongs and turned LPDR 1/2 turn to the right to release RL-4 connection, release torque 50 kNm. Observed disconnect with ROV. PU clear of conductor and lifted LPDR up to rig floor slowly until first flange was above spider dogs. String WT 45 MT. Engaged spider dogs and inserted stop bolts. Landed LPDR.",2.0 +15_9_F_12_2007_07_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-02T00:00:00+02:00,2007-07-03T00:00:00+02:00,2007-07-02 12:00:00+00:00,2007-07-02 22:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"BO and LD 3 LPDR joints in singles (tension joint, upper pup joint and splash zone joint), using 5 1/2"" elevator attached to handling flange B.",10.0 +15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-02 22:00:00+00:00,2007-07-03 04:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"BO and LD 3 LPDR standard joints in singles using 5 1/2"" elevator attached to handling flange A.",6.0 +15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-03 04:00:00+00:00,2007-07-03 10:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"BO and LD 3 LPDR standard joints in singles using 5 1/2"" elevator attached to handling flange A.",6.5 +15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-03 10:30:00+00:00,2007-07-03 14:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,RD LPDR handling equipment and cleared rig floor. Removed spider and excess equipment from rig floor. Removed equipment from wellhead area. Greased and serviced PRS's and TDS.,3.5 +15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-03 14:00:00+00:00,2007-07-03 15:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Held tool-box meeting prior to RIH with 3 1/2"" DP. Rigged up for running 3 1/2"" DP.",1.5 +15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-03 15:30:00+00:00,2007-07-03 16:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Trouble-shooted and repaired PRS software failure.,1.0 +15_9_F_12_2007_07_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-03T00:00:00+02:00,2007-07-04T00:00:00+02:00,2007-07-03 16:30:00+00:00,2007-07-03 22:00:00+00:00,1350.0,m,fixed,drilling -- casing,ok,success,"MU cement stinger to 3 1/2"" DP and RIH. Stabbed into conductor housing assisted by ROV. When RIH with 338 m of 3 1/2"" DP, crossed over to 5 1/2"" and continued RIH with cement stinger.",5.5 +15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-03 22:00:00+00:00,2007-07-03 23:00:00+00:00,1350.0,m,fixed,drilling -- casing,ok,success,Installed side entry sub and single. Installed Lo-torque valve on side entry sub.,1.0 +15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-03 23:00:00+00:00,2007-07-04 00:00:00+00:00,1352.0,m,fixed,drilling -- casing,ok,success,"PU stand and connected to TDS. Tagged bottom at 1353.5 m (1.5 m fill). PU 1 m to 1352 m. Displaced hole to seawater, 1500 lpm/32-67 bar pumping 100 m3 SW. Lined up to kill mud.",1.0 +15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-04 00:00:00+00:00,2007-07-04 01:00:00+00:00,1352.0,m,fixed,drilling -- drill,ok,success,Flow checked well and observed for bubles at wellhead with ROV. Rotated string with 5 rpm and reciprocated slowly. Meanwhile tested cement lines to 200 bar/5 min and held cement tool-box meeting with new crew. No gas observed.,1.0 +15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-04 01:00:00+00:00,2007-07-04 04:00:00+00:00,1074.0,m,fixed,drilling -- casing,ok,success,"Cemented plug #1 from 1352 m to 1079 m RKB: Mixed and pumped, 800 lpm/30 bar, 12,0 m3 1.90 SG ""G"" cement slurry and displaced with 8.5 m3 seawater using rig pumps, 1500 lpm/ 3 bar, 50 rpm/1-2 kNm. POOH to 1074 m and dropped sponge ball and circulated 1.2 m3 hole volume with seawater, 2200 lpm/55 bar. PU to 1073 m.",3.0 +15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-04 04:00:00+00:00,2007-07-04 07:00:00+00:00,795.0,m,fixed,drilling -- casing,ok,success,"Cemented plug #2 from 1073 m to 800 m RKB: Mixed and pumped, 800 lpm/27 bar, 12,0 m3 1.90 SG ""G"" cement slurry and displaced with 5.5 m3 seawater using rig pumps, 1500 lpm/ 3 bar, 50 rpm/1-2 kNm. POOH to 795 m and dropped sponge ball and circulated 1.2 m3 hole volume with seawater, 2200 lpm/55 bar. PU to 794 m.",3.0 +15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-04 07:00:00+00:00,2007-07-04 21:00:00+00:00,251.0,m,fixed,drilling -- wait,ok,success,POOH with cement stinger to shoe at 251 m due to upcoming other activity on rig: Waited on Siemens software downloading for process module due to by-passed ESD systems.,14.0 +15_9_F_12_2007_07_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-04T00:00:00+02:00,2007-07-05T00:00:00+02:00,2007-07-04 21:00:00+00:00,2007-07-04 22:00:00+00:00,335.0,m,fixed,drilling -- wait,ok,success,"MU and RIH with 3 1/2"" cement stinger. Had a few tight spots, observed with ROV.",1.0 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-04 22:00:00+00:00,2007-07-04 23:30:00+00:00,795.0,m,fixed,drilling -- wait,ok,success,"Crossed over to 5 1/2"" DP and continued MU and RIH with cement stinger. Installed side-entry sub with Lo-torque valve.",1.5 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-04 23:30:00+00:00,2007-07-05 00:00:00+00:00,795.0,m,fixed,drilling -- wait,ok,success,Pumped btms up to clean well. Meanwhile held pre-job meeting with crew before cement job.,0.5 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 00:00:00+00:00,2007-07-05 03:00:00+00:00,516.0,m,fixed,drilling -- casing,ok,success,"Cemented plug #3 from 794 m to 521 m RKB: Mixed and pumped, 800 lpm/26 bar, 12,0 m3 1.90 SG ""G"" cement slurry and displaced with 2.5 m3 seawater using rig pumps, 1500 lpm/ 1 bar, 50 rpm/1-2 kNm. POOH to 516 m, dropped sponge ball and circulated 1.2 m3 hole volume with seawater, 2200 lpm/45 bar. PU to 515 m.",3.0 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 03:00:00+00:00,2007-07-05 04:00:00+00:00,374.0,m,fixed,drilling -- casing,ok,success,"Cemented plug #4 from 515 m to 249 m RKB: Mixed and pumped, 800 lpm/21 bar, 16,6 m3 1.95 SG neat ""G"" cement slurry and displaced with 0.5 m3 seawater using cement unit, 1000 lpm/ 27 bar. POOH to 374 m.",1.0 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 04:00:00+00:00,2007-07-05 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued POOH w/ cmt stinger from 374m to 249 m. Dropped 2 sponge balls and circulated 1.2 m3 hole volume with seawater, 2200 lpm/45 bar. POOH",3.0 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 07:00:00+00:00,2007-07-05 07:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Laid out cmt assembly.,0.5 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 07:30:00+00:00,2007-07-05 09:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Changed out wash pipe and tested same to 275 bars. Meanwhile ROV repaired damage on 30"" housing.",1.75 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 09:15:00+00:00,2007-07-05 09:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Held tool box meeting prior to Slip and Cut Drill line,0.5 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 09:45:00+00:00,2007-07-05 12:15:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,Slip and Cut drill line.,2.5 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 12:15:00+00:00,2007-07-05 13:45:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Moved CTS funnel from F-4 to F-12, and installed hose.",1.5 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 13:45:00+00:00,2007-07-05 15:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box meeting prior to pick up 26"" BHA and R/U for making up 26"" BHA.",1.25 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 15:00:00+00:00,2007-07-05 15:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up 26"" Bit and motor assy. RIH same.",0.5 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 15:30:00+00:00,2007-07-05 18:30:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Terminated operation due to Siemens uploading of Software,3.0 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 18:30:00+00:00,2007-07-05 19:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Helicopter operation, no crane available. Meanwhile greased TDS and Dolly.",1.0 +15_9_F_12_2007_07_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-05T00:00:00+02:00,2007-07-06T00:00:00+02:00,2007-07-05 19:30:00+00:00,2007-07-05 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued M/U 26"" BHA. Had to use Rig tongs to M/U 17 1/4"" stabilizer. Performed tool box meeting prior to M/U 17 1/4"" stabilizer.",2.5 +15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-05 22:00:00+00:00,2007-07-06 02:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Cont. M/U 26"" BHA and RIH same. ROV monitored BHA entering funnel. RIH to one std above expected top cmt plug",4.0 +15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 02:00:00+00:00,2007-07-06 04:00:00+00:00,280.0,m,fixed,drilling -- drill,ok,success,"Held tool box meeting with all invovled personel. Started RIH with 40 rpm and 3660 lpm. Tagged cmt at 257 m. Continued drilling from 257m to 280m 40 rpm, 3660lpm and 2 - 4 MT WOB.",2.0 +15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 04:00:00+00:00,2007-07-06 08:00:00+00:00,335.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 280m to 335 m. 50 ROP, 40 rpm, 3660 lpm 2 -4 MT WOB. Pumped 30m³ 1.4 SG Pill 1990 lpm, 72 bars SPP, 40 rpm, 1-3 KNm TQ.",4.0 +15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 08:00:00+00:00,2007-07-06 11:45:00+00:00,225.0,m,fixed,drilling -- wait,ok,success,Pulled out of hole to 225m. Stand-by due to prioity of Siemens to upgrads software. Meanwhile perform check of TDS for loose items.,3.75 +15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 11:45:00+00:00,2007-07-06 14:15:00+00:00,376.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 335m to 376 m.40 ROP, 40 rpm, 3660 lpm, 88 bars SPP, 2 -4 MT WOB. Taking survay as required. +Slide F/ 335 - 364 +Slide F/ 370 - 376",2.5 +15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 14:15:00+00:00,2007-07-06 16:15:00+00:00,376.0,m,fixed,interruption -- other,ok,equipment failure,"Racked back one std due to ROV failure. Meanwhile circ at reduced rate 2013 lpm, 21.4 bars SPP. Inspected TDS. Terminated operation. Due to one double 3 ½"" DP came out of derrick single latch and leaned over the windwall across the drill floor. Meanwhile continued repairing ROV.",2.0 +15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 16:15:00+00:00,2007-07-06 18:15:00+00:00,370.0,m,fixed,drilling -- drill,ok,equipment failure,"Investigated incident with 3 1/2"" DP. Meanwhile circulated and reciprocate pipe, 3000 lpm 54,5 bars SPP, up/down weight 110/108 MT.",2.0 +15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 18:15:00+00:00,2007-07-06 19:00:00+00:00,370.0,m,fixed,drilling -- drill,ok,success,Stopped rig pumps. Connected CTS hose to ROV and started same.,0.75 +15_9_F_12_2007_07_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-06T00:00:00+02:00,2007-07-07T00:00:00+02:00,2007-07-06 19:00:00+00:00,2007-07-06 22:00:00+00:00,431.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 376 m to 431 m. 40 rpm, 3660 lpm, 88 bars SPP, 2 -4 MT WOB. Taking survay as required. Sweep 15 m³ Hi-vis pill 3 times every std.",3.0 +15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-06 22:00:00+00:00,2007-07-06 23:30:00+00:00,457.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 431 m to 457m sliding building angle. 3000 lpm, 2 - 6 MT WOB",1.5 +15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-06 23:30:00+00:00,2007-07-07 00:15:00+00:00,476.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 457 m to 476 m rotating 40 rpm, 4500 lpm, 149 bars SPP, 2 - 6 MT WOB, 4-5 kNm. Sweep 15 m³ Hi-vis pill 3 times every std.",0.75 +15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 00:15:00+00:00,2007-07-07 01:45:00+00:00,497.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 476 m to 497m sliding. 4500 lpm. 2 - 6 MT WOB",1.5 +15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 01:45:00+00:00,2007-07-07 02:30:00+00:00,512.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 497 m to 512 m rotating. 40 rpm, 3500 lpm. 6 - 8 MT WOB 28 m/h. Sweep 15 m³ Hi-vis pill 3 times every std.",0.75 +15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 02:30:00+00:00,2007-07-07 04:00:00+00:00,536.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 521 m to 536 m sliding. 4500 lpm. 8 MT WOB. 28 m/h",1.5 +15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 04:00:00+00:00,2007-07-07 19:00:00+00:00,880.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 536 m to 880 m . +Parameters: 3670 - 5000 lpm, 88 - 178 bar SPP, 40 - 70 rpm, 4,3 KNm, 8 - 12 MT WOB, 30 - 53 m/hr ROP, 1,07 - 1,11 ECD. Pumped sweep 2 - 3 times every std 15m³. + +Held time-out for safety with night crew at 19:00.",15.0 +15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 19:00:00+00:00,2007-07-07 20:45:00+00:00,880.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated well clean prior to enter Utsira, two times bottoms up, 5010 lpm, 172 bars SPP, pumped two hi-vis pills each of 15 m³, one at the start one in the middle.",1.75 +15_9_F_12_2007_07_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-07T00:00:00+02:00,2007-07-08T00:00:00+02:00,2007-07-07 20:45:00+00:00,2007-07-07 22:00:00+00:00,901.0,m,fixed,drilling -- drill,ok,success,"Resumed drilling 26"" hole. from 880 to 901 m +Parameters: 3335 - 5000 lpm, 92 - 183 bar SPP, 40 - 70 rpm, 2 - 5 KNm, 11 - 21 MT WOB, 11 - 150 m/hr ROP, 1,06 - 1,08 ECD. Pumped sweep 2 - 3 times every std 15m³ +Entered Utsira at 887 m.",1.25 +15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-07 22:00:00+00:00,2007-07-08 01:00:00+00:00,1054.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 26"" hole. from 901 to 1054 m +Parameters: 2982 - 3338 lpm, 78 - 101 bar SPP, 70 rpm, 4,4 - 6,5 KNm, 2,8 - 10 MT WOB, 95 - 140 m/hr ROP, 1,06 - 1,20 ECD. Pumped sweep 2 - 3 times every std 15m³",3.0 +15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 01:00:00+00:00,2007-07-08 03:00:00+00:00,1054.0,m,fixed,drilling -- circulating conditioning,ok,success,"At 1054 m attempted to rotate string after sliding. Picked up, circulated well clean 3338 lpm 98 bars. Started to rotate string and reciprocated slowly while circulating well clean.",2.0 +15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 03:00:00+00:00,2007-07-08 04:00:00+00:00,1082.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 26"" hole. from 1054 to 1082 m +Parameters: 3338 lpm, 95 - 106 bar SPP, 0,0 - 6,3 KNm, 10 - 11 MT WOB, 12 - 172 m/hr ROP, 1,12 - 1,13 ECD. Pumped sweep 2 - 3 times every std 15m³",1.0 +15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 04:00:00+00:00,2007-07-08 19:00:00+00:00,1362.0,m,fixed,drilling -- drill,ok,success,"Drilled 26"" hole from 1081 m MD RKB to 1362 m MD RKB. +Parameters: 4008 - 5350 lpm, 131 - 216 bar SPP, 40 - 70 rpm, 2 - 15,3 KNm, 2 - 12 MT WOB, 18 - 55 m/hr ROP, 1,07 - 1,11 ECD. Pumped sweep 2 - 3 times every std 15m³.",15.0 +15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 19:00:00+00:00,2007-07-08 19:45:00+00:00,1362.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 40 m³ Hi-vis and commenced circ. well clean. Meanwhile evaluated GR/Res log to confirm TD. Unable to identify base Skade on the GR/Res log, due to sensors still above base Skade.",0.75 +15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 19:45:00+00:00,2007-07-08 20:30:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Resumed drilling of 26"" hole from 1362m MD RKB to 1369 m MD RKB. +Parameters: 5010 lpm, 186 bar SPP, 2,3 KNm, 8,5 MT WOB, 17 m/hr ROP, 1,08 ECD.",0.75 +15_9_F_12_2007_07_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-08T00:00:00+02:00,2007-07-09T00:00:00+02:00,2007-07-08 20:30:00+00:00,2007-07-08 22:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,Awaited GR/Res logs to be evaluated by duty Geologist. Meanwhile circulated well at 5478 lpm 213 bars. Continued as planned. TD confirmed to be at 1369m MD RKB.,1.5 +15_9_F_12_2007_07_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-09T00:00:00+02:00,2007-07-10T00:00:00+02:00,2007-07-08 22:00:00+00:00,2007-07-09 02:45:00+00:00,1369.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pumped 40 m³ Hi-vis followed by 30 m³ sea water 40 m³ Hi-vis and circulated well clean with maximum rate 5477 lpm 213 bars (min. 3 x BU). Rotated string w/ 80 rpm and reciprocate. ECD 1,07. Held Tool box meeting prior to start pumping 1.35 SG mud.",4.75 +15_9_F_12_2007_07_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-09T00:00:00+02:00,2007-07-10T00:00:00+02:00,2007-07-09 02:45:00+00:00,2007-07-09 04:00:00+00:00,1369.0,m,fixed,drilling -- circulating conditioning,ok,success,"Started to displace open hole to 1,35 sg mud. 3200 - 5010 lpm 79 - 236 bars. Rotated string with 20 rpm.",1.25 +15_9_F_12_2007_07_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-09T00:00:00+02:00,2007-07-10T00:00:00+02:00,2007-07-09 04:00:00+00:00,2007-07-09 04:30:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,Completed displace well to 1.35 SG mud. Total pumped 480 m³.,0.5 +15_9_F_12_2007_07_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-09T00:00:00+02:00,2007-07-10T00:00:00+02:00,2007-07-09 04:30:00+00:00,2007-07-09 13:45:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Attempted to POOH w/ BHA, tightspot F/ 1348m T/ 1330m. Worked string/backreamed 260 - 440 lpm, 1.35 SG mud, 5 - 8 bars, 13 -37 KNm, 50- 70 rpm, max overpull 20 MT.",9.25 +15_9_F_12_2007_07_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-09T00:00:00+02:00,2007-07-10T00:00:00+02:00,2007-07-09 13:45:00+00:00,2007-07-09 22:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"RIH to TD, circulated hole clean with SW 4500 lpm 165 bar, 80 rpm, 8 - 12 KNm. One mud pump out of services.",8.25 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-09 22:00:00+00:00,2007-07-09 22:30:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Continued circulate hole clean with SW 4500 lpm 165 bar, 80 rpm, 8 - 12 KNm. Mud pump #3 out of services.",0.5 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-09 22:30:00+00:00,2007-07-10 01:15:00+00:00,1262.0,m,fixed,drilling -- drill,ok,success,"Mud pump #3 up running. Increased rate to 5478 lpm, 224 bars, 80 rpm, started to ream out of hole 1 std/hr, 22 - 28 KNm, Hook load 145 MT, no overpull. +At 1324m stopped rotation, no overpull. Pumped out of hole to 1313 m took OP of 20 MT, started to rotate 80 rpm. +Continued ream out of hole 1 std/hr F/ 1220 m T/ 1262 m, 5478 lpm, 222 - 226 bars, 80 rpm, 8 - 28 KNm, Hook load 140 - 145 MT.",2.75 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 01:15:00+00:00,2007-07-10 02:45:00+00:00,1220.0,m,fixed,drilling -- drill,ok,success,"Racked back second std. Continued POOH T/ 1220 m, pumped 40 m³ of hi-vis, and displaced same OOH with SW, 5478 lpm, 217 bars, 80 rpm, 8 - 10 KNm, Hook load 140 - 145 MT, no overpull",1.5 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 02:45:00+00:00,2007-07-10 04:00:00+00:00,1095.0,m,fixed,drilling -- drill,ok,success,POOH w/ 144 MT hook load F/ 1220m T/1095 12min/std. Pumped 40 m³ Hi-vis.,1.25 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 04:00:00+00:00,2007-07-10 05:30:00+00:00,1095.0,m,fixed,drilling -- drill,ok,success,"Circulated Hi-vis out of hole w/ SW at 5010 lpm, 180 bars.",1.5 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 05:30:00+00:00,2007-07-10 11:45:00+00:00,1093.0,m,fixed,drilling -- drill,ok,success,"POOH to 994 m, took over pull of 15 MT. Ran back in hole, met obstruction at 1093m, worked string, 333 - 5000 lpm, 3 - 179 bars, 5 - 15 rpm, 6 - 9 KNm. Lined up tool face high side, pumped 5000 lpm 179 bars, passed obstruction at 1093m. RIH F/ 1093m T/ 1101m.",6.25 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 11:45:00+00:00,2007-07-10 13:30:00+00:00,1101.0,m,fixed,drilling -- drill,ok,success,"Pumped 10 m³ Hi-vis followed by 1.5 btms up w/ SW, 5000 lpm, 179 bars, 50 rpm, 5 - 8 KNm.",1.75 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 13:30:00+00:00,2007-07-10 14:30:00+00:00,1142.0,m,fixed,drilling -- drill,ok,success,"RIH took weight at 1102 m rotated string, 330 lpm, 1 bar, 10 rpm, 13 - 15 KNm. Lined up tool face high side, 5000 lpm, 179 bars, passed obstruction. RIH F/ 1102m T/ 1142 m.",1.0 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 14:30:00+00:00,2007-07-10 16:00:00+00:00,1142.0,m,fixed,drilling -- drill,ok,success,"Pumped 10 m³ Hi-vis and circulated out same 5000 lpm, 179 bars. Rotated & reciprocated pipe F/1142 m T/ 1100m.",1.5 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 16:00:00+00:00,2007-07-10 20:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"RIH F/ 1142 m T/ 1369 m. Worked string, rotating/sliding high side. 3076 - 5010 lpm 82 - 190 bars, 0 - 20 rpm, 0.5 - 20 KNm.",4.0 +15_9_F_12_2007_07_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-10T00:00:00+02:00,2007-07-11T00:00:00+02:00,2007-07-10 20:00:00+00:00,2007-07-10 22:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Pumped 30 m³ Hi-vis, one btms up w/ SW, 25 m³ Hi-vis, 1.5 btms up w/ SW. 5500 lpm, 226 bars. 80 rpm. Rotated & reciprocated pipe F/ 1369m T/ 1355m.",2.0 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-10 22:00:00+00:00,2007-07-10 23:15:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Continued circulate out 1.5 btms up w/ SW. 5500 lpm, 226 bars. 80 rpm. Rotated & reciprocated pipe F /1369m T/ 1355m.",1.25 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-10 23:15:00+00:00,2007-07-11 00:00:00+00:00,1369.0,m,fixed,drilling -- drill,ok,success,"Displaced 200 m³ 1.4 SG mud. 5478 lpm, 259 bars. 80 rpm. Rotated & reciprocated pipe F/ 1369m T/ 1355m.",0.75 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 00:00:00+00:00,2007-07-11 04:00:00+00:00,1002.0,m,fixed,drilling -- drill,ok,success,"POOH w/ 26"" BHA. F/ 1369m T/ 1002m. Lubricated out due to over pull of 20 MT. F/ 1340m T/ 1303m and F/1102m T/1002. 442 lpm, 2.5 bars, 80 rpm, 8 - 20 KNm.",4.0 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 04:00:00+00:00,2007-07-11 05:00:00+00:00,870.0,m,fixed,drilling -- drill,ok,success,"POOH w/ 26"" BHA. Lubricated F/ 1002m T/ 870m. 442 lpm, 2.5 bars, 80 rpm, 8 - 20 KNm.",1.0 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 05:00:00+00:00,2007-07-11 06:45:00+00:00,870.0,m,fixed,drilling -- drill,ok,success,"Displaced hole to 200 m³ 1.40 SG mud above Utsira. 4500 lpm, 165 bars, 80 rpm, 3 - 7 KNm.",1.75 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 06:45:00+00:00,2007-07-11 10:30:00+00:00,415.0,m,fixed,drilling -- drill,ok,success,"Continued POOH F/ 870m T/ 415 m. Reamed back F/ 525 m T/ 415 m. 442 lpm, 2.5 bars, 80 rpm, 5 - 10 KNm.",3.75 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 10:30:00+00:00,2007-07-11 11:45:00+00:00,415.0,m,fixed,drilling -- drill,ok,success,"Displaced well to surface with 140 m³ 1.40 SG mud. 4500 lpm, 168 bars, 80 rpm, 0 - 5 KNm.",1.25 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 11:45:00+00:00,2007-07-11 13:00:00+00:00,120.0,m,fixed,drilling -- drill,ok,success,"Continued POOH F/ 415 m T/ 120 m. ROV observed well when pulling out of 30"" housing.",1.25 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 13:00:00+00:00,2007-07-11 16:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"Held tool box meeting, racked back BHA in derrick. Stabilizers covered with clay.",3.5 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 16:30:00+00:00,2007-07-11 18:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Cleaned Rig Floor. Simultaneously transfered CTS funnel from F-12 to F-4.,1.5 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 18:00:00+00:00,2007-07-11 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box meeting prior to lower DCI frame from rig floor to below cellar deck.,0.5 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 18:30:00+00:00,2007-07-11 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Removed protector guides on tensioner and centralizer deck. Lowered CTI frame to scaffolding below cellar deck and secured same.,1.25 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 19:45:00+00:00,2007-07-11 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed PDM head to 20"", Cleared rig floor.",0.75 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 20:30:00+00:00,2007-07-11 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box meeting prior to RU for CSG running.,0.25 +15_9_F_12_2007_07_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-11T00:00:00+02:00,2007-07-12T00:00:00+02:00,2007-07-11 20:45:00+00:00,2007-07-11 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U for running 20"" CSG. Changed bails, elevators.",1.25 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-11 22:00:00+00:00,2007-07-12 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued R/U for running 20"" CSG. Installed FAC tool, R/U CSG tong, dressed PS-30 slips, installed protector guides on tensioner and centralizer deck.",6.0 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 04:00:00+00:00,2007-07-12 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued rigging up for running 20"" casing.",1.0 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 05:00:00+00:00,2007-07-12 05:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Troubleshoot problem w/casing tong,0.75 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 05:45:00+00:00,2007-07-12 06:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting prior to run 20"" CSG.",0.5 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 06:15:00+00:00,2007-07-12 08:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,"Pick up 20"" shoe, intermediate and float, and thread locked same.",1.75 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 08:00:00+00:00,2007-07-12 09:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,equipment failure,Removed CSG guide on Odfjell spider elevator due to ID being 9mm to small.,1.0 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 09:00:00+00:00,2007-07-12 09:45:00+00:00,36.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" CSG F/12m T/36m",0.75 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 09:45:00+00:00,2007-07-12 10:00:00+00:00,36.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tool box meeting, re-installed modified CSG guide to elevators.",0.25 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 10:00:00+00:00,2007-07-12 10:15:00+00:00,52.0,m,fixed,drilling -- casing,ok,success,Continued RIH F/36m T/52M,0.25 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 10:15:00+00:00,2007-07-12 10:45:00+00:00,52.0,m,fixed,drilling -- casing,ok,equipment failure,PRS not operational - ET calibrated PRS.,0.5 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 10:45:00+00:00,2007-07-12 15:15:00+00:00,214.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/20"" casing F/52m T/151m. Filled every joint w/sw. Had ROV to guide 20"" CSG shoe into 30"" conductor, continued running 20"" casing to 214m.",4.5 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 15:15:00+00:00,2007-07-12 15:45:00+00:00,214.0,m,fixed,drilling -- casing,ok,equipment failure,"Replaced two sheared bolts to the make up and break out function on the piston latch of the 20"" CSG tong.",0.5 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 15:45:00+00:00,2007-07-12 17:00:00+00:00,249.0,m,fixed,drilling -- casing,ok,success,"Continued RIH F/ 214m T/ 249m. Engaged FAC tool into 20"" casing and pumped 27m³ 1.4 SG mud, 1667 lpm, 27 bars.",1.25 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 17:00:00+00:00,2007-07-12 17:30:00+00:00,249.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting with night shift for running 20"" CSG. Released FAC tool.",0.5 +15_9_F_12_2007_07_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-12T00:00:00+02:00,2007-07-13T00:00:00+02:00,2007-07-12 17:30:00+00:00,2007-07-12 22:00:00+00:00,460.0,m,fixed,drilling -- casing,ok,success,"RIH with 20"" CSG. F/249m T/460m. Filled every jnt with rest of 20m³ 1.40 SG mud, continued with SW. Had tight spot at 419m set down 6 MT, Engaged FAC tool and lubricated through obstruction at 419m.",4.5 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-12 22:00:00+00:00,2007-07-13 04:00:00+00:00,812.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 20"" CSG. F/460m T/812m.",6.0 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 04:00:00+00:00,2007-07-13 05:00:00+00:00,838.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/ 20"" CSG F/812m T/838m",1.0 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 05:00:00+00:00,2007-07-13 05:15:00+00:00,838.0,m,fixed,drilling -- casing,ok,success,"Due to incorrect torque, broke CSG jnt out and inspected threads. Meanwhile held tool box meeting with day shift.",0.25 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 05:15:00+00:00,2007-07-13 08:15:00+00:00,1045.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/ 20"" CSG F/838m T/1045m. Tight spot F/923m T/937m, set off 7 - 10 MT and washed through. Started investigating problems with casing tong load sensor.",3.0 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 08:15:00+00:00,2007-07-13 10:45:00+00:00,1045.0,m,fixed,drilling -- casing,ok,equipment failure,"Unable to make up CSG properly, investigated CSG tong, found fault in load censor and in software. Laid out two jnt w/ overtorqued threads, Replaced same w/ jnts from deck",2.5 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 10:45:00+00:00,2007-07-13 11:45:00+00:00,1083.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/ 20"" CSG F/1045m T/1083m",1.0 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 11:45:00+00:00,2007-07-13 13:45:00+00:00,1095.0,m,fixed,drilling -- casing,ok,success,At 1083m met obstruction. Worked casing down w/ 1200 - 200 lpm and 5 - 50 MT to 1095m.,2.0 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 13:45:00+00:00,2007-07-13 16:15:00+00:00,1120.0,m,fixed,drilling -- casing,ok,success,Continued to wash CSG down F/1095m T/1106m. Hit obstruction at 1106m washed down from 1106m to 1120m.,2.5 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 16:15:00+00:00,2007-07-13 18:15:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"RIH w/ 20"" CSG F/ 1120m T/1203m.",2.0 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 18:15:00+00:00,2007-07-13 21:00:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"Removed 20"" CSG automatic slips and installed manuel 20"" CSG slips. Modified automatic slips to 5½"" DP slips. Removed 20"" CSG elevator, bails and FAC tool. Installed bails and 5½"" DP elevator.",2.75 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 21:00:00+00:00,2007-07-13 21:15:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to pick up and run in w/ 18 3/4"" Subsea well head.",0.25 +15_9_F_12_2007_07_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-13T00:00:00+02:00,2007-07-14T00:00:00+02:00,2007-07-13 21:15:00+00:00,2007-07-13 22:00:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"Picked up 18 3/4"" Subsea well head, attempted to make up same, had problems getting 18 3/4"" Subsea well head vertical without the possibility of damaging the threads.",0.75 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-13 22:00:00+00:00,2007-07-13 22:45:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"Broke out 18 3/4"" Subsea well head and inspected threads. Postioned 18 3/4"" Subsea well head vertical and made up same.",0.75 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-13 22:45:00+00:00,2007-07-13 23:15:00+00:00,1203.0,m,fixed,drilling -- casing,ok,success,"Orientated DCI inlet on 18 3/4"" Subsea well head, within 90º - 45º to port side pointing east.",0.5 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-13 23:15:00+00:00,2007-07-14 00:00:00+00:00,1222.0,m,fixed,drilling -- casing,ok,success,"Removed RT bushing ran 18 3/4"" Subsea well head below RT. Installed bushing and 5½"" slips. Landed 18 3/4"" Subsea well head.",0.75 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 00:00:00+00:00,2007-07-14 01:15:00+00:00,1222.0,m,fixed,drilling -- casing,ok,success,"R/D 20"" CSG tong. Re-established Iron roughneck.",1.25 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 01:15:00+00:00,2007-07-14 01:30:00+00:00,1222.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to run in with the 18 3/4"" Subsea well head on 5½"" HWDP.",0.25 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 01:30:00+00:00,2007-07-14 03:00:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Ran in with 20"" CSG and 18 3/4"" Subsea well head. Positioned DCI inlet on 18 3/4"" Subsea well head below celler deck.",1.5 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 03:00:00+00:00,2007-07-14 03:15:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to make up DCI frame on to 18 3/4"" Subsea well head.",0.25 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 03:15:00+00:00,2007-07-14 04:00:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Started to attach DCI frame on to 18 3/4"" Subsea well head.",0.75 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 04:00:00+00:00,2007-07-14 07:00:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Attached DCI frame to 18 3/4"" Subsea well head, had to re-align DCI inlet. Installed check sub.",3.0 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 07:00:00+00:00,2007-07-14 08:45:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Picked up CSG string 0.5m weigth 250 MT. Pressure tested DCI frame on 18 3/4"" Subsea well head to 3000 psi as per Vetco procedure.",1.75 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 08:45:00+00:00,2007-07-14 09:15:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Re-orientated DCI frame on 18 3/4"" Subsea well head.",0.5 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 09:15:00+00:00,2007-07-14 09:45:00+00:00,1246.0,m,fixed,drilling -- casing,ok,success,"Dismantled scaffolding below cellar deck, to be able to run DCI frame through.",0.5 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 09:45:00+00:00,2007-07-14 10:30:00+00:00,1262.0,m,fixed,drilling -- casing,ok,success,Picked up 2 jnt HWDP from cantilever and RIH with landing string.,0.75 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 10:30:00+00:00,2007-07-14 11:00:00+00:00,1262.0,m,fixed,drilling -- casing,ok,equipment failure,Problem with HTS software. Investigated same,0.5 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 11:00:00+00:00,2007-07-14 12:15:00+00:00,1324.0,m,fixed,drilling -- casing,ok,success,"RIH w/ landing string F/1262m T/1324m. Took up/down weight 230/190 MT prior to land 18 3/4"" Subsea well head.",1.25 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 12:15:00+00:00,2007-07-14 12:30:00+00:00,1324.0,m,fixed,drilling -- casing,ok,success,"Orientated DCI frame on 18 3/4"" Subsea well head using the ROV.",0.25 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 12:30:00+00:00,2007-07-14 12:45:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Landed off 18 3/4"" Subsea well head and took 25 MT overpull. Kept 3 MT overpull on landing string.",0.25 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 12:45:00+00:00,2007-07-14 13:45:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up cmt head. Picked up cmt head and made up same.,1.0 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 13:45:00+00:00,2007-07-14 14:30:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up and make up cmt hose. Picked up cmt hose and made up same.,0.75 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 14:30:00+00:00,2007-07-14 15:45:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to perform cmt job. Simultaneously established circulation w/ SW picked up rate in steps F/1340 lpm T/2300 lpm.,1.25 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 15:45:00+00:00,2007-07-14 20:30:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Mixed and performed cmt job. +Pumped : 238.5 m³ 1.56 SG lead slurry at 900 - 1100 lpm, 25 - 35 bars pump pressure. + 20 m³ 1.92 SG tail slurry at 800 - 1000 lpm, 20 - 30 bars pump pressure.",4.75 +15_9_F_12_2007_07_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-14T00:00:00+02:00,2007-07-15T00:00:00+02:00,2007-07-14 20:30:00+00:00,2007-07-14 22:00:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Released dart, chased dart with SW at 3000 lpm, FCP 56 bars. At 9370 stks bumped plug increased pressure to 96 bars. 96,7 % pump efficiency.",1.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-14 22:00:00+00:00,2007-07-14 22:30:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Bled off pressure and checked for backflow to Halliburton cement unit, 1.2 m³ bled back. Bled off pressure in landing string.",0.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-14 22:30:00+00:00,2007-07-14 23:00:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to R/D cmt hose. R/D same cmt hose and control lines for operating the cmt head.,0.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-14 23:00:00+00:00,2007-07-14 23:30:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Set down 2 MT on CART and marked DP on drill floor. Turned string 5 right hand turn and released CART. Pulled 1.5m above 18 3/4"" Subsea well head.",0.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-14 23:30:00+00:00,2007-07-15 00:30:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,"Washed 18 3/4"" Subsea well head area with SW at 5000 lpm, using the landing string as washing tool. Inspected 18 3/4"" Subsea well head, found both pad eyes visible.",1.0 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 00:30:00+00:00,2007-07-15 01:45:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to L/D cmt head, L/D cmt head.",1.25 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 01:45:00+00:00,2007-07-15 02:15:00+00:00,130.0,m,fixed,drilling -- casing,ok,success,Dropped two Halliburton sponge balls and flush string using seawater at maximum rate.,0.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 02:15:00+00:00,2007-07-15 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pull out of water w/ landing string and CART. Measured landing string.,1.75 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 04:00:00+00:00,2007-07-15 05:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued L/O landing string. Held tool box talk with day shift prior to L/O CART. L/O 18 3/4"" CART. B/O subs from FAC tool and L/O same.",1.75 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 05:45:00+00:00,2007-07-15 06:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Cleared rig floor and excess equipment in preparation for L/O 26"" BHA.",0.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 06:15:00+00:00,2007-07-15 07:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk prior to L/O 26"" BHA. L/O 26"" bit and MWD power puls. Broke dog collar links.",1.25 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 07:30:00+00:00,2007-07-15 08:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,Replaced broken dog collar links.,0.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 08:00:00+00:00,2007-07-15 10:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Continued L/O remaining 26"" BHA.",2.0 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 10:00:00+00:00,2007-07-15 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared and tidied rig floor prior to run HPDR.,0.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 10:30:00+00:00,2007-07-15 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"R/U for HPDR, placed tension ring around F-12 on centralizer deck, rigged up and tested hydraulic spider, installed riser supports to HTS, installed guide lines in moonpool for HPDR and removed hatches on top level of platform.",4.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 15:00:00+00:00,2007-07-15 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held a detailed pre-job safety meeting, regarding picking up and running of the HPDR.",1.0 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 16:00:00+00:00,2007-07-15 17:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Built scaffolding barriers around all open well bay areas on each working level on the platform.,1.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 17:30:00+00:00,2007-07-15 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk with night shift prior to run HPDR.,0.5 +15_9_F_12_2007_07_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-15T00:00:00+02:00,2007-07-16T00:00:00+02:00,2007-07-15 18:00:00+00:00,2007-07-15 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared and picked up Tie Back Connector and stress jnt. Made up Tie Back Connector and stress jnt.,4.0 +15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-15 22:00:00+00:00,2007-07-16 02:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up Fairing (anti collision protection) and run with HPDR to next flange connection. Made up third connection of HPDR.,4.25 +15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 02:15:00+00:00,2007-07-16 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Function tested Tie Back Connector,1.75 +15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 04:00:00+00:00,2007-07-16 06:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Attached guide wire clamp above Tie Back Connector.,2.75 +15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 06:45:00+00:00,2007-07-16 11:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued run in with HPDR. Held tool box talk with day shift prior to pick up HPDR double ""B"". Picked up and made up same. ROV latched on both guide wires to template.",5.0 +15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 11:45:00+00:00,2007-07-16 12:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Waited on crane, due to helicopter crew change.",0.25 +15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 12:00:00+00:00,2007-07-16 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up and ran in with HPDR ""B"". Simultaneously prepared tools and equipment for installation of centralizers, tension ring and cylinders.",5.0 +15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 17:00:00+00:00,2007-07-16 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up tension jnt and fairings.,1.0 +15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 18:00:00+00:00,2007-07-16 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to pick up BOP jnt with Claxton tool installed. Picked up BOP jnt with Claxton tool and parked in 5½"" elevators.",0.75 +15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 18:45:00+00:00,2007-07-16 19:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Buildt scaffolding in Moon pool to get access for installation of BOP.,1.0 +15_9_F_12_2007_07_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-16T00:00:00+02:00,2007-07-17T00:00:00+02:00,2007-07-16 19:45:00+00:00,2007-07-16 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up BOP jnt with Claxton tool.,2.25 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-16 22:00:00+00:00,2007-07-17 00:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to remove Spider slips and installation of master bushing. Commenced removal of Spider slips and installed master bushing,2.25 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 00:15:00+00:00,2007-07-17 00:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked one 5½"" DP stds and made up same to Claxton tool.. Simultaneously laid out Spider slips from rig floor.",0.5 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 00:45:00+00:00,2007-07-17 01:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed 18 3/4"" Subsea well head protection cover and verified BX ring to be in correct position.",0.25 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 01:00:00+00:00,2007-07-17 01:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran to ½ m above 18 3/4"" Subsea well head, came down 10 cm at the time to just above the VX seal ring. Attempted to land TBC, when TBC was pushed aside due to current, VX ring came off.",0.75 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 01:45:00+00:00,2007-07-17 03:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,ROV came to surface and picked up new VX ring. Installed the new VX ring on wellhead.,1.5 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 03:15:00+00:00,2007-07-17 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Ran in with TBC and HPDR to +/- 5 cm above VX ring to much movement of the TBC to be able to land off on to 18 3/4"" Subsea well head. Secured riser in Moon Pool area to see if any change in movement.",0.75 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 04:00:00+00:00,2007-07-17 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Awaited for TBC to be stable prior to land same.,1.0 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 05:00:00+00:00,2007-07-17 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to move guide wires to slots F-4 & F-6. Prepared and moved guide wires to slots F-4 & F-6, to assist in stabbing the TBC. Meanwhile cleared aft set back area to be ready for picking up 5½"" DP.",2.0 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 07:00:00+00:00,2007-07-17 07:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Stabbed TBC and released centralizing slings in Moon pool area. Commenced to land riser as per Vetco procedure, set down 20 MT.",0.5 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 07:30:00+00:00,2007-07-17 10:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Launched Vetco hot stab and ran same to TBC. Latch on with ROV and locked H4-MUSL connector as per Vetco procedure. Pressured up in stages to 206 bars. Meanwihile picked up 5½"" DP from pipe deck.",2.75 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 10:15:00+00:00,2007-07-17 11:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Applied 10 MT overpull on riser to confirm H4-MUSL connector. Filled riser with SW. Lost overpull due to filling up w/ SW and adjusted for same. Completed filling up riser with SW. Measured distance from RBK to Bottom of Claxton tool to 10.925 m.,0.75 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 11:00:00+00:00,2007-07-17 12:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed 1502 Veco blind plug on Claxton tool and lined up to cmt unit to pump through TDS. Performed integrity test of the 20"" casing and riser to 20/195 bars 5/10 mins. Bled down in stages.",1.0 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 12:00:00+00:00,2007-07-17 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to installing centralisers, tension ring and cylinders. Meanwhile retrieved hot stab on TBC and replaced with dummy. Retrieved guide wires from template.",0.5 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 12:30:00+00:00,2007-07-17 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed centralisers and boat collison stool.,3.25 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 15:45:00+00:00,2007-07-17 21:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed tension ring and cylinders. Applied tension of 80 MT to the cylinders.,6.0 +15_9_F_12_2007_07_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-17T00:00:00+02:00,2007-07-18T00:00:00+02:00,2007-07-17 21:45:00+00:00,2007-07-17 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to disconnect Claxton tool,0.25 +15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-17 22:00:00+00:00,2007-07-18 01:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Disconnected Claxton tool. Racked back one 5½"" DP std and removed Claxton tool from rig floor. Cleared and cleaned rig floor area. (Crew change at 01:00)",3.25 +15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 01:15:00+00:00,2007-07-18 01:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to nipple up BOP.,0.25 +15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 01:30:00+00:00,2007-07-18 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Modified scaffolding around NT2 connector. Moved BOP tension cylinders and erected scaffolding around BOP test stump.,2.5 +15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 04:00:00+00:00,2007-07-18 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Erected scaffolding around BOP test stump. Commenced transporting of BOP carrier over NT2 riser connector. Cleaned BOP seal face and installed new seal ring. Centralized and secured HPDR. Landed the BOP and made up BOP clamp to 1600 ft/lbs. Meanwhile picked up 5½"" DP from pipe deck.",5.5 +15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 09:30:00+00:00,2007-07-18 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed BOP tensioners, installed diverter and measured for slick jnt.",5.5 +15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 15:00:00+00:00,2007-07-18 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior rig up for testing TDS. Rigged up same.,1.0 +15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 16:00:00+00:00,2007-07-18 20:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to test lines. Flushed lines. Commenced pressure testing of the TDS to 30/345 bars 5/10 mins. Worked valves several times to get a good test.,4.25 +15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 20:15:00+00:00,2007-07-18 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rigged down test assy and hoses.,1.25 +15_9_F_12_2007_07_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-18T00:00:00+02:00,2007-07-19T00:00:00+02:00,2007-07-18 21:30:00+00:00,2007-07-18 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to pick up test plug.,0.5 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-18 22:00:00+00:00,2007-07-18 22:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up bull nose jetting sub, test plug and RIH same.",0.75 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-18 22:45:00+00:00,2007-07-18 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,operation failed,"Unable to RIH due 19"" diverter insert still installed. Removed same.",0.75 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-18 23:30:00+00:00,2007-07-19 00:15:00+00:00,142.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran in with test plug and jet sub from surface to 135m. Washed down to 142m at 1700 lpm and 75 rpm.,0.75 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 00:15:00+00:00,2007-07-19 01:00:00+00:00,217.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Ran in and landed off test plug in well head.,0.75 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 01:45:00+00:00,2007-07-19 02:45:00+00:00,217.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to pressure test of the BOP NT2 connection and HPDR. Commenced pressure test 25/345 bars 5/10 min. Started to pull out of hole when hydraulic hose bursted on the iron roughneck rollers.,1.0 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 02:00:00+00:00,2007-07-19 03:00:00+00:00,200.0,m,fixed,drilling -- bop/wellhead equipment,ok,equipment failure,Repaired hydraulic hose and fitting.,1.0 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 03:00:00+00:00,2007-07-19 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with test plug and jet sub assy.,1.0 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 04:00:00+00:00,2007-07-19 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Broke and laid down BOP test plug and jet sub.,1.0 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 05:00:00+00:00,2007-07-19 05:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to running nominal seat protector.,0.25 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 05:15:00+00:00,2007-07-19 05:45:00+00:00,30.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Made up WBRT/nominal seat protector and RIH on 5 1/2"" DP.",0.5 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 05:45:00+00:00,2007-07-19 07:45:00+00:00,30.0,m,fixed,interruption -- other,ok,equipment failure,"Malfunction on AFT PRS. investigated situation, found bursted hose in dragchain.",2.0 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 07:45:00+00:00,2007-07-19 10:15:00+00:00,30.0,m,fixed,interruption -- other,ok,equipment failure,Brought work basket to drillfloor. Prepared permit and repaired hose in dragchain.,2.5 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 10:15:00+00:00,2007-07-19 10:30:00+00:00,30.0,m,fixed,interruption -- other,ok,equipment failure,Tested AFT PRS after repair. Found hose in dragchain to be thight but otherwise ok. Decided to use FWD PRS to continue RIH with WBRT/nominal seat protector.,0.25 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 10:30:00+00:00,2007-07-19 12:00:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to RIH with WBRT/nominal seat protector on 5 1/2"" DP.",1.5 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 12:00:00+00:00,2007-07-19 12:15:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Set nominal seat protector according to Vetco procedure at 141,3 m MD. Set down 5 MT, pull tested with 3 MT overpull.",0.25 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 12:15:00+00:00,2007-07-19 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with WBRT, broke out and laid down same.",0.75 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 13:00:00+00:00,2007-07-19 13:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to removing diverter.,0.25 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 13:15:00+00:00,2007-07-19 14:45:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Picked up diverter and set aside. Thightened slick-joint/overshot connection on the BOP. Filled riser with water and verifed connection holding hydrostatic pressure. Installed diverter in housing.,1.5 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 14:45:00+00:00,2007-07-19 16:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Clear and tidied rigfloor. Held toolbox talk prior to making up 17 1/2"" drilling BHA.",1.25 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 16:00:00+00:00,2007-07-19 17:45:00+00:00,50.0,m,fixed,drilling -- trip,ok,success,"Made up 17 1/2"" drilling BHA to ADN sub.",1.75 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 17:45:00+00:00,2007-07-19 19:15:00+00:00,50.0,m,fixed,drilling -- trip,ok,success,Fenced of drillfloor and WH module prior to handling RA source. Transferred RA source from shipment container to installation carrier. Attempted to install RA source in ADN - nogo.,1.5 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 19:15:00+00:00,2007-07-19 20:15:00+00:00,50.0,m,fixed,interruption -- rig up/down,ok,equipment failure,Made several attempts to install the RA source in the ADN sub - nogo. Attempted with dummy RA source - ok.,1.0 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 20:15:00+00:00,2007-07-19 21:30:00+00:00,50.0,m,fixed,interruption -- rig up/down,ok,equipment failure,"Discussed situation, suspected thread damage on RA source. Decided to change to backup ADN and RA source. Moved RA source from installation carrier to shipment container, thread mated correctly inside shipment container. Reconsidered action and made new attempt to install RA source. Removed adapter on ADN and transferred source directly from the installation carrier into the ADN. Installed RA source succesfully.",1.25 +15_9_F_12_2007_07_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-19T00:00:00+02:00,2007-07-20T00:00:00+02:00,2007-07-19 21:30:00+00:00,2007-07-19 22:00:00+00:00,70.0,m,fixed,drilling -- trip,ok,success,"Continued to make up 17 1/2"" drilling BHA. Made up NM drillcollar.",0.5 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-19 22:00:00+00:00,2007-07-20 01:00:00+00:00,320.0,m,fixed,drilling -- trip,ok,success,"Continued to make up 17 1/2"" drilling BHA. Made up 8 1/4"" drillcollar, jar/accelerator, x-over and 5 1/2"" HWDP. Installed PS-30 slips.",3.0 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 01:00:00+00:00,2007-07-20 03:00:00+00:00,600.0,m,fixed,drilling -- drill,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP. Picked up and made up 27 singles.",2.0 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 03:00:01+00:00,2007-07-20 04:00:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 17 1/2"" drilling BHA on 5 1/2"" DP stands.",0.9997222222222222 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 04:00:00+00:00,2007-07-20 05:15:00+00:00,1100.0,m,fixed,drilling -- drill,ok,success,"Continued RIH with 17 1/2"" drilling BHA on 5 1/2"" DP to 1100 m MD.",1.25 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 05:15:00+00:00,2007-07-20 05:45:00+00:00,1100.0,m,fixed,drilling -- drill,ok,success,Connected TDS for test of MWD/LWD tools. Encountered problems with mudpumps #1 and #3 when bringing up the rate.,0.5 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 05:45:00+00:00,2007-07-20 06:15:00+00:00,1100.0,m,fixed,interruption -- other,ok,equipment failure,Leakage observed on mudpump #1. Liner spray on mudpump #3 not working. Repaired mudpumps.,0.5 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 06:15:00+00:00,2007-07-20 06:45:00+00:00,1100.0,m,fixed,drilling -- drill,ok,success,Performed test of MWD/LWD tools. Brought pump rate up to 3500 lpm / 101 bar SPP. Not able to establish communication with ARC tool.,0.5 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 06:45:00+00:00,2007-07-20 08:30:00+00:00,1260.0,m,fixed,drilling -- drill,ok,success,"Continued to RIH with 17 1/2"" drilling BHA from 1100 m to 1260 m MD. Picked up single to space out for drilling shoetrack on 1 stand.",1.75 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 08:30:00+00:00,2007-07-20 09:00:00+00:00,1288.0,m,fixed,drilling -- drill,ok,success,Brought pumprate to 3000 lpm and washed down from 1260 m to 1288 m MD. Dumphose not handling flow => routed return flow to shakers and pumproom.,0.5 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 09:00:00+00:00,2007-07-20 09:45:00+00:00,1319.0,m,fixed,drilling -- drill,ok,success,Continued washing down from 1288 m to 1319 m MD at 3000 lpm. Tagged obstruction at 1319 m MD with 5 MT WOB.,0.75 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 09:45:00+00:00,2007-07-20 10:15:00+00:00,1319.0,m,fixed,drilling -- drill,ok,success,Attempted to Perform choke drill. Rig choke sensors not reading pressures.,0.5 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 10:15:00+00:00,2007-07-20 12:00:00+00:00,1319.0,m,fixed,interruption -- other,ok,equipment failure,Investigated sensor fault. Found faulty I/O module and sensor. Prepared for reparing sensor.,1.75 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 12:00:00+00:00,2007-07-20 12:45:00+00:00,1319.0,m,fixed,drilling -- circulating conditioning,ok,success,Brougth pumps up to 4500 lpm and observed/rearranged dumphose to take full return flow. Meanwhile worked on choke sensors.,0.75 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 12:45:00+00:00,2007-07-20 14:30:00+00:00,1319.0,m,fixed,interruption -- other,ok,equipment failure,"Continued repairing choke sensors. Meanwhile cleaned and tidied in Moonpool, shaker area and BOP control room.",1.75 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 14:30:00+00:00,2007-07-20 15:00:00+00:00,1319.0,m,fixed,drilling -- drill,ok,success,Performed choke drill.,0.5 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 15:00:00+00:00,2007-07-20 15:30:00+00:00,1326.0,m,fixed,drilling -- drill,ok,success,Established drilling parameters 3000 lpm / 50 RPM and reamed section from 1319 m to 1326 m MD. Tagged firm cement at 1326 m MD.,0.5 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 15:30:00+00:00,2007-07-20 19:15:00+00:00,1330.0,m,fixed,drilling -- drill,ok,success,Drilled firm cement from 1326 m MD to 1330 m MD. Drilling parameters : Flow 4000-4500 lpm / SPP 130-160 bar / 80-90 rpm / 3-10 MT WOB / Torque 10-20 kNm - string stalled out on occasions. Reamed as required. Drilled float collar at 1330 m MD.,3.75 +15_9_F_12_2007_07_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-20T00:00:00+02:00,2007-07-21T00:00:00+02:00,2007-07-20 19:15:00+00:00,2007-07-20 22:00:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,Drilled cement in shoetrack from 1330 m to 1355 m MD. Drilling parameters 4000 lpm / SPP 130 bar / 90 rpm / 3-5 MT WOB / Torque 16 kNm.,2.75 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-20 22:00:00+00:00,2007-07-20 23:00:00+00:00,1358.0,m,fixed,drilling -- drill,ok,success,Continued drilling cement in shoetrack from 1355 m to 1358 m MD. Drilling parameters 4000 lpm / SPP 130 bar / 90 rpm / 3-5 MT WOB / Torque 16 kNm.,1.0 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-20 23:00:00+00:00,2007-07-21 02:15:00+00:00,1367.5,m,fixed,drilling -- drill,ok,success,"Drilled cement in rathole from 1358 m to 1367,5 m MD. Drilling parameters 4000 lpm / SPP 131 bar / 50-80 rpm / 3 MT WOB / Torque 15 kNm. Reamed back to shoe for every 2 m drilled. Reamed through shoe without rotation last time - no obstructions. Performed toolbox talk prior to displacement.",3.25 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 02:15:00+00:00,2007-07-21 03:45:00+00:00,1367.5,m,fixed,drilling -- circulating conditioning,ok,success,"Displaced well to 1,35 sg Performadrill KCl mud. Pumped 25 m3 hi-vis followed by 30 m3 of drillwater and 220 m3 1,35 sg Performadrill. Pump rate 2000-4000 lpm / SPP 80-190 bar / rotation 20 rpm. Closed dumpline valve and routed interface mud to pit#12.",1.5 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 03:45:00+00:00,2007-07-21 04:00:00+00:00,1367.5,m,fixed,drilling -- circulating conditioning,ok,success,"Routed mud returns to pit#7 and circulated on closed system. Picked up single 5 1/2"" DP for drilling rathole.",0.25 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 04:00:00+00:00,2007-07-21 05:00:00+00:00,1372.0,m,fixed,drilling -- drill,ok,success,"Drilled from 1367,5 m to 1372 m MD with reduced ROP due to problems with cold mud overflowing the shakers.",1.0 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 05:00:00+00:00,2007-07-21 06:00:00+00:00,1372.0,m,fixed,drilling -- circulating conditioning,ok,success,Criculated and conditioned mud at reduced rate 2200 lpm due to overflowing on shakers.,1.0 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 06:00:00+00:00,2007-07-21 06:15:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"Pulled back into 20"" casing without pumping.",0.25 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 06:15:00+00:00,2007-07-21 08:00:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"Circulated and conditioned mud with bit inside 20"" casing. Changed shaker screens to 145 mesh. Established flowrate of 4500 lpm.",1.75 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 08:00:00+00:00,2007-07-21 08:15:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"Lined up cement unit down standpipe and kill line. Flushed lines with mud prior to XLOT. Closed BOP on 5 1/2"" DP.",0.25 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 08:15:00+00:00,2007-07-21 08:45:00+00:00,1355.0,m,fixed,formation evaluation -- rft/fit,ok,success,Performed XLOT. Pressured up 1st cycle at 100 lpm. Did not achieve expected response.,0.5 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 08:45:00+00:00,2007-07-21 09:00:00+00:00,1355.0,m,fixed,formation evaluation -- rft/fit,ok,success,Verified line up by closing in and releasing 10 bar down drillstring and kill line - ok.,0.25 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 09:00:00+00:00,2007-07-21 10:00:00+00:00,1355.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Continued XLOT. Pumped 1000 liter at 100 lpm to get to 8-10 bar, zeroed counter. Pumped an additional 500 liter to 26 bar. Unexpected respons. Bled back pressure.",1.0 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 10:00:00+00:00,2007-07-21 11:30:00+00:00,1355.0,m,fixed,formation evaluation -- rft/fit,ok,success,Pressured up again with same volume at 200 lpm. Monitored trip tank for leakage above BOP - none detected. Repeated cycle twice more up to approx 50 bar at 100/200 lpm. No definitive leak off pressure could be determined. Prepared for work on standpipe valves.,1.5 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 11:30:00+00:00,2007-07-21 13:45:00+00:00,1355.0,m,fixed,interruption -- other,ok,equipment failure,"Dismanteled manual choke valve on standpipe manifold. Greased valve S2, 10 and 11.",2.25 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 13:45:00+00:00,2007-07-21 15:15:00+00:00,1355.0,m,fixed,interruption -- other,ok,equipment failure,"Pressure tested standpipe manifold. Valves S3, 6, 7, 8 and 11 tested ok.",1.5 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 15:15:00+00:00,2007-07-21 16:45:00+00:00,1355.0,m,fixed,drilling -- drill,ok,success,"Lined up pumps and flowline for drilling. Stepped up rate to 4500 lpm. Cycled flowrates 3800/4500 lpm to set Powerdrive according to instructions from DD. Fast procedure failed. Reverted to long procedure, Powerdrive set - ok.",1.5 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 16:45:00+00:00,2007-07-21 20:30:00+00:00,1422.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 1372 m to 1422 m MD. Inserted and drilled with 1 singel to complete tally. Drilling parameters : Flow 4500 lpm / SPP 235 bar / 120 rpm / 10 MT WOB / Torque 15-20 kNm.",3.75 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 20:30:00+00:00,2007-07-21 21:00:00+00:00,1422.0,m,fixed,drilling -- drill,ok,success,Started setting Powerdrive for corrections needed according to directional plan. Cycled rate 3800/4500 lpm. Had overload of cuttings conveyer belt which was shut down by safety switch. Had to stop pumping because the cuttings conveyer belt had stopped.,0.5 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 21:00:00+00:00,2007-07-21 21:30:00+00:00,1422.0,m,fixed,interruption -- other,ok,equipment failure,Worked to clean and re-start cuttings conveyer belt.,0.5 +15_9_F_12_2007_07_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-21T00:00:00+02:00,2007-07-22T00:00:00+02:00,2007-07-21 21:30:00+00:00,2007-07-21 22:00:00+00:00,1431.0,m,fixed,drilling -- drill,ok,success,Continued cycling rate at 3800/4500 lpm to set Powerdrive. Continued drilling from 1422 m to 1431 m MD.,0.5 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-21 22:00:00+00:00,2007-07-21 22:15:00+00:00,1436.