diff --git "a/processed/ddr/15_9_19_S_activities.csv" "b/processed/ddr/15_9_19_S_activities.csv" new file mode 100644--- /dev/null +++ "b/processed/ddr/15_9_19_S_activities.csv" @@ -0,0 +1,1421 @@ +file,well_name,wellbore_name,report_start,report_end,act_start,act_end,md_m,md_uom,phase,activity_code,state,state_detail,comments,duration_hours +15_9_19_S_1992_09_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-08T00:00:00+02:00,1992-09-09T00:00:00+02:00,1992-09-08 16:00:00+00:00,1992-09-08 19:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"PULLED AND BOLSTERED ANCHORS NO.5, 1 AND 8",3.0 +15_9_19_S_1992_09_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-08T00:00:00+02:00,1992-09-09T00:00:00+02:00,1992-09-08 19:00:00+00:00,1992-09-08 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,WAITING ON NPD APPROVAL TO MOVE THE RIG. CONTINUE WORKING ON OUT- STANDING ITEMS ACCORDING TO PUNCHLISTS.,3.0 +15_9_19_S_1992_09_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-09T00:00:00+02:00,1992-09-10T00:00:00+02:00,1992-09-08 22:00:00+00:00,1992-09-09 01:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,CONTINUE WAITING ON NPD APPROVAL TO MOVE THE RIG.,3.0 +15_9_19_S_1992_09_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-09T00:00:00+02:00,1992-09-10T00:00:00+02:00,1992-09-09 01:00:00+00:00,1992-09-09 04:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED AND BOLSTERED ANCHORS NO.3 AND 7. BEGIN PULLING ANCHOR NO. 6,3.0 +15_9_19_S_1992_09_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-09T00:00:00+02:00,1992-09-10T00:00:00+02:00,1992-09-09 04:00:00+00:00,1992-09-09 12:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED AND BOLSTERED ANCHOR NO 6.,8.0 +15_9_19_S_1992_09_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-09T00:00:00+02:00,1992-09-10T00:00:00+02:00,1992-09-09 12:00:00+00:00,1992-09-09 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,WAITED ON NPD APPROVAL TO MOVE RIG. WORKED ON OUTSTANDING ITEMS ON PUNCH LIST.,10.0 +15_9_19_S_1992_09_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-10T00:00:00+02:00,1992-09-11T00:00:00+02:00,1992-09-09 22:00:00+00:00,1992-09-10 04:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,CONTINUED WAITING ON APPROVAL TO MOVE RIG. WORKED ON OUTSTANDING ITEMS ON PUNCH LIST. M/U FRAMO UMBILICAL TO CTS FOR FUNCTION TEST.,6.0 +15_9_19_S_1992_09_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-10T00:00:00+02:00,1992-09-11T00:00:00+02:00,1992-09-10 04:00:00+00:00,1992-09-10 11:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,WAITING ON APPROVAL TO MOVE RIG. WORKED ON OUTSTANDING ITEMS ON PUNCH LIST. FUNCTION TESTED FRAMO CTS.,7.0 +15_9_19_S_1992_09_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-10T00:00:00+02:00,1992-09-11T00:00:00+02:00,1992-09-10 11:00:00+00:00,1992-09-10 12:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED AND BOLSTERED ANCHOR NO 2.,1.0 +15_9_19_S_1992_09_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-10T00:00:00+02:00,1992-09-11T00:00:00+02:00,1992-09-10 12:00:00+00:00,1992-09-10 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,10.0 +15_9_19_S_1992_09_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-11T00:00:00+02:00,1992-09-12T00:00:00+02:00,1992-09-10 22:00:00+00:00,1992-09-11 04:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE.,6.0 +15_9_19_S_1992_09_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-11T00:00:00+02:00,1992-09-12T00:00:00+02:00,1992-09-11 04:00:00+00:00,1992-09-11 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,18.0 +15_9_19_S_1992_09_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-12T00:00:00+02:00,1992-09-13T00:00:00+02:00,1992-09-11 22:00:00+00:00,1992-09-12 04:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,6.0 +15_9_19_S_1992_09_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-12T00:00:00+02:00,1992-09-13T00:00:00+02:00,1992-09-12 04:00:00+00:00,1992-09-12 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,18.0 +15_9_19_S_1992_09_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-13T00:00:00+02:00,1992-09-14T00:00:00+02:00,1992-09-12 22:00:00+00:00,1992-09-13 04:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,6.0 +15_9_19_S_1992_09_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-13T00:00:00+02:00,1992-09-14T00:00:00+02:00,1992-09-13 04:00:00+00:00,1992-09-13 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,18.0 +15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-13 22:00:00+00:00,1992-09-14 01:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG ON MOVE TO LOCATION 15/9-C,3.0 +15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 01:00:00+00:00,1992-09-14 02:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"DROPPED ANCHOR NO 7, ON BOTTOM 03:00 HRS. CHECKED ANCHOR HOLDING 50 TON, OK.",1.0 +15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 02:00:00+00:00,1992-09-14 02:30:00+00:00,0.0,m,fixed,moving -- transit,ok,success,UNLOADED NORDMANN BORG.,0.5 +15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 02:30:00+00:00,1992-09-14 04:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"MOVED RIG TO TEMPLATE,PREPARED TO RUN ROV.",1.5 +15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 04:00:00+00:00,1992-09-14 06:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,JUMPED ROV.INSPECTED TEMPLATE AND INSTALLED HONEYWELL TRANSPONDER IN A1. UNABLE TO DISCONNECT TRANSPONDER DUE TO LIGHT FAILURE ON ROV. PULL ROV AND TRANSPONDER.,2.0 +15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 06:00:00+00:00,1992-09-14 12:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,ANCHOR ON BTM LENGTH BOAT ANCHOR ON BTM LENGTH BOAT NO.2 09:15 1012M MEARSK SUPPORT NO.3 09:22 1312M NORMAND BORG NO.1 10:30 1129M NORMAND BORG NO.6 11:06 1098M SOLFONN NO.5 13:02 1220M SOLFONN NO.4 14:15 1242M SOLFONN,6.5 +15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 12:30:00+00:00,1992-09-14 15:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,JUMPED ROV AND INSPECTED TEMPLATE. POS. RIG AND INSTALLED HONYWELL TRANSPONDER IN PILE SLEEVE A1. RETRIVED SIMRAD HPR TRANSPONDER IN C1. LOST TRANSPONDER ON WAY OUT. LOCATED TRANSPONDER W/ROV ON SEA BED 10-15M FROM S3 ON TEMPLATE.,3.0 +15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 15:30:00+00:00,1992-09-14 18:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,SET OUT ANCHOR NO.8 W/NORMAND BORG. ON BTM. AT 20:05 HRS. LENGTH 1059M,2.5 +15_9_19_S_1992_09_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-14T00:00:00+02:00,1992-09-15T00:00:00+02:00,1992-09-14 18:00:00+00:00,1992-09-14 22:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,DEBALLASTED RIG TO OPERATION DRAFT.,4.0 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-14 22:00:00+00:00,1992-09-14 23:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,CONTINUE DEBALLASTED RIG.,1.0 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-14 23:00:00+00:00,1992-09-15 01:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,ATTEMTED TO SET OUT CTS ANCHOR. WIRE FROM RIG TO NORMAND BORG WAS ACRO SS EMERGENCY TOWING LINE.,2.0 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 01:00:00+00:00,1992-09-15 02:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,REARRANGED WIRE FROM RIG TO NORMAND BORG.,1.0 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 02:00:00+00:00,1992-09-15 03:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED CTS ANCHOR OVER TO NORMAND BORG. REARRANGED CTS ANCHOR.,1.5 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 03:30:00+00:00,1992-09-15 04:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,POSISTIONED NORMAND BORG AND DROPPED CTS ANCHOR 120M/110 DEG. FROM TEMPLATE.,0.5 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 04:00:00+00:00,1992-09-15 05:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,INSPECTED CTS ANCHOR WITH ROV. RELEASED ROV HOOK. PULLED HOOK TO NORMAND BORG.,1.0 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 05:00:00+00:00,1992-09-15 06:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,equipment failure,"JUMPED SEA OWL,RETRIEVED SAME DUE TO ELECTRICAL FAILURE.",1.0 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 06:00:00+00:00,1992-09-15 10:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"PULLTESTED ANCHORS TO 160 TON,OK. JUMPED SEA OWL. POSITIONED RIG OVER TEMPLATE.",4.5 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 10:30:00+00:00,1992-09-15 12:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"PREPARED GUIDE LINE NO.4 TO OPEN HATCH,WHILE PERFORMED TEMPLATE SURVEY W/ROV.",1.5 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 12:00:00+00:00,1992-09-15 16:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"OPENED LATCH ON HATCH S3. ESTABLISHED WIRE TO OPEN HATCH. OPENED HATCH S3. INSPECTED HINGES,RELEASED WIRE. STABBED AND INSTALLED GUIDE WIRE NO.4. PULLTESTED SAME TO 2 TON,OK.",4.0 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 16:00:00+00:00,1992-09-15 17:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"INSTALLED GUIDE WIRE NO.1 AND PULLTESTED SAME WITH 2 TON,OK.",1.0 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 17:00:00+00:00,1992-09-15 18:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,MOVED RIG 12M IN DIR. 110 DEG. OPERATION INTERRUPTED DUE TO PROBLEMS ON GUIDE LINE NO.4.,1.0 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 18:00:00+00:00,1992-09-15 20:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,INSTALLED GUIDE WIRE NO.2 AND NO.3 PULLTESTED SAME TO 2 TON. MOVED RIG 25M FROM TEMPLATE IN DIR. 110 DEG.,2.0 +15_9_19_S_1992_09_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-15T00:00:00+02:00,1992-09-16T00:00:00+02:00,1992-09-15 20:00:00+00:00,1992-09-15 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 5"" HWDP",2.0 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-15 22:00:00+00:00,1992-09-16 03:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONT. P/U 5"" HWDP AND RACKED SAME BACK IN DERRICK. M/U 26"" BIT FOR RUNNING CTS.",5.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 03:30:00+00:00,1992-09-16 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"PICK UP 9 1/2"" DRILL COLLARS.",0.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 04:00:00+00:00,1992-09-16 05:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,MADE UP SPUD ASSEMBLY.,1.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 05:30:00+00:00,1992-09-16 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"DRIFTED CTS TO 34"" USING 34""/36"" HOLEOPENER.",0.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 06:00:00+00:00,1992-09-16 08:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,BREAK CONNECTION BWETWEEN FRONT DRILL AND HOLE OPENER. TREADS DAMAGE. LAID DOWN BOTH.,2.0 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 08:00:00+00:00,1992-09-16 09:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MADE UP 1 STAND 9 1/2"" DC AND RACKED BACK IN DERRICK.",1.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 09:30:00+00:00,1992-09-16 10:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"STABBED INTO CTS PUMP UNIT WITH 26"" BIT. CLOSED RAM AND PERFORMED PICK UP TEST.",0.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 10:00:00+00:00,1992-09-16 14:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PREPERED CTS PUMP AND HOSE FOR RUNNING.,4.0 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 14:00:00+00:00,1992-09-16 15:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PICKED UP AND RAN CTS PUMP AND HOSE.,1.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 15:30:00+00:00,1992-09-16 16:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,HOOKED UP COOLING TO CTS FROM RIG SYSTEM.,1.0 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 16:30:00+00:00,1992-09-16 17:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,RAN CTS TO 78M.,1.0 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 17:30:00+00:00,1992-09-16 18:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,WIRE CONNECTED TO MIDDLE POINT OF CTS HOSE TO SHORT. CLAMPED ON NEW WIRE.,0.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 18:00:00+00:00,1992-09-16 18:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,RAN CTS.,0.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 18:30:00+00:00,1992-09-16 19:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CHECKED WIRE/HOSES WITH ROV.,0.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 19:00:00+00:00,1992-09-16 20:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POSITIONED RIG OVER WELL. CHECKED WIRE/HOSES WITH ROV.,1.5 +15_9_19_S_1992_09_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-16T00:00:00+02:00,1992-09-17T00:00:00+02:00,1992-09-16 20:30:00+00:00,1992-09-16 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,RAN CTS. CHECKED WIRE/HOSES WITH ROV.,1.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-16 22:00:00+00:00,1992-09-17 00:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,RAN CTS. HAD PROBLEMS STABBING INTO PGB AND USED SCORPION TO HELP STABBING. STABBED IN WITH CTS 01:40 HRS.,2.0 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 00:00:00+00:00,1992-09-17 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"TOOK WEIGHT WHEN CTS WAS 1.20M ABOVE PGB. CHECKED CTS HOSE, HYDRAULIC HOSE, OK. SLACKED OFF CTS WEIGHT (5-6 TONS). CTS STILL AT THE SAME PLACE.",1.0 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 01:00:00+00:00,1992-09-17 02:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"STARTED CTS PUMP. MAX. RATE APPROX. 7000 L/MIN. WITH 160 BAR PRESSURE, WHILE OBSERVING OUTLET CTS HOSE WITH ROV.",1.0 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 02:00:00+00:00,1992-09-17 02:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"SET BIT ON BOTTOM AT 108,5M. JETTED FROM 108,5M TO 110M. MAX RATE 1650 L/MIN. CTS PUMP LANDED ON PGB.",0.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 02:30:00+00:00,1992-09-17 03:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"OPENED RAM ON CTS. PULLED 26"" BIT ABOVE TEMPLATE.",0.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 03:00:00+00:00,1992-09-17 03:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MOVED RIG 25M, DIRECTION 110 DEG..",0.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 03:30:00+00:00,1992-09-17 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PULLED OUT OF HOLE WITH CTS LANDING STRING.,0.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 04:00:00+00:00,1992-09-17 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PULLED OUT OF HOLE WITH CTS LANDING STRING. LAID DOWN BIT AND SUBS.,1.0 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 05:00:00+00:00,1992-09-17 12:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MADE UP AND RACKED BACK 10 STANDS 5"" DP.",7.0 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 12:00:00+00:00,1992-09-17 16:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"PICKED UP BOTTOM HOLE ASSEMBLY NO.1. SET MEMORY ON MWD AND FUNCTIONED SAME, OK.",4.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 16:30:00+00:00,1992-09-17 18:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MADE UP JAR, 2 X 8"" DC, CROSSED OVER TO HWDP AND RAN IN TO 91M.",1.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 18:00:00+00:00,1992-09-17 19:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,MOVED RIG TO 15M OFF LOCATION.,1.0 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 19:00:00+00:00,1992-09-17 19:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,INSTALLED AND RAN GUIDE FRAME. FOUND WIRE FOR CTS HOSE TWISTED. UNTWISTED SAME.,0.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 19:30:00+00:00,1992-09-17 20:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,MOVED RIG IN POSITION OVER TEMPLATE.,0.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 20:00:00+00:00,1992-09-17 20:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,UNTWISTED WIRE FOR CTS HOSE.,0.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 20:30:00+00:00,1992-09-17 21:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,HELD SHALLOW GAS MEETING WITH THE CREW.,0.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 21:00:00+00:00,1992-09-17 21:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,STAB INTO CTS PUMP AT 2315 HRS. RIH TO 107M. PULLED GUIDE FRAME TO SURFACE.,0.5 +15_9_19_S_1992_09_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-17T00:00:00+02:00,1992-09-18T00:00:00+02:00,1992-09-17 21:30:00+00:00,1992-09-17 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CLOSED RAM ON CTS PUMP AND TOOK SURVEY WITH MWD TOOL. INSPECTED CTS HOSE.,0.5 +15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-17 22:00:00+00:00,1992-09-17 22:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POSITIONED RIG. TOOK SURVEY ON BOTTOM 0,3 DEG.",0.5 +15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-17 22:30:00+00:00,1992-09-17 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,INSPECTED CTS HOSE WITH ROV AND STRAIGHTED SAME.,0.5 +15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-17 23:00:00+00:00,1992-09-18 00:30:00+00:00,134.0,m,fixed,drilling -- drill,ok,success,"DRILLED 9 7/8"" PILOTHOLE FROM 109 M TO 134 M.",1.5 +15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-18 00:30:00+00:00,1992-09-18 01:00:00+00:00,107.0,m,fixed,interruption -- repair,ok,equipment failure,"SWEEPED HOLE WITH 5 M3 HI-VIS MUD. POOH TO CTS PUMP, DUE TO FAILURE ON DEPTH SENSOR TO MWD.",0.5 +15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-18 01:00:00+00:00,1992-09-18 04:00:00+00:00,180.0,m,fixed,drilling -- drill,ok,success,"RIH TO 134 M. DRILLED 9 7/8"" PILOTHOLE FROM 134 M TO 180 M. PUMPED 5 M3 HI-VIS MUD ON EVERY STAND.",3.0 +15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-18 04:00:00+00:00,1992-09-18 04:30:00+00:00,195.0,m,fixed,drilling -- drill,ok,success,"DRILLED 9 7/8"" PILOTHOLE FROM 180 M TO 195 M.",0.5 +15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-18 04:30:00+00:00,1992-09-18 05:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,HELD SHALLOW GAS MEETING WITH CREW.,0.5 +15_9_19_S_1992_09_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-18T00:00:00+02:00,1992-09-19T00:00:00+02:00,1992-09-18 05:00:00+00:00,1992-09-18 22:00:00+00:00,547.0,m,fixed,drilling -- drill,ok,success,"DRILLED 9 7/8"" PILOTHOLE FROM 195 M TO 547 M. PUMPED 5 M3 HI-VIS PILL ON EVERY CONNECTION.",17.0 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-18 22:00:00+00:00,1992-09-18 23:00:00+00:00,547.0,m,fixed,drilling -- circulating conditioning,ok,success,"PUMPED 10 M3 HI-VIS PILL FOLLOWED BY 10 M3 SEAWATER AND 10 M3 1,25 SG HI-VIS MUD.",1.0 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-18 23:00:00+00:00,1992-09-19 01:00:00+00:00,80.0,m,fixed,drilling -- trip,ok,success,"POOH TO 15 M ABOVE TEMPLATE. PUMPED 0,7 M3 1,25 SG HI-VIS MUD ON EVERY STAND WHEN PULLING OUT.",2.0 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 01:00:00+00:00,1992-09-19 02:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PULLED RIG 35 M DIRECTION 110 DEG.,1.0 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 02:00:00+00:00,1992-09-19 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH. L/D 8"" MWD.",2.0 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 04:00:00+00:00,1992-09-19 08:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"M/U 12 1/4"" BIT,34""/36"" HOLEOPENER, REARRANGED BHA AND RIH TO 92 M.",4.5 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 08:30:00+00:00,1992-09-19 10:00:00+00:00,92.0,m,fixed,drilling -- trip,ok,success,POSITIONED RIG OVER TEMPLATE,1.5 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 10:00:00+00:00,1992-09-19 13:30:00+00:00,128.0,m,fixed,drilling -- hole open,ok,success,"STABBED INTO CTS PUMP,CLOSED CTS RAM TO CENTER STRING. OPENED UP 9 7/8"" PILOT HOLE TO 36"" FROM 109 M TO 128 M.",3.5 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 13:30:00+00:00,1992-09-19 14:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,REPAIRED SPEED CONTROL ON DRAW WORK.,0.5 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 14:00:00+00:00,1992-09-19 15:30:00+00:00,147.0,m,fixed,drilling -- hole open,ok,success,"OPENED UP 9 7/8"" PILOTHOLE TO 36"" FROM 128 M TO 147 M.",1.5 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 15:30:00+00:00,1992-09-19 17:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,INVESTIGATED FAILURE ON DRAW WORK SPEED CONTROL SYSTEM.,1.5 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 17:00:00+00:00,1992-09-19 18:30:00+00:00,170.0,m,fixed,drilling -- hole open,ok,success,"OPENED 9 7/8"" PILOTHOLE TO 36"" FROM 147 M TO 170 M. (12 1/4"" BIT AT 172 M)",1.5 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 18:30:00+00:00,1992-09-19 19:00:00+00:00,170.0,m,fixed,drilling -- circulating conditioning,ok,success,DISPLACED HOLE WITH 40 M3 HI-VIS MUD.,0.5 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 19:00:00+00:00,1992-09-19 20:00:00+00:00,170.0,m,fixed,drilling -- survey,ok,success,"DROPPED SINGLE SHOT SURVEY, PULLED STRING TO 118 M, RETRIEVED SURVEY WITH SLICK LINE. RIH TO 170 M. (SURVEY ""BULLSEYE"")",1.0 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 20:00:00+00:00,1992-09-19 21:00:00+00:00,170.0,m,fixed,drilling -- circulating conditioning,ok,success,"DISPLACED HOLE WITH 90 M3 1,25 SG HI-VIS MUD.",1.0 +15_9_19_S_1992_09_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-19T00:00:00+02:00,1992-09-20T00:00:00+02:00,1992-09-19 21:00:00+00:00,1992-09-19 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH TO 118 M, CLOSED CTS RAM,PULLED CTS PUMP ON 34""/36"" HOLEOPENER TO ABOVE TEMPLATE.",1.0 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-19 22:00:00+00:00,1992-09-19 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,PULLED RIG 25 M DIRECTION 110 DEG.,1.0 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-19 23:00:00+00:00,1992-09-20 01:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH WITH BHA AND CTS PUMP.OUT OFF WATER 03:00 HRS.,2.0 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 01:00:00+00:00,1992-09-20 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"SECURED CTS PUMP ON TROLLEY,OPENED CTS RAM,PULLED 34""/36"" HOLEOPENER RACKED SAME IN DERRICK.",1.5 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 02:30:00+00:00,1992-09-20 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"PREPARED FOR RUNNING 30"" CASING, PICKED UP SHOE AND CHECKED SAME.",1.5 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 04:00:00+00:00,1992-09-20 10:30:00+00:00,91.0,m,fixed,drilling -- casing,ok,success,"RAN 30"" CASING TO 91 M.",6.5 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 10:30:00+00:00,1992-09-20 11:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POSITIONED RIG OVER TEMPLATE.,0.5 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 11:00:00+00:00,1992-09-20 13:00:00+00:00,166.0,m,fixed,drilling -- casing,ok,success,"STABBED 30"" INTO PGB, LANDED 30"" CASING. SHOE AT 166 M. CHECKED LOCKRING ENGAGED WITH 22 TON OVERPULL, OK.",2.0 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 13:00:00+00:00,1992-09-20 14:30:00+00:00,166.0,m,fixed,drilling -- casing,ok,success,"HOOKED UP CEMENT HOSE.PRESSURE TESTED SURFACE LINES TO 100 BAR,OK. CIRCULATED 19 M3 WITH SEAWATER.STARTED TO MIX AND PUMP CEMENT.",1.5 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 14:30:00+00:00,1992-09-20 16:00:00+00:00,166.0,m,fixed,drilling -- casing,ok,operation failed,"LOST MIXWATER INTO SEA THROUGH TRIPTANK, FOUND ONE VALVE OPEN. CIRCULATED OUT CEMENT, MADE NEW LEAD MIXWATER IN PIT.",1.5 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 16:00:00+00:00,1992-09-20 18:00:00+00:00,166.0,m,fixed,drilling -- casing,ok,success,"MIXED AND PUMPED 17,2 M3 1,56 SG LEAD SLURRY, FOLLOWED BY 15 M3 1,9 SG TAIL SLURRY, DISPLACED SAME WITH 4,6 M3 SEAWATER. FLOWCHECKED-OK.",2.0 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 18:00:00+00:00,1992-09-20 18:30:00+00:00,104.0,m,fixed,drilling -- casing,ok,success,"B/U 30"" RUNNING TOOL , TESTED SCR'S WHILE CLEANED PIPE. PULL STINGER ABOVE TEMPLATE.",0.5 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 18:30:00+00:00,1992-09-20 19:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,PULLED RIG 25 M DIRECTION 110 DEG.,0.5 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 19:00:00+00:00,1992-09-20 20:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH, L/D 30"" RUNNING TOOL.",1.0 +15_9_19_S_1992_09_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-20T00:00:00+02:00,1992-09-21T00:00:00+02:00,1992-09-20 20:00:00+00:00,1992-09-20 22:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"DISCONNECTED CTS EXTENSION PIPE FOR 36"" HOLE.",2.0 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-20 22:00:00+00:00,1992-09-21 00:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"M/U CTS EXTENSION FOR DRILLING 26"" HOLE.",2.0 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 00:00:00+00:00,1992-09-21 03:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"M/U 18 3/4"" HOUSING JOINT, RACKED SAME IN DERRICK.",3.0 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 03:00:00+00:00,1992-09-21 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"M/U 26"" BHA.",1.0 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 04:00:00+00:00,1992-09-21 08:30:00+00:00,44.0,m,fixed,drilling -- trip,ok,success,"M/U 26"" BHA, TESTED MWD OK.CLOSED CTS RAM ON 26"" HOLEOPENER. RIH WITH CTS PUMP/26"" HOLEOPENER TO 44 M.",4.5 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 08:30:00+00:00,1992-09-21 10:30:00+00:00,44.0,m,fixed,interruption -- repair,ok,operation failed,SORTED OUT LOOP ON CTS HOSE.,2.0 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 10:30:00+00:00,1992-09-21 11:00:00+00:00,72.0,m,fixed,drilling -- trip,ok,success,"RIH WITH CTS PUMP/26"" HOLEOPENER TO 72 M.",0.5 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 11:00:00+00:00,1992-09-21 11:30:00+00:00,72.0,m,fixed,drilling -- trip,ok,success,POSITIONED RIG OVER TEMPLATE.,0.5 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 11:30:00+00:00,1992-09-21 12:30:00+00:00,162.0,m,fixed,drilling -- trip,ok,success,"LANDED CTS PUMP ON 30"" HOUSING,CONTINUED RIH WITH 12 1/4"" BIT/26"" HO. TAGGED CEMENT AT 162 M.",1.0 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 12:30:00+00:00,1992-09-21 13:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,SORTED OUT LOOP ON CTS HOSE.,1.0 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 13:30:00+00:00,1992-09-21 17:00:00+00:00,170.0,m,fixed,drilling -- casing,ok,success,"DRILLED CEMENT FROM 162 M,30"" SHOE AT 166 M AND CEMENT TO 170 M. (12 1/4"" BIT AT 172 M)",3.5 +15_9_19_S_1992_09_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-21T00:00:00+02:00,1992-09-22T00:00:00+02:00,1992-09-21 17:00:00+00:00,1992-09-21 22:00:00+00:00,230.0,m,fixed,drilling -- hole open,ok,success,"OPENED 9 7/8"" PILOTHOLE TO 26"" HOLE FROM 170 M TO 230 M. PUMPED 5 M3 HI-VIS PILL EVERY 15 M DRILLED.",5.0 +15_9_19_S_1992_09_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-22T00:00:00+02:00,1992-09-23T00:00:00+02:00,1992-09-21 22:00:00+00:00,1992-09-22 04:00:00+00:00,311.0,m,fixed,drilling -- hole open,ok,success,"OPENED 9 7/8"" PILOTHOLE TO 26"" FROM 230 M TO 311 M. PUMPED 5 M3 HI-VIS PILL ON EVERY 15 M DRILLED.",6.0 +15_9_19_S_1992_09_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-22T00:00:00+02:00,1992-09-23T00:00:00+02:00,1992-09-22 04:00:00+00:00,1992-09-22 19:00:00+00:00,545.0,m,fixed,drilling -- hole open,ok,success,"OPENED 9 7/8"" PILOTHOLE TO 26"" HOLE FROM 311 M TO 545 M. (12 1/4"" BIT AT 547 M) PUMPED 5 M3 HI-VIS PILL ON EVERY 15 M DRILLED.",15.0 +15_9_19_S_1992_09_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-22T00:00:00+02:00,1992-09-23T00:00:00+02:00,1992-09-22 19:00:00+00:00,1992-09-22 20:00:00+00:00,545.0,m,fixed,drilling -- circulating conditioning,ok,success,"PUMPED 10 M3 HI-VIS PILL,FOLLOWED BY 60 M3 OF SEAWATER.DISPLACED HOLE WITH 110 M3 HI-VIS PILL.",1.0 +15_9_19_S_1992_09_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-22T00:00:00+02:00,1992-09-23T00:00:00+02:00,1992-09-22 20:00:00+00:00,1992-09-22 22:00:00+00:00,545.0,m,fixed,drilling -- trip,ok,success,"POOH TO 30"" CASING SHOE. MAX OVERPULL 20 TON AT 420 M. RIH TO 545 M. WORKED TIGHT SPOT AT 420 M,OK.",2.0 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-22 22:00:00+00:00,1992-09-22 23:30:00+00:00,545.0,m,fixed,drilling -- trip,ok,success,"PUMPED 200 M3 OF SEAWATER FOLLOWED BY 45 M3 HI-VIS PILL. DISPLACED HOLE WITH 120 M3 1,25 SG HI-VIS MUD.",1.5 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-22 23:30:00+00:00,1992-09-23 01:30:00+00:00,90.0,m,fixed,drilling -- trip,ok,success,"POOH TO 122 M,CLOSED CTS RAM,PULLED CTS PUMP/26"" HOLEOPENER ABOVE TEMPLATE.",2.0 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 01:30:00+00:00,1992-09-23 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,MOVED RIG 25 M DIRECTION 110 DEG.,1.0 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 02:30:00+00:00,1992-09-23 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH WITH CTS PUMP/26"" HOLEOPENER.SECURED CTS PUMP ON TROLLEY.",1.5 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 04:00:00+00:00,1992-09-23 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"SECURED CTS PUMP,OPENED CTS RAM,RACKED 26"" HOLEOPENER BACK IN DERRICK.",1.0 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 05:00:00+00:00,1992-09-23 10:00:00+00:00,85.0,m,fixed,drilling -- casing,ok,success,"PREPARED AND RAN 20"" CASING TO 84 M. LOCKED FIRST 3 JOINTS. M/U CEMENT HEAD ON DP,RACKED SAME IN DERRICK.",5.0 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 10:00:00+00:00,1992-09-23 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,POSITIONED RIG OVER TEMPLATE.,0.5 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 10:30:00+00:00,1992-09-23 11:00:00+00:00,84.0,m,fixed,drilling -- casing,ok,operation failed,"GUIDE WIRE NO.3 HOOKED ON 20"" CASING,SORTED SAME OUT,OK.",0.5 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 11:00:00+00:00,1992-09-23 16:00:00+00:00,531.0,m,fixed,drilling -- casing,ok,success,"RAN 20"" CASING,LATCHED ON 30"" HOUSING,20"" SHOE AT 531 M. TOOK 18 TON OVERPULL,OK.",5.0 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 16:00:00+00:00,1992-09-23 17:00:00+00:00,531.0,m,fixed,drilling -- casing,ok,success,"HOOKED UP SURFACE LINES, PUMPED 95 M3 SEAWATER.MAX 2000 L/MIN. PRESSURE TESTED SURFACE LINES TO 100 BAR,OK.",1.0 +15_9_19_S_1992_09_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-23T00:00:00+02:00,1992-09-24T00:00:00+02:00,1992-09-23 17:00:00+00:00,1992-09-23 22:00:00+00:00,531.0,m,fixed,drilling -- casing,ok,success,"MIXED AND PUMPED 101 M3 1,56 SG LEAD SLURRY,FOLLOWED BY 15 M3 1.9 SG TAIL SLURRY.RELEASED DART ,DISPLACED CEMENT W/74,1 M3 1,25 SG MUD. SHEARED WIPERPLUG W/345 BAR. BUMPED PLUG AND PRESSURE TESTED 20"" CASING TO 70 BAR.",5.0 +15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-23 22:00:00+00:00,1992-09-23 22:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"RELEASED 20"" RUNNING TOOL BY 3 RIGHT HAND TURNS. PULLED RUNNING TOOL ABOVE TEMPLATE.",0.5 +15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-23 22:30:00+00:00,1992-09-23 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,MOVED RIG 25 M DIRECTION 110 DEG.,0.5 +15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-23 23:00:00+00:00,1992-09-24 00:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"L/D CEMENT HEAD,POOH L/D 20"" RUNNING TOOL.",1.5 +15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 00:30:00+00:00,1992-09-24 02:00:00+00:00,82.0,m,fixed,plug abandon -- other,ok,success,"M/U CORROSION CAP,RIH TO 82 M. INSTALLED MODIFIED GUIDE FRAME.",1.5 +15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 02:00:00+00:00,1992-09-24 03:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"WASHED WELLHEAD,USING SCORPION.PERFORMED SURVEY ON WELLHEAD,OK.",1.0 +15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 03:00:00+00:00,1992-09-24 03:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,POSITIONED RIG OVER TEMPLATE.,0.5 +15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 03:30:00+00:00,1992-09-24 04:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,LANDED CORROTION CAP.,0.5 +15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 04:00:00+00:00,1992-09-24 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"MIXED AND PUMPED INHIBITOR.OBSERVED WITH ROV,OK. SHEARED PINS ON CORROTION CAP RUNNING TOOL WITH 5 TON OVERPULL. POOH TO 81 M.",1.5 +15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 05:30:00+00:00,1992-09-24 10:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,RELEASED AND PULLED 3 GUIDE LINE ANCHORS.,4.5 +15_9_19_S_1992_09_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-09-24T00:00:00+02:00,1992-09-25T00:00:00+02:00,1992-09-24 10:00:00+00:00,1992-09-24 12:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,"HOOKED GUIDELINE ANHCOR NO.3 TO HATCH NO.3. CLOSED AND LOCKED SAME. (END OFF REPORT,CONT. ON REPORT NO.1 ON WELL 15/9-C 2H)",2.0 +15_9_19_S_1992_11_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-17T00:00:00+01:00,1992-11-18T00:00:00+01:00,1992-11-17 17:00:00+00:00,1992-11-17 17:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,MOVED RIG 30M FORWARD,0.5 +15_9_19_S_1992_11_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-17T00:00:00+01:00,1992-11-18T00:00:00+01:00,1992-11-17 17:30:00+00:00,1992-11-17 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RELEASED BOP FROM CARRIER. LIFTED BOP OFF TEST STUMP. INSTALLED VX ON STUMP. SET BOP BACK ON TEST STUMP AND WELDED BOP TO CARRIER. REMOVED RISER AND MOVED CARRIER BACK FOR BOP TESTING.,4.5 +15_9_19_S_1992_11_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-17T00:00:00+01:00,1992-11-18T00:00:00+01:00,1992-11-17 22:00:00+00:00,1992-11-17 23:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,OPENED HATCH COVER ON SLOT NO. 3.,1.0 +15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-17 23:00:00+00:00,1992-11-18 02:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,INSTALLED GUIDE WIRES.,3.5 +15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 02:30:00+00:00,1992-11-18 03:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,"MOVED RIG OVER WELL. PULL TESTED GUIDE LINES TO 2,5 TONS.",1.0 +15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 03:30:00+00:00,1992-11-18 05:00:00+00:00,103.0,m,fixed,drilling -- drill,ok,success,RIH WITH CORROSION CAP R/R TOOL. RAN GUIDE FRAME. RETRIEVED CORROSION CAP WITH 15 TONS OVERPULL. POOH WITH CAP AND R/R TOOL.,1.5 +15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 05:00:00+00:00,1992-11-18 06:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,LD CORROSION CAP AND R/R TOOL.,1.0 +15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 06:00:00+00:00,1992-11-18 15:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"PRESSURE TESTED UAP TO 27/345 BAR, 5/15 MINS. PRESSURE TESTED LAP AND PIPE RAMS TO 27/690 BAR, 5/15 MINS.",9.0 +15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 15:00:00+00:00,1992-11-18 15:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,MOVED RIG 30 M OFF WELL.,0.5 +15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 15:30:00+00:00,1992-11-18 17:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,FOUND SHEAR RAM LEAKING. BROUGHT CARRIER UP IN HIGH POSITION. PREPARED FOR WORKING ON SHEAR RAM.,1.5 +15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 17:00:00+00:00,1992-11-18 18:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,SECURED BOP.,1.0 +15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 18:00:00+00:00,1992-11-18 21:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,FUNCTION TESTED BOP.,3.5 +15_9_19_S_1992_11_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-18T00:00:00+01:00,1992-11-19T00:00:00+01:00,1992-11-18 21:30:00+00:00,1992-11-18 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,WORKED ON SHEAR RAM.,1.5 +15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-18 23:00:00+00:00,1992-11-18 23:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,CONT. WORKING ON SHEAR RAM. FOUND T-SEAL TO BE DAMAGED.,0.5 +15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-18 23:30:00+00:00,1992-11-19 01:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,LD RISER AND RUNNING TOOL,1.5 +15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-19 01:00:00+00:00,1992-11-19 02:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"CHANGED SAVER SUB IN TDS TO 6 5/8"" FH.",1.5 +15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-19 02:30:00+00:00,1992-11-19 05:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,RU FOR AND CARRIED OUT TORQUE MEASUREMENTS FOR CALIBRATION PURPOSES.,2.5 +15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-19 05:00:00+00:00,1992-11-19 06:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,CONT.REPAIRING SHEAR RAM.,1.0 +15_9_19_S_1992_11_20.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-19T00:00:00+01:00,1992-11-20T00:00:00+01:00,1992-11-19 06:00:00+00:00,1992-11-19 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,W.O.W. TO RUN BOP/RISER,17.0 +15_9_19_S_1992_11_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-20T00:00:00+01:00,1992-11-21T00:00:00+01:00,1992-11-19 23:00:00+00:00,1992-11-20 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CONT W.O.W.,6.0 +15_9_19_S_1992_11_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-20T00:00:00+01:00,1992-11-21T00:00:00+01:00,1992-11-20 05:00:00+00:00,1992-11-20 15:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"CONT. WOW TO RUN BOP/RISER. WHILE WOW, REARRANGED 9 1/2"" DC AND 8"" DC IN DERRICK AND PU/MU 17 1/2"" BHA AND RACKED SAME IN DERRICK.",10.5 +15_9_19_S_1992_11_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-20T00:00:00+01:00,1992-11-21T00:00:00+01:00,1992-11-20 15:30:00+00:00,1992-11-20 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RD DRILLPIPE EQUIPMENT. RU TO RUN BOP. MOVED BOP/CARRIER IN PLACE. PU 2 EA 50 FT RISER JOINTS AND MU TO BOP. DEBALLASTED RIG, CUT BOP LOOSE FROM CARRIER AND BALLASTED RIG. INSTALLED GUIDE WIRES. LIFTED BOP OFF CARRIER, MOVED CARRIER AWAY AND RAN BOP THROUGH SPLASH ZONE. RU TO TEST K/C LINES. TESTED TO 30 BAR/5 MINS.",6.5 +15_9_19_S_1992_11_21.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-20T00:00:00+01:00,1992-11-21T00:00:00+01:00,1992-11-20 22:00:00+00:00,1992-11-20 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,"ATTEMPTED PRESSURE TESTING K/C LINES TO 345 BAR, NEG. TEST PLUG LEAKING.",1.0 +15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-20 23:00:00+00:00,1992-11-20 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,TESTED K/C LINES TO 345 BAR/10 MINS.,0.5 +15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-20 23:30:00+00:00,1992-11-21 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"CONT. RUNNING BOP/RISER. PRESSURE TESTED K/C LINES TO 30/345 BAR, 5/10 MINS. MU SLIP JOINT AND HANDLING JOINT. MU GOOSE NECK FROM KILL LINE TO RISER. DE-BALLASTED RIG 2M.",5.5 +15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 05:00:00+00:00,1992-11-21 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"CONT. INSTALLATION OF KILL/CHOKE LINES, RISER TENSIONERS AND SADDLE FOR POD HOSES. PRESSURE TESTED KILL/CHOKE LINES TO 35/345 BAR, 5/10 MINUTES.",4.0 +15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 09:00:00+00:00,1992-11-21 10:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,POSITIONED RIG OVER WELL,1.0 +15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 10:00:00+00:00,1992-11-21 11:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,BALLASTED RIG TO DRILLING DRAFT,1.0 +15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 11:00:00+00:00,1992-11-21 16:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"LANDED BOP. OVERPULL TESTED WITH 25 TONS. CLOSED SHEAR RAM WITH ACOUSTIC SYSTEM AND PRESSURE TESTED 20"" CASING AND SHEAR RAM TO 75 BAR/15 MINUTES. LAID DOWN LANDING JOINT. INSTALLED DIVERTER. RIGGED DOWN RISER HANDLING EQUIPMENT.",5.0 +15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 16:00:00+00:00,1992-11-21 20:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"RIGGED UP PIPE HANDLING EQUIPMENT. MADE UP SPRING LOADED TOOL AND RAN IN HOLE. PRESSURE TESTED WELLHEAD CONNECTOR TO 20/345 BAR, 5/10 MINUTES. PULLED TOOL.",4.0 +15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 20:00:00+00:00,1992-11-21 21:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MADE UP SPRING LOADED TOOL TO 18 3/4"" NOMINAL BORE PROTECTOR AND RAN IN HOLE. FUNCTION TESTED BOP ON BLUE POD FROM DRILLERS PANEL. RETRIEVED SPRING LOADED TOOL.",1.5 +15_9_19_S_1992_11_22.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-21T00:00:00+01:00,1992-11-22T00:00:00+01:00,1992-11-21 21:30:00+00:00,1992-11-21 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,"INSTALLED SPIDER AND DIVERTER RUNNING TOOL. PICKED UP DIVERTER AND CHANGED OUT O-RINGS ON CONNECTION BETWEEN THE DIVERTER AND THE SLIP- JOINT INNER BARREL. RE-INSTALLED DIVERTER, OK.",1.5 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-21 23:00:00+00:00,1992-11-22 04:00:00+00:00,506.0,m,fixed,drilling -- trip,ok,success,MADE UP BOTTOMHOLE ASSEMBLY NUMBER 4 AND RAN IN HOLE TO 506 METERS. TESTED MUD MOTOR AND MWD ON WAY IN.,5.0 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 04:00:00+00:00,1992-11-22 04:30:00+00:00,506.0,m,fixed,drilling -- drill,ok,success,HELD KICK DRILL,0.5 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 04:30:00+00:00,1992-11-22 05:00:00+00:00,510.0,m,fixed,drilling -- trip,ok,success,CONT. RUNNING IN TO DRILL FLOAT/CEMENT/SHOE,0.5 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 05:00:00+00:00,1992-11-22 07:00:00+00:00,525.0,m,fixed,drilling -- casing,ok,success,TAGGED AT 517M. DRILLED PLUGS AND FLOAT FROM 517 TO 519 M AND CEMENT FROM 519 TO 525 M.,2.0 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 07:00:00+00:00,1992-11-22 08:00:00+00:00,525.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED TO TEST ACOUSTIC CONTROL SYSTEM, NEG. TROUBLE SHOOTING. RE-TESTED OK.",1.0 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 08:00:00+00:00,1992-11-22 09:00:00+00:00,531.0,m,fixed,drilling -- casing,ok,success,CONT. DRILLING CEMENT FROM 525 TO 531 M.,1.0 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 09:00:00+00:00,1992-11-22 09:30:00+00:00,531.0,m,fixed,moving -- position,ok,success,POSITIONED RIG,0.5 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 09:30:00+00:00,1992-11-22 11:00:00+00:00,547.0,m,fixed,drilling -- casing,ok,success,DRILLED SHOE AT 531M. CLEANED OUT RAT HOLE TO 547M. PUMPED 35 M3 BENTONITE MUD.,1.5 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 11:00:00+00:00,1992-11-22 12:30:00+00:00,552.0,m,fixed,drilling -- drill,ok,success,"DISPLACED WELL TO 1,20 SG KCL MUD. DRILLED 5M NEW FORMATION FROM 547M TO 552M WHILE DISPLACING.",1.5 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 12:30:00+00:00,1992-11-22 14:00:00+00:00,552.0,m,fixed,formation evaluation -- rft/fit,ok,success,"PULLED BACK TO CASING SHOE. CIRCULATED UNTIL EVEN MUDWEIGHT AROUND AND FLUSHED KILL/CHOKE LINES. PERFORMED LEAK-OFF TEST TO 1,62 SG EMW.",1.5 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 14:00:00+00:00,1992-11-22 16:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED UPPER RACKING ARM: WELDED ON ANTI-TURN PADS FOR SWING MOTOR.,2.5 +15_9_19_S_1992_11_23.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-22T00:00:00+01:00,1992-11-23T00:00:00+01:00,1992-11-22 16:30:00+00:00,1992-11-22 23:00:00+00:00,633.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 17 1/2"" FROM 552 TO 633M: STEERED FROM 562 TO 619M AND FROM 625 TO 633M.",6.5 +15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-22 23:00:00+00:00,1992-11-23 05:00:00+00:00,762.0,m,fixed,drilling -- drill,ok,success,"CONT. DRILLING/SURVEYING 17 1/2"" HOLE TO 762M. STEERED FROM 633 TO 650M, 663M TO 684M, 692M TO 711M AND 721M TO 745M.",6.0 +15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 05:00:00+00:00,1992-11-23 07:00:00+00:00,780.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 17 1/2"" HOLE FROM 762 TO 780M. STEERED FROM 762 TO 772M",2.0 +15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 07:00:00+00:00,1992-11-23 08:00:00+00:00,780.0,m,fixed,interruption -- maintain,fail,equipment failure,"ATTEMPTED TO DUMP SHAKERBOX, NO-GO. UNPLUGGED DUMP LINE AND CLEANED OUT SHAKERBOX.",1.0 +15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 08:00:00+00:00,1992-11-23 09:00:00+00:00,780.0,m,fixed,drilling -- ream,ok,success,REAMED FROM 720 TO 750M TO REDUCE DOG LEG.,1.0 +15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 09:00:00+00:00,1992-11-23 09:30:00+00:00,780.0,m,fixed,drilling -- drill,ok,success,CHANGED SHAKER SCREENS AND CLEANED OUT SHAKER BOX.,0.5 +15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 09:30:00+00:00,1992-11-23 10:00:00+00:00,780.0,m,fixed,drilling -- ream,ok,success,CONT. REAMING DOG LEG FROM 750 TO 780M.,0.5 +15_9_19_S_1992_11_24.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-23T00:00:00+01:00,1992-11-24T00:00:00+01:00,1992-11-23 10:00:00+00:00,1992-11-23 23:00:00+00:00,1037.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 17 1/2"" HOLE FROM 780 TO 1037M: STEERED 780-795M, 809-824M, 839-854M, 868-885M, 897-916M, 928-946M, 958-976M, 987-1006M AND 1016-1035M.",13.0 +15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-23 23:00:00+00:00,1992-11-23 23:30:00+00:00,1044.0,m,fixed,drilling -- drill,ok,success,CONT. ROTATION DRILLING AND SURVEYING TO 1044M.,0.5 +15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-23 23:30:00+00:00,1992-11-24 01:00:00+00:00,1044.0,m,fixed,drilling -- ream,ok,success,PULLED BACK TO 986M. REAMED DOG LEG TO 1044M.,1.5 +15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-24 01:00:00+00:00,1992-11-24 03:30:00+00:00,1105.0,m,fixed,drilling -- drill,ok,success,CONT. DRILLING/SURVEYING TO 1105M: STEERED FROM 1051-1068M AND 1077- 1094M.,2.5 +15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-24 03:30:00+00:00,1992-11-24 04:00:00+00:00,1105.0,m,fixed,drilling -- ream,ok,success,PULLED BACK TO 1044M. REAMED DOG LEG TO 1105M.,0.5 +15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-24 04:00:00+00:00,1992-11-24 05:00:00+00:00,1117.0,m,fixed,drilling -- drill,ok,success,CONT. DRILLING/SURVEYING TO 1117M: STEERED 1109-1117,1.0 +15_9_19_S_1992_11_25.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-24T00:00:00+01:00,1992-11-25T00:00:00+01:00,1992-11-24 05:00:00+00:00,1992-11-24 23:00:00+00:00,1395.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 17 1/2"" HOLE FROM 1117M TO 1395M: STEERED FROM 1117 TO 1123M, 1132-1147M, 1162-1175M, 1191-1203M AND 1221-1233M.",18.0 +15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-24 23:00:00+00:00,1992-11-25 05:00:00+00:00,1450.0,m,fixed,drilling -- drill,ok,success,"CONT. DRILLING/SURVEYING 17 1/2"" HOLE TO 1450M: STEERED FROM 1415 TO 1425M AND 1447-1452M.",6.0 +15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 05:00:00+00:00,1992-11-25 08:30:00+00:00,1490.0,m,fixed,drilling -- drill,ok,success,"CONT. DRILLING/SURVEYING 17 1/2"" HOLE TO SECTION TD AT 1490M: STEERED FROM 1450 TO 1452M AND 1485 TO 1490M.",3.5 +15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 08:30:00+00:00,1992-11-25 09:30:00+00:00,1490.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED,1.0 +15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 09:30:00+00:00,1992-11-25 17:30:00+00:00,1490.0,m,fixed,drilling -- ream,ok,success,BACK-REAMED FROM 1490M TO 533M.,8.0 +15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 17:30:00+00:00,1992-11-25 19:00:00+00:00,533.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HOLE CLEAN,1.5 +15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 19:00:00+00:00,1992-11-25 22:00:00+00:00,533.0,m,fixed,drilling -- trip,ok,success,"PULLED OUT OF HOLE. BROKE BIT, RACKED BACK BOTTOMHOLE ASSEMBLY. CHANGED SAVER SUB ON WAY OUT.",3.0 +15_9_19_S_1992_11_26.