diff --git "a/processed/ddr/15_9_F_11_B_activities.csv" "b/processed/ddr/15_9_F_11_B_activities.csv" new file mode 100644--- /dev/null +++ "b/processed/ddr/15_9_F_11_B_activities.csv" @@ -0,0 +1,1849 @@ +file,well_name,wellbore_name,report_start,report_end,act_start,act_end,md_m,md_uom,phase,activity_code,state,state_detail,comments,duration_hours +15_9_F_11_B_2013_05_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-28T00:00:00+02:00,2013-05-29T00:00:00+02:00,2013-05-28 12:30:00+00:00,2013-05-28 13:30:00+00:00,2627.0,m,fixed,drilling -- drill,ok,success,"Drilled 12 1/4"" hole from 2614 m MD to 2627 m MD with 2807 liter/min, 164-168 bar, 155 rpm, 9-13 kNm, WOB 6-13 MT.",1.0 +15_9_F_11_B_2013_05_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-28T00:00:00+02:00,2013-05-29T00:00:00+02:00,2013-05-28 13:30:00+00:00,2013-05-28 22:00:00+00:00,2787.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 12 1/4"" hole from 2627 m MD to 2787 m MD with 3400-3800 liter/min, 170-279 bar, 240-270 rpm, 12-22 kNm, WOB 4-9 MT, ECD 1,31-132 sg EMW. +Average ROP 19 meter/hour.",8.5 +15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-28 22:00:00+00:00,2013-05-29 04:00:00+00:00,2855.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 12 1/4"" hole from 2787 m MD to 2855 m MD with 3815-3954 liter/min, 265-278 bar, 260-300 rpm, 14-24 kNm, WOB 8-21 MT, ECD 1,31-132 sg EMW. +Average ROP 11,5 meter/hour.",6.0 +15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 04:00:00+00:00,2013-05-29 16:30:00+00:00,2917.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 12 1/4"" hole from 2855 m MD to 2917 m MD with 3815-3954 liter/min, 252-261 bar, 120 rpm, 10-22 kNm, WOB 6-21 MT, ECD 1,29 sg EMW. +Average ROP 5,2 meter/hour. +- Decision made to POOH for bit change.",12.5 +15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 16:30:00+00:00,2013-05-29 17:00:00+00:00,2908.0,m,fixed,drilling -- drill,ok,success,Reamed up off bottom to 2908 m MD. Sent down linked to Rips off and racked back stand.,0.5 +15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 17:00:00+00:00,2013-05-29 17:30:00+00:00,2908.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 30 min - Well static,0.5 +15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 17:30:00+00:00,2013-05-29 19:00:00+00:00,2546.0,m,fixed,drilling -- trip,ok,success,"POOH wet with 12 1/4"" BHA on 5 1/2"" DP from 2908 m MD to 2546 m MD. +Average tripping speed 241 m/hr.",1.5 +15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 19:00:00+00:00,2013-05-29 19:30:00+00:00,2546.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 30 min - Well Static.,0.5 +15_9_F_11_B_2013_05_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-29T00:00:00+02:00,2013-05-30T00:00:00+02:00,2013-05-29 19:30:00+00:00,2013-05-29 22:00:00+00:00,368.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 2546 m to 368 m . +Average tripping speed 871 m/hr.",2.5 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-29 22:00:00+00:00,2013-05-29 22:15:00+00:00,286.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA from 368 m to 286 m.",0.25 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-29 22:15:00+00:00,2013-05-29 22:45:00+00:00,286.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 30 min - Well static,0.5 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-29 22:45:00+00:00,2013-05-29 23:15:00+00:00,125.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP/HWDP from 286 m to 125 m.",0.5 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-29 23:15:00+00:00,2013-05-29 23:45:00+00:00,125.0,m,fixed,drilling -- trip,ok,success,Removed auto slips and installed master bushing.,0.5 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-29 23:45:00+00:00,2013-05-30 01:00:00+00:00,14.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 6 5/8"" HWDP from 125 m to 14 m..",1.25 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 01:00:00+00:00,2013-05-30 03:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Plugged in and verified MWD tools. L/D mud motor, CoPilot, AutoTrack and 12 1/4"" bit. +Bit Gradding: 1-3-WT-N-X-1/16-LT-PA",2.0 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 03:00:00+00:00,2013-05-30 03:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and Cleared rig floor.,0.25 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 03:15:00+00:00,2013-05-30 05:30:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,"P/U back-up 12 1/4"" bit, AutoTrack, CoPilot, mud motor and M/U same.",2.25 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 05:30:00+00:00,2013-05-30 06:45:00+00:00,25.0,m,fixed,drilling -- trip,ok,success,Plugged in verified and switched on MWD tools.,1.25 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 06:45:00+00:00,2013-05-30 08:00:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,"RIH 12 1/4"" BHA on 5 1/2"" HWDP from 25 m to 247 m",1.25 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 08:00:00+00:00,2013-05-30 08:15:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,Removed master bushing and installed auto slips.,0.25 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 08:15:00+00:00,2013-05-30 12:15:00+00:00,2870.0,m,fixed,drilling -- trip,ok,success,"RIH with 12 1/4"" BHA on 5 1/2"" DP filling string every 1000 m from 247 m to 2870 m.",4.0 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 12:15:00+00:00,2013-05-30 12:30:00+00:00,2870.0,m,fixed,drilling -- trip,ok,success,Filled string and recorded SCRs.,0.25 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 12:30:00+00:00,2013-05-30 13:30:00+00:00,2917.0,m,fixed,drilling -- ream,ok,success,"Washed/reamed in hole from 2870 m to 2917 m with 3500 lpm, 225 bar, 20 rpm, 10-13 kNm.",1.0 +15_9_F_11_B_2013_05_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-30T00:00:00+02:00,2013-05-31T00:00:00+02:00,2013-05-30 13:30:00+00:00,2013-05-30 22:00:00+00:00,3103.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 12 1/4"" hole from 2917 m to 3103 with 3800 lpm, 268 bar, 100 rpm, 17-27 kNm, WOB 8-12 MT, ECD 1,30 sg EMW. +Average ROP 22 meter/hour.",8.5 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-30 22:00:00+00:00,2013-05-31 03:30:00+00:00,3197.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 12 1/4"" hole from 3103 m to section TD at 3197 m with 3800 lpm, 268 bar, 100 rpm, 17-27 kNm, WOB 8-12 MT, ECD 1,30 sg EMW. Recorded TD survey +Average ROP 18 meter/hour. +TD called at 05:10 hrs.",5.5 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 03:30:00+00:00,2013-05-31 07:15:00+00:00,3197.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean 3.5 BU with 3800 lpm, 255 bar, 120 rpm, 12-20 kNm while recipricating string.",3.75 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 07:15:00+00:00,2013-05-31 07:45:00+00:00,3152.0,m,fixed,drilling -- pressure detection,ok,success,Flowchecked well for 30 min - Well Static.,0.5 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 07:45:00+00:00,2013-05-31 08:45:00+00:00,3152.0,m,fixed,drilling -- survey,ok,success,"Dropped pump down Gyro and pumped down same with 800 lpm, 19 bar. Confirmed tool initialized and started.",1.0 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 08:45:00+00:00,2013-05-31 13:00:00+00:00,2305.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 3152 m to 2305 m wet while recording gyro survey. +Average. tripping speed 171 m/hr.",4.25 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 13:00:00+00:00,2013-05-31 13:30:00+00:00,2305.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 30 min - Well static.,0.5 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 13:30:00+00:00,2013-05-31 15:45:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,"Pumped slug and POOH with 12 1/4"" BHA on 5 1/2"" DP from 2305 m to 247 m . +Average. tripping speed 915 m/hr.",2.25 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 15:45:00+00:00,2013-05-31 16:15:00+00:00,247.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well for 30 min - Well static + +Meanwhile removed auto slips and installed master bushing.",0.5 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 16:15:00+00:00,2013-05-31 16:30:00+00:00,140.0,m,fixed,drilling -- trip,ok,success,"POOH with 12 1/4"" BHA on 5 1/2"" DP from 247 m to 140 m.",0.25 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 16:30:00+00:00,2013-05-31 17:15:00+00:00,140.0,m,fixed,drilling -- other,ok,success,Held TBT. Recover gyro tool string and L/O same.,0.75 +15_9_F_11_B_2013_06_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-05-31T00:00:00+02:00,2013-06-01T00:00:00+02:00,2013-05-31 17:15:00+00:00,2013-05-31 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH 12 1/4"" BHA including HWDP to surface and L/O same. +L/O 6 5/8"" HWDP in singles to be sent ashore due to heavy wear on threads. +Bit grading: 1-2-WT-S-X-I-NO-TD",4.75 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-05-31 22:00:00+00:00,2013-05-31 23:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Serviced drilling equipment. Clean and clered rig floor.,1.5 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-05-31 23:30:00+00:00,2013-06-01 00:00:00+00:00,30.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U and M/U jet sub and wearbushing retrieval tool. RIH and washed BOP cavities with 1000 lpm, 5 bar.",0.5 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 00:00:00+00:00,2013-06-01 01:30:00+00:00,188.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH with wearbushing retrieval tool and engaged wearbushing with 5 MT down wight. Picked up 45 MT overpull and released wearbushing.,1.5 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 01:30:00+00:00,2013-06-01 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH and L/O wearbushing retrieval tool and dressed wellhead with 2000 lpm, 18 bar.",1.5 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 03:00:00+00:00,2013-06-01 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U handling equipment for 9 5/8"" casing. +Note Includes shift change and weekly fire drill.",4.0 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 07:00:00+00:00,2013-06-01 08:45:00+00:00,11.0,m,fixed,drilling -- casing,ok,success,"P/U 9 5/8"" shoe joint verified float function and dropped bypass baffle. M/U shoe joint and intermediate joint unable to get good make-up grath.",1.75 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 08:45:00+00:00,2013-06-01 09:30:00+00:00,11.0,m,fixed,drilling -- casing,ok,success,Broke out and layed out intermediate joint.,0.75 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 09:30:00+00:00,2013-06-01 10:00:00+00:00,49.0,m,fixed,drilling -- casing,ok,success,"P/U back-up intermediate joint and M/U shoe joint, intermediate joints and landing collar joint. Thread locked connections.",0.5 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 10:00:00+00:00,2013-06-01 15:00:00+00:00,334.0,m,fixed,drilling -- casing,ok,success,"RIH with 53.5 ppf 9 5/8"" casing from 49 m to 334 m . Filled casing every joint +Average running rate 5 joints/hr. +Observed shoe float switch to self filling mode.",5.0 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 15:00:00+00:00,2013-06-01 17:00:00+00:00,334.0,m,fixed,drilling -- casing,ok,success,"M/U circulation swedge and broke circulation with 200 lpm, 2 bar. Stepped up pumps from 200 lpm in increments of 600 lpm, 8.5 bar, 1000 lpm, 12 bar to 3000 lpm, 61 bar and close shoe float self filling ports.",2.0 +15_9_F_11_B_2013_06_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-01T00:00:00+02:00,2013-06-02T00:00:00+02:00,2013-06-01 17:00:00+00:00,2013-06-01 22:00:00+00:00,827.0,m,fixed,drilling -- casing,ok,success,"RIH with 53.5 ppf 9 5/8"" casing from 334 m to 827 m . Filled casing every joint.. +Average running rate 10 joints/hr.",5.0 +15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-01 22:00:00+00:00,2013-06-02 01:30:00+00:00,1270.0,m,fixed,drilling -- casing,ok,success,"RIH with 53.5 ppf 9 5/8"" casing from 827 m to 1270 m . Filled casing every joint. +Average running rate10 joints/hr.",3.5 +15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 01:30:00+00:00,2013-06-02 07:30:00+00:00,2563.0,m,fixed,drilling -- casing,ok,success,"Held TBT. RIH with 53.5 ppf 9 5/8"" casing stands from 1270 m to 2563 m . Filled casing every stand. +Average running rate 24 joints/hr.",6.0 +15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 07:30:00+00:00,2013-06-02 10:00:00+00:00,2563.0,m,fixed,drilling -- casing,ok,success,"Held TBT. Changed out casing running equipment from 9 5/8"" to 10 3/4"". P/U and M/U 9 5/8"" X 10 3/4"" X/over. Removed 9 5/8"" auto slips and installed 10 3/4"" and hook- up control lines. +Meanwhile: Performed deck management on cantilever and removed back-up joints.",2.5 +15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 10:00:00+00:00,2013-06-02 12:45:00+00:00,2808.0,m,fixed,drilling -- casing,ok,success,"RIH with 65.7 ppf 10 3/4"" casing from 2563 m to 2808 m. Filled casing every joint. +Average running rate 7 joints/hr. +Unable to function horizonta tranfer system [HTS].",2.75 +15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 12:45:00+00:00,2013-06-02 15:45:00+00:00,2808.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshoot HTS failure.,3.0 +15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 15:45:00+00:00,2013-06-02 18:15:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"RIH with 65.7 ppf 10 3/4"" casing from 2808 m to 3047 m. Filled casing every joint. +Average running rate 8 joints/hr.",2.5 +15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 18:15:00+00:00,2013-06-02 19:00:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"Held TBT. Changed to 5 1/2"" handling equipment.",0.75 +15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 19:00:00+00:00,2013-06-02 19:45:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,"P/U and M/U 9 5/8"" X 10 3/4"" casing hanger.",0.75 +15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 19:45:00+00:00,2013-06-02 21:15:00+00:00,3047.0,m,fixed,drilling -- casing,ok,success,Picked up and removed auto slips. RIH casing hanger below rotary and installed outerring and masterbushing. Removed casing tong and cleared rig floor of any excees equipment.,1.5 +15_9_F_11_B_2013_06_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-02T00:00:00+02:00,2013-06-03T00:00:00+02:00,2013-06-02 21:15:00+00:00,2013-06-02 22:00:00+00:00,3179.0,m,fixed,drilling -- casing,ok,success,"RIH with 65.7 ppf 10 3/4"" casing on 5 1/2"" HWDP landing string from 3047 m to 3179 m. Washed down last stand with 500 lpm, 22 bar.",0.75 +15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-02 22:00:00+00:00,2013-06-02 22:45:00+00:00,3179.0,m,fixed,drilling -- other,ok,success,P/U and M/U cement stand.,0.75 +15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-02 22:45:00+00:00,2013-06-02 23:00:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,Recorded Up/Dn weight 295/195 MT and RIH with casing hanger. Sat down 7 MT marked pipe and verified landing point. Picked up 45 MT overpull and marked pipe. Slacked off weight and sat down 7 MT. Rotated pipe 1/4 HR turn and verified stem free. Picked up 3 MT overpull prior to cement job.,0.25 +15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-02 23:00:00+00:00,2013-06-02 23:45:00+00:00,3192.0,m,fixed,drilling -- other,ok,success,"Broke circulation and staged up pumps to 1700 lpm, 46 bar - No Loss to formation. +Meanwhile: Held TBT, pressure tested cement lines and lined up for cement job.",0.75 +15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-02 23:45:00+00:00,2013-06-03 03:00:00+00:00,3192.0,m,fixed,drilling -- other,ok,success,"Verified cement line up and pumped 27 m3 of 1.52 sg spacer with 1200 lpm, 38 bar. Mixed and pumped 16.8 m3 of 1.90 sg cement slurry 650 lpm. Displaced the cement to the rig floor with 3m3. Zeroed stroke counters and displaced the cement with 92 m3 (4152 strokes) 1.28 sg OBM, 2500 lpm 36 bar. Observed indication of losses. +Slowed down pumps and displaced cement to 110 m3 (4954 strokes) with 2000 lpm, 32 bar. Slowed down pumps to 500 lpm (FCP 40 bar) and diplaced cement with calculated displacement volume plus 1/2 shoetrack volume. Total displacement volume with rig pumps 116 m3 (5227 strokes). No indication of top plug bumped. +Total losses while displacement 7-9 m3.",3.25 +15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-03 03:00:00+00:00,2013-06-03 06:00:00+00:00,3192.0,m,fixed,drilling -- other,ok,success,"Bleed off pressure and checked for back flow. Monitored for back flow on trip tank. Recorded 1.2 m3 back flow over a periode of 1 hr. Closed full open safety [FOSV] valve and monitored annulus on trip tank. + +Meanwhile: Isolated drilling equipment and performed general maintenance.",3.0 +15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-03 06:00:00+00:00,2013-06-03 08:30:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,"L/D cement head and checked for back flow. Observed flow from string +Closed FOSV and installed circulation swedge. Lined up surface lines to cement unit and applied 32 bar monitoring for pressure build-up. Recorded 35 bar pressure build-up to 67 bar. Pressured up to 69 bar and held back pressure.",2.5 +15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-03 08:30:00+00:00,2013-06-03 16:00:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,Performed general rig floor maintenance and serviced drilling equipment.,7.5 +15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-03 16:00:00+00:00,2013-06-03 16:30:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,Bled off pressure and monitored for pressure build-up. No pressure build-up observed.,0.5 +15_9_F_11_B_2013_06_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-03T00:00:00+02:00,2013-06-04T00:00:00+02:00,2013-06-03 16:30:00+00:00,2013-06-03 22:00:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,Performed general rig floor maintenance and serviced drilling equipment.,5.5 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-03 22:00:00+00:00,2013-06-04 01:00:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,Performed general rig floor maintenance and serviced drilling equipment.,3.0 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 01:00:00+00:00,2013-06-04 03:45:00+00:00,3192.0,m,fixed,interruption -- wait,ok,success,"Rigged up, slipped and cut 44 m drill line. Cleaned and cleared rig floor.",2.75 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 03:45:00+00:00,2013-06-04 04:15:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,"Held TBT. Line up cement unit, flushed and pressure tested lines to 20/250 bar for 5/10 min.",0.5 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 04:15:00+00:00,2013-06-04 05:30:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,"Changed test string configuration to allow csg test to be done in one operation with cement unit and switch to mud pumps for injection test. +R/D surface lines and circulation swedge.",1.25 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 05:30:00+00:00,2013-06-04 06:45:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,"Held TBT. M/U full open safety valve [FOSV], side entry sub and 5 1/2"" HWDP double. Screwed in top drive and R/U surface lines. Picked up 3 MT overpull.",1.25 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 06:45:00+00:00,2013-06-04 08:00:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,"Flushed and pressure tested lines to 20/250 bar for 5/10 min. Tested 9 5/8"" X 10 3/4"" casing to 20/250 bar for 5/10 min, 1803 L pumped and returned.",1.25 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 08:00:00+00:00,2013-06-04 08:30:00+00:00,3192.0,m,fixed,drilling -- casing,ok,success,Held string in tension and released casing running tool with 4 3/4 left hand turns.,0.5 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 08:30:00+00:00,2013-06-04 10:00:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"Spaced out and closed upper pipe ram. Lined up cement unit and performed injection test to 113 bar, 8.9/4 m3 Pumped/returned.",1.5 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 10:00:00+00:00,2013-06-04 10:30:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"Bleed back pressure and open rams. Lowered string to work hiegth, and R/D surface hose, close Lotorq. valve and open FOSV.",0.5 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 10:30:00+00:00,2013-06-04 12:00:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"Spaced out and closed upper pipe rams. Bullheaded 77 m3 1.10 sg brine with 1000 lpm, 112 bar.",1.5 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 12:00:00+00:00,2013-06-04 12:45:00+00:00,136.0,m,fixed,drilling -- casing,ok,success,"Shot off pumps and allowed pressure to stabilize for 10 min at 98 bar. Bleed off pressure in increemnts. +Bleed down from 98 bar to 79 bar, return 1.9 m3 pressure estab. at 86 bar. +Bleed down to 50 bar return 1.6 m3, pressure estab. at 74 bar. +Bleed down to 30 bar, return 2 m3, pressure estab. 60 bar. +Bleed down to 24 bar, return 1.3 m3, pressure estab. 13 bar. +Bleed down to 0 bar, return 1.2 m3 +- total 8 m3 retuns.",0.75 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 12:45:00+00:00,2013-06-04 13:15:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH and M/U casing running tool with 4 right hand turns.,0.5 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 13:15:00+00:00,2013-06-04 14:15:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Sat and pressure leak tested seal assembly to 35/207 bar for 5/10 min, 482/450 Litres Pumped/returned.",1.0 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 14:15:00+00:00,2013-06-04 15:00:00+00:00,138.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"Picked-up 45 MT overpull and pressure tested seal assembly to 20/345 bar for 5/10 min, 456/450 Litres Pumped/returned.",0.75 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 15:00:00+00:00,2013-06-04 17:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,Released casing running tool with 4 1/2 right hand turns. POOH to surface and L/D casing running tool,2.0 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 17:00:00+00:00,2013-06-04 17:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor.,0.5 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 17:30:00+00:00,2013-06-04 19:00:00+00:00,138.0,m,fixed,drilling -- other,ok,success,P/U wearbushing combination tool and jet sub. RIH and landed wear bushing with 5MT down weight. Picked up 5 MT overpull and verified wearbushing latch in. Slacked off 5 MT down weight on tool prior to BOP test.,1.5 +15_9_F_11_B_2013_06_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-04T00:00:00+02:00,2013-06-05T00:00:00+02:00,2013-06-04 19:00:00+00:00,2013-06-04 22:00:00+00:00,138.0,m,fixed,drilling -- bop activities,ok,success,Displaced BOP and pressure test BOPs to 20/345 bar for 5/10 min,3.0 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-04 22:00:00+00:00,2013-06-04 23:15:00+00:00,138.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested BOPs to 20/345 bar for 5/10 min,1.25 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-04 23:15:00+00:00,2013-06-05 00:45:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,POOH with wearbushing running tool and L/D same.,1.5 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 00:45:00+00:00,2013-06-05 01:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,Pressure tested blind shear rams and casing to 20/345 bar for 5/10 min,0.25 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 01:00:00+00:00,2013-06-05 08:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"Vacated rig floor due to exhaust fumes from production module. +Monitored exhaust CO level every 15 min.",7.5 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 08:30:00+00:00,2013-06-05 09:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held TBT. Flushed lines and tested standpipe to 20/400 bar for 5/10 min.,0.5 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 09:00:00+00:00,2013-06-05 12:00:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Held TBT. P/U and M/U 8 1/2"" Clean Out BHA including HWDP to 156 m.",3.0 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 12:00:00+00:00,2013-06-05 13:00:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Displaced riser to 1.28 sg OBM with 1700 lpm, 35 bar.",1.0 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 13:00:00+00:00,2013-06-05 14:00:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Held TBT. RIH 8 1/2"" clean out BHA from 156 m to 196 m and performed choke drill.",1.0 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 14:00:00+00:00,2013-06-05 14:30:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,Removed masterbushing and installed auto slips.,0.5 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 14:30:00+00:00,2013-06-05 18:15:00+00:00,3101.0,m,fixed,drilling -- trip,ok,success,"RIH 8 1/2"" clean out BHA on 5 1/2"" DP from 196 m to 3101 m, filling string every 1000 m. +Average tripping speed 775 m/hr.",3.75 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 18:15:00+00:00,2013-06-05 18:45:00+00:00,3128.0,m,fixed,drilling -- trip,ok,success,"Washed down from 3101 m to 3128 m with 2000 lpm, 140 bar, 30 rpm, 12-15 kNm.",0.5 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 18:45:00+00:00,2013-06-05 19:15:00+00:00,3135.0,m,fixed,drilling -- drill,ok,success,"RIH and recorded weight at 3128 m with 5 MT. Drilled excess cement from 3128 m to 3135 m with 2500 lpm, 190 bar, 60 rpm, 12-15 kNm. Observed shackers overflow.",0.5 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 19:15:00+00:00,2013-06-05 19:45:00+00:00,3135.0,m,fixed,drilling -- other,ok,success,Picked of bottom and screened down shackers.,0.5 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 19:45:00+00:00,2013-06-05 20:00:00+00:00,3141.0,m,fixed,drilling -- drill,ok,success,"Drilled excess cement from 3135 m to 3141 m with 2400 lpm, 140 bar, 60 rpm, 11-15 kNm.",0.25 +15_9_F_11_B_2013_06_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-05T00:00:00+02:00,2013-06-06T00:00:00+02:00,2013-06-05 20:00:00+00:00,2013-06-05 22:00:00+00:00,3177.0,m,fixed,drilling -- drill,ok,success,"Tagged top of cement at 3141 m. Drilled firm cement from 3141 m to 3177 m with 2400 lpm, 140 bar, 60 rpm, 11-16 kNm, WOB 10-16 MT, Average ROP 18 m/hr.",2.0 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-05 22:00:00+00:00,2013-06-05 22:30:00+00:00,3187.0,m,fixed,drilling -- drill,ok,success,"Drilled cement from 3177 m to 3187 m with 2400 lpm, 140 bar, 60 rpm, 11-16 kNm, WOB 10-16 MT, Average ROP 20 m/hr.",0.5 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-05 22:30:00+00:00,2013-06-05 22:45:00+00:00,3180.0,m,fixed,drilling -- trip,ok,success,Flow checked for 15 min - Well static.,0.25 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-05 22:45:00+00:00,2013-06-06 03:00:00+00:00,2640.0,m,fixed,drilling -- trip,ok,success,"Pumped out of hole with scraper assembly from 3187 m to 2640 m with 2500 lpm, 165-150 bar, 120 rpm, 9-16 kNm making tree passes on every stand racked.",4.25 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 03:00:00+00:00,2013-06-06 03:15:00+00:00,2640.0,m,fixed,drilling -- trip,ok,success,Flow checked for 15 min - Well static,0.25 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 03:15:00+00:00,2013-06-06 06:00:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Pumped slug and POOH with 8 1/2"" clan out BHA on 5 1/2"" DP from 2640 m to 156 m. +Average tripping speed 994 m/hr.",2.75 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 06:00:00+00:00,2013-06-06 06:15:00+00:00,156.0,m,fixed,drilling -- trip,ok,success,"Flowchecked well for 15 min - Well static +Meanwhile: Removed auto slips and installed masterbushing.",0.25 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 06:15:00+00:00,2013-06-06 07:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH on 5 1/2"" HWDP from 156 m to surface and layed out 8 1/2"" clean out BHA.",1.25 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 07:30:00+00:00,2013-06-06 08:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,Cleaned and cleared rig floor.,0.5 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 08:00:00+00:00,2013-06-06 09:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Held TBT. R/U wireline equipment and M/U cement bond log [CBL] tool string.,1.75 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 09:45:00+00:00,2013-06-06 12:30:00+00:00,3187.0,m,fixed,drilling -- other,ok,success,RIH CBL tool string from surface to 3187 m.,2.75 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 12:30:00+00:00,2013-06-06 16:15:00+00:00,2500.0,m,fixed,drilling -- other,ok,success,"POOH while logging from 3187 m to 2500 m. +TOC at 2679 m.",3.75 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 16:15:00+00:00,2013-06-06 17:45:00+00:00,0.0,m,fixed,drilling -- other,ok,success,POOH with CBL tool string from 2500 m to surface.,1.5 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 17:45:00+00:00,2013-06-06 19:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,L/O CBL tool string and R/D wireline equipment.,1.25 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 19:00:00+00:00,2013-06-06 19:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor.,0.25 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 19:15:00+00:00,2013-06-06 19:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"Held TBT. Changed to 5"" handling equipment",0.5 +15_9_F_11_B_2013_06_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-06T00:00:00+02:00,2013-06-07T00:00:00+02:00,2013-06-06 19:45:00+00:00,2013-06-06 22:00:00+00:00,23.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 8 1/2"" rotary steerable BHA",2.25 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-06 22:00:00+00:00,2013-06-06 22:45:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 8 1/2"" rotary steerable BHA",0.75 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-06 22:45:00+00:00,2013-06-07 00:15:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,Plugged-in tools and attempted to verify communication - NoGo,1.5 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 00:15:00+00:00,2013-06-07 01:45:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,"Troubleshoot MWD tools. +Broke connection at Flex stab and BCPM cleaned same. M/U connetion and plugged- in tools - OK",1.5 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 01:45:00+00:00,2013-06-07 03:00:00+00:00,38.0,m,fixed,drilling -- trip,ok,success,Held TBT. Barriered off rig floor and installed RA source.,1.25 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 03:00:00+00:00,2013-06-07 04:30:00+00:00,186.0,m,fixed,drilling -- trip,ok,success,"P/U and M/U 8 1/2"" rotary steerable BHA including 5 1/2"" HWDP to 186 m.",1.5 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 04:30:00+00:00,2013-06-07 05:00:00+00:00,186.0,m,fixed,drilling -- trip,ok,success,Removed masterbushing and installed auto slips.,0.5 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 05:00:00+00:00,2013-06-07 05:30:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,"RIH with 8 1/2"" rotary steerable BHA on 5 1/2"" DP from 186 m 1000 m. +Average tripping speed 1628 m/hr.",0.5 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 05:30:00+00:00,2013-06-07 06:15:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,"Filled string with 1.28 sg OBM and shallow tested tools with 2300 lpm, 140 bar..",0.75 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 06:15:00+00:00,2013-06-07 06:45:00+00:00,1000.0,m,fixed,drilling -- trip,ok,success,Performed choke drill.,0.5 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 06:45:00+00:00,2013-06-07 09:00:00+00:00,3171.0,m,fixed,drilling -- trip,ok,success,"RIH w/ith 8 1/2"" rotary steerable BHA on 5 1/2"" DP from 1000 m to 3171 m filling string every 1000 m. + Average tripping speed 1010 m/hr. Avg.",2.25 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 09:00:00+00:00,2013-06-07 09:45:00+00:00,3187.0,m,fixed,drilling -- trip,ok,success,"Established washing parameters and washed down from 3171 m to 3187 m with 1800 lpm, 40 bar, 40 rpm, 12-13 kNm.",0.75 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 09:45:00+00:00,2013-06-07 10:30:00+00:00,3197.0,m,fixed,drilling -- drill,ok,success,"Tagged TOC at 3187 m . Drilled shoetrack and rathole from 3187 m to 3197 m with 2000 lpm, 163 bar,60 rpm, 15-19 kNm.",0.75 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 10:30:00+00:00,2013-06-07 10:45:00+00:00,3200.0,m,fixed,drilling -- drill,ok,success,"Drilled 3 m new formation from 3197 m to 3200 m with 2000 lpm, 163 bar,60 rpm, 15-19 kNm. Wiped through shoetrack - No restrictions recorded.",0.25 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 10:45:00+00:00,2013-06-07 13:00:00+00:00,3200.0,m,fixed,drilling -- circulating conditioning,ok,success,Circulated hole clean to even MW in/out of 1.28 sg.,2.25 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 13:00:00+00:00,2013-06-07 13:30:00+00:00,3200.0,m,fixed,formation evaluation -- rft/fit,ok,success,"Lined-up cement unit, flushed and tested lines. Close BOP and performed FIT to 1.65 sg EMW with 101 bar surface pressure, 866/866 litres Pumped/Returned..",0.5 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 13:30:00+00:00,2013-06-07 14:15:00+00:00,3200.0,m,fixed,drilling -- survey,ok,success,"Recorded survey at 3180 m with 2000 lpm, 158 bar. Washed down and established drilling parameters.",0.75 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 14:15:00+00:00,2013-06-07 18:30:00+00:00,3250.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3200 m to 3250 m with 2400 lpm, 214 bar, 1.53 sg EMW, 80-120 rpm, 22-30 kNm, WOB 8-10 MT, Average ROP 12 m/hr",4.25 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 18:30:00+00:00,2013-06-07 20:00:00+00:00,3250.0,m,fixed,drilling -- other,ok,success,Recorded SCRs and tared CoPilot.,1.5 +15_9_F_11_B_2013_06_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-07T00:00:00+02:00,2013-06-08T00:00:00+02:00,2013-06-07 20:00:00+00:00,2013-06-07 22:00:00+00:00,3271.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3250 m to 3271 m with 2400 lpm, 214 bar, 1.53 sg EMW, 150 rpm, 22-30 kNm, WOB 8-10 MT, Average ROP 11 m/hr.",2.0 +15_9_F_11_B_2013_06_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-08T00:00:00+02:00,2013-06-09T00:00:00+02:00,2013-06-07 22:00:00+00:00,2013-06-08 04:00:00+00:00,3345.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3271 m to 3345 m with 2400-2500 lpm, 215-225 bar, 1.54-1.56 sg EMW, 150-160 rpm, 13-19 kNm, WOB 6-10 MT, Average ROP 12 m/hr.",6.0 +15_9_F_11_B_2013_06_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-08T00:00:00+02:00,2013-06-09T00:00:00+02:00,2013-06-08 04:00:00+00:00,2013-06-08 10:00:00+00:00,3481.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3345 m to 3481 m with 2500 lpm, 225-238 bar, 1.55-1.56 sg EMW, 160 rpm, 15-22 kNm, WOB 7-8 MT, Average ROP 23 m/hr. Top Hugin formation found at 3468 m.",6.0 +15_9_F_11_B_2013_06_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-08T00:00:00+02:00,2013-06-09T00:00:00+02:00,2013-06-08 10:00:00+00:00,2013-06-08 16:00:00+00:00,3625.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3481 m to 3648 m with 2500 lpm, 231-238 bar, 1.55-1.56 sg EMW, 160 rpm, 17-22 kNm, WOB 5-7 MT, Average ROP 24 m/hr, Max gas 1.6 %",6.0 +15_9_F_11_B_2013_06_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-08T00:00:00+02:00,2013-06-09T00:00:00+02:00,2013-06-08 16:00:00+00:00,2013-06-08 22:00:00+00:00,3776.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3648 m to 3776 m with 2500 lpm, 231-238 bar, 1.55-1.56 sg EMW, 160 rpm, 17-22 kNm, WOB 5-7 MT, Average ROP 25 m/hr, Max gas 1.6 %",6.0 +15_9_F_11_B_2013_06_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-09T00:00:00+02:00,2013-06-10T00:00:00+02:00,2013-06-08 22:00:00+00:00,2013-06-09 00:45:00+00:00,3839.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3776 m to 3839 m with 2500 lpm, 235-238 bar, 1.56-1.57 sg EMW, 160 rpm, 17-22 kNm, WOB 5-7 MT, Average ROP 23 m/hr, Max gas 1.6 %",2.75 +15_9_F_11_B_2013_06_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-09T00:00:00+02:00,2013-06-10T00:00:00+02:00,2013-06-09 00:45:00+00:00,2013-06-09 04:00:00+00:00,3852.0,m,fixed,drilling -- drill,ok,success,"Reduced ROP to to enable geosteering. Drilled and orientated 8 1/2"" hole from 3839 m to 3852 m with 2500 lpm, 233-235 bar, 1.55-1.56 sg EMW, 160 rpm, 13-18 kNm, WOB 1-4 MT, Average ROP 4 m/hr, Max gas 0.3 %",3.25 +15_9_F_11_B_2013_06_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-09T00:00:00+02:00,2013-06-10T00:00:00+02:00,2013-06-09 04:00:00+00:00,2013-06-09 10:00:00+00:00,3919.0,m,fixed,drilling -- drill,ok,success,"Reduced ROP to enable geosteering. Drilled and orientated 8 1/2"" hole from 3852 m to 3919 m with 2500 lpm, 230 bar, 1.54-1.55 sg EMW, 160 rpm, 15-22 kNm, WOB 3-6 MT, Average ROP 11 m/hr, Max gas 0.1 %",6.0 +15_9_F_11_B_2013_06_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-09T00:00:00+02:00,2013-06-10T00:00:00+02:00,2013-06-09 10:00:00+00:00,2013-06-09 15:00:00+00:00,3977.0,m,fixed,drilling -- drill,ok,success,"Reduced ROP to enable geosteering. Drilled and orientated 8 1/2"" hole from 3919 m to 3980 m with 2500 lpm, 230 bar, 1.54-1.55 sg EMW, 160 rpm, 17-22 kNm, WOB 5-7 MT, Average ROP 12 m/hr, Max gas 0.1 %",5.0 +15_9_F_11_B_2013_06_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-09T00:00:00+02:00,2013-06-10T00:00:00+02:00,2013-06-09 15:00:00+00:00,2013-06-09 22:00:00+00:00,4141.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 3980 m to 4141 m with 2500 lpm, 235-238 bar, 1.56-1.57 sg EMW, 160 rpm, 17-22 kNm, WOB 5-7 MT, Average ROP 23 m/hr, Max gas 1.6 %",7.0 +15_9_F_11_B_2013_06_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-10T00:00:00+02:00,2013-06-11T00:00:00+02:00,2013-06-09 22:00:00+00:00,2013-06-10 04:00:00+00:00,4283.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4141 m to 4283 m with 2500 lpm, 243-245 bar, 1.56-1.57 sg EMW, 160 rpm, 18-26 kNm, WOB 4-8 MT, Average ROP 24 m/hr, Max gas 1.7 %",6.0 +15_9_F_11_B_2013_06_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-10T00:00:00+02:00,2013-06-11T00:00:00+02:00,2013-06-10 04:00:00+00:00,2013-06-10 10:00:00+00:00,4376.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4283 m to 4376 m with 2500 lpm, 240\6 bar, 1.56-1.57 sg EMW, 160 rpm, 20-32 kNm, WOB 3-6 MT, Average ROP 16 m/hr, Max gas 1.7 %",6.0 +15_9_F_11_B_2013_06_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-10T00:00:00+02:00,2013-06-11T00:00:00+02:00,2013-06-10 10:00:00+00:00,2013-06-10 16:00:00+00:00,4479.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4376 m to 4479 m with 2500 lpm, 249-252 bar, 1.56-1.57 sg EMW, 160 rpm, 20-24 kNm, WOB 5-7 MT, Average ROP 17 m/hr, Max gas 0.3 %",6.0 +15_9_F_11_B_2013_06_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-10T00:00:00+02:00,2013-06-11T00:00:00+02:00,2013-06-10 16:00:00+00:00,2013-06-10 22:00:00+00:00,4567.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4479 m to 4567 m with 2500 lpm, 257 bar, 1.57-1.58 sg EMW, 160 rpm, 22-28 kNm, WOB 3-13 MT, Average ROP 15 m/hr, Max gas 1.8 %",6.0 +15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-10 22:00:00+00:00,2013-06-11 03:30:00+00:00,4661.