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 1431 m to 1436 m MD. Had to stop drilling due to prevailing problems with cuttings conveyer belt. Not able to restart belt.",0.25 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-21 22:15:00+00:00,2007-07-22 03:00:00+00:00,1436.0,m,fixed,interruption -- other,ok,equipment failure,"Conveyer belt could not be restarted as the shute in which the belt is running was full of cuttings. Opened forward shute on conveyer system to bring cuttings forward into skip. Emptied conveyer screws in shaker room into skips. Removed cuttings from conveyer belt shute with HP guns, fire hoses and suction hoses. Cleaned up cuttings from deck. + +Meanwhile circulated well with low rate and rotated string at 20 rpm.",4.75 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 03:00:00+00:00,2007-07-22 04:00:00+00:00,1461.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1436 m to 1461 m MD. Drilling prameters : Flow 4500 lpm / SPP 238 bar / 130 rpm / 2-3 MT WOB / ECD 1,37 sg / Torque 16 kNm. Restricted ROP to 30 m/hrs to check capacity of cuttings transport on conveyer belt.",1.0 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 04:00:00+00:00,2007-07-22 05:00:00+00:00,1476.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 1461 to 1476 m MD. Drilling parameters : Flow 4500 lpm / SPP 239 bar / 150 rpm / 5-10 MT WOB / Torque 18 kNm. ECD: 1,375 SG",1.0 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 05:00:00+00:00,2007-07-22 05:30:00+00:00,1476.0,m,fixed,drilling -- drill,ok,success,Took survey and downlinked Powerdrive by cycling rate 3800/4500 lpm. Observed blockage on cuttings conveyer screw in shaker room.,0.5 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 05:30:00+00:00,2007-07-22 06:30:00+00:00,1476.0,m,fixed,drilling -- drill,ok,success,Took SCR and calibrated MWD depth. Meanwhile worked to open blockage in cuttings convery screw.,1.0 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 06:30:00+00:00,2007-07-22 07:45:00+00:00,1476.0,m,fixed,interruption -- other,ok,equipment failure,Worked to open blockage/remove cuttings from conveyer screws in shaker room.,1.25 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 07:45:00+00:00,2007-07-22 09:00:00+00:00,1476.0,m,fixed,drilling -- drill,ok,success,Made connection and synchronized Powerdrive.,1.25 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 09:00:00+00:00,2007-07-22 10:00:00+00:00,1476.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1476 m to 1512 m MD. ECD: 1,375 SG",1.0 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 10:00:00+00:00,2007-07-22 10:30:00+00:00,1512.0,m,fixed,drilling -- drill,ok,success,Cycled pumprate 3800/4500 lpm to downlink Powerdrive. Blockage on cuttings conveyer screw in shaker room.,0.5 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 10:30:00+00:00,2007-07-22 11:00:00+00:00,1512.0,m,fixed,interruption -- other,ok,equipment failure,Worked to open blockage/remove cuttings from conveyer screws in shaker room.,0.5 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 11:00:00+00:00,2007-07-22 11:15:00+00:00,1512.0,m,fixed,drilling -- drill,ok,success,Made connection and took MWD survey.,0.25 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 11:15:00+00:00,2007-07-22 12:00:00+00:00,1546.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1512 m to 1546 m MD. Cuttings conveyer belt on main deck stopped moving/packed with cuttings.",0.75 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 12:00:00+00:00,2007-07-22 13:30:00+00:00,1546.0,m,fixed,interruption -- other,ok,equipment failure,Attempted to unplug/clean conveyer belt - nogo. Decided to pull into casing shoe while making repairs and modifications to the conveyer belt system.,1.5 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 13:30:00+00:00,2007-07-22 14:30:00+00:00,1467.0,m,fixed,interruption -- other,ok,equipment failure,"POOH with 17 1/2"" drilling BHA from 1546 m to 1467 m MD. Tight hole took approx 30 MT overpull.",1.0 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 14:30:00+00:00,2007-07-22 16:00:00+00:00,1354.0,m,fixed,interruption -- other,ok,equipment failure,"Continued POOH with 17 1/2"" drilling BHA while pumping from 1467 m to 1354 m MD inside casing.",1.5 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 16:00:00+00:00,2007-07-22 17:00:00+00:00,1354.0,m,fixed,interruption -- other,ok,equipment failure,Lined up well on triptank. Changed from PS-30 to manual slips. Static losses approx 100 l/hrs.,1.0 +15_9_F_12_2007_07_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-22T00:00:00+02:00,2007-07-23T00:00:00+02:00,2007-07-22 17:00:00+00:00,2007-07-22 22:00:00+00:00,1354.0,m,fixed,interruption -- other,ok,equipment failure,"Made modifications to cuttings conveyer belt : +-Cut and fitted drainage hatch +-Prepared IBC underneath drain +-Fit bracket for flushing with fire hoses +-Narrowed orifice of discharge shute + +Meanwhile serviced top drive. Tested path for cuttings transport and fluid discharge through the DCI system - ok. + +Static losses 30 l/hrs.",5.0 +15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-22 22:00:00+00:00,2007-07-23 00:45:00+00:00,1354.0,m,fixed,interruption -- other,ok,equipment failure,Continued making modifications to cuttings conveyer belt.,2.75 +15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-23 00:45:00+00:00,2007-07-23 02:30:00+00:00,1541.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 17 1/2"" drilling BHA from 1354 m to 1541 m MD. Pumped at 2000 lpm on way in / no rotation. Took weight and reamed through ledges at 1390 m MD and 1396 m MD. Meanwhile continued modifications on cuttings conveyer belt.",1.75 +15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-23 02:30:00+00:00,2007-07-23 03:30:00+00:00,1541.0,m,fixed,interruption -- other,ok,equipment failure,Tagged fill at 1541 m MD. Stepped up rate to 4500 lpm. Worked to get stable conditions on shakers and cuttings conveyer belt. Took cuttings partly to conveyer belt and partly to DCI unit with overboard discharge. Cut back rate to 3500 lpm to get stable condtions on shakers.,1.0 +15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-23 03:30:00+00:00,2007-07-23 04:00:00+00:00,1546.0,m,fixed,interruption -- other,ok,equipment failure,Washed from 1541 m to 1546 m MD. Parameters : Flow 3500 lpm / SPP 162 bar / 120 rpm / <1 MT WOB / Torque 13 kNm.,0.5 +15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-23 04:00:00+00:00,2007-07-23 21:00:00+00:00,1859.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1546 m to 1859 m MD. Driling parameters : Flow 4500 lpm / SPP 248 bar / 180 rpm / 3-5 MT WOB / Torque 14-23 kNm / ECD 1,37-1,38. + +Took surveys on connections. Reamed stand before connections. Downlinked Powerdrive at 10:15. + +Experienced problems with Mudpump #2.",17.0 +15_9_F_12_2007_07_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-23T00:00:00+02:00,2007-07-24T00:00:00+02:00,2007-07-23 21:00:00+00:00,2007-07-23 22:00:00+00:00,1859.0,m,fixed,interruption -- other,ok,equipment failure,"Mud pump #1 down failed, washout in valve seat, shut down pump. Mud pump #1 also out of service. Had to stop drilling. Reciprocated on stand while working on mud pump #2.",1.0 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-23 22:00:00+00:00,2007-07-23 23:45:00+00:00,1859.0,m,fixed,interruption -- other,ok,equipment failure,"Continued working on mud pump# 1 and 2. + +Meanwhile : +-Reciprocated on stand pumping 1800 lpm / rotation 30 rpm +-Attempted to make up 14"" casing joints in doubles, inserts and guides on PRS to tight for 14"" casing",1.75 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-23 23:45:00+00:00,2007-07-24 02:45:00+00:00,1809.0,m,fixed,interruption -- other,ok,equipment failure,"Continued working on mud pump # 1 and #2. Attempted to remove suction valve seat - nogo. Removed the complete suction valve seat housing and replaced with housing from mud pump #1. + +Meanwhile set back one stand and reciprocated on previous stand.",3.0 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 02:45:00+00:00,2007-07-24 03:00:00+00:00,1859.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 17 1/2"" drillng BHA for recommencement of drilling.",0.25 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 03:00:00+00:00,2007-07-24 04:00:00+00:00,1881.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 1859 m to 1881 m MD. Driling parameters : Flow 4500 lpm / SPP 250 bar / 180 rpm / 6 MT WOB/ Torque 20 kNm / ECD 1,38. Performed SCR.",1.0 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 04:00:00+00:00,2007-07-24 07:45:00+00:00,1959.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 1881 m to 1959 m MD. Drilling parametes : Flow 4500 lpm / SPP 250 bar / 180 rpm / 3-4 MT WOB / 22 kNm / ECD 1,37-1,38. +Found bent/loose die retainer plate on TDS.",3.75 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 07:45:00+00:00,2007-07-24 10:00:00+00:00,1940.0,m,fixed,interruption -- other,ok,equipment failure,Had to change die retainer plate on TDS. Circulated hole clean. Installed manual slips. Racked back 1 stand and installed side entry circulation sub. Hooked up coflex for circulation while working on TDS.,2.25 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 10:00:00+00:00,2007-07-24 13:45:00+00:00,1940.0,m,fixed,interruption -- other,ok,equipment failure,Dismanteled and replaced die retainer plate on TDS. Meanwhile circulated at 1500 lpm.,3.75 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 13:45:00+00:00,2007-07-24 14:45:00+00:00,1940.0,m,fixed,interruption -- other,ok,equipment failure,Tested torque wrench on TDS - ok. Installed automatic slips.,1.0 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 14:45:00+00:00,2007-07-24 15:15:00+00:00,1972.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 1959 m to 1972 m MD. Drilling parameters : Flow 4500 lpm / SPP 255 bar / 180 rpm / 3-4 MT WOB / 22 kNm / ECD 1,37-1,38.",0.5 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 15:15:00+00:00,2007-07-24 16:00:00+00:00,1972.0,m,fixed,drilling -- drill,ok,success,Shakers overflowing due to new mud being circulated. Cut back on flowrate and worked string until satisfactory flowrate of 4500 lpm could be achieved.,0.75 +15_9_F_12_2007_07_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-24T00:00:00+02:00,2007-07-25T00:00:00+02:00,2007-07-24 16:00:00+00:00,2007-07-24 22:00:00+00:00,2080.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 1959 m to 2080 m MD. Drilling parameters : Flow 4500 lpm / SPP 246 bar / 180 rpm / 3-4 MT WOB / 21 kNm / ECD 1,37-1,38. Performed survey and reamed stand on connection. Downlinked Powerdrive as required. + +Meanwhile ROV attached DCI hose to subsea clumpweights - ok.",6.0 +15_9_F_12_2007_07_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-25T00:00:00+02:00,2007-07-26T00:00:00+02:00,2007-07-24 22:00:00+00:00,2007-07-25 01:30:00+00:00,2146.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 2080 m to 2146 m MD. Drilling parameters : Flow 4500 lpm / SPP 258 bar / 180 rpm / 3-4 MT WOB / 23 kNm / ECD 1,37-1,38. Downlinked Powerdrive as required. Performed pit drill at 02:00. Bled 2-3 m3 mud into active. Good response from driller and Geoservice. Experienced problems with mud pumps, standpipe pressure eratic and lower than before.",3.5 +15_9_F_12_2007_07_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-25T00:00:00+02:00,2007-07-26T00:00:00+02:00,2007-07-25 01:30:00+00:00,2007-07-25 02:15:00+00:00,2150.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot problems with mudpumps, isolated one pump at the time. Problem with mud pump #2, took pump out of service. Attempted to drill ahead using mud pump #1 and #3. Got problem with mud pump #1.",0.75 +15_9_F_12_2007_07_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-25T00:00:00+02:00,2007-07-26T00:00:00+02:00,2007-07-25 02:15:00+00:00,2007-07-25 04:00:00+00:00,2150.0,m,fixed,interruption -- other,ok,equipment failure,"Stopped drilling. Worked on mud pump #2, changed ejection valve and valve seat. Meanwhile reciprocated string pumping 1500 lpm with mud pump #3. Rotated string 20 rpm.",1.75 +15_9_F_12_2007_07_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-25T00:00:00+02:00,2007-07-26T00:00:00+02:00,2007-07-25 04:00:00+00:00,2007-07-25 14:30:00+00:00,2320.0,m,fixed,drilling -- drill,ok,success,"Continued drilling from 2150 to 2320 m MD. Drilling parameters : Flow 4500 lpm / SPP 265 bar / 180 rpm / 10-12 MT WOB / Torque 20-25 kNm / ECD 1,37-1,38. Performed survey and reamed stand on connection. Downlinked Power as required.",10.5 +15_9_F_12_2007_07_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-25T00:00:00+02:00,2007-07-26T00:00:00+02:00,2007-07-25 14:30:00+00:00,2007-07-25 22:00:00+00:00,2403.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section from 2320 to 2403 m MD. ROP dropped to 5-10 m/hrs, increased WOB. Drilling parameters : Flow 4500 lpm / SPP 265-272 bar / 180 rpm / 10-18 MT WOB / Torque 16-23 kNm / ECD 1,37-1,38. Top of Balder encounterd at 2345 m MD. Stick slip tendencies at 2380 m MD, reduced WOB as required.",7.5 +15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-25 22:00:00+00:00,2007-07-26 01:00:00+00:00,2417.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole section 2403 m to 2417 m MD. Drilling parameters : Flow 4500 lpm / SPP 275 bar / 180 rpm / 18 MT WOB / Torque 20 kNm / ECD 1,37-1,38. + +ROP down to 4-6 m/hrs.",3.0 +15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-26 01:00:00+00:00,2007-07-26 02:00:00+00:00,2417.0,m,fixed,drilling -- drill,ok,success,"Due to decreasing ROP, picked 0,3 m off bottom to clean the bit. Increased pump rate to 4700 lpm and rotated at 220 rpm and held for 10 mins. Got problems with mud pump #3, took pump out of service, reciprocated on stand pumping 2000 lpm. Lined up mud pump #2. RIH and stepped up pumps to 4500 lpm for commencement of drilling.",1.0 +15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-26 02:00:00+00:00,2007-07-26 04:00:00+00:00,2438.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole section from 2417 m to 2438 m MD. Drilling parameters : Flow 4500 lpm / SPP 276 bar / 180 rpm / 15-18 MT WOB / Torque 24-30 kNm / ECD 1,37-1,38. + +ROP increased to appox 10 m/hrs. Drilling break at 2431with ROP of 20 m/hrs. Experienced stick slip tendencies at 2436 m MD, decreased WOB as required.",2.0 +15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-26 04:00:00+00:00,2007-07-26 12:30:00+00:00,2486.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 2438 m to 2486 m MD. Drilling paramaters : Flow 4500 lpm / SPP 272-280 bar / 150-180 rpm / 13-15 MT WOB / Torque 17-24 kNm / ECD 1,37. Took survey and reamed singel on connection. + +Got problems with mud pumps #2 and #3.",8.5 +15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-26 12:30:00+00:00,2007-07-26 19:45:00+00:00,2486.0,m,fixed,interruption -- other,ok,equipment failure,"Worked on mud pumps #2 and #3. Changed swab/piston and liner seal on pump #2. Changed liner spray hose on pump #3. + +Got pump #2 up and running. Attempted to recommence drilling at 21:45. Observed leakage on TDS washpipe.",7.25 +15_9_F_12_2007_07_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-26T00:00:00+02:00,2007-07-27T00:00:00+02:00,2007-07-26 19:45:00+00:00,2007-07-26 22:00:00+00:00,2444.0,m,fixed,interruption -- other,ok,equipment failure,Had leakage on TDS washpipe. Installed manual slips. Installed side entry circulation sub. Connected cement hose and circulated 1300 lpm while working on washpipe. Parked topdrive and changed washpipe.,2.25 +15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-26 22:00:00+00:00,2007-07-26 23:30:00+00:00,2444.0,m,fixed,interruption -- other,ok,equipment failure,Continued changing washpipe on TDS. Greased TDS.,1.5 +15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-26 23:30:00+00:00,2007-07-27 00:15:00+00:00,2486.0,m,fixed,interruption -- other,ok,equipment failure,"Finished working on TDS. Installed automatic slips. Made up stand and RIH to 2486 m MD, stepped up pumps and recommenced drilling.",0.75 +15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-27 00:15:00+00:00,2007-07-27 04:00:00+00:00,2505.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" section from 2486 m to 2505 m MD. Drilling paramaters : Flow 4500 lpm / SPP 280-284 bar / 180 rpm / 8-12 MT WOB / Torque 19-25 kNm / ECD 1,37. ROP dropped from 10 m/hrs to 2 m/hrs towards 2505.",3.75 +15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-27 04:00:00+00:00,2007-07-27 11:00:00+00:00,2513.0,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" section from 2505 m to 2513 m MD. Drilling parameters : Flow 4500 lpm / SPP 280-284 bar / 180 rpm / 8-12 MT WOB / Torque 19-25 kNm / ECD 1,37. ROP dropped from 2 m/hrs to 1 m/hrs towards 2513. Decided to pull out of hole to change bit.",7.0 +15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-27 11:00:00+00:00,2007-07-27 13:30:00+00:00,2513.0,m,fixed,drilling -- trip,ok,success,Circulated hole clean with 4500 lpm / SPP 285 bar while reciprocating on stand.,2.5 +15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-27 13:30:00+00:00,2007-07-27 15:00:00+00:00,2254.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA from 2513 m to 2254 m MD.",1.5 +15_9_F_12_2007_07_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-27T00:00:00+02:00,2007-07-28T00:00:00+02:00,2007-07-27 15:00:00+00:00,2007-07-27 22:00:00+00:00,1798.0,m,fixed,drilling -- trip,ok,success,Tight hole from 2254. Continued POOH while pumping at 3500 lpm from 2254 to 1798 m MD. Rotated at 40 rpm on 15 MT+ overpull as dictated by hole.,7.0 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-27 22:00:00+00:00,2007-07-28 00:15:00+00:00,1661.0,m,fixed,drilling -- trip,ok,success,"Continued POOH with 17 1/2"" BHA from 1798 m to 1661 m MD pumping at 3500 lpm. Rotated at 40 rpm on 15 MT+ overpull as dicated by hole.",2.25 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 00:15:00+00:00,2007-07-28 01:45:00+00:00,1661.0,m,fixed,drilling -- trip,ok,success,"Due to pack off tendencies at 1661 m MD, increasing ECD > 1,40 and increasing cuttings trend over shakers => Reciprocated and circulated on stand at 4500 lpm / 20 rpm. Decreased ECD from 1,402 to 1,390 with continuous flow of cuttings over shakers.",1.5 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 01:45:00+00:00,2007-07-28 03:00:00+00:00,1523.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 17 1/2"" drilling BHA from 1661 m to 1523 m MD. Sticky conditions. Pumped at 3500 lpm / Rotation 40 rpm. ECD 1,39-1,40.",1.25 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 03:00:00+00:00,2007-07-28 04:00:00+00:00,1439.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA from 1523 to 1439 m MD. Sticky conditions. Increased flow rate when pulling to 4500 lpm due to increasing ECD > 1,40. Rotated at 40 rpm.",1.0 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 04:00:00+00:00,2007-07-28 05:00:00+00:00,1337.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1439 to 1337 m MD. Sticky conditions. Increased flow rate when pulling to 4500 lpm due to increasing ECD > 1,40. Rotated at 40 rpm.",1.0 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 05:00:00+00:00,2007-07-28 07:15:00+00:00,1337.0,m,fixed,drilling -- trip,ok,success,Circulated hole clean. Pumped at 4500 lpm. Rotation 30-40 rpm.,2.25 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 07:15:00+00:00,2007-07-28 07:45:00+00:00,1337.0,m,fixed,drilling -- trip,ok,success,"Flowchecked prior to POOH in 20"" casing - well static. Pumped 4 m3 slug of 1,55 sg mud.",0.5 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 07:45:00+00:00,2007-07-28 08:00:00+00:00,1337.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drillling BHA on 5 1/2"" DP from 1337m to 1335 m MD. Tight hole at 1335 m MD when stabilizer entering shoetrack. Unable to pull without swabbing.",0.25 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 08:00:00+00:00,2007-07-28 11:30:00+00:00,1035.0,m,fixed,drilling -- trip,ok,success,Made up TDS to pipe and continued pulling from 1337 m to 1035 m MD while pumping at 1300-3000 lpm. Rotated as dictated by hole 10-40 rpm. At 1115 m MD increased flowrate to 4000 lpm.,3.5 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 11:30:00+00:00,2007-07-28 13:30:00+00:00,800.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1035 m to 800 m MD. No tight spots observed. Pumped 2 m3 slug of 1,55 sg mud.",2.0 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 13:30:00+00:00,2007-07-28 14:45:00+00:00,266.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 800 m to 266 m MD. Flowchecked prior to POOH with 17 1/2"" BHA - well static.",1.25 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 14:45:00+00:00,2007-07-28 15:00:00+00:00,163.0,m,fixed,drilling -- trip,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" HWDP from 266 m to 163 m MD.",0.25 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 15:00:00+00:00,2007-07-28 15:45:00+00:00,163.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk. Removed automatic slip and installed master bushing.,0.75 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 15:45:00+00:00,2007-07-28 18:30:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,"Continued to POOH with 17 1/2"" BHA. Racked back drillcollars and jar/intensifier.",2.75 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 18:30:00+00:00,2007-07-28 19:00:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,"With ADN sub in rotary, prepared for handling/removing RA source. Rigged up adapter and transfer shield. Fenced off drilling area. Attempted to remove RA source from ADN - nogo.",0.5 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 19:00:00+00:00,2007-07-28 21:00:00+00:00,38.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshot situation. RA source seemed to unscrew but was still hanging on threads. No back up transfer shield onboard in case shear pin release. Decided to try to pull RA source with the possible implication that back up ADN tool could not be run.,2.0 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 21:00:00+00:00,2007-07-28 21:45:00+00:00,38.0,m,fixed,interruption -- repair,ok,equipment failure,"Pulled RA source using tugger. Source came free, threads seemed to be OK. Transferred RA source to transport container. Planned for picking up backup ADN and backup RA source.",0.75 +15_9_F_12_2007_07_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-28T00:00:00+02:00,2007-07-29T00:00:00+02:00,2007-07-28 21:45:00+00:00,2007-07-28 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Picked up 17 1/2"" drilling BHA and lifted above rotary. Inspected bit. Prepared for breaking bit.",0.25 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-28 22:00:00+00:00,2007-07-28 22:45:01+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out 17 1/2"" PDC bit using bit breaker and manual tongs. Made up new 17 1/2"" rock bit to Powerdrive. Torqued bit to 37000 ft lbs using manual tongs. Gauged bit, checked nozzles and rollers.",0.7502777777777778 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-28 22:45:01+00:00,2007-07-29 01:00:01+00:00,9.0,m,fixed,drilling -- trip,ok,success,"Broke out an laid down ADN, Sonic and ARC tools. RIH with Powerdrive and hung off same in rotary. Cleared drillfloor and prepared for service on TDS.",2.25 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 01:00:01+00:00,2007-07-29 02:30:01+00:00,9.0,m,fixed,interruption -- maintain,ok,equipment failure,Worked on TDS. Checked TDS for noise while rotating. Changed gear oil on TDS.,1.5 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 02:30:01+00:00,2007-07-29 04:00:00+00:00,30.0,m,fixed,drilling -- trip,ok,success,"Made up and RIH with backup ARC, backup Sonic and Powerpulse.",1.4997222222222222 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 04:00:00+00:00,2007-07-29 04:45:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,"Made up ADN to 17 1/2"" drilling BHA.",0.75 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 04:45:00+00:00,2007-07-29 05:45:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk. Connected TDS and tested MWD tool pumping at 3000 lpm / SPP 50 bar - ok.,1.0 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 05:45:00+00:00,2007-07-29 08:15:00+00:00,40.0,m,fixed,drilling -- trip,ok,success,Held toolbox talk. Transferred and installed RA source in ADN tool using tranfer shield and transfer rod. Had problems to function fingers on collar fingerboard.,2.5 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 08:15:00+00:00,2007-07-29 08:30:00+00:00,40.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot fingerboard communication with AD control panel.,0.25 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 08:30:00+00:00,2007-07-29 09:15:00+00:00,205.0,m,fixed,interruption -- other,ok,equipment failure,"RIH with 17 1/2"" drilling BHA from 40 m to 205 m MD on 5 1/2"" HWDP to locate RA source below sealevel.",0.75 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 09:15:00+00:00,2007-07-29 12:15:00+00:00,205.0,m,fixed,interruption -- other,ok,equipment failure,Continued to work on collar fingerboard.,3.0 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 12:15:00+00:00,2007-07-29 12:45:00+00:00,40.0,m,fixed,interruption -- other,ok,equipment failure,"POOH with 17 1/2"" drilling BHA from 205 m to 40 m MD on 5 1/2"" HWDP.",0.5 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 12:45:00+00:00,2007-07-29 13:00:00+00:00,40.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to operating collar fingers manually.,0.25 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 13:00:00+00:00,2007-07-29 14:00:00+00:00,200.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" drilling BHA on DC and 5 1/2"" HWDP from 40 m to 200 m MD.",1.0 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 14:00:00+00:00,2007-07-29 14:30:00+00:00,200.0,m,fixed,drilling -- trip,ok,success,Removed master bushing. Installed automatic slips.,0.5 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 14:30:00+00:00,2007-07-29 16:30:00+00:00,1031.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2"" DP/HWDP from 200 m to 1031 m MD. Had problems with fingerboard. Meanwhile performed well control drill.",2.0 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 16:30:00+00:00,2007-07-29 17:00:00+00:00,1031.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot fingerboard.,0.5 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 17:00:00+00:00,2007-07-29 17:45:00+00:00,1345.0,m,fixed,drilling -- trip,ok,success,"Continued to RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1031 m to 1345 m MD.",0.75 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 17:45:00+00:00,2007-07-29 18:15:00+00:00,1345.0,m,fixed,drilling -- trip,ok,success,Filled drillpipe and broke circulation in shoetrack. Pumped at 3000 lpm / SPP 135 bar.,0.5 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 18:15:00+00:00,2007-07-29 19:15:00+00:00,1415.0,m,fixed,drilling -- trip,ok,success,"Continued to RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1345 m to 1415 m MD. Reamed thightspots at 1360, 1362 and 1378 m MD with 4500 lpm / 80 RPM.",1.0 +15_9_F_12_2007_07_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-29T00:00:00+02:00,2007-07-30T00:00:00+02:00,2007-07-29 19:15:00+00:00,2007-07-29 22:00:00+00:00,2238.0,m,fixed,drilling -- trip,ok,success,"RIH with 17 1/2"" drilling BHA on 5 1/2 DP from 1345 m to 2238 m MD - hole condition good.",2.75 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-29 22:00:00+00:00,2007-07-29 22:15:00+00:00,2238.0,m,fixed,drilling -- trip,ok,success,"Connected TDS, filled pipe and broke circulation.",0.25 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-29 22:15:00+00:00,2007-07-29 23:30:00+00:00,2470.0,m,fixed,drilling -- trip,ok,success,"Continued to RIH with 17 1/2"" drilling BHA on 5 1/2"" DP from 2238 m to 2470 m MD. Hit obstruction at 2470 m MD.",1.25 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-29 23:30:00+00:00,2007-07-30 00:30:00+00:00,2482.0,m,fixed,drilling -- trip,ok,success,Brought pump up to 4300 lpm / SPP 293 bar and reamed with 120 rpm to clear restriction. Still took some weight on bit. Reduced rate an downlinked Powerdrive according to instructions from DD. Reamed down to 2482 with 0-2 MT WOB while setting Powerdrive.,1.0 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 00:30:00+00:00,2007-07-30 01:00:00+00:00,2513.0,m,fixed,drilling -- trip,ok,success,Made connection. Performed SCR. Performed MWD survey. Reamed down to 2513 with 4300 lpm and 120 rpm.,0.5 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 01:00:00+00:00,2007-07-30 02:45:00+00:00,2523.5,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2513 m to 2523,5 m MD. Drilling parameters : Flow 4360 lpm / SPP 284-296 bar / 180 rpm / 12-19 MT WOB / Torque 23 kNm / ECD 1,391-1,394. ROP 5-7 m/hrs. Trip gas peaked at 12000 ppm.",1.75 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 02:45:00+00:00,2007-07-30 04:00:00+00:00,2523.5,m,fixed,drilling -- drill,ok,success,"Performed survey. Circulated hole clean => Reciprocated on stand, increased pumprate to 4500 lpm / 293 bar SPP / rotation 120 rpm. ECD when starting 1,393. ECD at 06.00 1,389. MW out 1,37. Started to add Graphite and Calcarb to active.",1.25 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 04:00:00+00:00,2007-07-30 04:30:00+00:00,2523.5,m,fixed,drilling -- drill,ok,success,Continued to circulate hole clean with 4500 lpm.,0.5 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 04:30:00+00:00,2007-07-30 05:00:00+00:00,2523.5,m,fixed,drilling -- drill,ok,success,Made connection. Performed MWD survey. Stepped up pumps to drilling rate at 4500 lpm.,0.5 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 05:00:00+00:00,2007-07-30 06:45:00+00:00,2535.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 2523,5 m to 2535 m MD. Drilling parameters : Flow 4500 lpm / SPP 282 bar / 180 rpm / 20 MT WOB / Torque 24 kNm / ECD 1,38. ROP 5 m/hrs. Failure on mud pump #1 and mud pump #3.",1.75 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 06:45:00+00:00,2007-07-30 08:45:00+00:00,2535.0,m,fixed,interruption -- other,ok,equipment failure,"Worked on mud pumps #1 and #3. Changed discharge valve and seat on MP#3. Changed suction valve, seat and cap seal on MP#1. Meanwhile reciprocated and circulated at 1500 lpm / 50 rpm.",2.0 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 08:45:00+00:00,2007-07-30 10:00:00+00:00,2541.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 2535 m to 2541 m MD. Drilling parameters : Flow 4500 lpm / SPP 282 bar / 180 rpm / 12 MT WOB / Torque 24 kNm / ECD 1,38. ROP 5 m/hrs.",1.25 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 10:00:00+00:00,2007-07-30 10:15:00+00:00,2541.0,m,fixed,drilling -- drill,ok,success,Checked for losses - ok.,0.25 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 10:15:00+00:00,2007-07-30 12:00:00+00:00,2548.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 2541 m to 2548 m MD. Drilling parameters : Flow 4500 lpm / SPP 282 bar / 180 rpm / 20 MT WOB / Torque 24 kNm / ECD 1,38. ROP 12 m/hrs",1.75 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 12:00:00+00:00,2007-07-30 12:15:00+00:00,2548.0,m,fixed,drilling -- drill,ok,success,Checked for losses - ok.,0.25 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 12:15:00+00:00,2007-07-30 19:45:00+00:00,2569.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 17 1/2"" hole from 2548 m to 2569 m MD. Drilling parameters : Flow 4500 lpm / SPP 272-280 bar / 180 rpm / 12-18 MT WOB / Torque 24 kNm / ECD 1,37. ROP 1-2 m/hrs. Had drilling break at 2569 m MD, ROP increased to 10 m/hrs over 0,8 m drilled, then decreased again. Dynamic losses of 1-2 m3/hrs. Encountered erratic data on incl. azim. sensor on powerdrive.",7.5 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 19:45:00+00:00,2007-07-30 21:30:00+00:00,2572.5,m,fixed,drilling -- drill,ok,success,"Drilled 17 1/2"" hole from 2569 to 2572,5 m MD. Drilling parameters : Flow 4500 lpm / SPP 282 bar / 180 rpm / 12 MT WOB / Torque 24 kNm / ECD 1,37. ROP 1-2 m/hrs. Log response indicating top of Ty penetrated. Dynamic losses approx 3 m3/hrs. Lost connection with PowerDrive sensors, incl, az, GR.",1.75 +15_9_F_12_2007_07_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-30T00:00:00+02:00,2007-07-31T00:00:00+02:00,2007-07-30 21:30:00+00:00,2007-07-30 22:00:00+00:00,2572.5,m,fixed,drilling -- drill,ok,success,Circulated bottoms up at 4500 lpm to obtain bottom sample.,0.5 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-30 22:00:00+00:00,2007-07-30 23:00:00+00:00,2572.5,m,fixed,drilling -- drill,ok,success,"Circulated bottoms up at 4500 lpm to obtain bottom sample. Dynamic losses 1,8 m3/hrs.",1.0 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-30 23:00:00+00:00,2007-07-30 23:30:00+00:00,2572.5,m,fixed,drilling -- drill,ok,success,"Obtained sample and verified section TD at 2572,5 m MD, 19 m MD into Ty formation.",0.5 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-30 23:30:00+00:00,2007-07-31 01:00:00+00:00,2529.0,m,fixed,drilling -- drill,ok,success,"Lined up pumps to pump Calcarb/Graphite LCM pill down drillstring. Pumped 19 m3 LCM pill at 2000 lpm while rotating 30 rpm. Spotted pill from 2572,5 m MD to 2567 m MD. Broke connection and spotted pill from 2567 m to 2529 m MD. Checked for losses - no static losses.",1.5 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 01:00:00+00:00,2007-07-31 03:00:00+00:00,2529.0,m,fixed,drilling -- drill,ok,success,"Cirulated well clean. Stepped up pumps to 4500 lpm and reciprocated on stand with 120/180 rpm rotation. Reset Powerdrive according to instructions from DD. Dynamic losses 0,5 m3/hrs.",2.0 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 03:00:00+00:00,2007-07-31 04:00:00+00:00,2490.0,m,fixed,drilling -- drill,ok,success,Broke connection set back stand and continued to clean well on next stand. Circulated at 4500 lpm with 120/180 rpm rotation while reciprocating string.,1.0 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 04:00:00+00:00,2007-07-31 04:45:00+00:00,2528.0,m,fixed,drilling -- drill,ok,success,Circulate hole clean at 4500 lpm and 120/180 rpm rotation while reciprocating on stand.,0.75 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 04:45:00+00:00,2007-07-31 05:15:00+00:00,2528.0,m,fixed,drilling -- drill,ok,success,Flow checked well - well static.,0.5 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 05:15:00+00:00,2007-07-31 12:15:00+00:00,1357.0,m,fixed,drilling -- drill,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 2528 m to 1357 m MD: Pulled wet pipe. Minor tightspots (max 10 MT overpull) observed at : 2254, 2252, 2120, 1924, 1939, 1652, 1535 m MD. Intervall 1520 m to 1480 m MD, max 18 MT overpull. Intervall 1385 m to 1357 m MD, max 18 MT overpull. No rotation and/or circulation needed.",7.0 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 12:15:00+00:00,2007-07-31 12:45:00+00:00,1357.0,m,fixed,drilling -- drill,ok,success,"Flow checked well inside casing shoe - well static. Pumped 10 m3 of 1,55 sg slug for pulling dry pipe.",0.5 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 12:45:00+00:00,2007-07-31 13:45:00+00:00,830.0,m,fixed,drilling -- drill,ok,success,"POOH with 17 1/2"" drilling BHA on 5 1/2"" DP from 1357 m to 830 m MD. Got problems with iron roughneck.",1.0 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 13:45:00+00:00,2007-07-31 16:00:00+00:00,830.0,m,fixed,interruption -- other,ok,equipment failure,Repaired bursted hydraulic hose in iron roughneck dragchain,2.25 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 16:00:00+00:00,2007-07-31 17:30:00+00:00,200.0,m,fixed,drilling -- drill,ok,success,"Continued to POOH with 17 1/2"" drilling BHA on 5 1/2"" DP/HWDP from 830 m to 200 m MD.",1.5 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 17:30:00+00:00,2007-07-31 18:00:00+00:00,200.0,m,fixed,drilling -- drill,ok,success,"Flow checked well prior to pulling 17 1/2"" BHA - well static. Removed automatic slips and installed masterbushing.",0.5 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 18:00:00+00:00,2007-07-31 19:45:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,"Pulled 17 1/2"" drilling BHA from 200 m to 63 m MD. Racked back drillcollars, jar and intensifier.",1.75 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 19:45:00+00:00,2007-07-31 20:45:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,Rigged up adapter and transfer shield on top of ADN tool. Removed RA from ADN source and transferred same to transportation container.,1.0 +15_9_F_12_2007_08_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-07-31T00:00:00+02:00,2007-08-01T00:00:00+02:00,2007-07-31 20:45:00+00:00,2007-07-31 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Broke out and laid down ADN, Sonic and ARC logging tools. Laid down Powerdrive.",1.25 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-07-31 22:00:00+00:00,2007-07-31 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleared and tidied rigfloor.,0.25 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-07-31 22:15:00+00:00,2007-08-01 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up cement stand with pups and singel. Not able to rack back because cement head was to heavy causing buckling of 5 1/2"" DP. Broke out and laid down pipe again. Left 4,5 m pup on cement head.",1.75 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 00:00:00+00:00,2007-08-01 01:15:00+00:00,10.0,m,fixed,drilling -- casing,ok,success,"Made up WBRRT tool and jet sub on 5 1/2"" HWDP. RIH and located pipe accross BOP. Operated rams. Jetted/washed BOP with 2000 lpm.",1.25 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 01:15:00+00:00,2007-08-01 02:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"RIH with WBRRT tool. Measured out pipe and washed accross nominal seat protector twice with 3000 lpm. Latched on to nominal seat protector at 140,12 m MD and released same with 15 MT overpull.",1.25 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 02:30:00+00:00,2007-08-01 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Dropped 2 15/16"" drift. POOH with WBRRT/nominal seat protector on 5 1/2"" HWDP. Retrieved drift and laid down WBRRT tool.",1.5 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 04:00:00+00:00,2007-08-01 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rig up for running 14"" casing. Installed casing tong on iron roughneck and hooked up hydralics. Hooked up FAC tool to TDS. Changed links and elevator.",4.0 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 08:00:00+00:00,2007-08-01 10:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"14"" air operated elevator needed dual air inlet, but only one available from TDS. Produced and hooked up hose tee on elevator air supply.",2.0 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 10:00:00+00:00,2007-08-01 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Attempted to pick up and make up cement head to 5 1/2"" pup joint and singel in mouse hole and rack back in collar finger - nogo. Stand was bending and it could not be set back as the PRS needed to change grip for racking. Broke out singel and laid down cement head and singel.",1.0 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 11:00:00+00:00,2007-08-01 11:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held prejob meeting prior to running 14"" casing. Meanwhile finished hooking up 14"" casing running equipment.",0.75 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 11:45:00+00:00,2007-08-01 12:00:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,P/U shoe joint and hung off in rotary.,0.25 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 12:00:00+00:00,2007-08-01 12:15:00+00:00,12.0,m,fixed,drilling -- casing,ok,success,Took time out as adviced by Statoil drilling supervisor. Emphasized that everyone working regulary on the drillfloor should use proper radio gear.,0.25 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 12:15:00+00:00,2007-08-01 15:15:00+00:00,40.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 14"" intermediate joint and float collar joint. Threadlocked couplings. Used manual slips when handling. Tested shoe and float collar joint for flowthrough and flowback - ok.",3.0 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 15:15:00+00:00,2007-08-01 17:00:00+00:00,68.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up double 14"" casing. Threadlocked coupling. Made up 5 m 14"" casing pup joint. Filled casing.",1.75 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 17:00:00+00:00,2007-08-01 18:15:00+00:00,68.0,m,fixed,drilling -- casing,ok,success,"Installed Odfjell flush mounted slips in rotary. Tested slips for potential casing lift out, casing lifted out. Adjusted opening pressure of slips, reattempted lift out - ok.",1.25 +15_9_F_12_2007_08_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-01T00:00:00+02:00,2007-08-02T00:00:00+02:00,2007-08-01 18:15:00+00:00,2007-08-01 22:00:00+00:00,236.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 68 m to 236 m MD. Filled every joint while running. Average running speed 3-4 jnts/hr.",3.75 +15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-01 22:00:00+00:00,2007-08-02 01:00:00+00:00,390.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 236 m to 390 m MD. Filled every joint while running. Average running speed 5 jnts/hr.",3.0 +15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 01:00:00+00:00,2007-08-02 04:00:00+00:00,580.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 390 m to 580 m MD. Filled every joint while running. Average running speed 5-6 jnts/hr.",3.0 +15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 04:00:00+00:00,2007-08-02 15:00:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 580 m to 1357 MD. Filled every joint while running. Average running speed 6 jnts/hr.",11.0 +15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 15:00:00+00:00,2007-08-02 15:30:00+00:00,1357.0,m,fixed,drilling -- casing,ok,success,"Circulated at 20"" shoe at 1357 m. Pumped 220 lpm and broke circulation at 48 bar. Increased pump rate to max 1500 lpm. No losses. Meanwhile serviced casing running equipment and cleared floor of protectors. Up weight 221 MT/ down weight 201 MT.",0.5 +15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 15:30:00+00:00,2007-08-02 19:30:00+00:00,1609.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 1357 to 1609 MD. Filled every joint while running. Average running speed 5-6 jnts/hr.",4.0 +15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 19:30:00+00:00,2007-08-02 20:00:00+00:00,1609.0,m,fixed,drilling -- casing,ok,success,Checked Flush Mounted Spider (FMS) for loose/broken items due to cracking sound when MU casing joint. Nothing was found.,0.5 +15_9_F_12_2007_08_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-02T00:00:00+02:00,2007-08-03T00:00:00+02:00,2007-08-02 20:00:00+00:00,2007-08-02 22:00:00+00:00,1752.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 1609 to 1752 m MD. Filled every joint while running. Average running speed 6-7 jnts/hr.",2.0 +15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-02 22:00:00+00:00,2007-08-03 04:00:00+00:00,2182.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 1752 to 2182 MD. Filled every joint while running. Average running speed 6-7 jnts/hr.",6.0 +15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 04:00:00+00:00,2007-08-03 07:00:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 2182 m to 2422 m MD. Filled every joint while running. Average running speed 7 jnts/hr.",3.0 +15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 07:00:00+00:00,2007-08-03 09:30:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,Remove FMC slips and installed master bushing/manual slips. RD FAC tool and 500 MT elevator. RU rig bails and elevator.,2.5 +15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 09:30:00+00:00,2007-08-03 10:00:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,"PU and MU 14"" casing hanger. RIH and jammed casing coupling in inner bushings in rotary table.",0.5 +15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 10:00:00+00:00,2007-08-03 12:00:00+00:00,2422.0,m,fixed,interruption -- other,ok,operation failed,Trouble-shooted casing coupling jamming. Removed inner bushing and master bushing. Ran casing hanger through rotary. Installed bushings and sat slips.,2.0 +15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 12:00:00+00:00,2007-08-03 13:00:00+00:00,2427.0,m,fixed,drilling -- casing,ok,success,Removed casing tong and stored on set back area.,1.0 +15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 13:00:00+00:00,2007-08-03 14:00:00+00:00,2512.0,m,fixed,drilling -- casing,ok,success,"Ran 14"" casing according to tally from 2427 m to 2512 m MD. Took max 40 MT weight at 2512 m. MU TDS, broke circulation and attempted to pass restriction. No go. Started to circulate at 220 lpm, 12 bar and increased flow to 470 lpm, 14.3 bar. Broke free upwards with 400 MT/down 296 MT.",1.0 +15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 14:00:00+00:00,2007-08-03 19:00:00+00:00,2513.0,m,fixed,drilling -- casing,ok,success,"Washed 14"" casing down from 2512 m to 2513 m MD, 550 lpm, 16 bar, 20-25 MT down weight.",5.0 +15_9_F_12_2007_08_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-03T00:00:00+02:00,2007-08-04T00:00:00+02:00,2007-08-03 19:00:00+00:00,2007-08-03 22:00:00+00:00,2513.5,m,fixed,drilling -- casing,ok,success,"Continued to work through tight spot and washed 14"" casing down from 2513 m to 2513.5 m MD, 1000-1400 lpm, 18-40 bar, 25-35 MT down weight. Max allowed pressure was 55 bar.",3.0 +15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-03 22:00:00+00:00,2007-08-04 04:00:00+00:00,2514.5,m,fixed,drilling -- casing,ok,success,"Continued to work through tight spot and washed 14"" casing down from 2513.5 m to 2514.5 m MD, 1400-2000 lpm, 20-40 bar, 20-45 MT down weight. Max allowed pressure was 55 bar. Observed loss at 2000 lpm.",6.0 +15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 04:00:00+00:00,2007-08-04 08:00:00+00:00,2515.0,m,fixed,drilling -- casing,ok,success,"Continued to work on tight spot at 2515 m MD, 200-2000 lpm/ max 60 bar and max 70 MT down weight. Free upweight 430-470 MT.",4.0 +15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 08:00:00+00:00,2007-08-04 10:00:00+00:00,2402.0,m,fixed,drilling -- casing,ok,success,"Pumped out of hole, 200 lpm, and RB 3 stds HWDP. Free upweight ~430-470 MT in Lista Fm. Above Lista Fm, free upweight 410-420 MT.",2.0 +15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 10:00:00+00:00,2007-08-04 11:00:00+00:00,2402.0,m,fixed,drilling -- casing,ok,success,"RU casing tong. BO 14"" casing hanger and LD same.",1.0 +15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 11:00:00+00:00,2007-08-04 13:00:00+00:00,2402.0,m,fixed,drilling -- casing,ok,success,Held tool box meeting prior to RU and LO casing. Changed bails and elevators. RU air lines to TDS.,2.0 +15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 13:00:00+00:00,2007-08-04 15:00:00+00:00,2357.0,m,fixed,drilling -- casing,ok,success,"POOH and LD 5 joints of 14"" csg from 2422 m to 2357 m MD.",2.0 +15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 15:00:00+00:00,2007-08-04 16:00:00+00:00,2357.0,m,fixed,drilling -- casing,ok,success,Changed bails and elevator. RD air lines to TDS.,1.0 +15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 16:00:00+00:00,2007-08-04 21:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"PU 14"" csg hanger assembly. Removed csg tong. Washed down 3 stds and 2 singles HWDP from 2366 m to 2496 m MD, 500 lpm, 7 bar. PU and MU cmt head. RIH and landed off 14"" csg hanger. 14"" land-off point @ 140.32 m MD. Top 14"" @ 140.0 m.",5.0 +15_9_F_12_2007_08_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-04T00:00:00+02:00,2007-08-05T00:00:00+02:00,2007-08-04 21:00:00+00:00,2007-08-04 22:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Circulated one csg volume of 1.35 sg WBM using rig pumps, 2300 lpm and 36 bar. Meanwhile RU cmt hoses and held tool box meeting prior to cmt job. Decreased flow to 2190 lpm and 35 bar loss free rate.",1.0 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-04 22:00:00+00:00,2007-08-04 23:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Continued circulating one csg volume of 1.35 sg WBM using rig pumps, 2190 lpm and 35 bar.",1.0 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-04 23:00:00+00:00,2007-08-05 01:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Pumped 21 m3 1.63 m3 sg Tuned Spacer using rig pumps, 1500 lpm and 17 bar. Dropped ball for bottom plug. Mixed and pumped 31 m3 1.90 sg cmt slurry, 800 lpm 25-34 bar. BTM plug sheared at approx 50 bar. Pumped 890 liter WBM to displace cement to rig floor. Released dart. Displaced wiper plug by pumping 3 m3 WBM with cement unit, 1200 lpm and 45 bar. Top plug sheared at 207 bar/977 ltr.",2.0 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 01:00:00+00:00,2007-08-05 03:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Displaced cement with rig pumps, 2440 lpm and 6.5 bar Increased displacement rate to 3000 lpm when cement entered annulus. Slowed down rate to 1200 lpm approx 3 m3 prior to bump. Recorded FCP 32 bar. Bumped plug with 187.7 m3 (8559 strokes) and pressured up to 103 bar. Bled back 870 ltr to cement unit and checked for back flow. Disconnected cement hose.",2.0 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 03:00:00+00:00,2007-08-05 04:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Sat seal assembly according to Vetco procedure by releasing over-pull and setting down 7-8 MT. Rotated landing string 4-41/2"" turns right-hand. Started pressure testing surface lines to 207 bar.",1.0 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 04:00:00+00:00,2007-08-05 05:30:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,Continue to set seal assembly according to Vetco procedure. Bled off pressure and opened upper rams. PU to 30 MT overpull and closed rams.,1.5 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 05:30:00+00:00,2007-08-05 06:00:00+00:00,2506.2,m,fixed,drilling -- casing,ok,success,"Tested MS seal assembly, 35 bar/345 bar 5min/15 min using cement unit. Volume pumped, 436 ltr.",0.5 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 06:00:00+00:00,2007-08-05 07:00:00+00:00,2505.0,m,fixed,drilling -- casing,ok,success,Reduced from 30 MT to 3 MT overpull. Rotated 4 turns to the right to release running tool. PU PADPRT and landing string. Removed lo-torque before RB cmt stand (2 x HWDP and cmt head).,1.0 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 07:00:00+00:00,2007-08-05 07:30:00+00:00,2505.0,m,fixed,drilling -- casing,ok,success,"Dropped 2 x sponge balls into HWDP. MU TDS and pumped 1.35 sg WBM at 3350 lpm, 29 bar.",0.5 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 07:30:00+00:00,2007-08-05 08:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH and LO PADPRT. Measured lead impression block. Cleared and cleaned rig floor.,1.0 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 08:30:00+00:00,2007-08-05 10:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MU jet sub, WB RT and wear bushing. RIH to 140 m. Installed wearbushing and POOH. Meanwhile RU gyro unit on rig floor.",2.0 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 10:30:00+00:00,2007-08-05 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Tested gyro downhole tools on rig floor. Meanwhile performed maintenace on TDS and PM's and house keeping.,3.0 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 13:30:00+00:00,2007-08-05 18:30:00+00:00,2470.0,m,wire line,workover -- wire line,ok,success,RIH with gyro from RKB to 2470 m MD. Performed gyro survey while POOH.,5.0 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 18:30:00+00:00,2007-08-05 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,LD tools and tested same. RD gyro unit and cleared rig floor.,2.5 +15_9_F_12_2007_08_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-05T00:00:00+02:00,2007-08-06T00:00:00+02:00,2007-08-05 21:00:00+00:00,2007-08-05 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,LO jet sub and wear bushing RT assembly. LO cement head assembly.,1.0 +15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-05 22:00:00+00:00,2007-08-05 22:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Continue LO cement head assembly.,0.5 +15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-05 22:30:00+00:00,2007-08-06 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Held tool box meeting prior to rigging up to pull diverter. Removed elevators and RU to pull diverter. Pulled diverter to rig floor. RU ""C"" spanner to bell nipple and undid nut. Removed seals and cleaned area. Found upper seal to be damaged. + +Meanwhile installed check valve and DCI hose on wellhead using ROV. Broke ROV handle on DCI hose.",5.5 +15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-06 04:00:00+00:00,2007-08-06 17:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Continued to work on leak in BOP slick joint. MU BOP mandrel to BOP. PU and ran diverter. Connected hydraulic hoses and overshot hose. Installed outer ring and master bushing. RD diverter handling equipment. + +Meanwhile RU slurry filter pump, performed maintenace and house keeping and prepared equipment for testing BOP.",13.0 +15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-06 17:00:00+00:00,2007-08-06 20:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Filled hole with 1.35 sg WBM and tested overshot seals. Closed shear ram and tested 14"" csg and shear ram 30/345 bar 5/15 min with cement unit. Pumped and bled back 3 m3. + +Meanwhile RD diverter handling equipment and RU 5 1/2"" DP handling equipment.",3.0 +15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-06 20:00:00+00:00,2007-08-06 21:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"MU and RIH with bull nose jetting tool and jetted BOP and wearbushing. Circulated 4000 lpm and 90 bar. Meanwhile located lead ""plug"" in kill line and removed same.",1.5 +15_9_F_12_2007_08_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-06T00:00:00+02:00,2007-08-07T00:00:00+02:00,2007-08-06 21:30:00+00:00,2007-08-06 22:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Picked up BOP test tool and space out assembly.,0.5 +15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-06 22:00:00+00:00,2007-08-06 23:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,RIH with BOP test tool and landed off.,1.0 +15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-06 23:00:00+00:00,2007-08-07 04:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP according to Mærsk procedure. Meanwhile changed out hose on PRS and continued housekeeping.,5.0 +15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-07 04:00:00+00:00,2007-08-07 05:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Continued pressure testing BOP according to Mærsk procedure. + +Meanwhile changed out hose on PRS and continued housekeeping.",1.0 +15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-07 05:00:00+00:00,2007-08-07 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RU chicksan and manifold for testing TDS and kelly hose. Flushed and tested TDS and kelly hose 35/345 bar 5/10 min. POOH with BOP test assembly. LO pup-joint, DP and test plug. Cleared and cleaned rig floor. + +Meanwhile changed out hose on PRS and continued housekeeping.",4.5 +15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-07 09:30:00+00:00,2007-08-07 21:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"Cleaned moonpool, BOP, all levels in wellhead and future equipment room. + +Meanwhile performed initial start-up of CRI and injection on 14"" x 20"" annulus. Formation fractured at 71 bar. Injection pressure leveled out at 110 bar with 1000 lpm seawater. Shut down pumps and pressure leveled out at 37.5 bar.",12.0 +15_9_F_12_2007_08_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-07T00:00:00+02:00,2007-08-08T00:00:00+02:00,2007-08-07 21:30:00+00:00,2007-08-07 22:00:00+00:00,9.0,m,fixed,drilling -- trip,ok,success,"Held tool box talk and started MU and RIH with 12 1/4"" BHA.",0.5 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-07 22:00:00+00:00,2007-08-08 04:00:00+00:00,324.0,m,fixed,drilling -- trip,ok,success,"MU and RIH with 12 1/4"" BHA from 9 to 324 m MD. Handled radioactive sources and installed 6 5/8"" Totco ring below 5 1/2"" HWDP. Weight below jar is 16 MT.",6.0 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 04:00:00+00:00,2007-08-08 06:30:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,"MU and RIH with 12 1/4"" BHA from 324 m to 1000 m MD.",2.5 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 06:30:00+00:00,2007-08-08 07:00:00+00:00,1000.0,m,fixed,drilling -- drill,ok,success,"MU TDS and tested downhole tools at 3500 lpm, 153 bar.",0.5 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 07:00:00+00:00,2007-08-08 08:00:00+00:00,1327.0,m,fixed,drilling -- drill,ok,success,"MU and RIH with 12 1/4"" BHA from 1000 m to 1327 m MD.",1.0 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 08:00:00+00:00,2007-08-08 09:30:00+00:00,1327.0,m,fixed,drilling -- drill,ok,equipment failure,Found trip tank displacement to be equal to metal displacement and not the calculated 646 l/std. Closed annular and pumped through lower kill to see if float was holding. Observed immediate pressure increase on DP side.,1.5 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 09:30:00+00:00,2007-08-08 10:00:00+00:00,1327.0,m,fixed,drilling -- drill,ok,equipment failure,Held tool box talk prior to POOH and change float. RU mud bucket.,0.5 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 10:00:00+00:00,2007-08-08 13:00:00+00:00,200.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 12 1/4"" BHA from 1327 m to 200 m MD to change float. Pumped slug when BHA at surface.",3.0 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 13:00:00+00:00,2007-08-08 13:30:00+00:00,200.0,m,fixed,drilling -- drill,ok,equipment failure,Removed auto slips and installed master bushings and inserts.,0.5 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 13:30:00+00:00,2007-08-08 17:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 12 1/4"" BHA from 200 m to surface. Removed radioactive source from ADN at 47 m.",3.5 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 17:00:00+00:00,2007-08-08 20:00:00+00:00,26.0,m,fixed,drilling -- drill,ok,equipment failure,"Held tool box talk with new crew. Broke off 12 1/4"" bit and LO powerdrive. PU and MU 12 1/4"" bit and backup powerdrive with pre-installed float. RIH with ADN to 26 m MD.",3.0 +15_9_F_12_2007_08_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-08T00:00:00+02:00,2007-08-09T00:00:00+02:00,2007-08-08 20:00:00+00:00,2007-08-08 22:00:00+00:00,26.0,m,fixed,drilling -- drill,ok,equipment failure,Inspected and evaluated damaged setting pistons on Stetho Scope. Decided to RIH with backup Stetho Scope.,2.0 +15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-08 22:00:00+00:00,2007-08-08 22:30:00+00:00,26.0,m,fixed,drilling -- drill,ok,equipment failure,PU and MU backup Stetho Scope.,0.5 +15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-08 22:30:00+00:00,2007-08-09 04:00:00+00:00,486.0,m,fixed,drilling -- drill,ok,equipment failure,"MU and RIH with 12 1/4"" BHA from 26 to 324 m MD. Programed sonic vision tool and loaded radioactive sources according to Schlumberger procedure. Weight below jar is 16 MT.",5.5 +15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-09 04:00:00+00:00,2007-08-09 06:30:00+00:00,1410.0,m,fixed,drilling -- drill,ok,equipment failure,"MU and RIH with 12 1/4"" BHA from 324 m to 1410 m MD. MU TDS and tested downhole tools at 3500 lpm, 148 bar at 1000 m.",2.5 +15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-09 06:30:00+00:00,2007-08-09 08:30:00+00:00,1410.0,m,fixed,drilling -- drill,ok,equipment failure,Observed incorrect displacement while RIH. Pumped at high flow rate in an attempt to free any debris inside float. Lined up to pump down kill line with annular closed to test float. Pumped down kill line with 30 bar and observed communication into drill string.,2.0 +15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-09 08:30:00+00:00,2007-08-09 11:00:00+00:00,200.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 12 1/4"" BHA from 1410 m to 200 m MD.",2.5 +15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-09 11:00:00+00:00,2007-08-09 15:00:00+00:00,143.0,m,fixed,drilling -- drill,ok,equipment failure,"Lined up to locate leakage in 12 1/4"" BHA. Tested drill string through kill line and observed pressure drop. Continued to POOH and tested each std via kill line for possible wash out. Found leakage in energizer. LD energizer and BO MWD tools due to battery life.",4.0 +15_9_F_12_2007_08_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-09T00:00:00+02:00,2007-08-10T00:00:00+02:00,2007-08-09 15:00:00+00:00,2007-08-09 22:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"POOH with 12 1/4"" BHA from 143 m to surface. LO jar and PU new jar. BO and LO MWD tools and downloaded radioactive sources. Unlatched battery on Stetho Scope.",7.0 +15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-09 22:00:00+00:00,2007-08-10 01:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held tool box meeting. Performed cut and slip of drill line.,3.0 +15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-10 01:00:00+00:00,2007-08-10 04:00:00+00:00,69.0,m,fixed,drilling -- drill,ok,equipment failure,"MU and RIH with 12 1/4"" BHA to 69 m MD.",3.0 +15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-10 04:00:00+00:00,2007-08-10 12:00:00+00:00,1327.0,m,fixed,drilling -- drill,ok,equipment failure,"MU and RIH with 12 1/4"" BHA from 69 m to 1327 m MD. Filled pipe every 10 stds. MU TDS and tested downhole tools at 3500 lpm, 168 bar at 1000 m.",8.0 +15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-10 12:00:00+00:00,2007-08-10 13:30:00+00:00,2450.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" BHA from 1327 m to 2450 m MD. Filled pipe every 10 stds.",1.5 +15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-10 13:30:00+00:00,2007-08-10 14:00:00+00:00,2477.0,m,fixed,drilling -- drill,ok,success,"Washed down from 2450 m and tagged cmt at 2477 m, 1000 lpm and 36 bar.",0.5 +15_9_F_12_2007_08_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-10T00:00:00+02:00,2007-08-11T00:00:00+02:00,2007-08-10 14:00:00+00:00,2007-08-10 22:00:00+00:00,2478.5,m,fixed,drilling -- drill,ok,success,"Drilled on float equipment from 2477 m to 2478.5 m with 1.35 sg WBM. Worked with drilling parameters, 1750-2500 lpm, 60-122 bar, 0-120 rpm, 0-27 kNm, 1-10 MT WOB. Lifted off bottom systematically while drilling float equipment to engage in float and to allow flushing below bit.",8.0 +15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-10 22:00:00+00:00,2007-08-11 02:00:00+00:00,2505.9,m,fixed,drilling -- drill,ok,success,"Drilled out shoe track and shoe with 1.35 sg WBM from previous section, 2490 lpm, 125 bar, 70 rpm, 16-29 kNm, 0-0.5 MT WOB. Started to see WOB (3-4 MT) from 2503.9 - 2505.9 m. Cleaned shoe track stepwise in 1-2 m steps. Spaced out with one single to have only one connection during cleaning of rate hole. Pulled through shoe track without rotation to verify no restrictions.",4.0 +15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 02:00:00+00:00,2007-08-11 04:00:00+00:00,2520.0,m,fixed,drilling -- drill,ok,success,"Cleaned out rathole from 2505.9 m to 2520 m with 1.35 sg WBM from previous section, 3340 lpm, 194-202 bar, 70 rpm, 25-29 kNm, 0.5-1 MT WOB, ECD 1.39. Cleaned rathole stepwise in 2-3 m steps. No bridge/ledge encountered when drilling out the section from 2512 to 2515 m where the casing couldn't pass.",2.0 +15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 04:00:00+00:00,2007-08-11 08:30:00+00:00,2573.0,m,fixed,drilling -- drill,ok,success,"Cleaned out rathole from 2520 m to 2573 m MD with 1.35 sg WBM from previous section, 3340 lpm, 200 bar, 70 rpm, 26-28 kNm, 0.5-1 MT WOB, ECD 1.39, ROP 20 m/hr. Up weight 195 MT/ down weight 160 MT.",4.5 +15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 08:30:00+00:00,2007-08-11 09:00:00+00:00,2576.0,m,fixed,drilling -- drill,ok,success,"Drilled new formation from 2572.5 m to 2576 m MD, 3600 lpm, 225 bar, 100 rpm, 29-33 kNm, 6 MT WOB, ECD 1.39, ROP 6 m/hr.",0.5 +15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 09:00:00+00:00,2007-08-11 11:00:00+00:00,2576.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated 1 1/2 btms up until shakers were clean. Mud weight stable at 1.38 sg.,2.0 +15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 11:00:00+00:00,2007-08-11 13:00:00+00:00,2576.0,m,fixed,drilling -- drill,ok,success,"RB 2 stds and one single to pull into 14"" shoe. Held tool box talk prior to FIT. Verified correct line up and performed line test, 50 bar/5 min. Performed FIT to 1.48 sg EMW. Pumped up a MWD survey to confirm FIT to 1.486 sg EMW. Meanwhile built stds of 5 1/2"" DP.",2.0 +15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 13:00:00+00:00,2007-08-11 17:15:00+00:00,2576.0,m,fixed,drilling -- circulating conditioning,ok,success,"RIH to bottom and observed no obstruction while RIH. Meanwhile held tool box meeting prior to displacement and confirmed line up. Displaced well to 1.35 sg OBM, 3600 lpm, 260 bar, 60 rpm, 22 kNm according to Baroids displacement plan. Filled sand traps and surface equipment with OBM and started to condition mud, 3340 lpm, 225 bar, 60 rpm. Up weight 180 MT/ down weight 145 MT. Meanwhile down linked MWD tools.",4.25 +15_9_F_12_2007_08_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-11T00:00:00+02:00,2007-08-12T00:00:00+02:00,2007-08-11 17:15:00+00:00,2007-08-11 22:00:00+00:00,2576.0,m,fixed,interruption -- repair,ok,equipment failure,"Trouble shot MWD transmission failure. Worked mud pumps at different rates and different configurations while rotated and resiprocated pipe. Bleed down and increased pressure on pulsation dampners, 300 psi/1100 psi. Closed one stand pipe. Managed to get good signal.",4.75 +15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-11 22:00:00+00:00,2007-08-11 23:15:00+00:00,2576.0,m,fixed,interruption -- repair,ok,equipment failure,Continued to trouble shoot MWD transmision failure. Down linked tool to 3 bit signal density. Started with bit on bottom and reduced pump rate to keep tool in sync. Got good signal with valid drilling parameters.,1.25 +15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-11 23:15:00+00:00,2007-08-12 02:15:00+00:00,2616.