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-25T00:00:00+01:00,1992-11-26T00:00:00+01:00,1992-11-25 22:00:00+00:00,1992-11-25 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,MADE UP PRE-LOADED CEMENT HEAD.,1.0 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-25 23:00:00+00:00,1992-11-25 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,CONTINUED MAKING UP CEMENT HEAD. RACKED BACK HEAD IN DERRICK.,0.5 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-25 23:30:00+00:00,1992-11-26 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"MADE UP WIPER PLUGS, CASING HANGER AND SEAL ASSEMBLY TO SINGLE TRIP TOOL. RACKED ASSEMBLY IN DERRICK.",3.0 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 02:30:00+00:00,1992-11-26 03:30:00+00:00,108.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MADE UP JET SUB. RAN IN HOLE AND WASHED WELLHEAD.,1.0 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 03:30:00+00:00,1992-11-26 05:00:00+00:00,221.0,m,fixed,interruption -- repair,ok,success,"MADE UP SPRING LOADED TOOL. RAN IN HOLE AND RETRIEVED 18 3/4"" NOMINAL BORE PROTECTOR WITH 3 TONS OVERPULL. LAID DOWN BORE PROTECTOR AND TOOL. FLUSHED KILL AND CHOKE LINES. WASHED WELLHEAD ON WAY OUT.",1.5 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 05:00:00+00:00,1992-11-26 07:00:00+00:00,110.0,m,fixed,interruption -- repair,ok,success,"WASHED WELLHEAD, BOP AND RISER. LAID DOWN JET SUB.",2.0 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 07:00:00+00:00,1992-11-26 08:30:00+00:00,0.0,m,fixed,drilling -- casing,fail,operation failed,REMOVED STUCK DRIFT FROM PLUG LAUNCHER IN CASING HANGER JOINT.,1.5 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 08:30:00+00:00,1992-11-26 10:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,INSTALLED CASING STABBING BOARD. RIGGED UP TO RUN CASING.,2.0 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 10:30:00+00:00,1992-11-26 11:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"MADE UP TAM PACKER AND 5"" PUP TO TDS.",1.0 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 11:30:00+00:00,1992-11-26 19:30:00+00:00,517.0,m,fixed,drilling -- casing,ok,success,"RAN SHOE JOINT, 1 CASING JOINT AND FLOAT JOINT AFTER HAVING CHECKED FLOATS. THREAD LOCKED SHOE JOINT AND FLOAT JOINT TO INTERMEDIATE JOINT. RAN 13 3/8"" CASING TO 517M. FILLED CASING WITH 1,20 SG WHEN RUNNING IN HOLE.",8.0 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 19:30:00+00:00,1992-11-26 20:30:00+00:00,517.0,m,fixed,drilling -- casing,ok,success,CIRCULATED BOTTOM UP AND CLEAN HOLE.,1.0 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 20:30:00+00:00,1992-11-26 21:00:00+00:00,517.0,m,fixed,drilling -- casing,ok,success,CHANGED TO 500 TON ELEVATOR AND SPIDER.,0.5 +15_9_19_S_1992_11_27.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-26T00:00:00+01:00,1992-11-27T00:00:00+01:00,1992-11-26 21:00:00+00:00,1992-11-26 23:00:00+00:00,739.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 13 3/8"" CASING TO 739M.",2.0 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-26 23:00:00+00:00,1992-11-27 05:00:00+00:00,1275.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 13 3/8"" CASING TO 1275M.",6.0 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 05:00:00+00:00,1992-11-27 06:30:00+00:00,1376.0,m,fixed,drilling -- casing,ok,success,"RAN 13 3/8"" CASING TO 1376 M.",1.5 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 06:30:00+00:00,1992-11-27 08:00:00+00:00,1482.0,m,fixed,drilling -- casing,ok,success,"MAKE UP 13 3/8"" CASING HANGER. RAN 13 3/8"" CASING ON 5"" HWDP. LANDED SAME. TOOK MEASUREMENTS.",1.5 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 08:00:00+00:00,1992-11-27 10:00:00+00:00,1482.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED BOTTOMS UP. PUMPED 25 M3 1,2 SG BENTONITE MUD. PRESSURE TESTED SURFACE LINE TO 345 BAR.",2.0 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 10:00:00+00:00,1992-11-27 13:30:00+00:00,1482.0,m,fixed,drilling -- casing,ok,success,"PUMPED 12 M3 1,4 SG SPACER. MIXED AND PUMPED 71,8 M3 1,56 SG LEAD SLURRY,FOLLOWED BY 20,1 M3 1,9 SG TAIL SLURRY. DROPPED DART AND DISPLACED CEMENT WITH 1,5 M3 1,4 SG SPACER.",3.5 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 13:30:00+00:00,1992-11-27 15:30:00+00:00,1482.0,m,fixed,drilling -- casing,ok,success,"DISPLACED CEMENT WITH 102,6 M3 1,2 SG MUD USING RIG PUMP. GOT CEMENT CONTAMINATED MUD IN RETURN OVER SHAKER. DID NOT BUMP PLUG.",2.0 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 15:30:00+00:00,1992-11-27 16:30:00+00:00,1482.0,m,fixed,drilling -- casing,ok,operation failed,"FLUSHED K/C LINE AND RISER. DUMPED CEMENT CONTAMINATED MUD. ATTEMPTED TO SET SEAL ASSY, NEGATIVE. RELEASED SEAL ASSY AND POOH WITH SAME.",1.0 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 16:30:00+00:00,1992-11-27 19:00:00+00:00,106.0,m,fixed,interruption -- repair,ok,equipment failure,"M/U MILL AND FLUSH TOOL. RIH AND WASHED SEAL AREA.GOT CMT CONTAMINATED MUD IN RETURN. POOH, L/D MILL AND FLUSH TOOL.",2.5 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 19:00:00+00:00,1992-11-27 21:00:00+00:00,106.0,m,fixed,drilling -- casing,ok,success,M/U AND RIH W/SEAL ASSY. SET AND PRESSURE TEST SAME TO 140 BAR. RETORQUED SEAL ASSY AND PRESSURE TESTED TO 220 BAR. POOH AND L/D R/T.,2.0 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 21:00:00+00:00,1992-11-27 22:30:00+00:00,106.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U JET SUB. RIH TO BELOW WELLHEAD. WASHED WELLHEAD/BOP AND RISER.,1.5 +15_9_19_S_1992_11_28.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-27T00:00:00+01:00,1992-11-28T00:00:00+01:00,1992-11-27 22:30:00+00:00,1992-11-27 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,CHANGED BAILS.,0.5 +15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-27 23:00:00+00:00,1992-11-28 00:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,R/D CASING STABBING BOARD. BROKE PLUG LAUNCHER FROM SINGLE TRIP TOOL.,1.0 +15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 00:00:00+00:00,1992-11-28 01:00:00+00:00,106.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"MADE UP WEAR BUSHING TO SPRING LOADED TOOL. RIH AND SET 13 3/8"" WEARBUSHING.",1.0 +15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 01:00:00+00:00,1992-11-28 05:00:00+00:00,106.0,m,fixed,drilling -- bop activities,ok,success,"PRESSURE TESTED BOP 20/220 BAR ON YELLOW POD, FUNCTION TEST BOP ON BLUE POD. FUNCTION TESTED ACOUSTIC SYSTEM.",4.0 +15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 05:00:00+00:00,1992-11-28 05:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"PULLED OUT OF HOLE WITH WEAR BUSHING RUNNING TOOL,JET SUB AND LAID DOWN SAME.",0.5 +15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 05:30:00+00:00,1992-11-28 07:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"PRESSURE TESTED LOWER/UPPER KELLY COCK, KELLY HOSE ON TOPDRIVE TO 20/220 BAR,OK.",1.5 +15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 07:00:00+00:00,1992-11-28 08:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"LAID DOWN 13 3/8"" TAM PACKER AND CEMENT HEAD.",1.0 +15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 08:00:00+00:00,1992-11-28 11:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"LAID DOWN 17 1/2"" BOTTOM HOLE ASSEMBLY.",3.5 +15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 11:30:00+00:00,1992-11-28 12:30:00+00:00,0.0,m,fixed,drilling -- survey,ok,success,RIGGED UP ATLAS WIRE LINE.,1.0 +15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 12:30:00+00:00,1992-11-28 18:30:00+00:00,1400.0,m,fixed,drilling -- survey,ok,success,RAN GYRO ON ATLAS WIRELINE.GYRO STOPPED AT 1407 M.CHECK LOGGED OUT OF HOLE.LAID DOWN GYRO.,6.0 +15_9_19_S_1992_11_29.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-28T00:00:00+01:00,1992-11-29T00:00:00+01:00,1992-11-28 18:30:00+00:00,1992-11-28 23:00:00+00:00,1407.0,m,fixed,drilling -- casing,ok,success,RAN CBL. CBL LOG STOPPED AT 1407 M. LOGGED CBL.,4.5 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-28 23:00:00+00:00,1992-11-29 00:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,CONTINUED LOGGING CBL TO WELLHEAD. RIGGED DOWN ATLAS WIRELINE.,1.5 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 00:30:00+00:00,1992-11-29 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"MADE UP 12 1/4"" BOTTOM HOLE ASSEMLY. CLOSED SHEAR RAM USING ACOUSTIC,PRESSURE TESTED 13 3/8"" CASING TO 220 BAR,OK.",2.0 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 02:30:00+00:00,1992-11-29 03:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,REPAIRED SCR FOR MUD PUMP.,0.5 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 03:00:00+00:00,1992-11-29 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONTINUED TO MAKE UP 12 1/4"" BOTTOM HOLE ASSEMLY. FUNCTION TESTED MUD MOTOR AND MWD.",2.0 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 05:00:00+00:00,1992-11-29 09:00:00+00:00,1441.0,m,fixed,drilling -- trip,ok,success,"RIH WITH 12 1/4"" BIT,TAGGED CEMENT AT 1441 M.",4.0 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 09:00:00+00:00,1992-11-29 09:30:00+00:00,1441.0,m,fixed,drilling -- drill,ok,success,PERFORMED BOP DRILL.,0.5 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 09:30:00+00:00,1992-11-29 12:00:00+00:00,1490.0,m,fixed,drilling -- casing,ok,success,"DRILLED CEMENT,FLOAT AND SHOE AND CLEANED RAT HOLE.",2.5 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 12:00:00+00:00,1992-11-29 13:00:00+00:00,1495.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 1490 M TO 1495 M.",1.0 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 13:00:00+00:00,1992-11-29 14:30:00+00:00,1495.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED/CONDITIONED MUD.GOT 1,28 SG IN RETURNS,CIRCULATED UNTIL 1,25 SG IN/OUT.",1.5 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 14:30:00+00:00,1992-11-29 15:30:00+00:00,1482.0,m,fixed,formation evaluation -- rft/fit,ok,success,"PERFORMED LOT WITH 1,25 SG MUD,EQUIVALENT TO 1,73 SG.",1.0 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 15:30:00+00:00,1992-11-29 18:00:00+00:00,1551.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 1495 M TO 1551 M. STARTED TO DRILL WITH NEW 1,2 SG MUD.",2.5 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 18:00:00+00:00,1992-11-29 18:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,HAD BLACK OUT DUE TO GENERATOR OVERLOAD. CIRCULATED WITH NBS WHILE RESTARTED GENERATOR.,0.5 +15_9_19_S_1992_11_30.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-29T00:00:00+01:00,1992-11-30T00:00:00+01:00,1992-11-29 18:30:00+00:00,1992-11-29 23:00:00+00:00,1637.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 1551 M TO 1637 M. ORIENTATED FROM 1585 M TO 1595 M.",4.5 +15_9_19_S_1992_12_01.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-30T00:00:00+01:00,1992-12-01T00:00:00+01:00,1992-11-29 23:00:00+00:00,1992-11-30 05:00:00+00:00,1748.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 1637 M TO 1748 M. ORIENTATED FROM 1677 M TO 1691 M.",6.0 +15_9_19_S_1992_12_01.xml,NO 15/9-19 S,NO 15/9-19 S,1992-11-30T00:00:00+01:00,1992-12-01T00:00:00+01:00,1992-11-30 05:00:00+00:00,1992-11-30 23:00:00+00:00,1981.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 1748 M TO 1981 M. ORIENTATED FROM 1926 M TO 1938 M (HS).",18.0 +15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-11-30 23:00:00+00:00,1992-12-01 04:30:00+00:00,2018.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 1981 M TO 2018 M. ORIENTATED FROM 1988 M TO 2001 M (15R).",5.5 +15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 04:30:00+00:00,1992-12-01 05:00:00+00:00,1985.0,m,fixed,drilling -- ream,ok,success,BACKREAMED FROM 2018 M TO 1985 M. (POOH DUE TO LOW ROP),0.5 +15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 05:00:00+00:00,1992-12-01 12:30:00+00:00,800.0,m,fixed,drilling -- ream,ok,success,"BACKREAMED FROM 1985 M TO 13 3/8"" SHOE AT 1482 M, CONTINUED BACKREAMING INSIDE CASING TO 800 W/HOLE ANGLE 20 DEG.",7.5 +15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 12:30:00+00:00,1992-12-01 13:30:00+00:00,800.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HOLE CLEAN. CIRCULATED RISER THROUGH KILL/CHOKE LINE.,1.0 +15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 13:30:00+00:00,1992-12-01 16:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH,BROKE BIT.",2.5 +15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 16:00:00+00:00,1992-12-01 21:30:00+00:00,1983.0,m,fixed,drilling -- trip,ok,success,"MADE UP NEW BIT,REPLACED LOWER SLEEVE STABILIZER TO 12"". FUNCTION TESTED MOTOR/MWD,RIH TO 1983 M.",5.5 +15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 21:30:00+00:00,1992-12-01 22:00:00+00:00,2018.0,m,fixed,drilling -- ream,ok,success,REAMED FROM 1983 M TO 2018 M AS PRECAUTION.,0.5 +15_9_19_S_1992_12_02.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-01T00:00:00+01:00,1992-12-02T00:00:00+01:00,1992-12-01 22:00:00+00:00,1992-12-01 23:00:00+00:00,2041.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 2018 M TO 2041 M.",1.0 +15_9_19_S_1992_12_03.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-02T00:00:00+01:00,1992-12-03T00:00:00+01:00,1992-12-01 23:00:00+00:00,1992-12-02 05:00:00+00:00,2166.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 2041 M TO 2166 M. ORIENTATED FROM 2132 M TO 2142 M (HS).",6.0 +15_9_19_S_1992_12_03.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-02T00:00:00+01:00,1992-12-03T00:00:00+01:00,1992-12-02 05:00:00+00:00,1992-12-02 12:00:00+00:00,2300.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 2166 M TO 2300 M. FLOWCHECKED DRILLING BREAK AT 2194 M,NEGATIVE.",7.0 +15_9_19_S_1992_12_03.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-02T00:00:00+01:00,1992-12-03T00:00:00+01:00,1992-12-02 12:00:00+00:00,1992-12-02 12:30:00+00:00,2300.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED AND ROTATED DRILLSTRING DUE TO INADEQUATE HOLE CLEANING.,0.5 +15_9_19_S_1992_12_03.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-02T00:00:00+01:00,1992-12-03T00:00:00+01:00,1992-12-02 12:30:00+00:00,1992-12-02 21:30:00+00:00,2470.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 2300 M TO 2470 M. INCREASED MUDWEIGHT FROM 1,3 SG TO 1,4 SG,WHILE DRILLING FROM 2300 M TO 2383 M.",9.0 +15_9_19_S_1992_12_03.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-02T00:00:00+01:00,1992-12-03T00:00:00+01:00,1992-12-02 21:30:00+00:00,1992-12-02 23:00:00+00:00,2465.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED TOP DRIVE DUE TO OVERLOAD ON ELECTRO MOTOR.,1.5 +15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-02 23:00:00+00:00,1992-12-03 02:00:00+00:00,2531.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 2470 M TO 2531 M.",3.0 +15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-03 02:00:00+00:00,1992-12-03 02:30:00+00:00,2531.0,m,fixed,interruption -- maintain,fail,equipment failure,CIRCULATED DUE TO OVERLOAD ON ELECTROMOTOR ON TOP DRIVE.,0.5 +15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-03 02:30:00+00:00,1992-12-03 05:00:00+00:00,1000.0,m,fixed,interruption -- maintain,fail,equipment failure,PUMPED OUT OF HOLE DUE TO PROBLEMS WITH ELECTRO MOTOR ON TOP DRIVE.,2.5 +15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-03 05:00:00+00:00,1992-12-03 12:00:00+00:00,1483.0,m,fixed,interruption -- maintain,fail,equipment failure,"PUMPED OUT OF HOLE FROM 2100 M TO 1435 M. PACKED OFF AND CHARGED FORMATION AT 2094 M, 1830 M AND 1535 M. MAX GAS 2,2 %. RIH TO 1483 M.",7.0 +15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-03 12:00:00+00:00,1992-12-03 19:00:00+00:00,1483.0,m,fixed,interruption -- maintain,fail,equipment failure,"REPLACED OIL PUMP ON TOP DRIVE, DUE TO STUCK UPPER BEARING. CIRCULATED/ROTATED PIPE WHILE REPAIRED TOP DRIVE. PUMPED TWO 10 M3 HI-VIS PILLS GIVING LARGE AMOUNTS OF CUTTINGS IN RETURNS.",7.0 +15_9_19_S_1992_12_04.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-03T00:00:00+01:00,1992-12-04T00:00:00+01:00,1992-12-03 19:00:00+00:00,1992-12-03 23:00:00+00:00,2215.0,m,fixed,drilling -- trip,ok,success,"TESTED MWD, PICKED UP 66 JOINTS 5"" DRILL PIPE WHILE RIH FROM 1570 M TO 2215 M.",4.0 +15_9_19_S_1992_12_05.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-04T00:00:00+01:00,1992-12-05T00:00:00+01:00,1992-12-03 23:00:00+00:00,1992-12-04 00:00:00+00:00,2531.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH WITH STAND FROM 2215 M TO 2531 M.,1.0 +15_9_19_S_1992_12_05.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-04T00:00:00+01:00,1992-12-05T00:00:00+01:00,1992-12-04 00:00:00+00:00,1992-12-04 05:00:00+00:00,2632.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 2531 M TO 2632 M.",5.0 +15_9_19_S_1992_12_05.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-04T00:00:00+01:00,1992-12-05T00:00:00+01:00,1992-12-04 05:00:00+00:00,1992-12-04 23:00:00+00:00,2933.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 2632 M TO 2933 M. ORIENTATED FROM 2674 M TO 2684 M. (170L)",18.0 +15_9_19_S_1992_12_06.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-05T00:00:00+01:00,1992-12-06T00:00:00+01:00,1992-12-04 23:00:00+00:00,1992-12-05 05:00:00+00:00,3015.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 2933 M TO 3015 M. ORIENTATED FROM 2965 M TO 2972 M. (95R)",6.0 +15_9_19_S_1992_12_06.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-05T00:00:00+01:00,1992-12-06T00:00:00+01:00,1992-12-05 05:00:00+00:00,1992-12-05 08:00:00+00:00,3017.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 3015 M TO 3017 M.",3.0 +15_9_19_S_1992_12_06.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-05T00:00:00+01:00,1992-12-06T00:00:00+01:00,1992-12-05 08:00:00+00:00,1992-12-05 13:00:00+00:00,2460.0,m,fixed,drilling -- ream,ok,success,"BACKREAMED FROM 3017 M TO 2460 M. PACKED OFF,AND CHARGED FORMATION.",5.0 +15_9_19_S_1992_12_06.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-05T00:00:00+01:00,1992-12-06T00:00:00+01:00,1992-12-05 13:00:00+00:00,1992-12-05 14:30:00+00:00,2460.0,m,fixed,drilling -- ream,ok,success,CIRCULATED HI-VIS PILL AROUND. NO INCREASING OF AMOUNT OFF CUTTINGS OVER SHAKER.,1.5 +15_9_19_S_1992_12_06.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-05T00:00:00+01:00,1992-12-06T00:00:00+01:00,1992-12-05 14:30:00+00:00,1992-12-05 23:00:00+00:00,2120.0,m,fixed,drilling -- ream,ok,success,"BACK REAMED FROM 2460 M TO 1960 M. HOLE PACKED OFF AT 2222 M,CHARGED FORMATION. ESTABLISHED CIRCULATION,PUMPED 10 M3 1,6 SG HI VIS PILL. HAD LARGE INCREASE IN CUTTINGS OVER SHAKER.",8.5 +15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-05 23:00:00+00:00,1992-12-06 00:00:00+00:00,1926.0,m,fixed,drilling -- ream,ok,success,BACK REAMED FROM 1960 M TO 1926 M.,1.0 +15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 00:00:00+00:00,1992-12-06 01:00:00+00:00,1926.0,m,fixed,interruption -- maintain,ok,success,CHANGED WASH PIPE ON TOP DRIVE.,1.0 +15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 01:00:00+00:00,1992-12-06 05:00:00+00:00,1926.0,m,fixed,drilling -- ream,ok,success,BACK REAMED FROM 1926 M TO 1482 M.,4.0 +15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 05:00:00+00:00,1992-12-06 09:00:00+00:00,800.0,m,fixed,drilling -- ream,ok,success,"BACKREAMED FROM 13 3/8"" SHOE AT 1482 M TO 800 M.",4.0 +15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 09:00:00+00:00,1992-12-06 09:30:00+00:00,800.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HI VIS PILL AROUND.BOOSTED RISER.,0.5 +15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 09:30:00+00:00,1992-12-06 13:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH. LAID DOWN BIT AND MUD MOTOR.,4.0 +15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 13:30:00+00:00,1992-12-06 19:00:00+00:00,1400.0,m,fixed,drilling -- trip,ok,success,"CHANGED OUT MUD MOTOR,MAKE UP BIT.REPLACED JARS.TESTED MUD MOTOR AND MWD. RIH TO 1400 M.",5.5 +15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 19:00:00+00:00,1992-12-06 19:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"FUNCTION TESTED BOP AND ACOUSTIC SYSTEM, OK.",0.5 +15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 19:30:00+00:00,1992-12-06 21:30:00+00:00,2876.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH FROM 1400 M TO 2876 M.,2.0 +15_9_19_S_1992_12_07.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-06T00:00:00+01:00,1992-12-07T00:00:00+01:00,1992-12-06 21:30:00+00:00,1992-12-06 23:00:00+00:00,3017.0,m,fixed,drilling -- ream,ok,success,"REAMED FROM 2876 M TO 3017 M, DUE TO TIGHT HOLE.",1.5 +15_9_19_S_1992_12_08.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-07T00:00:00+01:00,1992-12-08T00:00:00+01:00,1992-12-06 23:00:00+00:00,1992-12-07 01:00:00+00:00,3026.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 3017 M TO 3026 M.",2.0 +15_9_19_S_1992_12_08.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-07T00:00:00+01:00,1992-12-08T00:00:00+01:00,1992-12-07 01:00:00+00:00,1992-12-07 01:30:00+00:00,3026.0,m,fixed,interruption -- maintain,ok,equipment failure,"CHANGED PISTON ON MUDPUMP NO.1,SYLINDER NO.2. RECHARGED PULSATION DAMPENER WITH NITROGEN ON MUDPUMP NO.3. CIRCULATED/ROTATED WHILE REPAIRING MUDPUMPS.",0.5 +15_9_19_S_1992_12_08.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-07T00:00:00+01:00,1992-12-08T00:00:00+01:00,1992-12-07 01:30:00+00:00,1992-12-07 05:00:00+00:00,3078.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 3026 M TO 3078 M.",3.5 +15_9_19_S_1992_12_08.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-07T00:00:00+01:00,1992-12-08T00:00:00+01:00,1992-12-07 05:00:00+00:00,1992-12-07 23:00:00+00:00,3257.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 3078 M TO 3257 M. ORIENTED FROM 3143 M TO 3150 M (180),FROM 3192 M TO 3198 M (120 L) REAMED EACH CONNECTION TWICE WITH 180 RPM ON STRING TO IMPROVE HOLE CLEANING.",18.0 +15_9_19_S_1992_12_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-08T00:00:00+01:00,1992-12-09T00:00:00+01:00,1992-12-07 23:00:00+00:00,1992-12-08 05:00:00+00:00,3301.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 3257 M TO 3301 M. ORIENTED FROM 3284 M TO 3288 M. REAMED EACH CONNECTION TWICE WITH 180 RPM ON STRING TO IMPROVE HOLE CLEANING.",6.0 +15_9_19_S_1992_12_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-08T00:00:00+01:00,1992-12-09T00:00:00+01:00,1992-12-08 05:00:00+00:00,1992-12-08 17:00:00+00:00,3353.0,m,fixed,drilling -- drill,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 3301 M TO 3353 M. ORIENTED FROM 3284 M TO 3288 M(120L) AND FROM 3311 M TO 3321 M (120 L) REAMED EACH CONNECTION TWICE WITH 180 RPM ON STRING TO IMPROVE HOLE CLEANING.",12.0 +15_9_19_S_1992_12_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-08T00:00:00+01:00,1992-12-09T00:00:00+01:00,1992-12-08 17:00:00+00:00,1992-12-08 19:00:00+00:00,3353.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED AND ROTATED STRING 180 RPM.PUMPED 8 M3 1,6 SG HI VIS PILL.",2.0 +15_9_19_S_1992_12_09.