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4567 m to 4661 m with 2500 lpm, 260 bar, 1.57-1.59 sg EMW, 160 rpm, 22-29 kNm, WOB 3-13 MT, Average ROP 16 m/hr, Max gas 1.7 %",5.5 +15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 03:30:00+00:00,2013-06-11 08:00:00+00:00,4696.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4661 m to 4696 m with 2500 lpm, 255 bar, 1.56 sg EMW, 160 rpm, 25-30 kNm, WOB 10 MT, Average ROP 8 m/hr, Max gas 0.2 %",4.5 +15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 08:00:00+00:00,2013-06-11 09:30:00+00:00,4696.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshoot MWD tools. Worked string and circulated with 2500 lpm, 246 bar, 160 rpm, 25 kNm.",1.5 +15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 09:30:00+00:00,2013-06-11 15:30:00+00:00,4770.0,m,fixed,drilling -- drill,ok,success,"Drilled and orientated 8 1/2"" hole from 4696 m to section TD at 4770 m with 2500 lpm, 250-255 bar, 1.56-1.57 sg EMW, 160 rpm, 25-30 kNm, WOB 7-14 MT, Average ROP 8 m/hr, Max gas 0.1 % +Called TD at 17:36 hrs.",6.0 +15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 15:30:00+00:00,2013-06-11 20:15:00+00:00,4770.0,m,fixed,drilling -- circulating conditioning,ok,success,"Circulated hole clean with 2500 lpm, 247 bar, 160 rpm. 25-28 kNm,, 1.52 sg EMW Circulated total 5 B/U.",4.75 +15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 20:15:00+00:00,2013-06-11 21:30:00+00:00,4770.0,m,fixed,drilling -- pressure detection,ok,success,Recorded roadmap torque and flow checked - Well static.,1.25 +15_9_F_11_B_2013_06_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-11T00:00:00+02:00,2013-06-12T00:00:00+02:00,2013-06-11 21:30:00+00:00,2013-06-11 22:00:00+00:00,4583.0,m,fixed,drilling -- trip,ok,success,POOH wet from 4770 m to 4583 m. Average tripping speed 374 m/hr.,0.5 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-11 22:00:00+00:00,2013-06-12 01:15:00+00:00,3508.0,m,fixed,drilling -- trip,ok,success,POOH wet from 4583 m to 3508 m. Average tripping speed 331 m/hr.,3.25 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 01:15:00+00:00,2013-06-12 03:00:00+00:00,3508.0,m,fixed,formation evaluation -- log,ok,success,"Re-logged section across 3468 m with 30 m/hr to compare log response, bit depth from 3508 m to 3455 m.",1.75 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 03:00:00+00:00,2013-06-12 05:15:00+00:00,3192.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" DP wet from 3455 m to 3170 m. Average tripping speed 127 m/hr.",2.25 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 05:15:00+00:00,2013-06-12 05:30:00+00:00,3170.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 15 min- Well static,0.25 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 05:30:00+00:00,2013-06-12 08:00:00+00:00,3170.0,m,fixed,drilling -- bop activities,ok,success,Function tested BOPs,2.5 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 08:00:00+00:00,2013-06-12 08:30:00+00:00,3170.0,m,fixed,drilling -- other,ok,success,"Recorded torque and pipe stretch for 7"" liner running.",0.5 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 08:30:00+00:00,2013-06-12 10:00:00+00:00,1558.0,m,fixed,drilling -- trip,ok,success,"Pumped slug POOH with 8 1/2"" BHA on 5 1/2"" DP from 3170 m to 1558 m. Average tripping speed 1290 m/hr. +Observed problem with zone management system.",1.5 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 10:00:00+00:00,2013-06-12 10:30:00+00:00,1558.0,m,fixed,interruption -- repair,ok,equipment failure,Troubleshoot zone manegement system,0.5 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 10:30:00+00:00,2013-06-12 11:45:00+00:00,186.0,m,fixed,drilling -- trip,ok,success,"POOH with 8 1/2"" BHA on 5 1/2"" DP from 1558 m to 186 m. Average tripping speed 1097 m/hr.",1.25 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 11:45:00+00:00,2013-06-12 12:00:00+00:00,186.0,m,fixed,drilling -- trip,ok,success,Flowchecked well for 15 min- Well static,0.25 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 12:00:00+00:00,2013-06-12 17:45:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"L/D 8 1/2"" rotary steerable BHA including HWDP from 186 m to surface. +Bit grading: 2, 4, WT, N, X, I, BT, TD",5.75 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 17:45:00+00:00,2013-06-12 18:15:00+00:00,0.0,m,fixed,drilling -- other,ok,success,Cleaned and cleared rig floor.,0.5 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 18:15:00+00:00,2013-06-12 20:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held TBT. R/U 7"" handling equipment.",2.0 +15_9_F_11_B_2013_06_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-12T00:00:00+02:00,2013-06-13T00:00:00+02:00,2013-06-12 20:15:00+00:00,2013-06-12 22:00:00+00:00,60.0,m,fixed,drilling -- casing,ok,success,"P/U 7"" shoe joint, 3 ea. intermediate joint, float collar joint and landing collar. Verified floats function.",1.75 +15_9_F_11_B_2013_06_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-13T00:00:00+02:00,2013-06-14T00:00:00+02:00,2013-06-12 22:00:00+00:00,2013-06-13 04:00:00+00:00,341.0,m,fixed,drilling -- casing,ok,success,"RIH with 29 ppf 7"" liner from 60 m to 341 m. Average 4 joints/hrs. +Note: Slow running speed. only one casing handling equipment operator. Due to cancelled helicopters",6.0 +15_9_F_11_B_2013_06_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-13T00:00:00+02:00,2013-06-14T00:00:00+02:00,2013-06-13 04:00:00+00:00,2013-06-13 22:00:00+00:00,1418.0,m,fixed,drilling -- casing,ok,success,"RIH with 29 ppf 7"" liner from 341 m to 1418 m. Average 5.2 joints/hrs. L/O a total of 6 joints w/ damged treads.",18.0 +15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-13 22:00:00+00:00,2013-06-14 03:00:00+00:00,1666.0,m,fixed,drilling -- casing,ok,success,"RIH with 29 ppf 7"" liner from 1418 m to 1666. Average 4 joints/hrs. L/O 4 joints w/ damaged treads (Total for the run: 17).",5.0 +15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 03:00:00+00:00,2013-06-14 03:15:00+00:00,1666.0,m,fixed,drilling -- casing,ok,success,Performed Pre-job Meeting prior to P/U Liner Hanger.,0.25 +15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 03:15:00+00:00,2013-06-14 07:00:00+00:00,1666.0,m,fixed,drilling -- casing,ok,success,"Changed handling equipment. P/U and M/U liner hanger. Rigged down casing equipment. Changed handling equipment to 5 1/2"" drill pipe.",3.75 +15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 07:00:00+00:00,2013-06-14 15:00:00+00:00,3192.4,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" landing string from 1666m MD to 3192m MD inside casing. +Average tripping speed 190 m/hr. +No losses to formation.",8.0 +15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 15:00:00+00:00,2013-06-14 16:00:00+00:00,3192.4,m,fixed,drilling -- casing,ok,success,Broke circulation and increased flow rate in steps to 1000 lpm and 66 bar. Circulated one liner volume with 1000 lpm and 66 bar.,1.0 +15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 16:00:00+00:00,2013-06-14 19:00:00+00:00,3856.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" landing string from 3192m MD to 3856m MD. +Average tripping speed 221 m/hr. +No losses to formation.",3.0 +15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 19:00:00+00:00,2013-06-14 21:00:00+00:00,4095.0,m,fixed,drilling -- casing,ok,success,"From 3856m MD, observed frequent tight spots corresponding with high doglegs. +Ran in hole with 7"" liner on 5 1/2"" landing string and worked through tight spots from 3856m MD to 4095m MD. + +Average tripping speed 119 m/hr. +No losses to formation.",2.0 +15_9_F_11_B_2013_06_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-14T00:00:00+02:00,2013-06-15T00:00:00+02:00,2013-06-14 21:00:00+00:00,2013-06-14 22:00:00+00:00,4254.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" landing string from 4095m MD to 4254m MD. +Average tripping speed 159 m/hr. +No losses to formation.",1.0 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-14 22:00:00+00:00,2013-06-15 00:30:00+00:00,4745.0,m,fixed,drilling -- casing,ok,success,"RIH with 7"" liner on 5 1/2"" landing string from 4254m MD to 4745m MD. +Average tripping speed 196 m/hr. +No losses to formation.",2.5 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 00:30:00+00:00,2013-06-15 01:45:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,"Established circulation with 250 lpm and 60 bar. Verified parameters (up / down weights) and ran in hole with 7"" liner on 5 1/2"" drill pipe from 4254m MD and tagged TD at 4271m MD. + +Meanwhile: Performed toolbox talk prior to make up cement stand.",1.25 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 01:45:00+00:00,2013-06-15 03:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,"Spaced out with liner hanger to 3100m MD, liner shoe at 4769 m MD. Made up cement head.",1.25 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 03:00:00+00:00,2013-06-15 05:30:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Attempted to establish circulation with 100 lpm. Immediately triggered electronic popoff set at 70 bar. Investigated pressure build up in cement head.,2.5 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 05:30:00+00:00,2013-06-15 08:00:00+00:00,4771.0,m,fixed,drilling -- casing,ok,success,"Broke out and laid down cement head and drill pipe pup. Inspected same. + +Meanwhile: Cleaned and tidied rig floor. Established circulation with 360 lpm and 68 bar after confirmation that both darts were still in the cement head.",2.5 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 08:00:00+00:00,2013-06-15 10:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Broke off top drive and picked up and made up cement head. Dressed same.,2.0 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 10:00:00+00:00,2013-06-15 14:45:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Established circulation to 850 lpm and 87 bar in steps. Circulated 2 x open hole volume. Established rotation at 20 rpm and 25-28 kNm. Continued circulating bottoms up with 850 lpm and 87 bar.,4.75 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 14:45:00+00:00,2013-06-15 15:45:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Dropped ball and circulated same down with 500 lpm and 60 bar. Activated hanger and verified hanger set by slacking off 30MT - ok.,1.0 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 15:45:00+00:00,2013-06-15 16:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Sheared out ball seat by pumping with 225 bar.,0.25 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 16:00:00+00:00,2013-06-15 17:30:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,"Established loss free circulation with 900 lpm and 90 bar, and rotation with 20 rpm and 19-24 kNm. Circulated and conditioned mud prior to cement operation.",1.5 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 17:30:00+00:00,2013-06-15 17:45:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Pressure tested surface lines to 200 bar for 10 minutes - ok.,0.25 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 17:45:00+00:00,2013-06-15 21:15:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,"Pumped 5 m3 of 0.8 sg base oil at 900 lpm and 15 m3 of 1.35 sg tuned spacer followed by 3 m3 0.8 sg base oil. Closed IBOP and put 30 bar above. Opened lo-torque valve and dropped dart #1 for bottom plug. + +Mixed and pumped 26.7m3 1.90 sg cement slurry followed by 900 liter of drill water to displace lines. Dropped dart #2. Lined over to rig pumps and displaced cement with 1.32 sg oil based mud and 900 lpm. + +Sheared out bottom viper plug at 220 strokes. +Sheared out top viper plug at 1467 strokes. +Landed bottom viper plug at 1650 strokes. +Landed top viper plug at 2910 strokes. +Calculated efficiency: 95.8%. + +Rotated with 20 rpm to 2700 strokes. +Stopped rotating liner after 2700 strokes due to torque limit exceeded. +Reduced pump rate to 500 lpm at 2830 strokes. + +Bumped top viper plug with 130 bar circulating pressure and pressured up to 270 bar for 5 minutes - ok.",3.5 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 21:15:00+00:00,2013-06-15 21:30:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Bled down pressure to 5 bar to trip tank and perform inflow test for 5 minutes - no backflow.,0.25 +15_9_F_11_B_2013_06_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-15T00:00:00+02:00,2013-06-16T00:00:00+02:00,2013-06-15 21:30:00+00:00,2013-06-15 22:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Pulled running tool up 4.2 m . Applied 30 tonne to set liner packer.,0.5 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-15 22:00:00+00:00,2013-06-15 22:45:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Lined up to cement unit and verified line up. Closed upper annular and tested annulus and liner packer to 200 bar for 10 min - ok.,0.75 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-15 22:45:00+00:00,2013-06-15 23:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,"Stung out of PBR with liner hanger running tool by pressuring up liner to 70 bar, pulling out 5m and observed pressure drop.",0.25 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-15 23:00:00+00:00,2013-06-16 01:15:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Established circulation with 2000 lpm and 110 bar. Circulated out spacer and excess cement. Transferred a total of 40m3 of slops.,2.25 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 01:15:00+00:00,2013-06-16 02:00:00+00:00,4770.0,m,fixed,drilling -- casing,ok,success,Broke out and laid down cement head and racked back.,0.75 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 02:00:00+00:00,2013-06-16 03:00:00+00:00,3100.0,m,fixed,drilling -- casing,ok,success,Installed 2 x sponge balls and circulated 2 x string volumes at 2000 lpm and 96 bar.,1.0 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 03:00:00+00:00,2013-06-16 04:30:00+00:00,3100.0,m,fixed,drilling -- casing,ok,success,Pumped slug. Laid out cement stand to deck.,1.5 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 04:30:00+00:00,2013-06-16 05:00:00+00:00,3100.0,m,fixed,drilling -- casing,ok,success,Attempted to pressure test well to 270 bar. Inconclusive test due to slug and air in pipe.,0.5 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 05:00:00+00:00,2013-06-16 09:00:00+00:00,620.0,m,fixed,drilling -- casing,ok,success,"Pulled out of hole with liner hanger running tool on 5 1/2"" drill pipe from 3100m MD to 620m MD. + +Average: 620 m/hr.",4.0 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 09:00:00+00:00,2013-06-16 09:15:00+00:00,620.0,m,fixed,drilling -- casing,ok,success,Picked up 2 x single joints from deck.,0.25 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 09:15:00+00:00,2013-06-16 10:30:00+00:00,13.0,m,fixed,drilling -- casing,ok,success,"Pulled out of hole with liner hanger running tool on 5 1/2"" drill pipe from 620m MD to 13m. + +Average: 496 m/hr.",1.25 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 10:30:00+00:00,2013-06-16 11:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Changed handling equipment. Laid out liner hanger running tool to deck.,0.75 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 11:15:00+00:00,2013-06-16 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Cleaned and tidied rig floor.,0.25 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 11:30:00+00:00,2013-06-16 11:45:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Performed prejob meeting prior to pick up and make up flushing BHA.,0.25 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 11:45:00+00:00,2013-06-16 13:15:00+00:00,167.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up well protector. Ran in hole to 167m MD.,1.5 +15_9_F_11_B_2013_06_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-16T00:00:00+02:00,2013-06-17T00:00:00+02:00,2013-06-16 13:15:00+00:00,2013-06-16 22:00:00+00:00,167.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot brake release failure on top drive. Closed out fault seeking on electrical control system. + +Meanwhlie: Performed kick drill, rigged down drifting equipment from derrick. Serviced top drive / travelling block and dolly. Inspected and serviced PS21 slips. Prepared handling equipment for next BHA. Performed general maintenance.",8.75 +15_9_F_11_B_2013_06_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-17T00:00:00+02:00,2013-06-18T00:00:00+02:00,2013-06-16 22:00:00+00:00,2013-06-17 22:00:00+00:00,167.0,m,fixed,interruption -- other,ok,equipment failure,"Troubleshot brake release failure on top drive. Assembled top drive brake without hydraulic connections. + +Meanwhile: Prepared brine and cut weight from 1.20 sg to 1.03 sg. Inspected handrails and gates in derrick. Cleaned upper and lower shakers. Cleaned and tidied well bay area. Prepared fast line sheave for NDT inspection. Performed general maintanence.",24.0 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-17 22:00:00+00:00,2013-06-18 01:30:00+00:00,0.0,m,fixed,interruption -- other,ok,equipment failure,"Assembled top drive brake without hydraulic connections. +Performed PDO inpection on top drive. +Tested top drive.",3.5 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 01:30:00+00:00,2013-06-18 06:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with flushing assembly and flushed BOP and riser with 1600 lpm and 20 rpm. + +Meanwhile: Performed prejob meeting prior to pick up and make up cleanout assembly.",4.5 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 06:00:00+00:00,2013-06-18 06:15:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Drained well protector and laid down same.,0.25 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 06:15:00+00:00,2013-06-18 06:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Performed prejob meeting prior to performing pressure test of well against shear ram.,0.25 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 06:30:00+00:00,2013-06-18 07:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Lined up and pressure tested the surface lines to 270 bar for 5 minutes. Closed shear ram. Pressure tested well to 270 bar for 10 minutes - ok. Pumped a total of 2400 liters, bled 2400 liters back. Opened shear ram.",1.0 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 07:30:00+00:00,2013-06-18 08:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Changed handling equipment.,0.5 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 08:00:00+00:00,2013-06-18 08:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up cleanout assembly and removed protective covering.,0.5 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 08:30:00+00:00,2013-06-18 11:30:00+00:00,729.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with cleanout assembly on 3 1/2"" drill pipe to 729m MD.",3.0 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 11:30:00+00:00,2013-06-18 11:45:00+00:00,729.0,m,fixed,completion -- circulating conditioning,ok,success,"Performed flowcheck. Prepared for picking up 3 1/2"" drill pipe from cantilever.",0.25 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 11:45:00+00:00,2013-06-18 18:15:00+00:00,1592.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up 3 1/2"" drill pipe singles and ran in hole with cleanout assembly from 729m MD to 1592m MD.",6.5 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 18:15:00+00:00,2013-06-18 18:45:00+00:00,1592.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up and made up scrape assembly.,0.5 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 18:45:00+00:00,2013-06-18 19:00:00+00:00,1592.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 5 1/2"" handling equipment.",0.25 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 19:00:00+00:00,2013-06-18 19:15:00+00:00,1592.0,m,fixed,completion -- circulating conditioning,ok,success,Broke circulation with 1000 lpm and 170 bar and checked up and down weights.,0.25 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 19:15:00+00:00,2013-06-18 20:30:00+00:00,2271.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole with cleanout assembly from 1592m MD to 2271m MD (scrape at 630m MD).,1.25 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 20:30:00+00:00,2013-06-18 21:00:00+00:00,2271.0,m,fixed,completion -- circulating conditioning,ok,success,"Scraped area from 630m MD to 660m MD with 1000 lpm, 180 bar and 40 rpm.",0.5 +15_9_F_11_B_2013_06_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-18T00:00:00+02:00,2013-06-19T00:00:00+02:00,2013-06-18 21:00:00+00:00,2013-06-18 22:00:00+00:00,2834.0,m,fixed,completion -- circulating conditioning,ok,success,"Ran in hole with cleanout assembly on 5 1/2"" drill pipe from 2271m MD to 2834m MD.",1.0 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-18 22:00:00+00:00,2013-06-19 01:30:00+00:00,3977.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole with cleanout assembly from 2834m MD to 3977m MD.,3.5 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 01:30:00+00:00,2013-06-19 02:00:00+00:00,3977.0,m,fixed,completion -- circulating conditioning,ok,success,"Picked up and made up 10 3/4"" scraper.",0.5 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 02:00:00+00:00,2013-06-19 03:15:00+00:00,4650.0,m,fixed,completion -- circulating conditioning,ok,success,Ran in hole with cleanout assembly from 3977m MD to 4650m MD.,1.25 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 03:15:00+00:00,2013-06-19 04:00:00+00:00,4650.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke circulation with 500 lpm and 77 bar. Took up and down weights. Washed down stand from 4650m MD to 4689m MD with 500 lpm and 77 bar (9 5/8"" scraper at 3080m MD. Scraped area from 3080m MD to 3066m MD with 500 lpm, 75 bar, 40 rpm and 14 kNm.",0.75 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 04:00:00+00:00,2013-06-19 05:30:00+00:00,4694.0,m,fixed,completion -- circulating conditioning,ok,success,Washed down stand from 4689m MD to 4694m MD with 500 lpm and 76 bar. Tagged top of PBR at 3094m MD with 2MT. Picked up and established rotation at 30rpm. Washed and polished PBR.,1.5 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 05:30:00+00:00,2013-06-19 06:15:00+00:00,4694.0,m,fixed,completion -- circulating conditioning,ok,success,Circulated 3 x liner volume at 1300 lpm and 300 bar.,0.75 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 06:15:00+00:00,2013-06-19 06:30:00+00:00,4694.0,m,fixed,completion -- circulating conditioning,ok,success,Set down weight at PBR with 16MT. Observed shearing of MFCTC.,0.25 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 06:30:00+00:00,2013-06-19 07:45:00+00:00,4694.0,m,fixed,completion -- circulating conditioning,ok,success,"Circulated 3 x bottoms up through MFCTC valve with 3800 lpm, 292 bar, 80 rpm and 7-16 kNm.",1.25 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 07:45:00+00:00,2013-06-19 08:30:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Picked up drillstring from 4694m MD to 4687m MD and activated well commissioner and verified MFCTC in closed position.,0.75 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 08:30:00+00:00,2013-06-19 09:00:00+00:00,4687.0,m,fixed,completion -- other,ok,success,Closed pipe ram and lined up to pressure test annulus through kill line. Pressure tested annulus to 70 bar - ok.,0.5 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 09:00:00+00:00,2013-06-19 10:00:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Cycled MFCTC tool to locked closed position by setting down 19MT on PBR.,1.0 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 10:00:00+00:00,2013-06-19 10:45:00+00:00,4687.0,m,fixed,completion -- other,ok,success,Transfered mud from sandtraps to mud pits - emptied trip tanks.,0.75 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 10:45:00+00:00,2013-06-19 12:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Flushed surface lines with base oil.,1.5 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 12:15:00+00:00,2013-06-19 12:30:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Perform prejob meeting prior to displace drill string to base oil.,0.25 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 12:30:00+00:00,2013-06-19 15:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced drill string to base oil at 300-1000 lpm and 90-160 bar.,2.75 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 15:15:00+00:00,2013-06-19 15:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Monitored pressure and well on trip tank. Confirmed well stable with drillpipe pressure 94 bar.,0.5 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 15:45:00+00:00,2013-06-19 16:15:00+00:00,4687.0,m,fixed,completion -- other,ok,success,Activated well commissioner packer by setting down 18MT weight on PBR.,0.5 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 16:15:00+00:00,2013-06-19 16:30:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Performed prejob meeting prior to start inflow test.,0.25 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 16:30:00+00:00,2013-06-19 18:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Performed inflow test in steps of 30 bar from 94 bar to 4 bar. Held 4 bar for 30 minutes. Pressure increased 0.8 bar in 30 minutes - ok.,1.75 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 18:15:00+00:00,2013-06-19 18:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Pumped down base oil to 90 bar from cement unit to equalize differential pressure on well commissioner packer.,0.5 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 18:45:00+00:00,2013-06-19 19:00:00+00:00,4687.0,m,fixed,completion -- other,ok,success,Deactivated well commissioner packer. Pulled polish mill out of PBR while rotating with 10 rpm.,0.25 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 19:00:00+00:00,2013-06-19 19:30:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Isolated cement unit and bled of pressure. Bled back 8m3 base oil to trip tank.,0.5 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 19:30:00+00:00,2013-06-19 19:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Performed prejob meeting prior to start displacement to 1.03 sg brine.,0.25 +15_9_F_11_B_2013_06_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-19T00:00:00+02:00,2013-06-20T00:00:00+02:00,2013-06-19 19:45:00+00:00,2013-06-19 22:00:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced well through bit to 1.03 sg brine with 1000-2000 lpm and 118-235 bar.,2.25 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-19 22:00:00+00:00,2013-06-19 22:30:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Continued displacing well through bit to 1.03 sg brine with 1000-2000 lpm and 118-235 bar.,0.5 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-19 22:30:00+00:00,2013-06-19 22:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Opened MFCTC tool by setting down 20 bar on PBR.,0.25 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-19 22:45:00+00:00,2013-06-20 00:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,"Displaced well through MFCTC to 1.03 sg bine with 2000-4000 lpm, 40-146 bar, 90 rpm and 9-18 kNm.",1.5 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 00:15:00+00:00,2013-06-20 00:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Operated the MFCTC to closed position. Deactivated well commissioner packer.,0.5 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 00:45:00+00:00,2013-06-20 01:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,"Flushed flowlines with 1,03 sg brine.",0.5 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 01:15:00+00:00,2013-06-20 02:15:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,"Prepared to perform pressure test on well down pipe and kill line. Performed line test. +Pressure tested well to 345 bar with 1.03 sg brine - ok.",1.0 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 02:15:00+00:00,2013-06-20 02:45:00+00:00,4687.0,m,fixed,completion -- circulating conditioning,ok,success,Performed flow check for 30 minutes - well static.,0.5 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 02:45:00+00:00,2013-06-20 05:15:00+00:00,4120.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout string on 5 1/2"" drill pipe from 4687m MD to 4120m MD.",2.5 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 05:15:00+00:00,2013-06-20 05:45:00+00:00,4120.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out and laid down 10 3/4"" scraper.",0.5 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 05:45:00+00:00,2013-06-20 08:00:00+00:00,2796.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout string on 5 1/2"" drill pipe from 4120m MD to 2796m MD.",2.25 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 08:00:00+00:00,2013-06-20 17:30:00+00:00,2796.0,m,fixed,interruption -- other,ok,equipment failure,Top drive collided with stand in the pipe racking machine and bent top joint. Performed timeout for safety and inspected for damages. Aft PRS junction box damaged. Secured stand with fore PRS and parked aft PRS. Laid out stand to cantilever. Performed PDO check of derrick.,9.5 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 17:30:00+00:00,2013-06-20 20:00:00+00:00,1667.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout string on 5 1/2"" drill pipe from 2796m MD to 1667m MD.",2.5 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 20:00:00+00:00,2013-06-20 21:00:00+00:00,1667.0,m,fixed,completion -- circulating conditioning,ok,success,"Broke out and laid down well commissioner and 9 5/8"" scraper.",1.0 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 21:00:00+00:00,2013-06-20 21:30:00+00:00,1667.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 3 1/2"" handling equipment.",0.5 +15_9_F_11_B_2013_06_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-20T00:00:00+02:00,2013-06-21T00:00:00+02:00,2013-06-20 21:30:00+00:00,2013-06-20 22:00:00+00:00,1512.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout string on 3 1/2"" drill pipe from 1667m MD to 1512m MD.",0.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-20 22:00:00+00:00,2013-06-21 01:30:00+00:00,165.0,m,fixed,completion -- other,ok,success,"Pulled out of hole with cleanout string on 3 1/2"" drill pipe from 1512m MD to 165m MD.",3.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 01:30:00+00:00,2013-06-21 02:30:00+00:00,165.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced surface lines and manifolds to seawater.,1.0 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 02:30:00+00:00,2013-06-21 03:30:00+00:00,165.0,m,fixed,completion -- circulating conditioning,ok,success,Displaced riser to seawater from 165m MD with 2600 lpm and 59 bar.,1.0 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 03:30:00+00:00,2013-06-21 04:30:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Pulled out of hole with cleanout string on 3 1/2"" drill pipe from 156m MD. Laid down well protector to cantilever.",1.0 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 04:30:00+00:00,2013-06-21 05:00:00+00:00,0.0,m,fixed,completion -- circulating conditioning,ok,success,"Changed to 5 1/2"" handling equipment. Cleaned and tidied rig floor.",0.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 05:00:00+00:00,2013-06-21 05:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to pick up and run Safelock plug.,0.25 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 05:15:00+00:00,2013-06-21 07:15:00+00:00,632.0,m,fixed,completion -- other,ok,success,Picked up and made up Safelock plug. Ran in hole with Safelock plug to 632m MD.,2.0 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 07:15:00+00:00,2013-06-21 08:30:00+00:00,632.0,m,fixed,completion -- other,ok,success,Established circulation and washed the setting area with 1100 lpm and 4 bar. Installed Safelock plug at 635m MD. Top of plug at 631.6m MD.,1.25 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 08:30:00+00:00,2013-06-21 09:00:00+00:00,632.0,m,fixed,completion -- other,ok,success,"Lined up from cement unit and pressure tested Safelock plug from below to 200 bar for 10 minutes - ok. Pumped a total of 1128 liters, bled 1120 liters back.",0.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 09:00:00+00:00,2013-06-21 09:30:00+00:00,632.0,m,fixed,completion -- other,ok,success,Closed ball valve and released Safelock running tool.,0.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 09:30:00+00:00,2013-06-21 10:00:00+00:00,632.0,m,fixed,completion -- other,ok,success,Spotted 5m3 hi-visc pill on top of Safelock plug with 1800 lpm and 11 bar.,0.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 10:00:00+00:00,2013-06-21 11:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Pulled out of hole with Safelock running tool and laid out same to cantilever.,1.0 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 11:00:00+00:00,2013-06-21 11:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Lined up from cement unit and closed shear ram. Pressure tested Safelock plug from above to 345 bar for 10 minutes - ok. Pumped a total of 779 liters, bled 767 liters back. Opened shear ram.",0.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 11:30:00+00:00,2013-06-21 12:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up and made up bullnose and wearbushing retrieval tool.,0.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 12:00:00+00:00,2013-06-21 12:30:00+00:00,146.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran in hole with wearbushing retrieval tool to 146m MD. Pulled wearbushing free with 46MT overpull.,0.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 12:30:00+00:00,2013-06-21 13:00:00+00:00,138.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Racked back one stand and jetted wellhead with 1.03 sg brine at 2000 lpm and 20 bar.,0.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 13:00:00+00:00,2013-06-21 15:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled out of hole with 10 3/4"" wearbushing on 5 1/2"" drill pipe. Laid out wearbushing to cantilever.",2.0 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 15:00:00+00:00,2013-06-21 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to picking up lockdown assembly.,0.25 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 15:15:00+00:00,2013-06-21 16:00:00+00:00,146.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up seal assembly lockdown assembly and ran in hole on 5 1/2"" drill pipe to wellhead at 138m MD.",0.75 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 16:00:00+00:00,2013-06-21 18:30:00+00:00,146.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up to perform pressure test from cement unit. Pressure set seal assembly lockdown assembly with 207 bar. Verified assembly set by applying 30MT overpull.,2.