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2576 m to 2616 m MD with 1.35 sg OBM, 3340 lpm, 200 bar, 180 rpm, 30 kNm, 2-3 MT WOB, ECD 1.365, ROP 20-25 m/hr. Down linked and performed survey as required. PU off bottom and observed well for losses at 2607 m. Well was static.",3.0 +15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 02:15:00+00:00,2007-08-12 02:45:00+00:00,2616.0,m,fixed,interruption -- repair,ok,equipment failure,Lost signal from MWD tool on connection. Started with bit on bottom and reduced pump rate to keep tool in sync. Got good signal with valid drilling parameters.,0.5 +15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 02:45:00+00:00,2007-08-12 04:00:00+00:00,2640.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2616 m to 2640 m MD with 1.35 sg OBM, 3270 lpm, 189 bar, 180 rpm, 30 kNm, 2-3 MT WOB, ECD 1.37, ROP 20 m/hr. Down linked and performed survey as required.",1.25 +15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 04:00:00+00:00,2007-08-12 05:15:00+00:00,2647.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2640 m to 2647 m MD with 1.34 sg OBM, 3300 lpm, 202 bar, 180 rpm, 31-32 kNm, 0-1 MT WOB, ECD 1.37, ROP 5 m/hr. Down linked and performed survey as required.",1.25 +15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 05:15:00+00:00,2007-08-12 06:30:00+00:00,2647.0,m,fixed,interruption -- repair,ok,equipment failure,Reamed from 2646 m to 2610 m while MWD had signal loss.,1.25 +15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 06:30:00+00:00,2007-08-12 16:00:00+00:00,2740.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2647 m to 2740 m MD with 1.35 sg OBM, 3300-3500 lpm, 199-230 bar, 140-180 rpm, 28-44 kNm, 6-8 MT WOB, ECD 1.37, ROP 10-40 m/hr. Down linked and performed survey as required.",9.5 +15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 16:00:00+00:00,2007-08-12 17:00:00+00:00,2740.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean at 3600 lpm, 230 bar, 180 rpm prior to taking pressure points. Reciprocated string. Specified where to take pressure samples with Statoil geologist.",1.0 +15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 17:00:00+00:00,2007-08-12 20:30:00+00:00,2697.0,m,fixed,formation evaluation -- log,ok,success,"POOH and correlated into setting depth at 2697 m, 3425 lpm, 216 bar and no rotation. Down linked tool to 6 bit signal density. Took pressure reading with Stetho Scope at 2679,4 m according to Schlumberger instructions. Up weight 141 MT/down weight 142 MT. Pumped OOH after pressure reading from 2697 to 2640 m, 900 lpm, 21 bar, 90 rpm. Observed 10 MT overpull while POOH after pressure reading.",3.5 +15_9_F_12_2007_08_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-12T00:00:00+02:00,2007-08-13T00:00:00+02:00,2007-08-12 20:30:00+00:00,2007-08-12 22:00:00+00:00,2619.0,m,fixed,interruption -- repair,ok,equipment failure,"Had problems down linking to Stetho Scope. Made 3 attempts, recycled tool, down linked to sleep mode and back and worked with different flow rates before the tool took the command.",1.5 +15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-12 22:00:00+00:00,2007-08-12 23:00:00+00:00,2637.8,m,fixed,formation evaluation -- log,ok,success,POOH and correlated into setting depth at 2637.8 m and 2608.5 m. Took pressure readings with Stetho Scope at 2619.5 m and 2591 m according to Schlumberger instructions.,1.0 +15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-12 23:00:00+00:00,2007-08-13 00:00:00+00:00,2740.0,m,fixed,drilling -- drill,ok,success,"RIH with 12 1/4"" BHA to current TD. Down linked to MWD tools and set power drive.",1.0 +15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 00:00:00+00:00,2007-08-13 04:00:00+00:00,2766.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2740 m to 2766 m MD with 1.35 sg OBM, 3430-3565 lpm, 208-215 bar, 150 rpm, 22-40 kNm, 5-7 MT WOB, ECD 1.38, ROP 2-10 m/hr. Down linked and performed survey as required.",4.0 +15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 04:00:00+00:00,2007-08-13 05:30:00+00:00,2771.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2766 m to 2771 m MD with 1.35 sg OBM, 3390 lpm, 215 bar, 150 rpm, 22-40 kNm, 8 MT WOB, ECD 1.38, ROP 8 m/hr. Down linked and performed survey as required.",1.5 +15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 05:30:00+00:00,2007-08-13 10:30:00+00:00,2771.0,m,fixed,interruption -- other,ok,equipment failure,RB one std and repaired damaged die carriers on TDS.,5.0 +15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 10:30:00+00:00,2007-08-13 17:00:00+00:00,2811.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2771 m to 2811 m MD with 1.35 sg OBM, 3480-3560 lpm, 220-224 bar, 150-170 rpm, 18-45 kNm, 5-9 MT WOB, ECD 1.38, ROP 4-14 m/hr. Down linked and performed survey as required. Meanwhile built stds of 5"" DP in derrick with forward PRS.",6.5 +15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 17:00:00+00:00,2007-08-13 17:30:00+00:00,2811.0,m,fixed,interruption -- other,ok,equipment failure,Had problem with PRS ZMS system. Circulated while rectifying problem.,0.5 +15_9_F_12_2007_08_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-13T00:00:00+02:00,2007-08-14T00:00:00+02:00,2007-08-13 17:30:00+00:00,2007-08-13 22:00:00+00:00,2842.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2811 m to 2842 m MD with 1.35 sg OBM, 3560 lpm, 220-224 bar, 150 rpm, 30-37 kNm, 7-10 MT WOB, ECD 1.38, ROP 2-14 m/hr. Down linked and performed survey as required. Meanwhile built stds of 5"" DP in derrick with forward PRS.",4.5 +15_9_F_12_2007_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-14T00:00:00+02:00,2007-08-15T00:00:00+02:00,2007-08-13 22:00:00+00:00,2007-08-14 04:00:00+00:00,2872.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2842 m to 2872 m MD with 1.35 sg OBM, 3560 lpm, 220-224 bar, 150 rpm, 30-37 kNm, 7-10 MT WOB, ECD 1.38, ROP 2-9 m/hr. Down linked and performed survey as required. Meanwhile built stds of 5"" DP in derrick with forward PRS.",6.0 +15_9_F_12_2007_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-14T00:00:00+02:00,2007-08-15T00:00:00+02:00,2007-08-14 04:00:00+00:00,2007-08-14 17:45:00+00:00,2955.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2872 m to 2955 m MD with 1.35 sg OBM, 3560 lpm, 230-235 bar, 150 rpm, 20-45 kNm, 8-9 MT WOB, ECD 1.38-1.39, ROP 5-9 m/hr. Down linked and performed survey as required. Meanwhile built stds of 5"" DP in derrick with forward PRS.",13.75 +15_9_F_12_2007_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-14T00:00:00+02:00,2007-08-15T00:00:00+02:00,2007-08-14 17:45:00+00:00,2007-08-14 21:45:00+00:00,2963.0,m,fixed,interruption -- repair,ok,equipment failure,Trouble shot MWD transmission failure. Worked mud pumps at different rates and different configurations while rotated and resiprocated pipe. Down linked tool to 3 bit signal density. Started with bit on bottom and reduced pump rate to keep tool in sync. Got good signal with valid drilling parameters.,4.0 +15_9_F_12_2007_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-14T00:00:00+02:00,2007-08-15T00:00:00+02:00,2007-08-14 21:45:00+00:00,2007-08-14 22:00:00+00:00,2964.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2855 m to 2965 m MD with 1.35 sg OBM, 3430 lpm, 215 bar, 150 rpm, 20-45 kNm, 8-9 MT WOB, ECD 1.38-1.39, ROP 5-9 m/hr.",0.25 +15_9_F_12_2007_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-15T00:00:00+02:00,2007-08-16T00:00:00+02:00,2007-08-14 22:00:00+00:00,2007-08-14 22:15:00+00:00,2965.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2865 m to 2966 m MD with 1.35 sg OBM, 3430 lpm, 215 bar, 150 rpm, 20-45 kNm, 8-9 MT WOB, ECD 1.38-1.39, ROP 5-9 m/hr.",0.25 +15_9_F_12_2007_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-15T00:00:00+02:00,2007-08-16T00:00:00+02:00,2007-08-14 22:15:00+00:00,2007-08-15 01:15:00+00:00,2966.0,m,fixed,drilling -- drill,ok,equipment failure,Had black-out in Geoservices unit due to flooding. Cleaned up water and restarted system.,3.0 +15_9_F_12_2007_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-15T00:00:00+02:00,2007-08-16T00:00:00+02:00,2007-08-15 01:15:00+00:00,2007-08-15 04:00:00+00:00,2973.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2966 m to 2973 m MD with 1.35 sg OBM, 34300 lpm, 214-215 bar, 150 rpm, 25-36 kNm, 8-9 MT WOB, ECD 1.38-1.39, ROP 1-5 m/hr. Down linked and performed survey as required.",2.75 +15_9_F_12_2007_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-15T00:00:00+02:00,2007-08-16T00:00:00+02:00,2007-08-15 04:00:00+00:00,2007-08-15 21:15:00+00:00,3017.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2973 m to 3017 m MD, 3540 lpm, 223-239 bar, 140 rpm, 18-45 kNm, 7-10 MT WOB, ECD 1.38-1.40, ROP 1-4 m/hr. Increased mud weight to 1.40 sg OBM from 3000 m. Down linked and performed survey as required. Up weight 199 MT / Down weight 140 MT.",17.25 +15_9_F_12_2007_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-15T00:00:00+02:00,2007-08-16T00:00:00+02:00,2007-08-15 21:15:00+00:00,2007-08-15 22:00:00+00:00,3017.0,m,fixed,interruption -- other,ok,equipment failure,Wash pipe started leaking at 3017 m MD. Lined well up on trip tank. POOH to 3013 m and RB one std. Held tool box talk.,0.75 +15_9_F_12_2007_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-16T00:00:00+02:00,2007-08-17T00:00:00+02:00,2007-08-15 22:00:00+00:00,2007-08-16 00:15:00+00:00,3017.0,m,fixed,interruption -- other,ok,equipment failure,"Monitored well while MU swedge, TIW and cement hose and established circulation at 30 spm, 20 bar. Changed and pressure tested wash pipe with mud pump to 250 bar. RD cement hose, TIW and swedge.",2.25 +15_9_F_12_2007_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-16T00:00:00+02:00,2007-08-17T00:00:00+02:00,2007-08-16 00:15:00+00:00,2007-08-16 04:00:00+00:00,3030.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 3017 m to 3030 m MD with 1.40 sg OBM, 3540 lpm, 237-243 bar, 140 rpm, 10-45 kNm, 9-10 MT WOB, ECD 1.40-1.41, ROP 2-6 m/hr. Down linked and performed survey as required.",3.75 +15_9_F_12_2007_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-16T00:00:00+02:00,2007-08-17T00:00:00+02:00,2007-08-16 04:00:00+00:00,2007-08-16 22:00:00+00:00,3080.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12 1/4"" hole from 3030 m to 3080 m MD with 1.40 sg OBM, 3540 lpm, 239-241 bar, 140 rpm, 10-45 kNm, 7-10 MT WOB, ECD 1.40-1.41, ROP 2-5 m/hr. Down linked and performed survey as required.",18.0 +15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-16 22:00:00+00:00,2007-08-17 04:00:00+00:00,3110.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12 1/4"" hole from 3080 m to 3110 m MD with 1.40 sg OBM, 3540 lpm, 239-241 bar, 140 rpm, 10-45 kNm, 7-10 MT WOB, ECD 1.40-1.42, ROP 2-10 m/hr. Down linked and performed survey as required.",6.0 +15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 04:00:00+00:00,2007-08-17 04:30:00+00:00,3114.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 12 1/4"" hole from 3110 m to 3114 m MD, 10 meters past the Hot Shale. With 1.40 sg OBM, 3540 lpm, 239-241 bar, 140 rpm, 10-45 kNm, 7-10 MT WOB, ECD 1.41, ROP 2 m/hr. Down linked and performed survey as required.",0.5 +15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 04:30:00+00:00,2007-08-17 09:30:00+00:00,3113.0,m,fixed,drilling -- circulating conditioning,ok,success,"Pulled of bottom and circulated with 3540 lpm, 160 rpm, 10-28 kNm, reciprocated string. Meanwhile added LCM materials. Continued circulating well clean, racked back one stand for every second BU. Took up/down weight 200/142 MT static 165 MT. Recorded touque at 10 rpm 20 kNm and 20 rpm 18 kNm.",5.0 +15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 09:30:00+00:00,2007-08-17 10:45:00+00:00,2893.0,m,fixed,drilling -- trip,ok,success,POOH F/ 3113 m T/ 2893 wet. M/U TDS and pumped 5 m³ 1.6 SG slug and chased same with 4m³ OBM.,1.25 +15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 10:45:00+00:00,2007-08-17 12:45:00+00:00,2506.0,m,fixed,drilling -- trip,ok,success,"Continued POOH to 14"" shoe F/ 2893m T/ 2506 m, max drag of 10 MT. Flow checked for 15 min while rotating with 10 rpm.",2.0 +15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 12:45:00+00:00,2007-08-17 13:15:00+00:00,2405.0,m,fixed,drilling -- trip,ok,success,"POOH F/ 2506m T/ 2405m liner hanger setting depth. M/U TDS, took up/down weight 177/143 MT and 159 MT static stretch 0.5 m. Recorded torque at 10 rpm 10-12 kNm and 20 rpm 10-13 kNm. Dropped 2 3/4"" drift.",0.5 +15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 13:15:00+00:00,2007-08-17 19:15:00+00:00,234.0,m,fixed,drilling -- trip,ok,success,Continued POOH F/ 2405m T/ 234m.,6.0 +15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 19:15:00+00:00,2007-08-17 20:00:00+00:00,234.0,m,fixed,drilling -- trip,ok,success,Flow checked well with BHA below BOP. Meanwhile inspected aft PRS dies and replaced same. Well static.,0.75 +15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 20:00:00+00:00,2007-08-17 20:30:00+00:00,234.0,m,fixed,drilling -- trip,ok,success,"Pulled PR-21 auto slips and installed master bushing, cleared rig floor.",0.5 +15_9_F_12_2007_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-17T00:00:00+02:00,2007-08-18T00:00:00+02:00,2007-08-17 20:30:00+00:00,2007-08-17 22:00:00+00:00,200.0,m,fixed,drilling -- trip,ok,success,Commenced to POOH with BHA and L/O same.,1.5 +15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-17 22:00:00+00:00,2007-08-18 00:15:00+00:00,100.0,m,fixed,drilling -- trip,ok,success,"Continued L/O BHA, Held tool box talk prior to handing of Radio activ source. Unloaded radio activ source from tool.",2.25 +15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 00:15:00+00:00,2007-08-18 03:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Continued L/O BHA to pipe deck.,3.25 +15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 03:30:00+00:00,2007-08-18 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Commenced dumping data from the Sonic tool. Cleaned rig floor.,0.5 +15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 04:00:00+00:00,2007-08-18 07:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Continued dumping data from Sonic tool. Meanwhile performed general maintenance.,3.0 +15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 07:00:00+00:00,2007-08-18 07:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting with all involved personal prior to run 9 5/8"" liner.",0.25 +15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 07:15:00+00:00,2007-08-18 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U liner handling equipment, removed master bushing, installed FMS, installed 9 5/8"" inserts in BX elevators.",3.25 +15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 10:30:00+00:00,2007-08-18 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up shoe.,0.25 +15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 10:45:00+00:00,2007-08-18 11:45:00+00:00,38.0,m,fixed,drilling -- casing,ok,success,"P/U shoe, intermediate, and landing collar, made up same with Bakerlock.",1.0 +15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 11:45:00+00:00,2007-08-18 14:00:00+00:00,122.0,m,fixed,drilling -- casing,ok,success,"RIH with 9 5/8"" liner filling every single F/ 38m T/ 122m.",2.25 +15_9_F_12_2007_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-18T00:00:00+02:00,2007-08-19T00:00:00+02:00,2007-08-18 14:00:00+00:00,2007-08-18 22:00:00+00:00,2.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" liner filling every 5th joint F/122m T/ 651m.",8.0 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-18 22:00:00+00:00,2007-08-18 22:30:00+00:00,698.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" liner filling every 5th joint F/651m T/ 698m.",0.5 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-18 22:30:00+00:00,2007-08-18 23:15:00+00:00,698.0,m,fixed,drilling -- casing,ok,success,Removed FMS and installed master bushing.,0.75 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-18 23:15:00+00:00,2007-08-18 23:30:00+00:00,698.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick up Liner Hanger.,0.25 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-18 23:30:00+00:00,2007-08-19 01:00:00+00:00,712.0,m,fixed,drilling -- casing,ok,success,"Picked up Liner Hanger and made up same, as per Weatherford procedure.",1.5 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 01:00:00+00:00,2007-08-19 02:30:00+00:00,712.0,m,fixed,drilling -- casing,ok,success,Rig down casing tong and hydraulic hoses. Cleared rig floor. Installed PS-21 slips.,1.5 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 02:30:00+00:00,2007-08-19 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" Liner on 5½"" DP F/712m T/1033m.",1.5 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 04:00:00+00:00,2007-08-19 12:30:00+00:00,3069.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9 5/8"" Liner on 5½"" DP F/1033m T/3069m, filling every 5th std.",8.5 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 12:30:00+00:00,2007-08-19 13:15:00+00:00,3115.0,m,fixed,drilling -- casing,ok,success,"M/U to TDS and washed down F/3069 m T/ 3115m @ 500 lpm, 10 bars. Tagged bottom at 3115m, took up/down weight 210/145 MT static 156 MT.",0.75 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 13:15:00+00:00,2007-08-19 14:00:00+00:00,3115.0,m,fixed,drilling -- casing,ok,success,Racked back one stand. Made up cmt head and surface lines.,0.75 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 14:00:00+00:00,2007-08-19 14:45:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Commenced circulation of 1½ open hole volume, 1960 lpm @ 78 bar. Simultaneously held tool box talk prior to cmt job.",0.75 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 14:45:00+00:00,2007-08-19 16:00:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Dropped the ball and set the liner hanger according to Weatherford procedure. Liner hanger set at 2413m, top liner PBR at 2402m. Meanwhile tested cmt line to 345 bars 5 min.",1.25 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 16:00:00+00:00,2007-08-19 17:45:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Circulated 1 bottoms 2500 lpm, rotated string @ 20 rpm, torque 15-18 kNm.",1.75 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 17:45:00+00:00,2007-08-19 18:00:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,Pumped 20 m³ of 1.65 SG Tuned Spacer E+ with mud pumps 2500 lpm @ 80-50 bar.,0.25 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 18:00:00+00:00,2007-08-19 18:45:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,Lined up to cement unit. Released SSR dart. Started to mix the cement. Not able to add chemicals.,0.75 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 18:45:00+00:00,2007-08-19 20:45:00+00:00,3113.0,m,fixed,drilling -- casing,ok,equipment failure,Troubleshot and found no communication between chemical injection software and mixing pump. Through phone call to Halliburton in town it was possible to reboot the software system and continue the operation.,2.0 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 20:45:00+00:00,2007-08-19 21:30:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Cemented 9 5/8"" liner. Pumped 29.4m³ cement slurry 1.9 SG, 800 lpm @ 30-58 bar. Simultaneously rotated the liner during the cement job 20 rpm. torque 15-18 kNm. Displaced cement line to rig floor with fresh water. Closed Lo-torque valve on cement line. Bottom SSR plug sheared at 75 bar, after 28m³.",0.75 +15_9_F_12_2007_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-19T00:00:00+02:00,2007-08-20T00:00:00+02:00,2007-08-19 21:30:00+00:00,2007-08-19 22:00:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Displaced cement with 51.36 m³ (2341strokes) OBM at 2500 lpm, bumped plug, FCP 52 bar. Wiper plug sheared @ 1181 strokes and 250 bar. Rotated 20 rpm, final torque 20 kNm.",0.5 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-19 22:00:00+00:00,2007-08-19 22:30:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,"Applied 120 bar to plug, held for 5 min. Bled of pressure to the cmt unit, 700 l in returns.",0.5 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-19 22:30:00+00:00,2007-08-19 22:45:00+00:00,3113.0,m,fixed,drilling -- casing,ok,success,Set TSP packer according to Weatherford procedure up/down weight 160/135 MT,0.25 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-19 22:45:00+00:00,2007-08-19 23:30:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,"Pressured up to 40 bar, pulled running tool out of the PBR. Pumped 80 m³ of 1.4 SG OBM 2500 lpm.",0.75 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-19 23:30:00+00:00,2007-08-20 01:00:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,"Broked connection and dropped 2 Halliburton sponge balls, continued circulate hole clean with 2500 lpm @ 95 bars. Approx. 2 m³ cement in returns.",1.5 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 01:00:00+00:00,2007-08-20 01:30:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,"Flow checked well, static. Pumped 5m³ 1.60 SG slug.",0.5 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 01:30:00+00:00,2007-08-20 02:00:00+00:00,2422.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to L/O cmt head.,0.5 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 02:00:00+00:00,2007-08-20 03:30:00+00:00,1703.0,m,fixed,drilling -- casing,ok,success,POOH F/2422m T/1703m.,1.5 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 03:30:00+00:00,2007-08-20 04:00:00+00:00,1703.0,m,fixed,drilling -- casing,ok,success,Commenced breaking down cmt head.,0.5 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 04:00:00+00:00,2007-08-20 05:00:00+00:00,1703.0,m,fixed,drilling -- casing,ok,success,Continued L/O CMT head.,1.0 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 05:00:00+00:00,2007-08-20 05:15:00+00:00,1703.0,m,fixed,drilling -- casing,ok,success,"Held tool box meeting prior to POOH w/ 5½"" and TSP packer running tool.",0.25 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 05:15:00+00:00,2007-08-20 09:30:00+00:00,120.0,m,fixed,drilling -- casing,ok,success,"Continued POOH w/ 5½"" and TSP packer running tool F/1703m T120m",4.25 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 09:30:00+00:00,2007-08-20 09:45:00+00:00,120.0,m,fixed,drilling -- casing,ok,success,"Flow checked prior to pull BHA, well static.",0.25 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 09:45:00+00:00,2007-08-20 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH w/ TSP packer running tool and L/O same.,1.25 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 11:00:00+00:00,2007-08-20 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Cleared and cleaned rig floor. Made up bull nose jet sub, ran in and washed BOP, continued running in and washed Well head. Rotated string while washing 10-100 rpm, 2230-2500 lpm, 800-1200 Nm.",1.5 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 12:30:00+00:00,2007-08-20 13:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up and ran in with test plug and installed same in Well head.,0.75 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 13:15:00+00:00,2007-08-20 13:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Held tool box talk prior to commence BOP test.,0.25 +15_9_F_12_2007_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-20T00:00:00+02:00,2007-08-21T00:00:00+02:00,2007-08-20 13:30:00+00:00,2007-08-20 22:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Flushed through choke and kill lines to BOP. Commenced BOP test 25/345 bars 5/10 min.,8.5 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-20 22:00:00+00:00,2007-08-20 23:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"POOH and laid out test assy. Checked seals on test plug, found in perfect condition. Cleared rig floor.",1.75 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-20 23:45:00+00:00,2007-08-21 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to leak test well. Lined up and leak tested 9 5/8"" Liner and Liner Hanger 25/310 bars 5/10 min, w/ 1.4 SG OBM 4.3m³.",2.0 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 01:45:00+00:00,2007-08-21 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Bled of pressure through rig floor stand pipe manifold in stages. Total returns 3.75 m³.,1.25 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 03:00:00+00:00,2007-08-21 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"L/O 8 1/4"" DC's and jar. Simultaneously tested stand pipe 25/345 bars 5/10 mins.",1.0 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 04:00:00+00:00,2007-08-21 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued testing of the stand pipe 25/345 bars 5/10 mins. Tested Choke manifold 25/345 bars 5/10 mins,1.0 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 05:00:00+00:00,2007-08-21 05:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held tool box meeting prior to P/U 8½"" drill assy.",0.25 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 05:15:00+00:00,2007-08-21 07:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Commenced P/U 8½"" BHA. Simultaneously testing mainfold 25/345 bars 5/10 mins.",1.75 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 07:00:00+00:00,2007-08-21 07:15:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleared and cleaned rig floor.,0.25 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 07:15:00+00:00,2007-08-21 10:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,Changed out saver sub and torqued to 87 kNm.,2.75 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 10:00:00+00:00,2007-08-21 11:15:00+00:00,43.0,m,fixed,drilling -- trip,ok,success,"Continued P/U 8½"" BHA and RIH F/0 T/ 43m. Loaded radio active source into Ecoscope.",1.25 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 11:15:00+00:00,2007-08-21 13:30:00+00:00,120.0,m,fixed,drilling -- trip,ok,success,"Continued P/U 8½"" BHA and RIH F/43m T/ 120m. Changed out master bushing to PS-21 slips.",2.25 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 13:30:00+00:00,2007-08-21 15:15:00+00:00,935.0,m,fixed,drilling -- drill,ok,success,"RIH w/ 8½"" BHA on 5"" DP F/120m T/935m.",1.75 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 15:15:00+00:00,2007-08-21 15:45:00+00:00,935.0,m,fixed,drilling -- drill,ok,success,"M/U to TDS and filled the pipe, tested the MWD tool @ 1700 lpm, 76 spm, 101 bars.",0.5 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 15:45:00+00:00,2007-08-21 17:00:00+00:00,1342.0,m,fixed,drilling -- trip,ok,success,"Continued RIH w/ 8½"" BHA on 5"" DP F/935m T/1342m, M/U to TDS and filled the pipe.",1.25 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 17:00:00+00:00,2007-08-21 18:15:00+00:00,1342.0,m,fixed,drilling -- drill,ok,success,"Performed choke drill. Held tool box talk w/ night shift prior to RIH w/ 8½"" BHA on 5"" DP.",1.25 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 18:15:00+00:00,2007-08-21 19:15:00+00:00,1586.0,m,fixed,drilling -- drill,ok,success,"Continued RIH w/ 8½"" BHA on 5"" DP F/1341m T/1586m, M/U to TDS and filled the pipe.",1.0 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 19:15:00+00:00,2007-08-21 20:00:00+00:00,1586.0,m,fixed,drilling -- drill,ok,success,"Changed out surface handling equipment to run w/ 5½"" DP.",0.75 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 20:00:00+00:00,2007-08-21 21:45:00+00:00,1586.0,m,fixed,drilling -- trip,ok,equipment failure,"Trouble shot PS-21 slips, could not rectify problem in table, changed out slips to PS-30 slips.",1.75 +15_9_F_12_2007_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-21T00:00:00+02:00,2007-08-22T00:00:00+02:00,2007-08-21 21:45:00+00:00,2007-08-21 22:00:00+00:00,1646.0,m,fixed,drilling -- drill,ok,success,"Continued RIH w/ 8½"" BHA on 5½"" DP F/1586m T/1646m.",0.25 +15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-21 22:00:00+00:00,2007-08-22 02:00:00+00:00,3038.0,m,fixed,drilling -- drill,ok,success,"Continued RIH w/ 8½"" BHA on 5"" DP F/1646m T/3038m, filled pipe every 1000m.",4.0 +15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 02:00:00+00:00,2007-08-22 02:30:00+00:00,3080.0,m,fixed,drilling -- drill,ok,success,M/U to TDS and washed F/3038m T/ 3080m.,0.5 +15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 02:30:00+00:00,2007-08-22 03:00:00+00:00,3080.0,m,fixed,drilling -- drill,ok,success,Changed out PS-30 to manual master bushing.,0.5 +15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 03:00:00+00:00,2007-08-22 03:15:00+00:00,3086.0,m,fixed,drilling -- drill,ok,success,"Started to wash down, tagged TOC @ 3086m. Up/down weight 167/135 MT 162 static.",0.25 +15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 03:15:00+00:00,2007-08-22 06:45:00+00:00,3114.0,m,fixed,drilling -- casing,ok,success,"Commenced to drill out 9 5/8"" shoe track F/ 3086m. 50rpm, 2200 lpm, 12-16 kNm, weight RIH 147 MT.",3.5 +15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 06:45:00+00:00,2007-08-22 07:45:00+00:00,3116.0,m,fixed,drilling -- drill,ok,success,"Drillied new formation from 3114 m to 3116 m with 60 rpm, 2000 lpm, max 20 kNm, SPP 180 bar.",1.0 +15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 07:45:00+00:00,2007-08-22 10:30:00+00:00,3116.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated to condition the mud to 1.4 SG prior to perform FIT. 60rpm, 2200 lpm, 12-15 kNm, 180 bar.",2.75 +15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 10:30:00+00:00,2007-08-22 12:15:00+00:00,3105.0,m,fixed,drilling -- circulating conditioning,ok,success,"Lined up and pulled back into the shoe to 3105 m, closed annular. Performed FIT to 1.60 SG EMW, applied 56 bar to annulus and down DP w/ 1.40 SG OBM. Fluid pumped 780 ltr, fluid returned 740 ltr.",1.75 +15_9_F_12_2007_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-22T00:00:00+02:00,2007-08-23T00:00:00+02:00,2007-08-22 12:15:00+00:00,2007-08-22 22:00:00+00:00,3157.0,m,fixed,drilling -- drill,ok,success,"Drilled 8½"" hole from 3116 m to 3157 m . +Parameters: 2000-2200 lpm, 212 bar SPP 50-60 rpm, 13-19 KNm, 1-5 MT WOB, 2-6 m/hr ROP, 1.46 ECD.",9.75 +15_9_F_12_2007_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-23T00:00:00+02:00,2007-08-24T00:00:00+02:00,2007-08-22 22:00:00+00:00,2007-08-23 04:00:00+00:00,3200.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3157 m to 3200 m . +Parameters: 2000-2200 lpm, 210-211 bar SPP 60-130 rpm, 13-22 KNm, 1-5 MT WOB, 6-10 m/hr ROP, 1.46 ECD.",6.0 +15_9_F_12_2007_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-23T00:00:00+02:00,2007-08-24T00:00:00+02:00,2007-08-23 04:00:00+00:00,2007-08-23 22:00:00+00:00,3457.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3200 m to 3457 m . +Parameters: 2200 lpm, 208-215 bars SPP 130-140 rpm, 17-23 KNm, 3-8 MT WOB, 15-28 m/hr ROP, 1.46-1.47 ECD.",18.0 +15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-23 22:00:00+00:00,2007-08-23 23:00:00+00:00,3480.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3457 m to 3480 m . +Parameters: 2200 lpm, 208-215 bars SPP 130-140 rpm, 17-23 KNm, 3-8 MT WOB, 15-28 m/hr ROP, 1.46-1.47 ECD.",1.0 +15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-23 23:00:00+00:00,2007-08-23 23:30:00+00:00,3441.0,m,fixed,interruption -- maintain,ok,equipment failure,Wash pipe leaked. Pulled 1 stand up to 3441m and installed a pump in sub. Established circulation at 1900 lpm @ 205 bars. Had good returns over the shakers with cuttings.,0.5 +15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-23 23:30:00+00:00,2007-08-24 01:30:00+00:00,3480.0,m,fixed,interruption -- maintain,ok,equipment failure,Held tool box talk prior to change out wash pipe. Replaced wash pipe. M/U 1 stand of DP and established rotation at 60 rpm @ 1800 lpm and washed down to 3480m.,2.0 +15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-24 01:30:00+00:00,2007-08-24 03:45:00+00:00,3520.0,m,fixed,drilling -- drill,ok,success,"Continued drilling 8½"" hole from 3480 m to 3520 m . +Parameters: 2200 lpm, 214-217 bars SPP 140 rpm, 19-23 KNm, 3-6 MT WOB, 28 m/hr ROP, 1.47 ECD.",2.25 +15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-24 03:45:00+00:00,2007-08-24 04:00:00+00:00,3520.0,m,fixed,drilling -- circulating conditioning,ok,success,"Commenced circulating well clean reciprocating and rotating the string with 2200 lpm @ 160-180 RPM up, 1800 lpm @ 80 rpm down.",0.25 +15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-24 04:00:00+00:00,2007-08-24 09:00:00+00:00,3520.0,m,fixed,drilling -- circulating conditioning,ok,success,"Continued circulating the well clean while reciprocating and rotating the string, with 2200 lpm @ 160-180 RPM up, 1800 lpm @ 80 rpm down.",5.0 +15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-24 09:00:00+00:00,2007-08-24 12:00:00+00:00,3158.0,m,fixed,drilling -- trip,ok,success,"Flow checked well, well static. Simultaneously installed PS-21 auto slips & wiper rubber. +POOH pumping 700 lpm from 3520m to 3158m.",3.0 +15_9_F_12_2007_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-24T00:00:00+02:00,2007-08-25T00:00:00+02:00,2007-08-24 12:00:00+00:00,2007-08-24 22:00:00+00:00,3352.0,m,fixed,drilling -- trip,ok,success,Initiated Stethoscope and commenced taking pressure points according to Schlumberger procedure. Took 6 pressure points before midnight,10.0 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-24 22:00:00+00:00,2007-08-24 23:45:00+00:00,3430.0,m,fixed,drilling -- trip,ok,success,Continued taking pressure points according to Schlumberger procedure. Took 3 pressure points before Geoservices unit did shut down.,1.75 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-24 23:45:00+00:00,2007-08-25 01:15:00+00:00,3412.0,m,fixed,interruption -- repair,ok,equipment failure,Geoservices unit shut down due to activation of two gas detectors. The shut down was caused by water in one of the gas detectors. Re-booted the unit and the system.,1.5 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 01:15:00+00:00,2007-08-25 04:00:00+00:00,35.0,m,fixed,drilling -- trip,ok,success,Continued taking pressure points according to Schlumberger procedure. Took 6 pressure points.,2.75 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 04:00:00+00:00,2007-08-25 04:45:00+00:00,3517.0,m,fixed,drilling -- trip,ok,success,Continued taking pressure point according to Schlumberger procedure. Took 1 pressure point.,0.75 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 04:45:00+00:00,2007-08-25 05:00:00+00:00,3517.0,m,fixed,drilling -- trip,ok,success,Down linked MWD Stethoscope,0.25 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 05:00:00+00:00,2007-08-25 05:15:00+00:00,3517.0,m,fixed,drilling -- drill,ok,success,"Flow checked well, well static.",0.25 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 05:15:00+00:00,2007-08-25 08:15:00+00:00,3109.0,m,fixed,drilling -- drill,ok,success,"Commenced pump out of hole from 3517m to 3109m, 700 lpm 31bars. Up/down weight 167/134 MT. Monitored well static.",3.0 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 08:15:00+00:00,2007-08-25 09:30:00+00:00,3109.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated bottoms up 2200 lpm 210 bars. Meanwhile serviced rig equipment.,1.25 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 09:30:00+00:00,2007-08-25 09:45:00+00:00,3109.0,m,fixed,drilling -- drill,ok,success,"Dropped 2 3/4"" drift. Performed kick drill. Flow checked well, well static.",0.25 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 09:45:00+00:00,2007-08-25 10:45:00+00:00,2916.0,m,fixed,drilling -- drill,ok,success,"Continued POOH from 3109m (pulled 5 stds wet) to 3013m. Performed torque readings, 10 rpm 10.9 kNm, 15 rpm 11.7 kNM, 20 rpm 11.7 kNm, Weight of the string during rotation 147 MT. Took up/down weight 168/134 MT. Distance from neutral to up weight 0.6 m. Continued POOH wet from 3013m to 2916m.",1.0 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 10:45:00+00:00,2007-08-25 13:15:00+00:00,1748.0,m,fixed,drilling -- drill,ok,success,Made up to TDS and pumped 5m³ 1.6 SG slug. Continued POOH from 2916m to 1748m. Draw work brake unable to release.,2.5 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 13:15:00+00:00,2007-08-25 14:30:00+00:00,1748.0,m,fixed,interruption -- maintain,ok,equipment failure,Investigated problem with draw work brake.,1.25 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 14:30:00+00:00,2007-08-25 15:00:00+00:00,1586.0,m,fixed,drilling -- drill,ok,success,Continued POOH from 1748m to 1586m.,0.5 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 15:00:00+00:00,2007-08-25 18:00:00+00:00,130.0,m,fixed,drilling -- drill,ok,success,"Changed out to 5"" DP handling equipment. Continued POOH from 1586 to 130m. Rectified problem with draw work.",3.0 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 18:00:00+00:00,2007-08-25 18:30:00+00:00,130.0,m,fixed,drilling -- drill,ok,success,"Flow checked well, well static. Held tool box talk prior to L/O BHA.",0.5 +15_9_F_12_2007_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-25T00:00:00+02:00,2007-08-26T00:00:00+02:00,2007-08-25 18:30:00+00:00,2007-08-25 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Continued POOH w/ BHA and L/O same.,3.5 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-25 22:00:00+00:00,2007-08-25 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleaned and cleared rig floor. Function tested BOP.,1.0 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-25 23:00:00+00:00,2007-08-26 01:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to R/U 7"" liner handling equipment. R/U 7"" liner handling equipment.",2.75 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 01:45:00+00:00,2007-08-26 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to RIH w/ 7"" liner.",0.25 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 02:00:00+00:00,2007-08-26 04:00:00+00:00,63.0,m,fixed,drilling -- casing,ok,success,"P/U shoe, float, and landing collar. Made up same with Bakerlock. RIH w/ 7"" liner from 39m to 63m",2.0 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 04:00:00+00:00,2007-08-26 05:00:00+00:00,147.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/ 7"" liner from 63m to 147m, filling every 5th. joint.",1.0 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 05:00:00+00:00,2007-08-26 09:30:00+00:00,440.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk with day shift prior to RIH w/ 7"" liner. Continued RIH w/ 7"" liner from 147m to 440m, filling every 5th. joint. Problem M/U 7"" liner joints.",4.5 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 09:30:00+00:00,2007-08-26 12:00:00+00:00,487.0,m,fixed,drilling -- casing,ok,equipment failure,Laid out 4 joints due to damaged threads and replaced w/ the 3 back-up.,2.5 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 12:00:00+00:00,2007-08-26 13:30:00+00:00,487.0,m,fixed,drilling -- casing,ok,success,"Changed to 5½"" DP elevators. P/U hanger/TSP packer assembly and made up same as per Weatherford procedure. Removed 7"" FMS slips, installed master bushing. Filled PBR with Hi-visc mud. Took up/down weight 86/83 MT",1.5 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 13:30:00+00:00,2007-08-26 14:00:00+00:00,487.0,m,fixed,drilling -- casing,ok,success,"R/D Odfjell 7"" casing tong. Removed HTS rollers, cleared and cleaned rig floor.",0.5 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 14:00:00+00:00,2007-08-26 14:15:00+00:00,487.0,m,fixed,drilling -- casing,ok,success,"Held tool box prior to RIH w/ 7"" liner on 5½"" DP.",0.25 +15_9_F_12_2007_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-26T00:00:00+02:00,2007-08-27T00:00:00+02:00,2007-08-26 14:15:00+00:00,2007-08-26 22:00:00+00:00,3036.0,m,fixed,drilling -- casing,ok,success,"Installed PS-21 slips. Continued RIH w/ 7"" liner on 5½"" DP from 487m to 3036m, filling every 5th stand. Entered 9 5/8"" liner @ 2404m without any obstructions.",7.75 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-26 22:00:00+00:00,2007-08-27 00:15:00+00:00,3480.0,m,fixed,drilling -- casing,ok,success,"Continued RIH w/ 7"" liner on 5½"" DP from 3036m to 3480m, filling every 5th stand.",2.25 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 00:15:00+00:00,2007-08-27 01:15:00+00:00,3520.0,m,fixed,drilling -- casing,ok,success,"Established circulation @ 500 lpm 34 bars. Continued RIH washing down w/ 7"" liner on 5½"" DP from 3480m and tagged TD at 3520m. Down/up weigth 144/187 MT.",1.0 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 01:15:00+00:00,2007-08-27 01:30:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Racked back one stand. Made up 3m + 2m pup joints.,0.25 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 01:30:00+00:00,2007-08-27 02:00:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Made up cement head and connected up to TDS. Ran and tagged bottom to verify TD at 3520m. Set down 3 MT. Picked to 1 meter to 3519m.,0.5 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 02:00:00+00:00,2007-08-27 03:00:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Circulated 1½ open hole volume @ 1330 lpm 75 bars. Held pre-cement job meeting. Pressure tested cement line to Lo-torque valve at cement head.,1.0 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 03:00:00+00:00,2007-08-27 04:00:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Dropped ball and commenced setting the liner hanger according to Weatherford procedure.,1.0 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 04:00:00+00:00,2007-08-27 04:15:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,"Completed installation of the 7"" line hanger.",0.25 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 04:15:00+00:00,2007-08-27 05:30:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,"Circulated 1 bottoms up @ 2000 lpm, 151 bars, 20 rpm, 17-18 kNm.",1.25 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 05:30:00+00:00,2007-08-27 07:45:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,"Pumped 15 m³ of 1.65 SG Tuned Spacer E+ at 1500 lpm with the mud pumps. Closed Top Drive IBOP. Maintained 20 bar above IBOP. Dropped bottom DPD #1 dart, good indication with flag. +Pumped 12.7 m³ 1.90 SG cement slurry at 800 lpm, rotating the string 20 rpm 16-19 kNm. Displaced cement line to rig floor w/ 890 l fresh water. +Dropped DPD #2 dart for releasing wiper plug. Displace cement with 41.5 m³ (1893 strokes) OBM at 1500 lpm, 20 rpm string rotation. Had max 25 kNm . Wiper plug bumped @ 1893 stroks, applied 170 bars to Wiper plug for verification. Bled off pressure and checked for backflow. No losses during the entire cement job.",2.25 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 07:45:00+00:00,2007-08-27 08:00:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Installed TSP packer according to Weatherford procedure. Up/down weight 175/140 MT,0.25 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 08:00:00+00:00,2007-08-27 11:15:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,"Circulated well clean w/ 1.4 SG OBM @ 1700-2200 lpm, 62-102 bars, total pumped 353m³. Had spacer and cement in returns.",3.25 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 11:15:00+00:00,2007-08-27 11:30:00+00:00,3519.0,m,fixed,drilling -- casing,ok,success,Flow checked well. Well static. Meanwhile held tool box talk prior to L/O cement head.,0.25 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 11:30:00+00:00,2007-08-27 12:45:00+00:00,2980.0,m,fixed,drilling -- casing,ok,success,Released running tool. L/O cement head pup joints and racked back one stand.,1.25 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 12:45:00+00:00,2007-08-27 13:45:00+00:00,2980.0,m,fixed,drilling -- casing,ok,success,"Installed 2 spong balls, made up string to TDS and pumped down the spong balls with 32m³ (string volume)",1.0 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 13:45:00+00:00,2007-08-27 17:30:00+00:00,36.0,m,fixed,drilling -- casing,ok,success,"Pumped slug of 1.6 SG OBM. POOH w/ 7"" TSP packer running tool from 2980m to 36m.",3.75 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 17:30:00+00:00,2007-08-27 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Removed PS-21 slips and installed master bushing. Continued POOH w/ TSP packer running tool and L/O same.,0.75 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 18:15:00+00:00,2007-08-27 18:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleared & cleaned rig floor, checked dies in AFT PRS.",0.5 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 18:45:00+00:00,2007-08-27 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to pick BOP and WH clean out assy.,0.25 +15_9_F_12_2007_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-27T00:00:00+02:00,2007-08-28T00:00:00+02:00,2007-08-27 19:00:00+00:00,2007-08-27 22:00:00+00:00,330.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"M/U clean out assy. and RIH same to 330m. Positioned jet sub in WH at 138m and washed WH, Riser and BOP reciprocating the washing assy. across the specified areas. w/ 2500 lpm, 52 bars and 30 rpm.",3.0 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-27 22:00:00+00:00,2007-08-27 22:45:00+00:00,330.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued cleaning out the WH and BOP.,0.75 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-27 22:45:00+00:00,2007-08-27 23:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Laid out washing assy.,1.0 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-27 23:45:00+00:00,2007-08-28 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to change out handling equipment and picking up clean out assy.,0.25 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 00:00:00+00:00,2007-08-28 00:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Changed out handling equipment to 3 ½"", dies in AFT AR, BX elevators inserts and insert of the PS-21..",0.75 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 00:45:00+00:00,2007-08-28 04:00:00+00:00,280.0,m,fixed,drilling -- casing,ok,success,"M/U 7"" liner clean out assy. w/ 6"" bit and 7"" scaper. RIH on 3½"" DP from surface to 280m",3.25 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 04:00:00+00:00,2007-08-28 06:00:00+00:00,450.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with clean out assy. on 3½"" DP from 280 to 450m",2.0 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 06:00:00+00:00,2007-08-28 09:15:00+00:00,1062.0,m,fixed,drilling -- casing,ok,success,"Changed elevator inserts to 5"" DP. P/O 9 5/8"" Razor Back Scraper pick up weight 80 MT. Re-dressed PS-21 and Iron roughneck to 5"" DP. Removed HTS rollers. RIH with 5"" DP from 465m to 1062m.",3.25 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 09:15:00+00:00,2007-08-28 09:45:00+00:00,1062.0,m,fixed,drilling -- casing,ok,success,"Made up 4½"" IF to 5½"" FH X-O. M/U string to TDS, filled string prior to pressure testing of the 7"" liner.",0.5 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 09:45:00+00:00,2007-08-28 11:30:00+00:00,1062.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to pressure testing of the 7"" liner. Spaced out to middle pipe rams. Confirmed line up, leak tested line up to 310 bars 5 mins. Pressure tested 7"" liner pressuring up in increments to 310 bars, 10 mins.",1.75 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 11:30:00+00:00,2007-08-28 12:15:00+00:00,1062.0,m,fixed,drilling -- casing,ok,success,"Bled off pressure, had 4098 l in return. Broke out 4½"" IF to 5½"" FH X-O. Lined up to BOP.",0.75 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 12:15:00+00:00,2007-08-28 14:30:00+00:00,1121.0,m,fixed,drilling -- casing,ok,success,"P/U Tie Back Mill. Held tool box talk prior to change out 5"" handling equipment to 5½"" handling equipment. P/U MFCT, Razor Back Scraper. Re-dressed PS-21 slips and elevators to 5½"" DP. Checked flow rate/pressures. 58spm/103bars - 95spm/250bars.",2.25 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 14:30:00+00:00,2007-08-28 17:00:00+00:00,2008.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with Clean out assy. on 5½"" DP from 1121m to 2008m. Checked flow rate/pressures. 58spm/118bars - 95spm/247bars",2.5 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 17:00:00+00:00,2007-08-28 20:15:00+00:00,3017.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with Clean out assy. on 5½"" DP from 2008m to 3017m. Checked flow rate/pressures. 54spm(1240lpm)/104bars - 95spm(2101lpm)/254bars. Pumped 50m³ conditioned mud @ 106 spm, 2330 lpm 300 bars with 20 rpm 11 kNm. Took up/down weight 164/132 MT with pumps off.",3.25 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 20:15:00+00:00,2007-08-28 21:15:00+00:00,3132.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with Clean out assy. on 5½"" DP from 3017m to 3096m. M/U to TDS and scarped TCP gun hanger setting depth, from 3090m to 3125m with 100 spm, 300 bars, 40 rpm and 10-14 kNm. Rotation weight 147 MT.",1.0 +15_9_F_12_2007_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-28T00:00:00+02:00,2007-08-29T00:00:00+02:00,2007-08-28 21:15:00+00:00,2007-08-28 22:00:00+00:00,3420.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with Clean out assy. on 5½"" DP from 3132m to 3420m.",0.75 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-28 22:00:00+00:00,2007-08-28 23:00:00+00:00,3457.0,m,fixed,drilling -- casing,ok,success,"M/U to TDS, confirmed depth with tally. Pumped 1196 lpm / 120 bars, 2016 lpm / 260 bars and 2120 lpm / 289 bars, at 40 rpm. Scraped from 3427m to 3457m bit depth = 2970m to 3000m scraper depth. Up/Down weight 174/139 MT.",1.0 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-28 23:00:00+00:00,2007-08-28 23:30:00+00:00,3473.8,m,fixed,drilling -- casing,ok,success,"Continued RIH from 3457m and tagged top of 9 5/8"" PBR at 2405,5 m (3473.8m bit depth). Picked back rotated string at 50 rpm - 50 spm - 92 bars and 11-14 kNm. Slacked off slowly w/ 50 RPM with the Top Dress Mill assembly and set down 1-2 tonn on top of the PBR for a few minutes. Pulled out of the PBR with rotation.",0.5 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-28 23:30:00+00:00,2007-08-28 23:45:00+00:00,3468.0,m,fixed,drilling -- casing,ok,success,"Pulled bottom of polish mill 5 meter above liner top and reciprocated the string while conditioning the mud 40 rpm, 96 spm(2100lpm), 291 bars,",0.25 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-28 23:45:00+00:00,2007-08-29 02:45:00+00:00,3468.0,m,fixed,drilling -- casing,ok,success,"Sheared MFCT by setting down 24 MT on PBR with top dress mill. Opened the circulation ports. Established circulation of 191 spm(4200lpm) 230 bars, 40 rpm, 9 kNm kept 6.8 MT down weight.",3.0 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 02:45:00+00:00,2007-08-29 03:00:00+00:00,3468.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to clean out services lines.,0.25 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 03:00:00+00:00,2007-08-29 04:00:00+00:00,3468.0,m,fixed,drilling -- casing,ok,success,Commenced cleaning of surface equipment with Base oil then soap pil.,1.0 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 04:00:00+00:00,2007-08-29 10:15:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Continued cleaning of surface equipment. Meanwhile injected slops.,6.25 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 10:15:00+00:00,2007-08-29 10:45:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Filled sandtraps with base oil from pit # 10 & circulated through lines in shakers with base oil.,0.5 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 10:45:00+00:00,2007-08-29 13:00:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Mixed soap pill in pit # 10, flushed soap pill through all possible surface lines at maximum rate of 4000 lpm.",2.25 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 13:00:00+00:00,2007-08-29 17:00:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to prepare fluid used for well clean out. Prepared treated SW, pills and cleaned pits. Meanwhile closed bag and opened piperam. Pulled up +/- 1m to close MFCT.",4.0 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 17:00:00+00:00,2007-08-29 19:45:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Prepared seawater pre-mix prior to displacement.,2.75 +15_9_F_12_2007_08_30.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-29T00:00:00+02:00,2007-08-30T00:00:00+02:00,2007-08-29 19:45:00+00:00,2007-08-29 22:00:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Started displacing well with soap train to MFCT at 1000 lpm up chokeline. When pill at bit DP pressure reading:230 bars.,2.25 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-29 22:00:00+00:00,2007-08-29 23:15:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Continued displacing well with soap train to above MFCT at 1000 lpm, 230 bars constant DP pressure up choke line.",1.25 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-29 23:15:00+00:00,2007-08-29 23:30:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Stopped pumping. Closed in the well with 200 bars DP, 170 bars choke pressure. Opened MFCT setting down weight.",0.25 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-29 23:30:00+00:00,2007-08-30 01:00:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Circulated well at 2800 lpm, holding choke pressure constant at 170 bars. New DP pressure 270 bars. Continued circulating 2800 lpm 270 bars constant DP pressure w/ treated sea water",1.5 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 01:00:00+00:00,2007-08-30 01:30:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"Closed in well @ 80 bars when treated sea water at surface. Bled off the pressure from 80 bars in two steps to zero, prior to taking inflow test over the trip tank. Lined up to trip tank.",0.5 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 01:30:00+00:00,2007-08-30 02:45:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Inflow tested well over the trip tank for 30 mins. - OK,1.25 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 02:45:00+00:00,2007-08-30 04:00:00+00:00,3470.0,m,fixed,drilling -- casing,ok,success,Spaced out and closed pipe rams. Pressure tested well 20/345 bars 5/10 mins with treated sea water. Simultaneously mixing for displacing the well with treated sea water below 100 NTU,1.25 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 04:00:00+00:00,2007-08-30 05:15:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,Continued to clean surface lines. Prepared to pump TSW.,1.25 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 05:15:00+00:00,2007-08-30 08:00:00+00:00,3474.0,m,fixed,drilling -- casing,ok,success,"With MFCT in open position, pumped TSW at 3400 lpm / SPP 284 bar. Total volume pumped 365 m3. NTU reading levelled out at approx 150.",2.75 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 08:00:00+00:00,2007-08-30 09:00:00+00:00,3177.0,m,fixed,drilling -- casing,ok,success,"Closed MFCT. POOH with cleaning assembly on 5 1/2"" DP from 3474 m to 3177 m MD. Observed 12 mm locking nut falling from derrick, halted operation.",1.0 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 09:00:00+00:00,2007-08-30 10:00:00+00:00,3177.0,m,fixed,interruption -- other,ok,equipment failure,Performed FG inspection in derrick. Lock nut traced to clamp on ladder to crown block.,1.0 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 10:00:00+00:00,2007-08-30 13:30:00+00:00,1080.0,m,fixed,drilling -- casing,ok,success,"Continued to POOH with cleaning assembly on 5 1/2"" DP from 3177 m to 1080 m MD.",3.5 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 13:30:00+00:00,2007-08-30 14:00:00+00:00,1080.0,m,fixed,drilling -- casing,ok,success,"Changed from 5 1/2"" to 5"" handling equipment.",0.5 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 14:00:00+00:00,2007-08-30 14:30:00+00:00,1062.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down 14"" Razor back assy #5 and Tie-back/top dress mill assy #4.",0.5 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 14:30:00+00:00,2007-08-30 16:30:00+00:00,465.0,m,fixed,drilling -- casing,ok,success,"Continued to POOH on 5"" DP from 1062 m to 465 m MD. Changed inserts and jaws on IR to 3 1/2"" DP. Changed to 3 1/2"" inserts in elevator.",2.0 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 16:30:00+00:00,2007-08-30 17:00:00+00:00,465.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down 9 5/8"" Razor back assy #3.",0.5 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 17:00:00+00:00,2007-08-30 20:30:00+00:00,14.0,m,fixed,drilling -- casing,ok,success,"POOH with cleaning assy on 3 1/2"" DP from 465 m to 14 m MD.",3.5 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 20:30:00+00:00,2007-08-30 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down 7"" Razor back assy #2. Laid out assy #1, pup with 6"" bit. Changed to 5 1/2"" handling equipment.",1.0 +15_9_F_12_2007_08_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-30T00:00:00+02:00,2007-08-31T00:00:00+02:00,2007-08-30 21:30:00+00:00,2007-08-30 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Made up Wear Bushing Running and Retrieving Tool (WBRRT) to stand of 5 1/2"" HWDP. Checked tool.",0.5 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-30 22:00:00+00:00,2007-08-30 22:30:00+00:00,70.0,m,fixed,drilling -- casing,ok,success,"RIH with WBRRT on 5 1/2"" HWDP. Checked serial numbers of HWDP on way in. Found deviation in tally on joint #7 / std#2, serial number was incorrect compared to tally. Control measured joint and found a lenght deviation of 4,5 cm compared to tally.",0.5 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-30 22:30:00+00:00,2007-08-30 23:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,operation failed,"RIH with WBRRT on 5 1/2"" HWDP while measuring lenghts on all joints. Found several lenght deviations ranging from a few mm to mamximum 11 cm. Found one more wrong serial number.",1.0 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-30 23:30:00+00:00,2007-08-31 00:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Latched onto WB at 139,5 m MD and pulled same with 25 MT overpull. Broke circulation and washed across wellhead with 3000 lpm using TSW.",0.5 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 00:00:00+00:00,2007-08-31 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with WB/WBRRT on 5 1/2"" HWDP. Control measured 6 more 5 1/2"" HWDP joints on way out. Recalculated total tally with new measures and found a deviation of only 2 mm.",1.0 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 01:00:00+00:00,2007-08-31 03:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up casing tong, flush mounted spider and elevator for running 9 5/8"" x 10 3/4"" tie-back casing.",2.75 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 03:45:00+00:00,2007-08-31 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox meeting prior to start running 9 5/8"" x 10 3/4"" tie-back casing.",0.25 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 04:00:00+00:00,2007-08-31 14:45:00+00:00,798.0,m,fixed,drilling -- casing,ok,success,"Ran 9 5/8"" tie back casing to 798 m MD.",10.75 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 14:45:00+00:00,2007-08-31 15:45:00+00:00,798.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior changing elevator. Changed elevator from 9 5/8"" to 10 3/4"" BX3. +Found leakage on hydraulic fitting on 10 3/4"" BX3 elevator.",1.0 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 15:45:00+00:00,2007-08-31 16:30:00+00:00,798.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed hydraulic fitting and bolt head connection for return line on 10 3/4"" BX3 elevator.",0.75 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 16:30:00+00:00,2007-08-31 17:30:00+00:00,811.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 9 5/8"" x 10 3/4"" x-over. Changed slips segments in flush mounted spider. Hung off on x-over and installed casing swage on top of 10 3/4"" casing.",1.0 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 17:30:00+00:00,2007-08-31 20:30:00+00:00,811.0,m,fixed,interruption -- maintain,ok,success,Slip and cut drilline.,3.0 +15_9_F_12_2007_09_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-08-31T00:00:00+02:00,2007-09-01T00:00:00+02:00,2007-08-31 20:30:00+00:00,2007-08-31 22:00:00+00:00,811.0,m,fixed,interruption -- maintain,ok,success,Performed 6 monthly maintenance and inspection of crown block.,1.5 +15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-08-31 22:00:00+00:00,2007-08-31 22:45:00+00:00,811.0,m,fixed,interruption -- maintain,ok,success,Removed block hang off sling. Calibrated block.,0.75 +15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-08-31 22:45:00+00:00,2007-08-31 23:30:00+00:00,811.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to recommencing casing running. Broke off and laid down casing swage.,0.75 +15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-08-31 23:30:00+00:00,2007-09-01 04:00:00+00:00,1141.0,m,fixed,drilling -- casing,ok,success,"Continued to run 10 3/4"" casing from 811 m to 1141 m MD.",4.5 +15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 04:00:00+00:00,2007-09-01 16:30:00+00:00,2262.0,m,fixed,drilling -- casing,ok,success,"Ran 10 3/4"" tie-back casing from 1141 m to 2262 m MD. Average running speed 8 jnts/hr.",12.5 +15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 16:30:00+00:00,2007-09-01 17:00:00+00:00,2262.0,m,fixed,drilling -- casing,ok,success,"Changed from 10 3/4"" BX3 elevator to 5 1/2"" DP elevator.",0.5 +15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 17:00:00+00:00,2007-09-01 17:45:00+00:00,2262.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up 10 3/4"" casing hanger complete with isolation sleeve and PADPRT tool",0.75 +15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 17:45:00+00:00,2007-09-01 18:45:00+00:00,2262.0,m,fixed,drilling -- casing,ok,success,Removed spider from rotary and installed bushings. Removed casing tong.,1.0 +15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 18:45:00+00:00,2007-09-01 21:00:00+00:00,2393.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" casing/hanger on 5 1/2"" HWDP landing string. Strapped pipe on way in.",2.25 +15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 21:00:00+00:00,2007-09-01 21:30:00+00:00,2408.0,m,fixed,drilling -- casing,ok,success,"Made up TDS. Took up/down weights 253/199 MT. Pumped at 450 lpm while running in slowly with landing string. Observed pressure bulid up and lost returns at 2406,4 m MD indicating seals engaging 9 5/8"" liner sealbore. Stopped pumps. Observed stinger shroud shearing some 1,20 m further in and got hanger landing depth 0,8 m (total of 1.2+0.8=2m) further in at 2408,4 m MD.",0.5 +15_9_F_12_2007_09_02.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-01T00:00:00+02:00,2007-09-02T00:00:00+02:00,2007-09-01 21:30:00+00:00,2007-09-01 22:00:00+00:00,2408.0,m,fixed,drilling -- casing,ok,success,Performed low pressure test of stinger seals to 70 bar / 10 min - ok.,0.5 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-01 22:00:00+00:00,2007-09-01 23:00:00+00:00,2408.0,m,fixed,drilling -- casing,ok,success,"Marked pipe with 72 MT and 128 MT hookload. Applied 7 MT on PADPRT tool and rotated 4 1/4 turn clockwise to set tool. Pipe dropped 8,5"" as intended. Closed UPR.",1.0 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-01 23:00:00+00:00,2007-09-02 00:15:00+00:00,2408.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to setting MS seal. Pressured up to 207 bar with cement unit through kill line for 10 mins to set the MS seal. Volume pumped 272 liters.,1.25 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 00:15:00+00:00,2007-09-02 01:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,Opened UPR and pulled 50 MT above landing string weight to unset PADPRT tool. Pressure tested MS seal to 35/345 bar 5/10 mins. Volumed pumped 447 liters.,0.75 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 01:00:00+00:00,2007-09-02 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with PADRT tool on 5 1/2"" HWDP. Laid down PADPRT tool.",1.0 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 02:00:00+00:00,2007-09-02 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Closed shear ram and lined up to pressure up underneath with cement unit. Pressured up with cement unit to 345 bar. Pumped a total of 2630 liter on 1st attempt, good correlation with theoretical volume. Observed trendline which did not stabilize - steady drop observed at around 1 bar/min. Pressured up twice to 345 bar - same trend observed. Total volume pumped 2860 liters Attempted to bleed pressure back to cement unit - nogo, kill line blocked for unknown reason. Bled back to trip tank and recovered 2500 liters. Decided to re-attempt pressure test up cement line.",1.0 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 03:00:00+00:00,2007-09-02 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Lined up from cement unit pumping up cement line. Flushed through and performed line test to 345 bar - ok.,1.0 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 04:00:00+00:00,2007-09-02 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Troubleshot leakage in well. Pressured up on well to 345 bar from cement unit through cement line. Similar trendline observed with leakage rate of 0,5-1 bar/min. Pressured up on well twice more. Bled off pressure rapidly and lined back to cement unit. Pressure on cement unit rose from 2,8 bar to 7 bar over 2 hrs. Meanwhile discussed situation and way forward. Prepared for running MS seal retrieval tool.",3.0 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 07:00:00+00:00,2007-09-02 12:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up MS seal retirevel tool and inspected seals. RIH with retrieval tool on 5 1/2"" HWDP landing string as per Vetco procedure. Engaged tool by 1/2"" turn lefthand. Set down landing string weight of 10 MT instead of the intended 3 MT. Adjusted string weight and string jumped approx 0,3 m, got sudden gain in trip tank of approx 250 liter. Closed annular and pulled MS seal free with 10 MT overpull. POOH with retireval tool and MS seal on 5 1/2"" HWDP. Backed off MS seal, re-set running tool and laid down same.",5.0 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 12:00:00+00:00,2007-09-02 13:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Inspected MS seal and found scores on seal. Discussed situation. Prepared hanger jet and wash tool.,1.0 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 13:00:00+00:00,2007-09-02 17:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up and made ut Vetco jet and wash tool. RIH with tool on 5 1/2"" HWDP landing string. Tagged top of 10 3/4 casing hanger. Washed seal area, rotated with 3 rpm while pumping at 2200 lpm. POOH with jet and wash tool. Discussed way forward.",4.5 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 17:30:00+00:00,2007-09-02 19:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Prepared for running WBBRT w/10 3/4"" wearbushing. Picked up WBRRT, checked tool and installed 10 3/4"" wearbushing. RIH with tool WBRRT/wearbushing on 5 1/2"" HWDP landing string.",1.5 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 19:00:00+00:00,2007-09-02 20:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Set wearbushing at 140,2 m MD. POOH with WBRRT and laid down tool.",1.5 +15_9_F_12_2007_09_03.