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-08T00:00:00+01:00,1992-12-09T00:00:00+01:00,1992-12-08 19:00:00+00:00,1992-12-08 23:00:00+00:00,3100.0,m,fixed,drilling -- ream,ok,success,BACK REAMED FROM 3353 M TO 3100 M.,4.0 +15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-08 23:00:00+00:00,1992-12-09 03:30:00+00:00,2830.0,m,fixed,drilling -- ream,ok,success,"BACK REAMED FROM 3100 M TO 2830 M. PUMPED 8 M3 1,6 SG HI VIS PILL AT 3035 M",4.5 +15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 03:30:00+00:00,1992-12-09 05:00:00+00:00,2866.0,m,fixed,drilling -- ream,ok,success,"PACKED OFF AT 2830 M,WORKED/ROTATED PIPE DOWN TO 2866 M. NO RETURN.",1.5 +15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 05:00:00+00:00,1992-12-09 07:00:00+00:00,2904.0,m,fixed,drilling -- ream,ok,operation failed,WORKED/ROTATED PIPE FROM 2866 M TO 2904 M. ESTABLISHED CIRCULATION.,2.0 +15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 07:00:00+00:00,1992-12-09 10:00:00+00:00,2904.0,m,fixed,drilling -- ream,ok,operation failed,"CIRCULATED, BOOSTED RISER BY PUMPING DOWN KILL/CHOKE LINE USING CEMENT PUMP.",3.0 +15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 10:00:00+00:00,1992-12-09 10:30:00+00:00,2904.0,m,fixed,drilling -- ream,ok,operation failed,HOLE PACKED OFF AT 2904 M. WORKED PIPE AND ESTABLISHED CIRCULATION.,0.5 +15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 10:30:00+00:00,1992-12-09 15:00:00+00:00,2904.0,m,fixed,drilling -- ream,ok,operation failed,"ESTABLISHED FULL CIRCULATION (2700 LTR/MIN). PUMPED 10 M3 1,18 SG KCL PILL, FOLLOWED BY 8 M3 1,6 SG HI VIS PILL. CIRCULATED SAME OUT.",4.5 +15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 15:00:00+00:00,1992-12-09 15:30:00+00:00,2924.0,m,fixed,drilling -- ream,ok,operation failed,CIRCULATED AND WORKED/ROTATED PIPE UP/DOWN FROM 2900 M TO 2924 M. BEAKREAMED FROM 2924 M TO 2900 M. LOST RETURN.,0.5 +15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 15:30:00+00:00,1992-12-09 17:30:00+00:00,2904.0,m,fixed,drilling -- ream,ok,operation failed,WORKED PIPE TO ESTABLISH FULL CIRCULATION.,2.0 +15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 17:30:00+00:00,1992-12-09 22:30:00+00:00,2925.0,m,fixed,drilling -- ream,ok,operation failed,CIRCULATED AND WORKED/ROTATED PIPE UP/DOWN FROM 2900 M TO 2925 M. ADDED KCL AND EZ MUD DP DIRECTLY INTO ACTIVE MUD SYSTEM.,5.0 +15_9_19_S_1992_12_10.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-09T00:00:00+01:00,1992-12-10T00:00:00+01:00,1992-12-09 22:30:00+00:00,1992-12-09 23:00:00+00:00,2880.0,m,fixed,drilling -- ream,ok,success,BACK REAMED FROM 2900 M TO 2880 M.,0.5 +15_9_19_S_1992_12_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-10T00:00:00+01:00,1992-12-11T00:00:00+01:00,1992-12-09 23:00:00+00:00,1992-12-10 03:00:00+00:00,2732.0,m,fixed,drilling -- ream,ok,success,BACK REAMED FROM 2880 M TO 2732 M.,4.0 +15_9_19_S_1992_12_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-10T00:00:00+01:00,1992-12-11T00:00:00+01:00,1992-12-10 03:00:00+00:00,1992-12-10 05:00:00+00:00,2741.0,m,fixed,drilling -- ream,ok,operation failed,"HOLE PACKED OFF AT 2732 M,WORKED PIPE DOWN TO 2741 M. HAD FULL RETURN WITH MAX 1400 LTR/MIN,NO ROTATION.",2.0 +15_9_19_S_1992_12_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-10T00:00:00+01:00,1992-12-11T00:00:00+01:00,1992-12-10 05:00:00+00:00,1992-12-10 17:00:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"ATTEMPTED TO WORK PIPE FREE AT 2741 M,MAX OVERPULL/DOWNWEIGHT 175/40 TON. MAX TORQUE 33000 FT-LBS. CIRCULATED WITH MAX 2900 LTR/MIN. PUMPED 9 M3 1,11 SG KCL PILL,FOLLOWED BY 1,6 SG HI VIS PILL,PUMPED SAME OUT.PUMPED 9 M3 1,03 SG LO VIS PILL,FOLLOWED BY 1,6 SG HI VIS PILL.",12.0 +15_9_19_S_1992_12_11.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-10T00:00:00+01:00,1992-12-11T00:00:00+01:00,1992-12-10 17:00:00+00:00,1992-12-10 23:00:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"CONTINUED TO WORK PIPE FREE AT 2741 M,MAX PULL/DOWNWEIGHT 175/40 TON,MAX TORQUE 33000 FT-LBS. CIRCULATED WITH MAX 2900 LTR/MIN.",6.0 +15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-10 23:00:00+00:00,1992-12-11 01:00:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"CONTINUED TO WORK PIPE FREE AT 2741 M,MAX OVERPULL/DOWNWEIGHT 170/40 TON,MAX TORQUE 33000 FT-LBS. CIRCULATED WITH MAX 2900 LTR/MIN.",2.0 +15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 01:00:00+00:00,1992-12-11 02:00:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"PUMPED 18 M3 1,45 SG EZ SPOT PILL, DISPLACED SAME WITH 18 M3 1,4 SG MUD. SPOTTED 10,3 M3 AROUND BHA, LEFT 7,7 M3 INSIDE PIPE.",1.0 +15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 02:00:00+00:00,1992-12-11 05:00:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"CONTINUED TO WORK PIPE FREE AT 2741 M,MAX PULL/DOWNWEIGHT 175/40 TON. MAX TORQUE 33000 FT-LBS. PUMPED 210 LTR EZ SPOT PILL EVERY 1/2 HRS.",3.0 +15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 05:00:00+00:00,1992-12-11 10:30:00+00:00,2741.0,m,fixed,interruption -- fish,fail,stuck equipment,"CONT. ATTEMPTING TO WORK PIPE FREE, NEGATIVE. MOVED EZ-SPOT EVERY HALF HOUR BY PUMPING 210 LITERS.",5.5 +15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 10:30:00+00:00,1992-12-11 16:30:00+00:00,2652.0,m,fixed,interruption -- fish,fail,stuck equipment,"CHANGED TO 500 TON LINKS AND RIGGED UP ATLAS WIRELINE. RAN IN WITH JRC CUTTER AND CCL AT 14:30 HRS. WITH 50 TONS OVERPULL ON STRING, DETONATED CHARGE AT 2658,2M. PIPE NOT FREE. POOH WITH WIRELINE. FOUND JRC TOOL, X-OVER TO SAME AND 1 SINKER BAR TO BE LEFT IN HOLE.",6.0 +15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 16:30:00+00:00,1992-12-11 19:00:00+00:00,2658.0,m,fixed,interruption -- fish,fail,stuck equipment,"CIRCULATED 2000 STROKES: SURFACE PUMPING PRESSURE 100 BAR LESS THAN BEFORE CUTTING AND NO COMMUNICATION WITH MWD. ATTEMPTED TO WORK STRING FREE FROM THE BHA BY APPLYING UP TO 34000 FTLBS TORQUE AND 180 TONS OVERPULL, NO SUCCESS.",2.5 +15_9_19_S_1992_12_12.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-11T00:00:00+01:00,1992-12-12T00:00:00+01:00,1992-12-11 19:00:00+00:00,1992-12-11 23:00:00+00:00,2510.0,m,fixed,interruption -- fish,fail,stuck equipment,"RIGGED UP WIRELINE. RAN FREE-POINT INDICATOR. CHECKED AND CALIBRATED TOOL AT 1400M, OK. RAN IN TO 2512M, TOOL FAILURE. POOH.",4.0 +15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-11 23:00:00+00:00,1992-12-12 01:00:00+00:00,0.0,m,fixed,interruption -- fish,fail,stuck equipment,FOUND SHORT ON MONOCONDUCTOR EXTENSION CABLE. CUT OFF DAMAGED CABLE AND RETERMINATED.,2.0 +15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 01:00:00+00:00,1992-12-12 04:30:00+00:00,2584.0,m,fixed,interruption -- fish,fail,stuck equipment,"RAN IN WITH FREE-POINT INDICATOR AND CCL. CHECKED AND CALIBRATED TOOL AT 1400M, OK. FOUND 5"" DP TO BE FREE. CHECKED INSIDE HWDP AT 2530 AND 2584M, POSSIBLY FREE. POOH.",3.5 +15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 04:30:00+00:00,1992-12-12 05:00:00+00:00,0.0,m,fixed,interruption -- fish,fail,stuck equipment,PREPARED TO RUN IN WITH JRC CUTTER AND CCL.,0.5 +15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 05:00:00+00:00,1992-12-12 09:30:00+00:00,2516.0,m,fixed,interruption -- fish,fail,stuck equipment,"RAN IN WITH JRC CUTTER AND CCL. DETONATED CUTTER AT 2516M, KEPT 50 T OVERPULL ON STRING. POOH WITH WIRELINE.",4.5 +15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 09:30:00+00:00,1992-12-12 11:00:00+00:00,2516.0,m,fixed,drilling -- drill,ok,success,PULLED PIPE FREE WITH 100 T OVERPULL. CIRCULATED BU.,1.5 +15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 11:00:00+00:00,1992-12-12 16:00:00+00:00,2516.0,m,fixed,drilling -- drill,ok,success,POOH. MAX. BREAK-OUT TORQUE 80000 FTLBS. LD STUFFING BOX AND CIRCULATION SUB.,5.0 +15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 16:00:00+00:00,1992-12-12 16:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,CHANGED BAILS AND ELEVATOR.,0.5 +15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 16:30:00+00:00,1992-12-12 18:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,SLIPPED AND CUT 32M DRILL LINE.,1.5 +15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 18:00:00+00:00,1992-12-12 18:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,CLEARED RIG FLOOR. INSPECTED AND LUBRICATED TDS.,0.5 +15_9_19_S_1992_12_13.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-12T00:00:00+01:00,1992-12-13T00:00:00+01:00,1992-12-12 18:30:00+00:00,1992-12-12 23:00:00+00:00,80.0,m,fixed,interruption -- sidetrack,ok,success,MU BHA FOR SIDE TRACK.,4.5 +15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-12 23:00:00+00:00,1992-12-13 04:00:00+00:00,1266.0,m,fixed,interruption -- sidetrack,ok,success,CONT. MU BHA FOR SIDE TRACKING. DRIFTED AND SERVICE BROKE CONNECTIONS ON HWDP. RAN IN TO 1266M. LOST RETURNS.,5.0 +15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 04:00:00+00:00,1992-12-13 05:00:00+00:00,1390.0,m,fixed,interruption -- sidetrack,ok,success,"WORKED PIPE AND BROKE CIRCULATION, OK. WASHED/REAMED FROM 1266M TO 1390M.",1.0 +15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 05:00:00+00:00,1992-12-13 11:00:00+00:00,2220.0,m,fixed,drilling -- ream,fail,circulation loss,CONTINUED REAMING FROM 1390 TO 2220M. HOLE PACKED OFF. LOST RETURNS AND UNABLE TO ROTATE STRING.,6.0 +15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 11:00:00+00:00,1992-12-13 11:30:00+00:00,2188.0,m,fixed,interruption -- lost circulation,fail,circulation loss,WORKED PIPE BACK TO 2188M. ROTATED STRING AND RE-ESTABLISHED FULL CIRCULATION.,0.5 +15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 11:30:00+00:00,1992-12-13 13:30:00+00:00,2188.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED AND CLEANED HOLE.,2.0 +15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 13:30:00+00:00,1992-12-13 16:00:00+00:00,2188.0,m,fixed,drilling -- circulating conditioning,ok,success,"DISPLACED HOLE TO 1,50 SG NEW KCL MUD.",2.5 +15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 16:00:00+00:00,1992-12-13 16:30:00+00:00,2188.0,m,fixed,interruption -- maintain,fail,equipment failure,CHANGED SAVER SUB AND LOWER VALVE IN TDS.,0.5 +15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 16:30:00+00:00,1992-12-13 17:30:00+00:00,2188.0,m,fixed,drilling -- ream,ok,success,BACK-REAMED FROM 2188 TO 1971M.,1.0 +15_9_19_S_1992_12_14.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-13T00:00:00+01:00,1992-12-14T00:00:00+01:00,1992-12-13 17:30:00+00:00,1992-12-13 23:00:00+00:00,1971.0,m,fixed,drilling -- trip,ok,success,POOH,5.5 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-13 23:00:00+00:00,1992-12-14 00:00:00+00:00,1971.0,m,fixed,drilling -- trip,ok,success,CONT. POOH. RACKED BACK BHA.,1.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 00:00:00+00:00,1992-12-14 01:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,MU CEMENT HEAD. RACKED SAME BACK IN DERRICK.,1.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 01:00:00+00:00,1992-12-14 03:00:00+00:00,1640.0,m,fixed,interruption -- sidetrack,fail,circulation loss,"RAN IN WITH OPEN ENDED 5"" DP TO 1640M. LOST RETURNS.",2.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 03:00:00+00:00,1992-12-14 03:30:00+00:00,1640.0,m,fixed,interruption -- sidetrack,ok,success,"WORKED PIPE. CIRCULATED 800 STROKES, MAX. 60 SPM, FULL RETURNS.",0.5 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 03:30:00+00:00,1992-12-14 04:30:00+00:00,1902.0,m,fixed,interruption -- sidetrack,fail,circulation loss,"CONT. RUNNING IN TO 1902M, LOST RETURNS.",1.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 04:30:00+00:00,1992-12-14 05:00:00+00:00,2020.0,m,fixed,interruption -- sidetrack,ok,success,"WORKED PIPE AND CIRCULATED 40 SPM, FULL RETURNS. CONT. RUNNING IN TO 2020M.",0.5 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 05:00:00+00:00,1992-12-14 05:30:00+00:00,2220.0,m,fixed,interruption -- sidetrack,ok,success,CONT. RI TO 2220M.,0.5 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 05:30:00+00:00,1992-12-14 06:30:00+00:00,2220.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED. INCREASED RATE SLOWLY UP TO 2800 LPM.,1.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 06:30:00+00:00,1992-12-14 07:00:00+00:00,2220.0,m,fixed,interruption -- sidetrack,ok,success,"PUMPED 4 M3 HI-VIS 1,5 SG KCL MUD. DISPLACED SAME WITH 19,5 M3 MUD.",0.5 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 07:00:00+00:00,1992-12-14 09:00:00+00:00,2220.0,m,fixed,interruption -- sidetrack,ok,success,"PULLED BACK TO 2180M. HOOKED UP CEMENT HOSE, PRESSURE TESTED CEMENT LINES TO 100 BAR/5 MINS. PUMPED 3,0 M3 FRESH WATER, 15,2 M3 1,95 SG CEMENT, 430 L FRESH WATER, DROPPED WIPER PLUG AND DISPLACED CEMENT WITH 17,3 M3 1,5 SG MUD. ROTATED STRING DURING DISPLACEMENT.",2.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 09:00:00+00:00,1992-12-14 10:00:00+00:00,2180.0,m,fixed,interruption -- sidetrack,ok,success,PULLED BACK TO 1850M.,1.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 10:00:00+00:00,1992-12-14 13:00:00+00:00,1850.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED HOLE CLEAN.,3.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 13:00:00+00:00,1992-12-14 14:00:00+00:00,1850.0,m,fixed,interruption -- sidetrack,ok,success,"PUMPED 3,0 M3 FRESH WATER, 22,8 M3 1,5 SG CEMENT, 350 L FRESH WATER. DISPLACED WITH 14 M3 MUD.",1.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 14:00:00+00:00,1992-12-14 15:00:00+00:00,1410.0,m,fixed,interruption -- sidetrack,ok,success,PULLED BACK TO 1410M,1.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 15:00:00+00:00,1992-12-14 16:00:00+00:00,1410.0,m,fixed,interruption -- sidetrack,ok,success,CIRC. BU,1.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 16:00:00+00:00,1992-12-14 18:00:00+00:00,1410.0,m,fixed,interruption -- sidetrack,ok,success,POOH,2.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 18:00:00+00:00,1992-12-14 19:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"BROKE OUT 12 1/4"" BIT. REARRANGED BHA IN DERRICK",1.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 19:00:00+00:00,1992-12-14 20:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,LD CEMENT HEAD,1.0 +15_9_19_S_1992_12_15.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-14T00:00:00+01:00,1992-12-15T00:00:00+01:00,1992-12-14 20:00:00+00:00,1992-12-14 23:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"MU 12 1/4"" CLEAN-OUT ASSEMBLY AND RAN IN HOLE",3.0 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-14 23:00:00+00:00,1992-12-15 01:00:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,CONT RIH TO 1400M,2.0 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 01:00:00+00:00,1992-12-15 02:00:00+00:00,1493.0,m,fixed,interruption -- sidetrack,fail,stuck equipment,FILLED PIPE. WASHED/REAMED FROM 1400M TO 1493M. PIPE STUCK AT 1493M WITHOUT ANY WARNING SIGNS. KEPT FULL CIRCULATION.,1.0 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 02:00:00+00:00,1992-12-15 05:00:00+00:00,1496.0,m,fixed,interruption -- sidetrack,ok,success,WORKED PIPE FREE. WORKED PIPE ACROSS TIGHT AREAS AT 1492M TO 1494M. TENDENCIES OF GETTING STUCK SEVERAL TIMES. CONTINUED WORKING PIPE. NO CEMENT IN RETURNS. WORKED PIPE TO 1496M. FULL CIRCULATION AT ALL TIMES.,3.0 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 05:00:00+00:00,1992-12-15 08:00:00+00:00,1510.0,m,fixed,interruption -- sidetrack,ok,success,CONT. WASHING/REAMING TO 1510M.,3.0 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 08:00:00+00:00,1992-12-15 09:30:00+00:00,1510.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED WHILE MIXING HI-VIS 1,75 SG PILL.",1.5 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 09:30:00+00:00,1992-12-15 11:30:00+00:00,1510.0,m,fixed,interruption -- sidetrack,ok,success,SWEPT PILL AROUND AND WASHED/REAMED TO 1540M. TOOK WEIGHT.,2.0 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 11:30:00+00:00,1992-12-15 12:00:00+00:00,1540.0,m,fixed,interruption -- sidetrack,ok,success,BACK-REAMED TO 1483M.,0.5 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 12:00:00+00:00,1992-12-15 13:30:00+00:00,1483.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BU,1.5 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 13:30:00+00:00,1992-12-15 15:00:00+00:00,1483.0,m,fixed,interruption -- sidetrack,ok,success,BACK-REAMED TO 1000M.,1.5 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 15:00:00+00:00,1992-12-15 15:30:00+00:00,1000.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED HOLE CLEAN,0.5 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 15:30:00+00:00,1992-12-15 19:00:00+00:00,1000.0,m,fixed,interruption -- sidetrack,ok,success,"POOH. LD STABILISER/1 EACH 8"" DC/NB STABILISER/BIT.",3.5 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 19:00:00+00:00,1992-12-15 20:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"MU PRE-LOADED CEMENT HEAD, RACKED SAME IN DERRICK.",1.0 +15_9_19_S_1992_12_16.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-15T00:00:00+01:00,1992-12-16T00:00:00+01:00,1992-12-15 20:00:00+00:00,1992-12-15 23:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"RIH WITH 5"" OEDP. BROKE CIRCULATION AT 1150M.",3.0 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-15 23:00:00+00:00,1992-12-15 23:30:00+00:00,1470.0,m,fixed,interruption -- sidetrack,ok,success,"CONT. RIH WITH 5"" OEDP TO 1470M.",0.5 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-15 23:30:00+00:00,1992-12-16 01:00:00+00:00,1543.0,m,fixed,interruption -- sidetrack,ok,success,WASHED/ROTATED FROM 1470 TO 1543M. WORKED THROUGH SPOTS AT 1529 AND 1535M. TOOK WEIGHT AT 1543M. PULLED BACK TO 1527M.,1.5 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 01:00:00+00:00,1992-12-16 02:00:00+00:00,1527.0,m,fixed,interruption -- sidetrack,ok,success,RU CEMENT EQUIPMENT. PRESSURE TESTED SURFACE LINES TO 100 BAR/10 MINS. RAN IN TO 1541M.,1.0 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 02:00:00+00:00,1992-12-16 03:00:00+00:00,1541.0,m,fixed,interruption -- sidetrack,ok,success,"PUMPED 3,0 M3 FRESHWATER. MIXED AND PUMPED 10,4 M3 1,95 SG CEMENT, PUMPED 420 L FRESH WATER. DROPPED WIPER PLUG. DISPLACED WITH 12,2 M3 MUD.",1.0 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 03:00:00+00:00,1992-12-16 04:00:00+00:00,1541.0,m,fixed,interruption -- sidetrack,ok,success,DISCONNECTED CEMENT HOSE AND RACKED BACK CEMENT HEAD. PULLED BACK TO 1400M.,1.0 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 04:00:00+00:00,1992-12-16 04:30:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BU.,0.5 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 04:30:00+00:00,1992-12-16 05:00:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,PUMPED SLUG AND POOH TO 1300M.,0.5 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 05:00:00+00:00,1992-12-16 06:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,CONT. POOH.,1.0 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 06:00:00+00:00,1992-12-16 07:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,success,"RIH AND WASHED BOP AND WELLHEAD. INSTALLED TEST TOOL AND 1 STAND 5"" DP",1.0 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 07:00:00+00:00,1992-12-16 08:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,LD CEMENT HEAD,1.0 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 08:00:00+00:00,1992-12-16 14:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,success,"PRESSURE TESTED BOP TO 20/220 BAR, 5/10 MINS. PRESSURE TESTED STAND PIPE, INSIDE BOP AND SPARE KELLY COCK TO 35/345 BAR, 5/10 MINS. BOP WAS FUNCTIONED ON BLUE POD. FUNCTION TESTED BOP ON ACOUSTIC SYSTEM.",6.0 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 14:00:00+00:00,1992-12-16 22:30:00+00:00,1377.0,m,fixed,interruption -- sidetrack,ok,success,"MU BHA. TESTED MWD AND MUD MOTOR. CHANGED OUT JARS. PU 6 5/8"" HWDP. RI TO 1377M.",8.5 +15_9_19_S_1992_12_17.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-16T00:00:00+01:00,1992-12-17T00:00:00+01:00,1992-12-16 22:30:00+00:00,1992-12-16 23:00:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,DISPLACED WELL TO SEA WATER.,0.5 +15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-16 23:00:00+00:00,1992-12-16 23:30:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,CONT. DISPLACING TO SEA WEATER,0.5 +15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-16 23:30:00+00:00,1992-12-17 00:30:00+00:00,1474.0,m,fixed,interruption -- sidetrack,ok,success,"WASHED/REAMED FROM 1400M TO 1474M. INDICATION OF CEMENT FROM 1460 M. 1,5 - 2 TON WEIGHT.",1.0 +15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 00:30:00+00:00,1992-12-17 05:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"FLUSHED THROUGH SURFACE LINES, CHOKEMANIFOLD. CLANED OUT SHAKERPITS, TRIPTANK, POORBOY DEGASSER AND MUD SURFACE SYSTEM. PLUGGED OFF ALL DRAINS.",4.5 +15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 05:00:00+00:00,1992-12-17 17:30:00+00:00,1470.0,m,fixed,drilling -- drill,ok,success,CONTINUED PREPARATIONS FOR PETROFREE MUD: CLEANED SHAKER PITS AND MUD PITS. PLUGGED OFF DRAINS. STARTED OFFLOADING MUD FROM BOAT.,12.5 +15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 17:30:00+00:00,1992-12-17 19:30:00+00:00,1470.0,m,fixed,drilling -- circulating conditioning,ok,success,"PUMPED 9 M3 SPACER AND DISPLACED WELL TO 1,35 SG PETROFREE MUD.",2.0 +15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 19:30:00+00:00,1992-12-17 21:00:00+00:00,1470.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED TO CONDITION MUD WHILE FILLING SHAKERPITS AND SURFACE EQUIPMENT WITH MUD.,1.5 +15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 21:00:00+00:00,1992-12-17 22:00:00+00:00,1486.0,m,fixed,interruption -- sidetrack,ok,success,"WASHED/REAMED FROM 1474M TO 1478M. WITH PUMPS OFF, SET DOWN 5 TONS ON CEMENT. DRILLED CEMENT TO 1486M.",1.0 +15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 22:00:00+00:00,1992-12-17 22:30:00+00:00,1486.0,m,fixed,interruption -- sidetrack,fail,equipment failure,"WHILE PUMPING 2500 LPM, CHECKED TOOLFACE FOR 20 MINUTES, NEG. PULLED BACK INTO CASING. STOPPED PUMPS 2 MINUTES WHILE LINING UP FOR RETURNS OVER SHAKERS.",0.5 +15_9_19_S_1992_12_18.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-17T00:00:00+01:00,1992-12-18T00:00:00+01:00,1992-12-17 22:30:00+00:00,1992-12-17 23:00:00+00:00,1470.0,m,fixed,interruption -- sidetrack,ok,success,HOLE PACKED OFF. UNABLE TO CIRCULATE/ROTATE. WORKED PIPE FREE WITH 40 TONS OVERPULL.,0.5 +15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-17 23:00:00+00:00,1992-12-18 01:30:00+00:00,1470.0,m,fixed,interruption -- sidetrack,ok,success,PULLED BACK TO 1435M. LOOSING MUD WHEN CIRCULATING AT 1620LPM.,2.5 +15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 01:30:00+00:00,1992-12-18 03:00:00+00:00,1400.0,m,fixed,interruption -- sidetrack,ok,success,"PULLED BACK TO 1400M. CIRCULATED UP TO 2600 LPM, FULL RETURNS.",1.5 +15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 03:00:00+00:00,1992-12-18 05:00:00+00:00,1482.0,m,fixed,interruption -- sidetrack,ok,success,WASHED/REAMED FROM 1400 TO 1482M.,2.0 +15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 05:00:00+00:00,1992-12-18 09:00:00+00:00,1493.0,m,fixed,interruption -- sidetrack,ok,success,WASHED/REAMED TO 1486M. DRILLED CEMENT FROM 1486M TO 1493M.,4.0 +15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 09:00:00+00:00,1992-12-18 10:00:00+00:00,1493.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP.,1.0 +15_9_19_S_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 S,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 10:00:00+00:00,1992-12-18 11:00:00+00:00,1493.0,m,fixed,formation evaluation -- rft/fit,ok,success,"PRESSURE TESTED SURFACE LINES TO 100 BAR/10 MINS. PERFORMED F.I.T. TO 1,65 SG EQUIVALENT MUD WEIGHT.",1.0 +15_9_19_ST2_1992_12_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-18T00:00:00+01:00,1992-12-19T00:00:00+01:00,1992-12-18 11:00:00+00:00,1992-12-18 23:00:00+00:00,1536.0,m,fixed,interruption -- sidetrack,ok,success,"SIDETRACKED AND DRILLED 12 1/4"" HOLE. DRILLED/SURVEYED FROM 1493M TO 1536M: STEERED FROM 1493 TO 1507M, 1509-1511M, 1513-1523M AND 1531-1536M. (100-120 DEG.RIGHT TF) INCREASED MW FROM 1,35 TO 1,40 SG.WHILE DRILLING.",12.0 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-18 23:00:00+00:00,1992-12-19 05:00:00+00:00,1588.0,m,fixed,interruption -- sidetrack,ok,success,"CONT. DRILLING/SURVEYING 12 1/4"" HOLE TO 1588M: STEERED FROM 1536M TO 1551M AND 1562M TO 1580M. (80-85 DEG. RIGHT TOOLFACE)",6.0 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 05:00:00+00:00,1992-12-19 09:00:00+00:00,1630.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 1588M TO 1630M: STEERED FROM 1589 TO 1608M, 100 DEGREES RIGHT.",4.0 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 09:00:00+00:00,1992-12-19 10:30:00+00:00,1630.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP DUE TO EXCESSIVE AMOUNT OF CUTTINGS OVER SHAKERS.,1.5 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 10:30:00+00:00,1992-12-19 11:30:00+00:00,1630.