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 18:30:00+00:00,2013-06-21 19:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled out of hole from 138m MD. Cleaned and tidied rig floor.,0.5 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 19:00:00+00:00,2013-06-21 19:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to start nippling down diverter and bell nipple.,0.25 +15_9_F_11_B_2013_06_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-21T00:00:00+02:00,2013-06-22T00:00:00+02:00,2013-06-21 19:15:00+00:00,2013-06-21 22:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Rigged up to pull diverter. Pulled diverter. Installed master bushings. Laid diverter out to cantilever. Prepared to pull bell nipple.,2.75 +15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-21 22:00:00+00:00,2013-06-22 09:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Nippled down BOP and moved over to test stump.,11.5 +15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 09:30:00+00:00,2013-06-22 09:45:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed prejob meeting prior to remove master bushings and pick up and make up claxton tool to NT-2 connector.,0.25 +15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 09:45:00+00:00,2013-06-22 10:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Removed master bushings and outer bushings. Picked up and made up claxton tool to 5 1/2"" drill pipe.",0.75 +15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 10:30:00+00:00,2013-06-22 11:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Landed off claxton tool to NT-2 connector. Attached control lines and latched running tool. Recovered control lines. Verified make up by applying 5MT overpull.,0.75 +15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 11:15:00+00:00,2013-06-22 12:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Removed scaffold from around claxton tool. + +Meanwhile: Cleaned and tidied rig floor.",0.75 +15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 12:00:00+00:00,2013-06-22 12:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,Held prejob meeting prior to rigging down tensioning system.,0.25 +15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 12:15:00+00:00,2013-06-22 19:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Rigged down tensioning cylinders and tension ring. + +Meanwhile: Prepared 24"" elevator, C-plate and bails on rig floor.",6.75 +15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 19:00:00+00:00,2013-06-22 21:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Removed split hatch cover from F-11. Rigged up to run guide wires to wellhead template.,2.0 +15_9_F_11_B_2013_06_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-22T00:00:00+02:00,2013-06-23T00:00:00+02:00,2013-06-22 21:00:00+00:00,2013-06-22 22:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,Ran guide wires to seabed.,1.0 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-22 22:00:00+00:00,2013-06-23 01:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Ran guide wires to seabed and latched in place to wellhead template using ROV. Ran hot stab hydraulic connection and connected same to hot stab receptacle on riser connector using ROV.,3.5 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 01:30:00+00:00,2013-06-23 01:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to disconnect high pressure drilling riser.,0.25 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 01:45:00+00:00,2013-06-23 02:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Released high pressure drilling riser and pulled to 1 meter above wellhead housing. ROV locked hydraulic valves on high pressure drilling riser.,0.75 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 02:30:00+00:00,2013-06-23 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged up to pull high pressure drilling riser. Installed spider into rotary and installed hydraulic hoses. Function tested same.,4.0 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 06:30:00+00:00,2013-06-23 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled out of hole with BOP joint. Laid out BOP joint and claxton tool to cantilever.,2.0 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 08:30:00+00:00,2013-06-23 08:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Changed to 24"" handling equipment.",0.25 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 08:45:00+00:00,2013-06-23 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled riser tension joint and laid out same to cantilever.,1.75 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 10:30:00+00:00,2013-06-23 10:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Changed handling equipment to 5 1/2"".",0.25 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 10:45:00+00:00,2013-06-23 13:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pulled riser pup and one double (#2 + #3) joint. Laid out same to cantilever.,2.5 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 13:15:00+00:00,2013-06-23 15:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Unable to lay double riser joint on subrack craddle. Cut bumber bar off portside. Moved double riser joint to portside.,2.5 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 15:45:00+00:00,2013-06-23 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pull double riser joint (#4 + #5) and laid out to cantilever.,1.25 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 17:00:00+00:00,2013-06-23 17:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting with new crew.,0.25 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 17:15:00+00:00,2013-06-23 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected flange on single joint (#6). Installed lifting nubbing and laid out to cantilever with crane.,2.25 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 19:30:00+00:00,2013-06-23 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up single riser joint (#7) and set in spider.,0.5 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 20:00:00+00:00,2013-06-23 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected guide wires with ROV. Retrieved guide wires.,1.0 +15_9_F_11_B_2013_06_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-23T00:00:00+02:00,2013-06-24T00:00:00+02:00,2013-06-23 21:00:00+00:00,2013-06-23 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Disconnected flange on riser joint #7.,1.0 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-23 22:00:00+00:00,2013-06-23 23:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed lifting nubbing on riser joint #7 and laid out to cantilever with crane.,1.5 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-23 23:30:00+00:00,2013-06-24 02:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up lower riser pup #8 and set in spider. Disconnected flange. Installed lifting nubbing and laid out to cantilever with crane.,2.5 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 02:00:00+00:00,2013-06-24 03:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and laid out stressjoint and TBC (#9) to cantilever. + +Meanwhile: Installed guide funnel on wellhead.",1.5 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 03:30:00+00:00,2013-06-24 04:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Installed production tension contact ring on F-11 slot. Lowered annulus valves through rotary to wellhead.,0.5 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 04:00:00+00:00,2013-06-24 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Rigged up to run production riser.,2.5 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 06:30:00+00:00,2013-06-24 06:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to start run production riser.,0.25 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 06:45:00+00:00,2013-06-24 10:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up tieback connector and stessjoint and set in rotary. Picked up and made up lower riser pup.,3.5 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 10:15:00+00:00,2013-06-24 10:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lowered production riser through rotary to test connector. Functioned tieback connector by fully stroking out. Full stroke too long, broke ROV panel.",0.5 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 10:45:00+00:00,2013-06-24 13:15:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Pulled out with tiaback connector and riser stressjoint and set in rotary. Disconnected lower riser pup and laid out to cantilever. Laid out primary riser stressjoint to cantilever.,2.5 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 13:15:00+00:00,2013-06-24 16:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,Picked up backup riser stressjoint to rotary and made up to lower riser pup.,2.75 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 16:00:00+00:00,2013-06-24 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Tested backup tieback connector.,1.0 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 17:00:00+00:00,2013-06-24 17:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting with new crew.,0.25 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 17:15:00+00:00,2013-06-24 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Shimmed TBC ring. Lowered riser and landed off in riser spider.,0.5 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 17:45:00+00:00,2013-06-24 20:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up riser single #1 and positioned and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok.,3.0 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 20:45:00+00:00,2013-06-24 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up and installed flange protection fairings.,0.25 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 21:00:00+00:00,2013-06-24 21:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered riser and set in riser spider. Attached guide wires to clamp.,0.75 +15_9_F_11_B_2013_06_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-24T00:00:00+02:00,2013-06-25T00:00:00+02:00,2013-06-24 21:45:00+00:00,2013-06-24 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ran guide wires to seabed and attached to wellhead template wiht ROV. + +Meanwhle: Installed lifting nubbing to riser single #2.",0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-24 22:00:00+00:00,2013-06-25 00:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up riser single #2 and positioned and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,2.5 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 00:30:00+00:00,2013-06-25 02:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up riser single #3 and positioned and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,2.0 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 02:30:00+00:00,2013-06-25 05:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up riser single #4 and positioned and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,2.5 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 05:00:00+00:00,2013-06-25 05:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to pick up splash zone riser joint.,0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 05:15:00+00:00,2013-06-25 06:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up splash zone riser joint and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,1.5 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 06:45:00+00:00,2013-06-25 08:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up upper riser pup joint and positioned and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,1.75 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 08:30:00+00:00,2013-06-25 10:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up tension joint and landed off joint. Inspected seal surface and installed IX-14 ring. Made up flange connection with bolt tensioner. Pressure tested flange connection to 3000 psi through test port - ok. Lowered riser and set in riser spider.,1.5 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 10:00:00+00:00,2013-06-25 12:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Modified flange protector clamp straps. Installed protector clamps.,2.0 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 12:00:00+00:00,2013-06-25 12:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered riser and attached hang off plate. Locked spider and landed off weight.,0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 12:15:00+00:00,2013-06-25 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed riser running tool from riser tension joint.,0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 12:30:00+00:00,2013-06-25 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up 5 1/2"" drill pipe with riser running tool and tension riser joint. Picked up weight and removed hangoff plate.",1.0 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 13:30:00+00:00,2013-06-25 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to remove riser spider.,0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 13:45:00+00:00,2013-06-25 15:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed riser spider. Installed outer ring and master bushings.,1.5 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 15:15:00+00:00,2013-06-25 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up top drive to 5 1/2"" drill pipe and riser. Spaced out to install needle valve. Ensured needle valve secured for running.",0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 15:30:00+00:00,2013-06-25 17:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered riser to safe distance above riser landing guide funnel. Verified VGX ring in correct position. Lowered riser inside vertical guide. Removed riser guide funnel.,1.5 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 17:00:00+00:00,2013-06-25 17:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lowered hot stab to tieback connector. Installed hot stab using ROV.,0.5 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 17:30:00+00:00,2013-06-25 17:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Landed off tieback connector on wellhead with 15MT. Functioned valves on ROV panel to lock tieback connector.,0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 17:45:00+00:00,2013-06-25 18:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Applied 3000 psi until stroke indicator indicated fully set.,0.75 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 18:30:00+00:00,2013-06-25 18:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Picked up and applied 20MT overpull to verify latched production riser.,0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 18:45:00+00:00,2013-06-25 19:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Lined up to perform pressure test of riser.,0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 19:00:00+00:00,2013-06-25 19:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Filled riser with water using cement unit while venting through tension joint.,0.75 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 19:45:00+00:00,2013-06-25 20:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Performed prejob meeting prior to perform pressure test to 20/200 bar for 5/10 minutes.,0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 20:00:00+00:00,2013-06-25 20:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Pressure tested riser to 20/200 bar for 5/10 minutes. Pumped 320 liters. Bled 320 liters back.,0.75 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 20:45:00+00:00,2013-06-25 21:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Opened needle valve on tension joint to drain string. Closed needle valve.,0.25 +15_9_F_11_B_2013_06_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-25T00:00:00+02:00,2013-06-26T00:00:00+02:00,2013-06-25 21:00:00+00:00,2013-06-25 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Flushed tieback connector control lines with inhibitor using the mini reel pump.,1.0 +15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-25 22:00:00+00:00,2013-06-25 23:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Flushed tieback connector control lines with inhibitor using the mini reel pump. +Sat all valves to parking position. +Recovered hot stab and guide wires to surface. +Installed dummy stab in tieback connector.",1.25 +15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-25 23:15:00+00:00,2013-06-26 08:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed riser centralizers, tension ring and tension cylinders. + +Meanwhile: +Pressure tested BOP to 345 bar on stump. + +Performed pre-job meeting prior to cut and bevel the riser tension joint.",8.75 +15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-26 08:00:00+00:00,2013-06-26 11:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Cut the riser tension joint while holding 2-4 Ton overpull in string. +Laid out cut off riser piece and riser cutting equipment. + +Meanwhile: +Pressure tested BOP to 345 bar on stump.",3.5 +15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-26 11:30:00+00:00,2013-06-26 13:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Bevelled riser tension joint edge. + +Held pre-job / SJA meeting prior to pick up Claxton tool and BOP joint.",2.0 +15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-26 13:30:00+00:00,2013-06-26 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and sat multibowl in rotary, inspected NT2 connection, ok. +Picked up surface joint / Claxton tool assembly and made up same to multibowl. +Performed pick up test of assembly to 0,15 meter above deck. +Picked up assembly and removed master bushings. +Ran assembly through rotary. +Installed master bushings. +Picked up single and ran in with multibowl. +Landed out multibowl.",6.0 +15_9_F_11_B_2013_06_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-26T00:00:00+02:00,2013-06-27T00:00:00+02:00,2013-06-26 19:30:00+00:00,2013-06-26 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Tested multibowl BT and FS seals. +Energized plastic in uppper and lower BT seals. + +Meanwhile: +Attempted to pressure test annular BOP on stump.",2.5 +15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-26 22:00:00+00:00,2013-06-27 00:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Energized multibowl slips. +Performed 5 Ton overpull test, ok. + +Meanwhile: +Pressure tested annular BOP to 20 / 345 bar on stump. +Not able to obtain test. +Commenced to replace annular element.",2.0 +15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 00:00:00+00:00,2013-06-27 00:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed hatches around production riser. + +Meanwhile: +Replacing annular preventer.",0.5 +15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 00:30:00+00:00,2013-06-27 01:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed control hose reel and pump for Claxton tool on drill floor. + +Meanwhile: +Replacing annular preventer.",1.0 +15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 01:30:00+00:00,2013-06-27 03:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Erected scaffolding around Claxton tool in moonpool. + +Meanwhile: +Replacing annular preventer.",2.0 +15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 03:30:00+00:00,2013-06-27 05:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Attempted to disengage Claxton tool with 1500 psi on piston. +Not able to release tool. +Increased pressure to 1800 psi and released Claxton tool. + +Meanwhile: +Replacing annular preventer.",2.0 +15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 05:30:00+00:00,2013-06-27 07:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting. +Pulled out with Claxton tool and laid down same to cantilever deck. + +Meanwhile: +Replacing annular preventer. +Worked with installation of valves and test of multibowl.",2.0 +15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 07:30:00+00:00,2013-06-27 16:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,"Replaced annular preventer. +Function tested annular preventer twice prior to pressure test. +Pressure tested annular preventer to 30 / 345 bar - 5 / 10 minutes, test ok. + +Meanwhile: +Worked with installation of valves and test of multibowl. +Performed maintenance on TDS. +Moved slick joint and diverter to drill floor. +At 17:00 hrs informed PCR to shut down production on well F-12 and F-14.",8.5 +15_9_F_11_B_2013_06_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-27T00:00:00+02:00,2013-06-28T00:00:00+02:00,2013-06-27 16:00:00+00:00,2013-06-27 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-job meeting prior to nipple up BOP. +Moved BOP to well center and landed same onto riser. +Made up NT2 connector. +Connected tension system. +Ran slick joint and made up same. +At 23:15 hrs informed PCR to restart production on well F-12 and F-14.",6.0 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-27 22:00:00+00:00,2013-06-27 23:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pulled master bushings. +Installed diverter.",1.0 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-27 23:00:00+00:00,2013-06-28 00:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed BX elevator and rotator. +Changed handling equipment to 5 1/2"". +Picked up bowl protector RT and made up same to 5 1/2"" DP. +RIH and installed bowl protector. +POOH with RT.",1.75 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 00:45:00+00:00,2013-06-28 06:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and RIH with annulus insert retrieval tool. +Tagged and engaged annulus insert at 140,2 meter, Not able to release annulus insert. +POOH with RT. +Redressed RT, replaced torque pins with torque keys. +Ran back in with RT and engaged same. +Released annulus insert with 4000 Nm. +POOH with RT and redressed same with torque pins. +RIH and retrieved annulus insert. +Broke out and laid down annulus RT to cantilever.",5.75 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 06:30:00+00:00,2013-06-28 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to clean out run. +Picked up and made up jetting sub to 5 1/2"" DP. +RIH with jetting sub on 5 1/2"" DP from surface to 150 m. +Pumped 13 m3 hi-vis pill with 500 liter/min, 4 bar. +Chased pill with 4,5 m3 SW at 500 liter/min, 2,8 bar. +Stopped pumping and RIH from 150 m to 170 m. +Waited for pill to soak for 10 minutes. +Commenced circulation with SW between 170 m - 135 m at 3000 liter/min, 26 bar, 10 rpm, 1-3 kNm. +Displaced well back to 26 m3 1,03 sg inhibited brine with 3000 liter/min, 26 bar. +POOH and laid down jet sub.",4.0 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 10:30:00+00:00,2013-06-28 11:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Strapped DP stands from derrick.,1.25 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 11:45:00+00:00,2013-06-28 12:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting prior to retrieving bowl protector. +RIH with bowl protector retrieval tool and retrieved same. +POOH with bowl protector.",0.75 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 12:30:00+00:00,2013-06-28 15:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Performed pre-job meeting prior to rig up. +Rigged up handling equipment for 10 3/4"" tie-back casing.",2.75 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 15:15:00+00:00,2013-06-28 18:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Held pre-job meeting prior make up setting tool. +Picked up and racked back adjustable surface hanger setting tool.",2.75 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 18:00:00+00:00,2013-06-28 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Cleaned and cleared rigfloor. +Installed large head for 10 3/4"" casing handling in PDM. +Performed pre-job meeting prior to run 10 3/4"" tie-back string.",1.0 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 19:00:00+00:00,2013-06-28 21:15:00+00:00,103.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" tie-back connector, inspected same, ok. +Picked up and RIH with 10 3/4"" tie-back string as per running tally from surface to 103 meter.",2.25 +15_9_F_11_B_2013_06_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-28T00:00:00+02:00,2013-06-29T00:00:00+02:00,2013-06-28 21:15:00+00:00,2013-06-28 22:00:00+00:00,123.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" surface casing hanger assembly with adjustment sub and continued to RIH.",0.75 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-28 22:00:00+00:00,2013-06-28 23:00:00+00:00,139.7,m,fixed,drilling -- casing,ok,success,"Tagged land off point with 3 Ton. +Landed off tie-back string at 139,73 meter +Rotated string with two turns to engage threads in tie-back adapter.",1.0 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-28 23:00:00+00:00,2013-06-28 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,Released riser RT and POOH with same.,0.5 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-28 23:30:00+00:00,2013-06-29 01:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged down handling equipment for 10 3/4"" tie-back casing and cleared rig floor. +Rigged up for handling of 5 1/2"" DP.",1.5 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 01:00:00+00:00,2013-06-29 01:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up and made up tie-back torque tool. +Meanwhile drained riser.",0.5 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 01:30:00+00:00,2013-06-29 03:30:00+00:00,139.3,m,fixed,drilling -- casing,ok,success,"RIH with tie-back connector torque tool on 5 1/2"" DP. +Landed and engaged torque tool in tie-back adapter at 139,26 meter. +Made up tie-back connection to 13300 Nm, turned string 5 3/4 RH turns.",2.0 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 03:30:00+00:00,2013-06-29 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with tie-back connector torque tool on 5 1/2"" DP.",0.5 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 04:00:00+00:00,2013-06-29 05:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Rigged up handling equipment for 10 3/4"" tie-back casing. +Held toolbox talk.",1.25 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 05:15:00+00:00,2013-06-29 06:45:00+00:00,20.9,m,fixed,drilling -- casing,ok,success,"Picked up casing hanger landing string and RIH to top of casing hanger at 20,9 meter. +Engaged CHRT with 6 left hand turns.",1.5 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 06:45:00+00:00,2013-06-29 08:45:00+00:00,20.9,m,fixed,completion -- other,ok,success,"Performed pre-job meeting prior to test tie-back adapter. +Rigged up swedge and hose for tie-back connector test. +Flushed lines and tested lines to 345 bar for 5 minutes. +Pressure tested tie-back connector to 20 / 345 bar - 5 / 10 minutes. Pumped 466 liters, bled back 461 liters. +Rigged down swedge and hose.",2.0 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 08:45:00+00:00,2013-06-29 09:30:00+00:00,28.7,m,fixed,drilling -- casing,ok,success,"Picked up adjustable sub setting tool and RIH with same to 28,67 m",0.75 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 09:30:00+00:00,2013-06-29 10:00:00+00:00,28.7,m,fixed,drilling -- casing,ok,success,"Applied 133 bar, picked up 2 Ton, bleed off pressure. +Turned string 13 turns and picked up with 30 Ton overpull. Continued to turn untill 9000 Nm torque achieved. Total 14 1/4 turns. +Observed correct movement through annulus port on surface WH. +Final tension 30 Ton.",0.5 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 10:00:00+00:00,2013-06-29 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH with adjustable sub setting tool and racked back in derrick. +Changed to 10 3/4"" handling equipment. +Made up 10 3/4"" x 2002 weco swedge. +Pressure tested adjustable sub internal seal to 30 / 375 bar - 5 / 10 minutes. +Pumped 446 liters, bled back 446 liters. +Rigged down hose and swedge. +Disengaged CHRT with 6 right hand turns. +POOH with CHRT from 20,89 meter to surface. +Broke out and laid down CHRT to cantilever. +Rigged down 10 3/4"" casing handling equipment and rigged up for handling 5 1/2"" DP.",6.0 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 16:00:00+00:00,2013-06-29 18:15:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"Picked up 10 3/4"" MS-T seal assembly RT and made up same to 5 1/2"" DP double. +Connected hydraulic lines to RT and flushed through same. +Function tested 10 3/4"" MS-T seal assembly RT. +Installed MS-T seal on RT.",2.25 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 18:15:00+00:00,2013-06-29 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RIH with 10 3/4"" MS-T seal assembly and landed off at 20,86 meter. +Attempted to lock RT into riser. +Not able to lock RT into riser due to internal hydraulic leak i RT.",0.75 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 19:00:00+00:00,2013-06-29 21:00:00+00:00,20.9,m,fixed,interruption -- repair,ok,equipment failure,"POOH with 10 3/4"" MS-T seal assembly. +Picked up backup 10 3/4"" MS-T seal assembly RT and tested same hydraulically. +Verified RT measurements. +RIH with backup 10 3/4"" MS-T seal assembly and landed same at 20,86 meter.",2.0 +15_9_F_11_B_2013_06_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-29T00:00:00+02:00,2013-06-30T00:00:00+02:00,2013-06-29 21:00:00+00:00,2013-06-29 22:00:00+00:00,20.9,m,fixed,completion -- bop/wellhead equipment,ok,success,Sat MS-T seal assembly.,1.0 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-29 22:00:00+00:00,2013-06-29 23:15:00+00:00,20.9,m,fixed,drilling -- casing,ok,success,"Tested seal assembly to 345 bar - 10 minutes through multibowl test port. +POOH with 10 3/4"" MS-T seal assembly RT and laid down same.",1.25 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-29 23:15:00+00:00,2013-06-30 00:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Held toolbox talk. +Lined up to pressure test BOP connection and shear ram against Safe lock plug. +Performed pressure test to 30 / 345 bar - 5 / 10 minutes. +Pumped 553 liters, bled back 553 liters.",0.75 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 00:00:00+00:00,2013-06-30 01:00:00+00:00,20.5,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up bowl protector RT and made up same to 5 1/2"" DP. +RIH and installed bowl protector at 20,45 m.",1.0 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 01:00:00+00:00,2013-06-30 01:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,POOH with RT.,0.25 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 01:15:00+00:00,2013-06-30 05:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Rigged up, slipped and cut drill line. +Calibrated drawworks after slip and cut job. +Cleaned and cleared rig floor.",4.0 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 05:15:00+00:00,2013-06-30 05:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,Performed pre-job meeting prior to retrieve Safe Lock plug.,0.25 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 05:30:00+00:00,2013-06-30 08:45:00+00:00,611.0,m,fixed,completion -- other,ok,success,"Picked up Safe Lock plug RT and made up to 5 1/2"" DP. +RIH with Safe Lock plug RT on 5 1/2"" DP from surface to 611 m with restricted speed. +At 611 meter made up TDS and commenced washing down to 629 meter with 300 liter, 3 bar. +Increased flow rate to 2000 liter/min, 13 bar and displaced hi-pill out of well between 629 m - 621 m. +Decreased rate to 300 liter/min, 3-4 bar and washed back down to 629 meter. +Continued to wash down with 150 liter/min to top of plug at 631,6 m.",3.25 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 08:45:00+00:00,2013-06-30 09:45:00+00:00,631.0,m,fixed,completion -- other,ok,success,"Latched onto plug at 4. attempt. +Sat down 20 Ton on plug, rotated string 1/2 RH turn, took 15 Ton overpull. +Slacked off 2 Ton weight and applied 35 bar, observed pressure drop to 15 bar, bleed off pressure to 0 bar. +Took 2 ton overpull and rotated 24 right hand turns to release plug, pulled plug free up to 627 meter. +Performed flow check for 10 minutes, ok. +RIH to below plug setting point to ensure plug was retrieved and free, ok.",1.0 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 09:45:00+00:00,2013-06-30 12:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Held pre-job meeting prior to POOH. +POOH with Safe Lock plug on 5 1/2"" DP from 639 m to surface with restricted speed. +Inspected Safe Lock plug and RT, laid down same to cantilever.",2.5 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 12:15:00+00:00,2013-06-30 13:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Cleaned and cleared rigfloor. +Picked up bowl protector RT and made up same to 5 1/2"" DP. +RIH to 20,55 meter and attemped to retrieve bowl protector. +POOH with RT only. +Inspected RT and RIH to 20,55 meter and retrieved bowl protector. +POOH with bowl protector.",1.5 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 13:45:00+00:00,2013-06-30 17:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Pressure tested upper / lower IBOP's and kelly hose to 20 / 345 bar - 5 /10 minutes. + +Meanwhile: +Rigged up for running 7"" completion string.",3.25 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 17:00:00+00:00,2013-06-30 18:45:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting prior to rig up tubing equipment. +Changed to 7"" handling gear, BX elevators, installed rotator, adjusted link tilt function. +Made up kick stand and racked back in derrick. +Installed 7"" casing tong and tested same.",1.75 +15_9_F_11_B_2013_07_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-06-30T00:00:00+02:00,2013-07-01T00:00:00+02:00,2013-06-30 18:45:00+00:00,2013-06-30 22:00:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Installed Vario spider slips and tested same. +Rigged up cable drums on rigfloor and installed sheave for DHPG. +Prepared completion assembly #1 and #2 on deck.",3.25 +15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-06-30 22:00:00+00:00,2013-06-30 23:30:00+00:00,0.0,m,fixed,completion -- completion string,ok,success,"Rigged up cable drums on rigfloor and installed sheave for DHPG. +Prepared completion assembly #1 and #2 on deck. +Performed pre-job meeting with all involved personnel prior to run completion string.",1.5 +15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-06-30 23:30:00+00:00,2013-07-01 02:00:00+00:00,67.0,m,fixed,completion -- completion string,ok,success,"Picked up and RIH 7"" completion from surface to 67 meter. +Assembly #1 with 7"" perforated stem and mule shoe. +Assembly #2 with pre installed EVO plug and auto fill valve. +Assembly #3 with BOT Granite packer. +2 ea. plain 7"" tubing joints. +Assembly #4 with DHPG. +1 ea. plain 7"" tubing joint.",2.5 +15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-07-01 02:00:00+00:00,2013-07-01 03:45:00+00:00,67.0,m,fixed,completion -- completion string,ok,success,"Terminated cable to Down Hole Temperature and Pressure Gauge. +Function tested DHPG.",1.75 +15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-07-01 03:45:00+00:00,2013-07-01 18:30:00+00:00,715.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 67 m to 715 m +Average running speed 4 joints/hr. +Total rejected joints 2. +Observed trouble with belt on HTS.",14.75 +15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-07-01 18:30:00+00:00,2013-07-01 19:00:00+00:00,715.0,m,fixed,interruption -- maintain,ok,equipment failure,Troubleshoot on HTS belt sensor.,0.5 +15_9_F_11_B_2013_07_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-01T00:00:00+02:00,2013-07-02T00:00:00+02:00,2013-07-01 19:00:00+00:00,2013-07-01 22:00:00+00:00,913.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 715 m to 913 m +Average running speed 5,5 joints/hr. +Total rejected joints 2.",3.0 +15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-01 22:00:00+00:00,2013-07-02 00:00:00+00:00,971.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 913 m to 971 m +Average running speed 2 joints/hr. +Total rejected joints 2. +Observed hydraulic leak from elevator fitting.",2.0 +15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 00:00:00+00:00,2013-07-02 00:15:00+00:00,971.0,m,fixed,interruption -- maintain,ok,equipment failure,Replaced broken hydraulic fitting on elevator.,0.25 +15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 00:15:00+00:00,2013-07-02 05:00:00+00:00,1232.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 971 m to 1232 m +Average running speed 4,5 joints/hr. +Total rejected joints 3.",4.75 +15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 05:00:00+00:00,2013-07-02 05:45:00+00:00,1232.0,m,fixed,completion -- completion string,ok,success,"Held pre-job meeting. +Replaced tubing elevators to improve vertical alignment of tubing.",0.75 +15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 05:45:00+00:00,2013-07-02 12:00:00+00:00,1316.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1232 m to 1316 m +Average running speed 1 joints/hr. +Total rejected joints 9 +High pressure cleaned and re-doped all pins and boxes.",6.25 +15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 12:00:00+00:00,2013-07-02 15:30:00+00:00,1500.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1316 m to 1500 m +Average running speed 4,5 joints/hr. +Running speed reduced due continous alignment checking and optimizing. +Total rejected joints 0. + +Held pre-job meeting prior to adjust alignment on TDS.",3.5 +15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 15:30:00+00:00,2013-07-02 15:45:00+00:00,1500.0,m,fixed,completion -- other,ok,success,Adjusted TDS alignment.,0.25 +15_9_F_11_B_2013_07_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-02T00:00:00+02:00,2013-07-03T00:00:00+02:00,2013-07-02 15:45:00+00:00,2013-07-02 22:00:00+00:00,2035.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 1500 m to 2035 m +Average running speed 7 joints/hr. +Total rejected joints 0.",6.25 +15_9_F_11_B_2013_07_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-03T00:00:00+02:00,2013-07-04T00:00:00+02:00,2013-07-02 22:00:00+00:00,2013-07-03 09:15:00+00:00,2589.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 2035 m to 2589 m +Average running speed 4 joints/hr. +Total rejected joints 7.",11.25 +15_9_F_11_B_2013_07_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-03T00:00:00+02:00,2013-07-04T00:00:00+02:00,2013-07-03 09:15:00+00:00,2013-07-03 13:30:00+00:00,2612.0,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting prior to run DHSV. +Installed sheave for DHSV control line in PRS. +Picked up and made up assembly #5 DHSV and made up same to string. +RIH with completion string from 2589 m to 2595 m. +Installed and terminated DHSV control lines. +Tested DHSV control lines to 520 bar, bled back 370 ml. +Tested DHSV control lines to 345 bar and maintained DHSV open while contiue to RIH from 2595 m to 2612 m.",4.25 +15_9_F_11_B_2013_07_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-03T00:00:00+02:00,2013-07-04T00:00:00+02:00,2013-07-03 13:30:00+00:00,2013-07-03 17:00:00+00:00,2612.0,m,fixed,completion -- completion string,ok,success,"At 20,55 meter below rotary observed string taking 15 Ton weight. +Not able to enter centralizer on assembly #5 into 10 3/4"" casing in multi-bowl. +Picked up string. +Attempted to run through multi-bowl, still observing string taking weight. +Pulled out to inspect DHSV assembly for contact marks, no marks observed. +Observed rig not proper alignet above well.",3.5 +15_9_F_11_B_2013_07_04.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-03T00:00:00+02:00,2013-07-04T00:00:00+02:00,2013-07-03 17:00:00+00:00,2013-07-03 22:00:00+00:00,2612.0,m,fixed,completion -- other,ok,success,Prepared for skidding rig.,5.0 +15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-03 22:00:00+00:00,2013-07-03 23:30:00+00:00,2612.0,m,fixed,completion -- other,ok,success,"Prepared for skidding rig. +Held pre-job meeting prior to skid. +Skidded rig 15 cm forward. +Attempted to run through multi-bowl, still observing string taking weight. +Pulled out to inspect DHSV assembly for contact marks, no marks observed. +Ran back in with DHSV assembly, sat down 10 - 15 Ton weight on 10 3/4"" casing stump, passed through.",1.5 +15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-03 23:30:00+00:00,2013-07-04 03:00:00+00:00,2798.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 2612 m to 2798 m. +Average running speed 5 joints/hr. +Total rejected joints 0.",3.5 +15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 03:00:00+00:00,2013-07-04 03:30:00+00:00,2798.0,m,fixed,completion -- completion string,ok,success,Replaced elevator due to trouble with latch function.,0.5 +15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 03:30:00+00:00,2013-07-04 08:30:00+00:00,3066.0,m,fixed,completion -- completion string,ok,success,"RIH with 7"" tubing from 2798 m to 3066 m. +Average running speed 4,5 joints/hr.",5.0 +15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 08:30:00+00:00,2013-07-04 10:15:00+00:00,3066.0,m,fixed,completion -- completion string,ok,success,"Recorded up / down weights, 186 / 139 Ton. +Changed to 5 1/2"" DP elevators. +Rigged down sheaves for control lines. +Picked up pre-made DP landing stand and made up to tubing string. +Installed masterbushings and manual slips.",1.75 +15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 10:15:00+00:00,2013-07-04 12:30:00+00:00,3099.7,m,fixed,completion -- completion string,ok,success,"Performed pre-job meeting prior to RIH. +Washed down with 7"" tubing on 5 1/2"" DP from 3066 m to 3099,7 m at 150 liter/min, sat down 5 Ton on PBR no go. +Pulled back 4,5 meter out of PBR and increased rate to 220 liter/min. +Stung into PBR to confirm depth, observed small pressure peak when stinging in. +Continued to RIH and confirmed depth by setting down 5 Ton onto PBR no go at 3099,7 meter.",2.25 +15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 12:30:00+00:00,2013-07-04 17:00:00+00:00,3099.7,m,fixed,completion -- completion string,ok,success,"Picked up until weight observed. +Marked pipe. +POOH with 7"" tubing on 5 1/2"" DP. Strapped pipe while POOH. +Broke out landing string. +Replaced box on joint 14 due to poor threads. + +Meanwhile: +Prepared space out and picked up space out joints from cantilever.",4.5 +15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 17:00:00+00:00,2013-07-04 18:00:00+00:00,3075.7,m,fixed,completion -- completion string,ok,success,"Held pre-job meeting. +Made up two space out joints and RIH from 3099,7 m to 3075,7 m.",1.0 +15_9_F_11_B_2013_07_05.