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-02T00:00:00+02:00,2007-09-03T00:00:00+02:00,2007-09-02 20:30:00+00:00,2007-09-02 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Hung off RTTS in rotary and made up to stand of 5 1/2"" HWDP. Installed automatic slips.",1.5 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-02 22:00:00+00:00,2007-09-03 01:00:00+00:00,1650.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 9 5/8"" RTTS on 5 1/2"" DP/HWDP to 1650 m MD.",3.0 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 01:00:00+00:00,2007-09-03 02:30:00+00:00,1650.0,m,fixed,drilling -- casing,ok,equipment failure,Took up/down weights 132/117 MT. Roateted string to set RTTS packer. Slacked of 30 MT on the running string and set packer at 1650 m MD. Lined up to pump from cement unit up cement line and standpipe. Closed standpipe valve and performed line test to 345 bar - ok.,1.5 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 02:30:00+00:00,2007-09-03 03:30:00+00:00,1650.0,m,fixed,drilling -- casing,ok,equipment failure,"Pressurised well below RTTS packer in 50 bar increments. Held each step for 10 mins. Good tests obtained at 50, 100, 150, 200, 250 bar - no gain in trip tank observed. Total volume pumped at 250 bar was 1129 liter.",1.0 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 03:30:00+00:00,2007-09-03 04:00:00+00:00,1650.0,m,fixed,drilling -- casing,ok,equipment failure,"At 300 bar leakage was observed, pressure dropped 7 bar / 10 min - also gained 40 liters in triptank over 10 mins. Volume pumped 1332 liter. Bled off pressure on well.",0.5 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 04:00:00+00:00,2007-09-03 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Released RTTS. POOH on 5 1/2"" DP/HWDP with RTTS. Removed automatic slips and master bushing. Laid down RTTS.",4.0 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 08:00:00+00:00,2007-09-03 10:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up WBRRT set in retrieval mode. RIH with WBRRT on 5 1/2"" HWDP landing string. Latched on to 10 3/4"" wearbushing at 140 m MD and pulled free with 40 MT overpull.",2.0 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 10:00:00+00:00,2007-09-03 11:15:00+00:00,2408.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up PADRT tool set in catch mode. RIH on 5 1/2"" HWDP landing string and latched on to 10 3/4"" hanger according to Vetco instructions.",1.25 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 11:15:00+00:00,2007-09-03 12:45:00+00:00,2268.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up with 255 MT hookload and POOH with 9 5/8"" x 10 3/4"" tie back casing on 5 1/2"" HWDP landing string. Removed master bushing.",1.5 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 12:45:00+00:00,2007-09-03 15:45:00+00:00,2268.0,m,fixed,drilling -- casing,ok,equipment failure,"Held toolbox talk prior to rigging 10 3/4"" casing handling equipment. Installed casing tong, BX3 elevator and spider.",3.0 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 15:45:00+00:00,2007-09-03 16:15:00+00:00,2265.0,m,fixed,drilling -- casing,ok,equipment failure,"Held toolbox talk prior to laying down 10 3/4"" casing hanger / casing. Broke and laid down hanger and PADRT tool.",0.5 +15_9_F_12_2007_09_04.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-03T00:00:00+02:00,2007-09-04T00:00:00+02:00,2007-09-03 16:15:00+00:00,2007-09-03 22:00:00+00:00,1670.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 10 3/4"" tie-back casing from 2265 m to 1670 m MD. Average pulling speed 11 jnts/hr.",5.75 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-03 22:00:00+00:00,2007-09-04 04:00:00+00:00,822.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 10 3/4"" casing from 1670 m to 822 m MD. Average pulling speed 13 jnts/hr.",6.0 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 04:00:00+00:00,2007-09-04 06:00:00+00:00,798.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued pulling 10 3/4"" casing from 822 m to 798 m MD. Hung off on x-over. Broke out and laid down 9 5/8"" x 10 3/4"" x-over. Changed to 9 5/8"" elevator.",2.0 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 06:00:00+00:00,2007-09-04 09:00:00+00:00,550.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with 9 5/8"" casing from 798 m to 550 m MD.",3.0 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 09:00:00+00:00,2007-09-04 09:15:00+00:00,550.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed dies in casing tong from 9 3/4"" to 9 5/8"" (arrived on boat).",0.25 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 09:15:00+00:00,2007-09-04 14:00:00+00:00,40.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued to POOH with 9 5/8"" casing from 550 m to 40 m MD.",4.75 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 14:00:00+00:00,2007-09-04 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Removed spider and installed master bushing. POOH from 40 m MD. Laid down seal stinger. Inspected seals, lower seals missing and significant damage to rest of seals.",1.0 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 15:00:00+00:00,2007-09-04 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Held tolbox talk prior to breaking back up TSP assembly. Cleared and tidied drillfloor. Changed to 5 1/2"" inserts in elevator.",0.5 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 15:30:00+00:00,2007-09-04 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up TSP assembly. Broke 9 5/8"" connection and installed by pass ball drop seat. Re-made 9 5/8"" connection and laid down tool on pipedeck.",2.0 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 17:30:00+00:00,2007-09-04 20:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up WBRRT. Broke out jet sub and configured tool for BOP testing. RIH with WBRRT and 14"" wearbushing on 5 1/2"" HWDP landing and set same in wellhead.",2.5 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 20:00:00+00:00,2007-09-04 20:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,Broke TDS connection and parked travelling block for maintenance.,0.5 +15_9_F_12_2007_09_05.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-04T00:00:00+02:00,2007-09-05T00:00:00+02:00,2007-09-04 20:30:00+00:00,2007-09-04 22:00:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP to 35/345 bar 5/10 min according to Mærsk USP.,1.5 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-04 22:00:00+00:00,2007-09-05 01:30:00+00:00,140.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOP to 35/345 bar 5/10 min according to Mærsk USP.,3.5 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 01:30:00+00:00,2007-09-05 02:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Released WBRRT and POOH with same on 5 1/2"" HWDP landing string. Re-set tool on surface. Laid down WBRRT on pipe deck. Meanwhile function tested shear ram.",1.25 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 02:45:00+00:00,2007-09-05 04:00:00+00:00,100.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up 9 5/8"" x 14"" TSP assembly with simultaneous lift on elevator and deck crane. Inspected seals. Hung off assy in rotary. Removed masterbushing and installed automatic slips. RIH with TSP on 5 1/2"" DP to 100 m MD.",1.25 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 04:00:00+00:00,2007-09-05 08:45:00+00:00,2397.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with TSP assy on 5 1/2"" DP from 100 m to 2397 m MD. Running speed limited to 2 mins/std.",4.75 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 08:45:00+00:00,2007-09-05 09:30:00+00:00,2412.0,m,fixed,drilling -- casing,ok,equipment failure,"Dropped 1 3/4"" aluminium ball. Took up/down weights 160/131 MT. Continued to RIH with TSP packer from 2397 m ti 2412 m MD. Applied 10 MT on TSP assy. Pressured up string to 230 bar / 440 lpm. Observed pressure for 5 mins. Increased pressure and observed shear at 268 bar.",0.75 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 09:30:00+00:00,2007-09-05 10:00:00+00:00,2408.0,m,fixed,drilling -- casing,ok,equipment failure,Pulled out 4 m and set packer by applying 40 MT on top of PBR. Adjusted weight to 10 MT. Verifed new top of PBR to 2398.05 m MD.,0.5 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 10:00:00+00:00,2007-09-05 10:30:00+00:00,2408.0,m,fixed,drilling -- casing,ok,equipment failure,"Closed UPR, lined up from cement unit to BOP, and pressure tested TSP packer and annulus to 180 bar - ok. Volumed pumped 1632 liters.",0.5 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 10:30:00+00:00,2007-09-05 10:45:00+00:00,2350.0,m,fixed,drilling -- casing,ok,equipment failure,"POOH with TSP setting tool on 5 1/2"" DP from 2408 to 2350 m MD. Observed hydraulic leak on aft PRS.",0.25 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 10:45:00+00:00,2007-09-05 11:45:00+00:00,2350.0,m,fixed,interruption -- other,ok,equipment failure,Repaired hydraulic leak on aft PRS.,1.0 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 11:45:00+00:00,2007-09-05 15:30:00+00:00,200.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued to POOH with TSP setting tool on 5 1/2"" DP from 2350 m to 200 m MD.",3.75 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 15:30:00+00:00,2007-09-05 16:00:00+00:00,200.0,m,fixed,drilling -- casing,ok,equipment failure,Held toolbox talk. Removed automatic slips from rotary.,0.5 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 16:00:00+00:00,2007-09-05 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Continued to POOH with TSP setting tool from 200 m MD to surface. Laid down tool in basket on main deck.,1.0 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 17:00:00+00:00,2007-09-05 19:00:00+00:00,140.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with WBRRT on 5 1/2"" HWDP landing string. Latched on to 14"" WB at 140 m MD and pulled free with 30 MT overpull. Washed across subsea wellhead with 3000 lpm. POOH with WB/WBRRT on 5 1/2"" HWDP landing string.",2.0 +15_9_F_12_2007_09_06.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-05T00:00:00+02:00,2007-09-06T00:00:00+02:00,2007-09-05 19:00:00+00:00,2007-09-05 22:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Laid down WBRRT. Installed swedge and tested IBOP valves on TDS and standpipe valve to 35/345 bar 5/10 mins. + +Meanwhile : +-Backloaded used casing. Loaded, tallied and laid out new casing in stb pipedeck bays. +-Repaired hydraulic hose on topdrive +-Tested valves on kill manifold to 35/345 bar 5/10 mins.",3.0 +15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-05 22:00:00+00:00,2007-09-06 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Rigged up casing OWS casing tong. Changed inserts in elevator. Redressed PS-21 slips. + +Meanwhile : +-Backloaded used casing. Loaded, tallied and laid out new casing in stb pipedeck bays.",3.0 +15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 01:00:00+00:00,2007-09-06 03:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Backloaded used casing. Loaded, tallied and laid out new casing in stb pipedeck bays. + +Meanwhile : +-Barriered off drillfloor and commenced service on forward PRS",2.5 +15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 03:30:00+00:00,2007-09-06 04:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Had to halt loading casing temporarily. Supply boat Island Frontier reported trouble which could affect station keeping. Boat pulled away temporarily.,0.5 +15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 04:00:00+00:00,2007-09-06 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Loaded, tallied and laid out new 10 3/4"" casing in aft stb/port bays. Produced running tally. Counted joints on deck. + +Meanwhile : +-Pressure tested choke manifold to 35/345 bar 5/10 mins +-Pressure tested TIW and gray valve to 35/345 bar 5/10 mins",8.0 +15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 12:00:00+00:00,2007-09-06 12:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Broke down TIW and Gray valve after pressure testing same.,0.5 +15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 12:30:00+00:00,2007-09-06 13:00:00+00:00,7.0,m,fixed,drilling -- casing,ok,equipment failure,"Held toolbox talk prior to running 9 5/8"" x 10 3/4"" tie-back casing. Picked up seal stem assy. Commenced to run in hole with 9 5/8"" casing. Got problem closing/functioning elevator. Halted operations to remedy situation.",0.5 +15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 13:00:00+00:00,2007-09-06 13:45:00+00:00,7.0,m,fixed,interruption -- other,ok,equipment failure,Changed hydraulic fitting on BX elevator.,0.75 +15_9_F_12_2007_09_07.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-06T00:00:00+02:00,2007-09-07T00:00:00+02:00,2007-09-06 13:45:00+00:00,2007-09-06 22:00:00+00:00,374.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 9 5/8"" tie-back casing from surface to 374 m MD. Observed high thread torque on several joints.Observed some dry boxes. Had to lay out joint #57, #52 and #48 due to 70% thread torque on JAM unit and damaged threads. Used contingency dope LubeSeal API mod as required on pin end after joint #48. Average running speed less 4 jnts/hr.",8.25 +15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-06 22:00:00+00:00,2007-09-07 04:00:00+00:00,798.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 9 5/8"" tie-back casing from 374 m to 798 m MD. Washed pin ends and applied contingency dope as required. Average running speed 6 jnts/hr.",6.0 +15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 04:00:00+00:00,2007-09-07 04:45:00+00:00,796.0,m,fixed,drilling -- casing,ok,equipment failure,"Changed to 10 3/4"" BX3 elevator. Picked up and made up 9 5/8"" x 10 3/4"" x-over.",0.75 +15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 04:45:00+00:00,2007-09-07 05:30:00+00:00,796.0,m,fixed,drilling -- casing,ok,equipment failure,"Held toolbox talk. Removed PS-21 slips and changed to 10 3/4"" inserts, put slips back in rotary. Repositioned rollers on HTS. Adjusted PDM head.",0.75 +15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 05:30:00+00:00,2007-09-07 12:45:00+00:00,1505.0,m,fixed,drilling -- casing,ok,equipment failure,"Held toolbox meeting prior to running 10 3/4"" tie-back casing. Ran 10 3/4"" casing from 796 m to 1505 m MD. Average running speed 8 jnts/hr. Experienced problems with HTS conveyer belt.",7.25 +15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 12:45:00+00:00,2007-09-07 14:30:00+00:00,1505.0,m,fixed,interruption -- other,ok,equipment failure,Repaired conveyer belt.,1.75 +15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 14:30:00+00:00,2007-09-07 18:00:00+00:00,1920.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued to run 10 3/4"" tie-back casing. Average running speed 10 jnts/hr. Monkey arm on HTS jammed in upper position.",3.5 +15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 18:00:00+00:00,2007-09-07 18:30:00+00:00,1920.0,m,fixed,interruption -- other,ok,equipment failure,Mærsk ET techican fixed problem on software.,0.5 +15_9_F_12_2007_09_08.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-07T00:00:00+02:00,2007-09-08T00:00:00+02:00,2007-09-07 18:30:00+00:00,2007-09-07 22:00:00+00:00,2253.0,m,fixed,drilling -- casing,ok,equipment failure,"Continued to run 10 3/4"" tie-back casing from 1920 m to 2253 m MD.",3.5 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-07 22:00:00+00:00,2007-09-08 00:15:00+00:00,2258.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up 6,05 m 10 3/4"" pup joint made up and RIH with same. Changed elveator. Picked up 10 3/4"" casing hanger, washed, inspected and doped threads. Made up 10 3/4"" casing hanger. Checked tally and counted joints left on deck - ok.",2.25 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 00:15:00+00:00,2007-09-08 01:30:00+00:00,2258.0,m,fixed,drilling -- casing,ok,equipment failure,Rigged down casing tong. Removed casing slips. Checked PADPRT tool.,1.25 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 01:30:00+00:00,2007-09-08 02:00:00+00:00,2385.0,m,fixed,drilling -- casing,ok,equipment failure,"RIH with 9 5/8"" x 10 3/4"" tie-back casing, hanger and PADPRT tool on 5 1/2"" HWDP landing string. Set depth counter at 2385 m MD. Took up and down weights 250/200 MT.",0.5 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 02:00:00+00:00,2007-09-08 02:30:00+00:00,2402.0,m,fixed,drilling -- casing,ok,equipment failure,"Brought pumps up to 350 lpm and ran in hole with tie-back casing. Observed pressure increase and loosing weight at 2399 m MD. Stung approx 1 m further in and PBR locator in sealstem sheard out. Total sting in 2,7 m. Landed hanger at 140,1 m MD as per Vetco datum.",0.5 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 02:30:00+00:00,2007-09-08 03:15:00+00:00,2402.0,m,fixed,drilling -- casing,ok,equipment failure,Lined up to pump from cement unit up kill line through TDS. Performed low pressure test on sealstinger to 70 bar/10 min - ok. Recorded on chart.,0.75 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 03:15:00+00:00,2007-09-08 04:00:00+00:00,2402.0,m,fixed,drilling -- casing,ok,equipment failure,"Adjusted block weight to 73 MT. Rotated string 4 turns clockwise to activate PADPRT tool, observed 8,5"" drop as intended. Closed UPR and pressured up above PADRT tool to 207 bar to set MS seal - ok.",0.75 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 04:00:00+00:00,2007-09-08 05:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"With UPR closed, pressure tested MS seal from above to 35/345 bar 5 /10 min - ok. Released PADPRT tool according to Vetco instructions and POOH with same on 5 1/2"" HWDP landing string.",1.5 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 05:30:00+00:00,2007-09-08 06:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Flushed lines. Closed Shear ram. Pressure tested 9 5/8"" x 10 3/4"" tie-back casing and sealstem/PBR to 35/345 bar 5/10 min - ok. Pumped and bled back a total of 2637 liter, good correspondance with theoretical volume.",1.25 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 06:45:00+00:00,2007-09-08 08:30:00+00:00,140.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" lock down sub and RIH on 5 1/2"" HWDP landing string to 140 m. Set same according to Vetco instruction. Closed UPR and pressure tested lock down sub to 345 bar/10 min.",1.75 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 08:30:00+00:00,2007-09-08 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with RT on 5 1/2"" HWDP landing string.",1.0 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 09:30:00+00:00,2007-09-08 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Tidied drillfloor and removed casing running equipment for backload.,0.25 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 09:45:00+00:00,2007-09-08 10:30:00+00:00,200.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk. Picked up special 9,567"" casing drift and RIH with same on 5 1/2"" DP to 200 m MD.",0.75 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 10:30:00+00:00,2007-09-08 15:15:00+00:00,1590.0,m,fixed,drilling -- casing,ok,success,"Installed automatic slip. RIH with drift on 5 1/2"" DP and drifted well down to 1590 m MD. Observed 1-3 MT drag from 1439 m to 1536 m MD.",4.75 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 15:15:00+00:00,2007-09-08 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with casing drift on 5 1/2"" DP and laid down same.",2.75 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 18:00:00+00:00,2007-09-08 18:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Built stand of 5 1/2"" HWDP.",0.75 +15_9_F_12_2007_09_09.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-08T00:00:00+02:00,2007-09-09T00:00:00+02:00,2007-09-08 18:45:00+00:00,2007-09-08 22:00:00+00:00,642.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" GTV plug assembly. RIH with GTV plug on 5 1/2"" HWDP/DP to 641 m MD. Measured 2 stands while running in. Took up/down weights 102/98 MT. Set GTV plug by applying clockwise rotation and alernating up down loads. Plug setting depth 641 m MD (mid packer element).",3.25 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-08 22:00:00+00:00,2007-09-09 00:30:00+00:00,642.0,m,fixed,drilling -- casing,ok,success,Lined up from cement unit and performed line test to 345 bar/10 min - ok. Pressured up below GTV plug through DP and tested to 345 bar/10 min. Pumped 2150 liter with good correpsondance to theroretical volume. Recovered only 1800 liter. Discussed situation. Decided to move ahead with operations.,2.5 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 00:30:00+00:00,2007-09-09 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Released from GTV plug and pumped 10 m3 hi-vis on top of plug. POOH with GTV plug setting tool on 5 1/2"" HWDP/DP. Laid down setting tool.",1.5 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 02:00:00+00:00,2007-09-09 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Closed shear ram and lined up cement unit to pump in BOP. Pressure tested above GTV plug to 345 bar / 10 min - ok. Volume pumped / bled back 863/830 liters.,0.5 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 02:30:00+00:00,2007-09-09 03:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up stand of drillpipe. Emptied BOP for water by blowing air down the DP.,0.75 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 03:15:00+00:00,2007-09-09 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed elevator and prepared slings for pulling diverter.,0.75 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 04:00:00+00:00,2007-09-09 04:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued preparing for releasing and pulling diverter.,0.75 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 04:45:00+00:00,2007-09-09 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to pulling diverter.,0.25 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 05:00:00+00:00,2007-09-09 09:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attempted to pull diverter - nogo - stuck in diverter housing. Removed lid to access lock dogs. Inspected locks and found chunks of metal in cavities, verified lock dogs free to move. Adjusted elevation. Worked diverter up and down. Diverter came free. Lifted out and set down on drillfloor.",4.5 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 09:30:00+00:00,2007-09-09 10:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleared drillfloor. Transferred Claxton tool to drillfloor.,0.5 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 10:00:00+00:00,2007-09-09 10:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox meeting prior to nippling BOP overshot. Meanwhile worked on FWD PRS.,0.25 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 10:15:00+00:00,2007-09-09 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attempted to release lock ring on overshot. Used, C-spanner, chain hoists slings",4.75 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 15:00:00+00:00,2007-09-09 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Sourced torque tool for relasing flange on top of annular BOP instead of lock ring. Attempted to break bolts on flange - negative. Reverted to plan for releasing lock ring. Meanwhile reinforced C-spanners in mechanical workshop and continued work on PRS.,1.0 +15_9_F_12_2007_09_10.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-09T00:00:00+02:00,2007-09-10T00:00:00+02:00,2007-09-09 16:00:00+00:00,2007-09-09 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Worked to release overshot lock ring. Used C-spanner, chain hoists and slings. Meanwhile worked on FWD PRS.",6.0 +15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-09 22:00:00+00:00,2007-09-10 01:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Worked to release overshot lock ring. Used C-spanner, chain hoist. Rigged up eagle clamp and sheave. Pulled on lock ring C-spanner with tugger. Lock ring came free and was unscrewed by hand. Total thight turns approx 2,5. Meanwhile worked on FWD PRS.",3.5 +15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 01:30:00+00:00,2007-09-10 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed tools and slings from BOP. Attached sling to overshot and lifted same to drillfloor with tugger. Installed masterbushing, bushings and hole cover.",1.5 +15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 03:00:00+00:00,2007-09-10 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for skidding BOP. Released NT-2 connector and removed obstacles in moonpool. Cleared and tidied drillfloor.,1.0 +15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 04:00:00+00:00,2007-09-10 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Continued nippling down BOP. Prepared for skidding BOP. Got problems with hydraulics on BOP trolley.,0.5 +15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 04:30:00+00:00,2007-09-10 05:15:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Troubleshot problems with BOP trolley.,0.75 +15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 05:15:00+00:00,2007-09-10 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Skidded BOP on trolley and landed same on test stump.,0.75 +15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 06:00:00+00:00,2007-09-10 06:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Helt toolbox talk prior to running Claxton tool.,0.25 +15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 06:15:00+00:00,2007-09-10 08:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up Claxton tool and made up to stand of 5 1/2"" HWDP.",2.0 +15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 08:15:00+00:00,2007-09-10 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held toolbox talk. Landed Claxton tool i NT-2 connector on HPDR. Made up Claxton tool to NT-2 with Hytorq tool. Applied 2700 ft lbs on studs. + +Weather at 1430 : +Wind 19 m /s +Hs 3,8 / max 7,5",4.25 +15_9_F_12_2007_09_11.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-10T00:00:00+02:00,2007-09-11T00:00:00+02:00,2007-09-10 12:30:00+00:00,2007-09-10 22:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Watied on weather. Meanwhile worked on PRS.,9.5 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-10 22:00:00+00:00,2007-09-10 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Watied on weather. Meanwhile prepared for tranferring tension to block. Removed scaffolding and secured hatches on Centralizer deck. + +Weather at 0100 : +Wind 9,7 m /s +Hs 2,8 / max 4,1",1.0 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-10 23:00:00+00:00,2007-09-11 00:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held prejob meeting on Centralizer deck. Bled off pressure on tension cylinders and transferred 60 MT tension to block. Disconnected tension cylinder 1 and 3. Landed tensioner assembly on wooden chucks.,1.0 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 00:00:00+00:00,2007-09-11 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Disconnected cylinder 2 and 4 from tensioner assembly. Dismantled tensioner assembly. Removed tension ring. Removed boat collision stool and centralizer. Installed protector guides on Centralizer deck and landed tension ring in same. Installed protector guide on Tensioning deck. Meanwhile deployed hotstab on tuggerline through slot F-1. Engaged hotstab in hydraulic receptacle on TBC. + +Weather at 0600 : +Wind 6,7 m /s +Hs 2,2 / max 3,4",4.0 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 04:00:00+00:00,2007-09-11 04:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed scaffolding on Weatherdeck due to potential clash with HPDR riser. Tidied Centralizer deck.,0.75 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 04:45:00+00:00,2007-09-11 05:45:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather.,1.0 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 05:45:00+00:00,2007-09-11 06:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to disconnecting HPDR from wellhead.,0.5 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 06:15:00+00:00,2007-09-11 07:30:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Set valves on HPDR TBC. Set down weight to 55 MT. Pressurised primary unlock on TBC through minireel and hotstab. Lifted clear of wellhead/template in one continuos stroke. Hung of on handling sub, broke off and set back 5 1/2"" DP stand. No VX-ring observed on wellhead - assumed still contained in TBC.",1.25 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 07:30:00+00:00,2007-09-11 07:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior installing riser spider.,0.25 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 07:45:00+00:00,2007-09-11 08:45:00+00:00,140.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed bushings. Installed riser spider.,1.0 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 08:45:00+00:00,2007-09-11 11:00:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with Tension joint and BOP joint double. Hung off in riser spider. Broke connection according to Vetco/Bandak procedure. Attached soft sling. Observed damage on soft slings. Halted operation to assess situation.,2.25 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 11:00:00+00:00,2007-09-11 14:00:00+00:00,121.0,m,fixed,interruption -- other,ok,equipment failure,Inspected and rejected both soft sling. Searched for alternative slings - none onboard with sufficient SWL/lenght.,3.0 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 14:00:00+00:00,2007-09-11 16:00:00+00:00,121.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Slung Tension joint with 50 mm steel sling. Lifted same from drillfloor using deck crane. Laid down Tension joint in make up cradle on pipedeck.,2.0 +15_9_F_12_2007_09_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-11T00:00:00+02:00,2007-09-12T00:00:00+02:00,2007-09-11 16:00:00+00:00,2007-09-11 22:00:00+00:00,56.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH with 22"" HPDR. Removed fairrings while pulling out. Broke connections according to Vetco/Bandak procedure. Laid down doubles in port side storage rack.",6.0 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-11 22:00:00+00:00,2007-09-12 00:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Broke last connection between last doble and TBC joint. Laid out last double and put in port side storage rack. Pulled TBC joint. Inspected lock cavity on TBC, no VX-ring recovered. Slung TBC joint with heavy lift sling and laid down same on pipedeck. Secured rotary. Tidied drillfloor.",2.5 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 00:00:00+00:00,2007-09-12 00:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Brought 4 tension cylinder to drillfloor. Prepared for mounting cherry picker.,0.5 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 01:00:00+00:00,2007-09-12 02:00:00+00:00,0.0,m,fixed,drilling -- wait,ok,success,Not allowed access in wellhead module due to ongoing pressure testing on gas lift system. Discussed situation and adjusted barriers accordingly. Meanwhile mounted cherry picker on drillfloor.,1.0 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 02:00:00+00:00,2007-09-12 02:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Transferred 4 tension cylinders from drillfloor to Tensioning deck. Meanwhile mounted cherry picker on drillfloor.,0.5 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 02:30:00+00:00,2007-09-12 04:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Dismounted/mounted cylinders on Centralizer deck with tugger support from moonpool. Meanwhile mounted cherry picker on drillfloor.,1.5 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 04:00:00+00:00,2007-09-12 11:00:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Continued to dismount/mount tension cylinders in Tensioning deck roof. Used tugger support from moonpool for lifting cylinders.,7.0 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 11:00:00+00:00,2007-09-12 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for running production riser. Made up Tension joint handling tool to 6 m pup joint. Configured riser spider for running production riser. Prepared tension ring and protector guide in wellhead module.,1.5 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 12:30:00+00:00,2007-09-12 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed SJA / toolbox talk prior to running production riser.,0.5 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 13:00:00+00:00,2007-09-12 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up TBC joint and hung off in spider. Removed handling tool. Picked up lower pup joint and landed same on TBC joint. Made up flanged connection according to Vetco/bandak procedure. Installed fairring accross connection.,2.0 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 15:00:00+00:00,2007-09-12 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Placed TBC in in level with scaffolding on Weatherdeck. Function tested TBC according to Vetco instruction. Installed dummy stabs. Oriented lock/unlock panel to 45 deg starboard aft.,4.0 +15_9_F_12_2007_09_13.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-12T00:00:00+02:00,2007-09-13T00:00:00+02:00,2007-09-12 19:00:00+00:00,2007-09-12 22:00:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed handling tool on production riser flange in riser spider. Lifted 1st double with dual lift on block and deckcrane. Made up flanged connection according to Vetco/Bandak procedure. Installed fairring on coupling. Ran in and placed TBC connector in level with Centralizer deck. Prepared guidewires in slot F-11 and F-13. Built scaffolding/barriers around deck openings.,3.0 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-12 22:00:00+00:00,2007-09-12 23:00:00+00:00,52.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Attached ROV hooks to guide slings. Made rope loop for retrieval of ROV hooks and guide sling clamp. Hauled guidewires with ROV hooks through Centralizer deck, ran to sealevel. Landed 1 st double in riser spider. Ran guidewires individually to 20 m above seabed.",1.0 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-12 23:00:00+00:00,2007-09-13 01:00:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed handling tool. Lifted 2nd double to drillfloor with dual lift on block and deck crane. Made up flanged connection according to Vetco/Bandak procedure. RIH with 2nd double. Meanwhile hooked up hydraulics on tension cylinders.,2.0 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 01:00:00+00:00,2007-09-13 03:15:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted 3rd double to drillfloor with dual lift on block an deck crane. Removed handling joint. Made up flanged connection according to Vetco procedure. Meanwhile hooked up hydraulics on tension cylinders.,2.25 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 03:15:00+00:00,2007-09-13 04:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted tension joint to Horizontal position. Hoisted handling flange with 6 m pup joint to horizontal posistion with tuggers and made up to tension joint. RIH with 3rd double and landed in spider. Prepared for lifting tension joint to vertical position.,0.75 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 04:00:00+00:00,2007-09-13 07:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lifted tension joint to vertical position and MU tension joint flange to upper pup joint.,3.0 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 07:00:00+00:00,2007-09-13 08:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Split riser spider and removed same.,1.0 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 08:00:00+00:00,2007-09-13 09:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH with tension joint and installed master bushing. MU 5 1/2"" landing stand to handling sub.",1.0 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 09:00:00+00:00,2007-09-13 09:30:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared ROV to assist landing of PR. Verified that the VX-ring had been installed and checked F-12 well head.,0.5 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 09:30:00+00:00,2007-09-13 11:00:00+00:00,100.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed guidewires and lined up to 18 3/4"" sub sea WH. Hook load prior to landing was 97 MT.",1.5 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 11:00:00+00:00,2007-09-13 12:15:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Installed hot stab in receptacle A and set valves on TBC locking panel to ""primary lock"" position using ROV. Landed TBC on 18 3/4"" WH and sat down 15 MT.",1.25 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 12:15:00+00:00,2007-09-13 13:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared to set TBC according to Vetco procedures. Pressurized the TBC to 2500 psi using pump and minireel in moonpool. Did not get alignment indicating proper locking of TBC.,1.25 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 13:30:00+00:00,2007-09-13 15:30:00+00:00,139.0,m,fixed,interruption -- maintain,ok,operation failed,"Had shut down for Siemens ""shut down and fire pump logic"" (ESD tests).",2.0 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 15:30:00+00:00,2007-09-13 17:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Unlocked TBC and repeated connetion procedures according to Vetco instructions. Pressurized the TBC to 3000 psi using pump and minireel in moonpool. Got alignment indicating proper locking of TBC. Sat all valves on lock panel A into ""parking position"". Performed 20 MT overpull test on H4-MUSL connector (TBC) with TDS. Slacked off to 10 MT overpull. Sat TBC valves on flush panel B to ""lower dog flush"".",2.0 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 17:30:00+00:00,2007-09-13 20:30:00+00:00,139.0,m,fixed,interruption -- maintain,ok,operation failed,"Had shut down for Siemens ""shut down and fire pump logic"" (ESD tests).",3.0 +15_9_F_12_2007_09_14.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-13T00:00:00+02:00,2007-09-14T00:00:00+02:00,2007-09-13 20:30:00+00:00,2007-09-13 22:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed centralizer and boat collision stool on centralizer deck. Prepared for skidding cantilever.,1.5 +15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-13 22:00:00+00:00,2007-09-14 00:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Continued to install centralizer and boat collision stool on centralizer deck. Meanwhile had shut down for Siemens ""shut down and fire pump logic"" (ESD tests). Restarted all systems.",2.5 +15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 00:30:00+00:00,2007-09-14 02:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed bleed off valve on tension joint and lined up to fill riser. Held tool box meeting prior to filling riser and performing pressure test. Filled riser using CMT pump and venting air through valve on tension joint. Kept 10 MT overpull on PR.,1.5 +15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 02:00:00+00:00,2007-09-14 02:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Performed pressure test of PR to 20 bar/5 min. Volume pumped 70 ltr. Attempted to move TDS to keep tension in PR during pressure testing.,0.5 +15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 02:30:00+00:00,2007-09-14 03:00:00+00:00,139.0,m,fixed,interruption -- other,ok,equipment failure,Software problem on TDS (drawworks).,0.5 +15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 03:00:00+00:00,2007-09-14 03:30:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pressured up PR riser against well/GTV plug to 200 bar and compensated TDS to keep riser in tension. Performed pressure test of PR to 200 bar/10 min. Volume pumped 440 ltr.,0.5 +15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 03:30:00+00:00,2007-09-14 04:00:00+00:00,139.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared to pumpe corrosion inhibitor through port B1 on TBC using minireel and Vetco pump. Meanwhile finished installing centralizer and boat collision stool on centralizer deck,0.5 +15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 04:00:00+00:00,2007-09-14 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MU tensioner ring assembly on centralizer deck. Meanwhile prepared rig for skidding and changed liners and piston fluid ends in MP2.,1.0 +15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 05:00:00+00:00,2007-09-14 07:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,Commisioned all 4 new tension cylinders.,2.5 +15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 07:30:00+00:00,2007-09-14 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MU tensioner ring assembly on centralizer deck. Meanwhile retrieved riser guide wires from wellhead template and performed area inspection for high wind forcast procedure.,9.5 +15_9_F_12_2007_09_15.xml,NO 15/9-F-12,NO 15/9-F-12,2007-09-14T00:00:00+02:00,2007-09-15T00:00:00+02:00,2007-09-14 17:00:00+00:00,2007-09-14 18:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed security bolt on RT from PR and POOH. LD RT and 20 ft pup joint. Installed hatch on F-12 and suspended operation to F-7.,1.75 +15_9_F_12_2007_10_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-10-11T00:00:00+02:00,2007-10-12T00:00:00+02:00,2007-10-11 01:15:00+00:00,2007-10-11 03:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared Rig for skidding and skidded rig from F7 to F12.,1.75 +15_9_F_12_2007_10_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-10-11T00:00:00+02:00,2007-10-12T00:00:00+02:00,2007-10-11 03:00:00+00:00,2007-10-11 03:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded the cantilever 1.5 metres to SB.,0.25 +15_9_F_12_2007_10_12.xml,NO 15/9-F-12,NO 15/9-F-12,2007-10-11T00:00:00+02:00,2007-10-12T00:00:00+02:00,2007-10-11 03:15:00+00:00,2007-10-11 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered down the well head valves.,0.75 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 10:00:00+00:00,2007-12-30 11:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared main deck for skidding.,1.25 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 11:15:00+00:00,2007-12-30 11:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Held tool box talk prior to skidding of the cantilever.,0.25 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 11:30:00+00:00,2007-12-30 13:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever from F-15 to F-12,1.75 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 13:15:00+00:00,2007-12-30 15:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Installed stairs to the cantilever. Removed well head hatches.,1.75 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 15:00:00+00:00,2007-12-30 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for pick up the surface riser.,1.0 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 16:00:00+00:00,2007-12-30 16:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to pick up the surface riser.,0.25 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 16:15:00+00:00,2007-12-30 17:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked up the surface riser, removed protector. Meanwhile built scaffolding in the moon pool.",1.0 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 17:15:00+00:00,2007-12-30 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Removed the master bushing, ran in with the surface riser. Meanwhile built scaffolding at the well head deck.",1.75 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 19:00:00+00:00,2007-12-30 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Cleaned the NT2 well head connector. Landed and made up the surface riser.,3.0 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 22:00:00+00:00,2007-12-30 22:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to nippling up the BOP.,0.25 +15_9_F_12_2007_12_31.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-30T00:00:00+01:00,2007-12-31T00:00:00+01:00,2007-12-30 22:15:00+00:00,2007-12-30 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Prepared for nippling up the BOP, moved the BOP from the set back stump.",0.75 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-30 23:00:00+00:00,2007-12-31 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Moved the tension cylinders aside to be able to move the BOP in position over the surface riser. Aligned the BOP and the surface riser and landed the BOP. Meanwhile picked up and prepared the diverter for installation.,3.5 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 02:30:00+00:00,2007-12-31 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed the tension cylinders. Pressure tested the stand pipe manifold 20/345 bar 5/10 mins.,2.5 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 05:00:00+00:00,2007-12-31 11:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Nippled up slick jnt, diverter and torqued up the BOP/Surface riser NT2 connector. Rigged down the diverter handling equipment. Pressure tested IBOP to 20/345 bars 5/10 mins.",6.75 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 11:45:00+00:00,2007-12-31 12:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Held tool box talk prior to pressure test the BOP, surface riser and the well head connection against GT plug. Pressure tested same to 20/200 bars 5/10 mins.",1.0 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 12:45:00+00:00,2007-12-31 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to installation of the Bowl Protector.,0.25 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 13:00:00+00:00,2007-12-31 13:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rigged 5½"" DP handling equipment and made up slick joint.",0.75 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 13:45:00+00:00,2007-12-31 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Made up Bowl Protector running tool.,0.75 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 14:30:00+00:00,2007-12-31 15:30:00+00:00,20.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and installed the Bowl Protector at 20.9 m. Success on second attempt.,1.0 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 15:30:00+00:00,2007-12-31 15:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to retrieve the Annulus Insert in Subsea WH. Uncertainty with regards to length of landing string,0.25 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 15:45:00+00:00,2007-12-31 16:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,Made up the Annulus Insert retrieving tool. RIH with the Annulus Insert retrieving tool on HWDP. Slow operation to get correct landing string lenght.,1.0 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 16:45:00+00:00,2007-12-31 18:30:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH and tagged the Annulus Insert at 139.9 m. Pulled back 1.24 m took over pull of 40 MT. Attempted pass obstruction by turning the string 90º and 180º. Rotated the string with 2 RPM, passed obstruction.",1.75 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 18:30:00+00:00,2007-12-31 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with the Annulus insert retrieving tool for inspection.,1.5 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 20:00:00+00:00,2007-12-31 20:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Inspected the Annulus Insert retrieving tool. Found lock pin slightly bend but still operational.,0.25 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 20:15:00+00:00,2007-12-31 21:00:00+00:00,122.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with the Annulus Insert retrieving tool from surface to 122 m.,0.75 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 21:00:00+00:00,2007-12-31 21:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Took parameters prior to engage and retrieve the Annulus Insert. Open annular up/down weight 82/79 MT / 4 RPM / 400 Nm. Closed annular up/down weight 82/79 MT / 4 RPM / 400 Nm.,0.75 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 21:45:00+00:00,2007-12-31 22:15:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH from 122 m and tagged the Annulus Insert at 139.9 m, set down 2 MT.",0.5 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 22:15:00+00:00,2007-12-31 22:30:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,Rotated string and entered the J-slot. Set down 2 MT.,0.25 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 22:30:00+00:00,2007-12-31 22:45:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Closed annular and confirmed the engagement of the J-slot with 1 MT over pull. Marked string and turned string 3 turns to the left. Keeping the weight below 1½ MT set down weight and torque below 2 kNm. Marked string and measured 3 turns = 1¼"".",0.25 +15_9_F_12_2008_01_01.xml,NO 15/9-F-12,NO 15/9-F-12,2007-12-31T00:00:00+01:00,2008-01-01T00:00:00+01:00,2007-12-31 22:45:00+00:00,2007-12-31 23:00:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,Monitored for possible annulus pressure.,0.25 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2007-12-31 23:00:00+00:00,2007-12-31 23:45:00+00:00,139.9,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Rotated the string 3 + ½ turn to the left, kept the weight below 1½ MT set down weight and torque below 2 kNm. Marked string and measured 3(½) turns = 1¼"". Total backed out with the Annulus Insert = 2½"". Corrected according to Vetco procedure.",0.75 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2007-12-31 23:45:00+00:00,2008-01-01 00:00:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Pulled back from 139.9 m to 138 m. Took weight at 138.6 m 10 MT. Rotated the string and passed the obstruction.,0.25 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 00:00:00+00:00,2008-01-01 00:30:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Displaced the riser to completion fluid at 1000 lpm / 1.5 bars. Total volume pumped 30 m³.,0.5 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 00:30:00+00:00,2008-01-01 01:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH with the Annulus Insert. Inspected the Annulus Insert. Found no damage.,1.25 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 01:45:00+00:00,2008-01-01 02:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up HWDP stand and measured from mark when engaged the Annulus Insert. Accumulated length 140.01 m.,0.75 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 02:30:00+00:00,2008-01-01 02:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to run and retrieve the Bowl Protector in surface WH.,0.25 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 02:45:00+00:00,2008-01-01 03:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Picked up and made of the Bowl Protector retrieving tool.,0.5 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 03:15:00+00:00,2008-01-01 04:15:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with Bowl Protector retrieving tool and set down at 20 m. Attempted to work string down to 20.9 m as Bowl Protector was reported installed previous to day. POOH after 2 attempts.,1.0 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 04:15:00+00:00,2008-01-01 04:30:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,OOH with Bowl Protector retrieving tool. Inspected the tool found no marks. Measured length from landing shoulder to Bowl Protector retrieving tool nose = 0.8 m. Painted landing shoulder white. RIH with Bowl Protector retrieving tool. Tagged at 20 m. Turned one round to the right. POOH with Bowl Protector retrieving tool and retrieved the Bowl Protector.,0.25 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 04:30:00+00:00,2008-01-01 05:00:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with Jetting sub and commenced washing the surface well head area.,0.5 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 05:00:00+00:00,2008-01-01 05:45:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,Washed the surface well head area. 2200 lpm used 20m³ completion fluid. POOH with Jet washing assy. and laid out same.,0.75 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 05:45:00+00:00,2008-01-01 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and cleared the rig floor.,0.25 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 06:00:00+00:00,2008-01-01 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to make up Spear assy. Made up Spear assy and racked back in derrick.,1.0 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 07:00:00+00:00,2008-01-01 09:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up 10 3/4"" casing handling equipment.",2.0 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 09:00:00+00:00,2008-01-01 09:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Tool box talk prior to make up and run 10 3/4"" Tie- back assy.",0.5 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 09:30:00+00:00,2008-01-01 10:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,No crane available due to Helicopter. Meanwhile positioned the MST seal running tool on the rig floor. Inspected the MST running tool and confirmed leakages.,1.25 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 10:45:00+00:00,2008-01-01 14:00:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"Made up Drillquip Tie Back connector to 10 3/4"" casing and ran in hole from surface to 108 m.",3.25 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 14:00:00+00:00,2008-01-01 14:45:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"Held tool box talk prior to pick/make up the 10 3/4"" hanger. Performed same.",0.75 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 14:45:00+00:00,2008-01-01 15:15:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,"Changed elevator to 5½"" DP elevator.",0.5 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 15:15:00+00:00,2008-01-01 16:00:00+00:00,108.0,m,fixed,drilling -- casing,ok,success,Picked/made up spear assy and connected same up to top drive. Drained the riser. String weight 12 MT.,0.75 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 16:00:00+00:00,2008-01-01 16:45:00+00:00,140.1,m,fixed,drilling -- casing,ok,success,RIH with Tie Back string and set down 2 MT in Sub surface WH.,0.75 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 16:45:00+00:00,2008-01-01 18:15:00+00:00,104.1,m,fixed,drilling -- casing,ok,success,"Made up Tie Back connection, turned the string 5 right hand turns. Applied 5000 ft/lbs to energize the metal seal. After 3 turns the spear released due to torque friction in Tie Back connector. Re-engaged spear and took over pull of 11 MT completed the 5 turns with final torque of 5000 ft/lbs. Verified space out by observing correct colour code through the surface WH B-annulus valve.",1.5 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 18:15:00+00:00,2008-01-01 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POOH with the Spear assy. Racked back same in derrick.,1.0 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 19:15:00+00:00,2008-01-01 20:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held tool box prior to rig down 10 3/4"" casing handling equipment. Rigged down same.",1.5 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 20:45:00+00:00,2008-01-01 22:15:00+00:00,138.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to RIH with Straddle cup tester. Made up and ran in with Straddle cup tester from surface to 138 m.,1.5 +15_9_F_12_2008_01_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-01T00:00:00+01:00,2008-01-02T00:00:00+01:00,2008-01-01 22:15:00+00:00,2008-01-01 23:00:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Picked/made up pump in sub and cement hose. Spaced out prior to test Tie-back connector 139 m.,0.75 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-01 23:00:00+00:00,2008-01-01 23:45:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Flushed cement line and pressure tested line to 50/345 bars 5/10 mins.,0.75 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-01 23:45:00+00:00,2008-01-02 00:15:00+00:00,139.0,m,fixed,drilling -- casing,ok,success,Pressure tested Tie-Back connector to 50/345 bars 10/10 mins. Volume pumped 82 litres bled off 80 litres. Observed no pressure building up in B-annulus.,0.5 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 00:15:00+00:00,2008-01-02 02:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Rigged down cement hose and pump in sub. POOH with Straddle cup tester from 139 m to surface. Hung up at 22 m. OOH with the Straddle cup tested. The lower cup tester had minor damaged. Changed out same. Laid out the Starddle cup test assy.,2.0 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 02:15:00+00:00,2008-01-02 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to making up the Adjustment sub setting tool.,0.25 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 02:30:00+00:00,2008-01-02 03:30:00+00:00,27.5,m,fixed,drilling -- casing,ok,success,Picked/made up the Adjustment sub setting tool. RIH from surface to 21 m. Took weight. Turned string 90º and passed obstruction. Continued RIH to 27.5 m.,1.0 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 03:30:00+00:00,2008-01-02 04:30:00+00:00,27.1,m,fixed,drilling -- casing,ok,equipment failure,Applied 140 bars to the Adjustment sub setting tool. Slowly pulled up to land in Latching ring groove and took over pull of 30 MT. String at ±27.1 m. Bled off the pressure in the string and kept the tension. Rotated the string at 2700 - 3000 Nm 17 turns. No travelling movement of the casing hanger. Observed through the B-annulus valve. When picked up the 30 MT over pull the casing hanger moved ± 2 cm up.,1.0 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 04:30:00+00:00,2008-01-02 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,POOH with Adjustment sub setting tool. Checked and function tested the Adjustment sub setting tool. No marks operated ok.,0.5 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 05:00:00+00:00,2008-01-02 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Changed out to back up Adjustment sub setting tool.,1.5 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 06:30:00+00:00,2008-01-02 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Evaluation meeting with onshore organisation. Meanwhile performed general maintenance on the rig floor.,4.0 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 10:30:00+00:00,2008-01-02 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Held tool box talk prior to RIH with the Adjustment sub setting tool.,0.25 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 10:45:00+00:00,2008-01-02 12:00:00+00:00,27.0,m,fixed,drilling -- casing,ok,equipment failure,"Attempted to turn the Adjustment sub setting tool string using chain tongs. Made up TDS: RIH with Adjustment sub setting tool. Engaged the Adjustment sub setting tool in the vertical key slots. Turned string 10 turns to the right using the TDS, with 6000 Nm torque. Landed off the casing hanger, verified the Adjustment sub travel of 17 cm. By observation through B-annulus at WH. Released torque. +Applied 140 bars to the Adjustment sub setting tool. Picked up 30 MT over pull, bled off the pressure. Turned the Adjustment sub setting tool 4 turns with 2 - 3 kNm, unable to engage the vertical key slots to torque up the casing hanger. Retracted the Adjustment sub setting tool. POOH with the Adjustment sub setting tool.",1.25 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 12:00:00+00:00,2008-01-02 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,Evaluation meeting with onshore organisation. Meanwhile performed general maintenance on the rig floor.,3.25 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 15:15:00+00:00,2008-01-02 16:30:00+00:00,27.0,m,fixed,drilling -- casing,ok,success,"RIH with Adjustment sub setting tool. Applied 140 bars to the Adjustment sub setting tool. Took 10 MT over pull. Bled off the pressure. Ran back in 1cm, and pulled up slowly with 2 RPM rotation and engaged the vertical key slots. Applied 140 bars to the Adjustment sub setting tool. Took 30 MT over pull, bled off the pressure. Turned the string 1 turn to the right, and made up the casing hanger sleeve to 9500 Nm, total 11 turns. Retracted the Adjustment sub setting tool. POOH with the Adjustment sub setting tool.",1.25 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 16:30:00+00:00,2008-01-02 18:00:00+00:00,29.0,m,fixed,drilling -- casing,ok,success,Made up the Straddle cup tester. RIH and positioned the straddle cup tester across the Adjustment sub. Pressure tested same 20/345 bars 5/10 mins.,1.5 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 18:00:00+00:00,2008-01-02 19:15:00+00:00,29.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to POOH with Straddle cup tester and lay out same. Performed same.,1.25 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 19:15:00+00:00,2008-01-02 20:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box prior to lay out Red Baron Spear assy. Performed same.,1.0 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 20:15:00+00:00,2008-01-02 21:15:00+00:00,20.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and installed secondary Bowl protector at 20 m.,1.0 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 21:15:00+00:00,2008-01-02 21:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleared the rig floor. Held tool box talk prior to pick/make up 9.567"" drift.",0.5 +15_9_F_12_2008_01_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-02T00:00:00+01:00,2008-01-03T00:00:00+01:00,2008-01-02 21:45:00+00:00,2008-01-02 23:00:00+00:00,45.0,m,fixed,drilling -- casing,ok,success,"Picked/made up 9.567"" drift. RIH with 9.567"" drift from surface to 45 m.",1.25 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-02 23:00:00+00:00,2008-01-02 23:30:00+00:00,150.0,m,fixed,drilling -- casing,ok,success,"Continued RIH with 9.567"" drift from 45 m to 150 m.",0.5 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-02 23:30:00+00:00,2008-01-03 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with 9.567"" drift from 150 m to surface. Laid out the 9.567"" drift.",1.5 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 01:00:00+00:00,2008-01-03 01:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held tool box talk prior to make/pick up GTV plug retrieving tool. Performed same.,0.25 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 01:15:00+00:00,2008-01-03 01:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Changed to power slips.,0.25 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 01:30:00+00:00,2008-01-03 03:30:00+00:00,630.0,m,fixed,drilling -- casing,ok,success,RIH with the GTV plug retrieving tool from surface to 630 m.,2.0 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 03:30:00+00:00,2008-01-03 03:45:00+00:00,630.0,m,fixed,drilling -- casing,ok,success,Made up to TDS and took up/down weight 93/88 MT neutral 91 MT. Rotated the string at 10 RPM with 2 kNm.,0.25 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 03:45:00+00:00,2008-01-03 04:00:00+00:00,635.4,m,fixed,drilling -- casing,ok,success,RIH and tagged plug at 635.4 m. Set down 12 MT picked up 20 MT over pull. Slacked off the neutral weight and turned the string ¼ turn to the left. Pulled up and the GTV plug retrieving tool had disengaged the GTV plug.,0.25 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 04:00:00+00:00,2008-01-03 04:45:00+00:00,625.0,m,fixed,drilling -- casing,ok,success,"Lined up and circulated down string with 200 lpm / 5 RPM / 1000 Nm, 0.5 m above the plug. Pulled out 2.5 m increased rate 1100 - 2400 lpm / 30 RPM. Washed out the Hi-vis pill over shakers.",0.75 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 04:45:00+00:00,2008-01-03 05:00:00+00:00,634.0,m,fixed,drilling -- casing,ok,success,RIH with the GTV plug retrieving tool to engage the GTV plug at 635.4 m.,0.25 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 05:00:00+00:00,2008-01-03 06:15:00+00:00,641.0,m,fixed,drilling -- casing,ok,success,Latched GTV plug with LTCT retrieval tool according to BOT instructions. Released plug and allowed rubber element to relax for 15 mins prior to pulling plug.,1.25 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 06:15:00+00:00,2008-01-03 10:15:00+00:00,20.0,m,fixed,drilling -- casing,ok,success,"POOH with GTV plug from 641 m to 21 m MD on 5 1/2"" DP. Removed PS-21 slips and installed masterbushing.",4.0 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 10:15:00+00:00,2008-01-03 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pulled LTCT head/GTV plug to surface. Observed nominal seat protector caught with GTV plug. Prepared for working on MS-seal setting tool.,0.25 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 10:30:00+00:00,2008-01-03 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"Picked up 13 3/8"" MS-seal setting tool. Attempted to dismantle/split tool - nogo. Laid down MS-seal setting tool.",4.75 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 15:15:00+00:00,2008-01-03 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 13 3/8"" seat protector running tool. RIH and installed nominal seat protector in surface wellhead at 20 m MD.",0.5 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 15:45:00+00:00,2008-01-03 16:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk prior to making up 7"" x 9 5/8"" x 10 3/4"" clean out string.",0.25 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 16:00:00+00:00,2008-01-03 16:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed from 5 1/2"" to 3 1/2"" handling gear. Picked up clean out assy #1 comprising of 7"" scraper and magnet subs and hung off in rotary.",0.5 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 16:30:00+00:00,2008-01-03 17:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Cleared rigfloor. Prepared well control equipment.,0.5 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 17:00:00+00:00,2008-01-03 20:45:00+00:00,425.