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 1630M TO 1485M.,1.0 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 11:30:00+00:00,1992-12-19 12:30:00+00:00,1485.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP.,1.0 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 12:30:00+00:00,1992-12-19 13:00:00+00:00,1630.0,m,fixed,interruption -- sidetrack,ok,success,RIH TO 1630M.,0.5 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 13:00:00+00:00,1992-12-19 15:00:00+00:00,1653.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 1630M TO 1653M: STEERED FROM 1643M TO 1653 M, TOOLFACE 110 DEG. LEFT. OBSERVED 70 BAR INCREASE IN PUMP PRESSURE.",2.0 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 15:00:00+00:00,1992-12-19 16:00:00+00:00,1653.0,m,fixed,interruption -- repair,ok,success,"PUMPED 3 M3 ESTER PILL. SWEPT PILL AROUND, NO EFFECT.",1.0 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 16:00:00+00:00,1992-12-19 20:00:00+00:00,1653.0,m,fixed,interruption -- repair,ok,success,BACKREAMED FROM 1653M TO 1000M.,4.0 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 20:00:00+00:00,1992-12-19 21:30:00+00:00,1000.0,m,fixed,interruption -- repair,ok,success,CIRCULATED HOLE CLEAN. HAD HIGH AMOUNT OF CUTTINGS OVER THE SHAKERS FROM CASING. PUMPED SLUG.,1.5 +15_9_19_ST2_1992_12_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-19T00:00:00+01:00,1992-12-20T00:00:00+01:00,1992-12-19 21:30:00+00:00,1992-12-19 23:00:00+00:00,1000.0,m,fixed,interruption -- repair,ok,success,POOH,1.5 +15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-19 23:00:00+00:00,1992-12-20 04:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED POOH. INSPECTED BHA FOR DAMAGE/BLOCKAGE. FOUND 2 NOZZLES PLUGGED WITH FLAKE OF REINFORCED RUBBER FROM MUD MOTOR. LAID DOWN MUD MOTOR AND BIT. RACKED BACK MWD IN DERRICK.,5.0 +15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 04:00:00+00:00,1992-12-20 05:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,MADE UP NEW MUD MOTOR AND BIT. TESTED MUD MOTOR. RIH WITH BHA.,1.0 +15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 05:00:00+00:00,1992-12-20 08:00:00+00:00,250.0,m,fixed,interruption -- sidetrack,fail,equipment failure,"CONTINUED MAKING UP BOTTOMHOLE ASSEMBLY. ORIENTED TOOL FACE. RAN IN TO 250M. ATTEMPTED TESTING THE MWD TOOL, NEGATIVE.",3.0 +15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 08:00:00+00:00,1992-12-20 11:30:00+00:00,250.0,m,fixed,interruption -- repair,ok,success,POOH. LAID DOWN MWD TOOL. PICKED UP A NEW MWD TOOL AND TESTED SAME. RAN BACK IN TO 250M.,3.5 +15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 11:30:00+00:00,1992-12-20 13:30:00+00:00,1485.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RIH TO 1485M. FILLED PIPE AT 700M.,2.0 +15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 13:30:00+00:00,1992-12-20 14:30:00+00:00,1653.0,m,fixed,interruption -- sidetrack,ok,success,REAMED HOLE FROM 1485M TO 1653M.,1.0 +15_9_19_ST2_1992_12_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-20T00:00:00+01:00,1992-12-21T00:00:00+01:00,1992-12-20 14:30:00+00:00,1992-12-20 23:00:00+00:00,1799.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 1653M TO 1799M: STEERED FROM 1653 TO 1658M (120 DEGR. LEFT), 1665-1679 (120 L), 1694-1709 (80 L), 1723-1738 (110 L), 1752-1767 (110 L) AND 1780-1795 (110 L).",8.5 +15_9_19_ST2_1992_12_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-21T00:00:00+01:00,1992-12-22T00:00:00+01:00,1992-12-20 23:00:00+00:00,1992-12-21 05:00:00+00:00,1926.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED DRILLING/SURVEYING 12 1/4"" HOLE FROM 1799M TO 1926M: STEERED FROM 1809M TO 1824M (DIRECTION 115 DEGREES LEFT).",6.0 +15_9_19_ST2_1992_12_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-21T00:00:00+01:00,1992-12-22T00:00:00+01:00,1992-12-21 05:00:00+00:00,1992-12-21 23:00:00+00:00,2241.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 1926M TO 2241M: STEERED FROM 1982M TO 1992M (DIRECTION 90 DEGREES RIGHT).",18.0 +15_9_19_ST2_1992_12_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-22T00:00:00+01:00,1992-12-23T00:00:00+01:00,1992-12-21 23:00:00+00:00,1992-12-22 05:00:00+00:00,2357.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED DRILLING 12 1/4"" HOLE FROM 2241M TO 2357M: STEERED FROM 2242M TO 2248M (DIRECTION 120 DEGREES RIGHT).",6.0 +15_9_19_ST2_1992_12_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-22T00:00:00+01:00,1992-12-23T00:00:00+01:00,1992-12-22 05:00:00+00:00,1992-12-22 14:00:00+00:00,2502.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 2357M TO 2502M: STEERED FROM 2385M TO 2392M (DIRECTION 130 DEGREES RIGHT)",9.0 +15_9_19_ST2_1992_12_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-22T00:00:00+01:00,1992-12-23T00:00:00+01:00,1992-12-22 14:00:00+00:00,1992-12-22 15:00:00+00:00,2502.0,m,fixed,interruption -- repair,ok,success,CIRCULATED BOTTOMS UP,1.0 +15_9_19_ST2_1992_12_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-22T00:00:00+01:00,1992-12-23T00:00:00+01:00,1992-12-22 15:00:00+00:00,1992-12-22 21:30:00+00:00,2502.0,m,fixed,interruption -- sidetrack,ok,success,"BACK-REAMED FROM 2502M TO 13 3/8"" SHOE AS PRECAUTION.",6.5 +15_9_19_ST2_1992_12_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-22T00:00:00+01:00,1992-12-23T00:00:00+01:00,1992-12-22 21:30:00+00:00,1992-12-22 23:00:00+00:00,1485.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP,1.5 +15_9_19_ST2_1992_12_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-23T00:00:00+01:00,1992-12-24T00:00:00+01:00,1992-12-22 23:00:00+00:00,1992-12-22 23:30:00+00:00,1485.0,m,fixed,interruption -- maintain,fail,equipment failure,INVESTIGATED ALARM ON TDS. FOUND AIR BLOWER HOSE TO HAVE JUMPED OFF. RE-INSTALLED SAME.,0.5 +15_9_19_ST2_1992_12_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-23T00:00:00+01:00,1992-12-24T00:00:00+01:00,1992-12-22 23:30:00+00:00,1992-12-23 02:00:00+00:00,2502.0,m,fixed,interruption -- sidetrack,ok,success,RAN BACK IN TO 2502M. FILLED PIPE AND CIRCULATED A RISER VOLUME AT 1950M.,2.5 +15_9_19_ST2_1992_12_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-23T00:00:00+01:00,1992-12-24T00:00:00+01:00,1992-12-23 02:00:00+00:00,1992-12-23 05:00:00+00:00,2559.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 2502M TO 2559M: STEERED FROM 2502M TO 2510M (DIRECTION 75 DEGREES RIGHT)",3.0 +15_9_19_ST2_1992_12_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-23T00:00:00+01:00,1992-12-24T00:00:00+01:00,1992-12-23 05:00:00+00:00,1992-12-23 23:00:00+00:00,2840.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 2559M TO 2840M: STEERED FROM 2559 TO 2568M (DIRECTION 90 DEGREES RIGHT) AND FROM 2763 TO 2775M (HIGH SIDE).",18.0 +15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-23 23:00:00+00:00,1992-12-24 05:00:00+00:00,2938.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED DRILLING/SURVEYING 12 1/4"" HOLE TO 2938M.",6.0 +15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 05:00:00+00:00,1992-12-24 15:00:00+00:00,3018.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 2938M TO 3018M.",10.0 +15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 15:00:00+00:00,1992-12-24 16:00:00+00:00,3018.0,m,fixed,interruption -- repair,ok,success,CIRCULATED BOTTOMS UP,1.0 +15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 16:00:00+00:00,1992-12-24 17:00:00+00:00,3018.0,m,fixed,interruption -- sidetrack,fail,circulation loss,BACKREAMED FROM 3018M TO 2952M. HOLE PACKED OFF. LOST RETURNS. UNABLE TO ROTATE.,1.0 +15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 17:00:00+00:00,1992-12-24 20:30:00+00:00,2968.0,m,fixed,interruption -- lost circulation,fail,circulation loss,RAN IN FROM 2952M TO 2968M. ESTABLISHED ROTATION AND CIRCULATION. ONLY PARTIAL RETURNS WHEN PUMPING MORE THAN 1200 LPM.,3.5 +15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 20:30:00+00:00,1992-12-24 22:00:00+00:00,3017.0,m,fixed,interruption -- lost circulation,fail,circulation loss,"RAN IN TO 3017M. PUMPED AND SET 7,1 M3 LIQUID CASING LCM-PILL FROM 3017M TO 2927M WHILE PULLING BACK TO 2957M, FULL RETURNS. AT 2957M, HOLE PACKED OFF. UNABLE TO ROTATE. RAN BACK IN TO 2963M.",1.5 +15_9_19_ST2_1992_12_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-24T00:00:00+01:00,1992-12-25T00:00:00+01:00,1992-12-24 22:00:00+00:00,1992-12-24 23:00:00+00:00,2963.0,m,fixed,interruption -- lost circulation,ok,success,"AT 2963M, REESTABLISHED ROTATION AND CIRCULATION. KEEPING 40 RPM ON THE DRILL STRING, INCREASED CIRCULATION RATE IN STEPS TO 1300 LPM, FULL RETURNS.",1.0 +15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-24 23:00:00+00:00,1992-12-25 02:00:00+00:00,0.0,m,fixed,interruption -- lost circulation,ok,success,"CONTINUED INCREASING CIRCULATION RATE TO 1900LPM, FULL RETURNS.",3.0 +15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 02:00:00+00:00,1992-12-25 04:30:00+00:00,2963.0,m,fixed,interruption -- lost circulation,ok,success,"INCREASED CIRCULATION RATE TO 2600 LPM, FULL RETURNS. KEPT 40 RPM ON DRILL STRING.",2.5 +15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 04:30:00+00:00,1992-12-25 05:00:00+00:00,2963.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED OUT OF HOLE FROM 2963M TO 2941M.,0.5 +15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 05:00:00+00:00,1992-12-25 06:00:00+00:00,2941.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED BACKREAMING FROM 2941M TO 2936M. HOLE PACKED OFF AND STRING STALLED OUT. ATTEMPTED WORKING PIPE DOWN WITH 40 TONS, NO-GO. ATTEMPTED TO JAR DOWN, NO-GO. ATTEMPTED WORKING PIPE DOWN WITH TORQUE, NO-GO. PULLED 60 TONS OVERPULL ON PIPE. WORKED PIPE DOWN TO 2941M. REESTABLISHED ROTATION AND CIRCULATION.",1.0 +15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 06:00:00+00:00,1992-12-25 11:00:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED AND ROTATED PIPE AT 2941M. INCREASING AMOUNT OF CUTTINGS OVER SHAKERS. WORKED PIPE DOWN TO 2961M.,5.0 +15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 11:00:00+00:00,1992-12-25 12:30:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,"PUMPED 10 M3 LO-VIS PILL FOLLOWED BY 10 M3 HI-VIS PILL, CIRCULATED PILLS AROUND.",1.5 +15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 12:30:00+00:00,1992-12-25 18:30:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED CIRCULATING. RAISED MUDWEIGHT TO 1,45 SG.",6.0 +15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 18:30:00+00:00,1992-12-25 20:30:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,"PUMPED 20 M3 HI-VIS 1,6 SG PILL. CIRCULATED SAME AROUND.",2.0 +15_9_19_ST2_1992_12_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-25T00:00:00+01:00,1992-12-26T00:00:00+01:00,1992-12-25 20:30:00+00:00,1992-12-25 23:00:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED TO RECORD CUTTINGS RETURNS.,2.5 +15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-25 23:00:00+00:00,1992-12-26 02:00:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED CIRCULATING HOLE.,3.0 +15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-26 02:00:00+00:00,1992-12-26 05:00:00+00:00,2961.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED AND RAISED MUDWEIGHT TO 1,50 SG.",3.0 +15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-26 05:00:00+00:00,1992-12-26 08:30:00+00:00,2967.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED WHILE WORKING PIPE FROM 2967M TO 2941M. RECORDED CUTTINGS RETURNS.,3.5 +15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-26 08:30:00+00:00,1992-12-26 11:30:00+00:00,2967.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED HOLE AND RAISED MUDWEIGHT TO 1,55 SG.",3.0 +15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-26 11:30:00+00:00,1992-12-26 17:00:00+00:00,2967.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED HOLE WHILE RECORDING CUTTINGS RETURNS OVER SHAKER. WORKED PIPE BETWEEN 2967M AND 2941M WHILE CIRCULATING.,5.5 +15_9_19_ST2_1992_12_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-26T00:00:00+01:00,1992-12-27T00:00:00+01:00,1992-12-26 17:00:00+00:00,1992-12-26 23:00:00+00:00,2941.0,m,fixed,interruption -- sidetrack,ok,success,"BACKREAMED FROM 2941M TO 2913M AT 2700LPM, 150 RPM. TDS STALLED OUT AT 2917M. WORKED PIPE DUE TO TIGHT HOLE.",6.0 +15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-26 23:00:00+00:00,1992-12-26 23:30:00+00:00,2913.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING TO 2910M. WORKED PIPE DUE TO TIGHT HOLE.,0.5 +15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-26 23:30:00+00:00,1992-12-27 01:30:00+00:00,2910.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP WHILE WORKING PIPE BETWEEN 2939M AND 2910M.,2.0 +15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 01:30:00+00:00,1992-12-27 05:00:00+00:00,2910.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING FROM 2910M TO 2850M. WORKED PIPE DUE TO TIGHT HOLE. TDS STALLED OUT AT 2899M. CIRCULATED 15 MINUTES ON CONNECTION.,3.5 +15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 05:00:00+00:00,1992-12-27 06:00:00+00:00,2850.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 2850M TO 2837M. WORKED PIPE DUE TO TIGHT HOLE.,1.0 +15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 06:00:00+00:00,1992-12-27 07:00:00+00:00,2837.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP DUE TO HIGH AMOUNT OF CUTTINGS OVER SHAKERS.,1.0 +15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 07:00:00+00:00,1992-12-27 20:30:00+00:00,2837.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 2837M TO 2730M. WORKED PIPE DUE TO TIGHT HOLE.,13.5 +15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 20:30:00+00:00,1992-12-27 21:30:00+00:00,2730.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED BOTTOMS UP.,1.0 +15_9_19_ST2_1992_12_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-27T00:00:00+01:00,1992-12-28T00:00:00+01:00,1992-12-27 21:30:00+00:00,1992-12-27 23:00:00+00:00,2730.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 2730M TO 2715M. WORKED PIPE DUE TO TIGHT HOLE.,1.5 +15_9_19_ST2_1992_12_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-28T00:00:00+01:00,1992-12-29T00:00:00+01:00,1992-12-27 23:00:00+00:00,1992-12-28 05:00:00+00:00,2715.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING FROM 2715M TO 2608M. CIRCULATED 20 TO 15 MINS. ON EACH CONNECTION. WORKED PIPE IN TIGHT SECTIONS. TIGHT HOLE TO 2701M. TIGHT SPOTS TO 2608M.,6.0 +15_9_19_ST2_1992_12_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-28T00:00:00+01:00,1992-12-29T00:00:00+01:00,1992-12-28 05:00:00+00:00,1992-12-28 15:30:00+00:00,2608.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 2608M TO 2320M. MAX TOURQUE 14000 NM.,10.5 +15_9_19_ST2_1992_12_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-28T00:00:00+01:00,1992-12-29T00:00:00+01:00,1992-12-28 15:30:00+00:00,1992-12-28 16:30:00+00:00,2320.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED HOLE AND STARTED INCREASING MUD WEIGHT TO 1.60 S.G.,1.0 +15_9_19_ST2_1992_12_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-28T00:00:00+01:00,1992-12-29T00:00:00+01:00,1992-12-28 16:30:00+00:00,1992-12-28 23:00:00+00:00,2320.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 2320M TO 1661M. MAX TORQUE 14000 NM.,6.5 +15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-28 23:00:00+00:00,1992-12-29 00:00:00+00:00,1661.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 1661M TO 1590M. MAX TORQUE 10000 NM. LARGE AMOUNTS OF CUTTINGS STARTED COMMING OVER THE SHAKERS AND A SLIGHT PRESSURE INCREASE WAS OBSERVED.,1.0 +15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 00:00:00+00:00,1992-12-29 01:30:00+00:00,1590.0,m,fixed,interruption -- sidetrack,ok,success,CIRCULATED HOLE UNTIL CUTTINGS LEVEL CAME DOWN AND NO PRESSURE INCREASE WAS OBSERVED WHILE PULLING THE STAND OUT.,1.5 +15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 01:30:00+00:00,1992-12-29 05:00:00+00:00,1590.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 1590M TO 1475M. MAX TORQUE 10000 NM.,3.5 +15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 05:00:00+00:00,1992-12-29 06:30:00+00:00,1475.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 1475M TO 1440M.,1.5 +15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 06:30:00+00:00,1992-12-29 07:00:00+00:00,1615.0,m,fixed,interruption -- sidetrack,ok,success,"RIH TO 1615M, NO TIGHT SPOTS. POOH TO 1445M.",0.5 +15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 07:00:00+00:00,1992-12-29 09:00:00+00:00,1445.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 1445M TO 950M.,2.0 +15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 09:00:00+00:00,1992-12-29 14:30:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,"SLUGED PIPE. POOH. LAID DOWN 12 1/4"" BOTTOM HOLE ASSEMBLY.",5.5 +15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 14:30:00+00:00,1992-12-29 16:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,CLEANED ESTER MUD ON RIG FLOOR.,1.5 +15_9_19_ST2_1992_12_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-29T00:00:00+01:00,1992-12-30T00:00:00+01:00,1992-12-29 16:00:00+00:00,1992-12-29 23:00:00+00:00,840.0,m,fixed,interruption -- sidetrack,ok,success,MADE UP NEW BHA AND RAN IN HOLE TO 840M.,7.0 +15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-29 23:00:00+00:00,1992-12-30 03:00:00+00:00,2740.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RUNNING IN HOLE FROM 840M TO 2740M. WASHED PAST SPOT AT 2650M.,4.0 +15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 03:00:00+00:00,1992-12-30 05:00:00+00:00,2903.0,m,fixed,interruption -- sidetrack,ok,success,WASHED DOWN FROM 2740M TO 2780M. CONTINUED RIH FROM 2780M TO 2903M. WASHED PAST SPOT AT 2825M.,2.0 +15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 05:00:00+00:00,1992-12-30 05:30:00+00:00,2965.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RIH FROM 2903M TO 2965M.,0.5 +15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 05:30:00+00:00,1992-12-30 09:30:00+00:00,3018.0,m,fixed,interruption -- sidetrack,ok,success,REAMED/WASHED FROM 2965M TO 3018M. TIGHT SPOT AT 2965M.,4.0 +15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 09:30:00+00:00,1992-12-30 12:00:00+00:00,3043.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/SURVEYED 12 1/4"" HOLE FROM 3018M TO 3043M.",2.5 +15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 12:00:00+00:00,1992-12-30 18:30:00+00:00,3050.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3043M TO 3050M WITH LIMITED PENETRATION- RATE. VARIED DRILLING PARAMETRES WITHOUT ANY APPARENT GAIN.",6.5 +15_9_19_ST2_1992_12_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-30T00:00:00+01:00,1992-12-31T00:00:00+01:00,1992-12-30 18:30:00+00:00,1992-12-30 23:00:00+00:00,3050.0,m,fixed,interruption -- sidetrack,ok,success,BACKREAMED FROM 3050M TO 2778M. MAX TORQUE 15000 NM. RPM 140. PUMP PRESSURE 200 BAR AT 128 SPM.,4.5 +15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-30 23:00:00+00:00,1992-12-31 00:00:00+00:00,2778.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING FROM 2778M TO 2691M. MAX TORQUE 15000 NM. RPM 140. PUMP PRESSURE 200 BAR AT 128 SPM.,1.0 +15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 00:00:00+00:00,1992-12-31 05:00:00+00:00,2691.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING FROM 2691M TO 2130M. MAX TORQUE 15000 NM. RPM 140. PUMP PRESSURE 180 BAR AT 128 SPM.,5.0 +15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 05:00:00+00:00,1992-12-31 10:00:00+00:00,2130.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED BACKREAMING FROM 2130M TO 1069M. WORKING TIGHT SPOTS AT 1972M AND 1685M.,5.0 +15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 10:00:00+00:00,1992-12-31 14:00:00+00:00,1069.0,m,fixed,interruption -- sidetrack,ok,success,"POOH, CHANGED BIT AND MWD PRS-SUB.",4.0 +15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 14:00:00+00:00,1992-12-31 15:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"RECHECK ALIGMENT BETWEEN MUDMOTOR AND MWD TOOL, THIS DUE TO A DIFFERENCE OF 30 DEG. BETWEEN BHA NO.11 AND BHA NO.12. THE SAME TOOL WAS USED IN BOTH BHA'S.",1.5 +15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 15:30:00+00:00,1992-12-31 18:00:00+00:00,1480.0,m,fixed,interruption -- sidetrack,ok,success,RIH TO 1480M BREAKING CIRCULATION EVERY 500M.,2.5 +15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 18:00:00+00:00,1992-12-31 19:30:00+00:00,1480.0,m,fixed,interruption -- maintain,ok,success,SLIPPED AND CUT DRILLINE. SERVICED TOP DRIVE.,1.5 +15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 19:30:00+00:00,1992-12-31 20:00:00+00:00,1480.0,m,fixed,interruption -- sidetrack,ok,success,TOOK PRESSURE READINGS FOR HYDRAULIC CALCULATIONS.,0.5 +15_9_19_ST2_1993_01_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1992-12-31T00:00:00+01:00,1993-01-01T00:00:00+01:00,1992-12-31 20:00:00+00:00,1992-12-31 23:00:00+00:00,2983.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RIH FROM 1480M TO 2983M BREAKING CIRCULATION EVERY 500M.,3.0 +15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1992-12-31 23:00:00+00:00,1993-01-01 00:00:00+00:00,3050.0,m,fixed,interruption -- sidetrack,ok,success,WASHED/REAMED FROM 2983M TO 3050M. TIGHT SPOT AT 2925M.,1.0 +15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 00:00:00+00:00,1993-01-01 00:30:00+00:00,3050.0,m,fixed,interruption -- sidetrack,ok,success,"ATTEMPTED TO GET SURVEY, NEG. (TO MUCH NOISE FROM SYSTEM)",0.5 +15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 00:30:00+00:00,1993-01-01 05:00:00+00:00,3052.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3050M TO 3052M WITH LIMITED PENETRATION- RATE. VARIED ALL DRILLING PARAMETERS WITH NO APPARENT GAIN.",4.5 +15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 05:00:00+00:00,1993-01-01 12:30:00+00:00,3052.0,m,fixed,interruption -- sidetrack,ok,success,POOH. WORKED TIGHT SPOT AT 2993M. FLOWCHECKED AT SHOE-NEG.,7.5 +15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 12:30:00+00:00,1993-01-01 13:30:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,LAID DOWN MUD MOTOR.,1.0 +15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 13:30:00+00:00,1993-01-01 21:30:00+00:00,103.0,m,fixed,drilling -- bop activities,ok,success,MADE UP BOP TEST-TOOL. RIH AND TEST BOP TO 20 BAR / 200 BAR. POOH WITH TEST TOOL.,8.0 +15_9_19_ST2_1993_01_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-01T00:00:00+01:00,1993-01-02T00:00:00+01:00,1993-01-01 21:30:00+00:00,1993-01-01 23:00:00+00:00,37.0,m,fixed,interruption -- sidetrack,ok,success,MADE UP NEW BIT AND MUD MOTOR. RIH TO 37M. TESTED MUD MOTOR AND MWD.,1.5 +15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-01 23:00:00+00:00,1993-01-02 05:00:00+00:00,2207.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RIH FROM 37M TO 2207M. BROKE CIRCULATION EVERY 500M.,6.0 +15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 05:00:00+00:00,1993-01-02 06:30:00+00:00,2956.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED RIH FROM 2207M TO 2956M.,1.5 +15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 06:30:00+00:00,1993-01-02 07:30:00+00:00,3050.0,m,fixed,interruption -- sidetrack,ok,success,REAMED DOWN FROM 2956M TO 3050M.,1.0 +15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 07:30:00+00:00,1993-01-02 12:00:00+00:00,3082.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3050M TO 3082M. FLOW CHECKED DRILLING BRAKE AT 3063M - NEG.",4.5 +15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 12:00:00+00:00,1993-01-02 14:00:00+00:00,3099.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/STEARED 12 1/4"" HOLE FROM 3082M TO 3099M. HAD PROBLEMS RECIEVING TOOL PHASE READINGS, AND STALLING OF BIT. PROBLEM TIME 70 MIN.",2.0 +15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 14:00:00+00:00,1993-01-02 15:00:00+00:00,3099.0,m,fixed,formation evaluation -- log,ok,success,REAMED ONE STAND FOR GAMMA RAY LOG. USED 20 MIN TO OBTAIN SURVEY AT 3084M. TO IDENTIFY BOTTOM SAND.,1.0 +15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 15:00:00+00:00,1993-01-02 19:00:00+00:00,3137.