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-04T00:00:00+02:00,2013-07-05T00:00:00+02:00,2013-07-04 18:00:00+00:00,2013-07-04 22:00:00+00:00,3075.7,m,fixed,completion -- bop/wellhead equipment,ok,success,"Made up tubing hanger to space out joint. +Fed the control lines through hanger and terminated same.",4.0 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-04 22:00:00+00:00,2013-07-04 23:15:00+00:00,3075.7,m,fixed,completion -- bop/wellhead equipment,ok,success,"Leak tested all penetrations / fittings to 35 / 450 bar - 5 / 10 minutes, ok",1.25 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-04 23:15:00+00:00,2013-07-05 01:30:00+00:00,3075.7,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed C-plate and landed tubing in same. +Broke out handling tool. +Wrapped control and gauge lines 4 times around hanger neck.",2.25 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 01:30:00+00:00,2013-07-05 02:45:00+00:00,3075.7,m,fixed,completion -- bop/wellhead equipment,ok,success,"Connected lines to ports in communication collar. +Picked up and connected tubing hanger RT to hanger with 8 LH turns. +Connected DHSV control lines and tested same to 520 bar / 10 minutes. +Connected tubing hanger RT control lines to GE reel. +Left 520 bar in DHSV control line.",1.25 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 02:45:00+00:00,2013-07-05 05:30:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Picked up and made up landing joints to string. +RIH with hanger and landed same on 7"" landing string from 3075,7 m to 3098,20 m. 1,27 meter stick up. +Verified correct hanger land and seal integrity by testing to 70 bar - 5 min through ports on multi-bowl. +Engaged tubing hanger lock down ring. +Performed pull test to 15 Ton overpull, ok. + +Meanwhile drained riser.",2.75 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 05:30:00+00:00,2013-07-05 06:00:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested liner hanger seal to 35 / 345 bar - 5 / 10 min. +Opened DHSV.",0.5 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 06:00:00+00:00,2013-07-05 08:00:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged up swedge and cement hose, tested same to 345 bar - 10 min.",2.0 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 08:00:00+00:00,2013-07-05 08:15:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,Dropped ball.,0.25 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 08:15:00+00:00,2013-07-05 08:45:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Circulated ball down with 3500 liter/min, 32 bar, pressure increased to 70 bar at landing. +Held 70 bar pressure for 5 min to check integrity.",0.5 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 08:45:00+00:00,2013-07-05 12:15:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Increased pressure to 345 bar and held same for 30 minutes to set packer. +Meanwhile observed vent line on annulus A. +Bled pressure down to 280 bar. +Closed DHSV +Bled pressure down to 210 bar and performed low pressure inflow test, 70 bar, 30 min. +Bled pressure down to 10 bar and performed high pressure inflow test, 280 bar, 10 min. +Bled pressure back to 0 bar and opened DHSV.",3.5 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 12:15:00+00:00,2013-07-05 13:30:00+00:00,3098.2,m,fixed,completion -- bop/wellhead equipment,ok,success,"Lined up and tested connection from cement unit to A annulus. +Performed pressure test of production packer though A annulus to 35 / 345 bar, 5 / 10 min.",1.25 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 13:30:00+00:00,2013-07-05 14:45:00+00:00,3098.2,m,fixed,completion -- other,ok,success,"Held pre-job meeting prior to rig up wireline equipment. +Rigged up wireline sheaves and equipment. +Made up wireline tool string.",1.25 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 14:45:00+00:00,2013-07-05 20:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"RIH with wireline tool string and retrieved EVO plug. +While POOH observed stuck EVO plug inside DHG mandrel, jarred twice and continued to POOH to surface. +Laid out EVO plug and wireline tool string. +Rigged down wireline sheaves and equipment.",5.75 +15_9_F_11_B_2013_07_06.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-05T00:00:00+02:00,2013-07-06T00:00:00+02:00,2013-07-05 20:30:00+00:00,2013-07-05 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested line up from cement unit to drill floor to 355 bar -10 minutes. +Pressure tested production packer from below to 345 bar- 30 minutes.",1.5 +15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-05 22:00:00+00:00,2013-07-05 22:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Pressure tested production packer from below to 345 bar- 30 minutes. +Rigged down surface lines. +Closed DHSV.",0.75 +15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-05 22:45:00+00:00,2013-07-06 00:15:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting. +Disconnected tubing hanger RT by rotating 9 turns clockwise. +POOH with 7"" landing string and tubing hanger, laid out same.",1.5 +15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 00:15:00+00:00,2013-07-06 02:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Rigged down tubing handling equipment. +Cleaned and cleared rigfloor.",2.25 +15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 02:30:00+00:00,2013-07-06 04:15:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Rigged up handling equipment for 3 1/2"" DP. +Picked up and RIH with 6 3/8"" k-type BPV on 3 1/2"" DP. +Installed BPV and POOH with RT, laid out same.",1.75 +15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 04:15:00+00:00,2013-07-06 10:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Performed pre-job meeting prior to nipple down BOP. +Rigged up handling equipment for nipple job on rigfloor. +Nippled down diverter, pulled same to rigfloor and secured. +Removed riser tension cylinders. +Disconnected BOP from HP riser and skidded same to stump. +Pulled riser to rigfloor.",6.25 +15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 10:30:00+00:00,2013-07-06 15:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Terminated contol lines on wellhead + +Meanwhile: +Laid out HP riser onto HTS. +Prepared spacer spool.",5.0 +15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 15:30:00+00:00,2013-07-06 19:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Run down with spacer spool and landed same on multi-bowl. +Made up spacer spool and tested same. + +Meanwhile transportet scaffolding equipment up in derrick.",4.0 +15_9_F_11_B_2013_07_07.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-06T00:00:00+02:00,2013-07-07T00:00:00+02:00,2013-07-06 19:30:00+00:00,2013-07-06 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed A annulus test hose from wellhead deck. +Installed split hatches onto riser on tensioner deck. +Removed hatch from F-11. +Transferred XMT from overhead crane TDS. +Not able to run XMT through hatch.",2.5 +15_9_F_11_B_2013_07_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-07T00:00:00+02:00,2013-07-08T00:00:00+02:00,2013-07-06 22:00:00+00:00,2013-07-06 23:30:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,Removed Hatch from F-6.,1.5 +15_9_F_11_B_2013_07_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-07T00:00:00+02:00,2013-07-08T00:00:00+02:00,2013-07-06 23:30:00+00:00,2013-07-07 00:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Ran down and landed XMT onto spool. +Orientation veryfied by laser. +Made up XMT to spool piece. +Removed XMT lift cap and installed test cap.",1.25 +15_9_F_11_B_2013_07_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-07T00:00:00+02:00,2013-07-08T00:00:00+02:00,2013-07-07 00:45:00+00:00,2013-07-07 14:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Installed hatches on well F-11 and F-6. +Performed termination of control system and flowlines on XMT. + +Meanwhile: +Replaced drill line guide. +Replaced HTS belt. +Changed out brake on TDS. +Worked with installation of new flowline valve in shaker house. + +At 16:00 hrs handed over the well to Maersk Production.",13.25 +15_9_F_11_B_2013_07_08.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-07T00:00:00+02:00,2013-07-08T00:00:00+02:00,2013-07-07 14:00:00+00:00,2013-07-07 22:00:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Erected scaffolding in derrick to enable access to aft PRS. +Worked with installation of new flowline valve in shaker house. + +Meanwhile: +Performed termination of control system and flowlines on XMT.",8.0 +15_9_F_11_B_2013_07_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-08T00:00:00+02:00,2013-07-09T00:00:00+02:00,2013-07-07 22:00:00+00:00,2013-07-08 14:30:00+00:00,0.0,m,fixed,completion -- other,ok,success,"Erected scaffolding in derrick to enable access to aft PRS. +Replaced junction box aft PRS. +Performed planned maintenance on TDS and BOP. +Prepared to rig up wireline equipment. + +Meanwhile: +Performed termination of control system and flowlines on XMT. + +At 16:30 hrs the well was handed back from Maersk Production.",16.5 +15_9_F_11_B_2013_07_09.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-08T00:00:00+02:00,2013-07-09T00:00:00+02:00,2013-07-08 14:30:00+00:00,2013-07-08 22:00:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Held pre-job meeting. +Pressure tested XMT body and associated valves to 35 / 345 bar - 5 / 10 minutes.",7.5 +15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-08 22:00:00+00:00,2013-07-08 22:45:00+00:00,0.0,m,fixed,completion -- bop/wellhead equipment,ok,success,"Removed XMT cap. +RIH with BPV RT on tugger from rigfloor. +Retrieved 6 3/8"" BPV and POOH with same.",0.75 +15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-08 22:45:00+00:00,2013-07-09 05:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Removed F-11 hatch +Rigged up wireline BOP, riser and lubricator.",6.25 +15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-09 05:00:00+00:00,2013-07-09 08:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Held pre-job meeting. +Filled riser with 100% MEG. +Leak tested WL rig up to 30 / 200 bar - 5 / 10 min using cement pump. +Function tested WL BOP. +Connected hoses to lubricator and grease injector head. +Mounted slings and sheaves in TDS",3.0 +15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-09 08:00:00+00:00,2013-07-09 11:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,Performed test between tractor and WL interface.,3.25 +15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-09 11:15:00+00:00,2013-07-09 13:15:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Rigged up lower sheave. +Connected tractor to wireline. +Stabbed lubricator section onto riser. +Pressure tested WL rig up with tractor only to 30 / 200 bar - 5 / 10 min using cement pump. +Drained lubricator and broke out same.",2.0 +15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-09 13:15:00+00:00,2013-07-09 20:00:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,"Performed pre-job meeting prior to handling of toolstring. +Made up WL toolstring with guns and RIH. ( Tool length: 29.86m, MAX OD:4.5 in, Tool Weight:1157.65 kg) +Armed the guns. +Stabbed lubricator. +Pressure tested In-situ sub to 30 / 200 bar - 5 / 10 min.",6.75 +15_9_F_11_B_2013_07_10.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-09T00:00:00+02:00,2013-07-10T00:00:00+02:00,2013-07-09 20:00:00+00:00,2013-07-09 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Opened well according to procedure. +WHP: 80bar",2.0 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-09 22:00:00+00:00,2013-07-10 04:00:00+00:00,3700.0,m,wire line,completion -- perforate,ok,success,"RIH with perforate BHA #1 on WL tractor from surface to 3700 meter. +Not able to pass 3700 meter with string. +Push with 1000 lbs with tractor. +Simulations predicted 400 lbs push.",6.0 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 04:00:00+00:00,2013-07-10 05:30:00+00:00,3666.0,m,wire line,completion -- perforate,ok,success,Evaluated situation. Discussed situation with onshore organisation.,1.5 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 05:30:00+00:00,2013-07-10 06:15:00+00:00,3570.0,m,wire line,completion -- perforate,ok,success,Held TBT. POOH with BHA # 1 from 3700 m to 3570 m and tested tractor.,0.75 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 06:15:00+00:00,2013-07-10 07:45:00+00:00,3919.0,m,wire line,completion -- perforate,ok,success,RIH with BHA # 1 on WL tractor from 3570 m and passed restriction at 3700 m. RIH to 3919 m. Unable to communicate with tractor.,1.5 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 07:45:00+00:00,2013-07-10 08:30:00+00:00,3919.0,m,wire line,interruption -- other,ok,equipment failure,"Trouble shoot communication failure, No Go. Discussed situation with onshore organisation",0.75 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 08:30:00+00:00,2013-07-10 11:15:00+00:00,250.0,m,wire line,interruption -- other,ok,equipment failure,POOH with BHA # 1 from 3919 m to 250 m.,2.75 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 11:15:00+00:00,2013-07-10 12:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Held TBT. POOH with BHA # 1 from 250 m to surface.,0.75 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 12:00:00+00:00,2013-07-10 15:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed in well. Drained and broke lubricator. Broke down tool string and L/O same.,3.25 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 15:15:00+00:00,2013-07-10 17:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Checked wire line tools and cable. +Meanwhile: Checked tractor and found communication failure due to possible short circuit.",1.75 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 17:00:00+00:00,2013-07-10 19:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Held TBT. P/U and M/U BHA # 1RR. Stabbed lubricator on In-Situ Sub.,2.25 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 19:15:00+00:00,2013-07-10 19:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Pressure tested In-Situ Sub to 30/200 bar for 5/10 min.,0.25 +15_9_F_11_B_2013_07_11.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-10T00:00:00+02:00,2013-07-11T00:00:00+02:00,2013-07-10 19:30:00+00:00,2013-07-10 22:00:00+00:00,3471.0,m,wire line,interruption -- other,ok,equipment failure,"Opened well and RIH with BHA #1RR on WL from surface to 3471 m (Tool length: 29.86m, MAX OD:4.5 in, Tool Weight:1157.65 kg) +WHP: 80 bar",2.5 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-10 22:00:00+00:00,2013-07-10 22:30:00+00:00,3700.0,m,wire line,interruption -- other,ok,equipment failure,RIH with BHA # 1RR from 3470 m to 3592 m.,0.5 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-10 22:30:00+00:00,2013-07-10 22:45:00+00:00,3700.0,m,wire line,interruption -- other,ok,equipment failure,Engaged tractor and RIH with BHA # 1RR from 3592 m to 3700 m. .,0.25 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-10 22:45:00+00:00,2013-07-11 01:00:00+00:00,3700.0,m,wire line,interruption -- other,ok,equipment failure,Unable to pass restriction at 3700 m . Attempted to work passed restriction from 3660 m to 3700 m.,2.25 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 01:00:00+00:00,2013-07-11 02:15:00+00:00,3750.0,m,wire line,interruption -- other,ok,equipment failure,Pulled back to 3300 m. RIH with BHA # 1RR on wireline from 3300 m to 3557 m. Engaged tractor and RIH with BHA # 1RR on WL tractor from 3557 m to 3750 m. Performed pick-up test and confirmed tool depth.,1.25 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 02:15:00+00:00,2013-07-11 03:15:00+00:00,3919.0,m,wire line,interruption -- other,ok,equipment failure,RIH with BHA # 1RR on WL tractor from 3750 m to 3919 m,1.0 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 03:15:00+00:00,2013-07-11 05:00:00+00:00,4570.0,m,wire line,completion -- perforate,ok,success,RIH with BHA # 1RR on WL tractor from 3919 m to 4570 m,1.75 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 05:00:00+00:00,2013-07-11 10:00:00+00:00,3900.0,m,wire line,completion -- perforate,ok,success,Performed correlation run from 4570 m to 3900 m. Observed wireline jumped spool grove.,5.0 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 10:00:00+00:00,2013-07-11 10:45:00+00:00,4160.0,m,wire line,interruption -- other,ok,equipment failure,Payed out wireline and Re-spooled to 4160 m.,0.75 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 10:45:00+00:00,2013-07-11 12:15:00+00:00,4580.0,m,wire line,completion -- perforate,ok,success,Performed correlation run from 4160 m to 4580 m,1.5 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 12:15:00+00:00,2013-07-11 12:30:00+00:00,4539.0,m,wire line,completion -- perforate,ok,success,"Bleed off well head pressure from 80 bar to 39 bar. Positioned guns at perforating interval # 1 between 4539 m to 4527 m and fired guns, Good indication of guns fired. Well head pressure stabilized at 34.7 bar.",0.25 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 12:30:00+00:00,2013-07-11 16:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforating BHA # 1RR from 4539 m to surface. Observed wireline cable released from tool.,3.75 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 16:15:00+00:00,2013-07-11 16:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed in well on swap valve and hydraulic master valve [HMV],0.25 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 16:30:00+00:00,2013-07-11 17:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Evaluated situation and formulated plan forward.,0.5 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 17:00:00+00:00,2013-07-11 18:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Inflow tested HMV with 5 bar for 10 min and purged lubricator with nitrogen.,1.5 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 18:30:00+00:00,2013-07-11 20:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke lubricator connection and secured perforating BHA # 1RR with C-plate. Picked-up and verified guns fired. Broke connection above guns and secured tool string inside lubricator and L/O same.,2.0 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 20:30:00+00:00,2013-07-11 21:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH with gun assembly and L/O same.,1.0 +15_9_F_11_B_2013_07_12.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-11T00:00:00+02:00,2013-07-12T00:00:00+02:00,2013-07-11 21:30:00+00:00,2013-07-11 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Checked equipment and cleared rig floor,0.5 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-11 22:00:00+00:00,2013-07-12 01:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Builed cablehead and function tested wireline tractor.,3.0 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 01:00:00+00:00,2013-07-12 02:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,R/U wireline sheave. Tested interface between wireline tractor and logging tools Voltage Protection Module and Casing Collar Locator.,1.5 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 02:30:00+00:00,2013-07-12 03:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Held TBT. P/U lubricator and wireline sheave.,0.5 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 03:00:00+00:00,2013-07-12 04:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"P/U and M/U wireline tractor to cablehead. M/U lubricator and tested tractor communication. +Pressure tested In-situ sub to 30/200 bar, 5/10 min.",1.0 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 04:00:00+00:00,2013-07-12 05:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Displaced lubricator and pressure tested same to 30/345 bar for 5/10 min.,1.0 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 05:00:00+00:00,2013-07-12 08:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Held TBT. Bleed off pressure and broke out lubricator. P/U and M/U perforation gun assembly #2.,3.75 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 08:45:00+00:00,2013-07-12 09:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/345 bar for 5/10 min.,0.5 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 09:15:00+00:00,2013-07-12 09:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Equalized wellhead pressure to 35 bar and opened well.,0.25 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 09:30:00+00:00,2013-07-12 12:30:00+00:00,3360.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation BHA # 2 on wireline from surface to 3360 m. (Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg) +WHP:34.7 bar",3.0 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 12:30:00+00:00,2013-07-12 14:30:00+00:00,4564.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 2 on wireline tractor from 3360 m to 4564 m.,2.0 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 14:30:00+00:00,2013-07-12 17:00:00+00:00,4500.0,m,wire line,completion -- perforate,ok,success,Correlated across perforation interval and positioned gun with top shot at 4500 m . WHP 33 bar.,2.5 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 17:00:00+00:00,2013-07-12 17:15:00+00:00,4500.0,m,wire line,completion -- perforate,ok,success,Perforated interval from 4488 m to 4500 m. Wellhead pressure stabilized at 35 bar.,0.25 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 17:15:00+00:00,2013-07-12 21:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"POOH with perforation BHA # 2 on wireline from 4500 m to surface. Closed well, inflow tested and bleed down to 0 bar.",3.75 +15_9_F_11_B_2013_07_13.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-12T00:00:00+02:00,2013-07-13T00:00:00+02:00,2013-07-12 21:00:00+00:00,2013-07-12 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Held TBT. Broke lubricator and L/O guns.,1.0 +15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-12 22:00:00+00:00,2013-07-12 23:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,B/O and L/O perforation BHA # 2. Layed out wireline and cut same at cablehead.,1.5 +15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-12 23:30:00+00:00,2013-07-13 01:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Re-Build cablehead and prepared guns for perforation run # 3.,1.5 +15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 01:00:00+00:00,2013-07-13 02:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Tested interface between wireline tractor and logging tools Voltage Protection Module and Casing Collar Locator.,1.5 +15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 02:30:00+00:00,2013-07-13 04:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Held TBT. P/U and M/U perforation BHA # 3. M/U lubricator and tested In-Situ Sub to 30/200 bar for 5/10 min. +(Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg)",1.5 +15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 04:00:00+00:00,2013-07-13 09:15:00+00:00,4420.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 3 from surface to 4420 m.,5.25 +15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 09:15:00+00:00,2013-07-13 10:15:00+00:00,4420.0,m,wire line,completion -- perforate,ok,success,Attempted to correlate gun position for perforation interval # 3. Lost communication with perforation BHA # 3.,1.0 +15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 10:15:00+00:00,2013-07-13 15:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH to surface. Closed-in well and inflow tested same. bleed off wellhead pressure to 0 bar and broke out lubricator.,5.5 +15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 15:45:00+00:00,2013-07-13 18:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,L/D BHA on cantiliver deck and troubleshoot communication failure. Communication failure identified in cablehead.,2.5 +15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 18:15:00+00:00,2013-07-13 21:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Build new cablehead and tested tools.,2.75 +15_9_F_11_B_2013_07_14.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-13T00:00:00+02:00,2013-07-14T00:00:00+02:00,2013-07-13 21:00:00+00:00,2013-07-13 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,P/U and M/U perforation BHA # 3RR.,1.0 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-13 22:00:00+00:00,2013-07-13 22:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,M/U lubricator and tested In-Situ Sub to 30/200 bar for 5/10 min.,0.5 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-13 22:30:00+00:00,2013-07-14 01:00:00+00:00,3470.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with perforation BHA # 3RR on wireline from surface to 3470 m. WHP 37 bar. +(Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg)",2.5 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 01:00:00+00:00,2013-07-14 03:30:00+00:00,4450.0,m,wire line,interruption -- other,ok,equipment failure,RIH with perforation BHA # 3RR on wireline tractor from 3470 m to 4450 m.,2.5 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 03:30:00+00:00,2013-07-14 06:45:00+00:00,4450.0,m,wire line,completion -- perforate,ok,success,"Correlated across perforation interval # 3 and positioned guns. +WHP: 39 bar",3.25 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 06:45:00+00:00,2013-07-14 07:00:00+00:00,4367.0,m,wire line,completion -- perforate,ok,success,Perforated interval # 3 from 4355 m to 4367 m. WHP stabilized at 39 bar.,0.25 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 07:00:00+00:00,2013-07-14 10:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 3RR from 4367 m to surface.,3.25 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 10:15:00+00:00,2013-07-14 11:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Held TBT. Closed-in well and inflow tested same. Bleed down pressure to 0 bar and broke out lubricator.,1.5 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 11:45:00+00:00,2013-07-14 13:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,L/O perforation BHA # 3RR.,1.75 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 13:30:00+00:00,2013-07-14 16:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Re-build cablehead and tested tools.,2.5 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 16:00:00+00:00,2013-07-14 18:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Held TBT. P/U and M/U perforation BHA # 4 +(Tool length: 27.01m, MAX OD: 4.5in, Tool Weight: 974.65 kg)",2.0 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 18:00:00+00:00,2013-07-14 18:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/200 bar for 5/10 min. Eqaulized pressure and opened well.,0.5 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 18:30:00+00:00,2013-07-14 21:00:00+00:00,3390.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 4 on wireline from surface to 3390 m. WHP 42 bar,2.5 +15_9_F_11_B_2013_07_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-14T00:00:00+02:00,2013-07-15T00:00:00+02:00,2013-07-14 21:00:00+00:00,2013-07-14 22:00:00+00:00,3825.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 4 on wireline tractor from 3390 m to 3825 m.,1.0 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-14 22:00:00+00:00,2013-07-14 23:30:00+00:00,4470.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 4 on wireline tractor from 3825 m to 4470 m.,1.5 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-14 23:30:00+00:00,2013-07-14 23:45:00+00:00,4450.0,m,wire line,completion -- perforate,ok,success,Attempted to correlate across interval # 4 from 4470 m. Lost communication with tool string at 4450 m.,0.25 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-14 23:45:00+00:00,2013-07-15 03:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH with perforation BHA # 4 on wireline from 4450 m to surface. WHP 42 bar.,3.75 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 03:30:00+00:00,2013-07-15 04:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed-in well and inflow tested same. Bleed down pressure to 0 bar.,1.0 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 04:30:00+00:00,2013-07-15 06:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Broke out lubrictor and L/O tools. +Wireline logging computer blacked out at 07:30 hrs.",2.25 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 06:45:00+00:00,2013-07-15 09:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Cut wireline and L/D lubricator. R/D wireline wench and prepared to R/U back-up wench.,3.0 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 09:45:00+00:00,2013-07-15 10:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Spudded back-up wench on cantilever.,0.25 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 10:00:00+00:00,2013-07-15 13:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Hooked-up and tested wireline unit. +Installed new logging computer.",3.5 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 13:30:00+00:00,2013-07-15 16:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Attempted to test wireline caple, No Go. Slipped and cut 200m sections untill good test. Slipped and cut 800 m wireline and achieved good test.",2.5 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 16:00:00+00:00,2013-07-15 18:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Build cablehead and P/U lubricator.,2.5 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 18:30:00+00:00,2013-07-15 20:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,P/U and M/U wireline tractor to cablehead. Tested tractor communication and M/U lubricator.,1.75 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 20:15:00+00:00,2013-07-15 21:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Pressure tested In-situ sub to 30/200 bar, 5/10 min. Displaced lubricator and pressure tested same to 30/345 bar for 5/10 min.",1.25 +15_9_F_11_B_2013_07_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-15T00:00:00+02:00,2013-07-16T00:00:00+02:00,2013-07-15 21:30:00+00:00,2013-07-15 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Bleed off pressure and broke out lubricator. P/U and M/U perforation BHA # 4RR.,0.5 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-15 22:00:00+00:00,2013-07-15 23:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"P/U and M/U perforation BHA # 4RR. M/U lubricator and tested In-situ Sub to 30/300 bar for 5/10 min. +(Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg)",1.0 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-15 23:00:00+00:00,2013-07-16 01:45:00+00:00,3400.0,m,wire line,interruption -- other,ok,equipment failure,RIH with perforation BHA # 4RR on wireline from surface to 3400 m. WHP 47 bar,2.75 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 01:45:00+00:00,2013-07-16 02:30:00+00:00,3670.0,m,wire line,interruption -- other,ok,equipment failure,RIH with perforation BHA # 4RR on wireline tractor from 3400 m to 3670 m.,0.75 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 02:30:00+00:00,2013-07-16 08:00:00+00:00,3921.0,m,wire line,interruption -- other,ok,equipment failure,Worked assembly from 3670 m to 3921 m. Unable to pass 3921 m.,5.5 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 08:00:00+00:00,2013-07-16 10:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH from 3921 m to surface.,2.5 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 10:30:00+00:00,2013-07-16 13:45:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed and inflow tested well. Broke lubricator and L/O BHA # 4RR.,3.25 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 13:45:00+00:00,2013-07-16 18:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"L/D lubricator and changed greasehead. R/U wireline, build caplehead and tested tools.",4.5 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 18:15:00+00:00,2013-07-16 20:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,P/U and M/U wireline tractor and lubricator. Pressure tested In-Situ Sub to 30/300 bar for 5/10 min and Lubricator to 30/345 bar for 5/10 min.,1.75 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 20:00:00+00:00,2013-07-16 20:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Broke out lubricator. P/U perforation guns and M/U perforation BHA # 4RR2,0.5 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 20:30:00+00:00,2013-07-16 21:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,M/U lubricator and tested In-Situ Sub to 30/300 bar for 5/10 min. Eqaulized pressure and opened well.,0.5 +15_9_F_11_B_2013_07_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-16T00:00:00+02:00,2013-07-17T00:00:00+02:00,2013-07-16 21:00:00+00:00,2013-07-16 22:00:00+00:00,500.0,m,wire line,interruption -- other,ok,equipment failure,RIH perforation BHA # 4RR2 from surface to 500 m.,1.0 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-16 22:00:00+00:00,2013-07-16 23:45:00+00:00,3332.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with perforation BHA # 4RR2 on wireline from 500 m to 3332 m. Attempted to function Voltage Protection Module to engage tractor, No Go.",1.75 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-16 23:45:00+00:00,2013-07-17 01:00:00+00:00,3332.0,m,wire line,interruption -- other,ok,equipment failure,"Attempted to troubleshoot communication failure, No Go.",1.25 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 01:00:00+00:00,2013-07-17 03:30:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,POOH with perforation BHA # 4RR2 on wireline from 3332 m to surface.,2.5 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 03:30:00+00:00,2013-07-17 06:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,Closed and inflow tested Swab and Hydraulic master valves with 46 bar differential pressure. Broke out lubricator and L/O tools.,2.5 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 06:00:00+00:00,2013-07-17 09:00:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"Troubleshoot tool failure. Build new cablehead and changed out Voltage Protection Moule, Power Track Advanced, swivel and tractor",3.0 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 09:00:00+00:00,2013-07-17 11:15:00+00:00,0.0,m,wire line,interruption -- other,ok,equipment failure,"P/U tractor assembly and lubricator. M/U lubricator and tested tools. Eqaulized pressure and opened well. +(Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg) +WHP: 51 bar",2.25 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 11:15:00+00:00,2013-07-17 14:00:00+00:00,3350.0,m,wire line,interruption -- other,ok,equipment failure,"RIH with perforation BHA # 4RR3 on wireline from surface to 3350 m. +Tools tested at 250 m.",2.75 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 14:00:00+00:00,2013-07-17 17:00:00+00:00,4040.0,m,wire line,interruption -- other,ok,equipment failure,RIH with perforation BHA # 4RR3 on wireline tractor from 3350 m to 4040 m.,3.0 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 17:00:00+00:00,2013-07-17 18:15:00+00:00,4316.0,m,wire line,interruption -- other,ok,equipment failure,Correlated and positioned gun assembly at perforation interval # 4 from 4304 m to 4316 m. WHP 51 bar,1.25 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 18:15:00+00:00,2013-07-17 18:30:00+00:00,4316.0,m,wire line,completion -- perforate,ok,success,"Perforated interval # 4 from 4304 m to 4316 m, good indication of guns fired. +51 bar WHP before and after perforation.",0.25 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 18:30:00+00:00,2013-07-17 21:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 4RR3 from 4316 m to surface. WHP 52 bar,2.75 +15_9_F_11_B_2013_07_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-17T00:00:00+02:00,2013-07-18T00:00:00+02:00,2013-07-17 21:15:00+00:00,2013-07-17 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed and inflow tested Swab and Hydraulic master valves with 47 bar differential pressure.,0.75 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-17 22:00:00+00:00,2013-07-17 22:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Bleed down pressure to 0 bar and broke out lubricator.,0.5 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-17 22:30:00+00:00,2013-07-18 00:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,L/O perforation BHA # 4RR3 and L/D lubricator,1.5 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 00:00:00+00:00,2013-07-18 03:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Re-build cablehead and tested tools. +Meanwhile removed topdrive pipe handler for service.",3.0 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 03:00:00+00:00,2013-07-18 05:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U lubricator and M/U perforation BHA # 5.,2.25 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 05:15:00+00:00,2013-07-18 06:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/300 bar for 5/10 min. Eqaulized pressure and opened well.,0.75 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 06:00:00+00:00,2013-07-18 08:30:00+00:00,3377.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation BHA # 5 on wireline from surface to 3377 m. +(Tool length: 27.01m, MAX OD: 4.5in, Tool Weight: 974.65 kg)",2.5 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 08:30:00+00:00,2013-07-18 10:30:00+00:00,4305.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 5 on wireline tractor from 3377 m to 4305 m.,2.0 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 10:30:00+00:00,2013-07-18 12:15:00+00:00,4295.0,m,wire line,completion -- perforate,ok,success,"Correlated and postioned gun assembly at perforation interval # 5 from 4295 m to 4286 m. +WHP: 53.6 bar before and after perforation",1.75 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 12:15:00+00:00,2013-07-18 12:30:00+00:00,4295.0,m,wire line,completion -- perforate,ok,success,"Perforated interval # 5, good indication of guns fired.",0.25 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 12:30:00+00:00,2013-07-18 15:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 5 from 4295 m to surface.,3.0 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 15:30:00+00:00,2013-07-18 18:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed and inflow tested HMV/SWAB valve. Broke out lubricator and L/O perforation BHA # 5.,3.25 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 18:45:00+00:00,2013-07-18 21:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,"Re-biuld cablehead and tested tools. +Meanwhile: Removed washpipe and checked bolts on topdrive main chaft bearing retainer.",2.5 +15_9_F_11_B_2013_07_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-18T00:00:00+02:00,2013-07-19T00:00:00+02:00,2013-07-18 21:15:00+00:00,2013-07-18 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U lubricator and perforation BHA # 6.,0.75 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-18 22:00:00+00:00,2013-07-19 00:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U perforation BHA # 6.,2.0 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 00:00:00+00:00,2013-07-19 01:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/300 bar for 5/10 min. Eqaulized pressure and opened well. WHP 55 bar.,1.0 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 01:00:00+00:00,2013-07-19 03:45:00+00:00,3400.0,m,wire line,completion -- perforate,ok,success,"RIH with perforation BHA # 6 on wireline from surface to 3400 m +(Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg) +WHP: 56 bar",2.75 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 03:45:00+00:00,2013-07-19 06:15:00+00:00,4325.