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk prior to picking up 3 1/2"" singles. Ran 3 1/2"" drillpipe to 425 m MD.",3.75 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 20:45:00+00:00,2008-01-03 21:30:00+00:00,425.0,m,fixed,completion -- circulating conditioning,ok,success,Made up kick joint with FOSV and tested same - ok.,0.75 +15_9_F_12_2008_01_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-03T00:00:00+01:00,2008-01-04T00:00:00+01:00,2008-01-03 21:30:00+00:00,2008-01-03 23:00:00+00:00,432.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed from 3 1/2"" to 5"" handling equipment. Picked up and made up clean out assy #2 comprising of X-over, PBR mill and liner top dress mill.",1.5 +15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-03 23:00:00+00:00,2008-01-04 00:00:00+00:00,443.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up clean out assy #3 comprising of 9 5/8"" scraper, magnet, drift and x-over. Cleared rigfloor. Checked dies on PRS. Moved 2 ea damaged 5 1/2"" drillpipe stands.",1.0 +15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 00:00:00+00:00,2008-01-04 01:30:00+00:00,893.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean out assemblies on 5"" DP from 443 m to 893 m MD.",1.5 +15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 01:30:00+00:00,2008-01-04 02:00:00+00:00,893.0,m,fixed,completion -- circulating conditioning,ok,success,Performed toolbox talk / handover meeting with new drilling crew.,0.5 +15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 02:00:00+00:00,2008-01-04 05:00:00+00:00,1800.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH with clean out assemblies on 5"" DP from 893 m to 1800 m MD.",3.0 +15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 05:00:00+00:00,2008-01-04 06:00:00+00:00,1885.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean out assemblies from 1800 m to 1885 m MD. Picked up and made up clean out assy#4 comprising of 10 3/4"" scraper, magnet and x-over to 5 1/2"" DP.",1.0 +15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 06:00:00+00:00,2008-01-04 06:30:00+00:00,1930.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean out assemblies from 1885 m to 1930 m MD on 5 1/2"" DP.",0.5 +15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 06:30:00+00:00,2008-01-04 06:45:00+00:00,1930.0,m,fixed,completion -- circulating conditioning,ok,success,Checked tugger lines and FWD PRS due to high winds in the range of 50-60 knots.,0.25 +15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 06:45:00+00:00,2008-01-04 08:15:00+00:00,2290.0,m,fixed,completion -- circulating conditioning,ok,success,"Continued to RIH with clean out assemblies from 1930 m to 2290 m MD on 5 1/2"" DP. Observed dropped object from FWD PRS vertical hose bundel. Halted operation for further investigation.",1.5 +15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 08:15:00+00:00,2008-01-04 08:45:00+00:00,2290.0,m,fixed,completion -- circulating conditioning,ok,success,Investigated situation. Found 3 ea hose bundle securing pins dropped to rigfloor. Each pin approx 20 cm / 220 grammes. Halted operation as it was impossible to repair the damage due to high winds.,0.5 +15_9_F_12_2008_01_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-04T00:00:00+01:00,2008-01-05T00:00:00+01:00,2008-01-04 08:45:00+00:00,2008-01-04 23:00:00+00:00,2290.0,m,fixed,interruption -- other,ok,equipment failure,"Waiting on improved weather conditions to perform repair on FWD PRS. Wind speed 60 knots. + +Meanwhile : +-Performed general maintenance on aft IR +-Performed general housekeeping and cleaning in moonpool, rigfloor, shakers and pitroom +-Put protectors on pin end of 7"" tubing laid out on deck",14.25 +15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-04 23:00:00+00:00,2008-01-05 05:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waiting on improved weather conditions to perform repair on FWD PRS. Wind speed 60-70 knots. + +Meanwhile : +-Performed general housekeeping +-Secured drillstring and parked TDS for maintenance +-Injected slop in F-12 annulus +-Prepared spare parts and tools for performing PRS repair +-Inspected and tested completion assemblies",6.0 +15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 05:00:00+00:00,2008-01-05 11:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waitied on improved weather conditions to perform inspection and repair of FWD PRS. + +Meanwhile : +-Performed general cleaning in moonpool, pitroom and shakers +-Injected slop/overflush in F-12 annulus. Insufficient overflush due to exceeded pressure limit.",6.5 +15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 11:30:00+00:00,2008-01-05 13:00:00+00:00,2334.0,m,fixed,interruption -- waiting on weather,ok,success,Performed derrick inspection after high winds.,1.5 +15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 13:00:00+00:00,2008-01-05 16:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Inspected FWD PRS. Dragchain and hoses were severly twisted and partly torn down. Assessed situation and found damage to severe for immediate repair. Prepared for making repairs on AFT PRS instead.,3.0 +15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 16:00:00+00:00,2008-01-05 16:15:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to using work basket.,0.25 +15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 16:15:00+00:00,2008-01-05 17:15:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Inspected FWD PRS dragchain for loose items, removed and secured accordingly.",1.0 +15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 17:15:00+00:00,2008-01-05 19:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Brought scaffolding material to drillfloor and prepared for buliding scaffolding in derrick. Found that scaffolding job could not commence due to high winds and working hours regulations.,1.75 +15_9_F_12_2008_01_06.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-05T00:00:00+01:00,2008-01-06T00:00:00+01:00,2008-01-05 19:00:00+00:00,2008-01-05 23:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited on improved weather condtions and/or qualified rest for scaffolding crew. + +Meanwhile : +-Changed oil cooler on TDS +-Performed general cleaning in moonpool, pitroom and shakers",4.0 +15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-05 23:00:00+00:00,2008-01-06 05:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited on qualified rest for scaffolding crew. + +Meanwhile : +-Changed oil cooler on TDS +-Brought scaffolding material to derrick +-Emptied skimmer tank +-Made measurements for spare parts on FWD PRS +-Checked and measured completion assemblies",6.0 +15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 05:00:00+00:00,2008-01-06 06:45:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Seafastened AFT PRS.,1.75 +15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 06:45:00+00:00,2008-01-06 16:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to building scaffolding around AFT PRS. Built scaffolding. Prepared security net for installation underneath AFT PRS working area.,9.25 +15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 16:00:00+00:00,2008-01-06 16:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk. Installed canvas around scaffolding. Prepared for installing security net. Had to abort manriding operations due to maintenance of Siemens system and risk of main power loss.,0.5 +15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 16:30:00+00:00,2008-01-06 18:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Performed upgrade of Siemens system. Meanwhile continued to install canvas around scaffolding. Prepared lights for installation on scaffolding work platform.,2.0 +15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 18:30:00+00:00,2008-01-06 21:15:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Installed security net around AFT PRS scaffolding platform. Transferred tools and equipment to derrrick.,2.75 +15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 21:15:00+00:00,2008-01-06 22:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Mechanics worked on AFT PRS.,1.25 +15_9_F_12_2008_01_07.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-06T00:00:00+01:00,2008-01-07T00:00:00+01:00,2008-01-06 22:30:00+00:00,2008-01-06 23:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk. Rigged down security net due to wrong allignment/position of PRS relative to scaffolding platform.,0.5 +15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-06 23:00:00+00:00,2008-01-07 05:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited on qualified rest for scaffolding crews. + +Meanwhile : +-Continued rigging down security net +-Performed service on TDS +-Tested MS-seal setting tool +-General houskeeipng in drilling areas",6.0 +15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 05:00:00+00:00,2008-01-07 06:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Prepared for removing scaffolding around AFT PRS.,1.5 +15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 06:30:00+00:00,2008-01-07 08:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Removed part of scaffolding around AFT PRS.,2.0 +15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 08:30:00+00:00,2008-01-07 08:45:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Turned AFT PRS 180 deg for better access to upper drive / shaft.,0.25 +15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 08:45:00+00:00,2008-01-07 09:45:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Installed security net underneath AFT PRS.,1.0 +15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 09:45:00+00:00,2008-01-07 11:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Rebuilt scaffolding around AFT PRS. Meanwhile laid out TCP guns on top of tubing in STB AFT bay.,1.75 +15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 11:30:00+00:00,2008-01-07 15:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Performed repair work on AFT PRS upper drive. Meanwhile tested Siemens/ESD system.,3.5 +15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 15:00:00+00:00,2008-01-07 20:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Not able to do effective/continuous repair of AFT PRS due to interruptions in power supply from ongoing test of Siemens/ESD system.,5.5 +15_9_F_12_2008_01_08.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-07T00:00:00+01:00,2008-01-08T00:00:00+01:00,2008-01-07 20:30:00+00:00,2008-01-07 23:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Finished testing of Siemens/ESD system. Worked on AFT PRS upper drive.,2.5 +15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-07 23:00:00+00:00,2008-01-08 01:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Performed repair work on AFT PRS upper drive. Meanwhile removed cantilever hatch and prepared for lifting Xmas tree from transport basket to moonpool.,2.0 +15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-08 01:00:00+00:00,2008-01-08 01:30:00+00:00,2335.0,m,fixed,drilling -- bop activities,ok,success,Function pipe rams and HCR's on BOP - ok. Function tested annular preventer - closing time 42 sec versus requirement of 30 s. Meanwhile performed repair work on AFT PRS upper drive.,0.5 +15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-08 01:30:00+00:00,2008-01-08 05:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Performed repair work on AFT PRS upper drive. + +Meanwhile : +-Lifted Xmas tree from moonpool +-Prepared hose from moonpool to wellhead +-Laid out 7"" pup joints",3.5 +15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-08 05:00:00+00:00,2008-01-08 18:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Performed repair work on AFT PRS upper drive + +Meanwhile : +-Cleaned cameras in derrick +-Worked on dragchain for crane in moonpool +-Tested new V-ICIS software for mudpumps +-Reset V-ICIS control system after power shut down +-Prepared subsea caps for wellheads/conductor",13.0 +15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-08 18:00:00+00:00,2008-01-08 21:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Performed repair work on AFT PRS upper drive. Halted repair work due to high winds above set limitations for working in heights. Winds > 40 knots.,3.0 +15_9_F_12_2008_01_09.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-08T00:00:00+01:00,2008-01-09T00:00:00+01:00,2008-01-08 21:00:00+00:00,2008-01-08 23:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited for weather condtions to improve for resuming AFT PRS repair work. + +Meanwhile : +-Lifted subseas caps from main deck to Centralizer deck +-ROV closed valve on DCI hose for pressure testing",2.0 +15_9_F_12_2008_01_10.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-09T00:00:00+01:00,2008-01-10T00:00:00+01:00,2008-01-08 23:00:00+00:00,2008-01-09 05:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited for weather condtions to improve for resuming AFT PRS repair work. + +Meanwhile : +-Blinded pop off and tested DCI hose using cement unit to 200 bar / 10 min - ok +-ROV opened valve on DCI hose +-Installed debris caps on F-5, F-14 and F-15 wellheads +-Removed temporary cap and installed debris cap on F-1 conductor +-Attempted to inject slop in F-12 annulus. Pressure bulit up rapildly, 190 bar at approx 1 m3 pumped +-Operated/functioned annular preventer to gain faster closing time",6.0 +15_9_F_12_2008_01_10.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-09T00:00:00+01:00,2008-01-10T00:00:00+01:00,2008-01-09 05:00:00+00:00,2008-01-09 23:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Waited for weather condtions to improve for resuming AFT PRS repair work. + +Meanwhile : +-Removed lead target in cement unit test line +-Performed general maintenance in drilling areas +-Cleaned pits + +Winds : +12:00 81 knots +14:00 61 knots +16:00 56 knots +18:00 70 knots +20:00 53 knots +22:00 64 knots",18.0 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-09 23:00:00+00:00,2008-01-10 02:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,"Waited for weather condtions to improve for resuming AFT PRS repair work. + +Meanwhile : +-Performed maintenance on BX elevators +-Function tested annular preventer, 28 seconds to close (determined from readback pressure) +-Drained mainfold line to wellhead +-Performed derrick inspection prior to resume work on AFT PRS +-Inspected scaffolding in derrick + +Winds : +24:00 53 knots +02:00 40 knots",3.0 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 02:00:00+00:00,2008-01-10 03:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Performed derrick inspect after period of high winds. Inspected scaffolding work platform.,1.0 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 03:00:00+00:00,2008-01-10 04:30:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,"Waited for weather condtions to improve for resuming AFT PRS repair work. + +Winds : +04:00 40 knots +06:00 39 knots",1.5 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 04:30:00+00:00,2008-01-10 05:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Performed crown block inspection prior to accessing scaffolding platform for continued repair.,0.5 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 05:00:00+00:00,2008-01-10 14:45:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,"Continued working on AFT PRS upper drive. + +Meanwhile : +-Assisted in repairing AFT PRS +-Cleaned pits +-Functioned flowline isolation valve wih 1450 psi +-Function tested AFT PRS",9.75 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 14:45:00+00:00,2008-01-10 15:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to remvoing scaffolding.,0.25 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 15:00:00+00:00,2008-01-10 15:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Removed tools and equipment from AFT PRS scaffolding platform.,0.5 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 15:30:00+00:00,2008-01-10 18:00:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Assissted scaffolding crews in removing scaffolding from derrick.,2.5 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 18:00:00+00:00,2008-01-10 18:15:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk / handover meeting for continuation of removing scaffolding.,0.25 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 18:15:00+00:00,2008-01-10 20:30:00+00:00,2335.0,m,fixed,interruption -- other,ok,equipment failure,Waited on weather conditions to improve for continuing removing scaffolding.,2.25 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 20:30:00+00:00,2008-01-10 21:30:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Waited on weather condictons to improve. Wind speed 56 knots.,1.0 +15_9_F_12_2008_01_11.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-10T00:00:00+01:00,2008-01-11T00:00:00+01:00,2008-01-10 21:30:00+00:00,2008-01-10 23:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Checked FWD PRS for losse items. Secured FWD PRS by wrapping damaged parts with security net.,1.5 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-10 23:00:00+00:00,2008-01-11 01:30:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Continued to secure FWD PRS.,2.5 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 01:30:00+00:00,2008-01-11 01:45:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to removing scaffolding from derrick.,0.25 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 01:45:00+00:00,2008-01-11 04:45:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Removed scaffolding from derrick.,3.0 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 04:45:00+00:00,2008-01-11 05:00:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Calibrated block height after ESD power shut down.,0.25 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 05:00:00+00:00,2008-01-11 08:15:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Calibrated crown block. Re-set I-VICIS software for rig equipment after power shut down(s).,3.25 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 08:15:00+00:00,2008-01-11 08:30:00+00:00,2235.0,m,fixed,interruption -- other,ok,equipment failure,Held toolbox talk prior to installing PS-21 automatic slips and RIH. Installed PS-21.,0.25 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 08:30:00+00:00,2008-01-11 09:15:00+00:00,2376.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean out assemblies on 5 1/2"" DP from 2235 m to 2376 m MD.",0.75 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 09:15:00+00:00,2008-01-11 10:00:00+00:00,2407.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS to cleaning string. Scraped and cleaned FLX packer area from 500 m to 520 m MD with 10 3/4"" scraper. Pumped 80 m3 contamianted brine at 2500 lpm while reciprocating and rotating pipe at 60 RPM. Max torque 9 kNm. Up/down weights 146/117 MT.",0.75 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 10:00:00+00:00,2008-01-11 10:45:00+00:00,2578.0,m,fixed,completion -- circulating conditioning,ok,success,"RIH with clean out assemblies on 5 1/2"" DP from 2407 m to 2578 m MD. Could not release PS-21 slips after connection.",0.75 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 10:45:00+00:00,2008-01-11 16:00:00+00:00,2578.0,m,fixed,interruption -- other,ok,equipment failure,Repaired on PS-21 slips. Released slips. Exchanged PS-21 with PS-30 slips.,5.25 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 16:00:00+00:00,2008-01-11 18:45:00+00:00,3080.0,m,fixed,completion -- circulating conditioning,ok,success,RIH with scraper assemblies from 2578 m to 3080 m MD.,2.75 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 18:45:00+00:00,2008-01-11 20:15:00+00:00,3107.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS to cleaning string. Scraped and cleaned gun hanger area from 3080 m to 3100 m MD with 7"" scraper. Pumped SW at 1500 lpm while reciprocating and rotating pipe at 60 RPM. Max torque 17 kNm. Up/down weights 144/125 MT. Made connection and observed U-tube from well due to overweight brine pumped at an earlier stage. Scraped and cleaned area from 3100 m to 3105 m MD. Total volume pumped approx 30 m3.",1.5 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 20:15:00+00:00,2008-01-11 22:00:00+00:00,3425.0,m,fixed,completion -- circulating conditioning,ok,success,RIH with scraper assemblies from 3107 m to 3425 m mD.,1.75 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 22:00:00+00:00,2008-01-11 22:30:00+00:00,3442.0,m,fixed,completion -- circulating conditioning,ok,success,"Made up TDS to cleaning string. Scraped and cleaned production packer setting area from 2980 m to 3000 m MD with 9 5/8"" scraper. Pumped 30 m3 of SW at 1500 lpm while reciprocating and rotating pipe at 60 RPM.",0.5 +15_9_F_12_2008_01_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-11T00:00:00+01:00,2008-01-12T00:00:00+01:00,2008-01-11 22:30:00+00:00,2008-01-11 23:00:00+00:00,3458.0,m,fixed,completion -- circulating conditioning,ok,success,"Recorded parameters while circulating and rotating : Flow 1100 lpm / 50 RPM / Up weight 167 MT / Down weight 145 MT / Torque 25 kNm / SPP 72 bar. Took Up/down weight without circulation and rotation : Up weight 190 / Down weight 134 MT. Set torque limit to 27 kNm. RIH while circualting at 1100 LPM and rotating 50 RPM. Tagged top of PBR at 3026,2 m MD (bit depth 3457,9 m MD). String stalled out due to excessive torque, relaxed weight to regain rotation, which fluctuated between 20-50 RPM. Picked up above PBR. Ran back in to 3026 m (bit depth 3457,7 m MD) and dressed PBR for 1 min. Max torque 27 kNm.",0.5 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-11 23:00:00+00:00,2008-01-11 23:15:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,Picked string 5 m above PBR and marked pipe for lowest reciprocation depth.,0.25 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-11 23:15:00+00:00,2008-01-11 23:30:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,"Performed toolbox talk prior to displacing well from treated SW to 1,03 packer fluid.",0.25 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-11 23:30:00+00:00,2008-01-11 23:45:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,Added Oxygen scavenger and prepared for displacement.,0.25 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-11 23:45:00+00:00,2008-01-12 01:30:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,"Pumped 20 m3 hivis Soap pill followed by 20 m3 TSW spacer and 245 m3 1,03 sg packer fluid. Reciprocated and rotated pipe with 50 RPM. Pump rate 3300-3500 lpm. SPP 214-234 bar. Sampled returns and made consecutive NTU readings : 780/485/388/340/>1000/477/387/339/303 NTU.",1.75 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 01:30:00+00:00,2008-01-12 01:45:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke off and set back 1 stand of 5 1/2"" DP. Observed U-tube from annulus to pipe.",0.25 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 01:45:00+00:00,2008-01-12 03:15:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,"Mixed more 1,03 sg packer fluid for filling well when POOH. Meanwhile observed well.",1.5 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 03:15:00+00:00,2008-01-12 03:30:00+00:00,3453.0,m,fixed,completion -- circulating conditioning,ok,success,"Emptied SW from trip tanks. Filled triptanks. Topped up welll with 1,2 m3 packer fluid.",0.25 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 03:30:00+00:00,2008-01-12 05:00:00+00:00,3216.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies from 3453 m to 3216 m MD on 5 1/2"" DP.",1.5 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 05:00:00+00:00,2008-01-12 07:45:00+00:00,2175.0,m,fixed,completion -- circulating conditioning,ok,success,POOH with cleaning assemblies from 3216 m to 2175 m MD.,2.75 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 07:45:00+00:00,2008-01-12 08:00:00+00:00,2175.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox talk prior to moving PS-30 automatic slips.,0.25 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 08:00:00+00:00,2008-01-12 08:15:00+00:00,2175.0,m,fixed,completion -- circulating conditioning,ok,success,Removed PS-30 automatic slips and inserted masterbushing. Conducted kick drill. Secured well prior to ESD testing.,0.25 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 08:15:00+00:00,2008-01-12 08:30:00+00:00,2175.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed swedge on TDS for pressure testing IBOP.,0.25 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 08:30:00+00:00,2008-01-12 08:45:00+00:00,2175.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held toolbox talk prior to pressure testing TDS and manifold.,0.25 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 08:45:00+00:00,2008-01-12 09:30:00+00:00,2175.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Tested upper/lower IBOP to 30/345 bar 5/10 min. Progress intrerrupted by ESD testing.,0.75 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 09:30:00+00:00,2008-01-12 14:30:00+00:00,2175.0,m,fixed,interruption -- other,ok,equipment failure,Waited on ongoing Siemens/ESD testing. Meanwhile tested standpipe manifold valves to 30/345 bar 5/10 min.,5.0 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 14:30:00+00:00,2008-01-12 18:00:00+00:00,2175.0,m,fixed,interruption -- other,ok,equipment failure,"Got power shut down on rig. Waited on ongoing Siemens/ESD testing. Meanwhile removed scaffolding, cleaned and tidied in wellhead module.",3.5 +15_9_F_12_2008_01_13.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-12T00:00:00+01:00,2008-01-13T00:00:00+01:00,2008-01-12 18:00:00+00:00,2008-01-12 23:00:00+00:00,2175.0,m,fixed,interruption -- other,ok,equipment failure,Re-set V-ICIS-system. Calibrated block. Meanwhile tested valves in standpipe manifold to 30/345 bar 5/10 min. Cleaned and tidied in wellhead module.,5.0 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-12 23:00:00+00:00,2008-01-12 23:30:00+00:00,2175.0,m,fixed,interruption -- other,ok,equipment failure,Broke off swedge on TDS. Held toolbox talk prior to continue pulling cleaning string.,0.5 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-12 23:30:00+00:00,2008-01-13 00:30:00+00:00,1870.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5 1/2"" DP from 2175 m to 1870 m MD. Used manual slips.",1.0 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 00:30:00+00:00,2008-01-13 01:30:00+00:00,1870.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk. Removed bowl and masterbushing. Inserted PS-30 slips dressed for 5"" drillpipe. Attempted to run HTS to drillfloor, no-go due to lack of calibration. Broke out and laid down cleaning assy #4 with 10 3/4"" scraper/magnet on deck. Observed swarf on magnet. Broke out singel and laid down on drillfloor.",1.0 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 01:30:00+00:00,2008-01-13 02:00:00+00:00,1870.0,m,fixed,interruption -- other,ok,equipment failure,Calibrated HTS after ESD shut down.,0.5 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 02:00:00+00:00,2008-01-13 05:00:00+00:00,735.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5"" DP from 1870 m to 735 m MD.",3.0 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 05:00:00+00:00,2008-01-13 06:00:00+00:00,440.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assemblies on 5 1/2"" DP from 735 m to 440 m MD.",1.0 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 06:00:00+00:00,2008-01-13 06:15:00+00:00,440.0,m,fixed,completion -- circulating conditioning,ok,success,Held toolbox talk prior to removing PS-30 slips. Observed falling object from derrick when attempting to lift out slips. Shackle and tag fell down on drillers cabin and deflected to drillfloor. Halted operation for investigation and derrick inspection.,0.25 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 06:15:00+00:00,2008-01-13 07:00:00+00:00,440.0,m,fixed,interruption -- other,ok,equipment failure,Inspectred crown and TDS. Found source of shackle and tag to be from swivel between chain and wire on tugger.,0.75 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 07:00:00+00:00,2008-01-13 07:15:00+00:00,440.0,m,fixed,completion -- circulating conditioning,ok,success,Removed PS-30 slips from rotary and inserted master bushing.,0.25 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 07:15:00+00:00,2008-01-13 08:00:00+00:00,417.0,m,fixed,completion -- circulating conditioning,ok,success,"Racked back last stand and 5"" drillpipe. Laid out 9 5/8"" scraper assy and 7"" top dress/polish mill. Observed swarf on magnet. Inspected top dress mill - ok. Found piece of metal jammed in polish mill.",0.75 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 08:00:00+00:00,2008-01-13 08:45:00+00:00,417.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk prior to changing handling gear. Changed from 5"" to 3 1/2"" handing equipment. Inserted PS-21 dressed for 3 1/2"" pipe in rotary.",0.75 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 08:45:00+00:00,2008-01-13 14:00:00+00:00,10.0,m,fixed,completion -- circulating conditioning,ok,success,"POOH with cleaning assembly on 3 1/2"" DP. Broke out and laid down 3 1/2"" singles. Had problems to unlatch from pipe due to overgauge pipe close to couplings.",5.25 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 14:00:00+00:00,2008-01-13 14:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Laid out 7"" scraper assembly.",0.25 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 14:15:00+00:00,2008-01-13 15:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Held toolbox talk. Picked up Vetco bowl protector retrieval tool and RIH with same. Closed annular and flushed choke and kill line and manifolds from SW to 1,03 packer fluid at 1500 lpm.",1.25 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 15:30:00+00:00,2008-01-13 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with retrieval tool and latched bowl protector at 20,1 m MD. POOH with tool and racked back stand.",0.5 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 16:00:00+00:00,2008-01-13 16:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held toolbox talk prior to setting 10 3/4"" MS-seal.",0.25 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 16:15:00+00:00,2008-01-13 17:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Made up seal assembly to running tool. Made up control lines to running tools.,1.25 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 17:30:00+00:00,2008-01-13 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Ran MS-seal running tool and strapped control line to pipe. Landed MS seal over 10 3/4"" hanger at 20,8 m MD. Pressured up lock ring energizing line to 1500 psi and locked tool to WH. Took 7 MT overpull and verified tool set. Pressured up thorugh MS seal setting line to 4300 psi. Observed movement of string. Bled off pressure on control lines.",1.0 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 18:30:00+00:00,2008-01-13 19:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Pressure tested MS seal through test ports 3 and 4 on wellhead to 345 bar/10 min - ok.,0.75 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 19:15:00+00:00,2008-01-13 20:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released MS setting tool with 5 turns clockwise rotations. POOH with MS seal setting tool. Laid out tool and cleared rigfloor.,0.75 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 20:00:00+00:00,2008-01-13 21:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Held toolbox talk prior to leak testing surface tie back. Emptied SW on cement unit and filled tanks with drillwater. Verified B-annulus valves and test ports open. Lined up from cement unit to pump in kill line on BOP underneath shear ram. Pressurised line to 10 bar and opened HCR on BOP to verify line up. Closed shear ram.,1.25 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 21:15:00+00:00,2008-01-13 22:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed low pressure test of surface tie-back to 30 bar. Pressure dropped from 30,8 bar to 30,6 bar over 5 min - ok. Volume pumped 245 liter. Pressured up from 30 bar to 345 bar at 200 lpm. Total volume pumped 2408 liter. Observed pressure decline from 345 to 312 bar over 10 mimutes indicating a leakage rate of 21 l/min. Observed annulus which continued to flow after pressurising finished. Checked for leaks accross HCRs and shear ram - none observed. No increase in trip tank. Bled back pressure to zero. Recovered 2058 liter bled back volume. Checked pressure curve and found possible/neglible deflection around 300 bar.",1.0 +15_9_F_12_2008_01_14.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-13T00:00:00+01:00,2008-01-14T00:00:00+01:00,2008-01-13 22:15:00+00:00,2008-01-13 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Discussed situation. Meanwhile leak tested surface line to BOP to 345 bar / 10 min - ok.,0.75 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-13 23:00:00+00:00,2008-01-14 00:00:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,Discussed situation. Decided to do pressure test in steps to identify the onset of the leakage. Fitted B-annulus with pressure gauge.,1.0002777777777778 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 00:00:01+00:00,2008-01-14 01:00:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pressured up well in 50 bar increments: + +50 bar / 415 liter - Presssure drop 0,97 bar / 5 min +100 bar / 775 liter - Pressure drop 0,8 bar / 5 min +150 bar / 1099 liter - Pressure drop 1,8 bar / 5 min +200 bar / 1451 liter - Pressure drop 5,3 bar / 5 min corresponding to a leakage rate of 7 l/min.",1.0 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 01:00:01+00:00,2008-01-14 01:30:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Closed B-annulus valves. Observed wrong placement of pressure gauge and unsuited scale on same. Bled back pressure to 150 bar. Changed pressure gauge. Pressure dropped from 150 bar to 142 bar over 30 min (1,8 l/min) while working on annulus. When opening inner B-annulus valve a pressure of 12 bar could be observed on the pressure gauge immediately.",0.5 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 01:30:01+00:00,2008-01-14 02:15:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Pressured up well to 200 bar and observed annulus pressure increase to 25 bar. Pressure fell on well and increased on annulus : + +5 min : well; 2,4 bar drop / annulus; 3 bar cummulative increase +10 min : well; 4,6 bar drop / annulus; 6 bar cummulative increase +15 min : well; 6,4 bar drop / annulus; 9 bar cummulative increase +20 min : well; 7,5 bar drop / annulus; 11 bar cummulative increase + +Indication of leakage from tie-back casing to B-annulus confirmed. Leakage rate with closed annulus at approx 200 bar - 2,5 l/min.",0.75 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 02:15:01+00:00,2008-01-14 02:30:01+00:00,0.0,m,fixed,drilling -- casing,ok,success,Bled back pressure on casing and B-annulus.,0.25 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 02:30:01+00:00,2008-01-14 03:00:01+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Prepared for testing BOP. Picked up BOP test plug and RIH with same. Set test plug in surface wellhead.,0.5 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 03:00:01+00:00,2008-01-14 05:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"Tested 18 3/4"" surface BOP according to Mærsk procedure.",1.9997222222222222 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 05:00:00+00:00,2008-01-14 09:30:00+00:00,20.0,m,fixed,drilling -- bop activities,ok,success,"Tested 18 3/4"" surface BOP.",4.5 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 09:30:00+00:00,2008-01-14 09:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH with BOP test plug and laid down same.,0.25 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 09:45:00+00:00,2008-01-14 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Discussed further actions with town. Meanwhile picked up and made up 10 3/4"" cup tester.",1.75 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 11:30:00+00:00,2008-01-14 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held toolbox talk prior to RIH with 10 3/4"" cup tester.",0.5 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 12:00:00+00:00,2008-01-14 12:15:00+00:00,30.5,m,fixed,drilling -- casing,ok,operation failed,"RIH with 10 3/4"" cup tester on 5 1/2"" DP to 30,5 m MD. Closed UPR and verified lineup.",0.25 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 12:15:00+00:00,2008-01-14 12:45:00+00:00,30.5,m,fixed,drilling -- casing,ok,operation failed,"Pressure tested ASH and casing hanger against 10 3/4"" cup tester. Stepped up pressure in 50 bar increments from 100 bar and held each step for 5 min. Obtained good test at 345 bar. Pumped and bled back 79 l.",0.5 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 12:45:00+00:00,2008-01-14 13:00:00+00:00,132.0,m,fixed,drilling -- casing,ok,operation failed,"RIH with 10 3/4"" cup tester on 5 1/2"" DP from 30,5 m to 132 m MD. Closed UPR.",0.25 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 13:00:00+00:00,2008-01-14 13:45:00+00:00,132.0,m,fixed,drilling -- casing,ok,operation failed,"Pressure tested upper tie-back string against 10 3/4"" cup tester. Stepped up pressure in 50 bar increments from 100 bar and held each step for 5 min. Obtained good test at to 345 bar. Pumped and bled back 172 liter.",0.75 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 13:45:00+00:00,2008-01-14 14:00:00+00:00,150.0,m,fixed,drilling -- casing,ok,operation failed,"RIH with 10 3/4"" cup tester on 5 1/2"" DP from 132 m to 150 m MD. Closed UPR.",0.25 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 14:00:00+00:00,2008-01-14 14:45:00+00:00,150.0,m,fixed,drilling -- casing,ok,operation failed,"Pressure tested tie-back adaptor against 10 3/4"" cup tester. Stepped up pressure in 50 bar increments from 100 bar and held each step for 5 min. Obtained good tests at 345 bar. Entire upper tie-back string tested to 345 bar / 10 min - ok. Pumped and bled back 183 liter.",0.75 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 14:45:00+00:00,2008-01-14 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with 10 3/4"" cup tester on 5 1/2"" DP. Broke out and laid down cup tester.",0.5 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 15:15:00+00:00,2008-01-14 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Closed shear rams and performed fingerprinting of trip tank : +Added 20 l water above shear ram. Observed 20 l increase (driller/logger) +Added 10 l water above shear ram. Observed 10 l increase (driller/logger)",0.5 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 15:45:00+00:00,2008-01-14 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Lined up to pump down well and re-test the complete tie-back string.,0.25 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 16:00:00+00:00,2008-01-14 17:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Pressured up well to 101 bar at 100 lpm. Pumped 712 liter. Dropped from 101,6 bar to 100,7 bar in 5 min - ok. + +Pressured further up to 200 bar at 100 lpm. Total pumped 1410 liter. Dropped from 200 bar to 195,6 bar in 5 min. Leaking at approx 6 l/min. + +Pressured further up to 250 bar. Total pumped 1806 liter. Pressure drop 4 bar/5min. + +Pressured further up to 300 bar. Total pumped 2184 liter. Pressure drop 4 bar/5 min. Measured leakage rate of 4 l/min on B-annulus. + +Pressured further up to 346 bar. Pressure drop 0,5 bar/min. Measured leakage rate of 4 l/min on B-annulus.",1.25 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 17:15:00+00:00,2008-01-14 19:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Pressured up well to 345 bar every 15 min. Pressure dropped 0,5 bar/min. Measured a steady leakage rate of 4 l/min on B-annulus. Observed increase in leakage rate of approx 12 l/min each time the well was pressurised back to 345 bar. No significant change in leakage rates could be observed. Bled off pressure on well.",2.25 +15_9_F_12_2008_01_15.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-14T00:00:00+01:00,2008-01-15T00:00:00+01:00,2008-01-14 19:30:00+00:00,2008-01-14 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Picked up and RIH with nominal bowl protector at 20,8 m MD. Set bowl protector and pulled stand.",3.5 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-14 23:00:00+00:00,2008-01-15 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Waited for RTTS to arrive with supply boat. + +Meanwhile : +-Worked on IR +-Serviced manrider winches +-Changed centralizers for F-12 riser on Centralizer deck and tensioning deck +-Functioned flow line valve",6.0 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 05:00:00+00:00,2008-01-15 06:15:00+00:00,40.0,m,fixed,drilling -- casing,ok,operation failed,"Picked up 1 stand of 5 1/2"" DP to put underneath 9 5/8"" RTTS packer. Received RTTS, checked and measured same.",1.25 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 06:15:00+00:00,2008-01-15 07:00:00+00:00,45.0,m,fixed,drilling -- casing,ok,operation failed,"Made up 9 5/8"" RTTS packer.",0.75 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 07:00:00+00:00,2008-01-15 12:45:00+00:00,2350.0,m,fixed,drilling -- casing,ok,operation failed,"RIH with 9 5/8"" RTTS packer on 5 1/2"" DP from 45 m to 2350 m MD.",5.75 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 12:45:00+00:00,2008-01-15 13:15:00+00:00,2352.0,m,fixed,drilling -- casing,ok,operation failed,"Set 9 5/8"" RTTS by righthand rotation and set down 3 MT. Packer element set +/- 50 m above 9 5/8"" seal stinger.",0.5 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 13:15:00+00:00,2008-01-15 14:15:00+00:00,2352.0,m,fixed,drilling -- casing,ok,operation failed,"Lined up to pump from cement unit down kill line on BOP. Closed pipe ram, verified line up. Pressure tested 9 5/8"" x 10 3/4"" tie-back stinger above the RTTS packer to 345 bar / 10 min - ok. Volume pumped/bled back 1330 liter. No returns observed on B-annulus.",1.0 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 14:15:00+00:00,2008-01-15 15:45:00+00:00,2352.0,m,fixed,drilling -- casing,ok,operation failed,"Opened pipe ram. Released 9 5/8"" RTTS packer. RIH from 2352 m to 2420 m MD. Struggled to pass PBR pocket with end of pipe at 2400 m MD. Picked up and slacked off several times and passed pocket.",1.5 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 15:45:00+00:00,2008-01-15 16:15:00+00:00,2421.0,m,fixed,drilling -- casing,ok,operation failed,"Set 9 5/8"" RTTS packer by righthand rotation and set down 3 MT. Packer element set +/-20 m into 9 5/8"" liner.",0.5 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 16:15:00+00:00,2008-01-15 17:00:00+00:00,2421.0,m,fixed,drilling -- casing,ok,operation failed,"Lined up to pump from cement unit down TDS and DP. Verified line up. Pressure tested 9 5/8"" x 7 "" liner below the RTTS packer to 345 bar / 10 min - ok. Volume pumped/bled back 1100 liter.",0.75 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 17:00:00+00:00,2008-01-15 17:30:00+00:00,2421.0,m,fixed,drilling -- casing,ok,operation failed,"Lined up to pump from cement unit down kill line on BOP. Closed pipe ram, verified line up. Pressured up to 170 bar in stepwise manner : +30 bar / 10 min - ok. Cumulative pumped 145 liter +100 bar / 5 min - ok. Cumulative pumped 400 liter +171,5 bar. Cumulative pumped 712 liter - dropped 3 bar / 5 min. Leakage rate 2 l/min. Onset of leak from B-annulus could be observed at 165 bar.",0.5 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 17:30:00+00:00,2008-01-15 21:00:00+00:00,2420.0,m,fixed,drilling -- casing,ok,operation failed,"Allowed pressure to bleed off in attempt to establish leakage free pressure : + +160 bar - dropped 5,1 bar / 10 min (3,2%) - leakage 1,5 l/min +150 bar - dropped 4,6 bar / 10 min (3,1%) - leakage 1,5 l/min +140 bar - dropped 3,6 bar / 10 min (2,5%) - leakage 1,1 l/min +130 bar - dropped 3,2 bar / 10 min (2,5%) - leakage 1,0 l/min +120 bar - dropped 2,4 bar / 10 min (2,0%) - leakage 0,8 l/min +110 bar - dropped 2,4 bar / 10 min (2,2%) - leakage 0,7 l/min +100 bar - dropped 2,6 bar / 10 min (2,6%) - leakage 0,9 l/min +90 bar - dropped 1,7 bar / 10 min (1,9%) - leakage 0,5 l/min +80 bar - dropped 1,9 bar / 10 min (2,4%) - leakage 0,7 l/min +70 bar - dropped 1,5 bar / 10 min (2,2%) - leakage 0,5 l/min + +Bled pressure in well to zero.",3.5 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 21:00:00+00:00,2008-01-15 21:30:00+00:00,2420.0,m,fixed,drilling -- casing,ok,operation failed,"Released 9 5/8"" RTTS packer with 24 MT overpull according to Halliburton instructions. Allowed packer element to retract.",0.5 +15_9_F_12_2008_01_16.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-15T00:00:00+01:00,2008-01-16T00:00:00+01:00,2008-01-15 21:30:00+00:00,2008-01-15 23:00:00+00:00,2180.0,m,fixed,drilling -- casing,ok,operation failed,"POOH with 9 5/8"" RTTS packer on 5 1/2"" DP from 2420 m to 2180 MD. Pulled carefully through PBR pocket - no addtional drag observed.",1.5 +15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-15 23:00:00+00:00,2008-01-16 03:00:00+00:00,40.0,m,fixed,drilling -- casing,ok,operation failed,"Continued to POOH with 9 5/8"" RTTS packer on 5 1/2"" DP from 2180 m to 40 m MD.",4.0 +15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 03:00:00+00:00,2008-01-16 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Broke out an laid down 9 5/8"" RTTS packer. Racked back last stand.",1.0 +15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 04:00:00+00:00,2008-01-16 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Waited for plan of action from town. Meanwhile did routine testing of FOSV's and Gray valve.,1.0 +15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 05:00:00+00:00,2008-01-16 06:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Waited for plan of action from town. Meanwhile did routine testing of FOSV's and Gray valve.,1.0 +15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 06:00:00+00:00,2008-01-16 15:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Waited for instuctions from town. + +Meanwhile : +-Pressure tested safety valves +-Performed manitenance on rotary table lock +-Performed general housekeeping and PM's on drillfloor +-Removed BOP carrier from BOP",9.5 +15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 15:30:00+00:00,2008-01-16 19:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Recieved instruction from town to run guns. Waited on weather due to high winds, cranes down. Meanwhile rigged up casing tong, dressed PS-21 slips for 4 1/2"" and dressed BX elevator with 5"" inserts.",4.0 +15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 19:30:00+00:00,2008-01-16 20:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Laid out 4 1/2 perforation guns, firing heads and MAXR anchor on top of tubing in STB AFT bay. Made up FOSV with x-overs to perforation guns.",1.0 +15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 20:30:00+00:00,2008-01-16 21:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Held pre-job meeting on drillfloor. Made up Gray valve to stand of 5 1/2"" DP and racked back.",1.0 +15_9_F_12_2008_01_17.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-16T00:00:00+01:00,2008-01-17T00:00:00+01:00,2008-01-16 21:30:00+00:00,2008-01-16 23:00:00+00:00,38.0,m,fixed,completion -- perforate,ok,success,"Ran in hole with 4 1/2"" Orient exact weights/perforation guns from surface to 38 m MD.",1.5 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-16 23:00:00+00:00,2008-01-17 01:30:00+00:00,195.0,m,fixed,completion -- perforate,ok,success,"Ran in hole with 4 1/2"" Orient exact weights/spacers/perforation guns from 38 m MD to 195 m MD.",2.5 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 01:30:00+00:00,2008-01-17 02:00:00+00:00,195.0,m,fixed,completion -- perforate,ok,success,Removed PS-21 slips from rotary and inserted masterbushing and bowl. Removed and set back Odfjell casing tong. Took up weight 78 MT.,0.5 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 02:00:00+00:00,2008-01-17 03:00:00+00:00,200.0,m,fixed,completion -- perforate,ok,success,"Picked up and made up E-fire firing head. Made up firing head to swivel on top of gun section. Hung off in 3 1/2"" collar slips and secured with dog collar.",1.0 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 03:00:00+00:00,2008-01-17 03:45:00+00:00,206.0,m,fixed,completion -- perforate,ok,success,"Picked up and made up Pro-fire firing head. Made up firing head. Hung off in 3 1/2"" collar slips and secured with dog collar.",0.75 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 03:45:00+00:00,2008-01-17 04:30:00+00:00,217.5,m,fixed,completion -- perforate,ok,success,"Lifted in MAXR assembly complete with setting tool. Made up 3 1/2"" pup joint and X-over to assembly while laying on HTS. Picked up assembly and made up to Pro fire firing head. Checked adjustment of MAXR setting sleeve, removed transport studs and fitted shear pins. Hung off in 3 1/2"" DP slips.",0.75 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 04:30:00+00:00,2008-01-17 05:00:00+00:00,252.0,m,fixed,completion -- perforate,ok,success,"RIH with 4 1/2"" Orient exact perforation gun assy on 3 1/2"" DP from 217 m to 252 m MD according to tally.",0.5 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 05:00:00+00:00,2008-01-17 06:15:00+00:00,294.0,m,fixed,completion -- perforate,ok,success,"RIH with 4 1/2"" Orient exact perforation gun assy on 3 1/2"" DP from 252 m to 294 m MD according to tally. MU PBR no-go locator sub.",1.25 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 06:15:00+00:00,2008-01-17 07:15:00+00:00,294.0,m,fixed,completion -- perforate,ok,success,"Held tool box meeting and changed to 5"" handling equipment.",1.0 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 07:15:00+00:00,2008-01-17 09:15:00+00:00,862.0,m,fixed,completion -- perforate,ok,success,"RIH with 4 1/2"" Orient exact perforation gun assy on 5"" DP from 294 m to 862 m MD according to tally.",2.0 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 09:15:00+00:00,2008-01-17 12:30:00+00:00,862.0,m,fixed,drilling -- casing,ok,operation failed,Stopped RIH. Discussed testing requirements and further plans for F-12 with town.,3.25 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 12:30:00+00:00,2008-01-17 13:45:00+00:00,300.0,m,fixed,interruption -- other,ok,operation failed,"POOH with 4 1/2"" Orient exact perforation gun assy on 5"" DP from 862 m to 300 m MD according to tally.",1.25 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 13:45:00+00:00,2008-01-17 15:15:00+00:00,300.0,m,fixed,interruption -- other,ok,operation failed,"Held tool box meeting and changed to 3 1/2"" handling equipment.",1.5 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 15:15:00+00:00,2008-01-17 16:30:00+00:00,217.0,m,fixed,interruption -- other,ok,operation failed,"POOH with 4 1/2"" Orient exact perforation gun assy on 3 1/2"" DP from 300 m to 217 m MD according to tally.",1.25 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 16:30:00+00:00,2008-01-17 21:15:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Held tool box talk prior to handling guns on rig floor. POOH with 4 1/2"" Orient exact perforation gun assy from 217 m to OOH.",4.75 +15_9_F_12_2008_01_18.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-17T00:00:00+01:00,2008-01-18T00:00:00+01:00,2008-01-17 21:15:00+00:00,2008-01-17 23:00:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,Flushed lines and pressure tested from pump room to lower kill on BOP 35/240 bar for 5 min.,1.75 +15_9_F_12_2008_01_19.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-18T00:00:00+01:00,2008-01-19T00:00:00+01:00,2008-01-17 23:00:00+00:00,2008-01-18 02:00:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Flushed lines and pressure tested from cement unit to outer manual valve on B-annulus 35/250 bar for 5 min. + +Meanwhile performed maintenance on TDS and rig floor equipment.",3.0 +15_9_F_12_2008_01_19.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-18T00:00:00+01:00,2008-01-19T00:00:00+01:00,2008-01-18 02:00:00+00:00,2008-01-18 05:00:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,Waited for plan of action from town. Meanwhile performed maintenance on TDS and rig floor equipment.,3.0 +15_9_F_12_2008_01_19.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-18T00:00:00+01:00,2008-01-19T00:00:00+01:00,2008-01-18 05:00:00+00:00,2008-01-18 21:00:00+00:00,0.0,m,fixed,interruption -- other,ok,operation failed,"Waited for plan of action from town. + +Meanwhile : +-Performed 6 month maintenance on TDS +-Installed centralizer ring on F-7 +-Transfered 7 m3 packer fluid from pit 3 to cmt unit with MP2 +-Installed back up BX elevator and function tested same +-Disconnected winch on aft TDS working platform",16.0 +15_9_F_12_2008_01_19.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-18T00:00:00+01:00,2008-01-19T00:00:00+01:00,2008-01-18 21:00:00+00:00,2008-01-18 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Performed in-between test to 220 bar / 10 min on multibowl BT-seals.,0.5 +15_9_F_12_2008_01_19.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-18T00:00:00+01:00,2008-01-19T00:00:00+01:00,2008-01-18 21:30:00+00:00,2008-01-18 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather due to high winds up to 87 knop and danger for people to be present in well head module.,1.5 +15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-18 23:00:00+00:00,2008-01-19 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,Waited on weather due to high winds up to 72 knop and danger for people to be present in well head module.,6.0 +15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 05:00:00+00:00,2008-01-19 07:15:00+00:00,0.0,m,fixed,interruption -- well control,ok,operation failed,"Waited on weather due to high winds up to 60 knop and danger for people to be present in well head module. + +Meanwhile inspected AFT PRS and found damage on drag chain. Barried off rig floor.",2.25 +15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 07:15:00+00:00,2008-01-19 07:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held tool box talk for testing 10 3/4"" x 14"" annulus. Performed line test to 20 bar to verify correct line up. Closed shear ram.",0.5 +15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 07:45:00+00:00,2008-01-19 08:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Adjusted geoservices logging screen for documentation of test,1.0 +15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 08:45:00+00:00,2008-01-19 09:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Pressured up to 35 bar on B-annulus. Pressured up to 175 bar with MP2 using packer fluid on csg side. Observed 17 bar pressure increase on B-annulus due to ballooning (35-52 bar) + +Attempted to pressure up B-annulus to 220 bar with cmt unit. Stopped pumping at 97 bar and only 16 ltrs pumped (theoretical volume to 97 bar = 280 ltr).",1.0 +15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 09:45:00+00:00,2008-01-19 10:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Bled off B-annulus and csg to 0 bar and investigated surface lines. Disconnected 5K hose from cmt unit to surface wellhead and flushed through to verify no restrictions. Reconnected 5K hose to B-annulus and performed new line test 30/225 bar 5/10 min against closed outer valve on wellhead outlet. Pressured up to 50 bar on B-annulus with only 23 ltr pumped (23 ltr corresponds to pressuring up volume down to subsea wellhead, indicating blockage in 10 3/4"" hanger annulus ports).",1.0 +15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 10:45:00+00:00,2008-01-19 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Bled off pressure on B-annulus and had time-out to evaluate further action.,1.25 +15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 12:00:00+00:00,2008-01-19 13:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held tool box talk for testing 10 3/4"" x 14"" annulus. Performed line test to 20 bar to verify correct line up for both BOP kill line and B-annulus. + +Pressured up csg with MP2 to 50 bar/400 ltrs - Recorded 10 bar on B-annulus from cement unit. +Pressured up csg with MP2 to 70 bar/155 ltrs - Recorded 12,4 bar on B-annulus from cement unit. +Pressured up csg with MP2 to 156 bar/644 ltrs - Recorded 21 bar on B-annulus from cement unit. + +Observed leak into B-annulus at 156 bar, confirming communication through annulus ports in 10 3/4"" hanger from below (recorded pressure increase above ballooning effect). Recorded 1,9 bar/10min pressure increase on B-annulus with 135 bar differential pressure.",1.25 +15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 13:15:00+00:00,2008-01-19 17:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Had time-out to evaluate further action. Made arrangements for punching holes in 9 5/8"" csg. + +Meanwhile logged pressure on csg and B-annulus. Recorded 0,25 bar/10min pressure increase on B-annulus with 56 bar differential pressure.",3.75 +15_9_F_12_2008_01_20.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-19T00:00:00+01:00,2008-01-20T00:00:00+01:00,2008-01-19 17:00:00+00:00,2008-01-19 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Waited for tubing puncher equipment and schlumberger personnel to arrive on the rig. + +Bled off pressure on B-annulus from 60 to 2 bar in preparation to test shear rams. Observed pressure on csg driopping from 116 bar to 106.4 bar while bleeding off on B-annulus (due to balloning effect). + +RIH with WBRT and pulled WB. RIH with 2 stds of 5"" DP and test plug to 100 m MD. Sat test plug.",6.0 +15_9_F_12_2008_01_21.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-20T00:00:00+01:00,2008-01-21T00:00:00+01:00,2008-01-19 23:00:00+00:00,2008-01-20 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Waited for tubing puncher equipment and schlumberger personnel to arrive on the rig. + +Tested shear rams 20/345 bar 10 min with packer fluid, 82 ltrs pumped and 78 ltrs in return. POOH with test plug and LO same. RIH with WB and sat same.",6.0 +15_9_F_12_2008_01_21.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-20T00:00:00+01:00,2008-01-21T00:00:00+01:00,2008-01-20 05:00:00+00:00,2008-01-20 15:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Waited for tubing puncher equipment and schlumberger personnel to arrive on the rig. + +Meanwhile: +-Performed derrick inspection after high winds +-Changed out encoder, replaced bended link on drag chain and calibrated AFT PRS. +-Cleared future equipment room. +-Performed maintenace on crew conveyer between CRI and STB transport conveyer +-Cleared rig floor prior to running WL.",10.0 +15_9_F_12_2008_01_21.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-20T00:00:00+01:00,2008-01-21T00:00:00+01:00,2008-01-20 15:00:00+00:00,2008-01-20 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Placed wireline units on cantiliver and port leg and hooked them up electrically. RU umbilical from Schlumberger logging unit to Seawell wireline winch. Installed add-on drum with 7/16"" cable.",8.0 +15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-20 23:00:00+00:00,2008-01-21 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Prepared and loaded 1 11/16"" HNS Puncher. Changed to Schlumberger collector. MU MH-22 logging head for 7/16"" cable. RU sheave wheels on rig floor.",6.0 +15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 05:00:00+00:00,2008-01-21 13:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Continued RU wireline equipment and troubleshot power supply for wireline winch. Modified depth system on wireline winch drum. Function tested CCL tool.,8.5 +15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 13:30:00+00:00,2008-01-21 16:00:00+00:00,2450.0,m,fixed,drilling -- casing,ok,operation failed,"MU and RIH with toolstring to 2450 m. Correlated depth to tally using CCL and fired 1 11/16"" HNS Puncher at 2395-2392 m MD.",2.5 +15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 16:00:00+00:00,2008-01-21 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,POOH with toolstring and LO gun assembly. Confirmed all 41 shots were fired.,2.0 +15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 18:00:00+00:00,2008-01-21 18:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held pre job meeting with involved personnel. Lined up cement unit to pump down casing. Disconnected hose on B-annulus and observed flow due to U-tubing effect. Pumped down casing 300 lpm and observed full communication via holes punched in 9 5/8"" csg.",0.5 +15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 18:30:00+00:00,2008-01-21 19:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Hooked hose back up on B-annulus and performed a line test 35/220 bar 5/10 min. Bled off pressure to 20 bar, opened B-annulus valve and verified line-up. Lined up to monitor B-annulus on standpipe. Pressured B-annulus through punched holes in 9 5/8"" x 10 3/4"" tieback string to 220 bar / 10 min using 2196 ltrs drillwater from cement unit. Had 2.6 bar drop in 10 min.",1.25 +15_9_F_12_2008_01_22.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-21T00:00:00+01:00,2008-01-22T00:00:00+01:00,2008-01-21 19:45:00+00:00,2008-01-21 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Ivestigated leak by performing line tests against various valves. Isolated standpipe by closing valves on B-annulus wellhead. Unable to obtain pressure test within 1% pressure drop. Opened B-annulus valves and bled off pressure through stanpipe and into trip tank. Re-arranged line-up.,3.25 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-21 23:00:00+00:00,2008-01-22 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Re-tested B-annulus through punched holes in 9 5/8"" x 10 3/4"" tieback string to 220 bar / 10 min using packer fluid from cement unit. Observed 2.2 bar drop in 10 min. Pumped 2087 ltrs and bled back 1980 ltrs. + +Both manual valves on wellhead B-annulus had been tested to 220 bar/10 min during line tests.",1.0 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 00:00:00+00:00,2008-01-22 02:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,RU for running TCP guns. Prepared firing heads and loaded batteries.,2.25 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 02:15:00+00:00,2008-01-22 02:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Held tool box meeting for RU and RIH with TCP guns. + +Meanwhile closed shear rams due to slow increase in trip tank of 150 ltrs/hr.",0.5 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 02:45:00+00:00,2008-01-22 04:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Investigated increase in trip tank. No pressure build up recorded. Observed well on trip tank. No gain observed.,1.5 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 04:15:00+00:00,2008-01-22 05:00:00+00:00,27.0,m,fixed,completion -- perforate,ok,success,MU TCP guns and lowered each section into hole by BX elevators from surface to 54 m MD.,0.75 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 05:00:00+00:00,2008-01-22 09:00:00+00:00,173.0,m,fixed,drilling -- casing,ok,operation failed,"MU 4 1/2"" TCP guns and lowered each section into hole by BX elevators from surface to 173 m MD.",4.0 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 09:00:00+00:00,2008-01-22 11:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"POOH and LO 4 1/2"" gun assembly from 173 to 48 m. Held last 9 joints standby in TDS.",2.75 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 11:45:00+00:00,2008-01-22 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Held tool box talk. Greased up valves and pressure tested kill manifold to 345 bar/10 min.,2.25 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 14:00:00+00:00,2008-01-22 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,"Performed two line tests to 345 bar/10 min. Tested B-annulus through punched holes in 9 5/8"" x 10 3/4"" tieback string against outer manual valve on B-annulus to 220 bar / 10 min using packer fluid from cement unit. Observed 0 bar drop in 10 min. Pumped 2193 ltrs and bled back 2200 ltrs.",1.25 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 15:15:00+00:00,2008-01-22 15:45:00+00:00,0.0,m,fixed,drilling -- casing,ok,operation failed,Closed K-3 valve on on kill manifold and bleed off pressure down to cmt unit. Lined up cmt unit to B-annulus through hose from moonpool. Closed inner manual valve on B-annulus and equalized and opened outer valve. Bled off pressure on cmt unit down to 10 bar. Inflow tested inner manual valve on wellhead B-annulus to 220 bar/10 min. Bled off all pressures.,0.5 +15_9_F_12_2008_01_23.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-22T00:00:00+01:00,2008-01-23T00:00:00+01:00,2008-01-22 15:45:00+00:00,2008-01-22 23:00:00+00:00,292.0,m,fixed,completion -- perforate,ok,success,"MU 4 1/2"" TCP guns and lowered each section into hole by BX elevators from surface to 173 m MD. MU orient exact weight spacers from 173 m to 195 m MD. MU eFire firing head assembly and ProFire firing head assembly. MU MAXR assembly onto the HPA fill-sub assembly and RIH with TCP guns on 3 1/2"" DP from 217 to 285,5 m MD. MU PBR no-go locator sub.",7.25 +15_9_F_12_2008_01_24.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-23T00:00:00+01:00,2008-01-24T00:00:00+01:00,2008-01-22 23:00:00+00:00,2008-01-23 04:15:00+00:00,1311.0,m,fixed,completion -- perforate,ok,success,"RIH with 4 1/2"" TCP guns on 5 1/2"" DP to 1311 m MD.",5.25 +15_9_F_12_2008_01_24.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-23T00:00:00+01:00,2008-01-24T00:00:00+01:00,2008-01-23 04:15:00+00:00,2008-01-23 05:00:00+00:00,1311.0,m,fixed,interruption -- other,ok,equipment failure,Had VFD-fault (electrical problem) on AFT PRS racking arm.,0.75 +15_9_F_12_2008_01_24.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-23T00:00:00+01:00,2008-01-24T00:00:00+01:00,2008-01-23 05:00:00+00:00,2008-01-23 10:00:00+00:00,1311.0,m,fixed,interruption -- other,ok,equipment failure,"The upper racking arm on the AFT PRS could not move because brakes were locked. + +Meanwhile installed TIW on string and function tested BOP at low pressure.",5.0 +15_9_F_12_2008_01_24.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-23T00:00:00+01:00,2008-01-24T00:00:00+01:00,2008-01-23 10:00:00+00:00,2008-01-23 21:30:00+00:00,3310.0,m,fixed,completion -- perforate,ok,success,"Removed TIW and installed XO to 5 1/2"" DP. Changed handling equipment to 5 1/2"". + +RIH with 4 1/2"" TCP guns on 5 1/2"" DP from 1311 m to 3310 m MD. Up weight 212 MT / down weight 129 MT.",11.5 +15_9_F_12_2008_01_24.