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/STEARED 12 1/4"" HOLE FROM 3099M TO 3137M. LOST 20 MIN TRYING TO ESTABLISH TOOL PHASE.",4.0 +15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 19:00:00+00:00,1993-01-02 20:30:00+00:00,3137.0,m,fixed,interruption -- repair,fail,equipment failure,UNABLE TO OBTAIN TOOL PHASE FOR STEARING. MUD PUMP NO 1 DOWN. TO MUCH NOISE IN SYSTEM TO OBTAIN READABLE SIGNAL FROM MWD.,1.5 +15_9_19_ST2_1993_01_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-02T00:00:00+01:00,1993-01-03T00:00:00+01:00,1993-01-02 20:30:00+00:00,1993-01-02 23:00:00+00:00,3137.0,m,fixed,interruption -- sidetrack,ok,success,PULLED UP TO 2990M TO CIRCULATE BOTTOMS UP. WORKED PAST SPOT AT 3050M. STARTED CIRCULATING HOLE CLEAN. 0.5KG INCREASING TO 11KG CUTTINGS PER 15 SECONDS.,2.5 +15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-02 23:00:00+00:00,1993-01-03 03:30:00+00:00,2990.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED CIRCULATING HOLE CLEAN AT 2990M. MAX AMOUNT OF CUTTINGS OVER SHAKER 19KG PER 15 SECONDS. STOPPED WHEN LEVEL CAME DOWN TO 4,9 KG. CIRCULATED WITH 144 SPM ON DP, 50 SPM ON RISER AND 160 RPM. ESTIMATED AMOUNTS OF CUTTINGS CIRCULATED OUT 10M3.",4.5 +15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 03:30:00+00:00,1993-01-03 05:00:00+00:00,2990.0,m,fixed,interruption -- sidetrack,ok,success,POOH FROM 2990M TO 2738M. TIGHT SPOT AT 2982M.,1.5 +15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 05:00:00+00:00,1993-01-03 06:00:00+00:00,2738.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED PULLING UP FROM 2738M TO 2500M.,1.0 +15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 06:00:00+00:00,1993-01-03 06:30:00+00:00,3137.0,m,fixed,interruption -- sidetrack,ok,success,RAN BACK IN HOLE TO TD AT 3137M.,0.5 +15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 06:30:00+00:00,1993-01-03 07:00:00+00:00,3141.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3137M TO 3141M.",0.5 +15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 07:00:00+00:00,1993-01-03 08:30:00+00:00,3141.0,m,fixed,interruption -- repair,fail,equipment failure,ATTEMPTED TO GET SURVEY NEG. MWD TOOL FAILURE.,1.5 +15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 08:30:00+00:00,1993-01-03 16:00:00+00:00,3141.0,m,fixed,interruption -- sidetrack,ok,success,POOH TO CHANGE MWD TOOL.,7.5 +15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 16:00:00+00:00,1993-01-03 17:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,CLEANED ESTER MUD ON RIG FLOOR AND UNDER ROTARY.,1.0 +15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 17:00:00+00:00,1993-01-03 22:30:00+00:00,1343.0,m,fixed,interruption -- sidetrack,ok,success,PICKED UP NEW MWD AND PRS-SUB AND RIH TO 1343M.,5.5 +15_9_19_ST2_1993_01_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-03T00:00:00+01:00,1993-01-04T00:00:00+01:00,1993-01-03 22:30:00+00:00,1993-01-03 23:00:00+00:00,1343.0,m,fixed,interruption -- sidetrack,ok,success,PICKED UP HANG-OFF STAND AND PREPARED TO HANG OFF DUE TO WEATHER CONDITIONS.,0.5 +15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-03 23:00:00+00:00,1993-01-03 23:30:00+00:00,1447.0,m,fixed,interruption -- sidetrack,ok,success,HUNG OFF DRILL STRING IN WELLHEAD AND RETRIEVED HANG OFF STRING.,0.5 +15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-03 23:30:00+00:00,1993-01-04 00:30:00+00:00,1447.0,m,fixed,interruption -- sidetrack,ok,success,DISPLACED RISER TO SEA WATER.,1.0 +15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 00:30:00+00:00,1993-01-04 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,W.O.W. SEE REMARKS FOR DETAILS.,4.5 +15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 05:00:00+00:00,1993-01-04 13:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"W.O.W, SEE REMARKS FOR DETAILS.",8.0 +15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 13:00:00+00:00,1993-01-04 14:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,POSITIONED RIG BACK OVER TEMPLATE.,1.0 +15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 14:00:00+00:00,1993-01-04 14:30:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,DISPLACED RISER BACK TO 1.6 S.G. MUD.,0.5 +15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 14:30:00+00:00,1993-01-04 16:00:00+00:00,1447.0,m,fixed,interruption -- sidetrack,ok,success,RETRIEVED DRILLSTRING FROM WELLHEAD.,1.5 +15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 16:00:00+00:00,1993-01-04 17:30:00+00:00,1447.0,m,fixed,interruption -- sidetrack,ok,success,"POOH WITH HANG OFF ASSEMBLY, REDRESSED SAME.",1.5 +15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 17:30:00+00:00,1993-01-04 18:30:00+00:00,1343.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED UPPER RACKING ARM.,1.0 +15_9_19_ST2_1993_01_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-04T00:00:00+01:00,1993-01-05T00:00:00+01:00,1993-01-04 18:30:00+00:00,1993-01-04 23:00:00+00:00,3141.0,m,fixed,interruption -- sidetrack,ok,success,RIH FROM 1343M TO 3141M. WORKED TIGHT SPOT AT 2980M. REAMED LAST STAND TO TD.,4.5 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-04 23:00:00+00:00,1993-01-05 00:00:00+00:00,3141.0,m,fixed,interruption -- repair,fail,equipment failure,UNABLE TO OBTAIN READABLE SIGNALS FROM MWD. 45 MIN LOST TIME.,1.0 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 00:00:00+00:00,1993-01-05 01:00:00+00:00,3157.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3141M TO 3157M.",1.0 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 01:00:00+00:00,1993-01-05 03:00:00+00:00,3157.0,m,fixed,interruption -- repair,fail,equipment failure,"TROUBLESHOOTING SYSTEM TO GET READABLE DATA FROM MWD. UNABLE TO DETECT SOURCE OF PROBLEM. OBTAINED SURVEY BY USING MUDPUMP NO.3 AT 115 STKS. SUCTION MODULE ON MUD PUMP NO.1 DEVELOPED A LEAK, HAD TO BE CHANGED OUT.",2.0 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 03:00:00+00:00,1993-01-05 03:30:00+00:00,3166.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3157M TO 3166M.",0.5 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 03:30:00+00:00,1993-01-05 04:00:00+00:00,3166.0,m,fixed,interruption -- sidetrack,ok,success,TOOK SURVEY AT 3143M. HAD PROBLEMS WITH MWD SIGNAL.,0.5 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 04:00:00+00:00,1993-01-05 04:30:00+00:00,3166.0,m,fixed,interruption -- repair,fail,equipment failure,PUMP NO.3 LOST SUCTION DUE TO LEAK IN SUPERCHARGE FILTERBOX.,0.5 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 04:30:00+00:00,1993-01-05 05:00:00+00:00,3168.0,m,fixed,interruption -- sidetrack,ok,success,"STEARED 12 1/4"" HOLE FROM 3166M TO 3168M. WITH GOOD SIGNALS FROM MWD. USING MUD PUMP NO.2 AT 125 STKS.",0.5 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 05:00:00+00:00,1993-01-05 06:00:00+00:00,3174.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED/ORIENTATED 12 1/4"" HOLE FROM 3168M TO 3174M. GOOD MWD READINGS. USED MUD PUMP NO.2 AT 2020LPM.",1.0 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 06:00:00+00:00,1993-01-05 06:30:00+00:00,3174.0,m,fixed,interruption -- sidetrack,ok,success,TOOK SCR. LINED UP MUD PUMPS NO.2 AND 3.,0.5 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 06:30:00+00:00,1993-01-05 08:30:00+00:00,3188.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3174M TO 3188M. DRILLING PARAMETERS: 160 RPM, 2330LPM, 265BAR.",2.0 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 08:30:00+00:00,1993-01-05 09:00:00+00:00,3188.0,m,fixed,interruption -- sidetrack,fail,equipment failure,"ATTEMPTED TO TAKE SURVEY, NEGATIVE. LOST 40 MINUTES.",0.5 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 09:00:00+00:00,1993-01-05 10:30:00+00:00,3195.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3188M TO 3195M.",1.5 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 10:30:00+00:00,1993-01-05 13:00:00+00:00,3198.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"TOOK SURVEY AT 3195M. ORIENTATED FROM 3195M TO 3198M. USED MUD PUMP NO.2 AT 2020LPM. CHANGED TO MUD PUMP NO.3 AT 3196M DUE TO WASHOUT IN VALVE ON PUMP NO.2. HAD CONTINOUSLY PROBLEMS WITH LOCKING ON TO MWD SIGNAL AND WITH MUD MOTOR STALLING OUT. LOST 1,5 HRS. FINALLY MANAGED TO ORIENTATE USING BOTH MUD PUMPS NO.2 AND 3.",2.5 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 13:00:00+00:00,1993-01-05 13:30:00+00:00,3202.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED 12 1/4"" HOLE FROM 3198M TO 3202M. DRILLING PARAMETERS: 2390LPM, 270BAR. NO GAMMA RAY OR DIRECTIONAL DATA OBTAINED.",0.5 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 13:30:00+00:00,1993-01-05 15:30:00+00:00,3204.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"ORIENTATED 12 1/4"" HOLE FROM 3202M TO 3204M. HAD PROBLEMS WITH DIRECTIONAL DATA AND WITH MUDMOTOR STALLING OUT. LOST 1,5 HRS ON ACTUAL SURVEY PROBLEMS.",2.0 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 15:30:00+00:00,1993-01-05 16:30:00+00:00,3204.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"POOH TO 2898M. TIGHT SPOTS AT 3046M AND 3010M. STARTED CIRCULATING BUTTOMS UP WITH 2556LPM, 270BAR, 165RPM.",1.0 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 16:30:00+00:00,1993-01-05 20:30:00+00:00,2898.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"CIRCULATED HOLE CLEAN. MAX AMOUNT OF CUTTINGS OVER SHAKERS WAS 8,7 KG/15 SEC. CIRCULATION RATE 2500 LTRS ON DP AND 750 LTRS ON RISER. 160 RPM ON STRING. RACKED TWO STANDS BACK WHILE REAMING.",4.0 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 20:30:00+00:00,1993-01-05 21:30:00+00:00,2842.0,m,fixed,interruption -- repair,fail,equipment failure,ANADRILL REPLACED TRANSDUCER ON TOP OF STANDPIPE. PUMPED THROUGH CEMENT HOSE ON PUMP-IN SUB WHILE RECIPROCATING STRING. PUMP SPEED 1600 LPM.,1.0 +15_9_19_ST2_1993_01_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-05T00:00:00+01:00,1993-01-06T00:00:00+01:00,1993-01-05 21:30:00+00:00,1993-01-05 23:00:00+00:00,2842.0,m,fixed,interruption -- sidetrack,ok,equipment failure,STARTED PULLING UP TO 2500M FROM 2842M TO PERFORM TESTS ON ANADRILL MWD EQUIPMENT.,1.5 +15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-05 23:00:00+00:00,1993-01-05 23:30:00+00:00,2621.0,m,fixed,interruption -- sidetrack,ok,equipment failure,FINISHED PULLING UP TO 2500M FROM 2621M TO PERFORM TESTS ON ANADRILL MWD EQUIPMENT.,0.5 +15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-05 23:30:00+00:00,1993-01-06 00:30:00+00:00,2500.0,m,fixed,interruption -- repair,ok,equipment failure,"TESTED MWD EQUIPMENT WITH VARYING PUMPING SPEEDS. EQUIPMENT FUNCTIONING PROPERLY, ABLE TO GET BOTH SURVEYS AND TOOLPHASE.",1.0 +15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 00:30:00+00:00,1993-01-06 02:00:00+00:00,3204.0,m,fixed,interruption -- sidetrack,ok,equipment failure,RIH FROM 2500M TO 3204M. WORKED TIGHT AREA FROM 2974M TO 2985M.,1.5 +15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 02:00:00+00:00,1993-01-06 05:00:00+00:00,3204.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED TO ORIENT 12 1/4"" HOLE, BUT HAVING PROBLEMS KEEPING TOOLPHASE. MWD LOGGING UNIT IS RECIEVING TO MUCH NOISE. TOOLPHASE IS OBTAINED WHEN TOOL IS STATIONARY. WHEN MOVING DP, TOOLPHASE FLUCTUATES AND WHEN BIT IS ON BOTTOM TOOLPHASE IS LOST. INCREASE IN PRESSURE ON BOTTOM IS 5 BAR.",3.0 +15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 05:00:00+00:00,1993-01-06 07:30:00+00:00,3214.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"ORIENTATED 12 1/4"" HOLE FROM 3204M TO 3214M. HAVING SYNCHRONIZING PROBLEMS WITH MWD.",2.5 +15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 07:30:00+00:00,1993-01-06 10:30:00+00:00,3215.0,m,fixed,interruption -- sidetrack,ok,equipment failure,"ORIENTATED 12 1/4"" HOLE FROM 3214M TO 3215M. HAVING SYNCHRONIZING PROBLEMS WITH MWD AND BIT STALLING OUT.",3.0 +15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 10:30:00+00:00,1993-01-06 13:30:00+00:00,3215.0,m,fixed,interruption -- sidetrack,ok,success,"POOH TO 2495M. WORKED TIGHT SPOTS AT 3030M, 2990M AND 2965M.",3.0 +15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 13:30:00+00:00,1993-01-06 15:00:00+00:00,2495.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED HOLE CLEAN. MAX AMOUNT OVER SHAKER DURING CIRCULATION 6,8 KG/15 SEC. CIRCULATION RATE 2675 LPM ON DRILLSTRING, 750 LPM ON RISER. 180 RPM.",1.5 +15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 15:00:00+00:00,1993-01-06 22:00:00+00:00,2495.0,m,fixed,interruption -- sidetrack,ok,success,POOH.,7.0 +15_9_19_ST2_1993_01_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-06T00:00:00+01:00,1993-01-07T00:00:00+01:00,1993-01-06 22:00:00+00:00,1993-01-06 23:00:00+00:00,0.0,m,fixed,interruption -- sidetrack,ok,success,LAID DOWN ANADRILL MWD EQUIPMENT.,1.0 +15_9_19_ST2_1993_01_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-07T00:00:00+01:00,1993-01-08T00:00:00+01:00,1993-01-06 23:00:00+00:00,1993-01-07 05:00:00+00:00,2963.0,m,fixed,interruption -- sidetrack,ok,success,PICKED UP NEW BIT AND TELECO MWD-TOOL. RIH TO 2963M. NO TIME LOST RIGGING UP TELECO EQUIPMENT.,6.0 +15_9_19_ST2_1993_01_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-07T00:00:00+01:00,1993-01-08T00:00:00+01:00,1993-01-07 05:00:00+00:00,1993-01-07 06:00:00+00:00,3215.0,m,fixed,interruption -- sidetrack,ok,success,FINISHED RIH TO 3215M. REAMED LAST STAND.,1.0 +15_9_19_ST2_1993_01_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-07T00:00:00+01:00,1993-01-08T00:00:00+01:00,1993-01-07 06:00:00+00:00,1993-01-07 22:30:00+00:00,3303.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED AND ORIENTATED 12 1/4"" HOLE FROM 3215M TO 3303M. REAMED TWICE AFTER EACH STAND DRILLED. ORIENTATED WITH 2150LPM / 240-250BAR. DRILLED WITH 2270LPM / 270BAR / 160 RPM, PROBLEMS WITH STALLING FROM 3235M TO 3237M. DRILLED HARD STRINGERS AND HAD PROBLEMS BUILDING ANGLE FROM 3290M TO 3296M.",16.5 +15_9_19_ST2_1993_01_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-07T00:00:00+01:00,1993-01-08T00:00:00+01:00,1993-01-07 22:30:00+00:00,1993-01-07 23:00:00+00:00,3303.0,m,fixed,interruption -- sidetrack,ok,success,"REAMED AND CIRCULATED WITH 2300 LPM/170 RPM WITH NO APPERENT INCREASE IN TORQUE READINGS. MAX AMOUNT CUTTINGS OVER SHAKERS: 11,5 KG/15 SEC.",0.5 +15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-07 23:00:00+00:00,1993-01-08 01:30:00+00:00,3311.0,m,fixed,interruption -- sidetrack,ok,success,"ORIENTATED 12 1/4"" HOLE FROM 3303M TO 3311M. 2200 LPM / 240-250BAR. DRILLED THROUGH HARD STRINGERS AT 3308M AND 3310M.",2.5 +15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 01:30:00+00:00,1993-01-08 02:30:00+00:00,3315.0,m,fixed,interruption -- sidetrack,ok,success,HAD TO DRILL THROUGH A HARD SECTION FROM 3311M TO 3315M. USING 2200LTRS / 165 RPM / MAX 15TONN.,1.0 +15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 02:30:00+00:00,1993-01-08 05:00:00+00:00,3321.0,m,fixed,interruption -- sidetrack,ok,success,"ORIENTATED 12 1/4"" HOLE FROM 3315M TO 3321M. HAD STALLING PROBLEMS FROM 3316M TO 3319M.",2.5 +15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 05:00:00+00:00,1993-01-08 05:30:00+00:00,3321.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED TO CLEAN HOLE, PUMPING 2307 LPM WITH 260 BAR.",0.5 +15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 05:30:00+00:00,1993-01-08 08:00:00+00:00,3331.0,m,fixed,interruption -- sidetrack,ok,success,DRILLED AND ORIENTATED FROM 3321 TO 3331 M. HAD STALLING PROBLEMS IN STEERING MODE.,2.5 +15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 08:00:00+00:00,1993-01-08 11:00:00+00:00,3331.0,m,fixed,interruption -- sidetrack,ok,success,"WORKED PIPE AND CIRCULATED HOLE CLEAN, PUMPING 2326 LPM WITH 260BAR AND 172 RPM. MAX CUTTINGS OVER SHAKERS 15,4 KG/15 SEC.",3.0 +15_9_19_ST2_1993_01_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-08T00:00:00+01:00,1993-01-09T00:00:00+01:00,1993-01-08 11:00:00+00:00,1993-01-08 23:00:00+00:00,3389.0,m,fixed,interruption -- sidetrack,ok,success,DRILLED AND ORIENTATED FROM 3331 TO 3389 M. HAD STALLING PROBLEMS IN STEERING MODE.,12.0 +15_9_19_ST2_1993_01_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-09T00:00:00+01:00,1993-01-10T00:00:00+01:00,1993-01-08 23:00:00+00:00,1993-01-09 05:00:00+00:00,3436.0,m,fixed,interruption -- sidetrack,ok,success,CONTINUED DRILLING AND ORIENTATING FROM 3389 TO 3436 M. HAD STALLING PROBLEMS WHEN STEERING.,6.0 +15_9_19_ST2_1993_01_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-09T00:00:00+01:00,1993-01-10T00:00:00+01:00,1993-01-09 05:00:00+00:00,1993-01-09 09:30:00+00:00,3475.0,m,fixed,interruption -- sidetrack,ok,success,"CONT DRILLING 12 1/4"" HOLE FROM 3436 TO 3475 M. ATTEMPTED TO ORIENTATE AT 3460 M.",4.5 +15_9_19_ST2_1993_01_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-09T00:00:00+01:00,1993-01-10T00:00:00+01:00,1993-01-09 09:30:00+00:00,1993-01-09 12:30:00+00:00,3475.0,m,fixed,interruption -- sidetrack,ok,success,"WORKED PIPE AND CIRCULATED HOLE CLEAN, PUMPING 2390 LPM WITH 172 RPM AND 273 BAR. MAX CUTTINGS OVER SHAKERS IN END OF DRILLING 18 KG/15 SEC MAX CUTTINGS DURING CIRC 9,7 KG/15 SEC.",3.0 +15_9_19_ST2_1993_01_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-09T00:00:00+01:00,1993-01-10T00:00:00+01:00,1993-01-09 12:30:00+00:00,1993-01-09 22:30:00+00:00,3562.0,m,fixed,interruption -- sidetrack,ok,success,"DRILLED FROM 3475 TO 3562 M. ATTEMPTED TO ORIENTATE AT 3461 M. ORIENTATED FROM 3509 TO 3513,5 M. HAD DRILLING BREAKE AT 3489 M - FLOWHECKED.",10.0 +15_9_19_ST2_1993_01_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-09T00:00:00+01:00,1993-01-10T00:00:00+01:00,1993-01-09 22:30:00+00:00,1993-01-09 23:00:00+00:00,3562.0,m,fixed,interruption -- sidetrack,ok,success,"CIRCULATED HOLE CLEAN, PUMPING 2270 LPM WITH 172 RPM AND 260 BAR.",0.5 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-09 23:00:00+00:00,1993-01-10 05:00:00+00:00,3562.0,m,fixed,interruption -- sidetrack,ok,success,"CONTINUED HOLE CLEANING, PUMPING 2270 LPM WITH 172 RPM AND 260 BAR. MAX CUTTINGS OVER SHAKERS 17,2 KG/15 SEC. STARTED TREATED MUD AT 0500 HRS.",6.0 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 05:00:00+00:00,1993-01-10 10:00:00+00:00,3562.0,m,fixed,drilling -- circulating conditioning,ok,success,"CONTINUED CIRCULATING FOR HOLE CLEANING AND TREATED MUD. PUMPED 2206 LPM WITH 164 RPM AND 244 BAR. MAX CUTTINGS OVER SHAKERS 2,2 KG/15 SEC.",5.0 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 10:00:00+00:00,1993-01-10 10:30:00+00:00,3580.0,m,fixed,drilling -- drill,ok,success,"DRILLED 12 1/4"" HOLE FROM 3562 TO 3580 M. DRILLING BREAK AT 3570 M.",0.5 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 10:30:00+00:00,1993-01-10 14:00:00+00:00,3580.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED BOTTOMS UP FOR FORMATION SAMPLE. PUMPED 2200 LPM, 20 AND 160 RPM.",3.5 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 14:00:00+00:00,1993-01-10 18:00:00+00:00,2100.0,m,fixed,drilling -- trip,ok,success,"POOH TO 2100 M TO RUN 9 5/8"" CSG. REAMED THROUGH TIGHT SPOT AT 3025 M.",4.0 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 18:00:00+00:00,1993-01-10 18:30:00+00:00,2100.0,m,fixed,drilling -- wait,ok,success,SECURED EXLOG HOSE TO KELLY HOSE.,0.5 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 18:30:00+00:00,1993-01-10 20:00:00+00:00,1300.0,m,fixed,drilling -- trip,ok,success,"CONT POOH TO 6 STDS ABOVE 13 3/8"" CSG SHOE. FLOWCHECKED 20 MIN WHILE M/U HANG-OFF TOOL.",1.5 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 20:00:00+00:00,1993-01-10 20:30:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,RIH WITH HANG-OFF TOOL. RELEASED TOOL. BIT DEPTH 1390 M.,0.5 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 20:30:00+00:00,1993-01-10 21:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,POOH WITH LANDING STRING.,0.5 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 21:00:00+00:00,1993-01-10 21:30:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,DISPLACED RISER TO SEAWATER.,0.5 +15_9_19_ST2_1993_01_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-10T00:00:00+01:00,1993-01-11T00:00:00+01:00,1993-01-10 21:30:00+00:00,1993-01-10 23:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,WAITING ON WEATHER.,1.5 +15_9_19_ST2_1993_01_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-11T00:00:00+01:00,1993-01-12T00:00:00+01:00,1993-01-10 23:00:00+00:00,1993-01-11 05:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,"CONT WAITING ON WEATHER, FOR DETAILS SEE GERERAL REMARKS.",6.0 +15_9_19_ST2_1993_01_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-11T00:00:00+01:00,1993-01-12T00:00:00+01:00,1993-01-11 05:00:00+00:00,1993-01-11 23:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,"WAITED ON WEATHER FOR WEATHER DETAILS, SEE GENERAL REMARKS.",18.0 +15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-11 23:00:00+00:00,1993-01-12 05:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,CONT WAITING ON WEATHER.,6.0 +15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 05:00:00+00:00,1993-01-12 09:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED WAITING ON WEATHER.,4.0 +15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 09:00:00+00:00,1993-01-12 11:00:00+00:00,1390.0,m,fixed,drilling -- casing,ok,success,"P/U 9 5/8"" CSG HANGER AND PLUGS, M/U TO RUNNING TOOL. RACKED HANGER ASSY BACK IN DERRICK.",2.0 +15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 11:00:00+00:00,1993-01-12 14:00:00+00:00,1390.0,m,fixed,interruption -- waiting on weather,ok,success,"RIH WITH HANG-OFF RETRIEVING TOOL TO 101 M. DISPLACED RISER TO 1,60 SG MUD. ENGAGED DRILL STRING AND POOH WITH RETRIEVING TOOL.",3.0 +15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 14:00:00+00:00,1993-01-12 14:30:00+00:00,1490.0,m,fixed,drilling -- trip,ok,success,RIH TO 1490 M.,0.5 +15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 14:30:00+00:00,1993-01-12 16:30:00+00:00,1490.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED AND CONDITIONED MUD,2.0 +15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 16:30:00+00:00,1993-01-12 20:00:00+00:00,3580.0,m,fixed,drilling -- trip,ok,success,CONT RIH FROM 1490 TO 3580 M. BROKE CIRC EVERY 500 M. REAMED TIGHT SPOT AT 3009 M.,3.5 +15_9_19_ST2_1993_01_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-12T00:00:00+01:00,1993-01-13T00:00:00+01:00,1993-01-12 20:00:00+00:00,1993-01-12 23:00:00+00:00,3580.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED AND TREATED MUD.,3.0 +15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-12 23:00:00+00:00,1993-01-13 04:30:00+00:00,3570.0,m,fixed,drilling -- circulating conditioning,ok,success,"CONT CIRCULATION AND TREATED MUD, REDUSED MW FROM 1,62 TO 1,60 SG. PUMPED 2200 LPM WITH 264 BAR AND 135 RPM.",5.5 +15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 04:30:00+00:00,1993-01-13 05:00:00+00:00,3480.0,m,fixed,drilling -- casing,ok,success,"FLOWCHECKED 10 MIN, POOH TO RUN 9 5/8"" CASING, AT 3480 M.",0.5 +15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 05:00:00+00:00,1993-01-13 14:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"CONT POOH WITH 12 1/4"" BIT FROM 3480 M. BACKREAMED FROM 3030 TO 2990 M FLOWCHECKED AT 2350 AND 1475 M. L/D BIT AND BHA, DUMPED MEMORY ON MWD TOOL.",9.0 +15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 14:00:00+00:00,1993-01-13 16:30:00+00:00,103.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIH WITH JET SUB AND WASHED BOP/WH, M/U SPRING LOADED TOOL AND CONT RIH AND RETRIEVED WEAR BUSHING. PERFORMED ""VETCO"" MEASUREMENTS.",2.5 +15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 16:30:00+00:00,1993-01-13 17:30:00+00:00,103.0,m,fixed,drilling -- casing,ok,equipment failure,REPAIRED UPPER RACKING ARM,1.0 +15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 17:30:00+00:00,1993-01-13 18:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH, L/D WB. WASHED WH SEAL AREA AND BOP AND CONT POOH.",1.0 +15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 18:30:00+00:00,1993-01-13 21:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/U TO RUN 9 5/8"" CASING, INST TAM TOOL. HELD PRE-JOB MEETING WITH CREW",2.5 +15_9_19_ST2_1993_01_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-13T00:00:00+01:00,1993-01-14T00:00:00+01:00,1993-01-13 21:00:00+00:00,1993-01-13 23:00:00+00:00,76.0,m,fixed,drilling -- casing,ok,success,"RAN SHOE JNT, 1 CSG JNT AND FLOAT JNT, CHECKED FLOAT. THREAD LOCKED SHOE JNT AND FLOAT JNT TO INTERMEDITATE JNT. RAN 9 5/8"" CSG TO 76 M. FILLED EVERY JNT WITH 1,60 SG MUD.",2.0 +15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-13 23:00:00+00:00,1993-01-14 05:00:00+00:00,810.