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 6 on wireline tractor from 3400 m to 4325 m.,2.5 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 06:15:00+00:00,2013-07-19 08:00:00+00:00,4280.0,m,wire line,completion -- perforate,ok,success,Correlated across interval # 6 from 4280 m to 4268 m and positioned guns.,1.75 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 08:00:00+00:00,2013-07-19 08:15:00+00:00,4280.0,m,wire line,completion -- perforate,ok,success,"Perforated interval # 6 from 4268 m to 4280 m, good indication of guns fired.",0.25 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 08:15:00+00:00,2013-07-19 11:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 6 from 4280 m to surface. WHP 56 bar.,3.25 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 11:30:00+00:00,2013-07-19 12:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed and inflow tested HMV/SWAB valve with 51 bar differential pressure.,0.5 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 12:00:00+00:00,2013-07-19 14:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke out lubricator and L/O perforation BHA # 6.,2.25 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 14:15:00+00:00,2013-07-19 16:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Re-build cablehead and tested tools prior to P/U perforation BHA # 7.,2.25 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 16:30:00+00:00,2013-07-19 18:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U and M/U perforation BHA # 7,2.0 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 18:30:00+00:00,2013-07-19 19:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/300 bar for 5/10 min.,0.5 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 19:00:00+00:00,2013-07-19 21:30:00+00:00,3529.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 7 on wireline from surface to 3529 m.,2.5 +15_9_F_11_B_2013_07_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-19T00:00:00+02:00,2013-07-20T00:00:00+02:00,2013-07-19 21:30:00+00:00,2013-07-19 22:00:00+00:00,3693.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 7 on wireline tractor from 3529 m to 3693 m.,0.5 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-19 22:00:00+00:00,2013-07-19 23:00:00+00:00,4130.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 7 on wireline tractor from 3693 m to 4130 m,1.0 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-19 23:00:00+00:00,2013-07-20 01:45:00+00:00,4075.0,m,wire line,completion -- perforate,ok,success,Correlated and positioned gun assembly at perforation interval # 7 from 4075 m to 4065 m. WHP 57.5 bar,2.75 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 01:45:00+00:00,2013-07-20 02:00:00+00:00,4075.0,m,wire line,completion -- perforate,ok,success,"Perforated interval # 7, good indication of guns fired. WHP 58.1 bar + (Tool length: 30.85m, MAX OD:4.5 in, Tool Weight: 1184.65 kg)",0.25 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 02:00:00+00:00,2013-07-20 05:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 7 from 4075 m to Surface. WHP 59 bar.,3.25 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 05:15:00+00:00,2013-07-20 06:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Closed and inflow tested HMV/SWAB valve with 54 bar differential pressure.,1.5 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 06:45:00+00:00,2013-07-20 08:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Broke out lubricator and L/O perforation BHA # 7.,1.75 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 08:30:00+00:00,2013-07-20 09:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Re-build cablehead and tested tools.,1.0 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 09:30:00+00:00,2013-07-20 11:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,P/U and M/U perforation BHA # 8.,2.0 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 11:30:00+00:00,2013-07-20 12:30:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,M/U lubricator and pressure tested In-Situ Sub to 30/300 bar for 5/10 min. Eqaulized pressure and opened well. WHP 59 bar.,1.0 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 12:30:00+00:00,2013-07-20 17:00:00+00:00,4095.0,m,wire line,completion -- perforate,ok,success,RIH with perforation BHA # 8 from surface to 4095 m,4.5 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 17:00:00+00:00,2013-07-20 18:15:00+00:00,4043.0,m,wire line,completion -- perforate,ok,success,Correlated and positioned gun assembly at perforation interval # 8.,1.25 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 18:15:00+00:00,2013-07-20 18:30:00+00:00,4043.0,m,wire line,completion -- perforate,ok,success,Perforated interval # 8 from 4043 m to 4031 m.,0.25 +15_9_F_11_B_2013_07_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-20T00:00:00+02:00,2013-07-21T00:00:00+02:00,2013-07-20 18:30:00+00:00,2013-07-20 22:00:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,POOH with perforation BHA # 8 from 4043 m to surface. WHP 59 bar.,3.5 +15_9_F_11_B_2013_07_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-21T00:00:00+02:00,2013-07-22T00:00:00+02:00,2013-07-20 22:00:00+00:00,2013-07-20 23:45:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Inflow tested surface controlled subsea safety valve for 30 min and hydraulic master valve for 10 min with 56 bar differential.,1.75 +15_9_F_11_B_2013_07_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-21T00:00:00+02:00,2013-07-22T00:00:00+02:00,2013-07-20 23:45:00+00:00,2013-07-21 02:15:00+00:00,0.0,m,wire line,completion -- perforate,ok,success,Purged riser and lubricator. B/O lubricator and L/O perforation BHA # 8.,2.5 +15_9_F_11_B_2013_07_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-21T00:00:00+02:00,2013-07-22T00:00:00+02:00,2013-07-21 02:15:00+00:00,2013-07-21 08:30:00+00:00,0.0,m,wire line,completion -- wire line,ok,success,R/D wireline equipment.,6.25 +15_9_F_11_B_2013_07_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-21T00:00:00+02:00,2013-07-22T00:00:00+02:00,2013-07-21 08:30:00+00:00,2013-07-21 21:00:00+00:00,0.0,m,wire line,moving -- skid,ok,success,"Prepared for skidding operation: +Installed weather deck hatches on slot F-11. +Installed drilling hatches on slot F-1 +R/D Enviro Unit hand rails and moved same 3 m port. +Performed deck manegement in preparation of equipment for 26"" section. +Performed maintenance of drilling equipment. +Spudded Gyro wireline equipment on cantiliver deck. +L/O 26"" mud motor BHA on cantiliver. + +******* Reporting transfered to F-1 *********",12.5 +15_9_F_11_B_2013_07_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-22T00:00:00+02:00,2013-07-23T00:00:00+02:00,2013-07-22 12:00:00+00:00,2013-07-22 16:00:00+00:00,4768.7,m,fixed,completion -- other,ok,success,"Started reporting rig activity on F-1 at 23:00hrs on 21.07.2013 + +Prepared for final pressure test on F-11B Xmas tree before handover to production department. +Performed testing on tree as follows: + +- Filled Xmas tree with MEG using MEG injection pump. Pressure tested tree cap to 30/200 bar for 5/10min, good test. +- Pressure tested Swab valve to 30/200 bar for 5/10 mi, good test +- Bullheaded 3 m3 MEG into tubing using MEG injection pump, followed by 6,6 m3 packer fluid using cement pump and 1,2 m3 MEG with MEG injection pump. Closed DHSV and inflow tested same for 30 min, good test. + +Suspended further testing on F-11 tree until F-1 26"" section below DHSV",4.0 +15_9_F_11_B_2013_07_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2013-07-23T00:00:00+02:00,2013-07-24T00:00:00+02:00,2013-07-23 15:00:00+00:00,2013-07-23 18:00:00+00:00,4768.7,m,fixed,completion -- other,ok,success,"Continued offline pressure test operations on F-11 Xmas tree for handover to production department. + +- Inflow tested HMV for 10 min, good test. +- Inflow tested MMV for 10 min, good test. +- Installed 2"" weco blind cap on KWV. +- Pressured tested Xmas tree KWV cap and KWV to 35/200 bar for 5/10 min, good test. + +Well F-11B handed over to production 23.07.2013 at 20:00 hrs.",3.0 +15_9_F_11_B_2015_10_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-24T00:00:00+02:00,2015-10-25T00:00:00+02:00,2015-10-24 19:45:00+00:00,2015-10-24 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Vessel arrived rig. Unloaded WL equipment from vessel.,2.25 +15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-24 22:00:00+00:00,2015-10-25 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to lift containers from vessel.,4.0 +15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 02:00:00+00:00,2015-10-25 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Spotted equipment on pipedeck according to spotting plan. Started to hook up units to power. +Meanwhile spotted containers on drill floor.",3.0 +15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 05:00:00+00:00,2015-10-25 06:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Prepared cables for hookup of the general surface equipment.,1.5 +15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 06:30:00+00:00,2015-10-25 07:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held platform general alarm exercise with all crew.,0.5 +15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 07:00:00+00:00,2015-10-25 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Rigged up general surface equipment; WL winch and add on, Altus and Schlumberger logging units, working containers etc. Built scaffolding around units.",8.0 +15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 15:00:00+00:00,2015-10-25 17:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Leak tested BOP to 20/345 bar for 5/10 min on stump.,2.0 +15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 17:00:00+00:00,2015-10-25 19:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Function tested BOP rams from winch panel.,2.0 +15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 19:00:00+00:00,2015-10-25 19:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Finalized WL winch and function tested same.,0.5 +15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 19:30:00+00:00,2015-10-25 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Lifted riser pieces to drill floor prior to start building lower riser section and lubricator. Lifted grease injection head, GIH, and prepared same. +Meanwhile Altus and Schlumberger started to prepare BHA for testing.",1.5 +15_9_F_11_B_2015_10_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-25T00:00:00+02:00,2015-10-26T00:00:00+01:00,2015-10-25 21:00:00+00:00,2015-10-25 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Built lubricator horizontally using tugger and catwalk. +Meanwhile built GIH.",2.0 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-25 23:00:00+00:00,2015-10-26 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Continued to build lubricator and installed same in elevator connected to top drive. Built lower riser section and top lubricator. +Meanwhile production department started to close in well.",2.0 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 01:00:00+00:00,2015-10-26 02:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted BOP in moonpool area. Connected GIH to top lubricator and treaded cable.,1.5 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 02:30:00+00:00,2015-10-26 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Hooked up airhose to line viper. +Meanwhile Altus megged cable and built cablehead.",1.0 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 03:30:00+00:00,2015-10-26 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Spooled out hoses for BOP, test pump and hoses for HMV & DHSV down to moonpool. +Meanwhile Altus megged cablehead and function tested tractor.",1.5 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 05:00:00+00:00,2015-10-26 06:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected hoses to grease injection head.,1.0 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 06:00:00+00:00,2015-10-26 10:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited on production to complete shutting inn and inflow test well. +Meanwhile performed toolbox talk for changing hatch and rigging up. Altus and Schlumberger tested toolstring.",4.0 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 10:00:00+00:00,2015-10-26 10:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Received well from production department.,0.5 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 10:30:00+00:00,2015-10-26 11:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Changed well hatch with wireline hatch.,1.0 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 11:30:00+00:00,2015-10-26 14:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Disconnected top cap and landed lower riser and BOP. Hooked up hoses and function tested same. +Meanwhile Altus and Schlumberger completed string test.",2.5 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 14:00:00+00:00,2015-10-26 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Rigged up kill wing manifold, bleedoff hose and equalizing loop over to prod. wing.",4.0 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 18:00:00+00:00,2015-10-26 19:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Filled oil on pump for DHSV & HMV and prepared same, had some issue with air into system.",1.5 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 19:30:00+00:00,2015-10-26 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lined up via BOP for inflow test / Leak test of swab and kill wing manifold.,1.5 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 21:00:00+00:00,2015-10-26 21:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed Pre-job Meeting for testing swab and Kill wing manifold.,0.25 +15_9_F_11_B_2015_10_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-26T00:00:00+01:00,2015-10-27T00:00:00+01:00,2015-10-26 21:15:00+00:00,2015-10-26 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Inflow tested / leak tested swab to 20/345 bar for 5/10 min according to program. Leak tested kill wing manifold and hoses to 20/345 bar for 5/10 min.,1.75 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-26 23:00:00+00:00,2015-10-27 00:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Hooked up hoses for local control of DHSV and HMV and tested same.,1.25 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 00:15:00+00:00,2015-10-27 00:30:00+00:00,0.0,m,wire line,workover -- other,ok,success,Performed pre job meeting prior to install lubricator sections.,0.25 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 00:30:00+00:00,2015-10-27 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted middle lubricator section and connected same to BOP. Lifted top lubricator.,0.5 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 01:00:00+00:00,2015-10-27 03:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U BHA #1 Tractor and PLT/RST and installed same.,2.5 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 03:30:00+00:00,2015-10-27 05:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Stabbed lubricator and filled rig up with MEG using production permanent lines via XMT cross. Leak tested R/U to 20/345 bar for 5/10 min. +Meanwhile performed communication check with tools.",1.75 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 05:15:00+00:00,2015-10-27 06:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Opened HMV. Pressurized DHSV control line. Production pumped MEG via XMT cross to equalize across DHSV and opened same.,1.5 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 06:45:00+00:00,2015-10-27 07:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Equalized pressure across swab and opened same.,1.0 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 07:45:00+00:00,2015-10-27 08:30:00+00:00,540.0,m,wire line,workover -- wire line,ok,success,"RIH w/ BHA #1 (Tractor & PLT/RST) by gravity from surface to 540 m, WHP 94 bar.",0.75 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 08:30:00+00:00,2015-10-27 09:00:00+00:00,540.0,m,wire line,workover -- wire line,ok,success,Schlumberger performed communication check with toolstring.,0.5 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 09:00:00+00:00,2015-10-27 10:45:00+00:00,2750.0,m,wire line,workover -- wire line,ok,success,"Continued to RIH by gravity from 540 m to 2750 m. Stopped for spinner calibration. +Depth PU +400 m 1150 lbs +800 m 1350 lbs +1200 m 2000 lbs +1600 m 2300 lbs +2000 m 2950 lbs +2400 m 3450 lbs +FF at 0,3 or slightly below",1.75 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 10:45:00+00:00,2015-10-27 11:30:00+00:00,2750.0,m,wire line,workover -- wire line,ok,success,"Performed spinner calibration at 10, 20, 30 & 40 m/min. +Meanwhile performed well control drill.",0.75 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 11:30:00+00:00,2015-10-27 11:45:00+00:00,2800.0,m,wire line,workover -- wire line,ok,success,Continued to RIH by gravity. Observed tool stopped at 2800 m. PU weight 3850 lbs. Had to start tractor.,0.25 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 11:45:00+00:00,2015-10-27 12:00:00+00:00,2800.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor mode.,0.25 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 12:00:00+00:00,2015-10-27 13:35:00+00:00,3570.0,m,wire line,workover -- wire line,ok,success,RIH using tractor from 2800 m to 3570 m. Tractor software froze.,1.5833333333333333 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 13:35:00+00:00,2015-10-27 14:05:00+00:00,3570.0,m,wire line,interruption -- other,ok,success,"Restarted tractor software, OK.",0.5 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 14:05:00+00:00,2015-10-27 16:25:00+00:00,4530.0,m,wire line,workover -- wire line,ok,success,"Continued to RIH using tractor from 3570 m to 4530 m. Stopped to perform first sigma logging pass. +Depth PU +3200 m 4200 lbs +3600 m 4150 lbs +4000 m 4800 lbs +4500 m 6100 lbs +FF at 0,3 or slightly below",2.3333333333333335 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 16:25:00+00:00,2015-10-27 18:40:00+00:00,3440.0,m,wire line,workover -- wire line,ok,success,Powered up minitron and started 10 m/min up pass. Logged sigma across 4530 to 3430 m.,2.25 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 18:40:00+00:00,2015-10-27 20:30:00+00:00,4270.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor mode and tractored back down from 3440 m to 4270 m.,1.8333333333333333 +15_9_F_11_B_2015_10_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-27T00:00:00+01:00,2015-10-28T00:00:00+01:00,2015-10-27 20:30:00+00:00,2015-10-27 23:00:00+00:00,4200.0,m,wire line,workover -- wire line,ok,success,"Powered up RST tool to perform first IC up pass at 0,5 m/min. Logged across interval 4254 to 4200 m. WHP 102 bar.",2.5 +15_9_F_11_B_2015_10_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-28T00:00:00+01:00,2015-10-29T00:00:00+01:00,2015-10-27 23:00:00+00:00,2015-10-28 05:00:00+00:00,3818.0,m,wire line,workover -- wire line,ok,success,"Continued to log RST IC pass at 0,5 m/min across interval from 4200 to 4188 m, 4045 to 3895 m and 3827 up to 3818 m. +Meanwhile performed well control drill.",6.0 +15_9_F_11_B_2015_10_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-28T00:00:00+01:00,2015-10-29T00:00:00+01:00,2015-10-28 05:00:00+00:00,2015-10-28 12:10:00+00:00,3470.0,m,wire line,workover -- wire line,ok,success,"Continued to log IC pass at 0,5 m/min from 3818 to 3660 m and 3522 to 3470 m. Completed logging first IC pass.",7.166666666666667 +15_9_F_11_B_2015_10_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-28T00:00:00+01:00,2015-10-29T00:00:00+01:00,2015-10-28 12:10:00+00:00,2015-10-28 14:05:00+00:00,4270.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor and tractored down from 3470 m to 4270 m.,1.9166666666666667 +15_9_F_11_B_2015_10_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-28T00:00:00+01:00,2015-10-29T00:00:00+01:00,2015-10-28 14:05:00+00:00,2015-10-28 23:00:00+00:00,3780.0,m,wire line,workover -- wire line,ok,success,"Switched over to logging mode and started second IC pass. Logged IC pass at 0,5 m/min from 4254 to 4188 m, 4045 to 3895 m and 3827 to 3780 m. WHP 109.",8.916666666666666 +15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-28 23:00:00+00:00,2015-10-29 05:00:00+00:00,3470.0,m,wire line,workover -- wire line,ok,success,"Continued to log RST IC pass at 0,5 m/min from 3780 to 3660 and 3522 to 3470 m. Completed logging second IC pass.",6.0 +15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 05:00:00+00:00,2015-10-29 07:25:00+00:00,4525.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor and tractored back down to 4525 m to perform PLT shut in pass.,2.4166666666666665 +15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 07:25:00+00:00,2015-10-29 07:50:00+00:00,3994.0,m,wire line,workover -- wire line,ok,success,Switched over to logging mode and performed shut in PLT pass at 20 m/min across interval 4520 to 4000 m. Parked toolstring at 3994 m.,0.4166666666666667 +15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 07:50:00+00:00,2015-10-29 13:15:00+00:00,3994.0,m,wire line,workover -- wire line,ok,success,Petec evaluated data. RST data was good. Challenging to evaluate PLT shut in passes. Had to re-arrange wells prior to startup F-11 B for production. Production ready to open well.,5.416666666666667 +15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 13:15:00+00:00,2015-10-29 14:10:00+00:00,3994.0,m,wire line,workover -- wire line,ok,success,"Equalized pressure PWV using equalizing loop. Well routed towards HP separator. +Opened choke 6%. WHP 108 bar and DHPG 302 bar.",0.9166666666666666 +15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 14:10:00+00:00,2015-10-29 18:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Opened choke stepwise up to 12%. WHP 59 bar and DHPG 258 bar.,3.8333333333333335 +15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 18:00:00+00:00,2015-10-29 21:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened choke stepwise up to 20%. WHP 46 bar and DHPG 239 bar. +Meanwhile observed pressure in DHSV CL was at 520 bar.",3.0 +15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 21:00:00+00:00,2015-10-29 21:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened choke stepwise up to 24%. WHP 43 bar and DHPG 235 bar. +Meanwhile Isolated DHSV CL on wellhead and bled of pressure at pump to avoid bleeding off to 0 bar. Repeated sequence until CL pressure was 420 bar.",0.5 +15_9_F_11_B_2015_10_30.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-29T00:00:00+01:00,2015-10-30T00:00:00+01:00,2015-10-29 21:30:00+00:00,2015-10-29 23:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Opened choke stepwise up to 34%. WHP 38 bar and DHPG 227 bar.,1.5 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-29 23:00:00+00:00,2015-10-30 01:30:00+00:00,3994.0,m,wire line,workover -- wire line,ok,success,Opened choke stepwise to 70 %. WHP 32 bar and DHPG 222 bar.,2.5 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 01:30:00+00:00,2015-10-30 04:00:00+00:00,3994.0,m,wire line,workover -- wire line,ok,success,Opened choke stepwise to 100 %. WHP 32 bar and DHPG 222 bar.,2.5 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 04:00:00+00:00,2015-10-30 05:35:00+00:00,4530.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor mode and RIH to perform 1. PLT flowing pass. Observed higher pullforce on tractor headtension 600 lbs compared to 300 lbs during shut in passes. Stopped at 4530 m.,1.5833333333333333 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 05:35:00+00:00,2015-10-30 06:15:00+00:00,3997.0,m,wire line,workover -- wire line,ok,success,Switched over to logging mode and picked back up. Tension peaked at 9000 lbs (SLB counter) but decreased to approx. 6900 lbs. Logged PLT flowing pass at 10 m/min across interval 4520 m to 4000 m.,0.6666666666666666 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 06:15:00+00:00,2015-10-30 07:40:00+00:00,4530.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor mode and RIH to perform 2. PLT flowing pass.,1.4166666666666667 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 07:40:00+00:00,2015-10-30 08:15:00+00:00,3990.0,m,wire line,workover -- wire line,ok,success,Switched over to logging mode and picked back up. Logged PLT flowing pass at 20 m/min across interval 4520 m to 4000 m.,0.5833333333333334 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 08:15:00+00:00,2015-10-30 09:25:00+00:00,4530.0,m,wire line,workover -- wire line,ok,success,Switched over to tractor mode and RIH to perform 3. PLT flowing pass.,1.1666666666666667 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 09:25:00+00:00,2015-10-30 09:45:00+00:00,3986.0,m,wire line,workover -- wire line,ok,success,Switched over to logging mode and picked back up. Logged PLT flowing pass at 30 m/min across interval 4520 m to 4000 m.,0.3333333333333333 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 09:45:00+00:00,2015-10-30 14:30:00+00:00,3986.0,m,wire line,workover -- wire line,ok,success,PETEC evaluated data from PLT flowing passes. Decision made to re-run one pass. Observed trouble to start tractor.,4.75 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 14:30:00+00:00,2015-10-30 15:45:00+00:00,3986.0,m,wire line,interruption -- other,ok,success,Problem with tractor power supply. Had to change power supply on surface. OK.,1.25 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 15:45:00+00:00,2015-10-30 16:00:00+00:00,3986.0,m,wire line,workover -- wire line,ok,success,Decision made to not run the additional pass. PLT data was good enough for further decision. Shut in well and POOH. WHP 35 bar.,0.25 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 16:00:00+00:00,2015-10-30 19:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 3986 m to surface. WHP 90 bar.,3.0 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 19:00:00+00:00,2015-10-30 20:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Closed SV and bled off lubricator. Inflow tested SV. Closed HMV and inflow tested same, monitored pressure in XMT cross. Meanwhile purged lubricator with N2 via bleed manifold.",1.6666666666666667 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 20:40:00+00:00,2015-10-30 20:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed toolbox talk prior to L/D BHA#1.,0.16666666666666666 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 20:50:00+00:00,2015-10-30 22:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator. L/D BHA #1 on deck.,1.6666666666666667 +15_9_F_11_B_2015_10_31.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-30T00:00:00+01:00,2015-10-31T00:00:00+01:00,2015-10-30 22:30:00+00:00,2015-10-30 23:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Altus and Schlumberger strated to prepare toolstring for perforation run #1.,0.5 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-30 23:00:00+00:00,2015-10-31 01:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Altus performed communication check with tools. Not able to communicate with Altus VPM through tractor.,2.0 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 01:00:00+00:00,2015-10-31 02:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Restarted all surface systems and changed to different VPM sub. Communication with VPM sub OK, but not able to switch same. Reviewed issue from last campaign, not similar issue.",1.5 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 02:30:00+00:00,2015-10-31 03:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Contacted onshore duty and continued to troubleshoot.,1.0 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 03:30:00+00:00,2015-10-31 04:20:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Removed the additional rig-grounding on the tool and switched VPM directly from the panel. VPM was switching OK. Issue most likely related to current grounding.,0.8333333333333334 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 04:20:00+00:00,2015-10-31 05:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Lifted tractor and assembled with Schlumberger toolstring to perform Schlumberger tool check.,0.6666666666666666 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 05:00:00+00:00,2015-10-31 06:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Lifted tools to rig floor due to wind picking up. Continued to check tools.,1.0 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 06:00:00+00:00,2015-10-31 06:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Powered down tools prior to handling explosives.,0.25 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 06:15:00+00:00,2015-10-31 06:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed toolbox talk prior to M/U BHA#2 tractor & perforation guns.,0.25 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 06:30:00+00:00,2015-10-31 09:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"M/U BHA #2 Tractor and perforation gun. Added 40 litres of Starlube into lubricator. Challenging to handle heavy 4,5"" perforation gun. Leak tested QTS to 20/345 bar.",3.0 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 09:30:00+00:00,2015-10-31 10:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Filled lubricator with MEG using production permanent line into XMT cross. Equalized and opened HMV. Equalized and opened SV. WHP 118 bar. +Meanwhile performed well control drill, leak in connection above BOP.",1.25 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 10:45:00+00:00,2015-10-31 11:20:00+00:00,210.0,m,wire line,workover -- perforate,ok,success,"RIH with BHA#2 Tractor and 4,5"" Perforation guns from surface to 70 m below seabed.",0.5833333333333334 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 11:20:00+00:00,2015-10-31 11:30:00+00:00,210.0,m,wire line,workover -- perforate,ok,success,Performed communications check with tractor and tools.,0.16666666666666666 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 11:30:00+00:00,2015-10-31 13:15:00+00:00,2800.0,m,wire line,workover -- perforate,ok,success,"Continued to RIH from 210 m to 2800 m. Observed tool stopped. Had to start tractor. +Depth PU (Altus winch) +400 m 2070 lbs +800 m 2630 lbs +1200 m 3100 lbs +1600 m 3800 lbs +2000 m 4150 lbs +2400 m 5050 lbs +2800 m 6000 lbs",1.75 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 13:15:00+00:00,2015-10-31 17:30:00+00:00,4030.0,m,wire line,workover -- perforate,ok,success,"Switched over to tractor. Tractored down from 2800 m to 4030 m. Observed tractor speed decreased to approx. 2-3 m/min. +Depth PU (Altus winch) +3200 m 7000 lbs +3600 m 6700 lbs +4000 m 8000 lbs",4.25 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 17:30:00+00:00,2015-10-31 17:50:00+00:00,3930.0,m,wire line,workover -- perforate,ok,success,"Performed gun check, OK. Performed first correlation pass at 10 m/min from 4030 to 3930 m. Observed high pulling weighs at between 8000-9000 lbs (Schlumberger counter). Adjusted depth by +4 m.",0.3333333333333333 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 17:50:00+00:00,2015-10-31 19:10:00+00:00,4034.0,m,wire line,workover -- perforate,ok,success,Switched over to tractor and tractored back down. Tractor speed approx. 2-3 m/min.,1.3333333333333333 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 19:10:00+00:00,2015-10-31 19:40:00+00:00,3930.0,m,wire line,workover -- perforate,ok,success,Switched over to logging. Performed second correlation pass at 10 m/min. Max tension 9800 lbs (Schlumberger counter).,0.5 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 19:40:00+00:00,2015-10-31 22:30:00+00:00,3930.0,m,wire line,workover -- perforate,ok,success,"Repeated sequence and performed 3 passes between 4030 to 3930 m, to ensure perforation guns properly oriented.",2.8333333333333335 +15_9_F_11_B_2015_11_01.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-10-31T00:00:00+01:00,2015-11-01T00:00:00+01:00,2015-10-31 22:30:00+00:00,2015-10-31 23:00:00+00:00,4020.0,m,wire line,workover -- perforate,ok,success,Tractored back down prior to position guns for perforation.,0.5 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-10-31 23:00:00+00:00,2015-10-31 23:30:00+00:00,3900.0,m,wire line,workover -- perforate,ok,success,"Switched over to logging. Logged up from 4020 m and positioned toolstring with top shot at 3960 m. Perforated interval 3960 - 3969 m. WHP 119 bar. No indication on cable tension, DHPG increased by 0,3 bar. Logged up after shooting.",0.5 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-10-31 23:30:00+00:00,2015-11-01 00:30:00+00:00,2800.0,m,wire line,workover -- perforate,ok,success,POOH from 3900 m to 2800 m . Observed leak on grease skid.,1.0 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 00:30:00+00:00,2015-11-01 01:00:00+00:00,2800.0,m,wire line,interruption -- other,ok,success,Leak on the drum for one of the hoses running from the grease skid up to GIH. Isolated same and continued POOH with only one hose injecting grease to GIH.,0.5 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 01:00:00+00:00,2015-11-01 02:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Continued to POOH from 2800 m to surface. When at DHSV depth performed PA announcement for handling explosives on drillfloor.,1.6666666666666667 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 02:40:00+00:00,2015-11-01 04:25:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed SV and HMV and inflow tested same. Purged lubricator with N2.,1.75 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 04:25:00+00:00,2015-11-01 04:35:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed toolbox talk prior to break lubricator and L/D toolstring.,0.16666666666666666 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 04:35:00+00:00,2015-11-01 06:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator and L/D BHA #2. Observed all shots fired.,1.4166666666666667 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 06:00:00+00:00,2015-11-01 10:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Altus and Schlumberger started tool check for next perforation toolstring. +Meanwhile Altus wireline changed grease hose on GIH.",4.5 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 10:30:00+00:00,2015-11-01 10:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed toolbox talk prior to M/U BHA#3.,0.25 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 10:45:00+00:00,2015-11-01 11:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"Installed BHA #3 tractor and 4,5"" perforation guns into lubricator. +Added 40 litres of Starlube into lubricator.",1.0833333333333333 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 11:50:00+00:00,2015-11-01 13:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Stabbed lubricator and leak tested QTS to 20/345 bar for 5/10 min. Production filled lubricator with MEG using permanent line into XMT cross. Equalized and opened HMV and SV. WHP 119 bar.,1.1666666666666667 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 13:00:00+00:00,2015-11-01 13:20:00+00:00,300.0,m,wire line,workover -- perforate,ok,success,"RIH w/ BHA #3 Tractor and 4,5"" perforation guns from surface to 300 m.",0.3333333333333333 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 13:20:00+00:00,2015-11-01 13:25:00+00:00,300.0,m,wire line,workover -- perforate,ok,success,Powered up tool and checked communication.,0.08333333333333333 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 13:25:00+00:00,2015-11-01 15:15:00+00:00,2800.0,m,wire line,workover -- perforate,ok,success,Continued to RIH from 300 m to 2800 m. Tool stopped. Had to start tractor.,1.8333333333333333 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 15:15:00+00:00,2015-11-01 15:30:00+00:00,2800.0,m,wire line,workover -- perforate,ok,success,Switched over to tractor. Observed problems with tractor communication.,0.25 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 15:30:00+00:00,2015-11-01 16:30:00+00:00,2800.0,m,wire line,interruption -- other,ok,success,Checked tractor power supply. OK. Checked all connections. Found loose connection. Communication OK.,1.0 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 16:30:00+00:00,2015-11-01 20:35:00+00:00,4030.0,m,wire line,workover -- perforate,ok,success,Tractored down from 2800 m to 4030 m. Tractor speed decreased to approx. 2-4 m/min.,4.083333333333333 +15_9_F_11_B_2015_11_02.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-01T00:00:00+01:00,2015-11-02T00:00:00+01:00,2015-11-01 20:35:00+00:00,2015-11-01 23:00:00+00:00,3860.0,m,wire line,workover -- perforate,ok,success,Swiched over to logging and performed first correlation pass at 10 m/min from 4030 to 3860 m. Run back in and repeated sequence for orientation of guns. Run back in with tractor.,2.4166666666666665 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-01 23:00:00+00:00,2015-11-01 23:30:00+00:00,3860.0,m,wire line,workover -- perforate,ok,success,Switched over logging and performed second orientation pass at 10 m/min from 4030 m to 3860 m.,0.5 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-01 23:30:00+00:00,2015-11-02 00:30:00+00:00,4020.0,m,wire line,workover -- perforate,ok,success,Switched over to tractor and RIH to position gun prior to perforate.,1.0 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 00:30:00+00:00,2015-11-02 01:45:00+00:00,3918.0,m,wire line,workover -- perforate,ok,success,"Switched over to logging and P/U to position for perforation. Observed log was 1 meter shallow. Repeated pass, still shallow. Shifted depth +0,7 m. Performed new pass and positioned gun. Perforated interval 3910 - 3919 m. Observed shots fired on tension. WHP 118 bar.",1.25 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 01:45:00+00:00,2015-11-02 02:00:00+00:00,3853.0,m,wire line,workover -- perforate,ok,success,Logged up. Observed logging tool not communicating. Stopped and checked communication. Possible short in tool after perforation.,0.25 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 02:00:00+00:00,2015-11-02 04:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH from 3853 m to surface.,2.5 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 04:30:00+00:00,2015-11-02 06:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed SV & HMV and inflow tested same. Purged lubricator with N2.,2.0 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 06:30:00+00:00,2015-11-02 06:45:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Performed toolbox talk prior to L/D BHA #3.,0.25 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 06:45:00+00:00,2015-11-02 07:30:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator and L/D BHA #3 on deck. All shots fired.,0.75 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 07:30:00+00:00,2015-11-02 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Latched lubricator for lifting lubricator & BOP.,0.5 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 08:00:00+00:00,2015-11-02 13:30:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Closed BOP and opened HMV for inflow testing of DHSV. Bled off pressure above DHSV. +Meanwhile held toolbox talk prior to rig down lubricator, BOP and riser from XMT.",5.5 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 13:30:00+00:00,2015-11-02 13:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed HMV and bleed off pressure below BOP.,0.4166666666666667 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 13:55:00+00:00,2015-11-02 17:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Disconnected hoses to BOP and prepared to lift rig up off XMT. Disconnected riser on XMT. Lifted lubricator, BOP and riser using top-drive and double securing, secured same in rotary.",3.25 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 17:10:00+00:00,2015-11-02 17:45:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Installed top cap and leak tested XMT top cap to 20/345 bar for 5/10 min. +Meanwhile prepared for skidding rig.",0.5833333333333334 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 17:45:00+00:00,2015-11-02 18:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Had to wait due to skidding from F-11B to F-5.,0.75 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 18:30:00+00:00,2015-11-02 19:30:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Installed KWV cap and leak tested same to 20/345 bar for 5/10 min.,1.0 +15_9_F_11_B_2015_11_03.