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-23T00:00:00+01:00,2008-01-24T00:00:00+01:00,2008-01-23 21:30:00+00:00,2008-01-23 23:00:00+00:00,3315.7,m,fixed,completion -- perforate,ok,success,"Tagged TOL at 3315.7 m MD and landed no-go locator on top of PBR. Sat down 5 MT. Pulled to up-weight and marked the string ( 1.9 m stretch in string). Reciprocated string 10 times to orientate the guns. + +Tagged TOL again at 3315.6 m and landed no-go locator on top PBR. Sat down 5 MT. Pulled to up-weight and verified mark on string. + +PO 9 m with 4 1/2"" TCP guns to locate top shot at 3130 m MD. Slacked off weight by releasing 0.5 m stretch in string. + +Held tool box meeting before pressuring up the well when reciprocating string.",1.5 +15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-23 23:00:00+00:00,2008-01-24 00:30:00+00:00,3305.2,m,fixed,completion -- perforate,ok,success,"Checked line-up. Broke circulation by pumping 300 lpm at 5 bar. Closed annular BOP. + +Pressured up annulus and DP simultaniously by pumping 800 lpm to 220 bar to activate MAXR setting tool. Held pressure for 2 min. Bled off pressure and verified that pressure was zero before opening annular BOP. Pumped 3100 ltrs and bled back 3000 l. One cycle used on ProFire. + +Waited 25 min, from activation, for MAXR to set. Sat down 2 MT to confirm that MAXR had been sat. Picked up 3 m and re-checked up/down weights to confirm that the hanger had been released from the running tool. String weight was reduced by 14 MT.",1.5 +15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-24 00:30:00+00:00,2008-01-24 05:00:00+00:00,1802.0,m,fixed,completion -- perforate,ok,success,"POOH with MAXR setting tool on 5 1/2"" DP from 3305 to 1802 m MD.",4.5 +15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-24 05:00:00+00:00,2008-01-24 13:45:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"POOH with MAXR setting tool on 5 1/2"" DP from 1802 m to OOH. LO gun hanger setting tool and RD handling equipment.",8.75 +15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-24 13:45:00+00:00,2008-01-24 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and pulled secondary bowl protector in surface wellhead at 20 m MD. MU jet sub and cleaned BOP and wellhead at 2000 lpm / 8 bar / 10 RPM. LO same.,2.25 +15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-24 16:00:00+00:00,2008-01-24 20:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"MU kick assembly. RU csg tong and prepared to run 7"" tubing. Lifted in place BOT and WellDynamics' cable drums. Installed FMS.",4.0 +15_9_F_12_2008_01_25.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-24T00:00:00+01:00,2008-01-25T00:00:00+01:00,2008-01-24 20:00:00+00:00,2008-01-24 23:00:00+00:00,73.0,m,fixed,completion -- completion string,ok,success,"Held pre-job meeting with involved personnel. MU and ran 7 1/2"" seal stem (no seals) with ratcheting muleshoe assembly. Function tested ratcheting muleshoe. MU joint with pre-installed NPR plug and pre-installed 1 3/4"" ball. MU and ran one 7"" tubing joint. MU and ran 7""x 9 5/8"" Granite production packer. MU and ran one 7"" tubing joint. MU 7"" 20 ft PBR assembly with pups. Load tested PBR.",3.0 +15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-24 23:00:00+00:00,2008-01-25 00:00:00+00:00,100.0,m,fixed,completion -- completion string,ok,success,"Attempted to MU and run 7"" tubing joints. Had to LO out 2 joints.",1.0 +15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 00:00:00+00:00,2008-01-25 05:00:00+00:00,100.0,m,fixed,interruption -- waiting on weather,ok,success,"WOW due to high winds up to 71 knop. Crane was not able to lift DHPG on to drill floor and could not RU sheave weel for DHPG and chemical injection line in derrick. + +Meanwhile continued MU and run 3 x 7"" tubing joints. Had to LO out 1 joint.",5.0 +15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 05:00:00+00:00,2008-01-25 06:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to high winds up to 60 knop. Crane was not able to lift DHPG on to drill floor and could not RU sheave weel for DHPG and chemical injection line in derrick.,1.0 +15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 06:00:00+00:00,2008-01-25 08:00:00+00:00,100.0,m,fixed,completion -- completion string,ok,success,Installed control line sheave in high strength wire in derrick. Held on to sheave with PRS racking arm to avoid it from moving in the wind.,2.0 +15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 08:00:00+00:00,2008-01-25 09:30:00+00:00,100.0,m,fixed,completion -- completion string,ok,success,POOH to check collar that was changed out on second joint below gauge carrier. Verified correct length on tubing compared to tally.,1.5 +15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 09:30:00+00:00,2008-01-25 16:30:00+00:00,110.0,m,fixed,completion -- completion string,ok,success,"Held tool box meeting prior to PU gauge assembly. + +MU and RIH with DHPG/Asphalthene assembly. Installed one tubing joint above DHPG and positioned assembly in working hight. PU and terminated cable to DHPG. Function checked gauge. + +Connected chemical injection line. Tested line and installed protector clamps.",7.0 +15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 16:30:00+00:00,2008-01-25 19:15:00+00:00,145.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 110 m to 145 m MD. Maintained 100 bar pressure on chemical injection line while RIH.",2.75 +15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 19:15:00+00:00,2008-01-25 19:45:00+00:00,145.0,m,fixed,completion -- completion string,ok,success,Installed AFT rollers to HTS and function tested same.,0.5 +15_9_F_12_2008_01_26.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-25T00:00:00+01:00,2008-01-26T00:00:00+01:00,2008-01-25 19:45:00+00:00,2008-01-25 23:00:00+00:00,286.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 145 m to 286 m MD. Maintained 100 bar pressure on chemical injection line while RIH.",3.25 +15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-25 23:00:00+00:00,2008-01-26 05:00:00+00:00,625.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 286 m to 625 m MD. Maintained 100 bar pressure on chemical injection line while RIH. Up weight 90 MT / down weight 85 MT at 500 m MD.",6.0 +15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-26 05:00:00+00:00,2008-01-26 09:30:00+00:00,800.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 625 m to 800 m MD. Maintained 100 bar pressure on chemical injection line while RIH.",4.5 +15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-26 09:30:00+00:00,2008-01-26 11:30:00+00:00,800.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to unfavorable wind direction and high winds up to 70 knots.,2.0 +15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-26 11:30:00+00:00,2008-01-26 14:00:00+00:00,881.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 800 m to 881 m MD. Maintained 100 bar pressure on chemical injection line while RIH.",2.5 +15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-26 14:00:00+00:00,2008-01-26 15:00:00+00:00,881.0,m,fixed,interruption -- waiting on weather,ok,success,WOW due to unfavorable wind direction and high winds up to 70 knots.,1.0 +15_9_F_12_2008_01_27.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-26T00:00:00+01:00,2008-01-27T00:00:00+01:00,2008-01-26 15:00:00+00:00,2008-01-26 23:00:00+00:00,1322.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 881 m to 1322 m MD. Maintained 100 bar pressure on chemical injection line while RIH. LO 1 joint.",8.0 +15_9_F_12_2008_01_28.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-27T00:00:00+01:00,2008-01-28T00:00:00+01:00,2008-01-26 23:00:00+00:00,2008-01-27 05:00:00+00:00,1620.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 1322 m to 1620 m MD. Maintained 100 bar pressure on chemical injection line while RIH. Average running speed is 5,5 joint/hr. Up weight 132 MT / down weight 111 MT at 1500 m MD.",6.0 +15_9_F_12_2008_01_28.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-27T00:00:00+01:00,2008-01-28T00:00:00+01:00,2008-01-27 05:00:00+00:00,2008-01-27 07:30:00+00:00,1738.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 1620 m to 1738 m MD. Pressure dropped from 100 to 25 bar on chemical injection line.",2.5 +15_9_F_12_2008_01_28.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-27T00:00:00+01:00,2008-01-28T00:00:00+01:00,2008-01-27 07:30:00+00:00,2008-01-27 09:45:00+00:00,1738.0,m,fixed,completion -- completion string,ok,success,"Bled off pressure in chemical injection line and observed for pressure build up. No pressure increase observed. Pressured up to 50 bar and observed that it bled back to 25 bar. + +Meanwhile serviced PRS and TDS.",2.25 +15_9_F_12_2008_01_28.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-27T00:00:00+01:00,2008-01-28T00:00:00+01:00,2008-01-27 09:45:00+00:00,2008-01-27 23:00:00+00:00,2428.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 1738 m to 2428 m MD. Pressure increased from 25 bar to 35 bar on chemical injection line while RIH. Average running speed was 5,5 joint/hr. + +Took 4.5 MT weight when entering 9 5/8"" tieback hanger at 2412 m MD. PU 8 MT and continued to RIH at slow speed.",13.25 +15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-27 23:00:00+00:00,2008-01-28 01:00:00+00:00,2528.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 2428 m to 2528 m MD. Pressure increased from 35 bar to 38 bar on chemical injection line while RIH. Average running speed was 5,5 joint/hr. Up weight 195 MT / down weight 130 MT.",2.0 +15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 01:00:00+00:00,2008-01-28 02:00:00+00:00,2528.0,m,fixed,completion -- completion string,ok,success,Held tool box meeting with involved personnel. PU and MU DHSV assembly.,1.0 +15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 02:00:00+00:00,2008-01-28 02:30:00+00:00,2528.0,m,fixed,interruption -- repair,ok,success,DHSV got stuck in lower guiding plate on FMS while lowering DHSV assembly through slips. Managed to free slips.,0.5 +15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 02:30:00+00:00,2008-01-28 03:15:00+00:00,2528.0,m,fixed,completion -- completion string,ok,success,Removed FMS and lowered DHSV through rotary table. Re-installed FMS. Installed one joint above DHSV. Installed hole cover.,0.75 +15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 03:15:00+00:00,2008-01-28 05:00:00+00:00,2528.0,m,fixed,completion -- completion string,ok,success,"RU sheave wheel for single CL to a tugger. Inserted and hoisted in position. + +PU, flushed and connected CL. Tested CL to 570 bar / 10 min. Bled down pressure to zero and got 210 ml back. Pumped up to 420 bar on control line to maintain DHSV open while RIH.",1.75 +15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 05:00:00+00:00,2008-01-28 18:15:00+00:00,3023.0,m,fixed,completion -- completion string,ok,success,"Ran 7"" tubing, cable and clamps from 2528 m to 3023 m MD. Pressure increased from 38 bar to 45 bar on chemical injection line while RIH. Average running speed was 4 joint/hr due to increased drag. Up weight 227 MT / down weight 137 MT.",13.25 +15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 18:15:00+00:00,2008-01-28 19:30:00+00:00,3030.6,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting. MU the last tubing joint and RIH slowly. Stung into top of liner with ratcheting muleshoe approx 4 m before landing out with no-go. Sat down 5 MT and marked pipe 7.69 m off btm of joint #19. Pulled up to up-weight and marked pipe 6.5 m off btm of joint #19. + +POOH 8 m to confirm tagging depth. Up weight 215 MT / down weight 135 MT. Observed that up-weight was reduced by 12 MT. RIH slowly and verified landing depth.",1.25 +15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 19:30:00+00:00,2008-01-28 20:45:00+00:00,3030.6,m,fixed,completion -- completion string,ok,success,Discussed situation with town.,1.25 +15_9_F_12_2008_01_29.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-28T00:00:00+01:00,2008-01-29T00:00:00+01:00,2008-01-28 20:45:00+00:00,2008-01-28 23:00:00+00:00,3000.5,m,fixed,completion -- completion string,ok,success,"POOH with 3 tubing joints. Took up weight 225 MT / down weight 135 MT. RU to circulate down tubing. + +Meanwhile re-calculated casing design for production PBR being sheared prior to setting the production packer. Calculated space-out for production PBR.",2.25 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-28 23:00:00+00:00,2008-01-29 00:00:00+00:00,3006.5,m,fixed,completion -- completion string,ok,success,"Performed line-up check. Attempted to circulate by pumping 100 lpm with cement unit up to 13 bar. No returns observed. Held pressure for 2 min. This confirmed that PBR had not been sheared. RD circulation equipment. + +PU and MU 6.038 m pup joint according to original space-out.",1.0 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 00:00:00+00:00,2008-01-29 04:00:00+00:00,3007.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"PU and MU tubing hanger with handling tool. Lowered the TH down to rotary. Cut the control lines 3 m above TH and fed the CL through the TH. Plugged off DHPG line. Plugged off spare penetration holes in TH with 1/4"" NPT blind plugs. Leak tested all fittings simultaneously through 1/8"" test ports to 448 bar /10 min.",4.0 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 04:00:00+00:00,2008-01-29 05:00:00+00:00,3007.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lifted TH to sufficient hight for handling master bushing. Removed FMS and installed master bushing. Installed C-plate and landed TH in same.,1.0 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 05:00:00+00:00,2008-01-29 06:00:00+00:00,3007.0,m,fixed,completion -- bop/wellhead equipment,ok,success,BO and LD TH landing tool. Wrapped control lines 3 times around hanger neck. Found broken gauge line.,1.0 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 06:00:00+00:00,2008-01-29 09:00:00+00:00,3007.0,m,fixed,interruption -- repair,ok,equipment failure,Dicussed situation with town and decided to re-splice the gauge line.,3.0 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 09:00:00+00:00,2008-01-29 15:00:00+00:00,3007.0,m,fixed,interruption -- repair,ok,equipment failure,Spliced gauge cable. Fed gauge line through hanger and installed clamp.,6.0 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 15:00:00+00:00,2008-01-29 17:00:00+00:00,3007.0,m,fixed,interruption -- repair,ok,equipment failure,"Landed TH in C-plate. BO and LD TH hanger handling tool. Leak tested fitting through 1/8"" test port to 448 bar /10 min.",2.0 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 17:00:00+00:00,2008-01-29 19:30:00+00:00,3007.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Attempted to install TH running tool with BX-elevator. Changed to pick-up elevator and re-stabbed TH running tool. MU THRT to communication collar with 8 left hand turns. Connected chemical injection line and TRSCSSV control lines to 1/4"" communication ports on top of THRT. Leak tested TRSCSSV line to 570 bar/10 min. Bled off 510 ml. Pressured up and kept 570 bar on TRSCSSV line while RIH. BO THRT piston retaining screws.",2.5 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 19:30:00+00:00,2008-01-29 21:30:00+00:00,3028.4,m,fixed,completion -- bop/wellhead equipment,ok,success,PU TH running string and removed C-plate. Installed bushings. Drained riser down to wellhead using A-annulus overboard line. RIH while taping control lines to landing string and stung into liner PBR. Landed out on the landing shoulder in the tubing head. Stick-up 1.33 m.,2.0 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 21:30:00+00:00,2008-01-29 22:00:00+00:00,3028.4,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested TH in port 1 on surface WH to 70 bar/5 min to verify correct landing. Pressured up function line on THRT to 207 bar to engage TH lock down ring. Pull tested TH to 236 MT to verify hanger lock down.,0.5 +15_9_F_12_2008_01_30.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-29T00:00:00+01:00,2008-01-30T00:00:00+01:00,2008-01-29 22:00:00+00:00,2008-01-29 23:00:00+00:00,3028.4,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested TH seal through test port 1 on surface WH to 35/450 bar for 5/10 min. Bled down to zero bar when test was verified by StatoilHydro. + +Meanwhile changed elevator inserts and prepared to PU pumping/testing assembly.",1.0 +15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-29 23:00:00+00:00,2008-01-30 00:00:00+00:00,3028.4,m,fixed,completion -- test scsssv,ok,success,"MU pumping/testing assembly and confirmed line-up with cement unit. Filled tubing with drill water and performed line test to 345 bar/10 min. + +Meanwhile bled off pressure in chemical injection line and observed for back flow for 30 min.",1.0 +15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 00:00:00+00:00,2008-01-30 00:30:00+00:00,3028.4,m,fixed,completion -- test scsssv,ok,success,"Opened A-annulus valve. Pressured up tubing against pre-installed NPR plug w/ball to 50 bar/10 min. Volume pumped 186 ltrs. + +Meanwhile observed no pressure build-up in chemical injection line for 10 min. Pressured up chemical injection line until pressure leveled out at 95 bar.",0.5 +15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 00:30:00+00:00,2008-01-30 01:00:00+00:00,3028.4,m,fixed,completion -- test scsssv,ok,success,"Closed TRSCSSV and bled off pressure above to 5 bar. Inflow tested TRSCSSV for 10 min. Volume bled off was 30 ltrs. Pumped 44 ltrs, equalized and opened TRSCSSV. Pressured up control line to 570 bar and kept TRSCSSV open.",0.5 +15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 01:00:00+00:00,2008-01-30 01:45:00+00:00,3028.4,m,fixed,completion -- test scsssv,ok,success,"Continued to pressure up tubing to 300 bar. Held pressure for 15 min to set packer and test tubing. PBR sheared at 221.5 bar. Volume pumped was 774 ltrs (Total: 186 + 774 = 960 ltrs). No flow observed from A-annulus. + +Meanwhile performed a 300 bar/15 min leak-test on chemical injection line.",0.75 +15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 01:45:00+00:00,2008-01-30 03:30:00+00:00,3028.4,m,fixed,completion -- test scsssv,ok,success,"Bled off pressure in tubing to 280 bar. Volume bled back was 50 ltrs. Closed TRSCSSV and bled off pressure above to 210 bar. Volume bled back was 40 ltrs. Inflow tested TRSCSSV to 70 bar/30 min. Bled off pressure above TRSCSSV to 10 bar. Volume bled back was 120 ltrs. Inflow tested TRSCSSV to 270 bar/30 min. Pumped 180 ltrs, equalized and opened TRSCSSV. Bled off pressure in tubing to zero. Volume bled back was 780 ltrs. Kept TRSCSSV open. Closed A-annulus valve. RD pumping/testing assembly. + +Meanwhile performed SJA with wireline crew.",1.75 +15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 03:30:00+00:00,2008-01-30 05:00:00+00:00,3028.4,m,wire line,workover -- rig up/down,ok,success,Performed pre-job meeting on rig floor. Spotted and RU WL equipment.,1.5 +15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 05:00:00+00:00,2008-01-30 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Performed pre-job meeting and reviewed SJA with two different crews (crew change). MU 7"" Vam Top x 9"" 4 ACME crossover to top of landing string. Installed Seawell pump-in sub. Installed kill hose to pump-in sub. Lined up and pressure tested to 345/10 min against inner Lo-torque valve. Ok. Installed 6 1/2"" WL-BOP. Hooked up hydraulic connections to WL-BOP and function tested same. + +Closed WL-BOP. Performed connection test to 300 bar/5 min against NPR plug in tubing at 3014 m MD. Kept A-annulus vented and observed for fluid returns out A-annulus at surface WH. Volume pumped was 942 ltrs. Bled back 880 ltrs. No returns observed.",8.5 +15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 13:30:00+00:00,2008-01-30 21:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"RU WL sheave with 7/32"" braided line in TDS and PU to sufficient hight. PU and installed lower WL lubricator section. PU upper WL lubricator section to above connection point. Lowered cable head down to WL-BOP and connected lubricator. Broke connection above WL-BOP and lifted lubricator section 1.5 m. Installed WL toolstring. Attempted to fill up lubricator using cement unit, but ended up using WL test pump. Leak tested rig-up to 25/300 bar for 5 /10 min.",7.5 +15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 21:00:00+00:00,2008-01-30 22:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Observed tugger wire and 7/32"" braided line was twined together at top of lubricator. Got acceptance from OIM and performed SJA for man-riding operation in derrick with wind speed 36-40 knots to be able to RIH.",1.0 +15_9_F_12_2008_01_31.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-30T00:00:00+01:00,2008-01-31T00:00:00+01:00,2008-01-30 22:00:00+00:00,2008-01-30 23:00:00+00:00,1500.0,m,wire line,workover -- wire line,ok,success,Equalized and opened blind rams. RIH with WL toolstring to 450 m MDRKB and verified that TRSCSSV was fully open. Continued RIH with WL toolstring from 450 to 1500 m MDRKB.,1.0 +15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-30 23:00:00+00:00,2008-01-31 00:00:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,RIH with WL toolstring from 1500 to 3000 m MDRKB. Pick up weight 670 kg / slack off weight 760 kg.,1.0 +15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 00:00:00+00:00,2008-01-31 02:00:00+00:00,3014.8,m,wire line,workover -- wire line,ok,success,Pressured up tubing to 10 bar with cement unit. Volume pumped was 40 ltrs. RIH and latched plug at 3014.8 m MDRKB. Observed for pressure drop for 15 min when equalizing the plug. No pressure drop observed. Jared plug free and waited for 30 min to let plug elements retract. Confirmed that plug was free. No pressure drop observed.,2.0 +15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 02:00:00+00:00,2008-01-31 05:00:00+00:00,2972.0,m,wire line,workover -- wire line,ok,success,"POOH with NPR plug from 3014.8 m to PBR at 2972 m. Made attempt to pass PBR with max overpull of 785 kg. Bled off pressure in tubing to zero and waited another 30 min to ensure that elements was released. Bled back 80 ltrs. No returns on A-annulus. Continued to attempt to pass PBR. Max overpull 900kg. Unable to pass restriction at 2972 m MDRKB, but free to go down.",3.0 +15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 05:00:00+00:00,2008-01-31 11:00:00+00:00,3020.0,m,wire line,workover -- wire line,ok,success,"Worked to free NPR pulling string from 3020 m to 2972 m. PU weight was 950 kg. + +Filled tubing up to neddle valve on lubricator and checked for swabbing effect.",6.0 +15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 11:00:00+00:00,2008-01-31 13:00:00+00:00,3068.0,m,wire line,workover -- wire line,ok,success,Tensioned up cable to 1700 kg at 2972 m and waited 35 min. Continued to work to free NPR pulling string from 3068 m to 2972 m.,2.0 +15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 13:00:00+00:00,2008-01-31 19:00:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,Discussed situation with town and made plans for further operations.,6.0 +15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 19:00:00+00:00,2008-01-31 20:15:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,Held pre job meeting with involved personnel. RU hose from cement unit to A-annulus and performed line test 200 bar/5 min. RIH with NPR pulling string to 3000 m. Reduced TRSCSSV CL pressure to 520 bar.,1.25 +15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 20:15:00+00:00,2008-01-31 21:15:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,Pressured up A-annulus to 100 bar using cement unit. Volume pumped 786 ltrs. Kept TRSCSSV CL pressure below 570 bar. Worked to free NPR pulling string from 3000 m to 2972.4 m. Observed that restriction had shifted 0.4 m deeper. Not able to pull NPR plug through PBR.,1.0 +15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 21:15:00+00:00,2008-01-31 22:15:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,Pressured up A-annulus to 200 bar using cement unit. Volume pumped 710 ltrs. Kept TRSCSSV CL pressure below 570 bar. Worked to free NPR pulling string from 3000 m to 2972.8 m. Observed that restriction had shifted 0.4 m deeper. Not able to pull NPR plug through PBR.,1.0 +15_9_F_12_2008_02_01.xml,NO 15/9-F-12,NO 15/9-F-12,2008-01-31T00:00:00+01:00,2008-02-01T00:00:00+01:00,2008-01-31 22:15:00+00:00,2008-01-31 23:00:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,"Closed A-annulus valve. Moved hose from A to B-annulus. Pressured up to 200 bar to equalize pressure against B-annulus. Opened B-annulus valve and bled off pressure to zero. Bled back 1390 ltrs. Closed B-annulus. + +Menwhile adjusted TRSCSSV CL pressure and RU overboard line to A-annulus.",0.75 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-01-31 23:00:00+00:00,2008-02-01 00:15:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,"Lined up cement unit to pump-in sub on rig floor and performed line test to 345 bar. Prepared injection head for 345 bar test. Bled off chemical injection line to zero and inflow tested same. + +Pressured up the tubing to 35 bar/10 min to test the production packer from below. Volume pumped was 117 ltrs. Kept 570 bar on TRSCSSV CL. Opened A-annulus. No backflow observed. Pressure dropped 0.17 bar. + +Pressured up the tubing to 345 bar/10 min to test the production packer from below. Volume pumped was 1137 ltrs (total). Kept 570 bar on TRSCSSV CL. No backflow observed. Pressure dropped 1.0 bar. Inflow test of chemical injection line was ok.",1.25 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 00:15:00+00:00,2008-02-01 01:00:00+00:00,3000.0,m,wire line,workover -- wire line,ok,success,"Worked to free NPR pulling string from 3000 m to 2971.0 m. Observed that restriction had shifted 1.0 m higher due to balloning. Not able to pull NPR plug through PBR. + +Bled pressure back to zero. Volume bled back was 1390 ltrs. + +Worked to free NPR pulling string from 3000 m to 2972.0 m. Not able to pull NPR plug through PBR.",0.75 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 01:00:00+00:00,2008-02-01 01:30:00+00:00,3089.0,m,wire line,workover -- wire line,ok,success,"RIH with NPR pulling string to 3089 m and tagged TCP gun hanger. Up weight 1060 kg. Put NPR plug on top of TCP gun hanger and jared 10 times without lifting the plug from the hanger. Pulled up 2-3 m to 1200 kg tension and lost 500 kg, before upweight stabilized at 800 kg. Went down and verified tag at 3089 m.",0.5 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 01:30:00+00:00,2008-02-01 03:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with NPR pulling tool. Passed PBR and TRSCSSV without any signs of hanging up. Hanged off toolstring in tool catcher.,1.5 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 03:00:00+00:00,2008-02-01 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Observed tugger wire and 7/32"" braided line was twined together at top of lubricator. Held tool box meeting. Had to man-ride to sort out wires in derrick. Broke connection above WL-BOP and lifted off lubricator section. LD WL toolstring.",2.0 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 05:00:00+00:00,2008-02-01 09:45:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,Stabbed the WL lubricator. Waited on weather and WL tools to arrive from shore.,4.75 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 09:45:00+00:00,2008-02-01 13:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Untangled the WL wire from the shackle on the tugger line. Cut of 50 m of wire and made new rope socket. Took pull test on the rope socket to 1500 kg. Tested the up stroke on jar, worked at 500 kg.",3.75 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 13:30:00+00:00,2008-02-01 14:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held meeting with shore regarding running details.,0.75 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 14:15:00+00:00,2008-02-01 14:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Re-calibrated the WL BOP.,0.5 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 14:45:00+00:00,2008-02-01 15:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Made up new WL BHA and installed in lubricator. HW 240 kg.,1.0 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 15:45:00+00:00,2008-02-01 16:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Leak-tested rig-up to 25bar/5min and 240 bar/10min, against WL-BOP Blind Rams.",0.75 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 16:30:00+00:00,2008-02-01 18:45:00+00:00,3050.0,m,wire line,workover -- wire line,ok,success,"Opened the WL-BOP Blind Rams, and Shear Blind rams. RIH with the NPR plug GS retrieving tool. At 2950 m weight up/down 730/370 kg HW 670 kg. RIH to 3050 m weight up/down 750/370 kg HW 370 kg. Drifted back to 2963m without no obstruction.",2.25 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 18:45:00+00:00,2008-02-01 21:30:00+00:00,3094.0,m,wire line,workover -- wire line,ok,success,"RIH and latch the NPR at 3094 m (WL depth). Pulled out with the NPR plug, had 200 kg extra pulling weight, Entered the Mule shoe, no obstruction. Kept steady pull of 12 m/min, took overpull of 400 kg at 2975 m, continued pull out of hole. Passed the DHSV with no overpull.",2.75 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 21:30:00+00:00,2008-02-01 22:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Unable to latch with the tool catcher. HW 390 kg. Held tool talk prior to brake at the WL BOP.,1.0 +15_9_F_12_2008_02_02.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-01T00:00:00+01:00,2008-02-02T00:00:00+01:00,2008-02-01 22:30:00+00:00,2008-02-01 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Applied 150 bars to the grease injection head. Pressure up the well to 80 bars, 340 litres, closed the DHSV and bled of the pressure to 10 bars above the DHSV and inflow tested same for 10 min.",0.5 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-01 23:00:00+00:00,2008-02-01 23:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Applied 80 bars to the well and opened the DHSV. Bled of the pressure of the well, same volume in return 340 litre.",0.5 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-01 23:30:00+00:00,2008-02-02 00:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Broke the lubricator and laid out the BHA with NPR plug, no damage to the NPR plug.",0.5 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 00:00:00+00:00,2008-02-02 03:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"R/D the WL lubricator, the GIH, the WL BOP and disconnected the BCU.",3.75 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 03:45:00+00:00,2008-02-02 05:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Held tool box talk prior to retrieve the TBG landing string. R/D the control lines.,1.25 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 05:00:00+00:00,2008-02-02 06:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,Rigged down control line sheave.,1.0 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 06:00:00+00:00,2008-02-02 07:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk prior to L/O the 7"" landing string. Attempted same.",1.0 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 07:00:00+00:00,2008-02-02 08:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"Problems with elevators malfunction, investigated same. Changed out elevators and function tested same.",1.0 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 08:00:00+00:00,2008-02-02 08:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Held tool box talk prior to use tuggers to retrieve the 7"" landing string. Picked up and laid out 7"" landing sting.",0.5 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 08:30:00+00:00,2008-02-02 10:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Cleared rig floor, casing tong, Baker control line drum, Gauge/inj. Line drum and PS-30 slips.",2.0 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 10:30:00+00:00,2008-02-02 13:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to installation of the BPV. Picked up the PBV and ran in same on tugger and installed same.,3.0 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 13:30:00+00:00,2008-02-02 19:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held tool box talk prior to nipple down the stack. Nippled down BOP and set back into cradle, laid out riser.",6.0 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 19:30:00+00:00,2008-02-02 19:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed dart in BPV.,0.25 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 19:45:00+00:00,2008-02-02 20:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered down tension cylinder to centralizer deck.,0.75 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 20:30:00+00:00,2008-02-02 21:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to lower down the Co-flex hose onto the XMT deck.,0.5 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 21:00:00+00:00,2008-02-02 22:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Lowered the Co-flex hose onto the XMT deck.,1.5 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 22:30:00+00:00,2008-02-02 22:45:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to terminate the control lines.,0.25 +15_9_F_12_2008_02_03.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-02T00:00:00+01:00,2008-02-03T00:00:00+01:00,2008-02-02 22:45:00+00:00,2008-02-02 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Removed the communication collar.,0.25 +15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-02 23:00:00+00:00,2008-02-03 03:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Terminated the control line in the well head.,4.5 +15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 03:30:00+00:00,2008-02-03 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed the spacer spool. Found the protection cover for hydraulic outlets at the master bushing laying on the well cover on XMT deck.,0.5 +15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 04:00:00+00:00,2008-02-03 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Held time out regarding dropped object from drill floor to the well head: 20m, 5 kg.",0.5 +15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 04:30:00+00:00,2008-02-03 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Held tool box talk prior to install the master bushing and installed same.,0.5 +15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 05:00:00+00:00,2008-02-03 05:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Installed master bushing.,0.5 +15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 05:30:00+00:00,2008-02-03 14:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed extension spool and torqued up same. Pressure tested void to 30/345 bars 5/10 min. Pressure tested VG 63 seal 35 bars 10 min. Installed gauge outlet. Meanwhile had time out with dayshift regarding dropped object.,9.0 +15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 14:30:00+00:00,2008-02-03 16:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to R/D scaffolding and removal of hatch cover. Performed same.,2.0 +15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 16:30:00+00:00,2008-02-03 16:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to pick up and installation of the X-mas tree.,0.25 +15_9_F_12_2008_02_04.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-03T00:00:00+01:00,2008-02-04T00:00:00+01:00,2008-02-03 16:45:00+00:00,2008-02-03 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up, landed, orientated and installed the X-mas tree. Installed WV spool outlet and production co-flex hose.",6.25 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-03 23:00:00+00:00,2008-02-04 03:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up 2"" 1502 hose to the KWV outlet. Torqued up the PWV spool outlet and the production co-flex hose.",4.75 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 03:45:00+00:00,2008-02-04 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to pressure test the production line and the X-mas tree.,0.25 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 04:00:00+00:00,2008-02-04 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up and flushed the lines to the X-mas tree,1.0 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 05:00:00+00:00,2008-02-04 05:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Completed flushing of lines to the X-mas tree.,0.25 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 05:15:00+00:00,2008-02-04 06:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested X-mas tree connections to 30/345 bars 5/10 min.,0.75 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 06:00:00+00:00,2008-02-04 06:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to flush X-mas tree and production flow line prior to leak test of same.,0.75 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 06:45:00+00:00,2008-02-04 08:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Awaited confirmation of correct torqued up flow line.,1.5 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 08:15:00+00:00,2008-02-04 09:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Checked remote panel to operate X-mas tree valves. Found too low fluid level.,1.0 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 09:15:00+00:00,2008-02-04 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Flushed production flow line into the separator.,0.75 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 10:00:00+00:00,2008-02-04 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up and leak tested production flow line 50/180 bars 5/10 min.,1.5 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 11:30:00+00:00,2008-02-04 11:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to inflow test LMV and HMV against BPV.,0.25 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 11:45:00+00:00,2008-02-04 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressured up to 240 bars against BPV. Inflow tested LMV and HMV, 230 bars diff.",2.25 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 14:00:00+00:00,2008-02-04 14:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Held tool box talk prior to retrieve the dart and the BPV.,0.25 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 14:15:00+00:00,2008-02-04 17:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed tree cap, had to pump out same. Retrieved the dart and the BPV. Re-installed the tree cap.",3.0 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 17:15:00+00:00,2008-02-04 18:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Leak tested tree cap to 30/345 bars 5/10 min.,0.75 +15_9_F_12_2008_02_05.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-04T00:00:00+01:00,2008-02-05T00:00:00+01:00,2008-02-04 18:00:00+00:00,2008-02-04 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested BOT control line exit blocks for DHSV to 570bars/15 min. Measured return fluids from control line 225 ml. Removed the Co-flex support frame at the X-mas tree, and transferred to the welders shop for modification. + +Continued operation on F-4",2.0 +15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 08:00:00+00:00,2008-02-11 09:00:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Held prejob meeting with all involved, including Maersk Production.",1.0 +15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 09:00:00+00:00,2008-02-11 09:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Installed lo-torq valve on kill valve on XMT. Hooked up 2"" HP-hose from lo-torq valve to cement pump kill line valve in moon pool.",0.5 +15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 09:30:00+00:00,2008-02-11 10:00:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Flushed line from cement unit to XMT, observing for returns in needle valve on XMT cap.",0.5 +15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 10:00:00+00:00,2008-02-11 10:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Closed KV. Leak tested line from cement pump to KV to 250 bar/10 min. No leak observed through needle valve on XMT cap. Bled pressure down to 20 bar, to cement pump. Closed SV and needle valve on XMT cap. DHPG pressure = 277,1 bar.",0.5 +15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 10:30:00+00:00,2008-02-11 11:00:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,Opened MMV. Opened HMV. Pressured up well to 30 bar with cement pump. Confirmed pressure increase on DHPG. Opened DHSV w/460 bar control line pressure.,0.5 +15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 11:00:00+00:00,2008-02-11 11:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,Continued to pressure up well to 240 bar (750 liter) with cement pump. Pressured up chemical injection line to 230 bar with Well Dynamics test pump. Leak tested termination block for chemcial injection line on wellhead to 230 bar/10 min.,0.5 +15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 11:30:00+00:00,2008-02-11 12:30:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,Closed MMV. Bled off pressure above MMV to 10 bar. Inflow tested MMV to 230 bar/10 min. Equalized MMV with 240 bar. Opened MMV. Closed HMV. Bled off pressure above HMV to 10 bar. Inflow tested HMV to 230 bar/10 min. Equalized HMV with 240 bar. Opened HMV. Bled ppressure in well to 0 bar to cement pump. Bled back 710 liter. Counted 3 cycles on ProFire firing head on TCP guns.,1.0 +15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 12:30:00+00:00,2008-02-11 14:00:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Schlumberger TCP performed training pulses with cement pump. Schlumberger sent firing command ,with cement unit, to E-Fire firing head in TCP guns. Bled down well pressure to 0 bar to cement unit. Closed TKV and Lo-torq valve. The TCP guns fired after waiting the programmed time delay of 10 minutes. Wellhead pressure / DHPG pressure increased to 31/ 308 bar. Closed DHSV. Bled down pressure above DHSV to 0 bar to the flowline. Monitored WHP in XMT for 30 minutes to verify DHSV integrity. No pressure buildup observed.",1.5 +15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 14:00:00+00:00,2008-02-11 14:15:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,"Closed valve to cement pump kill line in moon pool to isolate 2"" HP-hose to KV on XMT.",0.25 +15_9_F_12_2008_02_12.xml,NO 15/9-F-12,NO 15/9-F-12,2008-02-11T00:00:00+01:00,2008-02-12T00:00:00+01:00,2008-02-11 14:15:00+00:00,2008-02-11 16:00:00+00:00,0.0,m,fixed,completion -- perforate,ok,success,Performed well hand over activiities. Verified that all valves on XMT and DHSV were closed. Handed well over to Maersk production at 17:00. ****************END OF OPERATIONS****************,1.75 +15_9_F_12_2009_03_14.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 14:00:00+00:00,2009-03-13 17:30:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on Mærsk Production to hand over well to Volve D&W. + +Meanwhile performed 5-yearly maintenace on choke manifold.",3.5 +15_9_F_12_2009_03_14.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-13T00:00:00+01:00,2009-03-14T00:00:00+01:00,2009-03-13 17:30:00+00:00,2009-03-13 23:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,"Waited on Mærsk Production to shut in well and inflow test HMV to 120-5 bar/10 min and DHSV to 120-5 bar/30 min. Had 2.3 bar drop/10 min on HMV and 0.2 bar drop/30 min on DHSV. + +Meanwhile performed 5-yearly maintenace on choke manifold and loosened bolts on kill ving valve on BOP in preparation for 5-yearly maintenance.",5.5 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-13 23:00:00+00:00,2009-03-14 00:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off pressure to 0 bar above DHSV. Confirmed valve status and handed over well to drilling at 01:00.,1.0 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 00:00:00+00:00,2009-03-14 01:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Transferred HMV and DHSV to local controled panel (wireline lock-out mode). Connected Seawell pump and tested line up.,1.0 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 01:00:00+00:00,2009-03-14 02:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed test and bleed manifold from moonpool outlet to XMT KWV. Prepared bleed down hose and valves from KWV to closed drain.,1.0 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 02:00:00+00:00,2009-03-14 03:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Flushed lines and attempted to perform line test to 30/200 bar for 5/10 min from cmt unit to KWV through test and bleed manifold. Had 8 bar increase on low pressure test. Investigated situation. Performed ""line test"" for cmt unit seperatly. Ok. Performed line test to 30/200 bar for 5/10 min from cmt unit to KWV through test and bleed manifold.",1.5 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 03:30:00+00:00,2009-03-14 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened KWV and attempted test XMT cross. Pressure dropped from 20 to 8 bar while pumping and from 26 bar to 11 bar on second attempt. Checked line-up for leaks. No leaks observed. Opened SV. Flushed through XMT through tree cap needle valve. Closed SV and re-attempted to test XMT cross. Pressure dropped from 30 to 8 bar. Closed LTV1 and performed a second line test to 30 bar/5 min. Ok. Opened LTV1 and re-attempted to test XMT cross without sucess.,1.5 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 05:00:00+00:00,2009-03-14 05:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed MMV to establish if it was HMV or PWV that was leaking. Re-attempted to test XMT cross without sucess.,0.5 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 05:30:00+00:00,2009-03-14 08:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Operated and greased up PWV.,2.5 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 08:00:00+00:00,2009-03-14 09:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Verified PWV, SV and HMV were closed. Leak tested XMT cross to 30/200 bar for 5/10 min using cmt unit and 100% MEG. Had 2.4 bar drop (1.2%)/10 min. Bled off pressure to 0 bar to platform closed drain. Verified no pressure below treee cap and removed same.",1.5 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 09:30:00+00:00,2009-03-14 10:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box talk for installing WL riser and lubricator and change elevator. Lifted WL riser sections and BOP with Top Drive using double lift arrangement. Lowered and stabbed on to XMT connection.,0.5 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 10:00:00+00:00,2009-03-14 11:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Changed elevators and PU lubricator. + +Meanwhile pressure tested shear ram on WL BOP to 30/200 bar for 5/10 min. Ok.",1.5 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 11:30:00+00:00,2009-03-14 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Man-rode to turn WL sheave wheel.,0.5 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 12:00:00+00:00,2009-03-14 14:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,MU combination toolstring in riser and stabbed on lubricator with in-situ sub.,2.0 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 14:00:00+00:00,2009-03-14 15:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Verified that toolstring was sitting in toolcatcher. Opened SV 10 turns and opened KWV. Filled riser with 100% MEG from cmt unit. Leak tested WL riser, BOP and lubricator to 30/200 bar for 5/10 min using cmt unit and 100% MEG. Ok. Bled off pressure to 0 bar. Closed SV and KWV.",1.25 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 15:15:00+00:00,2009-03-14 15:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Performed well control exercise with Seawell, Schlumberger and Mærsk crew.",0.25 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 15:30:00+00:00,2009-03-14 17:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened HMV, KWV and SV 10 turns. Filled well above DHSV with 7.7 m3 100% MEG. Equalized and opened DHSV at 93 bar. Closed KWV and bled off pressureto 0 bar in manifold.",1.75 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 17:15:00+00:00,2009-03-14 18:00:00+00:00,485.0,m,wire line,workover -- wire line,ok,success,"Opened SV with 45 turns. RIH with combination toolstring on 7/16"" EWLL to 485 m and took pick up weight.",0.75 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 18:00:00+00:00,2009-03-14 18:15:00+00:00,498.0,m,wire line,workover -- wire line,ok,success,"Attempted to RIH through DHSV, but found solid hold up depth at 498 m.",0.25 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 18:15:00+00:00,2009-03-14 19:45:00+00:00,485.0,m,wire line,workover -- wire line,ok,success,"Changed out MEG tanks and re-filled MEG on cmt unit. + +Meanwhile held tool box talk prior to equalizing and opening DHSV. Performed well control exercise with Seawell, Schlumberger and Mærsk crew.",1.5 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 19:45:00+00:00,2009-03-14 20:30:00+00:00,485.0,m,wire line,workover -- wire line,ok,success,Opened LTV1 and LTV2. Equalized pressure to 90 bar and opened KWV. Pumped 8.95 m3 100% MEG into well and observed pressure drop from 90 to 69 bar. This confirmed that DHSV was open/partly open.,0.75 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 20:30:00+00:00,2009-03-14 22:15:00+00:00,485.0,m,wire line,workover -- wire line,ok,success,"Attempted to RIH through DHSV, but found solid hold up depth at 498 m. Discussed further options.",1.75 +15_9_F_12_2009_03_15.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-14T00:00:00+01:00,2009-03-15T00:00:00+01:00,2009-03-14 22:15:00+00:00,2009-03-14 23:00:00+00:00,485.0,m,wire line,workover -- wire line,ok,success,Functioned DHSV closed/open twice to remove possible debris. Had 3.0 dl return when closing DHSV and pumped 4.25 dl when opening DHSV. Had good indication of DHSV being in open position.,0.75 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-14 23:00:00+00:00,2009-03-14 23:30:00+00:00,498.0,m,wire line,workover -- wire line,ok,success,Attempted to RIH through DHSV and experienced a 1 m drop of the toolstring after initial hold up. Made several more attempts to run through DHSV.,0.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-14 23:30:00+00:00,2009-03-15 02:00:00+00:00,3260.5,m,wire line,workover -- wire line,ok,success,"RIH with toolstring through DHSV to 515 m and pulled back up to ensure valve was fully open. Continued RIH with combination toolstring on 7/16"" EWL from 485 m to 3027 m (tally dyp). Hung up at 7"" liner PBR and made several attempts to enter 7"" liner. Continued RIH with combination toolstring from 3027 m to 3260.5 m (log dyp). RIH tension was 1900 lbs and PU tension was 5100 lbs at 3250 m MD. RIH speed was 30 m/min. RIH speed inside 7"" liner was 20 m/min. Tension inside 7"" liner was higher than simulated (60% of max safe pull to be able to break weakpoint).",2.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 02:00:00+00:00,2009-03-15 02:30:00+00:00,3260.5,m,wire line,workover -- perforate,ok,success,"Tagged top of TCP guns at 3260.5 m (ref open hole log)/ at 3258.5 m (ref pip-tag in tally). Made GR-CCL correlation log from 3260.6 m to 3029 m (top of 7"" liner).",0.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 02:30:00+00:00,2009-03-15 04:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH with combination toolstring on 7/16"" EWL from 3029 m to OOH. Ran carefully through DHSV at 497 m MD. Pulled cable head into tool catcher.",2.0 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 04:30:00+00:00,2009-03-15 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed SV partly and verified toolstring out of hole. Recorded SIWHP 81 bar. Closed HMV and bled down pressure above to 5 bar.,0.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 05:00:00+00:00,2009-03-15 06:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Inflow tested HMV 81 -5 bar/10 min ok. Opened KWV and SV 10 turns. Bled off pressure to zero to closed drain and purged riser with Nitrogen. Closed KWV. Bled off remaining pressure in lubricator through needle valve. Closed SV.,1.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 06:30:00+00:00,2009-03-15 07:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke lubricator at in-situ sub and LD combination toolstring. Found centered circular impression on lead impression block confirms that part of running tool for TCP gun hanger was lost in hole and is sitting at the top of the TCP gun hanger.,0.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 07:00:00+00:00,2009-03-15 07:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed PLT toostring in riser and MU in-situ sub. Leak tested in-situ sub to 30/200 bar for 5/10 min. Ok.,0.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 07:30:00+00:00,2009-03-15 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Opened KWV. Equalized and opened HMV using cmt pump and 100% MEG. WHP was 85 bar. Closed KWV.,0.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 08:00:00+00:00,2009-03-15 10:30:00+00:00,3030.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT toolstring on 7/16"" EWL from surface to 2929 m MD. Ran carefully through DHSV at 492 m. Performed station log and checked readings against DHPG. Continued RIH with PLT toolstring on 7/16"" EWL from 2929 m to 3030 m MD.",2.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 10:30:00+00:00,2009-03-15 13:00:00+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"Logged PLT down/up and performed shut-in calibration passes from 3030 m to 3255 m MD. + +Pass 1: Down/up speed: 10 m/min +Pass 2: Down/up speed: 20 m/min +Pass 3: Down/up speed: 30 m/min +Pass 4: Down/up speed: 40 m/min",2.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 13:00:00+00:00,2009-03-15 15:30:00+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT on 7/16"" EWL from 3030 m to 3255 m MD. + +Took stationary PLT readings at : +3245 m MD +3233 m MD +3200 m MD +3154 m MD + +POOH with PLT toolstring from 3154 m to 3080 m MD. Spinner response appr 2.0 RPS. Moved even further up to 2915 m. Still spinner response 2.0 RPS. Decided to go down to 3080 m again.",2.5 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 15:30:00+00:00,2009-03-15 22:30:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,"Beaned up well in increments to 4500 Sm3/d. Obtained stable FBHP ( less than 0.1 bar variance for 1 hr) of 276,6 bar at DHPG.",7.0 +15_9_F_12_2009_03_16.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-15T00:00:00+01:00,2009-03-16T00:00:00+01:00,2009-03-15 22:30:00+00:00,2009-03-15 23:00:00+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"Logged PLT down/up and performed high rate passes from 3030 m to 3255 m MD. + +Pass 1: Down/up speed: 10 m/min",0.5 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-15 23:00:00+00:00,2009-03-16 00:30:01+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"Logged PLT down/up and performed high rate passes from 3030 m to 3255 m MD. + +Pass 2: Down/up speed: 20 m/min +Pass 3: Down/up speed: 30 m/min +Pass 4: Down/up speed: 40 m/min",1.5002777777777778 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 00:30:01+00:00,2009-03-16 01:15:01+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT on 7/16"" EWL from 3030 m to 3255 m MD. + +Took stationary PLT readings at : +3245 m MD +3233 m MD +3200 m MD +3154 m MD + +POOH with PLT toolstring from 3154 m to 3080 m MD.",0.75 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 01:15:01+00:00,2009-03-16 02:45:01+00:00,3080.0,m,wire line,workover -- wire line,ok,success,"Choked back on well in increments to 3000 Sm3/d. Obtained stable FBHP ( less than 0.1 bar variance for 1 hr) of 283,7 bar at DHPG.",1.5 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 02:45:01+00:00,2009-03-16 04:30:01+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"Logged PLT down/up and performed medium rate passes from 3030 m to 3255 m MD. + +Pass 1: Down/up speed: 10 m/min +Pass 2: Down/up speed: 20 m/min +Pass 3: Down/up speed: 30 m/min +Pass 4: Down/up speed: 40 m/min",1.75 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 04:30:01+00:00,2009-03-16 05:00:00+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"RIH with PLT on 7/16"" EWL from 3030 m to 3255 m MD. + +Took stationary PLT readings at : +3245 m MD +3233 m MD +3200 m MD +3154 m MD + +POOH with PLT toolstring from 3154 m to 3080 m MD.",0.49972222222222223 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 05:00:00+00:00,2009-03-16 08:45:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,"Choked back on well in increments to 1500 Sm3/d. Obtained stable FBHP ( less than 0.1 bar variance for 1 hr) of 290,2 bar at DHPG.",3.75 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 08:45:00+00:00,2009-03-16 10:45:00+00:00,3255.0,m,wire line,workover -- wire line,ok,success,"Logged PLT down/up and performed medium rate passes from 3030 m to 3255 m MD. + +Pass 1: Down/up speed: 10 m/min +Pass 2: Down/up speed: 20 m/min +Pass 3: Down/up speed: 30 m/min +Pass 4: Down/up speed: 40 m/min",2.0 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 10:45:00+00:00,2009-03-16 11:15:00+00:00,2929.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT toolstring on 7/16"" EWL from surface to 2929 m MD. Performed station log and checked readings against DHPG. Read 290.1 bar.",0.5 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 11:15:00+00:00,2009-03-16 12:15:00+00:00,2929.0,m,wire line,workover -- wait,ok,success,Shut in well. Recorded SIWHP was 117 bar.,1.0 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 12:15:00+00:00,2009-03-16 14:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"POOH with PLT toolstring on 7/16"" EWL from 2929 m to surface. Ran carefully through DHSV at 492 m. Pulled cable head into tool catcher. Closed SV using 45 turns to verify BHA OOH. Closed HMV.",2.25 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 14:30:00+00:00,2009-03-16 15:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Opened SV 10 turns. Opened KWV and bled off pressure in XMT, riser and lubricator to 5 bar to closed drain. Closed KWV and SV.",0.5 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 15:00:00+00:00,2009-03-16 15:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Inflow tested HMV 117 -5 bar/10 min. Had 1.14 bar (1%) drop/10 min. Opened KWV. Equalized and opened HMV using cmt pump and 100% MEG.,0.5 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 15:30:00+00:00,2009-03-16 16:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed DHSV using Seawell pump on drill floor. Bled off pressure to 113 bar above DHSV. Opened KWV. Bullheaded 3 m3 100% MEG into well using cmt pump.,1.0 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 16:30:00+00:00,2009-03-16 17:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off pressure above closed DHSV from 113 bar to 63 bar.,0.5 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 17:00:00+00:00,2009-03-16 19:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed KWV. Closed MMV. Opened PWV and bled down XMT and flowline to 5 bar. Closed PWV. Inflow tested MMV to 63 -5 bar/10 min. Had 0.11 bar (0.2%) drop/10 min.,2.0 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 19:00:00+00:00,2009-03-16 19:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened KWV and PWV. Equalized and opened MMV using cmt unit and 100% MEG.,0.75 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 19:45:00+00:00,2009-03-16 21:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off pressure in XMT/above DHSV through PWV and flowline to 5 bar. Closed PWV and KWV.,1.5 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 21:15:00+00:00,2009-03-16 21:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Inflow tested DHSV to 117 -5bar/30 min. Had 1.32 bar (1.1%) increase/30 min. + +Meanwhile had tool box talk prior to breaking down lubricator and toolstring.",0.5 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 21:45:00+00:00,2009-03-16 22:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened KWV. Bled off remaining 5 bar above DHSV to closed drain.,0.75 +15_9_F_12_2009_03_17.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-16T00:00:00+01:00,2009-03-17T00:00:00+01:00,2009-03-16 22:30:00+00:00,2009-03-16 23:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Opened SV. Bled off pressure/drained XMT, riser and lubricator to closed drain.",0.5 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-16 23:00:00+00:00,2009-03-16 23:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Continued bleeding off pressure/drained XMT, riser and lubricator to closed drain.",0.5 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-16 23:30:00+00:00,2009-03-17 00:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Purged XMT, riser and lubricator with nitrogen 3 times due to grease in lubricator. Closed KWV and SV.",1.0 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 00:30:00+00:00,2009-03-17 01:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Broke lubricator at in-situ sub. Lifted out and LD PLT toolstring. No marks or damage observed on tool. No obvious explanation why in-line spinner did not work. Cut cable.,1.0 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 01:30:00+00:00,2009-03-17 03:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"LD lubricator and RD sheave wheels. Split lubricator at drill floor, preserved and moved to cantiliver. Cleared rig floor of WL equipment.",2.0 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 03:30:00+00:00,2009-03-17 05:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed 10 mT lift cap on WL riser and installed manual elevator on riser section as part of double lift arrangement from TDS. Detached riser from BOP's and LO same.,1.5 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 05:00:00+00:00,2009-03-17 09:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Lifted WL BOP's using double lift arrangement from TDS and transferred to moonpool overhead crane.,4.5 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 09:30:00+00:00,2009-03-17 10:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Disconnected and lifted out lower WL riser section and XO from XMT using double lift arrangement from TDS. Installed hatch on weather deck.,0.75 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 10:15:00+00:00,2009-03-17 10:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed XMT tree cap. Hooked up hose from Seawell test pump on drill floor to test cap on XMT.,0.5 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 10:45:00+00:00,2009-03-17 11:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested SV to 30/345 bar for 5/10 min. Good test. Bled off pressure to closed drain.,0.5 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 11:15:00+00:00,2009-03-17 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RD cmt test line and bleed off manifold from KWV.,0.75 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 12:00:00+00:00,2009-03-17 13:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Leak tested tree cap and XMT cross to 30/345 bar for 5/10 min using Seawell test pump and 100% MEG. Good test. Bled off pressure. Installed cap on KWV and removed 1/2"" plug. Leak tested KWV to 30/345 bar for 5/10 min using Seawell test pump and 100% MEG. Good test. Bled off pressure. Installed 1/2"" plug in KWV cap. Leak tested KWV cap to 30/345 bar for 5/10 min using Seawell test pump and 100% MEG. Good test. Bled off pressure. + +Disconnected Seawell test pump from XMT tree cap and closed needle valve. Disconnected local control panel for HMV and DHSV and re-established platform permanent control system.",1.75 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 13:45:00+00:00,2009-03-17 14:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Handed well over from Volve D&W to Mærsk Production.,0.25 +15_9_F_12_2009_03_18.xml,NO 15/9-F-12,NO 15/9-F-12,2009-03-17T00:00:00+01:00,2009-03-18T00:00:00+01:00,2009-03-17 14:00:00+00:00,2009-03-17 15:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Cleared rig floor off remaining WL equipment. Cleaned rigfloor with dedicated grease wash.,1.5 +15_9_F_12_2010_09_21.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 06:30:00+00:00,2010-09-20 10:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Skidded rig to F-12.,3.5 +15_9_F_12_2010_09_21.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 10:00:00+00:00,2010-09-20 12:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Changed to workover hatch on F-12.,2.5 +15_9_F_12_2010_09_21.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 12:30:00+00:00,2010-09-20 17:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,Waited for Production Department to bean up F-14 and shut in F-12 for leak testing and handover. Meanwhile built new cable head (4/3-2005 lbs) and leak tested cable rams in BOP.,4.5 +15_9_F_12_2010_09_21.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-20T00:00:00+02:00,2010-09-21T00:00:00+02:00,2010-09-20 17:00:00+00:00,2010-09-20 22:00:00+00:00,0.0,m,wire line,workover -- wait,ok,success,Waited on production department to prepere well for handover. Meanwhile held prejob meeting with all night shift personnel involved in operation.,5.0 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-20 22:00:00+00:00,2010-09-20 22:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Took over well. Checked valve status.,0.75 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-20 22:45:00+00:00,2010-09-20 23:45:00+00:00,0.0,m,wire line,workover -- wait,ok,success,Prod. department installed isolation certificate on remotly operated valves on well.,1.0 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-20 23:45:00+00:00,2010-09-21 00:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested x-mas tree cross. 