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 9 5/8"" CASING FROM 76 TO 810 M. RECORDED UP AND DOWN WT.",6.0 +15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 05:00:00+00:00,1993-01-14 07:00:00+00:00,980.0,m,fixed,drilling -- casing,ok,success,"CONT RUNNING 9 5/8""CASING FROM 810 TO 980 M.",2.0 +15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 07:00:00+00:00,1993-01-14 07:30:00+00:00,980.0,m,fixed,drilling -- casing,ok,equipment failure,REPAIRED GANTRY CRANE,0.5 +15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 07:30:00+00:00,1993-01-14 11:00:00+00:00,1460.0,m,fixed,drilling -- casing,ok,success,CONT RUNNING CASING FROM 980 TO 1460 M.,3.5 +15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 11:00:00+00:00,1993-01-14 13:00:00+00:00,1460.0,m,fixed,drilling -- casing,ok,success,"INSTALLED TAM PKR, CIRC HOLE SLOWLY AT 80 LPM INCRASING TO 275 LPM. RECORDED LOSS. CHECKED SURFACE PITS FOR LEAKS. MONITORED WELL ON TRIP TANK, WELL STATIC, NO LOSS TO FORMATION DURING CIRCULATION.",2.0 +15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 13:00:00+00:00,1993-01-14 13:30:00+00:00,1460.0,m,fixed,drilling -- casing,ok,equipment failure,PROBLEMS TO RESET TAM PACKER,0.5 +15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 13:30:00+00:00,1993-01-14 16:00:00+00:00,1460.0,m,fixed,drilling -- casing,ok,success,"INSTALLED TAM-PKR. INCREASED PUMP RATE IN STEPS OF 80 LPM TO 598 LPM. HAD FULL RETURNS, CIRC BOTTOMS UP",2.5 +15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 16:00:00+00:00,1993-01-14 17:00:00+00:00,1460.0,m,fixed,drilling -- casing,ok,success,INSTALLED 500 MT ELEVAT0R AND SPIDER,1.0 +15_9_19_ST2_1993_01_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-14T00:00:00+01:00,1993-01-15T00:00:00+01:00,1993-01-14 17:00:00+00:00,1993-01-14 23:00:00+00:00,2210.0,m,fixed,drilling -- casing,ok,success,CONT RUNNING CASING FROM 1460 TO 2210 M,6.0 +15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-14 23:00:00+00:00,1993-01-15 05:00:00+00:00,2747.0,m,fixed,drilling -- casing,ok,success,CONT RUNNING CASING FROM 2210 TO 2747 M,6.0 +15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 05:00:00+00:00,1993-01-15 11:30:00+00:00,3228.0,m,fixed,drilling -- casing,ok,success,"CONT RUNNING 9 5/8"" CASING FROM 2747 TO 3228 M HELD OPERATION MEETING WITH CREW.",6.5 +15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 11:30:00+00:00,1993-01-15 13:30:00+00:00,3228.0,m,fixed,interruption -- waiting on weather,ok,success,"ENGAGED TAM-PACKER. BROKE CIRCULATION GENTLY, CIRCULATED WHILE WOW. PREPARED 10 3/4"" CSG EQUIP.",2.0 +15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 13:30:00+00:00,1993-01-15 16:00:00+00:00,3390.0,m,fixed,drilling -- casing,ok,success,CONT RUNNING CASING FROM 3228 TO 3390 M,2.5 +15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 16:00:00+00:00,1993-01-15 17:30:00+00:00,3390.0,m,fixed,drilling -- casing,ok,success,"REPLACED 9 5/8"" CSG EQUIP WITH 10 3/4"" CSG EQUIP. M/U X-OVER HELD OPERATION MEETING WITH CREW",1.5 +15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 17:30:00+00:00,1993-01-15 18:00:00+00:00,3442.0,m,fixed,drilling -- casing,ok,success,"RIH WITH 10 3/4"" CASING FROM 3390 TO 3442 M",0.5 +15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 18:00:00+00:00,1993-01-15 19:00:00+00:00,3442.0,m,fixed,drilling -- casing,ok,success,"R/D 10 3/4"" CASING EQUIP AND R/U 6 5/8"" DP EQUIP",1.0 +15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 19:00:00+00:00,1993-01-15 20:30:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"RAN 10 3/4"" CASING HANGER AND LANDING STRING. LANDED HANGER AT 2140 HRS WITH 9 5/8"" SHOE AT 3569,3 M",1.5 +15_9_19_ST2_1993_01_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-15T00:00:00+01:00,1993-01-16T00:00:00+01:00,1993-01-15 20:30:00+00:00,1993-01-15 23:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED WELL, REDUCED MW FROM 1,60 TO 1,55 SG. TREATED MUD FOR MUD PROPERTIES",2.5 +15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-15 23:00:00+00:00,1993-01-16 05:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"CONT CIRCULATION TO REDUCE MW FROM 1,60 TO 1,55 SG. TREATED MUD. PUMPED 810-1437 LPM WITH 34-45 BAR",6.0 +15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 05:00:00+00:00,1993-01-16 12:30:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"CONT CIRCULATION TO REDUCE MW FROM 1,60 TO 1,55 SG. TREATED MUD. PUMPED 1440 LPM WITH +- 40 BAR",7.5 +15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 12:30:00+00:00,1993-01-16 14:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"PUMPED 30 M3 1,55 SG OMC-2 TREATED PETROFREE MUD FOLLOWED BY 44 M3 1,55 SG BENTONITE MUD",1.5 +15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 14:00:00+00:00,1993-01-16 16:30:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"PUMPED 11,5 M3 1,70 SG SPACER. DROPPED BALL FOR BOTTOM PLUG. MIXED AND PUMPED 32 M3 1,94 SG CEMENT SLURRY. DROPPED DART AND DISPLACED CEMENT WITH 1,3 M3 MIX WATER AND 2,0 M3 1,55 SG PETROFREE MUD.",2.5 +15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 16:30:00+00:00,1993-01-16 18:00:00+00:00,3569.0,m,fixed,drilling -- casing,fail,mud loss,"DISPLACED CEMENT WITH 1,55 SG PETROFREE MUD PUMPING WITH RIG PUMPS. PRESS BUILD UP TO 190 BAR AFTER 89,9 M3 PUMPED. CALCULATED VOLUME 126,2 M3 TO BUMP PLUG.",1.5 +15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 18:00:00+00:00,1993-01-16 21:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,mud loss,"CHECKED OUT SURFACE EQUIPMENT. BLEED OFF PRESS TO 20 BAR, RECIEVED 1200 LTR BACK. CHECKED OUT AND FOUND ALL CEMENT TO BE LEFT IN CASING. PRESS UP CSG TO 300 BAR ATTEMPTING TO OPEN UP CASING - NEG. BLEED OFF PRESSURE.",3.0 +15_9_19_ST2_1993_01_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-16T00:00:00+01:00,1993-01-17T00:00:00+01:00,1993-01-16 21:00:00+00:00,1993-01-16 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"R/D SURFACE EQUIP, BACKED OUT FMC SINGLE TRIP RUNNING TOOL FROM HANGER POOH AND L/D SEAL ASSY",2.0 +15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-16 23:00:00+00:00,1993-01-17 02:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"L/D CMT HEAD AND X-OVERS. CHANGED ELEVATOR LINKS, R/D STABBING BOARD. R/U HEAD ON LOWER RACKING ARM.",3.0 +15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 02:00:00+00:00,1993-01-17 04:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"M/U AND RIH WITH JET SUB, WASHED WH AREA, M/U WEAR BUSHING AND CONT RIH, SET WB AND POOH",2.0 +15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 04:00:00+00:00,1993-01-17 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"P/U AND M/U NEW 8 1/2"" BHA.",1.0 +15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 05:00:00+00:00,1993-01-17 05:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,equipment failure,"CONT M/U 8 1/2"" BHA. NOT ABLE TO INSTALL FLOAT, REPLACED BIT SUB AND FLOAT.",0.5 +15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 05:30:00+00:00,1993-01-17 07:30:00+00:00,115.0,m,fixed,drilling -- casing,ok,success,CONT M/U BHA AND RIH TO 115 M.,2.0 +15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 07:30:00+00:00,1993-01-17 08:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,POOH DUE TO BAD WEATHER,1.0 +15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 08:30:00+00:00,1993-01-17 16:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"DISPLACED RISER TO SW. PREPARED TO UNLATCH LMRP, CLOSED SHEAR-RAM. UNLATCHED LMRP AT 1640 HRS. DEBALLASTED RIG TO SURVIVAL DRAFT. PULLED RIG 25 M OFF LOCATION.",8.0 +15_9_19_ST2_1993_01_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-17T00:00:00+01:00,1993-01-18T00:00:00+01:00,1993-01-17 16:30:00+00:00,1993-01-17 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER,6.5 +15_9_19_ST2_1993_01_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-18T00:00:00+01:00,1993-01-19T00:00:00+01:00,1993-01-17 23:00:00+00:00,1993-01-18 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CONT WAITING ON WEATHER,6.0 +15_9_19_ST2_1993_01_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-18T00:00:00+01:00,1993-01-19T00:00:00+01:00,1993-01-18 05:00:00+00:00,1993-01-18 18:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED WAITING ON WEATHER,13.0 +15_9_19_ST2_1993_01_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-18T00:00:00+01:00,1993-01-19T00:00:00+01:00,1993-01-18 18:00:00+00:00,1993-01-18 20:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,DEBALLASTED RIG TO 21 M AND PULLED RIG ON LOCATION,2.5 +15_9_19_ST2_1993_01_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-18T00:00:00+01:00,1993-01-19T00:00:00+01:00,1993-01-18 20:30:00+00:00,1993-01-18 22:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CLEARED OUT GUIDELINES AROUND BOP STACK WITH ROV. INSTALLED NEW GUIDELINE NO 2 WITH ROV,2.0 +15_9_19_ST2_1993_01_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-18T00:00:00+01:00,1993-01-19T00:00:00+01:00,1993-01-18 22:30:00+00:00,1993-01-18 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,INSTALLED DIVERTER HANDLING TOOL.,0.5 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-18 23:00:00+00:00,1993-01-19 00:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,RELEASED DIVERTER AND PREPERED TO LAND LMRP.,1.5 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 00:30:00+00:00,1993-01-19 02:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,BALLASTED RIG TO DRILLING DRAFT,1.5 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 02:00:00+00:00,1993-01-19 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RI AND LANDED LMRP, PULLTESTED WITH 25 MT. INSTALLED DIVERTER ELEMENT AND L/D HANDLING TOOLS",3.0 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 05:00:00+00:00,1993-01-19 06:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,PRESS TESTED BOP KILL AND CHOKE STABS.345 BAR/10 MIN,1.0 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 06:00:00+00:00,1993-01-19 07:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"DISPLACED RISER TO 1,55 SG PETROFREE MUD",1.5 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 07:30:00+00:00,1993-01-19 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RETRIEVED WEAR BUSHING,1.5 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 09:00:00+00:00,1993-01-19 10:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U CEMENT CLEANOUT TOOL AND RIH. WASHED WELLHEAD AND POOH,1.5 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 10:30:00+00:00,1993-01-19 12:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"M/U SEAL ASSY, RIH AND INSTALLED IN WH. PRESS TESTED SEAL ASSY TO 345 BAR",1.5 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 12:00:00+00:00,1993-01-19 14:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,PRESS TESTED BOP ON BLUE POD,2.5 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 14:30:00+00:00,1993-01-19 15:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,operation failed,ATTEMPTED TO OPERATE FAILSAFE - NEG. SEARCED FOR MALFUNCTION AND FOUND BOOSTER BOTTLES ON BOP NOT CHARGED. OPENED ACCUMULATOR ISOLATOR AND CONTINUED PRESS TESTING BOP.,1.0 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 15:30:00+00:00,1993-01-19 17:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,PRESS TESTED BOP. FUNCTION TESTED ACOUSTIC SYSTEM.,2.0 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 17:30:00+00:00,1993-01-19 18:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,PULLED OUT BOP TEST TOOL,0.5 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 18:00:00+00:00,1993-01-19 19:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,PRESS TESTED SHEAR RAM 345 BAR.,1.0 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 19:00:00+00:00,1993-01-19 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RUN AND INSTALLED WEAR BUSHING,1.0 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 20:00:00+00:00,1993-01-19 20:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"SERVICE-BROKE TAM-PACKER, L/D ON DECK",0.5 +15_9_19_ST2_1993_01_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-19T00:00:00+01:00,1993-01-20T00:00:00+01:00,1993-01-19 20:30:00+00:00,1993-01-19 23:00:00+00:00,170.0,m,fixed,drilling -- casing,ok,success,"M/U 8 1/2"" BIT, BHA AND RIH TO DRILL CMT IN 9 5/8"" CASING BROKE CIRC EVERY 500 M",2.5 +15_9_19_ST2_1993_01_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-20T00:00:00+01:00,1993-01-21T00:00:00+01:00,1993-01-19 23:00:00+00:00,1993-01-20 03:30:00+00:00,2502.0,m,fixed,drilling -- casing,ok,success,CONT RIH FROM 170 TO 2502 M BROKE CIRC EVERY 500 M,4.5 +15_9_19_ST2_1993_01_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-20T00:00:00+01:00,1993-01-21T00:00:00+01:00,1993-01-20 03:30:00+00:00,1993-01-20 05:00:00+00:00,2510.0,m,fixed,drilling -- casing,ok,success,"DRILLED DART PLUG FROM 2502 M, CONTINUED DRILLING CMT FROM 2502,5 TO 2510 M",1.5 +15_9_19_ST2_1993_01_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-20T00:00:00+01:00,1993-01-21T00:00:00+01:00,1993-01-20 05:00:00+00:00,1993-01-20 23:00:00+00:00,2937.0,m,fixed,drilling -- casing,ok,success,"CONTINUED DRILLING WITH 8 1/2"" BIT IN 9 5/8"" CASING FROM 2510 TO 2937 M",18.0 +15_9_19_ST2_1993_01_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-21T00:00:00+01:00,1993-01-22T00:00:00+01:00,1993-01-20 23:00:00+00:00,1993-01-21 05:00:00+00:00,3040.0,m,fixed,drilling -- casing,ok,success,CONTINUED DRILLING CEMENT FROM 2937 TO 3040 M,6.0 +15_9_19_ST2_1993_01_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-21T00:00:00+01:00,1993-01-22T00:00:00+01:00,1993-01-21 05:00:00+00:00,1993-01-21 23:00:00+00:00,3391.0,m,fixed,drilling -- casing,ok,success,"CONTINUED DRILLING CEMENT WITH 8 1/2"" BIT IN 9 5/8"" CASING FROM 3040 TO 3391 M",18.0 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-21 23:00:00+00:00,1993-01-22 00:30:00+00:00,3422.0,m,fixed,drilling -- casing,ok,success,"CONT DRILLING CMT IN 9 5/8"" CASING FROM 3391 TO 3422 M",1.5 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 00:30:00+00:00,1993-01-22 02:30:00+00:00,3280.0,m,fixed,interruption -- waiting on weather,ok,success,"CIRCULATED 15 MIN AND BACKREAMED 5 STDS, CONTINUED CIRC HOLE CLEAN DUE TO BAD WEATHER.",2.0 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 02:30:00+00:00,1993-01-22 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"M/U TIW AND HANG-OFF TOOL. RI AND HANG-OFF IN WH, POOH DISPLACED RISER TO SEAWATER AND CLOSED S/R PREPARED TO UNLATCH LMRP",2.5 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 05:00:00+00:00,1993-01-22 12:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"WAITED ON WEATHER. DE-BALLASTED RIG 2,1 M.",7.0 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 12:00:00+00:00,1993-01-22 13:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,"RE-BALLASTED RIG TO DRILLING DRAFT. OPENED SHEAR RAM AND DISPLACED RISER BACK TO 1,55 SG MUD.",1.5 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 13:30:00+00:00,1993-01-22 15:30:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,RAN IN TO WELLHEAD AND RECONNECTED TO DRILL STRING. RACKED HANG-OFF STAND IN DERRICK. L/D INSIDE BOP.,2.0 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 15:30:00+00:00,1993-01-22 16:00:00+00:00,3422.0,m,fixed,drilling -- casing,ok,success,RAN IN TO 3393M. WASHED TO 3422M.,0.5 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 16:00:00+00:00,1993-01-22 18:30:00+00:00,3452.0,m,fixed,drilling -- casing,ok,success,DRILLED CEMENT FROM 3422M TO 3452M.,2.5 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 18:30:00+00:00,1993-01-22 20:00:00+00:00,3452.0,m,fixed,drilling -- casing,ok,success,CIRCULATED BOTTOMS UP,1.5 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 20:00:00+00:00,1993-01-22 20:30:00+00:00,3543.0,m,fixed,drilling -- casing,ok,success,RAN IN TO 3543M. TOOK WEIGHT.,0.5 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 20:30:00+00:00,1993-01-22 22:00:00+00:00,3580.0,m,fixed,drilling -- casing,ok,success,"DRILLED WIPER PLUG, FLOAT AND SHOE. CLEANED RAT HOLE.",1.5 +15_9_19_ST2_1993_01_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-22T00:00:00+01:00,1993-01-23T00:00:00+01:00,1993-01-22 22:00:00+00:00,1993-01-22 23:00:00+00:00,3580.0,m,fixed,drilling -- casing,ok,success,"PULLED BACK INTO 9 5/8"" CASING. CIRCULATED BOTTOMS UP.",1.0 +15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-22 23:00:00+00:00,1993-01-23 00:00:00+00:00,3560.0,m,fixed,drilling -- casing,ok,success,CONTINUED CIRCULATING HOLE CLEAN. SLUGGED PIPE.,1.0 +15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 00:00:00+00:00,1993-01-23 05:00:00+00:00,3560.0,m,fixed,drilling -- casing,ok,success,POOH. RACKED BHA IN DERRICK. BROKE BIT.,5.0 +15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 05:00:00+00:00,1993-01-23 10:00:00+00:00,0.0,m,fixed,interruption -- other,fail,operation failed,"RIGGED UP WIRELINE. RIH WITH GYRO, UNABLE TO PASS 1230M. POOH.",5.0 +15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 10:00:00+00:00,1993-01-23 14:30:00+00:00,2675.0,m,fixed,drilling -- survey,ok,success,"MADE UP 8 1/2"" BIT AND 9 5/8"" CASING SCRAPER. RAN IN TO 2675M. BROKE CIRCULATION AT 1200 AND 2400M.",4.5 +15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 14:30:00+00:00,1993-01-23 15:30:00+00:00,2675.0,m,fixed,drilling -- circulating conditioning,ok,success,TOOK WEIGHT UP TO 20 MT FROM 2503 M TO 2675 M. CIRC. BOTTOMS UP TO CLEAN HOLE.,1.0 +15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 15:30:00+00:00,1993-01-23 17:00:00+00:00,3545.0,m,fixed,drilling -- survey,ok,success,CONTINUED RUNNING IN TO 3545M.,1.5 +15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 17:00:00+00:00,1993-01-23 20:00:00+00:00,3545.0,m,fixed,drilling -- circulating conditioning,ok,success,WORKED CASING SCRAPER FROM 3525M TO 3545M. CIRCULATED HOLE CLEAN AND CONDITIONED MUD.,3.0 +15_9_19_ST2_1993_01_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-23T00:00:00+01:00,1993-01-24T00:00:00+01:00,1993-01-23 20:00:00+00:00,1993-01-23 23:00:00+00:00,2052.0,m,fixed,drilling -- survey,ok,success,POOH FROM 3545M.,3.0 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-23 23:00:00+00:00,1993-01-24 00:00:00+00:00,1300.0,m,fixed,drilling -- survey,ok,success,CONTINUED POOH TO 1300M.,1.0 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 00:00:00+00:00,1993-01-24 01:30:00+00:00,1030.0,m,fixed,drilling -- survey,ok,success,PUMPED OUT OF HOLE FROM 1300M TO 1030M.,1.5 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 01:30:00+00:00,1993-01-24 02:00:00+00:00,1030.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP.,0.5 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 02:00:00+00:00,1993-01-24 04:00:00+00:00,0.0,m,fixed,drilling -- survey,ok,success,CONTINUED POOH. BROKE BIT AND CASING SCRAPER. RACKED BHA.,2.0 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 04:00:00+00:00,1993-01-24 05:00:00+00:00,0.0,m,fixed,drilling -- survey,ok,success,RIGGED UP FOR WIRELINE.,1.0 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 05:00:00+00:00,1993-01-24 11:00:00+00:00,0.0,m,fixed,drilling -- survey,ok,success,RAN GYRO TO 3500M. POOH AND L/D TOOL. R/D WIRELINE,6.0 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 11:00:00+00:00,1993-01-24 11:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U JET TOOL. WASHED WELLHEAD. L/D JET TOOL.,0.5 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 11:30:00+00:00,1993-01-24 13:00:00+00:00,0.0,m,fixed,drilling -- casing,fail,equipment failure,M/U BAKER CEMENT RETAINER AND RIH TO 85M. PIPE DID NOT FILL. POOH AND L/D RETAINER.,1.5 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 13:00:00+00:00,1993-01-24 21:00:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,M/U ALPHA CEMENT RETAINER AND RIH TO 3535M.,8.0 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 21:00:00+00:00,1993-01-24 21:30:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"RELEASED SLIPS AND SET RETAINER BY PULLING 20 TONS OVERPULL. SET DOWN 10 TONS TO VERIFY SETTING, OK.",0.5 +15_9_19_ST2_1993_01_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-24T00:00:00+01:00,1993-01-25T00:00:00+01:00,1993-01-24 21:30:00+00:00,1993-01-24 23:00:00+00:00,3535.0,m,fixed,drilling -- casing,fail,equipment failure,"LINED UP TO PRESSURE TEST CEMENT RETAINER. FLUSHED LINES AND ATTEMPTED PRESSURE TESTING SURFACE LINES AGAINST FAIL SAFE VALVE TO 100 BAR, NEGATIVE. TESTED CEMENT UNIT, OK. LINED OVER FROM TEST LINE TO CEMENT LINE AND ATTEMPTED PRESSURE TESTING AGAINST FAIL SAFE, NEG.",1.5 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-24 23:00:00+00:00,1993-01-25 00:30:00+00:00,3525.0,m,fixed,drilling -- casing,ok,success,"PRESSURE TESTED CEMENT RETAINER AGAINST UAP TO 70 BAR/10 MINS, OK. RELEASED RUNNING TOOL AND STINGED OUT OF RETAINER. BROKE CIRCULATION AT 25-30 BAR WITH CEMENT UNIT.",1.5 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 00:30:00+00:00,1993-01-25 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POOH WITH 5 STANDS. M/U PULLING TOOL. RIH AND RETRIEVED WEAR BUSHING. L/D SAME.,1.5 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 02:00:00+00:00,1993-01-25 04:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,RAN IN TO RETRIEVE SEAL ASSEMBLY. LATCHED INTO SAME. CLOSED UAP AND PULLED SEAL ASSEMBLY FREE. NO OVERPULL. NO GAS OR PRESSURE BELOW SEAL ASSEMBLY. CIRCULATED THROUGH BOP. OPENED UAP AND PULLED OOH WITH SEAL ASSEMBLY. L/D SEAL ASSEMBLY AND PULLING TOOL.,2.5 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 04:30:00+00:00,1993-01-25 05:00:00+00:00,3522.0,m,fixed,drilling -- casing,ok,success,RAN IN TO 3522M. HOOKED UP CEMENT HOSE AND LINED UP TO ESTABLISH CIRCULATION BEHIND CASING.,0.5 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 05:00:00+00:00,1993-01-25 09:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"M/U CIRC. SUB AND CEMENT HOSE. PRESSURE TESTED SURFACE LINES TO 250 BAR/5 MINS. BROKE CIRCULATION. STINGED INTO RETAINER AND SAT DOWN 10 TONS ON SAME. ATTEMPTED TO ESTABLISH CIRCULATION BEHIND CASING, NEGATIVE.",4.0 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 09:00:00+00:00,1993-01-25 11:30:00+00:00,3372.0,m,fixed,drilling -- casing,ok,success,DISCONNECTED CEMENT HOSE. PULLED BACK TO 3372M. PREPARED FOR RUNNING SEAL ASSEMBLY.,2.5 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 11:30:00+00:00,1993-01-25 13:30:00+00:00,3372.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER.,2.0 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 13:30:00+00:00,1993-01-25 15:00:00+00:00,35.0,m,fixed,interruption -- repair,ok,success,ATTEMPTED TO RUN IN WITH SEAL ASSEMBLY. HUNG UP AT 35M. POOH. FOUND SEALS DAMAGED. L/D SEAL ASSEMBLY AND RUNNING TOOL.,1.5 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 15:00:00+00:00,1993-01-25 19:30:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"RAN IN TO 3530M. HOOKED UP CEMENT HOSE AND PRESSURE TESTED SURFACE LINES TO 345 BAR/5 MINS. PUMPED 1,0 M3 MIXING WATER AS SPACER. MIXED AND PUMPED 4,0 M3 1,9 SG CEMENT. PUMPED 0,5 M3 SPACER. DISPLACED SAME WITH 24,0 M3 MUD AT 600 LPM. STINGED INTO RETAINER. SQUEEZED CEMENT INTO FORMATION BY PUMPING 6,0 M3 MUD AT 400 LPM/160 BAR.",4.5 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 19:30:00+00:00,1993-01-25 19:31:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"STINGED OUT OF RETAINER. PUMPED 0,5 M3 MUD. PULLED BACK TO 3452M.",0.016666666666666666 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 19:31:00+00:00,1993-01-25 20:30:00+00:00,3452.