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2015-11-02T00:00:00+01:00,2015-11-03T00:00:00+01:00,2015-11-02 19:30:00+00:00,2015-11-02 20:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Disconnected lines for local control of DHSV and HMV. Cleaned and tidyed area. Handed well over to production. + +------------------------- END OF OPERATION -----------------------------",0.5 +15_9_F_11_B_2016_04_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-14T00:00:00+02:00,2016-04-15T00:00:00+02:00,2016-04-14 17:00:00+00:00,2016-04-14 17:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held Pre-job meeting with night crew.,0.5 +15_9_F_11_B_2016_04_15.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-14T00:00:00+02:00,2016-04-15T00:00:00+02:00,2016-04-14 17:30:00+00:00,2016-04-14 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Vessel arrived rig. Unloaded WL equipment from vessel.,4.5 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-14 22:00:00+00:00,2016-04-15 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Spotted equipment on pipedeck according to spotting plan. Checked and and verified all equipment recieved.,3.0 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 01:00:00+00:00,2016-04-15 05:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Prepared hoses and cables for hookup of surface equipment.,4.0 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 05:00:00+00:00,2016-04-15 05:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held pre-job meeting with day crew.,0.5 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 05:30:00+00:00,2016-04-15 07:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to prepare equipment prior to rig up.,1.5 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 07:00:00+00:00,2016-04-15 10:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Started to verify equipment according to Maersk checklist for hookup to rig.,3.0 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 10:00:00+00:00,2016-04-15 11:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Lifted Grease injection head and toolcatcher to drillfloor. +Fed cable through GIH.",1.5 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 11:30:00+00:00,2016-04-15 14:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Maersk electrician connected power to Altus and SLB units. + +Meanwhile, lifted PCE equipment to drillfloor.",2.5 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 14:00:00+00:00,2016-04-15 14:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk with involved personell prior to start building riser.,0.5 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 14:30:00+00:00,2016-04-15 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Built riser and lubricator section on catwalk using tugger. + +Meanwhile, finalized and function tested WL winch. Schlumberger built cable head.",2.5 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 17:00:00+00:00,2016-04-15 21:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Schlumberger tested primary BHA. + +Meanwhile, Leak tested BOP on stump to 20/345 bar for 5/10 min. Function tested BOP rams.",4.75 +15_9_F_11_B_2016_04_16.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-15T00:00:00+02:00,2016-04-16T00:00:00+02:00,2016-04-15 21:45:00+00:00,2016-04-15 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Production department started to close in well for handover.,0.25 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-15 22:00:00+00:00,2016-04-15 23:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Altus worked on lubricator and riser section. + +Meanwhile, Schlumberger tested B/U equipment.",1.5 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-15 23:30:00+00:00,2016-04-16 00:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to lifting BOP to moonpool area.,0.5 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 00:00:00+00:00,2016-04-16 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Lifted BOP down to moonpool area. Spooled out hoses for BOP, HMV and DHSV to moonpool.",1.0 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 01:00:00+00:00,2016-04-16 01:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Attempted to feed cable head (3,125'') through lubricator. Unable to due to small ID of X-over (3'') in lubricator.",0.5 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 01:30:00+00:00,2016-04-16 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Schlumberger disconnected bottom of cable head and fed cable through lubricator.,0.5 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 02:00:00+00:00,2016-04-16 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Connected GIH to lubricator section using tugger and catwalk. Spooled out and connected hoses to GIH. + +Meanwhile, Schlumberger re-connected cable head and began signal test to equipment.",2.0 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 04:00:00+00:00,2016-04-16 07:00:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,Waited while production department tested well barriers prior to handover.,3.0 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 07:00:00+00:00,2016-04-16 07:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed handover meeting between production and Intervention. Verified valve status on XMT with production representant.,0.75 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 07:45:00+00:00,2016-04-16 08:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to lifting riser and lubricator section,0.4166666666666667 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 08:10:00+00:00,2016-04-16 09:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted and replaced permanent hatch with WL hatch.,1.0833333333333333 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 09:15:00+00:00,2016-04-16 09:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Removed XMT top cap on well.,0.4166666666666667 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 09:40:00+00:00,2016-04-16 10:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted and connected lower riser to XMT.,0.3333333333333333 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 10:00:00+00:00,2016-04-16 11:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Installed BOP on lower riser. Connected hoses to BOP and function tested same. Verified open / close time.,1.1666666666666667 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 11:10:00+00:00,2016-04-16 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Rigged up KWV manifold and bleed-off hoses on wellhead.,0.8333333333333334 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 12:00:00+00:00,2016-04-16 12:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted middle riser section and landed on top of BOP.,0.5 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 12:30:00+00:00,2016-04-16 13:00:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held toolbox talk prior to lifting lubricator to middle riser.,0.5 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 13:00:00+00:00,2016-04-16 14:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lubricator and GIH to middle riser. Installed Schlumberger dummy BHA in lubricator and stabbed onto middle riser.,1.5 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 14:30:00+00:00,2016-04-16 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected hoses for operating HMV and DHSV.,0.5 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 15:00:00+00:00,2016-04-16 16:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Filled lubricator with MEG from production department. +Leak tested rig-up to 20/345 bar for 5/10 min.",1.8333333333333333 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 16:50:00+00:00,2016-04-16 17:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Purged lubricator with N2.,0.6666666666666666 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 17:30:00+00:00,2016-04-16 17:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Verified no liquid in rig-up prior to installing perforation BHA in well. Broke lubricator and L/D Schlumberger dummy BHA.,0.3333333333333333 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 17:50:00+00:00,2016-04-16 18:15:00+00:00,0.0,m,wire line,workover -- other,ok,success,Held toolbox talk prior to installing perforation BHA in well.,0.4166666666666667 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 18:15:00+00:00,2016-04-16 21:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"M/U BHA for perforation run #1 (3 3/8'' PJN guns w/ 3 1/8'' Tufftrac). Leak tested QTS to 20/345 bar 5/10 min. +Dumped 40 l Starlube in lubricator.",2.75 +15_9_F_11_B_2016_04_17.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-16T00:00:00+02:00,2016-04-17T00:00:00+02:00,2016-04-16 21:00:00+00:00,2016-04-16 22:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Opened HMV and pressurized DHSV control line.,1.0 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-16 22:00:00+00:00,2016-04-17 00:20:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Standby while production department used another well to equalize and open DHSV.,2.3333333333333335 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 00:20:00+00:00,2016-04-17 00:40:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Opened DHSV and SV. WHP = 69 bar.,0.3333333333333333 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 00:40:00+00:00,2016-04-17 01:25:00+00:00,600.0,m,wire line,workover -- perforate,ok,success,"RIH w/ run #1 (Perforation guns w/ Tractor), 3,375"" OD guns by gravity from surface to 600 m.",0.75 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 01:25:00+00:00,2016-04-17 01:45:00+00:00,600.0,m,wire line,workover -- perforate,ok,success,"Schlumberger performed communication check with toolstring. + +Meanwhile, Held well contol exercise with WL crew. +Scenario: Leakage in QTS with BHA at 1500 mMD.",0.3333333333333333 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 01:45:00+00:00,2016-04-17 02:45:00+00:00,2810.0,m,wire line,workover -- perforate,ok,success,"Continue to RIH with BHA #1 from 600 mMD to HUD at 2810 mMD taking PUW every 500m. + +Depth (m) PUW (lbs) Sim PUW (lbs) HW (lbs) +1000 2810 2511 2360 +1500 3600 3258 3200 +2000 4300 4279 3840 +2500 5400 5482 4919 + +Actual friction factor: 0.289.",1.0 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 02:45:00+00:00,2016-04-17 04:35:00+00:00,3550.0,m,wire line,workover -- perforate,ok,success,"Activated tractor and continued to RIH with from 2810 mMD to 3550 mMD . Average running speed w/ Tractor: 9 m/min. + +Depth (mMD) PUW (lbs) Sim PUW (lbs) +3050 5450 5950 +3300 5600 6270",1.8333333333333333 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 04:35:00+00:00,2016-04-17 05:10:00+00:00,3740.0,m,wire line,workover -- perforate,ok,success,"Contined to RIH with tractor activated to 3642 mMD. Tractor seemed to struggle. Shut down tractor, picked up full weight and slacked off 10m. +Started tractor again and RIH to 3740 mMD.",0.5833333333333334 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 05:10:00+00:00,2016-04-17 05:50:00+00:00,3740.0,m,wire line,workover -- perforate,ok,success,Performed orientation pass #1. Some stick and slip observed. Increased tractor arm force.,0.6666666666666666 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 05:50:00+00:00,2016-04-17 07:10:00+00:00,3900.0,m,wire line,workover -- perforate,ok,success,Continued to RIH with tractor activated to 3900mMD. Performed orientation pass #2 and stopped tractor.,1.3333333333333333 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 07:10:00+00:00,2016-04-17 07:40:00+00:00,3600.0,m,wire line,workover -- perforate,ok,success,Performed correlation logging from 3900 mMD to 3600 mMD.,0.5 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 07:40:00+00:00,2016-04-17 08:40:00+00:00,3710.0,m,wire line,workover -- perforate,ok,success,Activated tractor and RIH to 3710 mMD. Tractor stalled out.,1.0 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 08:40:00+00:00,2016-04-17 08:50:00+00:00,3600.0,m,wire line,workover -- perforate,ok,success,Switched to logging mode. Performed correlation pass from 3710 mMD to 3600 mMD.,0.16666666666666666 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 08:50:00+00:00,2016-04-17 09:40:00+00:00,3710.0,m,wire line,workover -- perforate,ok,success,Activated tractor and RIH to 3710 mMD. Tractor stalled out at same depth as previously.,0.8333333333333334 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 09:40:00+00:00,2016-04-17 10:00:00+00:00,3684.0,m,wire line,workover -- perforate,ok,success,Switched to logging mode and performed correlation pass. Positioned Gun 1 with bottom shots at 3684 mMD.,0.3333333333333333 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 10:00:00+00:00,2016-04-17 10:05:00+00:00,3684.0,m,wire line,workover -- perforate,ok,success,"Perforated interval 3675 - 3684 mMD and lost 250 lbs on tension. +WHP before/ after: 79,0 / 79,9 bar. +A-annulus before / after: 12,4 / 12,1 bar.",0.08333333333333333 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 10:05:00+00:00,2016-04-17 10:27:00+00:00,3438.0,m,wire line,workover -- perforate,ok,success,Performed correlation pass for gun #2 while pulling out to 3438 mMD.,0.36666666666666664 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 10:27:00+00:00,2016-04-17 10:55:00+00:00,3562.0,m,wire line,workover -- perforate,ok,success,Activated tractor and RIH to 3562 mMD while performing correlation pass for gun #2.,0.4666666666666667 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 10:55:00+00:00,2016-04-17 11:10:00+00:00,3481.0,m,wire line,workover -- perforate,ok,success,Switched to logging mode and performed correlation pass. Positioned Gun 2 with bottom shots at 3481 mMD.,0.25 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 11:10:00+00:00,2016-04-17 11:15:00+00:00,3481.0,m,wire line,workover -- perforate,ok,success,"Perforated interval 3475 - 3481 mMD and lost 400 lbs on tension. +WHP before/ after: 81,2 / 81,7 bar. +A-annulus before / after: 12,0 / 12,0 bar.",0.08333333333333333 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 11:15:00+00:00,2016-04-17 11:25:00+00:00,3300.0,m,wire line,workover -- perforate,ok,success,POOH to 3300 mMD while correlating depth.,0.16666666666666666 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 11:25:00+00:00,2016-04-17 13:50:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,POOH from 3300 m to surface. WHP 84 bar.,2.4166666666666665 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 13:50:00+00:00,2016-04-17 15:05:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed and inflow tested SV. Closed HMV. Valve needed to be greased before test.,1.25 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 15:05:00+00:00,2016-04-17 15:25:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Waited while production department greased HMV.,0.3333333333333333 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 15:25:00+00:00,2016-04-17 16:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Closed and inflow tested HMV. Purged lubricator with N2.,0.5833333333333334 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 16:00:00+00:00,2016-04-17 16:15:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Held toolbox meeting prior to L/D BHA with explosives.,0.25 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 16:15:00+00:00,2016-04-17 17:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,Broke lubricator and L/D BHA #1 (Perforation guns w/ tractor). Confirmed all shots fired.,0.75 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 17:00:00+00:00,2016-04-17 17:50:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U dummy BHA for testing lubricator. Installed and stabbed lubricator. Attempted to Leak tested QTS. Found leakage in a O-ring.,0.8333333333333334 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 17:50:00+00:00,2016-04-17 18:10:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Changed damaged O-Ring in lubricator and leak tested same to 20/345 bar for 5/10 min.,0.3333333333333333 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 18:10:00+00:00,2016-04-17 21:06:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Closed DHSV and opened HMV. Bled down pressure in tubing to 10 bar.,2.933333333333333 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 21:06:00+00:00,2016-04-17 21:40:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,"Inflow tested DHSV with 74 bar dP. Pressure increased 0,1 bar/30min.",0.5666666666666667 +15_9_F_11_B_2016_04_18.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-17T00:00:00+02:00,2016-04-18T00:00:00+02:00,2016-04-17 21:40:00+00:00,2016-04-17 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Bled off pressure above DHSV before disconnecting lubricator.,0.3333333333333333 +15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-17 22:00:00+00:00,2016-04-18 00:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Continued to bleed off tubing pressure to 0 bar. Slow progress due to unable to use PWV for bleed off.,2.75 +15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 00:45:00+00:00,2016-04-18 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed HMV. Broke lubricator and L/D dummy BHA.,0.25 +15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 01:00:00+00:00,2016-04-18 01:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,L/D lubricator and GIH on catwalk using rig crane and top drive.,0.5833333333333334 +15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 01:35:00+00:00,2016-04-18 02:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected lifting sub to middle riser section.,0.4166666666666667 +15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 02:00:00+00:00,2016-04-18 02:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Disconnected lower riser from XMT. Lifted entire riser section and BOP from XMT up to moonpool area.,0.25 +15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 02:15:00+00:00,2016-04-18 02:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Installed top cap on XMT.,0.08333333333333333 +15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 02:20:00+00:00,2016-04-18 02:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Tested KWV cap and top cap to 20/345 bar for 5/10 min.,0.5833333333333334 +15_9_F_11_B_2016_04_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-18T00:00:00+02:00,2016-04-19T00:00:00+02:00,2016-04-18 02:55:00+00:00,2016-04-18 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Replaced WL hatch with permanent hatch. Handed well back to production. + +----------------- End of Operation ---------------------",1.0833333333333333 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 04:45:00+00:00,2016-04-20 07:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited for supply vessel to arrive with straddle equipment. + +Meanwhile, skidded rig to F-11.",2.75 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 07:30:00+00:00,2016-04-20 08:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Vessel arrived rig with equipment.,0.5 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 08:00:00+00:00,2016-04-20 10:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Checked and verified the received straddle equipment OK.,2.25 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 10:15:00+00:00,2016-04-20 14:30:00+00:00,0.0,m,wire line,interruption -- wait,ok,success,"Waited while production department prepared well for handover. + +Meanwhile, cleaned and tidy rig floor and pipe deck.",4.25 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 14:30:00+00:00,2016-04-20 14:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Received well from production department.,0.25 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 14:45:00+00:00,2016-04-20 15:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Replaced permanent hatch with WL hatch,0.75 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 15:30:00+00:00,2016-04-20 16:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Inflow tested SV and TKV on XMT. Leak tested KWV to 20/345 bar for 5/10 min.,0.5 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 16:00:00+00:00,2016-04-20 16:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Hooked up chiksan manifold on KW and leak tested same to 20/345 bar for 5/10 min.,0.5 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 16:30:00+00:00,2016-04-20 16:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Removed top cap on XMT.,0.16666666666666666 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 16:40:00+00:00,2016-04-20 17:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted riser section and BOP from moonpool area and landed on XMT.,1.0833333333333333 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 17:45:00+00:00,2016-04-20 18:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Connected hoses for test pump and local control of DHSV and HMV on XMT.,0.8333333333333334 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 18:35:00+00:00,2016-04-20 18:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Held toolbox talk prior to lifting lubricator and GIH.,0.16666666666666666 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 18:45:00+00:00,2016-04-20 19:20:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Lifted lubricator and GIH from catwalk and hung off same above riser section on drill floor.,0.5833333333333334 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 19:20:00+00:00,2016-04-20 20:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"M/U BHA for run #2 (Straddle w/ tractor) in Lubricator. Added 80 L starlube in riser before stabbing lubricator. Filled lubricator with MEG. +Attempted to leak test rig-up to 20/345 bar for 5/10 min. Dicovered leakage in GIH due to error in Grease pump.",1.4166666666666667 +15_9_F_11_B_2016_04_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-20T00:00:00+02:00,2016-04-21T00:00:00+02:00,2016-04-20 20:45:00+00:00,2016-04-20 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Waited while Altus and Maersk mechanic fixed grease pump.,1.25 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-20 22:00:00+00:00,2016-04-20 22:45:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Waited for Altus and Maersk mechanic to fix grease pump. Achieved good test of 345 bar on lubricator, but pump still not working as it should. Grease pump stroke increased rapidly due to pump not able to deliver enough grease pressure.",0.75 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-20 22:45:00+00:00,2016-04-20 23:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Attempted to open HMV and equalizing manifold to pressure up lubricator with N2 and displace Starlube and MEG into well. Unable to open HMV due to error in HMV pump.,0.25 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-20 23:00:00+00:00,2016-04-21 00:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Waited while Altus fixed HMV pump. Most likely caused by air in pump system.,1.0 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 00:00:00+00:00,2016-04-21 00:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Opened HMV and injected N2 in lubricator and bullheaded MEG/Starlube mix into well. + +Meanwhile, Grease pump started to work properly again.",0.5833333333333334 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 00:35:00+00:00,2016-04-21 00:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed HMV and bled off pressure in lubricator.,0.3333333333333333 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 00:55:00+00:00,2016-04-21 01:05:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator and added 80 L Starlube in riser.,0.16666666666666666 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 01:05:00+00:00,2016-04-21 01:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Stabbed lubricator and filled rig-up with MEG. Attempted to leak test rig-up, but grease pump was unable to deliver grease pressure.",0.4166666666666667 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 01:30:00+00:00,2016-04-21 06:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Altus worked on grease pump issue with Maersk mechanic and electrician.,5.0 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 06:30:00+00:00,2016-04-21 12:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Grease pump OK. + +Waited for approval from onshore organisation if OK to RIH.",5.5 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 12:00:00+00:00,2016-04-21 12:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Leak tested lubricator to 20/345 bar for 5/10 min. Opened HMV,0.5 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 12:30:00+00:00,2016-04-21 14:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Equalized and opened DHSV. WHP = 62 bar. Observed leakage in O-ring on X-over between XMT and lower riser.,1.5 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 14:00:00+00:00,2016-04-21 15:55:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Closed DHSV and bled down pressure in tubing to 3 bar.,1.9166666666666667 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 15:55:00+00:00,2016-04-21 16:50:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Inflow tested DHSV to 59 bar dP for 30 min.,0.9166666666666666 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 16:50:00+00:00,2016-04-21 17:55:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Bled off remaining pressure in tubing to 0 bar,1.0833333333333333 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 17:55:00+00:00,2016-04-21 18:50:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Closed HMV and purged lubricator with N2.,0.9166666666666666 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 18:50:00+00:00,2016-04-21 19:30:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Broke lubricator and L/D BHA #2 (Straddle w/ Tractor) on drill floor.,0.6666666666666666 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 19:30:00+00:00,2016-04-21 20:10:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Disconnected lower riser from X-over and liftet Riser section and BOP using top drive with double securing. +Changed O-ring on X-over and stabbed riser back onto X-over.",0.6666666666666666 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 20:10:00+00:00,2016-04-21 20:20:00+00:00,0.0,m,wire line,interruption -- other,ok,success,"Disconnected XMT from X-over and liftet Riser section and BOP using top drive with double securing. +Changed O-ring on X-over and stabbed riser back onto XMT. +One of the O-rings had some small marks.",0.16666666666666666 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 20:20:00+00:00,2016-04-21 20:40:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Closed shear ram on BOP and leak tested between SV and BOP to 200 bar for 10 min.,0.3333333333333333 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 20:40:00+00:00,2016-04-21 21:10:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Lifted lubricator and GIH and hung it off above riser section using rig crane and top drive.,0.5 +15_9_F_11_B_2016_04_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-21T00:00:00+02:00,2016-04-22T00:00:00+02:00,2016-04-21 21:10:00+00:00,2016-04-21 22:00:00+00:00,0.0,m,wire line,interruption -- other,ok,success,M/U BHA for run #2 (Straddle w/ tractor).,0.8333333333333334 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-21 22:00:00+00:00,2016-04-21 23:15:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Stabbed on lubricator and leak tested rig-up to 20/345 bar for 5/10 min using 100% MEG.,1.25 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-21 23:15:00+00:00,2016-04-22 00:10:00+00:00,0.0,m,wire line,interruption -- other,ok,success,Opened HMV. Equalized and opened DHSV. WHP 59 bar.,0.9166666666666666 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 00:10:00+00:00,2016-04-22 02:45:00+00:00,2830.0,m,wire line,workover -- wire line,ok,success,"RIH w/ run #2 (563-700 Straddle-Resolve-TuffTRAC; max OD 5.63"" straddle) from surface to HUD at 2830 m. Performed PU every 500 m. + +Depth (m) PUW (lbs) +500 3000 +1000 3650 +1500 4650 +2000 5250 +2500 6550",2.5833333333333335 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 02:45:00+00:00,2016-04-22 05:00:00+00:00,3580.0,m,wire line,workover -- wire line,ok,success,Activated tractor and RIH with tractor from 2830 m to 3580 m. Average running speed 9 m/min. WHP 63 bar.,2.25 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 05:00:00+00:00,2016-04-22 05:35:00+00:00,3735.0,m,wire line,workover -- wire line,ok,success,Continued RIH with tractor activated from 3580 m to 3735 m. Average running speed 8 m/min.,0.5833333333333334 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 05:35:00+00:00,2016-04-22 11:00:00+00:00,3745.0,m,wire line,workover -- wire line,ok,success,Performed 8 correlation passes in interval 3730 - 3640 mMD. Experienced severe stick-slip and difficulties getting on depth with correlation log.,5.416666666666667 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 11:00:00+00:00,2016-04-22 12:30:00+00:00,3785.6,m,wire line,workover -- wire line,ok,success,"Made 2 attempt to position BHA at setting depth by logging up from 3720 mMD. Slightly off-depth from correlation log, unable to position straddle within desired uncertainty margin. Positioned BHA on third pass by logging up from 3720 mMD to 3766.8 mMD.",1.5 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 12:30:00+00:00,2016-04-22 13:00:00+00:00,3765.8,m,wire line,workover -- wire line,ok,success,"Set straddle across interval 3674.4 - 3685.0 mMD. Lost 2000 lbs immediately. Tagged straddle with tractor to verify set. +WHP 67 bar.",0.5 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 13:00:00+00:00,2016-04-22 15:25:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 3765 mMD to surface. Average pulling speed 30 m/min. WHP 69 bar.,2.4166666666666665 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 15:25:00+00:00,2016-04-22 16:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed and inflow tested SV and HMV. Purge riser with N2.,1.3333333333333333 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 16:45:00+00:00,2016-04-22 17:05:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed tool-box talk on drillfloor prior to L/D BHA.,0.3333333333333333 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 17:05:00+00:00,2016-04-22 17:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator. L/D BHA on deck.,0.4166666666666667 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 17:30:00+00:00,2016-04-22 18:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Checked cable head and tractor for next run.,1.25 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 18:45:00+00:00,2016-04-22 18:55:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed tool-box talk on drillfloor prior to M/U BHA.,0.16666666666666666 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 18:55:00+00:00,2016-04-22 19:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,M/U BHA for run #3 (563-700 Straddle-Resolve-TuffTRAC).,0.6666666666666666 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 19:35:00+00:00,2016-04-22 20:05:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Stabbed on lubricator and tested QTS to 20/345 bar for 5/10 min.,0.5 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 20:05:00+00:00,2016-04-22 20:25:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Equalized and opened HMV and SV. HW 2280 lbs. WHP 71 bar.,0.3333333333333333 +15_9_F_11_B_2016_04_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-22T00:00:00+02:00,2016-04-23T00:00:00+02:00,2016-04-22 20:25:00+00:00,2016-04-22 22:00:00+00:00,2050.0,m,wire line,workover -- wire line,ok,success,"RIH w/ run #2 (563-700 Straddle-Resolve-TuffTRAC; max OD 5.63"" straddle) from surface to 2050 mMD. Performed PU every 500 m.",1.5833333333333333 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-22 22:00:00+00:00,2016-04-22 22:35:00+00:00,2830.0,m,wire line,workover -- wire line,ok,success,"Continued RIH from 2050 mMD to HUD at 2830 mMD. Performed PU every 500 m. + +Depth (m) PUW (lbs) +500 3000 +1000 3530 +1500 4500 +2000 5200 +2500 6200",0.5833333333333334 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-22 22:35:00+00:00,2016-04-23 00:10:00+00:00,3490.0,m,wire line,workover -- wire line,ok,success,RIH with tractor activated from 2830 m to 3490 mMD. Average running speed 9 m/min.,1.5833333333333333 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 00:10:00+00:00,2016-04-23 02:45:00+00:00,3515.0,m,wire line,workover -- wire line,ok,success,"Correlated multiple times across interval 3525 - 3470 mMD. Experience stick-slip and high tension (pulled maximum 9500 lbs), which affected logging quality.",2.5833333333333335 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 02:45:00+00:00,2016-04-23 03:05:00+00:00,3485.7,m,wire line,workover -- wire line,ok,success,Positioned straddle with top element at 3474.5 mMD. Verified depth with Petec and picked up 1.5 m to 3473 mMD to have straddle elements symmetrical over perforations.,0.3333333333333333 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 03:05:00+00:00,2016-04-23 03:35:00+00:00,3484.2,m,wire line,workover -- wire line,ok,success,"Set straddle across interval 3473.0 - 3483.5 mMD. Lost appr. 3400 lbs on surface tension, head tension dropped 1000 lbs. Completed setting sequence and tagged straddle with tractor to verify set. WHP 77 bar.",0.5 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 03:35:00+00:00,2016-04-23 05:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,POOH from 3484mMD to surface. Average pulling speed 30 m/min.,2.0833333333333335 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 05:40:00+00:00,2016-04-23 07:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed and inflow tested HMV and SV. WHP 80 bar.,1.3333333333333333 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 07:00:00+00:00,2016-04-23 08:00:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Closed DHSV and bled of pressure above through PWV.,1.0 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 08:00:00+00:00,2016-04-23 09:45:00+00:00,0.0,m,wire line,workover -- test scsssv,ok,success,Inflow tested DHSV to 0.01 bar / 30 min .,1.75 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 09:45:00+00:00,2016-04-23 10:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Closed HMV and purged lubricator through XT-cross with N2.,0.5 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 10:15:00+00:00,2016-04-23 10:35:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed tool-box talk prior to L/D BHA on drillfloor.,0.3333333333333333 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 10:35:00+00:00,2016-04-23 11:10:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Broke lubricator. L/D BHA on drillfloor.,0.5833333333333334 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 11:10:00+00:00,2016-04-23 11:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,L/D upper lubricator section and GIH to catwalk.,0.5 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 11:40:00+00:00,2016-04-23 11:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Performed tool-box talk prior to lifting riser of well.,0.08333333333333333 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 11:45:00+00:00,2016-04-23 12:40:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Disconnected and lifted lower lubricator section above WL BOP to drillfloor. Lifted WL BOP from hatchdeck to PCE container. Lifted riser to cantilever deck.,0.9166666666666666 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 12:40:00+00:00,2016-04-23 14:15:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Installed top cap and KW cap. Rewound all BOP and PCE hoses. +Installed permanent hatch.",1.5833333333333333 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 14:15:00+00:00,2016-04-23 15:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Leak tested top cap and KW cap to 20/345 bar for 5/10 min. +Meanwhile: Split lubricator on drillfloor.",1.5 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 15:45:00+00:00,2016-04-23 16:45:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Checked valve status with production operator and cleaned wellhead area. Prepared handover documention and handed well back to production dep.,1.0 +15_9_F_11_B_2016_04_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-23T00:00:00+02:00,2016-04-24T00:00:00+02:00,2016-04-23 16:45:00+00:00,2016-04-23 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Packed equipment and prepared for backload.,5.25 +15_9_F_11_B_2016_04_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-24T00:00:00+02:00,2016-04-25T00:00:00+02:00,2016-04-23 22:00:00+00:00,2016-04-24 09:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,Packed equipment and prepared for backload. Cleaned drillfloor and cantilever.,11.0 +15_9_F_11_B_2016_04_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-04-24T00:00:00+02:00,2016-04-25T00:00:00+02:00,2016-04-24 09:00:00+00:00,2016-04-24 15:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"Performed are inspection with barge engineer. Cleaned and tidied offices and workspace. Demobilized all personell. +*** End of operation ***",6.0 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 03:45:00+00:00,2016-09-18 04:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed prejob meeting to skid cantilever,0.25 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 04:00:00+00:00,2016-09-18 04:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Skidded cantilever onto F-11 slot, 3m to starboard",0.5 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 04:30:00+00:00,2016-09-18 05:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed after skid jobs and cleared in moon pool area,0.5 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 05:00:00+00:00,2016-09-18 10:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"Removed production flow line from F11B. Meanwhile L/D HPDR to cantilever, R/D diverter chains and installed elevators, spotted WL equipment on rig floor, prepared for R/U manifolds and hoses to XT",5.0 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 10:00:00+00:00,2016-09-18 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Continued with preparations and R/U WL (started to R/U and check chicksan manifolds) . Meanwhile pressure tested blind flange on production wing valve,1.0 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 11:00:00+00:00,2016-09-18 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed the fox hole and started to lower the wire line BOP into moon pool, continued with R/U chicksan manifolds on X-mas tree.",2.0 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 13:00:00+00:00,2016-09-18 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U top hatches in the moon pool. Meanwhile continued with lowering the WL BOP and positioning in moon pool. Lowered hoses down to WL BOP,3.0 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 16:00:00+00:00,2016-09-18 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to remove XT cap and install lower riser and WL BOP,0.25 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 16:15:00+00:00,2016-09-18 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed XT cap and installed lower riser,1.25 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 17:30:00+00:00,2016-09-18 17:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to install WL BOP,0.25 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 17:45:00+00:00,2016-09-18 19:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted and installed WL BOP, installed hoses",1.75 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 19:30:00+00:00,2016-09-18 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressure tested bleed off manifold. 