20/170 bar for 5/10 min.,1.0 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 00:45:00+00:00,2010-09-21 01:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed KWV cap and rigged up chiksan valves. Leak tested bleed off hose against closed KWV. 20/180 bar for 5/10 min.,0.75 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 01:30:00+00:00,2010-09-21 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Removed tree cap and installed lower riser and BOP. Leak tested riser connections and BOP shear seal. 20/180 bar for 5/10 min. Installed upper riser. Prepared lubricator for lifting.,2.5 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 04:00:00+00:00,2010-09-21 07:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,RU lubricator and GIH in elevator. Installed BHA #1 and stabbed on. Filled rig-up with MEG using platform MEG injection system. Checked toolstring.,3.5 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 07:30:00+00:00,2010-09-21 08:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held pre-job meeting with involved personnel.,1.0 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 08:30:00+00:00,2010-09-21 11:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested rig-up to 20/170 bar for 5/10 min. Opened HMV and equalized TRSCSSV with MEG using platform MEG injection system. SIWHP 82 bar. Equalized and opened SV.,3.0 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 11:30:00+00:00,2010-09-21 13:15:00+00:00,1000.0,m,wire line,workover -- wire line,ok,success,"RIH with BHA #1, PLT logging string, to 1000 m MDRKB.",1.75 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 13:15:00+00:00,2010-09-21 13:45:00+00:00,1000.0,m,wire line,workover -- wire line,ok,success,Performed spinner calibration passes at 10/20/30/40 m/min up/down.,0.5 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 13:45:00+00:00,2010-09-21 15:00:00+00:00,3130.0,m,wire line,workover -- wire line,ok,success,Continued RIH to 3130 m.,1.25 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 15:00:00+00:00,2010-09-21 15:30:00+00:00,2929.0,m,wire line,workover -- wire line,ok,success,"Performed depth correlation with GR/CCL. Radioactive marker at 3091.7 m. Pulled up to 2929 m (DHG) and took stationary reading. Temp. = 105 C deg. Press. = 311,98 bar.",0.5 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 15:30:00+00:00,2010-09-21 17:00:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,"Ran PLT shut in passes from 3250 to 3080 m at speed 10/ 20/ 30/ 40 m/min. Up / Down. Took stationary readings at 3080, 3250, 3200 and 3155 m. Pulled up and placed PLT at 3080 m.",1.5 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 17:00:00+00:00,2010-09-21 21:00:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Beaned up well to approx. 5000 Sm3/d against test separator.,4.0 +15_9_F_12_2010_09_22.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-21T00:00:00+02:00,2010-09-22T00:00:00+02:00,2010-09-21 21:00:00+00:00,2010-09-21 22:00:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Waited for stable flow.,1.0 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-21 22:00:00+00:00,2010-09-22 00:45:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Continued waiting for stable flow. Stabilized flow rate at approx. 5050 Sm³/d.,2.75 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 00:45:00+00:00,2010-09-22 03:15:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Took stationary reading for 5 min at depth 3080 m. Attempted to RIH at various speeds. Max speed was 80 m/min. Stopped at various depths between 2985 and 3015 m.,2.5 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 03:15:00+00:00,2010-09-22 04:00:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Reduced flow rate to 3000 Sm³/d.,0.75 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 04:00:00+00:00,2010-09-22 05:15:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Waited for stable flow rate.,1.25 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 05:15:00+00:00,2010-09-22 05:45:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,"Took stationary readings at 3080, 3155, 3200 and 3250 m.",0.5 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 05:45:00+00:00,2010-09-22 07:15:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Logged flowing passes between 3030 and 3250 m. Logged down at 40 m/min and up at 10/20/30/40 m/min. Unable to log down passes at 10/20/30 m/min. Positioned toolstring at 3080 m.,1.5 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 07:15:00+00:00,2010-09-22 10:45:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Reduced flow rate to 1500 Sm3/d and stabilized.,3.5 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 10:45:00+00:00,2010-09-22 13:15:00+00:00,3080.0,m,wire line,workover -- wire line,ok,success,Logged flowing passes between 3000 and 3250 m. Logged down at 40 m/min and up at 10/20/30/40 m/min. Unable to log down passes at 10/20/30 m/min. Positioned toostring at 3000 m. Shut in well.,2.5 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 13:15:00+00:00,2010-09-22 15:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH.,2.0 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 15:15:00+00:00,2010-09-22 17:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed well. WHP = 89 bar. Bled down and inflow tested HMV. Bled down and flushed lubricator with N2. LD and inspected BHA #1.,2.25 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 17:30:00+00:00,2010-09-22 20:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Prepared and checked BHA #2, CCL, DPU and 5,72"" EVO bridge plug. Lifted toolstring to rig floor.",2.5 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 20:00:00+00:00,2010-09-22 21:15:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held tool box meeting on rig floor. Installed BHA #2 into lubricator. Added 25 ltr Ramex into riser. Leak tested QTS to 20/170 bar for 5/10 min. Equalized with N2 across HMV and opened well. WHP 98.6 bar.,1.25 +15_9_F_12_2010_09_23.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-22T00:00:00+02:00,2010-09-23T00:00:00+02:00,2010-09-22 21:15:00+00:00,2010-09-22 22:00:00+00:00,800.0,m,wire line,workover -- wire line,ok,success,"RIH with BHA #2, EVO bridge plug to 800 m.",0.75 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-22 22:00:00+00:00,2010-09-23 00:00:00+00:00,3220.0,m,wire line,workover -- wire line,ok,success,"Continued RIH with 5,72"" EVO plug to 3220 m.",2.0 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 00:00:00+00:00,2010-09-23 01:00:00+00:00,3210.0,m,wire line,workover -- wire line,ok,success,"Performed depth correlation passes. POOH to setting depth and activated DPU. Installed plug with mid element at 3210 m and top plug at 3209,3 m. Lost 400 lbs. WHP 98,7 bar.",1.0 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 01:00:00+00:00,2010-09-23 03:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH with BHA #2.,2.25 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 03:15:00+00:00,2010-09-23 04:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Closed well. WHP = 98.6 bar. Bled down and inflow tested HMV.,0.75 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 04:00:00+00:00,2010-09-23 05:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Bled off and flushed lubricator with N2.,1.5 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 05:30:00+00:00,2010-09-23 05:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,LD toolstring. Running tool OK.,0.25 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 05:45:00+00:00,2010-09-23 07:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Opened HMV and bled down pressure above DHSV against test separator to 1 bar. Pumped 200 litres of MEG into well. Inflow tested DHSV.,1.75 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 07:30:00+00:00,2010-09-23 08:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Leak tested x-mas tree cross. 20/100 bar for 5/10 min.,1.0 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 08:30:00+00:00,2010-09-23 09:45:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Held prejob meeting regarding RD WL equipment with all personnel involved in operation. LD lubricator onto catwalk machine. (HTS),1.25 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 09:45:00+00:00,2010-09-23 12:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Disconnected and lifted upper riser to rigfloor with top drive. Disconnected and lifted BOP away in moon pool area. Disconnect and lifted lower riser to rig floor.,2.25 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 12:00:00+00:00,2010-09-23 13:00:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,Installed x-mas tree top cap and KWV cap. Leak tested both. 20/345 bar for 5/10 min.,1.0 +15_9_F_12_2010_09_24.xml,NO 15/9-F-12,NO 15/9-F-12,2010-09-23T00:00:00+02:00,2010-09-24T00:00:00+02:00,2010-09-23 13:00:00+00:00,2010-09-23 14:30:00+00:00,0.0,m,wire line,workover -- rig up/down,ok,success,"Cleaned up in wellhead area. Transfered controll of DHSV and HMV to platform system. Handed well over to Maersk Prod. department. Meanwhile started to skid rig to next location. + +--------------------------------- END OF OPERATION---------------------------------------------",1.5 +15_9_F_12_2014_11_23.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-22T00:00:00+01:00,2014-11-23T00:00:00+01:00,2014-11-22 15:00:00+00:00,2014-11-22 15:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Stril Luna arrived Maersk Inspirer. Spotted some equipment. Wind picked up above 40 knots, had to wait for further spotting.",0.25 +15_9_F_12_2014_11_23.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-22T00:00:00+01:00,2014-11-23T00:00:00+01:00,2014-11-22 15:15:00+00:00,2014-11-22 23:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,Waited on weather prior to lift and spot containers from vessel.,7.75 +15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-22 23:00:00+00:00,2014-11-23 00:00:00+00:00,0.0,m,wire line,interruption -- waiting on weather,ok,success,Waited on weather prior to spotting equipment.,1.0 +15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 00:00:00+00:00,2014-11-23 00:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk with all involved prior to spotting equipment. Meanwhile boat positioned longside rig.,0.5 +15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 00:30:00+00:00,2014-11-23 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted Altus and Halliburton equipment on pipedeck.,5.5 +15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 06:00:00+00:00,2014-11-23 11:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Checked alignment on WL winch and fine tuned add on. Secured same to pipe deck. Pulled cables between the different containers.,5.0 +15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 11:00:00+00:00,2014-11-23 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Spotted wellhead pump and filled with correct fluid. Connected add on drum together with winch. +Maersk electrician checked WL equipment due to punch list from onshore.",4.5 +15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 15:30:00+00:00,2014-11-23 18:00:00+00:00,0.0,m,wire line,interruption -- other,ok,operation failed,Maersk performed a thorough check of the Altus equipment due to the findings onshore. Meanwhile unpacked equipment from conatiners and prepared for BOP test.,2.5 +15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 18:00:00+00:00,2014-11-23 19:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Continued to prepare equipment and hoses for testing of BOP. +Meanwhile continued to check equipment together with rig electrician.",1.5 +15_9_F_12_2014_11_24.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-23T00:00:00+01:00,2014-11-24T00:00:00+01:00,2014-11-23 19:30:00+00:00,2014-11-23 23:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Performed low pressure test of BOP. +Meanwhile continued to check equipment together with rig electrician.",3.5 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-23 23:00:00+00:00,2014-11-24 00:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Continued with high pressure test on BOP. +Meanwhile continued to check equipment together with rig electrician.",1.5 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 00:30:00+00:00,2014-11-24 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Function tested WL unit & winch. Hooked up logging container to power. +Meanwhile performed area inspection on wellhead and discussed procedure for R/U WL riser on XMT.",1.5 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 02:00:00+00:00,2014-11-24 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted parts for grease injection head and toolcatcher. Spotted riser parts for building same on drill floor.,1.5 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 03:30:00+00:00,2014-11-24 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed toolbox talk prior to start building riser and lubricator pieces.,0.5 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 04:00:00+00:00,2014-11-24 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Built the riser and lubricator sections horizontally on the pipe handling system. +Meanwhile notified production dept to start shut in well F-12.",2.0 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 06:00:00+00:00,2014-11-24 11:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Hooked up remaining containers to fire and gas and completed check of Altus winch and logging unit. +Meanwhile prepared correct fittings to be hooked up to HMV to DHSV on wellhead.",5.0 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 11:00:00+00:00,2014-11-24 12:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged up sheave wheel and prepared spreader beam for lubricator.,1.5 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 12:30:00+00:00,2014-11-24 18:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited on production to obtain good test on XMT valves. Not able to obtain good test. Had to grease HMV and MMV. +Meanwhile preapred cablehead and tested Halliburton toolstring.",6.0 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 18:30:00+00:00,2014-11-24 19:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Handed well over from Production department to Drilling and well.,0.75 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 19:15:00+00:00,2014-11-24 19:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed toolbox talk on drill floor prior start R/U on well. Work permit for start rigging on XMT not activated or prepared.,0.25 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 19:30:00+00:00,2014-11-24 21:15:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Had to wait for WP to be approved for rigging of WL equipment. +Meanwhile prepared manifold and chicksan on wellhead.",1.75 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 21:15:00+00:00,2014-11-24 21:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held SJA for rigging of WL equipment on XMT.,0.25 +15_9_F_12_2014_11_25.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-24T00:00:00+01:00,2014-11-25T00:00:00+01:00,2014-11-24 21:30:00+00:00,2014-11-24 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged up chicsan and low torque on KWV.,1.5 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-24 23:00:00+00:00,2014-11-25 00:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to rig up on wellhead. Completed rigging up manifold on KWV. Observed 35 bar pressure in XMT cross.,1.5 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 00:30:00+00:00,2014-11-25 01:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Checked valves and inlets into XMT cross for possible leaks, together with production operator. Found that valve for MEG pump was leaking into XMT cross. Closed another valve on the MEG inlet line. Bled off pressure.",0.5 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 01:00:00+00:00,2014-11-25 02:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Installed wireline hatch and disconnected top cap on XMT.,1.5 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 02:30:00+00:00,2014-11-25 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lowered bottom riser and X-over. Installed BOP and hooked up lines. Function tested BOP. Filled lower riser and BOP with MEG using MEG pump and closed upper ram for testing lower riser.,2.5 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 05:00:00+00:00,2014-11-25 05:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged riser from BOP up to drill floor.,0.5 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 05:30:00+00:00,2014-11-25 08:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Rigged up lubricator and hoses on drill floor. Attached sheave wheel in spreader bar in top drive. Lifted up lubraicator. +Meanwhile prepared Halliburton toolstring on drill floor.",2.75 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 08:15:00+00:00,2014-11-25 08:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed toolbox talk prior to picking up BHA.,0.25 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 08:30:00+00:00,2014-11-25 10:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,"Installed BHA#1 7"" EV0 plug into lubricator. Stabbed lubricator and tested communication with toolstring.",1.5 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 10:00:00+00:00,2014-11-25 10:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to leak test the R/U.,0.3333333333333333 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 10:20:00+00:00,2014-11-25 11:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Erected barriers for leak testing and got production department to fill riser with MEG using MEG pump. Leak tested R/U to 20/345 bar using Altus pump. Observed leak in the test hose from the pump during low pressure test.,0.9166666666666666 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 11:15:00+00:00,2014-11-25 11:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Changed hose and continued with leak test.,0.5 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 11:45:00+00:00,2014-11-25 13:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Leak tested R/U and kill wing chicksan manifold to 20/345 bar for 5/10 minutes using 100% MEG. Equalized DHSV using MEG from production system. DHSV equalized and opened at 51 bar. Equalized and opened SV.,1.75 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 13:30:00+00:00,2014-11-25 15:40:00+00:00,1000.0,m,wire line,workover -- other,ok,success,"RIH w/BHA #1 (7"" EV0 plug) from surface to 1000 m. WHP 51 bar. Observed loss in communication with toolstring. Signal came back again. Continued to RIH. Pick up weights approx. 700 lbs higher than simulated values.",2.1666666666666665 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 15:40:00+00:00,2014-11-25 16:00:00+00:00,1400.0,m,wire line,workover -- other,ok,success,"Continued to RIH from 1000 m to 1400 m. Lost commuincation with toolstring. Trouble shooted equipment. Observed communication on and off. Checked surface equipment and trollex. Observed cmmunication falling out when running in hole, but no clear pattern. Decision made to POOH.",0.3333333333333333 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 16:00:00+00:00,2014-11-25 17:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH w/BHA #1 from 1400 m to surface. WHP 50 bar.,1.25 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 17:15:00+00:00,2014-11-25 19:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed SV & HMV and inflow tested same. Purged riser with N2 prior to break lubricator.,2.25 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 19:30:00+00:00,2014-11-25 19:40:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Held Toolbox talk prior to lift L/D BHA#1,0.16666666666666666 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 19:40:00+00:00,2014-11-25 20:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke lubricator and L/D BHA#1.,0.3333333333333333 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 20:00:00+00:00,2014-11-25 21:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Halliburton checked toolstring components and cablehead. Not able to detect any defects. Decision made to change cablehead and run complete back up string.,1.0 +15_9_F_12_2014_11_26.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-25T00:00:00+01:00,2014-11-26T00:00:00+01:00,2014-11-25 21:00:00+00:00,2014-11-25 23:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Re-buildt cable head. +Meanwhile Altus checked tension head on WL winch: +Winch weight Calibration weight +1000 lbs 950 lbs +2000 lbs 1800 lbs +3000 lbs 2680 lbs +4000 lbs 3500 lbs +The calibrated Halliburton weight will show correct tension",2.0 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-25 23:00:00+00:00,2014-11-26 00:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Continued to re-build cable head. Time consuming to build due to stiff cords on 7/16"" cable together with narrow holes in cablehead cone.",1.75 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 00:45:00+00:00,2014-11-26 01:20:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Lifted tools to rig floor for testing of toolstring through cablehead. +Meanwhile held toolbox talk for installing the BHA into lubricator.",0.5833333333333334 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 01:20:00+00:00,2014-11-26 02:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Installed toollstring into lubricator and Leak tested QTS to 20/345 bar for 5/10 min. +Meanwhile held toolbox talk for the plug run.",1.1666666666666667 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 02:30:00+00:00,2014-11-26 03:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Opened HMV and equalized acoss swab using well pressure.,0.5 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 03:00:00+00:00,2014-11-26 04:40:00+00:00,1400.0,m,wire line,interruption -- other,ok,equipment failure,"RIH w/BHA #2 7"" EVO plug from surface to 1400 m. WHP 51 bar. +Performed well control drill: Leakage in grease injection head. +Stopped each 300 meters to perform P/U weight.",1.6666666666666667 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 04:40:00+00:00,2014-11-26 06:45:00+00:00,3135.0,m,wire line,workover -- other,ok,success,"Continued to RIH from 1400 meter to 3135 m. +Stopped each 300 meters to perform P/U weight.",2.0833333333333335 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 06:45:00+00:00,2014-11-26 07:40:00+00:00,3150.0,m,wire line,workover -- other,ok,success,Correlated BHA across interval 3135 - 3050 m . Set plug with mid packer element at 3150 m. Observed 400 lbs drop in tension. WHP 47 bar.,0.9166666666666666 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 07:40:00+00:00,2014-11-26 09:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,POOH with BHA#2 from 3150 m to surface. Hung slightly up in the packer area. Continued to POOH.,2.0833333333333335 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 09:45:00+00:00,2014-11-26 10:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Closed SV. Had to wait on production department for bleeding of, due to problems with a gas compressor.",0.75 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 10:30:00+00:00,2014-11-26 11:45:00+00:00,0.0,m,wire line,workover -- other,ok,success,Bled of lubricator and inflow tested SV & HMV. Purged lubricator with N2.,1.25 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 11:45:00+00:00,2014-11-26 11:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to L/D toolstring.,0.16666666666666666 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 11:55:00+00:00,2014-11-26 12:10:00+00:00,0.0,m,wire line,workover -- other,ok,success,Broke lubricator and L/D BHA #2.,0.25 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 12:10:00+00:00,2014-11-26 14:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Lifted Halliburton perforating toolstring to drill floor and started to prepare guns.,1.8333333333333333 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 14:00:00+00:00,2014-11-26 14:20:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk prior to arm the perforating guns.,0.3333333333333333 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 14:20:00+00:00,2014-11-26 15:55:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Installed BHA #3 (4 5/8"" Perforating gun) into lubricator. Stabbed lubricator and tested QTS to 20/345 bar for 5/10 min. Equalized and opened SV and HMV. WHP 46 bar.",1.5833333333333333 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 15:55:00+00:00,2014-11-26 19:30:00+00:00,3135.0,m,wire line,workover -- perforate,ok,success,"RIH w/BHA #3 (4 5/8"" Perforating gun) from surface to 3135 meters. WHP 46 bar. +Stopped each 500 meters and pulled up 50 meters. +Depth P/U weight +500 m 1410 lbs +1000 m 2130 lbs +1500 m 2950 lbs +2000 m 3650 lbs +2500 m 4400 lbs +3000 m 4900 lbs",3.5833333333333335 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 19:30:00+00:00,2014-11-26 20:05:00+00:00,3135.0,m,wire line,workover -- perforate,ok,success,"Performed three correlation passes across interval 3135 - 3050 m. Positioned gun with top shot at 3126,2 m & bottom shot at 3130,7 mMD. WHP 45 bar.",0.5833333333333334 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 20:05:00+00:00,2014-11-26 20:25:00+00:00,3131.0,m,wire line,workover -- wire line,ok,success,Activated perforation guns. Observed current increase and drop in tension of 200 lbs. No change in WHP at 45 bar. Started POOH.,0.3333333333333333 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 20:25:00+00:00,2014-11-26 22:30:00+00:00,480.0,m,wire line,workover -- perforate,ok,success,POOH with BHA #3 from 3131 m to 480 m. WHP 45 bar.,2.0833333333333335 +15_9_F_12_2014_11_27.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-26T00:00:00+01:00,2014-11-27T00:00:00+01:00,2014-11-26 22:30:00+00:00,2014-11-26 23:00:00+00:00,480.0,m,wire line,workover -- perforate,ok,success,Held toolbox talk prior to take guns out of hole. Included toolbox talk for rigging down WL equipment.,0.5 +15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-26 23:00:00+00:00,2014-11-26 23:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Continued to POOH from 480 m to surface.,0.25 +15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-26 23:15:00+00:00,2014-11-27 00:45:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Closed SV & HMV and inflow tested for well handover. Purged riser with nitrogen.,1.5 +15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 00:45:00+00:00,2014-11-27 01:10:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator and L/D BHA#3.,0.4166666666666667 +15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 01:10:00+00:00,2014-11-27 02:30:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Closed upper BOP ram. Opened HMV and closed DHSV for inflow test of same. Had 40 bar delta P. Test OK - 0 bar/30 min. Bled down pressure above DHSV to 0 and closed HMV.,1.3333333333333333 +15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 02:30:00+00:00,2014-11-27 04:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged down lubricator. Rigged down riser above BOP. Disconnected BOP and rigged down same. Disconnected lower riser from XMT.,2.1666666666666665 +15_9_F_12_2014_11_28.xml,NO 15/9-F-12,NO 15/9-F-12,2014-11-27T00:00:00+01:00,2014-11-28T00:00:00+01:00,2014-11-27 04:40:00+00:00,2014-11-27 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Mounted top cap on XMT. Disconnected chickasn on kill wing cap and mounted kill wing cap. Pressure tested Top cap & KW cap to 20/345 bar for 5/10 min. +Change WL hatch with permanent hatch. Prepared for skidding to F-1C. + +----------------------------------------- END OF OPERATION ------------------------------------------------",3.3333333333333335 +15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 16:30:00+00:00,2016-08-14 18:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Prepared to skid cantilever,1.5 +15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 18:00:00+00:00,2016-08-14 18:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed Pre-job Meeting to skid cantilever,0.5 +15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 18:30:00+00:00,2016-08-14 19:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Removed stairs and bridge to cantilever,0.5 +15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 19:00:00+00:00,2016-08-14 19:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded cantilever to F-12 slot, 0.5m to port , 4.56m forward and 0.5m to starboard",0.75 +15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 19:45:00+00:00,2016-08-14 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed moon pool hatch on F-12 and confirmed cantilever position. Installed split hatches on F-12,2.0 +15_9_F_12_2016_08_15.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-14T00:00:00+02:00,2016-08-15T00:00:00+02:00,2016-08-14 21:45:00+00:00,2016-08-14 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for rigging up wire line equipment in moon pool and drill floor,0.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-14 22:00:00+00:00,2016-08-14 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed well cap on F-12. Installed lower riser joint and WL BOP,1.75 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-14 23:45:00+00:00,2016-08-15 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connect WL control lines and hoses to BOP. Function tested BOP +Rigged up kill hose to tree +P/U upper WL riser joint +Lifted WL equipment to rig floor",2.0 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 01:45:00+00:00,2016-08-15 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting w/ new crew,0.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 02:00:00+00:00,2016-08-15 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed upper riser joint on top of BOP +Meanwhile continued to open rig BOP for inspection",0.5 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 02:30:00+00:00,2016-08-15 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Changed BX inserts to 3.5in +Meanwhile continued to open rig BOP for inspection",0.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 02:45:00+00:00,2016-08-15 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to R/U WL equipment above RKB +Meanwhile continued to inspect and clean rig BOP. M/U WL lubricator on HTS and installed hoses on same. Filled A and B annulus.",3.0 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 05:45:00+00:00,2016-08-15 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted lubricator from HTS to TDS,0.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 06:00:00+00:00,2016-08-15 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built cable head and tested same +Meanwhile worked on flow line and cleaned BOP from cement",0.5 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 06:30:00+00:00,2016-08-15 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U tool string w/ deep set plug BHA (run#4),0.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 06:45:00+00:00,2016-08-15 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U tool string, installed kill hose onto the tree",1.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 08:00:00+00:00,2016-08-15 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to fill and pressure test WL rig up,0.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 08:15:00+00:00,2016-08-15 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Flushed lines w/ 50/50 MEG. Filled WL riser and lubricator,0.75 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 09:00:00+00:00,2016-08-15 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested WL rig up to 20/345bar for 5/10min,0.75 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 09:45:00+00:00,2016-08-15 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to bullhead the well,0.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 10:00:00+00:00,2016-08-15 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Opened MV and HMV. Observed pressure inside tree increased to 55 Bar. +Applied 520 bar on control lines for DHSV. Performed line test and open KWV. +Pumped 3 m3 50/50 MEG/SW with cement unit @ 1100l/min - 83bar",0.5 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 10:30:00+00:00,2016-08-15 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pumped 10m3 Wash pill at 1300l/min - 91bar,0.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 10:45:00+00:00,2016-08-15 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bullheaded well with sea water at 1300l/min, +/- 90 Bar. After pumped 40m3, standpipe pressure started to increase slowly. +Final circulation pressure 151bar",2.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 13:00:00+00:00,2016-08-15 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pumped 10m3 MEG/SW with cement unit at 1100l/min +SIWHP when stopped pumping 55bar",0.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 13:15:00+00:00,2016-08-15 15:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Equalized and opened SV. +RIH with WL to 3010m.",2.5 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 15:45:00+00:00,2016-08-15 17:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Correlated depth w/ BHA (run#4). Correlation interval 2850m-3005m,1.75 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 17:30:00+00:00,2016-08-15 18:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Trouble shoot winch after not able to achieve stable running speed with winch. Suspected overheating of hydraulic system,1.0 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 18:30:00+00:00,2016-08-15 19:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Set plug w/ mid packer element at 3003 m. Confirmed plug set w/ tagging,0.5 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 19:00:00+00:00,2016-08-15 21:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"POOH from 3003 m to surface. Average pulling speed 22m/min +Meanwhile performed TBT for pressure testing of plug",2.25 +15_9_F_12_2016_08_16.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-15T00:00:00+02:00,2016-08-16T00:00:00+02:00,2016-08-15 21:15:00+00:00,2016-08-15 22:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Closed SV and inflow tested same +Meanwhile lined up cement unit for pressure test plug",0.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-15 22:00:00+00:00,2016-08-15 22:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Pressure tested deep set plug to 20/260bar for 5/10 minutes. Good test,0.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-15 22:45:00+00:00,2016-08-16 00:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Bled off pressure above deep set plug to close drain to 10bar. +Performed inflow test of deep set plug. Good test",1.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 00:30:00+00:00,2016-08-16 01:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Bled down pressure from tubing. Closed HMV, confirmed SV and KWV closed +L/D BHA",1.0 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 01:30:00+00:00,2016-08-16 02:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U shallow set plug BHA (run #5), installed same into lubricator. Leak tested lubricator/QTS to 20/345bar 5/10min. +Opened HMV, SV",1.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 02:45:00+00:00,2016-08-16 03:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,RIH shallow set plug to 256m,0.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 03:00:00+00:00,2016-08-16 04:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Correlated BHA across interval 200 - 300m . Set plug with mid packer element at 249m. Tagged plug. POOH w/ setting tool to lubricator,1.0 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 04:00:00+00:00,2016-08-16 04:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Lined up cement pump and pressure tested shallow set plug to 20/230bar for 5/10min. Good test,0.5 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 04:30:00+00:00,2016-08-16 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed HMV,KWV and SV, verified no pressure in XT",0.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 04:45:00+00:00,2016-08-16 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Started R/D wireline equipment,0.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 05:00:00+00:00,2016-08-16 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting w/ oncoming crew to R/D WL equipment,0.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 05:15:00+00:00,2016-08-16 05:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,L/D plug setting tool,0.5 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 05:45:00+00:00,2016-08-16 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D lubricator, moved same from the rig floor",1.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 07:00:00+00:00,2016-08-16 07:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D upper wire line riser joint,0.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 07:15:00+00:00,2016-08-16 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Disconnected control lines and hoses to WL BOP and pulled same to rig floor +Meanwhile prepared to pull Fox hole",0.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 08:00:00+00:00,2016-08-16 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D WL BOP and lower riser joint. Lifted BOP to pipe deck,1.5 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 09:30:00+00:00,2016-08-16 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for rearranging well hatches in moon pool,0.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 09:45:00+00:00,2016-08-16 11:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Removed hatches on F-12 and F-7 and beam between slots,1.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 11:00:00+00:00,2016-08-16 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing, installed chains to TDS and attached to XMT as per lifting plan, with double securing",0.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 11:45:00+00:00,2016-08-16 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued w/ attaching lifting arrangement to XMT +Meanwhile performed BOP test No.2 (low pressure only) to 20bar",0.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 12:00:00+00:00,2016-08-16 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed high pressure test on BOP. Test No.2 to 345bar,0.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 12:15:00+00:00,2016-08-16 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to rig up to pull XMT. Took 1t tension with TDS and disconnected Greyloc clamp below XMT +Meanwhile performed BOP test No 1 to 20/345bar for 5/10 min",1.0 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 13:15:00+00:00,2016-08-16 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted XMT to Moon pool and transported to skid according to lifting plan. +Meanwhile lined up for BOP pressure test No. 3",0.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 14:00:00+00:00,2016-08-16 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to move/handle XMT to moon pool hatch +Meanwhile performed BOP test No. 3 to 20/345bar 5/10 min, +performed BOP test No. 4 to 20/345bar 5/10 min",0.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 14:45:00+00:00,2016-08-16 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed beam between slots and hatch on F-7 slot. +Meanwhile lined up for BOP pressure test No. 5",0.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 15:30:00+00:00,2016-08-16 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted spool spacer to the rig floor. +Meanwhile performed BOP test No. 5, installed master bushing",1.0 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 16:30:00+00:00,2016-08-16 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Prepared wellhead to install HP riser. +Meanwhile performed BOP test No. 6, removed lifting tool for foxhole",0.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 17:15:00+00:00,2016-08-16 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleared rig floor and HTS, meanwhile carried out TBT for testing BOP.",0.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 17:30:00+00:00,2016-08-16 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued working on wellhead. measured RKB - WH 19.95m. +Meanwhile continued pressure test on BOP. Prepared paperwork required for running HP Riser and man riding on TDS",1.0 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 18:30:00+00:00,2016-08-16 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed communication collar. Meanwhile isolated TDS, hydraulic mech investigated sweating connection on link tilt cylinder. Finished pressure testing BOP and rigged down equipment used for pressure testing",0.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 19:15:00+00:00,2016-08-16 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed Pre-job Meeting to P/U high pressure riser +Meanwhile deisolated TDS, TBT",0.5 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 19:45:00+00:00,2016-08-16 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected all rigging equipment to TDS bails and picked up HP Riser. Removed master bushing and half-moon hatches. P/U and RIH with HP Riser, removed protector",1.25 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 21:00:00+00:00,2016-08-16 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued RIH w/ HP riser, cleaned and checked seal area and M/U NT2 connector",0.75 +15_9_F_12_2016_08_17.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-16T00:00:00+02:00,2016-08-17T00:00:00+02:00,2016-08-16 21:45:00+00:00,2016-08-16 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to skid BOP,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-16 22:00:00+00:00,2016-08-16 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed halfmoon hatches and master bushing, released BOP NT2 connector from stump. +Continued pressure testing Kill and Choke Manifold",0.5 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-16 22:30:00+00:00,2016-08-16 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Skidded BOP to well center, moved port and stb tension cylinders in order to land off BOP on HP Riser Stump. +Installed seal and land off BOPs. Meanwhile continued pressure testing Kill and Choke Manifold",0.75 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-16 23:15:00+00:00,2016-08-16 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to connect tension cylinders. Meanwhile continued pressure testing Kill and Choke Manifold,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-16 23:30:00+00:00,2016-08-17 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Connected all 4 tension cylinders to BOP carrier. Meanwhile continued pressure testing Kill and Choke Manifold,1.0 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 00:30:00+00:00,2016-08-17 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and run slick joint, retracted TDS. +Removed master bushing and outer ring, run down and landed off slick jnt and M/U 4x studs",0.75 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 01:15:00+00:00,2016-08-17 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and RIH w/ diverter and land off same. Continued to M/U rest of studs on slick jnt,1.5 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 02:45:00+00:00,2016-08-17 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to build scaffolding,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 03:00:00+00:00,2016-08-17 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Built scaffolding around HP Riser. +Meanwhile removed lifting chains from TDS. Prepared and M/U test assembly for pressure testing TDS",1.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 04:15:00+00:00,2016-08-17 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Started M/U NT2 connector,0.75 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 05:00:00+00:00,2016-08-17 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to M/U NT2 connector w/ new crew,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 05:15:00+00:00,2016-08-17 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Finished M/U NT2 connector between BOP and riser. +Meanwhile performed pressure test on TDS. Test NO.1 and Test NO. 2, Kelly hose, Upper IBOP",1.75 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 07:00:00+00:00,2016-08-17 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed load shift from BOP carriers to tension system and pressurized diverter system. +Meanwhile continued TDS pressure test. Test NO. 3, Lower IBOP",0.5 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 07:30:00+00:00,2016-08-17 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Filled up riser and BOP with SW, closed BSR and pressure tested BOP/connector through Kill line to 20/345bar for 5/10min. Meanwhile performed TBT for rig up casing handling equipment",0.75 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 08:15:00+00:00,2016-08-17 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong and changed BX inserts to 7inch,1.5 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 09:45:00+00:00,2016-08-17 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 10:00:00+00:00,2016-08-17 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U THRT and make up to first joint of the landing string,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 10:15:00+00:00,2016-08-17 11:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Overtorqued connection between THRT and first joint due to wrong tong setting. +Troubleshoot, broke out and inspected treads. Damaged. L/D damaged pup joint and THRT",1.0 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 11:15:00+00:00,2016-08-17 11:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Broke off 2x pup joints from first landing string joint,0.5 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 11:45:00+00:00,2016-08-17 12:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,P/U backup THRT and first landing string joint,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 12:00:00+00:00,2016-08-17 12:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,L/D back up THRT due to it not being able to communicate with DHSV,0.5 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 12:30:00+00:00,2016-08-17 12:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Prepared to P/U primary landing string. +Meanwhile perform maintenance on BOP control system",0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 12:45:00+00:00,2016-08-17 13:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"P/U primary THRT, broke off damaged pup joint and L/D same. +Replaced with new pup joint and M/U to THRT",1.0 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 13:45:00+00:00,2016-08-17 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,P/U primary landing string,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 14:00:00+00:00,2016-08-17 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U 3x pup joints and M/U to THRT, RIH to 22m",0.5 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 14:30:00+00:00,2016-08-17 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH landing string to surface. Prepared and connected control lines to THRT,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 14:45:00+00:00,2016-08-17 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH with THRT and landed on the tubing. M/U THRT to TH,0.75 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 15:30:00+00:00,2016-08-17 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for pumping open ME plug,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 15:45:00+00:00,2016-08-17 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Dropped 2in ball inside landing string and M/U swedge with 1502 weco to 7in tubing,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 16:00:00+00:00,2016-08-17 17:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Lined up to line test. Go to low pressure 20bar. Cement pump tripped. Troubleshoot. Meanwhile lift remaining tubing handling equipment to rig floor. Reel and compact spider slips,1.0 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 17:00:00+00:00,2016-08-17 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued w/ line test. Meanwhile prepared rigfloor for second reel,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 17:15:00+00:00,2016-08-17 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected cement hose to pumping swedge and applied 20 bar to confirm line up. +Continued to pressure up to 60 bar (unable to stop at 50 bar due to pressure building up to fast), no indication of opening of the Pump-open sub in ME plug. Bled off. Waited 5 min to let plug reset. +Note: Plug supposed to open at 40 bar.",0.75 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 18:00:00+00:00,2016-08-17 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up well to 50 bar w/ cement unit. Did not observe signs of Pump-open sub in ME plug openning . Bled off pressure via choke +Meanwhile: +- Called and consulted Interwell duty support. Agreed to pump up to 100bar to try to open plug. +- Continued to rig up reels.",0.5 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 18:30:00+00:00,2016-08-17 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Started to pressured up well with constant rate of 50 l/min. Observed clear change of pressure trend at 56 bar indicating openning of Pump-open sub in ME plug +Stopped pressuring up at 102 bar",0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 18:45:00+00:00,2016-08-17 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled off pressure and monitor well on fully closed choke, no pressure build up.",0.5 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 19:15:00+00:00,2016-08-17 19:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Pressured up well to equalize and open DHSV, applied 130 bar to string, observed DHSV equalizing and opening at 122bar. Pressured up control lines to 520 bar. Bled off tubing pressure to zero via choke to trip tank. Returns 60 liters indicating that DHSV closed after pressure above is pled off. +Repeated equalizing and bleeding off sequence and observed same volume bled off",0.5 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 19:45:00+00:00,2016-08-17 20:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Confirmed 520 bar on control line and applied 140 bar to the well, 170 liters pumped and 90 liters returned. Meanwhile evaluated situation. Discussed situation w/ onshore organisation.",0.75 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 20:30:00+00:00,2016-08-17 20:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Applied 100 bar to tubing. Disconnected cement hose and bled off directly into a drum. 51 liters returned indicating that DHSV was closed,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 20:45:00+00:00,2016-08-17 21:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Reconnected cement hose to tubing. Meanwhile held TBT to swap hydraulic pump to pressure up control line for DHSV,0.25 +15_9_F_12_2016_08_18.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-17T00:00:00+02:00,2016-08-18T00:00:00+02:00,2016-08-17 21:00:00+00:00,2016-08-17 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Connected another hydraulic pump to control line, applied 520bar to control line. Started pressuring up tubing while monitoring gauge on the hydraulic pump for indications of DHSV sleeve movement. +Observed DHSV equalized and opened at 146 bar and stop pressuring up at 152bar. No indication of DHSV sleeve movement. Bled off pressure, volume returned 60 liters. 152bar trapped below DHSV",1.0 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-17 22:00:00+00:00,2016-08-17 23:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Evaluated situation. Discussed situation w/ onshore organisation, callled well integrity duty +Meanwhile prepared papers and serviced/drops checked rig floor equipment",1.75 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-17 23:45:00+00:00,2016-08-18 01:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Continued discussing way forward. Discussed risks, barrier status, well control contingencies. Agreed to attempt to pull tubing hanger with 152bar trapped pressure below DHSV. Updated change log. +Meanwhile applied 20 bar to tubing and inflow tested DHSV, Good. Continued with rig maintenance and pressure tested valves S1 and C26, good",1.75 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 01:30:00+00:00,2016-08-18 01:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed Pre-job Meeting for pulling tubing hanger as per agreed new plan,0.25 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 01:45:00+00:00,2016-08-18 02:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"R/D cementing hose, chiksans. Attempted to back off weco1502 swedge. Collar backing off together with swedge. Torqued up collar to 15000 ft*lbs and manage to break off swedge, L/D same",0.75 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 02:30:00+00:00,2016-08-18 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed circulating swedge for TDS. M/U TDS and unlock tubing hanger. +Pull tubing hanger free with 185t hook load (15ton overpull). Observed drop in Trip tank indicating that A-annulus was not 100% full. Waited for trip tank level to stabilize, total of 2 m3 lost",1.0 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 03:30:00+00:00,2016-08-18 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to pull landing string to TH. After pulling further 9m, observed gain in trip tank indicating seals pulled out of PBR. +Stopped and flowchecked, after 270l gain trip tank static. Gain volume corresponded to expected volume value due to trapped pressure below DHSV",1.5 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 05:00:00+00:00,2016-08-18 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to L/D THRT and to POOH 7in tubing w/ control lines,0.25 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 05:15:00+00:00,2016-08-18 06:00:00+00:00,2962.0,m,fixed,plug abandon -- other,ok,success,Cut control lines. L/D TH and THRT + 2 pup joints from 2976m to 2962m,0.75 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 06:00:00+00:00,2016-08-18 06:45:00+00:00,2951.0,m,fixed,plug abandon -- other,ok,success,"Connected control lines to reel. Removed master bushing and installed compact spider slips. +Pull 1x joint while doing adjustment on slips and tong",0.75 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 06:45:00+00:00,2016-08-18 08:30:00+00:00,2737.0,m,fixed,plug abandon -- other,ok,success,"Pull 7in tubing from liner 2951m to 2737m. Measured radioactivity every 10 joints. +Average pulling speed 6,8joints/hour",1.75 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 08:30:00+00:00,2016-08-18 08:45:00+00:00,2737.0,m,fixed,plug abandon -- other,ok,success,"Performed time out for safety w/ crew due to radioactivity recorded in 7in tubing. +10-16 Bq/cm2 and 1-2uSv/h recorded",0.25 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 08:45:00+00:00,2016-08-18 10:45:00+00:00,2473.0,m,fixed,plug abandon -- other,ok,success,"Continued to pull 7in tubing from 2737 to 2473m. DHSV assy in rotary. Average pulling speed 10joints/hour +Continued to measure radioactivity at 9-12 Bq/cm2 and 1-2uSv/h on inside of tubing and 3-4 Bq/cm2 and 0.5uSv/h on the outside of the tubing",2.0 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 10:45:00+00:00,2016-08-18 11:15:00+00:00,2473.0,m,fixed,plug abandon -- other,ok,success,"R/D Compact spider, install master bushing",0.5 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 11:15:00+00:00,2016-08-18 11:30:00+00:00,2473.0,m,fixed,plug abandon -- other,ok,success,"P/U 1x joint and cut control line to avoid having control line across BOP during WL operation. +RIH w/ same and L/D DHSV",0.25 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 11:30:00+00:00,2016-08-18 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted WL equipment and tool string to rig floor. Meanwhile cleaned and cleared rig floor,0.75 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 12:15:00+00:00,2016-08-18 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/U WL equipment,0.25 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 12:30:00+00:00,2016-08-18 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U for WL and M/U logging tool string (run#9). +Performed surface check prior to RIH",2.0 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 14:30:00+00:00,2016-08-18 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with logging BHA on WL. From surface to 2960m. Checked pick up weights every 500m. +Average running speed 28m/min",1.75 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 16:15:00+00:00,2016-08-18 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Logged USIT across interval 2960 - 2506 m. Performed repeat pass across interval 2960 - 2860 m. Processed and uploaded data into Interact system. +Confirmed quality of data with logging duty. Received confirmation from logging duty that following intervals had high cement quality: 2895-2960m, 2660-2671m",2.5 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 18:45:00+00:00,2016-08-18 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH from 2500 m to surface. Average pulling speed 42 m/min.,1.0 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 19:45:00+00:00,2016-08-18 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D WL equipment and change elevator inserts to 5,5in DP. Meanwhile function tested DHSV on deck. Observed indication of sleeve moving and flapper openning/closing",0.75 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 20:30:00+00:00,2016-08-18 20:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting to R/D tubing tong,0.25 +15_9_F_12_2016_08_19.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-18T00:00:00+02:00,2016-08-19T00:00:00+02:00,2016-08-18 20:45:00+00:00,2016-08-18 22:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,R/D tubing tong,1.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-18 22:00:00+00:00,2016-08-18 22:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed master bushing and installed PS21s. +Run down 1st std, observed back flow while running down",0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-18 22:15:00+00:00,2016-08-18 22:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U 2x 5,5in pup joints for space out",0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-18 22:30:00+00:00,2016-08-19 00:15:00+00:00,2962.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued RIH with 5,5in DP from 2521m to 2962m restricted due to back flow. +Performed D1 kick drill",1.75 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 00:15:00+00:00,2016-08-19 01:00:00+00:00,2962.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS and staged up pump rate to 3700 l/min - 178 bar. Observed increase in gas returns to 10%, stopped pump and lined up returns through gas traps",0.75 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 01:00:00+00:00,2016-08-19 02:45:00+00:00,2962.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued circulating with 2200 l/min - 65 bar, max gas 28% and 7ppm H2S in fluid. Circulated until gas dropped to 3% and zero H2S. Pumped through dump line with 2200 l/min to check clear.",1.75 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 02:45:00+00:00,2016-08-19 03:15:00+00:00,2962.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U pumping assembly, connected cement hose and 2x lo-torqs. Meanwhile held TBT for cementing job",0.5 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 03:15:00+00:00,2016-08-19 03:30:00+00:00,2965.0,m,fixed,plug abandon -- cement plug,ok,success,"Positioned string at 2965m, lined up and pumped 20 m3 wash pill. 3700l/min - 180bar",0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 03:30:00+00:00,2016-08-19 04:00:00+00:00,2965.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up to cement hose and performed connection test w/ 345 bar for 3 mins. Bled off pressure to 20 bar, closed IBOP and applied 20 bar behind. Open to cement hose and verified line up",0.5 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 04:00:00+00:00,2016-08-19 05:30:00+00:00,2965.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (2965 m - 2765 m ): Mixed and pumped 9,2 m3 of 1,9 SG cement slurry, 550 l/min. Displaced the cement to the rig floor with 2900 l of drill water. Zeroed volume counters. Displaced the cement with 44 m3 (1986 strokes) of SW, 3700 l/min/ 147 bar. Pulled out of cement to 2765m at 4 min/stand. Theoretical TOC 2765 m MD.",1.5 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 05:30:00+00:00,2016-08-19 06:45:00+00:00,2765.0,m,fixed,plug abandon -- cement plug,ok,success,Installed sponge ball. Pumped 10m3 hi-vis at 1350l/min / 35 bar. Circulated 3000 l/min/ 100 bar. Meanwhile removed PS21 slips and installed master bushing. Held TBT for P/U BOP wash tool,1.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 06:45:00+00:00,2016-08-19 07:00:00+00:00,2722.0,m,fixed,plug abandon -- cement plug,ok,success,POOH and R/B 1x stand from 2765m to 2722m,0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 07:00:00+00:00,2016-08-19 08:15:00+00:00,2722.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed closed FOSV and BOP wash tool, make 10x passes in BOP and well head at 1500 LPM / 11 bar, operated rams and annular once",1.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 08:15:00+00:00,2016-08-19 08:30:00+00:00,2722.0,m,fixed,plug abandon -- cement plug,ok,success,R/B stand and L/D wash tool and FOSV,0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 08:30:00+00:00,2016-08-19 09:00:00+00:00,2475.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 2722 m to 2475 m,0.5 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 09:00:00+00:00,2016-08-19 09:15:00+00:00,2475.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to rig up casing tong,0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 09:15:00+00:00,2016-08-19 10:15:00+00:00,2475.0,m,fixed,plug abandon -- other,ok,success,Installed casing tong and removed X-over,1.0 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 10:15:00+00:00,2016-08-19 10:30:00+00:00,2463.0,m,fixed,plug abandon -- other,ok,success,"Pulled 1x joint of 7in tubing from 2475m to 2463m , removed master bushing and installed compact spider slips",0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 10:30:00+00:00,2016-08-19 10:45:00+00:00,2463.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting pull and L/D tubing w/ control lines,0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 10:45:00+00:00,2016-08-19 11:00:00+00:00,2463.0,m,fixed,plug abandon -- other,ok,success,Connected control line to reel,0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 11:00:00+00:00,2016-08-19 11:45:00+00:00,2415.0,m,fixed,plug abandon -- other,ok,success,"Pulled 7in tubing from 2463m to 2415m. Control line jammed into slips segment, lifted slips to release +Measured second joint for radioactivity at 10-30 Bq/cm2 and 1-2uSv/h on inside and 8-11 Bq/cm2 and 0.5 uSv/h on outside",0.75 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 11:45:00+00:00,2016-08-19 13:30:00+00:00,2189.0,m,fixed,plug abandon -- other,ok,success,Continued pulling 7in tubing from 2415m to 2189m. Measuring for radioactivity 1-2 uSv/h on inside of tubing. Average pulling speed 11 joints/hour,1.75 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 13:30:00+00:00,2016-08-19 14:00:00+00:00,2189.0,m,fixed,plug abandon -- other,ok,success,Performed TOFS due to finger injury to floor man. Discussed what happened and preventative measures,0.5 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 14:00:00+00:00,2016-08-19 16:00:00+00:00,1877.0,m,fixed,plug abandon -- other,ok,success,Continued to pull 7in tubing from 2189m to 1877. Average pulling speed 12 joints/hour. Last joint laid down #111,2.0 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 16:00:00+00:00,2016-08-19 16:15:00+00:00,1877.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/D casing handling equipment,0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 16:15:00+00:00,2016-08-19 16:30:00+00:00,1877.0,m,fixed,plug abandon -- other,ok,success,"Pulled up 1x joint, cut and secured control line to avoid having control line in BOP during R/D. R/D compact spider, installed master bushing. Run down and set manual slips",0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 16:30:00+00:00,2016-08-19 17:30:00+00:00,1877.0,m,fixed,plug abandon -- other,ok,success,R/D casing tongs,1.0 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 17:30:00+00:00,2016-08-19 17:45:00+00:00,1877.0,m,fixed,plug abandon -- other,ok,success,"P/U spear assembly (run#11), greased pack off, grapple and set in catch",0.25 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 17:45:00+00:00,2016-08-19 18:15:00+00:00,1905.0,m,fixed,plug abandon -- other,ok,success,RIH from 1876m to 1905m. Removed FOSV from liner swedge. Removed master bushings and installed PS21,0.5 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 18:15:00+00:00,2016-08-19 19:15:00+00:00,2356.0,m,fixed,plug abandon -- trip,ok,success,"Continued RIH on 5,5in DP from 1905m to 2356m. Average running speed 450m/hour",1.0 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 19:15:00+00:00,2016-08-19 21:15:00+00:00,2356.0,m,fixed,interruption -- fish,ok,success,"Observed loose stand in derrick. Held TBT, recovered stand using forward PRS and returned to TDS. Held stand w/ aft PRS to lower down TDS to be able to inspect elevators. Elevators found to be damaged. Changed out elevators to spare set. +Performed drops check of aft PRS before continuing with operation.",2.0 +15_9_F_12_2016_08_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-19T00:00:00+02:00,2016-08-20T00:00:00+02:00,2016-08-19 21:15:00+00:00,2016-08-19 22:00:00+00:00,2712.0,m,fixed,plug abandon -- trip,ok,success,Continued RIH from 2356m to 2712m. Average running speed 350 m/hour,0.75 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-19 22:00:00+00:00,2016-08-19 23:00:00+00:00,2768.0,m,fixed,plug abandon -- trip,ok,success,"M/U TDS and pumped w/ 400 l/min - 3.5 bar, 550 l/m - 5 bar. +Up/down weights 202t/126t. Washed down w/ 550 l/min from 2712m to 2768m",1.0 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-19 23:00:00+00:00,2016-08-19 23:30:00+00:00,899.0,m,fixed,plug abandon -- trip,ok,success,"Tagged cement at 2768m w/ 10t, released spear by rotating 2x turns clockwise and observed torque dropped to 6kNm then increased to 9kNm. +Observed hook load dropped to 90t. RIH slowly and located top of 7in tubing 7m lower or at 2775m. Set down 10t to repeat tagging of the cement",0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-19 23:30:00+00:00,2016-08-20 01:15:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Dropped drift and POOH w/ spear on 5,5in DP from 899 m to surface. Avg. tripping speed 730 m/hr +Retrieved drift",1.75 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 01:15:00+00:00,2016-08-20 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled spear on surface. Inspected same, ok",0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 01:30:00+00:00,2016-08-20 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed PS21s and installed master bushings,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 01:45:00+00:00,2016-08-20 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U MS-T seal retrieval tool,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 02:00:00+00:00,2016-08-20 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U MS-T seal retrieval tool to 1x joint and 1x pup joint of 5,5in DP",0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 02:15:00+00:00,2016-08-20 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled MS-T seal retrieval tool to surface and connected control lines, function tested tool",0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 02:45:00+00:00,2016-08-20 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH w/ MS-T seal retrieval tool and positioned tool stem in correct space out. Meanwhile bled off 5 bar from B-annulus.,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 03:00:00+00:00,2016-08-20 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Turned string counter clockwise using chain tongs, only able to get 1x turn. Backed out and attempted again, 1x turn only. Tried to turn w/ iron roughneck, no go",1.0 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 04:00:00+00:00,2016-08-20 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH and inspected tool, no damage found, observed some minor scratches",0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 04:30:00+00:00,2016-08-20 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D MS-T seal retrieval tool on HTS,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 04:45:00+00:00,2016-08-20 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U jetting tool assembly to 5,5in DP stand",0.75 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 05:30:00+00:00,2016-08-20 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Jetted WH area with 2200 l/min - 60bar - 10 rpm,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 05:45:00+00:00,2016-08-20 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D wash tool and R/B DP stand,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 06:00:00+00:00,2016-08-20 06:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U MS-T retrieval tool assy,0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 06:30:00+00:00,2016-08-20 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH with MS-T seal retrieval tool. Rotated tool 4x turns counter clockwise to engage tool to seal. Released seal assembly w/ 80t overpull,2.0 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 08:30:00+00:00,2016-08-20 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ MS-T seal retrieval tool, removed seal assy.Disconnected control lines. L/D tool and landing string",0.75 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 09:15:00+00:00,2016-08-20 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 09:30:00+00:00,2016-08-20 09:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to P/U cutter BHA (run#14),0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 09:45:00+00:00,2016-08-20 10:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U premade cutter BHA (run#14), M/U to 5,5in DP and RIH to cutting depth of 124m",0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 10:15:00+00:00,2016-08-20 10:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS to string, checked and verified depth, filled pipe. Established parameters. 300 l/min - 30bar, 500l/min - 83bar, 100rpm, 1-5 kNm (pumps off), Weights: 73t - up, 69t - down, 70t - rotation",0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 10:45:00+00:00,2016-08-20 11:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Cut 10 3/4in surface tie-back at 124m. 80rpm, 300 l/min - 30bar. Observed shock on surface indicating successful cut",0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 11:15:00+00:00,2016-08-20 11:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ cutter BHA (run#14) to surface and L/D same,0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 11:45:00+00:00,2016-08-20 12:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Cleaned and cleared rig floor,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 12:00:00+00:00,2016-08-20 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Serviced drilling equipment,0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 12:30:00+00:00,2016-08-20 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U spear assembly (run#15),0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 12:45:00+00:00,2016-08-20 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U spear assembly (run#15) from derrick, checked and serviced same",0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 13:00:00+00:00,2016-08-20 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH and latched on to 10 3/4in tie-back. Pulled free same w/ 8t overpull,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 13:15:00+00:00,2016-08-20 14:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U casing tong for 10 3/4in csg,0.75 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 14:00:00+00:00,2016-08-20 14:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Set slips on fish and released spear. R/B spear in derrick,0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 14:30:00+00:00,2016-08-20 14:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Changed to BX3 elevators,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 14:45:00+00:00,2016-08-20 15:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Installed elevator on hanger. Broke off and L/D same,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 15:00:00+00:00,2016-08-20 16:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,POOH 10 3/4in csg tie-back from 104m to surface,1.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 16:15:00+00:00,2016-08-20 17:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D casing tong. Cleaned and cleared rig floor,1.0 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 17:15:00+00:00,2016-08-20 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U torque tool BHA (run#16),0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 17:30:00+00:00,2016-08-20 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U torque tool to 3m. Removed FOSV from swedge,0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 17:45:00+00:00,2016-08-20 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U 1x stand of 5,5in HWDP and M/U to X-over, RIH w/ 5,5in HWDP from 3m to 117m. Torqued all connections to 67500 kNm",0.75 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 18:30:00+00:00,2016-08-20 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS to 5,5in DP, RIH to 140m, started pumping with 1450 l/m, rotated w/ 10rpm. Jetted tie-back adapter area",0.5 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 19:00:00+00:00,2016-08-20 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Stopped pumping and engaged to tie-back adapter at 141,5m. Attempted to back out Tie back adapter with 30k kNm, string backed out at Saver sub. M/U Saver sub to 50 kNm. Tried to break again up 40kNm, something broke below rotary table, after 2 turns measured distance travelled up of string +/-1in. Continued turning out further 4 turns, distance travelled further +/-2in. Assumed as good indication of Tie back adapter loose.",0.75 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 19:45:00+00:00,2016-08-20 20:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH from 141,5m, visually checked all connections. When reached end of last 5,5in HWDP stand observed no BHA. The connection backed out from X-over",0.75 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 20:30:00+00:00,2016-08-20 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH with 5,5in HWDP to fish BHA, from surface to 113m. M/U TDS to 5,5in DP and tagged top of fish at 138,5m. Rotate to screw into the fish, string stalled out at 6kNm",1.0 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 21:30:00+00:00,2016-08-20 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ BHA to surface, removed and inspect x-over, ok",0.25 +15_9_F_12_2016_08_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-20T00:00:00+02:00,2016-08-21T00:00:00+02:00,2016-08-20 21:45:00+00:00,2016-08-20 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U to X-over. All connections M/U to 67kNm, Saver sub M/U to 50kNm. RIH to 117m",0.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-20 22:00:00+00:00,2016-08-20 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued to RIH w/ torque tool to 117m,0.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-20 22:15:00+00:00,2016-08-20 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS and RIH, engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Broke at 39kNm. Measured distance 1,5in after 5 turns. Suspected broken at connection. M/U back to 1kNm. POOH, visually checked every connection. Observed connection above X-over broke.",1.0 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-20 23:15:00+00:00,2016-08-21 01:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned X-over connection and M/U to HWDP without applying pipe dope. All connections M/U to 67kNm, Saver sub M/U to 50kNm. +RIH, engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Broke at +/-39kNm. Measured distance 1,5in after 5 turns. Suspected at connection. M/U back to 1kNm. POOH, visually checked every connection. Observed connection above X-over broke.",1.75 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 01:00:00+00:00,2016-08-21 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleaned X-over connection and M/U to HWDP to 74kNM without applying pipe dope. All DP connections M/U to 67kNm, Saver sub M/U to 50kNm. +RIH, engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Broke at +/-39kNm. Observed Saver sub connection broke. M/U saver sub again to 50kNm and attempted to break. Observed Saver sub connection broke.",1.75 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 02:45:00+00:00,2016-08-21 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U manual tong and held TBT for use of manual tongs,0.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 03:00:00+00:00,2016-08-21 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Trapped 20 kNm in with shaft and applied TDS break. Put tong on and pulled 20 kNm, released brake and pulled with tong to 25k n/m. Applied TDS brake. Pulled up to max 30kNm with Rig tong, observed torq reduced on TDS Shaft. Took off Rig tong, rotated TDS counter clockwise to make sure free. Made string back up to 2kNm. POOH, visually checked all connections. No connections have been observed backed out",2.0 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 05:00:00+00:00,2016-08-21 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Started RIH w/ torque tool,0.5 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 05:30:00+00:00,2016-08-21 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Carried out weekly HSE drill, table top exercise regarding volumetric well control",0.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 05:45:00+00:00,2016-08-21 07:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued RIH w/ torque tool. Engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Applied 25kNm in steps before pipe started to rotate. Than rotated free at 2kNm. Measured distance 1,5in after 5 turns. POOH. Observed no torque tool/X/over on the drill pipe - left in hole",1.5 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 07:15:00+00:00,2016-08-21 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RIH w/ DP from surface to 137 m. M/U TDS and latched on to fish. POOH from to surface. L/D torque tool,1.0 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 08:15:00+00:00,2016-08-21 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U Left hand Tie-back adapter torque tool and M/U to X/O,0.5 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 08:45:00+00:00,2016-08-21 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH torque tool on 5,5in left hand DP. From surface to 140. P/U singles from cantilever",1.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 10:00:00+00:00,2016-08-21 10:45:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Left hand X-over arrived on the rig. Inspected and discovered it was right hand X-over. Evaluated situation. Meanwhile performed hydraulic test on BX4.,0.75 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 10:45:00+00:00,2016-08-21 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U 1x more joint of DP and M/U to string. Attempted to break off Tie-Back adapter using rig tongs on DP. Pulled +/- 28kNm. Cathead fully stroked out. No success,1.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 12:00:00+00:00,2016-08-21 12:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Evaluated situation. Meanwhile performed tests on Aft iron roughneck,0.5 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 12:30:00+00:00,2016-08-21 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH from 140m to surface. L/D torque tool. Clean and clear rig floor,0.75 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 13:15:00+00:00,2016-08-21 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U drill collars from deck,0.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 13:30:00+00:00,2016-08-21 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and RIH 8,25 DC from surface to 90m (9 joints). R/B same in derrick",2.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 15:45:00+00:00,2016-08-21 16:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to P/U guns,0.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 16:00:00+00:00,2016-08-21 16:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,R/U to run guns,0.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 16:15:00+00:00,2016-08-21 17:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,P/U and M/U TCP gun BHA from surface to 17m,0.75 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 17:00:00+00:00,2016-08-21 17:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to handle guns w/ new crew,0.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 17:15:00+00:00,2016-08-21 17:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Continued to M/U guns BHA to 18m,0.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 17:30:00+00:00,2016-08-21 18:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"RIH w/ guns on 5,5in DP to 138m",1.0 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 18:30:00+00:00,2016-08-21 19:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"M/U TDS and positioned guns at 151.7m, closed UPRs and applied 20 bar to IBOP, opened to confirm line up. Up/down weights 72t/68t, flushed ball seat with 222 l/min. Opened UPRs, broke out connection and dropped 1 3/8in ball. M/U connection and positioned guns at firing depth 144,5-147,5m (top-bottom shot), closed UPRs and lined up through fully open Choke",0.5 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 19:00:00+00:00,2016-08-21 19:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Pumped down ball with 160 l/min, sheared ball seat at 150 bar. Indication of guns firing (sound, vibration on surface). Top shot at 144,5m, bottom shot at 147,5m. Continued pumping with 150 l/min until returns, increased to 770 l/min, observed slight gain of 500ltr and then losses of 60m3/hr. Pumped 1,5 times btms up, gas observed and still on losses",0.5 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 19:30:00+00:00,2016-08-21 20:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Stopped pumping, left choke open and opened UPRs, observed increase in flow. Close UPRs and closed choke, monitored for pressure on chole. Initially 1 bar, slowly increased to 2.9 bar then leveled out. Opened choke and slowly bled off pressure to 1 bar, closed choke and monitored for pressure build up, ok, no build up observed",0.75 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 20:15:00+00:00,2016-08-21 21:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Opened choke and circulateed with UPRs closed with 760 l/min, initially observed 60m3/hr losses. After confirmed returns increased flow rate to 890 l/min - 2,5 bar, max gas of 4.3%. Continued circulating until gas content curve showed downward trend. Total losses since punch 21m3",1.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 21:30:00+00:00,2016-08-21 21:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Stopped pumping and flowchecked through fully open choke, static. Opened UPRs and flowchecked on trip tanks, static",0.25 +15_9_F_12_2016_08_22.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-21T00:00:00+02:00,2016-08-22T00:00:00+02:00,2016-08-21 21:45:00+00:00,2016-08-21 22:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Started POOH from 147m,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 22:00:00+00:00,2016-08-21 22:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,POOH w/ guns from 147m to surface,0.5 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 22:30:00+00:00,2016-08-21 22:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforation guns BHA. All shots fired,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 22:45:00+00:00,2016-08-21 23:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to P/U cutter BHA,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 23:00:00+00:00,2016-08-21 23:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U and M/U cutter BHA,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 23:15:00+00:00,2016-08-21 23:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Removed master bushing and installed PS21,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-21 23:30:00+00:00,2016-08-22 01:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA on 5,5in DP from 9,2m to 892m. Average running speed 510 m/hour. Filled pipe at 1330l/min, 3 bar",1.75 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 01:15:00+00:00,2016-08-22 02:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS. Positioned cutters to cutting depth of 887m. Up/down weights 97t/90t, took parameters 75rpm - 4-7kNM, 300l/min - 18bar, 400l/min - 35bar, 500l/min - 61bar. Cut csg at 887m w/ 300l/min - 21bar, 80rpm - 8-12kNm. Measured gap of more than 2.7m",1.0 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 02:15:00+00:00,2016-08-22 03:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Flowchecked well. Observed instant gain of 300l, then loss of 3m3/hour. Then losses went to 0. Observed bubbling inside drill string and in the riser, smell of gas. M/U TDS to string and observed increase in trip tank",1.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 03:30:00+00:00,2016-08-22 05:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Closed UPR and started to circulate via fully open rig choke, performed 1x full circulation at 600-1000l/min max 6bar. Stopped pump and monitor via sample line. No flow",1.5 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 05:00:00+00:00,2016-08-22 05:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Opened UPR , line up trip tank and flow checked",0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 05:15:00+00:00,2016-08-22 06:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ cutting BHA on 5,5in DP from 887 m to 6 m . Avg. tripping speed 705 m/hr.",1.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 06:30:00+00:00,2016-08-22 06:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Removed PS21 and installed master bushing,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 06:45:00+00:00,2016-08-22 07:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutting BHA. Cleaned and cleared rig floor,0.5 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 07:15:00+00:00,2016-08-22 07:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Performed Pre-job Meeting to M/U LH landing string for torque tool,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 07:30:00+00:00,2016-08-22 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U 1x joint of 5,5in LH DP, M/U to x-over and 1x pup joint, L/D same onto HTS. P/U and M/U tieback adapter torque tool to LH DP, RIH to 140m",1.0 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 08:30:00+00:00,2016-08-22 08:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U LH DP with x-over and pup joint, M/U TDS, engaged to tieback adapter. Applied 30 kNm clockwise torque to string and released brake in an attempt to shock tieback adapter free. No success",0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 08:45:00+00:00,2016-08-22 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to use rig tongs,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 09:00:00+00:00,2016-08-22 09:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Applied 25kNm counterclockwise torque with TDS and applied brake. Latched onto pipe with rig tong and pulled to max 50kNm, observed connection above x-over broke out",0.75 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 09:45:00+00:00,2016-08-22 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting w/ oncoming crew,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 10:00:00+00:00,2016-08-22 10:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Broke out TDS from pup joint and layed out joint, x-over and pup onto HTS",0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 10:15:00+00:00,2016-08-22 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Evaluated situation. Meanwhile cleaned and cleared drill floor,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 10:30:00+00:00,2016-08-22 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Broke out pup joint from x-over, cleaned threads and M/U dry back to x-over to 67 kNm",1.0 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 11:30:00+00:00,2016-08-22 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U joint, x-over and pup joint and M/U same to string at well center",0.5 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 12:00:00+00:00,2016-08-22 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U TDS and trapped 25kNm in string, latched rig tong and pulled to 42kNm then slowly increased to 52kNm",1.75 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 13:45:00+00:00,2016-08-22 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting for changes in the plan,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 14:00:00+00:00,2016-08-22 18:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attached ropes to rig tong, trapped 26kNm with TDS. Pulled w/ rig tong up to 75kNm on the string. Tieback adapter did not release. Meanwhile discussed with onshore organization way forward",4.0 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 18:00:00+00:00,2016-08-22 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH tieback adapter torque tool from 140 meter to surface. L/D same,0.5 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 18:30:00+00:00,2016-08-22 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Discussed way forward. Meanwhile performed drops check on TDS and serviced same. Troubleshoot on XP pilot pressure on BX elevator.,1.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 19:45:00+00:00,2016-08-22 20:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Started preparing milling BHA. Meanwhile continued to Troubleshoot on XP pilot pressure on BX-elevator,0.5 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 20:15:00+00:00,2016-08-22 21:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,M/U milling BHA. L/D same,1.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 21:30:00+00:00,2016-08-22 21:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U cutter assembly,0.25 +15_9_F_12_2016_08_23.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-22T00:00:00+02:00,2016-08-23T00:00:00+02:00,2016-08-22 21:45:00+00:00,2016-08-22 22:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting for change in plans,0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-22 22:00:00+00:00,2016-08-22 23:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Broke connection above the cutter. Changed and adjusted knives to 12,25in size",1.5 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-22 23:30:00+00:00,2016-08-23 00:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,M/U cutter BHA together w/ torque tool for spaceout verification. Remeasured BHA components and pups/DP below torque tool,1.0 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 00:30:00+00:00,2016-08-23 01:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ cutter BHA. Engaged torque tool in tieback adapter, P/U 21.44m up to position knives at cutting depth of 139,7m (ca middle of tieback adapter)",0.5 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 01:00:00+00:00,2016-08-23 02:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Took parameters 300l/min - 22bar, 400l/min - 49bar, 500l/min - 85bar. Cut tieback adapter at 139,7m w/ 300l/min - 19bar, 80rpm - 2-8kNm. As pressure decreased, increased pump rate to 400l/min - 7bar, 460l/min - 5bar, 530l/min - 2bar. This pressure drop indicated that knives fully retracted and tieback adapter cut",1.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 02:15:00+00:00,2016-08-23 02:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ cutting BHA,0.5 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 02:45:00+00:00,2016-08-23 03:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D cutting BHA,0.75 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 03:30:00+00:00,2016-08-23 03:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U fishing BHA (run#21),0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 03:45:00+00:00,2016-08-23 04:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"RIH on 5,5in DP to 128 meter and latched on to 10 3/4in tieback fish",0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 04:00:00+00:00,2016-08-23 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to pull up to 80t overpull, worked the string several times up/down. No success",1.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 05:15:00+00:00,2016-08-23 05:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"POOH with spear BHA on 5,5in DP f/ 129m to 27m",0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 05:30:00+00:00,2016-08-23 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/B spear BHA (run#21),0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 05:45:00+00:00,2016-08-23 06:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"P/U torque tool and cutter assembly (run#22) and 1x joint of 5,5in DP, M/U to TDS. Tested knives with 300 l/min, ok. Broke out TDS, continued M/U BHA to 29m",1.0 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 06:45:00+00:00,2016-08-23 08:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 5,5in DP and tagged top of Tie back adapter with 2T at 124m. Filled string. Evaluated new cutting depth",1.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 08:00:00+00:00,2016-08-23 08:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Broke out TDS and POOH with cutter BHA (run#22). Installed lifting nubbing and pulled out cutter BHA,0.75 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 08:45:00+00:00,2016-08-23 10:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Changed knives in cutter to 13,5in ones. M/U TDS and tested cutter knives w/ 310 l/min, ok",1.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 10:00:00+00:00,2016-08-23 11:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 5,5DP and tagged top of Tie back adapter with 2T at 124m. Filled string and broke circulation w/ 310 l/min - 19 bar",1.0 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 11:00:00+00:00,2016-08-23 12:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Positioned knives at 139.7m. Increased flow rate to 500 l/min - 82 bar, started rotating w/ 100rpm, started cutting tieback adapter w/ 1-9kNm - 60 bar, increased to 140rpm - 1-7kNm, 495 l/min - 27bar, then 600l/min - 17bar. Good indication of cut, lifted fish on knives, then pumps off",1.0 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 12:00:00+00:00,2016-08-23 12:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ cutter BHA (run#22).,0.5 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 12:30:00+00:00,2016-08-23 13:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D torque tool and cutter BHA (run#22),0.75 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 13:15:00+00:00,2016-08-23 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U Spear BHA (run#23), set spear in catch position. RIH to 26m",0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 13:30:00+00:00,2016-08-23 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ spear to 106m. M/U TDS, took up/down weights 73t/70t. Continued in hole and latched onto fish at 128.5m, pulled free with 3t overpull",0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 13:45:00+00:00,2016-08-23 14:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"Broke-out TDS and POOH w/ spear BHA. Observed fish on spear. Released spear and L/D fish, R/B spear",0.75 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 14:30:00+00:00,2016-08-23 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 14:45:00+00:00,2016-08-23 15:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting to P/U milling BHA (run#24),0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 15:00:00+00:00,2016-08-23 15:45:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Carried out PMs and dailys while waiting for crew change helicopters,0.75 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 15:45:00+00:00,2016-08-23 17:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,P/U and M/U milling BHA (run#24). RIH same to 98m,1.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 17:00:00+00:00,2016-08-23 17:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting w/ oncoming crew,0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 17:15:00+00:00,2016-08-23 17:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,RIH w/ milling BHA (run#24) from 98 to 135m,0.5 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 17:45:00+00:00,2016-08-23 18:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Took up/down weights 85t/82t, parameters: 80rpm - 1-5kNm, 2000l/min - 14bar",0.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 18:00:00+00:00,2016-08-23 21:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"RIH and tagged tieback adapter cut at 139,7m, marked milling distance on pipe. P/U, started pumping and rotation 2000l/min - 13bar - 80rpm. RIH and started milling tieback adapter. Torque 2-7kNm, WOB 1t. Observed almost no vibration in the start and very noticeable vibration effects in the end of milling period. Totally milled ca 14cm down",3.25 +15_9_F_12_2016_08_24.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-23T00:00:00+02:00,2016-08-24T00:00:00+02:00,2016-08-23 21:15:00+00:00,2016-08-23 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Investigated water leak on TDS,0.75 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-23 22:00:00+00:00,2016-08-24 02:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Identified leak on the wash pipe, re-tighten wash pipe, performed drops inspection on TDS. Put on hydraulic power and discovered hydraulic leak: loose connection from one of the hoses on TDS. Repaired leak.",4.25 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 02:15:00+00:00,2016-08-24 02:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Resumed milling. 2000l/min - 13bar - 80rpm. Observed noticeable vibration,0.25 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 02:30:00+00:00,2016-08-24 03:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Observed leak on TDS. Stopped milling. Repaired leak on the wash pipe,0.5 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 03:00:00+00:00,2016-08-24 07:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Resumed milling w/ reduced rpm. 2000l/min - 13bar - 60rpm. Observed noticeable vibration. Increased pump rate to 2500l/min - 20bar, 4-7kNm, WOB 1-3t. Totally milled 27cm down",4.5 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 07:30:00+00:00,2016-08-24 08:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Stopped milling and P/U off bottom due to leaking Pod on BOPs. Found and repaired leak in hard pipe for gauge,0.5 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 08:00:00+00:00,2016-08-24 10:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Resumed milling 60rpm - 2500l/min - 20bar, 2-10kNm, WOB 1-3t",2.5 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 10:30:00+00:00,2016-08-24 10:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Held time out for safety meeting due to first aid incident on pipe deck,0.25 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 10:45:00+00:00,2016-08-24 13:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Continued milling 60rpm - 2500l/min - 21bar, 4-9kNm, WOB 5-10t. Observed WOB decreased, indicating that casing hanger was milled through. Totally milled 44cm including tieback adapter part",2.25 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 13:00:00+00:00,2016-08-24 13:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U and stopped rotation, RIH and tagged csg stump with 5T at 144m, marked pipe",0.25 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 13:15:00+00:00,2016-08-24 14:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Dressed off csg stump w/ 80rpm - 1-6kNm - 2500 l/min - 16 bar, WOB - 3t, milled down 10 cm",0.75 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 14:00:00+00:00,2016-08-24 14:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Stopped rotation and P/U of bottom. Circulated 2x btms up with 3000 l/min,0.25 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 14:15:00+00:00,2016-08-24 16:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Carried out drops check of TDS and BOPs. Found loose solenoid valve on TDS, fixed and made safe. Meanwhile function tested BOPs",1.75 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 16:00:00+00:00,2016-08-24 17:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,POOH w/ milling BHA from 146m to 78m,1.0 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 17:00:00+00:00,2016-08-24 17:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting to L/D milling BHA (run#24),0.25 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 17:15:00+00:00,2016-08-24 18:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"R/B 2x stands 8,25in DC. L/D X-over. Cleaned magnets - 14,7kg of metal swarf recovered from magnet, Observed no 9,5in tapered mill in the bottom of BHA, lost in the well. Inspected pilot mill, tungstein carbide teeth almost worn out. Undergauged of 1/8in. L/D rest of BHA.",1.25 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 18:30:00+00:00,2016-08-24 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed Pre-job Meeting to P/U spear BHA. Meanwhile tested shear rams: to close - 23s/31,2gal, to open - 20s/29,8gal",0.25 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 18:45:00+00:00,2016-08-24 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U spear BHA (run#25). Rearranged the12in stab above 8,25in DC to be able to engage spear below perforations in 10 3/4in csg",1.5 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 20:15:00+00:00,2016-08-24 21:00:00+00:00,152.0,m,fixed,plug abandon -- trip,ok,success,"RIH w/ spear assy on 5,5in DP to 152m. Weight Up/Down: 74t/71 t",0.75 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 21:00:00+00:00,2016-08-24 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Engage spear into the fish. Pulled csg fish free w/ 50t overpull,0.5 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 21:30:00+00:00,2016-08-24 21:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Flowchecked well for 15 min,0.25 +15_9_F_12_2016_08_25.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-24T00:00:00+02:00,2016-08-25T00:00:00+02:00,2016-08-24 21:45:00+00:00,2016-08-24 22:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,Started POOH w/ csg fish on spear,0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-24 22:00:00+00:00,2016-08-24 22:45:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH w/ csg fish on spear. Set fish in slips. Released spear and R/B same,0.75 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-24 22:45:00+00:00,2016-08-24 23:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/U csg handling equipment,0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-24 23:00:00+00:00,2016-08-25 00:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U handling equipment for 10 3/4in casing,1.5 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 00:30:00+00:00,2016-08-25 00:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to pull and L/D casing,0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 00:45:00+00:00,2016-08-25 05:00:00+00:00,410.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Pull 10 3/4in casing from 730m to 410m. Average pulling speed 6,5 joints/hour, max pulling speed 9 joints/hour. Pulled 28joints totally",4.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 05:00:00+00:00,2016-08-25 05:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting w/ new crew,0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 05:15:00+00:00,2016-08-25 06:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued pulling 10 3/4in casing from 410m to 150m. Average pulling speed 13,3 joints/hour. Pulled 48 joints totally",1.5 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 06:45:00+00:00,2016-08-25 07:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Pulled FMS and installed master bushing due to low string weight,0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 07:00:00+00:00,2016-08-25 08:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Continued to pull 10 3/4in casing from 150m to surface using manual slips and dog collar. Average pulling speed 8 joints/hour. Pulled totally 63 joints,1.5 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 08:30:00+00:00,2016-08-25 08:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Recovered last joint and discovered tapered mill stuck in the cut, photographed and secured prior to laying out",0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 08:45:00+00:00,2016-08-25 09:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/D casing handling equipment,0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 09:00:00+00:00,2016-08-25 10:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D casing handling equipment,1.0 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 10:00:00+00:00,2016-08-25 11:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Performed drop check and greased FWD PRS, no findings. Performed drop check and greased AFT PRS, no findings",1.0 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 11:00:00+00:00,2016-08-25 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U EZSV/cutter assembly (run#27),0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 11:15:00+00:00,2016-08-25 12:30:00+00:00,14.7,m,fixed,plug abandon -- mechanical plug,ok,success,P/U and RIH EZSV/cutter assembly (run#27) to 14.7m,1.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 12:30:00+00:00,2016-08-25 13:00:00+00:00,175.0,m,fixed,plug abandon -- other,ok,success,Continued RIH w/ EZSV/cutter assembly (run#27) to 175m. Run carefully through wellhead/casing hanger area,0.5 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 13:00:00+00:00,2016-08-25 13:15:00+00:00,175.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and installed PS21,0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 13:15:00+00:00,2016-08-25 14:30:00+00:00,854.0,m,fixed,plug abandon -- other,ok,success,Contiuned RIH from 175m to 854m. Restricted RIH speed to 2min/std,1.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 14:30:00+00:00,2016-08-25 15:15:00+00:00,879.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U TDS and run down to 879m, filled pipe. Washed setting area with 300 l/min - 16 bar, set EZSV at 879m mid packer depth, tagged EZSV with 10t",0.75 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 15:15:00+00:00,2016-08-25 15:30:00+00:00,869.0,m,fixed,plug abandon -- cut,ok,success,Positioned cutter knives at 869m,0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 15:30:00+00:00,2016-08-25 15:45:00+00:00,869.0,m,fixed,plug abandon -- cut,ok,success,"Recorded parameters: 309 l/min - 18 bar, 100rpm, 1-7kNm. Cut 14in casing w/ 100rpm, 310l/min. Observed pressure drop and confirmed cut window of 20cm",0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 15:45:00+00:00,2016-08-25 16:00:00+00:00,869.0,m,fixed,plug abandon -- cut,ok,success,Lined up to trip tank and flowchecked well. Static,0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 16:00:00+00:00,2016-08-25 17:45:00+00:00,54.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ EZSV running tool/cutter BHA (run#27) from 873m to 54m. Pulling wet using mud backet. Meanwhile carried out kick drill,1.75 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 17:45:00+00:00,2016-08-25 18:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Retrieved drift, flow checked well. Meanwhile held prejob meeting to L/D EZSV running tool/cutting BHA (run#27)",0.5 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 18:15:00+00:00,2016-08-25 18:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Removed PS 21, installed master bushing",0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 18:30:00+00:00,2016-08-25 20:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"R/B last santd of drill pipe, L/D BHA. Cleared rig floor and prepared for running guns",1.5 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 20:00:00+00:00,2016-08-25 20:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to P/U perforation guns (run#28),0.25 +15_9_F_12_2016_08_26.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-25T00:00:00+02:00,2016-08-26T00:00:00+02:00,2016-08-25 20:15:00+00:00,2016-08-25 22:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,P/U and M/U gun assembly to 18 m,1.75 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-25 22:00:00+00:00,2016-08-25 22:30:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,"RIH w/ perforating BHA to 149,3 m (Top shot @146 m)",0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-25 22:30:00+00:00,2016-08-25 22:45:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to fire guns and circulate gas,0.25 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-25 22:45:00+00:00,2016-08-25 23:00:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,"Closed UPR, lined up to pump through choke and MGS, circulated w/ 300l/min - 0 Bar",0.25 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-25 23:00:00+00:00,2016-08-25 23:30:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,"Broke TDS, dropped 1 3/8in ball . M/U TDS. Took up/down weights: 72t/69t. Closed UPR. Pumped down ball w/ 160 l/min, pressured up to 135 bar to shear ball seat. Good indication of guns firing. Top shot @146 m, bottom shot @149m",0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-25 23:30:00+00:00,2016-08-26 00:15:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,"Continued circulating w/ 160 l/min until stable returnes observed. Increased pump rate to 1000 l/min - 3,5bar. Max gas 3,6 % - H2S 1 ppm (in fluid). Circulated 3,5x bottoms up",0.75 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 00:15:00+00:00,2016-08-26 00:45:00+00:00,149.0,m,fixed,plug abandon -- perforate,ok,success,Flowchecked well through the choke. Ok. Opened UPR and flowchecked well. Ok,0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 00:45:00+00:00,2016-08-26 01:15:00+00:00,10.0,m,fixed,plug abandon -- perforate,ok,success,POOH w/ perforating BHA from 149m,0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 01:15:00+00:00,2016-08-26 02:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforating BHA,0.75 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 02:00:00+00:00,2016-08-26 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed handling equipment and prepared to P/U EZSV plug,0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 02:30:00+00:00,2016-08-26 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U EZSV,0.25 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 02:45:00+00:00,2016-08-26 03:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U EZSV plug and RT,0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 03:15:00+00:00,2016-08-26 05:00:00+00:00,834.0,m,fixed,plug abandon -- other,ok,success,RIH w/ EZSV (run# 29) to 854 mMD. Average running speed 556 m/hr.,1.75 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 05:00:00+00:00,2016-08-26 06:00:00+00:00,854.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Established circulation and washed the setting area, 500 lpm/ 0,3 bar. Installed the 14"" EZSV mechanical plug at 854 mMD. Load tested the plug with 10 ton.",1.0 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 06:00:00+00:00,2016-08-26 06:30:00+00:00,645.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 854 m to 645 mMD . Avg. tripping speed 418 m/hr.",0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 06:30:00+00:00,2016-08-26 07:00:00+00:00,645.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Changed inserts in BX elevator to 5"" and P/U RTTS plug. +Removed PS-21 slips and installed master bushing. +Changed inserts in BX elevator back to 5 1/2""",0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 07:00:00+00:00,2016-08-26 07:45:00+00:00,788.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ RTTS and safety joint on 5 1/2"" DP from 645 m to 788 m (RTTS plug depth at 143.6m). +RTTS plug hung up at 143.6m. Pulled up and re-attempted to RIH. Unable to run RTTS plug past restriction in WH.",0.75 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 07:45:00+00:00,2016-08-26 08:00:00+00:00,788.0,m,fixed,plug abandon -- other,ok,success,"Evaluated situation. +Meanwhile: Greased and checked dies on IRN.",0.25 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 08:00:00+00:00,2016-08-26 08:15:00+00:00,645.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ RTTS on 5 1/2"" DP from 788 m to 645 m.",0.25 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 08:15:00+00:00,2016-08-26 09:00:00+00:00,645.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Changed BX inserts to 5"". +L/D the RTTS and safety joint.",0.75 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 09:00:00+00:00,2016-08-26 09:30:00+00:00,648.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U 3m pup for space out. +Pulled master bushing and installed PS-21 slips.",0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 09:30:00+00:00,2016-08-26 10:15:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ EZSV RT on 5 1/2"" DP from 648 m to 854 m . Avg. tripping speed 275 m/hr. +Tagged EZSV w/ 2 ton to confirm depth.",0.75 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 10:15:00+00:00,2016-08-26 10:45:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U pump-in sub. Stung into EZSV and set down 10 ton. +Connected cement hose and installed lo-torque valve to pump-in sub.",0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 10:45:00+00:00,2016-08-26 12:30:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed UPR +Lined up and pumped 10m3 push pill at 1000lpm / 12 bar. +Circulated SW at 1000-1800 lpm / 12 bar until clean returns. +Meanwhile: Performed TBT for cement job.",1.75 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 12:30:00+00:00,2016-08-26 12:45:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"Opened UPR and flow checked well, static.",0.25 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 12:45:00+00:00,2016-08-26 14:45:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up and pumped 20m3 wash pill at 1285 lpm / 11.5 bar. + +Closed upper FOSV and trapped 20 bar behind. Applied 20 bar from cement unit to drill floor and confirmed line-up. Pumped 33 m3 1.90sg cement slurry at 600 lpm. Added well-life to the first 10m3 of cement slurry (11 kg/m3). + +Chased cement by pumping SW at 1000 lpm / 12 bar. After catching up with cement, continued displacing cement with SW at 1000 lpm / 12 bar, then reduced rate to 800 lpm the last 1.7m3. Pumped totally 11.7m3 SW. +Pressure increased from 12 bar to 47 bar, indicating that cement entered annulus. + +Recorded 1.8m3 losses during displacement. Estimated TOC in annulus at 480 mMD.",2.0 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 14:45:00+00:00,2016-08-26 15:15:00+00:00,854.0,m,fixed,plug abandon -- cement plug,ok,success,"Released from EZSV plug and rigged down cement hose. +L/D pump-in sub.",0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 15:15:00+00:00,2016-08-26 16:00:00+00:00,811.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 854 m to 811 m. +Installed pup joint w/ pre-loaded sponge ball. Circulated with 3450 lpm / 31 bar until clean returns. Measured 10% gas, reduced rate to 1980 lpm.",0.75 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 16:00:00+00:00,2016-08-26 16:45:00+00:00,647.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 811 m to 647 m. Avg. tripping speed 219 m/hr.",0.75 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 16:45:00+00:00,2016-08-26 17:00:00+00:00,644.0,m,fixed,plug abandon -- cement plug,ok,success,L/D 3m pup joint.,0.25 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 17:00:00+00:00,2016-08-26 17:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 644 m to surface. Avg. tripping speed 970 m/hr.",0.5 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 17:30:00+00:00,2016-08-26 17:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Removed PS-21 slips and installed master bushing. +L/D EZSV RT.",0.25 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 17:45:00+00:00,2016-08-26 18:00:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Cleaned and cleared drill floor.,0.25 +15_9_F_12_2016_08_27.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-26T00:00:00+02:00,2016-08-27T00:00:00+02:00,2016-08-26 18:00:00+00:00,2016-08-26 22:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: Maintenance +- Replaced alignment cylinders on TDS +- Performed PM inspection on drawworks +- Performed PM check on FWD PRS",4.0 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-26 22:00:00+00:00,2016-08-27 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Meanwhile: Performed maintenance +- Inspected flowline cover +- Performed maintenance and housekeeping in pump room and shakers +- Flushed chiksan hoses on WH +- Continued PMs on TDS +- Prepared and started to check out points on skidding checklist +- Prepared tools to N/D BOP",7.0 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 05:00:00+00:00,2016-08-27 06:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +De-isolated drawworks, TDS and both PRSs. +Meanwhile: Prepared equipment and tools required to N/D BOP. DFO prepared pits for injection.",1.0 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 06:00:00+00:00,2016-08-27 11:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC +Carried out maintenance on TDS. Changed out alignment cylinder and aligned TDS to well center. +Visually checked both PRSs for damages on hydraulic hoses and performed general inspection. +Meanwhile: Continued with skidding checklist and prepared equipment required for next well.",5.25 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 11:15:00+00:00,2016-08-27 11:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,P/U and M/U EZSV RT.,0.25 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 11:30:00+00:00,2016-08-27 12:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"RIH w/ EZSV RT on 5 1/2"" DP from surface to 42 m.",0.5 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 12:00:00+00:00,2016-08-27 13:00:00+00:00,764.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ EZSV RT on 5 1/2"" DP from 42 m to 764 m . Avg. tripping speed 481 m/hr.",1.0 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 13:00:00+00:00,2016-08-27 17:00:00+00:00,804.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U TDS sub and positioned string at 804 m. Lined up to cement unit and confirmed line-up. + +Attempted to pressure test annulus cement and EZSV plug to 115 bar / 10 min. Pressure had decreasing trend due to possible air in the system. + +Attempted to pressure up well 6 times. Less pressure drop observed for each attempt. +Pressure tested annulus cement and EZSV plug to 115 bar / 10 min, bled off pressure. + +Meanwhile: B/O pup joints previously used for space out.",4.0 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 17:00:00+00:00,2016-08-27 17:15:00+00:00,852.0,m,fixed,plug abandon -- cement plug,ok,success,"Performed TBT for placing cement plug in 14"" casing +Meanwhile: Performed line-test.",0.25 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 17:15:00+00:00,2016-08-27 18:15:00+00:00,852.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated 1 x B/U at 3300 lpm / 100 bar. Max 2,5 ppm HC concentration in return fluid.",1.0 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 18:15:00+00:00,2016-08-27 19:00:00+00:00,852.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 10m3 wash pill. + +Mixed and pumped 8,2 m3 1,93sg cement slurry at 600 lpm. +Displaced cement with cement unit by pumping 8 m3 FW (1m3 underdisplacement) at 1200 lpm.",0.75 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 19:00:00+00:00,2016-08-27 19:25:00+00:00,852.0,m,fixed,plug abandon -- cement plug,ok,success,L/O pump-in sub.,0.4166666666666667 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 19:25:00+00:00,2016-08-27 19:30:00+00:00,852.0,m,fixed,plug abandon -- cement plug,ok,success,"Flow checked well, static.",0.08333333333333333 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 19:30:00+00:00,2016-08-27 20:00:00+00:00,644.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 852 m to 644 m. Restricted pulling speed 2 min/std.",0.5 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 20:00:00+00:00,2016-08-27 21:45:00+00:00,644.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated 1 x string volume prior to installing sponge ball due to backflow. +R/B 1 std and M/U pup joint with pre-installed sponge ball. +Circulated 1 x B/U, 50 rpm / 2-4 kNm, 1200 lpm / 1 bar. +L/O pup joint.",1.75 +15_9_F_12_2016_08_28.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-27T00:00:00+02:00,2016-08-28T00:00:00+02:00,2016-08-27 21:45:00+00:00,2016-08-27 22:00:00+00:00,413.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH w/ EZSV RT on 5 1/2"" DP from 644 m to 413 m. Avg. tripping speed 924 m/hr.",0.25 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-27 22:00:00+00:00,2016-08-27 22:30:00+00:00,2.0,m,fixed,plug abandon -- cement plug,ok,success,"Continued POOH w/ EZSV RT on 5 1/2"" DP from 413 m to 2 m. Avg. tripping speed 987 m/hr.",0.5 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-27 22:30:00+00:00,2016-08-27 22:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"L/D EZSV RT. +Pulled PS-21 slips and installed master bushing",0.25 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-27 22:45:00+00:00,2016-08-27 23:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Cleaned and cleared drill floor. +Meanwhile: Started to drain riser",0.75 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-27 23:30:00+00:00,2016-08-28 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U handling equipment for pulling diverter. +Prepared to pull diverter",0.75 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 00:15:00+00:00,2016-08-28 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for N/D diverter and BOP,0.25 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 00:30:00+00:00,2016-08-28 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed tension cylinders on BOP,1.0 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 01:30:00+00:00,2016-08-28 05:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Removed master bushing and outer ring. Installed lifting eyes for diverter. +Attempted to pull diverter, 7 ton overpull. Installed shims for releasing the diverter lock ring. +Re-attempted to pull diverter. + +Installed tension cylinders and aligned BOP/slick joint with diverter.",3.5 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 05:00:00+00:00,2016-08-28 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing drilling crew.,0.25 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 05:15:00+00:00,2016-08-28 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,Prepared to pull diverter. Removed 2 x shims from diverter housing.,0.25 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 05:30:00+00:00,2016-08-28 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed well controll table-top at drill floor.,0.5 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 06:00:00+00:00,2016-08-28 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled diverter and secured to 5 1/2"" DP in set-back. +Removed slick joint from BOP. +Disconnected BOP tension cylinders.",2.0 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 08:00:00+00:00,2016-08-28 08:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Broke NT2 connector. +Performed TBT for skidding BOP onto test stump.",0.5 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 08:30:00+00:00,2016-08-28 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Picked up BOP using BOP carrier. Skidded BOP and landed on stump. M/U NT2 bolt.,1.5 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 10:00:00+00:00,2016-08-28 10:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed scaffolding around riser.,0.5 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 10:30:00+00:00,2016-08-28 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for pulling riser.,0.25 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 10:45:00+00:00,2016-08-28 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Attached lifting arrangement to TDS bails. P/U 3 ton over pull on HP riser.,0.75 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 11:30:00+00:00,2016-08-28 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Loosened bolts on HP riser connector. 2 bolts stuck.,1.0 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 12:30:00+00:00,2016-08-28 13:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Worked on loosening bolts on HP riser connector. +Meanwhile: Completed skidding checklist. Loosened bolts on hatch on well F-7. Installed kill wing manifold on XT on F-5.",0.5 +15_9_F_12_2016_08_29.xml,NO 15/9-F-12,NO 15/9-F-12,2016-08-28T00:00:00+02:00,2016-08-29T00:00:00+02:00,2016-08-28 13:00:00+00:00,2016-08-28 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled and L/O HP riser. +Prepared hatches in moonpool. + +Installed hatch on well F-12. +P/U hatch on F-7 (swapping hatches between F-7 and F-9 for later operations). +Meanwhile: Installed check valve in cement head. + + +********* End of report **********",2.75 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 09:00:00+00:00,2016-10-19 09:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding operations,0.25 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 09:15:00+00:00,2016-10-19 09:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Removed access stairs to cantilever +Skidded cantilever to well F-12.",0.5 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 09:45:00+00:00,2016-10-19 10:15:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Installed access stairs to cantilever +Meanwhile: Removed hatches.",0.5 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 10:15:00+00:00,2016-10-19 10:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Built scaffolding around hatches. +Installed hole covers on well F-14",0.25 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 10:30:00+00:00,2016-10-19 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered NT2 connector from drill floor. M/U same onto multibowl. +Meanwhile: Installed master bushing and BX-elevator.",0.75 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 11:15:00+00:00,2016-10-19 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for M/U BHA and RIH with inner string.,0.25 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 11:30:00+00:00,2016-10-19 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and RIH with cutter BHA,1.25 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 12:45:00+00:00,2016-10-19 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U Multibowl RT. RIH and engaged RT to Multibowl. +Confirmed by pulling 20 ton overpull.",0.25 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 13:00:00+00:00,2016-10-19 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load shifted weight from tension cylinders to TDS. +Meanwhile: Performed TBT for R/D tension cylinders",0.25 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 13:15:00+00:00,2016-10-19 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D tension cylinders,1.0 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 14:15:00+00:00,2016-10-19 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed boat collision stool and centralizers.,1.0 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 15:15:00+00:00,2016-10-19 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Built scaffolding around hole opening.,0.25 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 15:30:00+00:00,2016-10-19 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled 20 ton overpull. +Increased flow in steps to 2600 lpm / 87 bar. Cut riser. +Observed loss of overpull, good indication of cut.",0.5 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 16:00:00+00:00,2016-10-19 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D hoses and valve outlets from Multibowl.,1.0 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 17:00:00+00:00,2016-10-19 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew.,0.25 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 17:15:00+00:00,2016-10-19 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser and inner string to drill floor. +Installed C-plate and landed off riser. +R/B Multibowl RT",0.5 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 17:45:00+00:00,2016-10-19 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed false rotary. Pulled and R/B inner string. R/B cutter BHA.,0.5 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 18:15:00+00:00,2016-10-19 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U and M/U Multibowl RT. +R/D C-plate.",0.25 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 18:30:00+00:00,2016-10-19 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled tensioner joint above rotary table. +Landed off riser onto elevator.",0.5 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 19:00:00+00:00,2016-10-19 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut tensioner joint. Significant wave height 1,2 m +R/D cutting machine.",1.0 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 20:00:00+00:00,2016-10-19 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT for L/O Multibowl and tensioner joint.,0.25 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 20:15:00+00:00,2016-10-19 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O Mutlibowl and tensioner joint (Lift #1). +Removed Multibowl and NT2 connector.",0.5 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 20:45:00+00:00,2016-10-19 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled upper pup joint and splash zone joint. Cleaned off marine growth on centralizer deck.,0.75 +15_9_F_12_2016_10_20.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-19T00:00:00+02:00,2016-10-20T00:00:00+02:00,2016-10-19 21:30:00+00:00,2016-10-19 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser. Significant wave height 1,4 m",0.5 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-19 22:00:00+00:00,2016-10-19 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D cutting machine,0.25 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-19 22:15:00+00:00,2016-10-19 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O upper pup and splash zone joint (Lift #2) +Pulled riser (Lift #3).",0.5 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-19 22:45:00+00:00,2016-10-19 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser. Significant wave height 1 m. +R/D cutting machine",0.5 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-19 23:15:00+00:00,2016-10-19 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #3). +Pulled riser (Lift #4), cleaned off marine growth on centralizer deck. +Riser out of splash zone at 01:45",0.5 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-19 23:45:00+00:00,2016-10-20 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser +R/D cutting machine",0.5 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 00:15:00+00:00,2016-10-20 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #4). +Pulled riser (Lift #5), cleaned off marine growth on centralizer deck.",0.5 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 00:45:00+00:00,2016-10-20 01:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser +R/D cutting machine",0.5 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 01:15:00+00:00,2016-10-20 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #5). +Pulled riser (Lift #6), cleaned off marine growth on centralizer deck.",0.5 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 01:45:00+00:00,2016-10-20 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser +R/D cutting machine",0.75 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 02:30:00+00:00,2016-10-20 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #6). +Pulled out with lower pup joint and stress joint (Lift #7). +Installed master bushing. L/O lower pup and stress joint.",0.75 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 03:15:00+00:00,2016-10-20 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor for excess equipment.,0.25 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 03:30:00+00:00,2016-10-20 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Cleared WH decks for excess equipment. + +Meanwhile: Performed skidding checks.",2.25 +15_9_F_12_2016_10_21.xml,NO 15/9-F-12,NO 15/9-F-12,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 05:45:00+00:00,2016-10-20 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatch in moonpool + +**** END OF REPORT ****",0.5