20/345bar 5/10 min. Meanwhile P/U WL riser, performed housekeeping on rig floor, performed maintenance on gas trap in shaker",1.5 +15_9_F_11_B_2016_09_19.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-18T00:00:00+02:00,2016-09-19T00:00:00+02:00,2016-09-18 21:00:00+00:00,2016-09-18 22:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Attempted to pressure test lower riser and WL BOP. Observed leak in the connection between lower riser and XT. Drained riser and lifted lower riser and WL BOP from XT. Secured work place. Inspected connection. Observed scratches on the internal sealing face on the XT side,1.0 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-18 22:00:00+00:00,2016-09-19 00:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Evaluated situation. Located replacement X-over on F-04 well. Meanwhile opened BOP on stump and serviced drilling equipment,2.0 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 00:00:00+00:00,2016-09-19 02:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Waited for production to prepare paperwork, isolate F-4 and bleed off pressure below tree cap. Meanwhile removed damaged X-over from F-11B XT. Built lubricator on rig floor",2.0 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 02:00:00+00:00,2016-09-19 05:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Attempted to disconnect tree cap from X-over on F-4. No-go. Meanwhile opened and inspected BOP for cement,3.0 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 05:00:00+00:00,2016-09-19 05:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Removed X-over from the XT and moved same to welders shop to attempt to release tree cap from X-over,0.5 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 05:30:00+00:00,2016-09-19 07:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Release tree can from the X-over in the welders shop with help of heating,2.0 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 07:30:00+00:00,2016-09-19 08:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Installed X-over on XT on F-11B well,0.5 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 08:00:00+00:00,2016-09-19 08:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Installed lower riser and WL BOP on XT,0.5 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 08:30:00+00:00,2016-09-19 09:30:00+00:00,0.0,m,fixed,interruption -- other,ok,success,"Attempted to pressure test of bleed off manifold and connection on WL lower riser to XT, 20/345bar 5/10 min. Observed leak on bleed off manifold",1.0 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 09:30:00+00:00,2016-09-19 10:15:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Troubleshoot leak on bleed off manifold,0.75 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 10:15:00+00:00,2016-09-19 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Performed pressure test of bleed off manifold and connection on WL lower riser to XT, 20/345bar 5/10 min",0.5 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 10:45:00+00:00,2016-09-19 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to install riser and lubricator,0.25 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 11:00:00+00:00,2016-09-19 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed cover under WL BOP. Installed riser,0.75 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 11:45:00+00:00,2016-09-19 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed handling equipment. Installed WL lift equipment,0.25 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 12:00:00+00:00,2016-09-19 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lifted lubricator, M/U setting tool. Moved safety pin in sheave under elevator",1.25 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 13:15:00+00:00,2016-09-19 13:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed lubricator, M/U plug BHA",0.5 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 13:45:00+00:00,2016-09-19 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Filled riser and lubricator with 50/50 MEG. Pressure tested WL rig up to 20/345 bar 5/10 min using cement pump,1.0 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 14:45:00+00:00,2016-09-19 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to bullhead well to sea water,0.25 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 15:00:00+00:00,2016-09-19 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Closed SV, opened HMV. Pressured up DHSV control line to 520bar. Confirmed line up. Pumped 3m3 of 50/50 MEG w/ cement unit.",0.25 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 15:15:00+00:00,2016-09-19 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/U to rig pump. Pumped 10 m3 wash pill w/ 1200 l/min - 124 bar,0.5 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 15:45:00+00:00,2016-09-19 19:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bullheaded 249 m3 sea water w/ 1300 l/min - 120 bar. Standpipe pressure slowly decreased and stabilised at 68 bar. Stopped pumps, SIWHP 35bar. Meanwhile performed TBT to RIH w/ deepset barrier plug",3.25 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 19:00:00+00:00,2016-09-19 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pumped 10m3 50/50 MEG w/ cement pump, 1300l/min - 80bar. Closed KV on XT",0.25 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 19:15:00+00:00,2016-09-19 21:45:00+00:00,2838.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Equalized and opened SV. RIH w/ run #4, deep set barrier plug to 2838 m. Average running speed 35 m/min. Tool string stopped at 2838 m",2.5 +15_9_F_11_B_2016_09_20.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-19T00:00:00+02:00,2016-09-20T00:00:00+02:00,2016-09-19 21:45:00+00:00,2016-09-19 22:00:00+00:00,2700.0,m,fixed,plug abandon -- mechanical plug,ok,success,POOH from to 2700 m,0.25 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-19 22:00:00+00:00,2016-09-20 00:00:00+00:00,3083.0,m,fixed,plug abandon -- mechanical plug,ok,success,"RIH from 2700m. Tool string stopped at 2876m. POOH and RIH several times, worked gradually down to setting depth.",2.0 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 00:00:00+00:00,2016-09-20 00:30:00+00:00,3083.0,m,fixed,plug abandon -- mechanical plug,ok,success,Correlated BHA across interval 3030 - 3092 m . Set plug with mid packer element at 3083 m . Lost 300 lbs of weight after setting sequence was complete. Tagged plug,0.5 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 00:30:00+00:00,2016-09-20 02:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,POOH from 3083 m to 0 m . Average pulling speed 35 m/min,1.75 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 02:15:00+00:00,2016-09-20 05:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Pressure tested ME550-700 plug and SV to 20/265bar for 5/10min. Bled off pressure in tubing to 10bar to closed drain. Inflow tested deepset barrier plug for 30 min. Ok. Bled off remaining pressure in tubing to closed drain. Meanwhile continued to pressure test BOP.,3.25 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 05:30:00+00:00,2016-09-20 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/D BHA (run#4),0.25 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 05:45:00+00:00,2016-09-20 06:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Broke lubricator and L/D BHA (run#4). Meanwhile serviced drilling equipment and continued with testing BOP,0.5 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 06:15:00+00:00,2016-09-20 07:00:00+00:00,0.0,m,fixed,interruption -- other,ok,success,Built new cablehead.,0.75 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 07:00:00+00:00,2016-09-20 08:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"M/U BHA, tested DECT cutter and connected cable head. Installed lubricator",1.0 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 08:00:00+00:00,2016-09-20 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Leak tested QTS to 20/345 bar for 5/10 min. Bleed down well pressure from 32bar to 1 bar. Opened SV,1.0 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 09:00:00+00:00,2016-09-20 10:45:00+00:00,3065.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ cutter BHA (run #5), to 3065 m. Running speed 35 m/min.",1.75 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 10:45:00+00:00,2016-09-20 12:00:00+00:00,3048.0,m,fixed,plug abandon -- other,ok,success,"Correlated across interval 3004 - 3065 m . Positioned cutter at 3055 m. Performed cut, tubing in compression. Tool stalled out. Retracted anchors",1.25 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 12:00:00+00:00,2016-09-20 13:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with W/L . Average pulling speed 35 m/min,1.5 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 13:30:00+00:00,2016-09-20 14:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Closed SV and leak tested tree/cross to 345 bar.,1.0 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 14:30:00+00:00,2016-09-20 15:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Broke off lubricator and L/D tool string,1.0 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 15:30:00+00:00,2016-09-20 16:45:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U tool string w/ 572-700 ME plug (run#6), installed lubricator. Pressure tested QTS to 20/345 bar for 5/10 min. Ok",1.25 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 16:45:00+00:00,2016-09-20 18:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"L/U to pressure up tubing. Pressured up tubing to confirm cut. Pressure went up to +/- 90 bar, then dropped to 1 bar. Observed 0.5 bar increase in annulus pressure. Continued to pump slowly with cement unit down tubing. Pressure increased both in tubing and annulus which indicated communication to annulus. Stopped pumping w/ +/- 9 bar in well. Bled off tubing pressure to 3 bar and open SV .",1.5 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 18:15:00+00:00,2016-09-20 18:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,RIH w/ shallow set plug (run#6) to 256 m. Average running speed 35 m/min.,0.25 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 18:30:00+00:00,2016-09-20 19:00:00+00:00,276.0,m,fixed,plug abandon -- mechanical plug,ok,success,Correlated BHA across interval 229 - 276 m . Set plug with mid packer element at 246 m. P/U weight before/after setting 884/484 lbs. Tagged plug,0.5 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 19:00:00+00:00,2016-09-20 19:30:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,POOH from 246 m to 0 m . Average pulling speed 35 m/min. Confirmed tool string in tool catcher and closed SV .Meanwhile held TBT for pressure testing shallow plug,0.5 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 19:30:00+00:00,2016-09-20 20:15:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,Lined up and tested shallow set barrier plug to 20bar/300bar for 5/10min. Bled off pressure to closed drain. Meanwhile TBT for rigging down wireline,0.75 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 20:15:00+00:00,2016-09-20 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Drained lubricator and riser and purged w/ N2. Meanwhile disconnected WL BOP hoses,0.75 +15_9_F_11_B_2016_09_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-20T00:00:00+02:00,2016-09-21T00:00:00+02:00,2016-09-20 21:00:00+00:00,2016-09-20 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/D lubricator, tool string, R/D sheaves",1.0 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-20 22:00:00+00:00,2016-09-20 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D WL riser above BOP, L/D same",0.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-20 22:30:00+00:00,2016-09-21 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/D WL BOP and lower riser joint. Removed all WL equipment from rig floor and moon pool. Pulled fox hole to be able to lift WL BOP from moon pool. Lifted WL BOP from the moon pool to the pipe deck,3.0 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 01:30:00+00:00,2016-09-21 01:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed pre-job meeting to remove hatches. Meanwhile removed BX elevator and installed chains in bails,0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 01:45:00+00:00,2016-09-21 02:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed split hatch on F-11. Removed hatch on adjacent well. Removed beam,0.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 02:15:00+00:00,2016-09-21 02:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to remove X-tree and AAR for WL operation,0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 02:30:00+00:00,2016-09-21 02:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed lifting cap w/ tugger. Meanwhile performed pressure tests of kill/choke manifolds,0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 02:45:00+00:00,2016-09-21 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and outer ring. Meanwhile performed pressure tests of kill/choke manifolds,0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 03:00:00+00:00,2016-09-21 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lowered diverter chains on TDS bails to wellhead and attached to X-tree with double securing. Took weight as per lifting plan and removed Grayloc clamp. Meanwhile performed pressure tests of kill/choke manifolds,0.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 03:30:00+00:00,2016-09-21 04:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted X-tree to moon pool. Transfered load to gantry crane in moon pool. Meanwhile performed pressure tests of kill/choke manifolds,0.75 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 04:15:00+00:00,2016-09-21 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Attached lifting arrangement from TDS to Spacer spool. Lifted same to rig floor. Meanwhile performed pressure tests of kill/choke manifolds,0.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 04:45:00+00:00,2016-09-21 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed outer ring and MB. Meanwhile Landed X-tree on skid and started to make up Grayloc clamp. Meanwhile performed pressure tests of kill/choke manifolds,0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 05:00:00+00:00,2016-09-21 05:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to install hatches in moon pool,0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 05:15:00+00:00,2016-09-21 06:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to M/U X-tree to bracket. Installed fox hole. Installed hatches in moon pool, prepared to test TDS.",1.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 06:45:00+00:00,2016-09-21 09:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Installed communication collar on well head using tugger line from rig floor. Meanwhile P/U riser from cantilever,2.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 09:00:00+00:00,2016-09-21 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered HP riser to well head M/U same, installed master bushing and covers in moon pool",0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 09:15:00+00:00,2016-09-21 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Built scaffolding in moon pool for BOP/NT2 connector. Meanwhile pressure tested TDS,1.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 10:45:00+00:00,2016-09-21 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted BOP from stump and skidded same F-11,0.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 11:15:00+00:00,2016-09-21 11:45:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,"Troubleshoot Bop lifter , sensor fault on test stump",0.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 11:45:00+00:00,2016-09-21 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Landed BOP on stump and M/U NT2 connector. Installed tension cylinder. Meanwhile drifted pipe in derrick,2.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 14:15:00+00:00,2016-09-21 16:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing and installed slick joint and diverter. M/U bolts on slick joint, and removed lift gear on diverter",1.75 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 16:00:00+00:00,2016-09-21 16:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pressured up diverter system, meanwhile drop checked on BOP and carried out housekeeping in moon pool",0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 16:15:00+00:00,2016-09-21 16:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Filled the well with sea water, using Trip tank",0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 16:30:00+00:00,2016-09-21 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested connection on BOP and riser to 20/300 bar for 5/10min against shallow set plug,0.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 17:00:00+00:00,2016-09-21 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.5 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 17:30:00+00:00,2016-09-21 18:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Lifted casing tong to rig floor. Meanwhile broke out FOSV from side entry assembly for testing offline,1.0 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 18:30:00+00:00,2016-09-21 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/U casing tong,0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 18:45:00+00:00,2016-09-21 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong,1.0 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 19:45:00+00:00,2016-09-21 20:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U THRT,0.25 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 20:00:00+00:00,2016-09-21 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U THRT. Reconfigured pups in the string for space out,0.75 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 20:45:00+00:00,2016-09-21 21:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"Troubleshoot issues w/ casing tong, unable to B/O connection. Removed tong tension level and grinded same",0.75 +15_9_F_11_B_2016_09_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-21T00:00:00+02:00,2016-09-22T00:00:00+02:00,2016-09-21 21:30:00+00:00,2016-09-21 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Continued to P/U and M/U tubingTHRT. POOH, installed control lines and inspected THRT",0.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 22:00:00+00:00,2016-09-21 22:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"RIH and landed off THRT, engaged tool and confirmed w/ 2t overpull",0.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 22:15:00+00:00,2016-09-21 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Applied pressure to shear pin and then rotated string 8x turns CCW into communication collar,0.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 22:30:00+00:00,2016-09-21 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pump open ME shallow set barrier plug,0.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 22:45:00+00:00,2016-09-21 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Dropped 2in steel ball in the well, installed swedge to Fig. 1502 connection, installed LTV and cement hose",0.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 23:15:00+00:00,2016-09-21 23:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pressure tested cement hose and LTV to 20/345bar for 5/10 min. Confirmed line up,0.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-21 23:45:00+00:00,2016-09-22 00:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Checked annulus pressure at wellhead 10bar. Started to pressure up tubing w/ cement unit with constant rate. Observed pressure drop after reaching 28 bar indicating that plug opened. Stopped pumping, pressure in tubing stabilized at 13 bar. Annulus pressure at wellhead went up and stabilized to 13 bar.",0.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 00:00:00+00:00,2016-09-22 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Bled off tubing pressure above DHSV to zero and monitored for buildup, no build up observed. Applied 520bar to the control line to open DHSV. Pressured up well w/ cementing unit. Observed indications of equalizing and openning of DHSV both on cement unit and on pressure gauge on control fluid pump. Stopped pumping. Bled off well to zero pressure. Annulus pressure 2 bar. No indications of gas below DHSV/in the well observed. Confirmed zero pressure below DHSV. Closed DHSV",0.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 00:30:00+00:00,2016-09-22 01:00:00+00:00,3055.0,m,fixed,plug abandon -- other,ok,success,"RD swedge, LTV and cement hose. Meanwhile held TBT for pulling tubing hanger free",0.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 01:00:00+00:00,2016-09-22 01:15:00+00:00,3055.0,m,fixed,plug abandon -- other,ok,success,Pressured upTHRT line to 2000psi and then bled down to 500 psi to release TH,0.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 01:15:00+00:00,2016-09-22 01:45:00+00:00,3055.0,m,fixed,plug abandon -- other,ok,success,"P/U to 166t , neutral weight, continued to P/U to 170t, TH released (5t overpull). Continued to POOH, observed +/- 20t drag, disconnected control hoses, RIH before start breaking and L/D landing string",0.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 01:45:00+00:00,2016-09-22 02:45:00+00:00,3034.0,m,fixed,plug abandon -- other,ok,success,L/D landing string and THRT. Meanwhile held TBT for installing power slips and control line reel,1.0 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 02:45:00+00:00,2016-09-22 03:45:00+00:00,3034.0,m,fixed,plug abandon -- other,ok,success,Installed power slips and positioned control line reel,1.0 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 03:45:00+00:00,2016-09-22 04:30:00+00:00,3002.0,m,fixed,plug abandon -- other,ok,success,POOH w/ 7in tubing from 3034m 3002m,0.75 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 04:30:00+00:00,2016-09-22 05:00:00+00:00,3002.0,m,fixed,interruption -- repair,ok,success,Repaired hydraulic hose for Flush mounted slips,0.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 05:00:00+00:00,2016-09-22 05:15:00+00:00,3002.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to pull tubing,0.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 05:15:00+00:00,2016-09-22 08:45:00+00:00,2833.0,m,fixed,plug abandon -- other,ok,success,"Continued pulling tubing from 3065m to 2833m. Average pulling speed 4,5 joints/hour",3.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 08:45:00+00:00,2016-09-22 09:00:00+00:00,2833.0,m,fixed,plug abandon -- other,ok,success,Installed box protector on joint 239 w/ ME plug inside. Used crane to lay it out,0.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 09:00:00+00:00,2016-09-22 11:45:00+00:00,2608.0,m,fixed,plug abandon -- other,ok,success,Continued pulling tubing from 2833m to 2608m. Average pulling speed 7 joints/hour,2.75 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 11:45:00+00:00,2016-09-22 12:30:00+00:00,2589.0,m,fixed,plug abandon -- other,ok,success,"Removed control line from DHSV, secured same on drum. L/D DHSV using crane. Observed back flow from well. Trip tank static. Waited for backflow to decrease",0.75 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 12:30:00+00:00,2016-09-22 13:15:00+00:00,2589.0,m,fixed,plug abandon -- other,ok,success,M/U swedge to casing. Moved control line drum from drill floor,0.75 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 13:15:00+00:00,2016-09-22 13:45:00+00:00,2589.0,m,fixed,plug abandon -- other,ok,success,R/D casing tong. Installed clamp on pipe for control line,0.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 13:45:00+00:00,2016-09-22 14:00:00+00:00,2589.0,m,fixed,plug abandon -- other,ok,success,"Changed handling gear to RIH w/ 5,5in DP",0.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 14:00:00+00:00,2016-09-22 14:15:00+00:00,2589.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared rig floor,0.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 14:15:00+00:00,2016-09-22 15:15:00+00:00,2589.0,m,fixed,interruption -- maintain,ok,success,Troubleshoot and changed linear transducer on Iron roughneck. Meanwhile built pump in tee and M/U pup joints in fox hole,1.0 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 15:15:00+00:00,2016-09-22 15:45:00+00:00,2549.0,m,fixed,plug abandon -- cement plug,ok,success,"Started RIH from 2589m. Adjusted clamp, M/U 1st stand",0.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 15:45:00+00:00,2016-09-22 16:15:00+00:00,2549.0,m,fixed,plug abandon -- cement plug,ok,success,Removed casing slips and installed slips for DP,0.5 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 16:15:00+00:00,2016-09-22 18:30:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,Continued RIH with back flow to 3050m. M/U TDS on all stands. Average RIH speed 215m/hour,2.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 18:30:00+00:00,2016-09-22 19:15:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Circulated SW w/ 3000 l/min - 155bar. Observed high reading of CO of 90ppm on portable gas sensors in shacker room. Returns OIW was over 100ppm, visually dirty",0.75 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 19:15:00+00:00,2016-09-22 20:30:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Stopped pumps, lined up to take returns to MGS, circulated w/ 1000l/min - 34bar. Confirmed zero gas readings",1.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 20:30:00+00:00,2016-09-22 21:30:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Opened BOP, resumed circulation w/ 3000 l/min - 155bar. Confirmed OIW content below 30ppm after total of 193m3 circulated",1.0 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 21:30:00+00:00,2016-09-22 21:45:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped wash pill of 20m3, 3000 l/min - 150 bar",0.25 +15_9_F_11_B_2016_09_23.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-22T00:00:00+02:00,2016-09-23T00:00:00+02:00,2016-09-22 21:45:00+00:00,2016-09-22 22:00:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"R/B stand, P/U single and pump in assembly",0.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-22 22:00:00+00:00,2016-09-22 22:30:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Installed cementing hose, pressure tested same to 250bar for 3 min.",0.5 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-22 22:30:00+00:00,2016-09-22 22:45:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting for cement job,0.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-22 22:45:00+00:00,2016-09-23 00:00:00+00:00,3050.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (3050 m - 2850 m ): Mixed and pumped 9,2 m3 of 1,9 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 2900 l of drill water. Zeroed volume counters. Displaced the cement with 46 m3 (2076 strokes) of SW, 2000 l/min/ 40 bar. Pulled out of cement to 2850m at 4 min/stand. Theoretical TOC 2850 m MD.",1.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 00:00:00+00:00,2016-09-23 02:15:00+00:00,2850.0,m,fixed,plug abandon -- cement plug,ok,success,Installed sponge ball. Pumped 10m3 hi-vis at 1700l/min / 65 bar. Circulated 3000 l/min/ 140 bar. Held TBT for P/U BOP wash tool,2.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 02:15:00+00:00,2016-09-23 04:00:00+00:00,2800.0,m,fixed,plug abandon -- cement plug,ok,success,"POOH and R/B 1x stand. Installed closed FOSV and BOP wash tool, made 10x passes in BOP and well head at 1500 LPM / 12 bar, operated rams and annular once",1.75 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 04:00:00+00:00,2016-09-23 05:00:00+00:00,2550.0,m,fixed,plug abandon -- cement plug,ok,success,POOH from 2829m to 2550m. Average pulling speed 280m/hour,1.0 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 05:00:00+00:00,2016-09-23 05:15:00+00:00,2550.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/U casing handling equipment,0.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 05:15:00+00:00,2016-09-23 06:00:00+00:00,2550.0,m,fixed,plug abandon -- other,ok,success,"Removed dril pipe slips, installed casing slips. Removed CL clamp",0.75 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 06:00:00+00:00,2016-09-23 07:00:00+00:00,2550.0,m,fixed,plug abandon -- other,ok,success,R/U casing tong,1.0 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 07:00:00+00:00,2016-09-23 07:30:00+00:00,2550.0,m,fixed,plug abandon -- other,ok,success,Broke off swedge. Changed handling equipment in elevator. M/U FOSV to swedge,0.5 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 07:30:00+00:00,2016-09-23 13:45:00+00:00,1944.0,m,fixed,plug abandon -- other,ok,success,"POOH with 7in tubing from 2550m to 1944m. Average pulling speed 8,2 joints/hour",6.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 13:45:00+00:00,2016-09-23 14:00:00+00:00,1944.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to R/D casing handling equipment,0.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 14:00:00+00:00,2016-09-23 15:15:00+00:00,1944.0,m,fixed,plug abandon -- other,ok,success,R/D casing handling equipment. Cleaned and cleared rig floor,1.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 15:15:00+00:00,2016-09-23 15:45:00+00:00,1944.0,m,fixed,plug abandon -- other,ok,success,Serviced PRSs,0.5 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 15:45:00+00:00,2016-09-23 19:00:00+00:00,1944.0,m,fixed,interruption -- maintain,ok,success,Located and repaired/changed leaking hose on aft PRS,3.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 19:00:00+00:00,2016-09-23 19:15:00+00:00,1944.0,m,fixed,plug abandon -- other,ok,success,P/U and B/O FOSV from tubing swedge,0.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 19:15:00+00:00,2016-09-23 19:45:00+00:00,1978.0,m,fixed,plug abandon -- other,ok,success,P/U spear assembly (run #11) and engaged into 7in tubing at RKB. RIH on DP from 1944m to 1978m,0.5 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 19:45:00+00:00,2016-09-23 20:00:00+00:00,1978.0,m,fixed,plug abandon -- other,ok,success,Removed master bushings and install DP slips,0.25 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 20:00:00+00:00,2016-09-23 21:00:00+00:00,2810.0,m,fixed,plug abandon -- trip,ok,success,Continued to RIH w/ tubing on spear from 1978m to 2810m. Average running speed 832m/hour. Meanwhile carried out TBT for pressure testing rig up of pumping lines to X-mas tree for slop injection,1.0 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 21:00:00+00:00,2016-09-23 21:30:00+00:00,2850.0,m,fixed,plug abandon -- trip,ok,success,"M/U TDS and washed down with 550 l/min - 15bar from 2810m, tagged TOC at 2853.4m w/ 10t. Release spear from tubing by rotating 2x turns clockwise. Top of tubing left in the well at 909m. Meanwhile prepared to test chicksan lines to X-mas tree on F-4",0.5 +15_9_F_11_B_2016_09_24.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-23T00:00:00+02:00,2016-09-24T00:00:00+02:00,2016-09-23 21:30:00+00:00,2016-09-23 22:00:00+00:00,436.0,m,fixed,plug abandon -- trip,ok,success,"POOH w/ spear BHA (run#11) on 5,5in DP from 909 m to 436 m . Avgerage tripping speed 950 m/hour",0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-23 22:00:00+00:00,2016-09-23 22:30:00+00:00,40.0,m,fixed,plug abandon -- trip,ok,success,"Continued to POOH w/ spear BHA (run#11) on 5,5in DP from 436 m to 40 m . Avgerage tripping speed 800 m/hour",0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-23 22:30:00+00:00,2016-09-23 23:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled spear on surface. Inspected and R/B in derrick same,0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-23 23:00:00+00:00,2016-09-23 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed DP slips and installed master bushing,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-23 23:15:00+00:00,2016-09-23 23:45:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,P/U jetting tool and RIH to 20.6m,0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-23 23:45:00+00:00,2016-09-24 00:15:00+00:00,20.0,m,fixed,interruption -- maintain,ok,success,"Troubleshoot pump control, unable to control mud pumps from rig floor due to PLC issue. Meanwhile carried out TBT for running pump local for jetting wellhead",0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 00:15:00+00:00,2016-09-24 00:30:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,"Washed wellhead w/ 1500 l/min - 28 bar , 1360 strokes pumped",0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 00:30:00+00:00,2016-09-24 00:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH and L/D jetting tool,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 00:45:00+00:00,2016-09-24 02:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U MS-T seal retrieval tool and tested same,1.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 02:00:00+00:00,2016-09-24 03:00:00+00:00,20.0,m,fixed,plug abandon -- other,ok,success,RIH to 20.1m and engaged MS-T seal retrieval tool. Pulled seal free with 110t overpull,1.0 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 03:00:00+00:00,2016-09-24 03:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH from 20m and L/D MS-T seal and retrieval tool,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 03:15:00+00:00,2016-09-24 03:45:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,P/U and M/U 10 3/4in cutter BHA (run#13),0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 03:45:00+00:00,2016-09-24 04:15:00+00:00,127.0,m,fixed,plug abandon -- cut,ok,success,"RIH w/ 10 3/4in cutter BHA (run#13) on 5,5in DP to 127 m cutting depth",0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 04:15:00+00:00,2016-09-24 04:30:00+00:00,127.0,m,fixed,plug abandon -- cut,ok,success,"Recorded parameters: 600 l/min - 125 bar, 400 l/min - 50 bar, 300 l/min - 25 bar, up/down weights 73t/69t",0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 04:30:00+00:00,2016-09-24 05:00:00+00:00,127.0,m,fixed,plug abandon -- cut,ok,success,"Cut 10 3/4in tieback casing at 127m 400-600 l/min, 35-50 bar, 3-7 kNm",0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 05:00:00+00:00,2016-09-24 05:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"POOH w/ 10 3/4in cutter BHA (run#13) on 5,5in DP, Inspected knives, ok, L/D BHA",0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 05:30:00+00:00,2016-09-24 05:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"P/U spear BHA (run#14), inspected same",0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 05:45:00+00:00,2016-09-24 06:00:00+00:00,107.0,m,fixed,plug abandon -- other,ok,success,RIH w/ spear BHA and engaged spear in tieback casing. Pulled fish to surface,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 06:00:00+00:00,2016-09-24 06:15:00+00:00,107.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/U casing tong,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 06:15:00+00:00,2016-09-24 06:30:00+00:00,107.0,m,fixed,plug abandon -- other,ok,success,Released spear from tieback casing fish. R/B spear in derrick,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 06:30:00+00:00,2016-09-24 07:45:00+00:00,107.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U casing handling equipment,1.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 07:45:00+00:00,2016-09-24 08:00:00+00:00,107.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to pull and L/D 10 3/4in casing,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 08:00:00+00:00,2016-09-24 10:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,POOH with 10 3/4in tieback casing from 107 m to 0 m,2.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 10:15:00+00:00,2016-09-24 11:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D 10 3/4in casing handling equipment,0.75 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 11:00:00+00:00,2016-09-24 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed to left hand saver sub on TDS,1.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 12:15:00+00:00,2016-09-24 13:15:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,"P/U left hand torque tool with jet sub below (run#15). M/U torque to 67kNm, RIH same on left hand drill pipe from surface to 140m",1.0 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 13:15:00+00:00,2016-09-24 13:30:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,M/U TDS to string and washed tieback adapter area w/ 1500 l/min - 12 bar,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 13:30:00+00:00,2016-09-24 14:00:00+00:00,140.0,m,fixed,plug abandon -- other,ok,success,Engaged and released tieback adapter w/ 15 kNm,0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 14:00:00+00:00,2016-09-24 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH w/ left hand drill pipe from 140m to surface,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 14:15:00+00:00,2016-09-24 14:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed left hand saver sub,0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 14:45:00+00:00,2016-09-24 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,L/D torque tool,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 15:00:00+00:00,2016-09-24 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U spear BHA (run#16),0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 15:15:00+00:00,2016-09-24 15:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U saver sub to TDS,0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 15:45:00+00:00,2016-09-24 16:00:00+00:00,129.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ spear to 129m, engage spear to tieback adapter fish",0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 16:00:00+00:00,2016-09-24 16:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH slowly w/ fish on spear to surface,0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 16:30:00+00:00,2016-09-24 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Released spear and L/D tieback adapter fish,0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 17:00:00+00:00,2016-09-24 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/B spear BHA in the derrick. Meanwhile started step rate testing on F-4 well w/ cement unit,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 17:15:00+00:00,2016-09-24 17:30:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,Performed Pre-job Meeting to handle perforation guns. Meanwhile changed handling gear,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 17:30:00+00:00,2016-09-24 18:00:00+00:00,12.0,m,fixed,plug abandon -- perforate,ok,success,P/U and RIH with perforation guns to 12m (run#17),0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 18:00:00+00:00,2016-09-24 18:30:00+00:00,24.0,m,fixed,plug abandon -- perforate,ok,success,"P/U wild single, 2x X-overs and firing head, M/U same",0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 18:30:00+00:00,2016-09-24 18:45:00+00:00,145.0,m,fixed,plug abandon -- perforate,ok,success,RIH w/ perforation BHA to 145m bottom shot depth,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 18:45:00+00:00,2016-09-24 19:15:00+00:00,145.0,m,fixed,plug abandon -- perforate,ok,success,"Closed UPR, opened choke. Applied 10 bar on IBOP. Opened IBOP to confirm line up. Filled string. Opened UPR, Broke off TDS and dropped 1 3/8 ball in string. M/U TDS. Closed UPR and opened choke. Fired guns with 160 l/min - 137 bar. Top shot at 142m, bottom shot at 145m. Continued to circulate w/ 160l/min - 2 bar. No gas observed in returns",0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 19:15:00+00:00,2016-09-24 19:45:00+00:00,145.0,m,fixed,plug abandon -- perforate,ok,success,"Increased pump rate to 1000l/min -12 bar. Observed only water in returns. Circulated 1x BU, gas reading close to 0ppm in fluid and no readings in air. Stoped pumps",0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 19:45:00+00:00,2016-09-24 20:00:00+00:00,145.0,m,fixed,plug abandon -- perforate,ok,success,"Flowchecked well for 15 min through choke, stable. Meanwhile finished pumpin step rate insection test on F-4 well",0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 20:00:00+00:00,2016-09-24 20:15:00+00:00,28.0,m,fixed,plug abandon -- perforate,ok,success,POOH w/ perforation BHA (run#17) from 145m to 28m,0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 20:15:00+00:00,2016-09-24 20:45:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforation BHA (run#17). All shots fired,0.5 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 20:45:00+00:00,2016-09-24 21:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,Performed Pre-job Meeting to P/U 9 5/8in casing cutter BHA (run#18),0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 21:00:00+00:00,2016-09-24 21:15:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,P/U 9 5/8in casing cutter BHA (run#18),0.25 +15_9_F_11_B_2016_09_25.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-24T00:00:00+02:00,2016-09-25T00:00:00+02:00,2016-09-24 21:15:00+00:00,2016-09-24 22:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,RIH w/ 9 5/8in casing cutter BHA (run#18) to 805m. Average tripping speed 1070m/hour,0.75 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-24 22:00:00+00:00,2016-09-24 22:15:00+00:00,885.0,m,fixed,plug abandon -- cut,ok,success,"Continued to RIH w/ 9 5/8in casing cutter BHA (run#18) from 805m to 885,5 m",0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-24 22:15:00+00:00,2016-09-24 22:30:00+00:00,885.0,m,fixed,plug abandon -- cut,ok,success,"M/U TDS, filled string, took parameters. 300l/min - 16 bar, 600 l/min - 80 bar",0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-24 22:30:00+00:00,2016-09-24 23:00:00+00:00,885.0,m,fixed,plug abandon -- cut,ok,success,"Cut 9 5/8in casing at 885,5m w/ 300-400 l/min, 19-32 bar, 80rpm, 3-7 kNm. Observed good indications of cut: pressure dropped to 0 and reduction of torque. Measured gap of 90cm",0.5 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-24 23:00:00+00:00,2016-09-24 23:30:00+00:00,885.0,m,fixed,plug abandon -- cut,ok,success,"Performed flowcheck. Observed losses of 1,6m3/hour. Losses soon stopped, totally lost of 0,3m3",0.5 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-24 23:30:00+00:00,2016-09-25 00:45:00+00:00,10.0,m,fixed,plug abandon -- cut,ok,success,POOH w/ 9 5/8in casing cutter BHA (run#18) from 885 m to 10 m . Avg. tripping speed 580 m/hour. Meanwhile performed TBT to inject drilling slop in F-4. Started pumping preflush w/ 1000l/min - 145bar,1.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 00:45:00+00:00,2016-09-25 01:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,L/D 9 5/8in casing cutter BHA (run#18),0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 01:00:00+00:00,2016-09-25 01:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,Performed Pre-job Meeting for drops inspection of TDS,0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 01:15:00+00:00,2016-09-25 01:45:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Carried out TDS drops inspection and service. Meanwhile continued w/ drilling slop injection on F-4. Total preflush pumped of 70m3, started pumping drilling slop, Batch#1, 1000l/min - 145bar",0.5 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 01:45:00+00:00,2016-09-25 02:00:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,P/U side entry assembly (used in last cement job) and B/O 2x pup joints,0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 02:00:00+00:00,2016-09-25 02:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"Performed Pre-job Meeting to P/U 12,25 milling BHA (run#19)",0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 02:15:00+00:00,2016-09-25 04:15:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,"P/U and M/U 12,25in milling BHA (run#19). Meanwhile continued w/ drilling slop injection on F-4. Total drilling slop pumped of 93m3 (batch#1), started pumping postflush, 1000l/min - 146bar",2.0 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 04:15:00+00:00,2016-09-25 04:30:00+00:00,135.0,m,fixed,plug abandon -- mill,ok,success,"RIH w/ 12,25in milling BHA (run#19) to 135 m",0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 04:30:00+00:00,2016-09-25 04:45:00+00:00,140.0,m,fixed,plug abandon -- mill,ok,success,"Recorded parameters: 400l/min - 2bar, 1300l/min - 6bar, 2000l/min - 9bar, 80rpm - 2-5kNm, weights up/down - 22t/15t. Tagged top of 10 3/4in subsea casing hanger at 139.7m. Meanwhile finished w/ pumping postflush after batch#1 of drilling slop on F-4. Total postflush pumped of 140m3 (after batch#1), 1000l/min - 150bar. Stopped injection for 2 hours",0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 04:45:00+00:00,2016-09-25 11:15:00+00:00,140.0,m,fixed,plug abandon -- mill,ok,success,"Milled 10 3/4in subsea casing hanger from 140.1 to 140.4 meter. 1500-2000l/min, 11Bar, 60-120rpm, max 25 kNm, WOB 1-8t. Observed good indications of break through: reduction of torque and WOB. Meanwhile continued w/ pumping drilling slop batch#2 on F-4. Total preflush pumped of 70m3 (before batch#2), started pumping drilling slop, Batch#2, 1000l/min - 150bar",6.5 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 11:15:00+00:00,2016-09-25 12:00:00+00:00,140.0,m,fixed,plug abandon -- mill,ok,success,"Run down and tagged top of 10 3/4in casing stump at 142.1m. Dressed off top of stump +/- 5 cm, 80-100rpm, 4t WOB, 2-4kNm, 2000l/min - 9bar",0.75 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 12:00:00+00:00,2016-09-25 12:15:00+00:00,100.0,m,fixed,plug abandon -- mill,ok,success,"Pulled up above casing hanger area and circulated 2x BU @ 3000 l/min - 21bar. Observed no losses, no gas in returns. R/B 1x stand",0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 12:15:00+00:00,2016-09-25 12:45:00+00:00,100.0,m,fixed,plug abandon -- mill,ok,success,Performed drops inspection on TDS. Meanwhile carried out TBT for BHA handling,0.5 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 12:45:00+00:00,2016-09-25 14:30:00+00:00,0.0,m,fixed,plug abandon -- mill,ok,success,POOH and L/D milling BHA,1.75 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 14:30:00+00:00,2016-09-25 15:00:00+00:00,145.0,m,fixed,plug abandon -- other,ok,success,P/U Spear assy (run#20). Checked and inspected same. RIH to 145m,0.5 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 15:00:00+00:00,2016-09-25 15:15:00+00:00,145.0,m,fixed,plug abandon -- other,ok,success,M/U TDS. Engaged fish. Observed 10t overpull to pull fish free,0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 15:15:00+00:00,2016-09-25 16:00:00+00:00,747.0,m,fixed,plug abandon -- trip,ok,success,"POOH with casing fish on spear. Set casing fish in slips. Bottom of casing fish at 747m. Meanwhile finished w/ pumping postflush after batch#2 of drilling slop on F-4. Total drilling slop pumped for batch#2 of 250m3, postflush pumped of 140m3 (after batch#2), 1000l/min - 150bar. Stopped injection for 2 hours",0.75 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 16:00:00+00:00,2016-09-25 16:15:00+00:00,747.0,m,fixed,plug abandon -- other,ok,success,"Inspected spear, found grapple cracked. Secured grapple and R/B spear BHA in derrick. Meanwhile performed TBT to R/U casing handling equipment",0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 16:15:00+00:00,2016-09-25 17:30:00+00:00,747.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/U casing handling equipment for 10 3/4in casing,1.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 17:30:00+00:00,2016-09-25 17:45:00+00:00,747.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting/Brief to pull 10 3/4in x 9 5/8in casing,0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 17:45:00+00:00,2016-09-25 18:00:00+00:00,747.0,m,fixed,plug abandon -- equipment recovery,ok,success,Removed master bushing and installed power slips,0.25 +15_9_F_11_B_2016_09_26.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-25T00:00:00+02:00,2016-09-26T00:00:00+02:00,2016-09-25 18:00:00+00:00,2016-09-25 22:00:00+00:00,334.0,m,fixed,plug abandon -- equipment recovery,ok,success,"POOH with 10 3/4in casing from 747 to 334m. Average pulling speed 8,5 joints/hr. Meanwhile continued w/ pumping drilling slop batch#3 on F-4. Total preflush pumped of 70m3 (before batch#3), started pumping drilling slop, Batch#3, 1000l/min - 145bar",4.0 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-25 22:00:00+00:00,2016-09-25 22:30:00+00:00,256.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued to POOH with 10 3/4in casing from 334 to 256m. Average pulling speed 8,7 joints/hr",0.5 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-25 22:30:00+00:00,2016-09-25 22:45:00+00:00,256.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to change handling gear,0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-25 22:45:00+00:00,2016-09-25 23:00:00+00:00,256.0,m,fixed,plug abandon -- equipment recovery,ok,success,Changed handling equipment for 9 5/8in casing,0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-25 23:00:00+00:00,2016-09-25 23:45:00+00:00,256.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Attempted to break 10 3/4in x 9 5/8in X-over. Not able to set tongs on the x-over due to no handling pup and OD of x-over bigger than collar of 10 3/4in. Repositioned x-over below and set lower tong jaws (adjustable) on x-over, confirmed length above 9 5/8in collar is not too long to pick up with elevator. Broke 10 3/4in joint from x-over and L/D x-over together w/ 9 5/8in joint",0.75 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-25 23:45:00+00:00,2016-09-26 00:00:00+00:00,232.0,m,fixed,plug abandon -- equipment recovery,ok,success,Changed BX inserts to 9 5/8in,0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 00:00:00+00:00,2016-09-26 02:45:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,"Continued to POOH with 9 5/8in casing from 232 to 0m. Used manual slips. Average pulling speed 7,6 joints/hr, totally pulled 61 joints. Meanwhile finished w/ pumping postflush after batch#3 of drilling slop on F-4. Total drilling slop pumped for batch#3 of 250m3, postflush pumped of 140m3 (after batch#3), 1000l/min - 150bar. Stopped injection for 2 hours",2.75 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 02:45:00+00:00,2016-09-26 03:00:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Cleaned and cleared rig floor,0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 03:00:00+00:00,2016-09-26 03:15:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,Performed Pre-job Meeting to R/D casing tong,0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 03:15:00+00:00,2016-09-26 04:30:00+00:00,0.0,m,fixed,plug abandon -- equipment recovery,ok,success,R/D casing tong,1.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 04:30:00+00:00,2016-09-26 04:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to M/U combined cutter/EZSV plug BHA (run#21),0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 04:45:00+00:00,2016-09-26 05:30:00+00:00,13.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U cutting assy and broke off taper mill. M/U M/U combined cutter/EZSV plug BHA (run#21),0.75 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 05:30:00+00:00,2016-09-26 05:45:00+00:00,13.0,m,fixed,plug abandon -- other,ok,success,"Removed master bushing, installed drill pipe slips",0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 05:45:00+00:00,2016-09-26 07:30:00+00:00,878.0,m,fixed,plug abandon -- other,ok,success,"RIH w/ combined cutter/EZSV plug BHA (run#21) from 13 m to 878 m . Average tripping speed 500 m/hr. Meanwhile continued w/ pumping drilling slop batch#4 on F-4. Total preflush pumped of 70m3 (before batch#4), 1000l/min - 145bar",1.75 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 07:30:00+00:00,2016-09-26 07:45:00+00:00,878.0,m,fixed,plug abandon -- mechanical plug,ok,success,"Set EZSV @ 877.5m. Released running tool w/ +/- 25t overpull, tagged plug w/ 10 ton",0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 07:45:00+00:00,2016-09-26 08:30:00+00:00,868.0,m,fixed,plug abandon -- cut,ok,success,"Established and recorded parameters before cutting casing. 80 rpm - 1-6 kNm, 400 l/min - 42 bar, 500 l/min - 60 bar, 600 l/min - 83bar. Cut casing @ 867.5m, 80rpm, 22 kNm, 400 l/min - 42bar. Observed good indication of cut: pressure dropped to 5 bar when cut performed, pulled up 1m and pressure increased to 42bar again. Meanwhile continued w/ pumping drilling slop batch#4 on F-4, started pumping drilling slop, Batch#4, 1000l/min - 145bar",0.75 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 08:30:00+00:00,2016-09-26 08:45:00+00:00,868.0,m,fixed,plug abandon -- cut,ok,success,Flow checked well. Static. Dropped drift inside stand #22,0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 08:45:00+00:00,2016-09-26 10:15:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,POOH wet w/ combined cutter/EZSV tool BHA (run#21) from 868 m to 0 m. Avg. tripping speed 580 m/hr. Used mud bucket,1.5 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 10:15:00+00:00,2016-09-26 10:30:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Removed drill pipe slips, installed master bushing",0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 10:30:00+00:00,2016-09-26 11:00:00+00:00,0.0,m,fixed,plug abandon -- cut,ok,success,"Broke off and L/D EZSV running tool and X-overs, M/U taper mill to bottom of cutter and L/D cutter asembly",0.5 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 11:00:00+00:00,2016-09-26 11:15:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,"Performed Pre-job Meeting to P/U perforation BHA (run#22). Meanwhile changed BX inserts to 4,5in",0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 11:15:00+00:00,2016-09-26 12:15:00+00:00,15.0,m,fixed,plug abandon -- perforate,ok,success,P/U perforation BHA (run#22),1.0 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 12:15:00+00:00,2016-09-26 12:45:00+00:00,146.0,m,fixed,plug abandon -- perforate,ok,success,"RIH w/ perforation BHA (run#22) from 15 m to 145,5 m (btm shot)",0.5 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 12:45:00+00:00,2016-09-26 13:15:00+00:00,146.0,m,fixed,plug abandon -- perforate,ok,success,"Closed UPR, opened choke. Applied 10 bar on IBOP. Opened IBOP to confirm line up. Filled string. Opened UPR, Broke off TDS and dropped 1 3/8 ball in string. M/U TDS. Closed UPR and opened choke. Fired guns with 160 l/min - 138 bar. Top shot at 142,5m, bottom shot at 145,5m. Continued to circulate w/ 160l/min - 2 bar. No gas observed in returns",0.5 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 13:15:00+00:00,2016-09-26 13:45:00+00:00,146.0,m,fixed,plug abandon -- perforate,ok,success,"Increased pump rate to 1000l/min. Pressure went up to 25 bar and then dropped and stabilized at 4 bar. Circulated 1x BU, observed small losses, quickly stabilized, gas reading close to 0 in fluid and no readings in air. Stoped pumps",0.5 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 13:45:00+00:00,2016-09-26 14:15:00+00:00,146.0,m,fixed,plug abandon -- perforate,ok,success,"Flowchecked well over the choke for 15 min. Stable. Open UPR, flow checked well with BOP open, stable. Meanwhile finished w/ pumping postflush after batch#4 of drilling slop on F-4. Total drilling slop pumped for batch#4 of 220m3, postflush pumped of 140m3 (after batch#4), 1000l/min - 145bar. Stopped injection",0.5 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 14:15:00+00:00,2016-09-26 14:30:00+00:00,15.0,m,fixed,plug abandon -- perforate,ok,success,POOH w/ perforation BHA (run#22) from 146 m to 15 m,0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 14:30:00+00:00,2016-09-26 15:00:00+00:00,0.0,m,fixed,plug abandon -- perforate,ok,success,L/D perforation BHA (run#22). All shots fired,0.5 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 15:00:00+00:00,2016-09-26 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to P/U EZSV assembly (run#23),0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 15:15:00+00:00,2016-09-26 16:00:00+00:00,3.0,m,fixed,plug abandon -- mechanical plug,ok,success,P/U EZSV assembly (run#23),0.75 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 16:00:00+00:00,2016-09-26 17:45:00+00:00,845.0,m,fixed,plug abandon -- other,ok,success,P/U 2x 3m pup joints and 1x 1.5m pup joint for spaceout and RIH w/ EZSV assembly to 845m. Average running speed 480m/hour,1.75 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 17:45:00+00:00,2016-09-26 18:00:00+00:00,845.0,m,fixed,plug abandon -- cement plug,ok,success,M/U side entry sub assembly,0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 18:00:00+00:00,2016-09-26 18:45:00+00:00,855.0,m,fixed,plug abandon -- mechanical plug,ok,success,"M/U TDS and recorded weights up/down 98t/91t. Washed setting area w/ L/min. Set EZSV plug at 855,3m, tagged plug w/ 10t and keep 10t weight on EZSV",0.75 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 18:45:00+00:00,2016-09-26 19:00:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed UPR, confirmed line up through the choke and MGS",0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 19:00:00+00:00,2016-09-26 20:45:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 10m3 Hi-vis pill at 900l/min - 14bar, continued to displace C-annulus to sea water, staged up pumps to 1700l/min - 38bar. Max gas 2,6%, 1-2 ppm H2S in fluid. Oil base mud in returns initially and sea water towards the end. Totally sea water pumped of 1,4x BU",1.75 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 20:45:00+00:00,2016-09-26 21:00:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Opened UPR and closed choke, flow checked the well. Stable. Meanwhile held TBT before cement job",0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 21:00:00+00:00,2016-09-26 21:15:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,Connected cement hose and LT valve,0.25 +15_9_F_11_B_2016_09_27.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-26T00:00:00+02:00,2016-09-27T00:00:00+02:00,2016-09-26 21:15:00+00:00,2016-09-26 22:00:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Pumped 20m3 wash pill ahead of cement job, 1300l/min - 13,4bar. Verified line up for cement job",0.75 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-26 22:00:00+00:00,2016-09-26 23:15:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Cement plug in C-annulus (467 m - 867 m): Mixed and pumped 33 m3 of 1,95 SG cement slurry, 600 l/min. Displaced the cement with 12m3 of drill water. 1000 l/min/ 12 bar, after caught up w/ cement pressure went up to 52 bar. Stopped pumping, pressure went down to 31bar. Pulled w/ running tool out of EZSV, pressure dropped to 0 bar",1.25 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-26 23:15:00+00:00,2016-09-26 23:45:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,Disconnected cementing hose and L/D side entry sub. M/U pup w/ preinstalled sponge ball,0.5 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-26 23:45:00+00:00,2016-09-27 01:15:00+00:00,855.0,m,fixed,plug abandon -- cement plug,ok,success,"Lined up and pumped 10m3 wash pill, 2300l/min - 20bar. Circulated well to clean sea water until OIW reading below 30ppm. Originally mud in returns and clean sea water in the end. Max gas 3.2%. Totally circulated 108 m3, 2x BU",1.5 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 01:15:00+00:00,2016-09-27 02:15:00+00:00,11.0,m,fixed,plug abandon -- other,ok,success,"POOH w/ EZSV running tool from 855 m to 11 m, average pulling speed 850m/hour",1.0 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 02:15:00+00:00,2016-09-27 03:00:00+00:00,0.0,m,fixed,plug abandon -- mechanical plug,ok,success,"L/D 3x 5,5in pup joints and EZSV running tool",0.75 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 03:00:00+00:00,2016-09-27 05:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,WOC (from 01:20). Meanwhile isolated both PRSs and carried out 3 monthly PMS,2.0 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 05:00:00+00:00,2016-09-27 08:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC. Meanwhile started with maintenance on forward and aft PRS. Meanwhile continued w/ pumping drilling slop batch#5 on F-4. Total preflush pumped of 70m3 (before batch#5), started pumping drilling slop, Batch#5, 1000l/min - 145bar",3.0 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 08:00:00+00:00,2016-09-27 10:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,WOC. Meanwhile continued to perform maintenance on forward and aft PRS,2.5 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 10:30:00+00:00,2016-09-27 13:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,WOC. Work aloft suspended due to wind speed above 50 knots. Gusting upto 60 knots. Performed high wind checks. Meanwhile performed rig PMs and maintenance,2.5 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 13:00:00+00:00,2016-09-27 14:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC. Wind speed 52-59 knots. Continued rig floor maintenance and PMs. Prepared to clean mud pits. Hooked up line from F-09 to rig choke manifold to bleed off gas. Meanwhile finished w/ pumping postflush after batch#5 of drilling slop on F-4. Total drilling slop pumped for batch#5 of 170m3, postflush pumped of 140m3 (after batch#5), 1000l/min - 145bar",1.5 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 14:30:00+00:00,2016-09-27 15:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"WOC. Wind speed now below 48 knots, continued to work on aft PRS. Continued to hook up line from F-09 to rig choke manifold. Started cleaning in mud pit No. 5",1.0 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 15:30:00+00:00,2016-09-27 17:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,WOC. Performed maintenance on TDS. Continued to hook up line from F-09 to rig choke manifold. Continued cleaning in mud pit No. 5,1.5 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 17:00:00+00:00,2016-09-27 17:15:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,Deisolated TDS,0.25 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 17:15:00+00:00,2016-09-27 17:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to change grapple on 10 3/4in spear,0.25 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 17:30:00+00:00,2016-09-27 18:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Changed grapple on 10 3/4in spear BHA for the well of F-4,0.75 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 18:15:00+00:00,2016-09-27 18:45:00+00:00,20.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U MST tool and M/U to 5,5in DP, RIH to 20m",0.5 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 18:45:00+00:00,2016-09-27 19:00:00+00:00,20.0,m,fixed,plug abandon -- cement plug,ok,success,Removed Master Bushings and install PS21 slips,0.25 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 19:00:00+00:00,2016-09-27 20:00:00+00:00,808.0,m,fixed,plug abandon -- cement plug,ok,success,"RIH w/ MST tool on 5,5in DP from 20m to 808m, average running speed of 790m/hour. Meanwhile lined up and started pressure testing surface lines",1.0 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 20:00:00+00:00,2016-09-27 21:00:00+00:00,808.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed UPR, performed line test to 120 bar, good test",1.0 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 21:00:00+00:00,2016-09-27 21:30:00+00:00,808.0,m,fixed,plug abandon -- cement plug,ok,success,"Closed IBOP, lined up to test the well with cement unit. Pressure tested C-annulus surface cement plug to 115bar for 10min. Good test",0.5 +15_9_F_11_B_2016_09_28.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-27T00:00:00+02:00,2016-09-28T00:00:00+02:00,2016-09-27 21:30:00+00:00,2016-09-27 22:00:00+00:00,808.0,m,fixed,plug abandon -- cement plug,ok,success,Broke off TDS and spaced out for cement job,0.5 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-27 22:00:00+00:00,2016-09-27 22:15:00+00:00,853.0,m,fixed,plug abandon -- cement plug,ok,success,"P/U and M/U side entry sub assembly, installed cement hose",0.25 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-27 22:15:00+00:00,2016-09-27 22:30:00+00:00,853.0,m,fixed,plug abandon -- cement plug,ok,success,Performed Pre-job Meeting to place balanced cement plug,0.25 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-27 22:30:00+00:00,2016-09-27 22:45:00+00:00,853.0,m,fixed,plug abandon -- cement plug,ok,success,Pumped 10m3 wash pill. Staged up rate to 2200l/min - 16bar,0.25 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-27 22:45:00+00:00,2016-09-27 23:30:00+00:00,853.0,m,fixed,plug abandon -- cement plug,ok,success,"Balanced cement plug (755 m - 855 m ): Mixed and pumped 8 m3 of 1,95 SG cement slurry, 600 l/min. Zeroed volume counters. Displaced the cement with 9m3. 1000 l/min - 12 bar. Caught up with cement, pressure increased to 25bar. Theoretical TOC 755 m MD",0.75 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-27 23:30:00+00:00,2016-09-28 00:00:00+00:00,655.0,m,fixed,plug abandon -- cement plug,ok,success,Pulled out of cement to 655m at 2 min/stand.,0.5 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 00:00:00+00:00,2016-09-28 00:45:00+00:00,655.0,m,fixed,plug abandon -- cement plug,ok,success,"M/U pup w/ pre-installed sponge ball. Circulated above cement plug at 3300 l/min - 30 bar, 50 RPM. Diverted returns overboard. Total circulated 75m3 (1,7x BU)",0.75 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 00:45:00+00:00,2016-09-28 01:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,POOH w/ MST tool from 655m to surface. Average tripping speed of 870 m/hour,0.75 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 01:30:00+00:00,2016-09-28 01:45:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,Removed PS21 and installed master bushing,0.25 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 01:45:00+00:00,2016-09-28 02:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,"Broke off stand#1 and R/B same, L/D MST tool",0.5 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 02:15:00+00:00,2016-09-28 03:15:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,M/U BOP jetting tool to stand#1. Jet BOP 1400l/min - 24 bar - 40 rpm. Function tested BOP. L/D BOP jetting tool and R/B DP stand,1.0 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 03:15:00+00:00,2016-09-28 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to N/D diverter,0.25 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 03:30:00+00:00,2016-09-28 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Drained riser, meanwhile removed BX elevators and rotator. Installed lifting chains for diverter to bails",0.5 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 04:00:00+00:00,2016-09-28 05:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled master bushing and outer ring, attached lifting chains to diverter. Bled down pressure on diverter, disconnected overshot hose",1.0 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 05:00:00+00:00,2016-09-28 06:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Pulled diverter and secured same on DP set back area,1.0 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 06:00:00+00:00,2016-09-28 07:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Disconnected and pull slick joint to rig floor. Meanwhile hook up bleed off line to F-09,1.5 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 07:30:00+00:00,2016-09-28 07:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to release BOP tension system,0.25 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 07:45:00+00:00,2016-09-28 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed BOP tension cylinders. Meanwhile continued w/ pumping drilling slop batch#6 on F-4. Total preflush pumped of 70m3 (before batch#6), started pumping drilling slop, Batch#6, 1000l/min - 140bar",1.5 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 09:15:00+00:00,2016-09-28 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Skidded BOP from well center to test stump. Meanwhile perform maintenance on FWD PRS. Emptied skimmer tank,0.75 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 10:00:00+00:00,2016-09-28 10:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Dismantled scaffolding from well center. Meanwhile performed maintenance on FWD PRS,0.75 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 10:45:00+00:00,2016-09-28 11:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Removed master bushing and outer ring in RKB,0.25 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 11:00:00+00:00,2016-09-28 11:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed Pre-job Meeting to L/D high pressure riser,0.25 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 11:15:00+00:00,2016-09-28 12:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Connected lifting gear and pulled HP riser, L/D same",1.0 +15_9_F_11_B_2016_09_29.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-09-28T00:00:00+02:00,2016-09-29T00:00:00+02:00,2016-09-28 12:15:00+00:00,2016-09-28 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Removed split hatches on F-11 and installed solid cover. Meanwhile ventilated gas from annulus on F-09 to rig choke. Meanwhile finished w/ pumping postflush after batch#6 of drilling slop on F-4. Total drilling slop pumped for batch#6 of 123m3, postflush pumped of 140m3 (after batch#5), 1000l/min - 137bar + +REPORTING ON F-9A",2.0 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 06:15:00+00:00,2016-10-20 06:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed TBT for skidding rig to F-11 B,0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 06:30:00+00:00,2016-10-20 06:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Skidded cantilever to well F-11 B,0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 06:45:00+00:00,2016-10-20 07:00:00+00:00,0.0,m,fixed,moving -- skid,ok,success,Performed post-skid checks.,0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 07:00:00+00:00,2016-10-20 07:30:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Removed hatch. +Built scaffolding around hole opening in moonpool. + +Meanwhile: Installed deck hatches on well F-12.",0.5 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 07:30:00+00:00,2016-10-20 07:45:00+00:00,0.0,m,fixed,moving -- skid,ok,success,"Removed scaffolding on WH deck to access well F-11. + +Meanwhile: Changed elevator.",0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 07:45:00+00:00,2016-10-20 08:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Lowered and N/U NT2 connector. +Installed master bushing.",0.5 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 08:15:00+00:00,2016-10-20 09:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U BHA and inner string.,1.0 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 09:15:00+00:00,2016-10-20 09:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Engaged Multibowl RT to Multibowl. Confirmed with 20 ton overpull.,0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 09:30:00+00:00,2016-10-20 11:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Load shifted weight from tension cylinders to TDS. +N/D tension cylinders and boat collision stool. +Built scaffolding around hole opening.",2.0 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 11:30:00+00:00,2016-10-20 11:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Staged up flow rate to 2400 lpm / 80 bar. +Cut riser at 134,9m. Observed loss of overpull, good indication of cut.",0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 11:45:00+00:00,2016-10-20 12:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/D hoses and valve outlets from Multibowl. +Pulled master bushing.",0.75 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 12:30:00+00:00,2016-10-20 12:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled Multibowl, riser and inner string to drill floor. Installed master bushing and C-plate. +Laned off Multibowl onto C-plate.",0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 12:45:00+00:00,2016-10-20 13:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,M/U TDS and B/O Multibowl RT. R/B same.,0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 13:00:00+00:00,2016-10-20 13:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U false rotary and C-plate.,0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 13:15:00+00:00,2016-10-20 14:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POOH with inner string. R/B cutter BHA.,0.75 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 14:00:00+00:00,2016-10-20 14:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,P/U and M/U Mutlibowl RT.,0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 14:15:00+00:00,2016-10-20 15:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"POOH with riser (Lift #1). Cleaned off marine growth on centralizer deck. +Meanwhile: Performed TBT for L/O Multibowl and tensioner joint.",0.75 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 15:00:00+00:00,2016-10-20 15:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,R/U cutting machine,0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 15:15:00+00:00,2016-10-20 17:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Attempted to cut riser. Significant wave height 0,8m +Observed vibrations after cut a few millimeters into the tensioner joint. +Cutter jammed several times.",1.75 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 17:00:00+00:00,2016-10-20 17:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Performed TBT with ongoing crew,0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 17:15:00+00:00,2016-10-20 18:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Re-aligned cutter and started new cut. +Cut riser, vibrations still present. Significant wave height 0,7m. +R/D cutting machine.",1.5 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 18:45:00+00:00,2016-10-20 19:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O Multibowl and tensioner joint. +Removed Multibowl RT and NT2 connector.",0.5 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 19:15:00+00:00,2016-10-20 19:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Pulled riser (Lift #2). Cleaned off marine growth on centralizer deck. +Landed off riser onto elevator.",0.5 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 19:45:00+00:00,2016-10-20 20:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser, no further vibrations observed. Significant wave height 0,8m +R/D cutting machine",0.5 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 20:15:00+00:00,2016-10-20 20:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #2). +Pulled riser (Lift #3). Cleaned off marine growth on centralizer deck. +Landed off riser onto elevator.",0.5 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 20:45:00+00:00,2016-10-20 21:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser. Significant wave height 0,7m +R/D cutting machine.",0.25 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 21:00:00+00:00,2016-10-20 21:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #3). +Pulled riser (Lift #4). Cleaned off marine growth on centralizer deck. +Landed off riser onto elevator. +Riser out of splash zone at 23:30",0.5 +15_9_F_11_B_2016_10_21.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-20T00:00:00+02:00,2016-10-21T00:00:00+02:00,2016-10-20 21:30:00+00:00,2016-10-20 22:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser. +R/D cutting machine.",0.5 +15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-20 22:00:00+00:00,2016-10-20 22:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #4). +Pulled riser (Lift #5). Cleaned off marine growth on centralizer deck. +Landed off riser onto elevator.",0.5 +15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-20 22:30:00+00:00,2016-10-20 22:45:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser +R/D cutting machine",0.25 +15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-20 22:45:00+00:00,2016-10-20 23:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #5). +Pulled riser (Lift #6). Cleaned off marine growth on centralizer deck. +Landed off riser onto elevator.",0.5 +15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-20 23:15:00+00:00,2016-10-20 23:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"R/U cutting machine +Cut riser +R/D cutting machine",0.25 +15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-20 23:30:00+00:00,2016-10-21 00:15:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"L/O riser joint (Lift #6). +Pulled riser (Lift #7). +L/O last riser joint.",0.75 +15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 00:15:00+00:00,2016-10-21 00:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,Cleaned and cleared drill floor,0.25 +15_9_F_11_B_2016_10_22.xml,NO 15/9-F-11 B,NO 15/9-F-11 B,2016-10-21T00:00:00+02:00,2016-10-22T00:00:00+02:00,2016-10-21 00:30:00+00:00,2016-10-21 01:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"Installed hatches and hole covers in moonpool and WH deck. +Removed scaffolding. + +*** END OF REPORT ***",1.0