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED ANY EXCESS CEMENT BEYOND 3000M. PUMPED 8,0 M3 2,0 SG HI-VIS PILL. DISPLACED SAME WITH 29,0 M3 MUD.",0.9833333333333333 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 20:30:00+00:00,1993-01-25 21:00:00+00:00,3270.0,m,fixed,drilling -- casing,ok,success,PULLED BACK TO 3270M.,0.5 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 21:00:00+00:00,1993-01-25 22:00:00+00:00,3270.0,m,fixed,drilling -- casing,ok,success,CIRCULATED OUT ANY EXCESS PILL.,1.0 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 22:00:00+00:00,1993-01-25 22:30:00+00:00,2985.0,m,fixed,drilling -- casing,ok,success,SLUGGED PIPE. POOH TO 2985M.,0.5 +15_9_19_ST2_1993_01_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-25T00:00:00+01:00,1993-01-26T00:00:00+01:00,1993-01-25 22:30:00+00:00,1993-01-25 23:00:00+00:00,2985.0,m,fixed,interruption -- maintain,fail,equipment failure,"DRIVE GEAR FOR JAW ON UPPER RACKING ARM WORN OUT. ATTEMPTED REPAIR, NEGATIVE.",0.5 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-25 23:00:00+00:00,1993-01-25 23:30:00+00:00,2985.0,m,fixed,interruption -- maintain,ok,success,"CONT. ATTEMPTS TO REPAIR JAW, NEGATIVE. RIGGED UP TO PULL STANDS MANUALLY.",0.5 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-25 23:30:00+00:00,1993-01-26 05:00:00+00:00,2985.0,m,fixed,drilling -- casing,ok,success,POOH TO 750M. PULLED STANDS IN DERRICK MANUALLY.,5.5 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 05:00:00+00:00,1993-01-26 06:30:00+00:00,750.0,m,fixed,drilling -- casing,ok,success,CONT. POOH. L/D CEMENT STINGER,1.5 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 06:30:00+00:00,1993-01-26 07:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,operation failed,"ATTEMPTED TO RELEASE JAMMED SEAL ASSEMBLY FROM RUNNING TOOL, NEGATIVE.",0.5 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 07:00:00+00:00,1993-01-26 08:30:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,RIH WITH CEMENT CLEAN-OUT TOOL. HUNG UP AT 34 M. WORKED TOOL THROUGH RESTRICTION. WASHED WELLHEAD AND POOH.,1.5 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 08:30:00+00:00,1993-01-26 09:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,CLEANED RIG FLOOR.,0.5 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 09:00:00+00:00,1993-01-26 13:00:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,M/U ELASTOMERIC SEAL ASSEMBLY AND RUNNING TOOL AND RIH. HUNG UP AT 34 M. WORKED THROUGH RESTRICTION. SET SEAL ASSEMBLY. FLUSHED LINES. PRESSURE TESTED SURFACE LINES TO 345 BAR/5 MINS. PRESSURE TESTED SEAL ASSEMBLY TO 345 BAR/10 MINS. RELEASED RUNNING TOOL AND POOH.,4.0 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 13:00:00+00:00,1993-01-26 14:30:00+00:00,105.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,SET WEAR BUSHING.,1.5 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 14:30:00+00:00,1993-01-26 16:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,RIGGED UP WIRELINE. PREPARED AND ARMED GUNS.,1.5 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 16:00:00+00:00,1993-01-26 17:00:00+00:00,34.0,m,fixed,drilling -- casing,fail,equipment failure,"ATTEMPTED TO RUN IN WITH GUNS, NEGATIVE. HUNG UP AT 34 M. POOH. INSTALLED CENTRALIZER.",1.0 +15_9_19_ST2_1993_01_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-26T00:00:00+01:00,1993-01-27T00:00:00+01:00,1993-01-26 17:00:00+00:00,1993-01-26 23:00:00+00:00,3260.0,m,fixed,drilling -- casing,ok,success,"RAN IN WITH PERFORATING GUNS. CORRELATED AND PERFORATED 9 5/8"" CASING FROM 3260 TO 3255,4M. POOH.",6.0 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-26 23:00:00+00:00,1993-01-27 00:30:00+00:00,3260.0,m,fixed,drilling -- casing,ok,success,CONT. POOH WITH GUNS. ALL SHOTS FIRED. R/D WIRELINE.,1.5 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 00:30:00+00:00,1993-01-27 01:00:00+00:00,3260.0,m,fixed,drilling -- casing,ok,success,FLUSHED K/C-LINES. VERIFIED OPEN PERFORATIONS BY INJECTING MUD WITH CEMENT PUMP AGAINST SHEAR RAM.,0.5 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 01:00:00+00:00,1993-01-27 05:00:00+00:00,1700.0,m,fixed,drilling -- casing,ok,success,M/U ALPHA CEMENT RETAINER. HUNG UP AT 34 M. WORKED RETAINER THROUGH RESTRICTION. RAN IN TO 1700M. ROTATED 1-2 REVOLUTIONS TO THE LEFT EACH 10 STANDS TO PREVENT SLIPS FROM SETTING PREMATURELY. RUNNING SPEED 90 SEC/STD.,4.0 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 05:00:00+00:00,1993-01-27 08:00:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,CONT. RIH WITH ALPHA CEMENT RETAINER.,3.0 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 08:00:00+00:00,1993-01-27 09:00:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,SET PACKER AT 3225M. FLUSHED SURFACE LINES AND PRESSURE TESTED RETAINER DOWN ANNULUS TO 70 BAR/10 MINS.,1.0 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 09:00:00+00:00,1993-01-27 09:30:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,"RE-CHECKED PERFORATIONS BY INJECTING 0,5 M3 MUD.",0.5 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 09:30:00+00:00,1993-01-27 12:00:00+00:00,3225.0,m,fixed,drilling -- casing,fail,equipment failure,"ATTEMPTED TO RELEASE RUNNING TOOL, NEGATIVE. INCREASED OVERPULL IN STEPS UP TO 40 TONS. ROTATED STRING WITH OVERPULL. WHILE ROTATING, REDUCED OVERPULL IN STEPS UNTIL NEUTRAL AND SLACKED DOWN UNTIL WEIGHT DOWN. WORKED PIPE UP/DOWN WHILE ROTATING, CAME FREE WITH 20 T OVERPULL. PRESSURE TESTED RETAINER TO 95 BAR/10 MINS.",2.5 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 12:00:00+00:00,1993-01-27 12:01:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,"STUNG INTO RETAINER AND CONFIRMED INJECTIVITY. PULLED OUT OF RETAINER WHILE PUMPING TO VERIFY PROPER FUNCTIONING, OK.",0.016666666666666666 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 12:01:00+00:00,1993-01-27 16:00:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,"INSTALLED CEMENT HOSE. FLUSHED/PRESSURE TESTED SURFACE LINES TO 345 BAR/5 MINS. PUMPED 3,0 M3 UNWEIGHED SPACER. MIXED AND PUMPED 7,5 M3 1,9 SG CEMENT SLURRY. PUMPED 1,0 M3 UNWEIGHED SPACER. DISPLACED SAME WITH 16,9 M3 1,55 BENTONITE MUD. STINGED INTO RETAINER. SQUEEZED 5,0 M3 CEMENT SLURRY BY PUMPING 9,0 M3 BENTONITE MUD.",3.9833333333333334 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 16:00:00+00:00,1993-01-27 17:00:00+00:00,3225.0,m,fixed,drilling -- casing,ok,success,"HESITATION SQUEEZED 1,0 M3 CEMENT SLURRY. STINGED OUT OF RETAINER. PUMPED 0,5 M3 MUD. PULLED BACK TO 3210M.",1.0 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 17:00:00+00:00,1993-01-27 20:00:00+00:00,3210.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"DISPLACED HOLE TO 1,55 BENTONITE MUD.",3.0 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 20:00:00+00:00,1993-01-27 20:30:00+00:00,3210.0,m,fixed,plug abandon -- other,ok,success,R/D CIRCULATING EQUIPMENT. R/U TO L/D PIPE,0.5 +15_9_19_ST2_1993_01_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-27T00:00:00+01:00,1993-01-28T00:00:00+01:00,1993-01-27 20:30:00+00:00,1993-01-27 23:00:00+00:00,3210.0,m,fixed,plug abandon -- trip,ok,success,POOH. L/D DP.,2.5 +15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-27 23:00:00+00:00,1993-01-28 02:00:00+00:00,3210.0,m,fixed,plug abandon -- trip,ok,success,CONT. POOH. L/D 85 JOINTS.,3.0 +15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 02:00:00+00:00,1993-01-28 05:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,CONT. POOH WITH STINGER TO 200M.,3.0 +15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 05:00:00+00:00,1993-01-28 05:30:00+00:00,200.0,m,fixed,plug abandon -- trip,ok,success,CONT. POOH. L/D CEMENT STINGER.,0.5 +15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 05:30:00+00:00,1993-01-28 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"PRESSURE TESTED 9 5/8"" CASING TO 345 BAR/15 MINS.",1.0 +15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 06:30:00+00:00,1993-01-28 09:00:00+00:00,205.0,m,fixed,plug abandon -- mechanical plug,ok,success,M/U BAKER 2C-2P RETRIEVABLE ABANDONMENT PLUG. RAN IN HOLE AND SET PLUG AT 205M. PRESSURE TESTED PLUG TO 100 BAR FOR 15 MINS. PULLED BACK 3 M.,2.5 +15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 09:00:00+00:00,1993-01-28 10:30:00+00:00,202.0,m,fixed,plug abandon -- other,ok,success,DISPLACED HOLE TO INHIBITED SEA WATER. L/D BAKER RUNNING TOOL.,1.5 +15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 10:30:00+00:00,1993-01-28 11:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,SLIPPED DRILL LINE.,1.0 +15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 11:30:00+00:00,1993-01-28 15:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,R/U TO PULL BOP. L/D DIVERTER. INSTALLED HANDLING JOINT. DEBALLASTED RIG 10 FT. UNLATCHED BOP AND PULLED SAME ABOVE TEMPLATE.,3.5 +15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 15:00:00+00:00,1993-01-28 16:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,MOVED RIG 25M OFF LOCATION,1.5 +15_9_19_ST2_1993_01_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-28T00:00:00+01:00,1993-01-29T00:00:00+01:00,1993-01-28 16:30:00+00:00,1993-01-28 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RE-BALLASTED RIG TO DRILLING DRAFT. DISCONNECTED RUCKER TENSIONERS. REMOVED POD LINE SADDLES AND K/C-LINES. PULLED BOP TO SURFACE. DE-BALLASTED RIG 10 FT DUE TO HIGH SEAS. LANDED BOP ON CARRIER.,6.5 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-28 23:00:00+00:00,1993-01-29 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,SECURED BOP ONTO CARRIER. L/D 2 EA 50 FT RISER JOINTS.,4.0 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 03:00:00+00:00,1993-01-29 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RE-BALLASTED RIG TO DRILLING DRAFT. R/D RISER HANDLING EQUIPMENT. R/U PIPE HANDLING EQUIPMENT.,1.0 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 04:00:00+00:00,1993-01-29 04:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,CLEANED RIG FLOOR.,0.5 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 04:30:00+00:00,1993-01-29 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U RUNNING TOOL FOR TEMPORARY ABANDONMENT CAP.,0.5 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 05:00:00+00:00,1993-01-29 06:00:00+00:00,82.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MADE UP TEMPORARY ABANDONMENT CAP TO RUNNING TOOL AND RAN IN TO 82M.,1.0 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 06:00:00+00:00,1993-01-29 07:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,MOVED RIG OVER WELL,1.5 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 07:30:00+00:00,1993-01-29 08:30:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"INSTALLED CAP ON WELLHEAD. PUMPED STACK-MAGIC CORROSION INHIBITOR. RELEASED RUNNING TOOL, PULLED BACK TO 80M.",1.0 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 08:30:00+00:00,1993-01-29 10:30:00+00:00,95.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"PULLED GUIDE WIRE 3 AND 4. RELEASED GUIDE WIRE 1, CLOSED HATCH WITH SAME. PULLED GUIDE WIRE 1.",2.0 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 10:30:00+00:00,1993-01-29 11:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,PULLED RIG 25M OFF LOCATION.,1.0 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 11:30:00+00:00,1993-01-29 15:00:00+00:00,80.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"PULLED OUT AND LAID DOWN CAP RUNNING TOOL. LAID DOWN 11 JOINTS OF 6 1/2"" DRILL COLLAR, 1 JAR AND 9 JOINTS OF 6 5/8"" HEAVY-WEIGHT DRILL PIPE.",3.5 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 15:00:00+00:00,1993-01-29 17:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,BACKLOADED PETROFREE MUD.,2.0 +15_9_19_ST2_1993_01_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-29T00:00:00+01:00,1993-01-30T00:00:00+01:00,1993-01-29 17:00:00+00:00,1993-01-29 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER FOR ANCHOR HANDLING,6.0 +15_9_19_ST2_1993_01_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-30T00:00:00+01:00,1993-01-31T00:00:00+01:00,1993-01-29 23:00:00+00:00,1993-01-30 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,CONTINUED WAITING ON WEATHER FOR ANCHOR HANDLING,6.0 +15_9_19_ST2_1993_01_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-30T00:00:00+01:00,1993-01-31T00:00:00+01:00,1993-01-30 05:00:00+00:00,1993-01-30 20:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER FOR ANCHOR HANDLING,15.0 +15_9_19_ST2_1993_01_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-30T00:00:00+01:00,1993-01-31T00:00:00+01:00,1993-01-30 20:00:00+00:00,1993-01-30 23:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,DE-BALLASTED RIG,3.0 +15_9_19_ST2_1993_02_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-31T00:00:00+01:00,1993-02-01T00:00:00+01:00,1993-01-30 23:00:00+00:00,1993-01-31 00:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,CONT. DE-BALLASTING RIG.,1.5 +15_9_19_ST2_1993_02_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-31T00:00:00+01:00,1993-02-01T00:00:00+01:00,1993-01-31 00:30:00+00:00,1993-01-31 05:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"PULLED ANCHORS. BOLSTERED ANCHOR NO.8, 5, 4 AND 1. CONNECTED TOWING GEAR TO ""VIKING LADY"".",4.5 +15_9_19_ST2_1993_02_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-31T00:00:00+01:00,1993-02-01T00:00:00+01:00,1993-01-31 05:00:00+00:00,1993-01-31 06:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED ANCHORS. BLOSTERD ANCHOR NO. 2 AND 6.,1.5 +15_9_19_ST2_1993_02_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-31T00:00:00+01:00,1993-02-01T00:00:00+01:00,1993-01-31 06:30:00+00:00,1993-01-31 07:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,HAD TO STOP ANCHOR HANDLING DUE TO FAUTY TYRISTOR IN SCR. CHANGED SAME.,1.0 +15_9_19_ST2_1993_02_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-01-31T00:00:00+01:00,1993-02-01T00:00:00+01:00,1993-01-31 07:30:00+00:00,1993-01-31 09:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PULLED ANCHORS. BLOSTERD ANCHOR NO. 3 AND PREPAIRED ANCHOR NO. 7 FOR DROP AT NEW LOCATION. ANCHOR NO. 7 HUNG OFF AT 10:25 HRS.,2.0 +15_9_19_ST2_1993_02_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-17T00:00:00+01:00,1993-02-18T00:00:00+01:00,1993-02-17 14:00:00+00:00,1993-02-17 18:30:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG IN TRANSIT FROM 15/9-D3H TO 15/9-19S WITH VIKING LADY IN TOWING BRIDDLE. DROPPED ANCHOR NO 7 AT 1955 HRS,4.5 +15_9_19_ST2_1993_02_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-17T00:00:00+01:00,1993-02-18T00:00:00+01:00,1993-02-17 18:30:00+00:00,1993-02-17 23:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"SET ANCHORS NO 2, 6, 3, 1 AND 5",4.5 +15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-17 23:00:00+00:00,1993-02-18 01:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,SET ANCHORS NO 8 AND 4,2.5 +15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 01:30:00+00:00,1993-02-18 05:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,BALLASTED RIG,3.5 +15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 05:00:00+00:00,1993-02-18 06:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,BALLASTED RIG TO DRILLING DRAFT,1.0 +15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 06:00:00+00:00,1993-02-18 10:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,"TENSION-TESTED ANCHORS, RERUN ANCHOR NO 7 AND TENSION TESTED SAME TO 160 MT",4.0 +15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 10:00:00+00:00,1993-02-18 12:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,"POSITIONED RIG OVER SLOT 3, WELL 15/9-19S",2.0 +15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 12:00:00+00:00,1993-02-18 19:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,"RAN GUIDELINE AND CONNECTED TO HATCH. POSITIONED RIG AND OPENED HATCH. ESTABLISED GUIDELINES, ASSISTED WITH ROV.",7.0 +15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 19:00:00+00:00,1993-02-18 20:30:00+00:00,0.0,m,fixed,moving -- position,ok,success,PULLED RIG 25 M OFF LOCATION,1.5 +15_9_19_ST2_1993_02_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-18T00:00:00+01:00,1993-02-19T00:00:00+01:00,1993-02-18 20:30:00+00:00,1993-02-18 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,REPAIRED TDS,2.5 +15_9_19_ST2_1993_02_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-19T00:00:00+01:00,1993-02-20T00:00:00+01:00,1993-02-18 23:00:00+00:00,1993-02-19 05:00:00+00:00,0.0,m,fixed,interruption -- maintain,ok,equipment failure,CONT REPARING TDS,6.0 +15_9_19_ST2_1993_02_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-19T00:00:00+01:00,1993-02-20T00:00:00+01:00,1993-02-19 05:00:00+00:00,1993-02-19 12:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"L/D 6 5/8"" DRILLPIPE",7.5 +15_9_19_ST2_1993_02_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-19T00:00:00+01:00,1993-02-20T00:00:00+01:00,1993-02-19 12:30:00+00:00,1993-02-19 14:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"PERFORMED TORQUE READING CHECK ON TDS, TESTED TORQUE AGAINST TONG LOAD CELL",1.5 +15_9_19_ST2_1993_02_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-19T00:00:00+01:00,1993-02-20T00:00:00+01:00,1993-02-19 14:00:00+00:00,1993-02-19 15:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"L/D REMAINING 6 5/8"" DRILLPIPE",1.5 +15_9_19_ST2_1993_02_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-19T00:00:00+01:00,1993-02-20T00:00:00+01:00,1993-02-19 15:30:00+00:00,1993-02-19 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 5"" DRILLPIPE, RACKED BACK IN DERRICK",7.5 +15_9_19_ST2_1993_02_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-20T00:00:00+01:00,1993-02-21T00:00:00+01:00,1993-02-19 23:00:00+00:00,1993-02-20 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONTINUED P/U 5"" DRILLPIPE",6.0 +15_9_19_ST2_1993_02_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-20T00:00:00+01:00,1993-02-21T00:00:00+01:00,1993-02-20 05:00:00+00:00,1993-02-20 08:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONT P/U 5"" DRILLPIPE, TOT 201 JNTS.",3.5 +15_9_19_ST2_1993_02_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-20T00:00:00+01:00,1993-02-21T00:00:00+01:00,1993-02-20 08:30:00+00:00,1993-02-20 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITING ON WEATHER,14.5 +15_9_19_ST2_1993_02_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-21T00:00:00+01:00,1993-02-22T00:00:00+01:00,1993-02-20 23:00:00+00:00,1993-02-21 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITING ON WEATHER,6.0 +15_9_19_ST2_1993_02_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-21T00:00:00+01:00,1993-02-22T00:00:00+01:00,1993-02-21 05:00:00+00:00,1993-02-21 23:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER,18.0 +15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-21 23:00:00+00:00,1993-02-22 05:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER,6.0 +15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 05:00:00+00:00,1993-02-22 07:00:00+00:00,0.0,m,fixed,interruption -- waiting on weather,ok,success,WAITED ON WEATHER,2.0 +15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 07:00:00+00:00,1993-02-22 07:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RIH WITH CORROSION CAP RETRIEVING TOOL TO 86 M,0.5 +15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 07:30:00+00:00,1993-02-22 11:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,"PULLED RIG ON LOCATION, POSITIONED SAME. ENTERED CORR CAP W/RET TOOL, PULLED CAP FREE WITH 20 MT OVERPULL. PULLED RIG 25 M OFF LOCATION.",3.5 +15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 11:00:00+00:00,1993-02-22 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PULLED OUT WITH CORROSION CAP.,1.5 +15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 12:30:00+00:00,1993-02-22 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,P/U AND ORIENTATED THOJ IN BOP USING CRANE,6.5 +15_9_19_ST2_1993_02_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-22T00:00:00+01:00,1993-02-23T00:00:00+01:00,1993-02-22 19:00:00+00:00,1993-02-22 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PREPARED BOP FOR RUNNING. INSTALLED VX-RING,4.0 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-22 23:00:00+00:00,1993-02-23 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,RAN BOP STACK ON 2 EA 50 FT RISER JNTS. PRESS TESTED K/C LINES TO 345 BAR/10 MIN. CONT RIH WITH BOP/RISER. PRESS TESTED K/C 345 BAR/10 MIN,6.0 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 05:00:00+00:00,1993-02-23 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,REPAIRED TEST PLUG FOR K/C LINES,0.5 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 05:30:00+00:00,1993-02-23 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,PRESS TESTED K/C LINES TO 345 BAR/10 MIN.,0.5 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 06:00:00+00:00,1993-02-23 13:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"P/U SLIP JNT AND LAND JNT, H/U K/C LINES TO SLIP JNT. INSTALLED SADLES FOR POD HOSES, INSTALLED RISER TENSIONERS. DEBALLASTED RIG 3 M. ATTEMPTED TO PRESS TEST K/C LINES.",7.0 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 13:00:00+00:00,1993-02-23 13:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,equipment failure,"CHANGED O-RING ON KILL LINE GOOSNECK, PRESS TESTED SAME TO 200 BAR",0.5 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 13:30:00+00:00,1993-02-23 15:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,"POSITIONED RIG ABOVE SLOT, BALLASTED TO DRILLING DRAFT",1.5 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 15:00:00+00:00,1993-02-23 16:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"LANDED BOP OFF IN WH, CLOSED CONNECTOR. PERFORMED OVERPULL WITH 25 MT",1.0 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 16:00:00+00:00,1993-02-23 18:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,"L/D LANDING JNT, P/U AND INSTALL DIVERTER. H/U HYDRAULIC HOSES",2.5 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 18:30:00+00:00,1993-02-23 19:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,RIH WITH TEST PLUG AND INSTALLED SAME,1.0 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 19:30:00+00:00,1993-02-23 20:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,PRESS TESTED K/C LINES AND WELLHEAD CONN 345 BAR. FUNCTION TESTED BOP.,1.0 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 20:30:00+00:00,1993-02-23 21:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,"POOH, L/D TEST PLUG, FUNCTION TESTED SHEAR RAM WITH ACCOUSTIC",1.0 +15_9_19_ST2_1993_02_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-23T00:00:00+01:00,1993-02-24T00:00:00+01:00,1993-02-23 21:30:00+00:00,1993-02-23 23:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"R/U AND RUN KOS THOJ, ADAPTER JNT AND WOR JNTS",1.5 +15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-23 23:00:00+00:00,1993-02-24 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"CONT RUN WOR. PRESS TEST EVERY CONNECTION 345 BAR RUN TOTAL THOJ, ADAPTER JNT AND 3 EA WOR",4.0 +15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 03:00:00+00:00,1993-02-24 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"POOH WITH WOR, ADAPTER JNT AND THOJ. L/D SAME",2.0 +15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 05:00:00+00:00,1993-02-24 05:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,CONT R/D KOS WOR EQUIPMENT,0.5 +15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 05:30:00+00:00,1993-02-24 07:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,PRESS TESTED TDS VALVES AND KELLY HOSES TO 345 BAR,1.5 +15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 07:00:00+00:00,1993-02-24 10:00:00+00:00,205.0,m,fixed,drilling -- casing,ok,success,"RIH AND RETRIEVED BAKER RETRIEVABLE PLUG AT 205 M POOH WITH PLUG AND RET TOOL, UNABLE TO FREE PLUG FROM RET TOOL, L/D BOTH.",3.0 +15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 10:00:00+00:00,1993-02-24 17:00:00+00:00,3216.0,m,fixed,drilling -- casing,ok,success,"M/U 8 1/2"" BHA Æ19, INITIALIZED MWD MEMORY AND FUNCTION TESTED SAME. RIH AND TAGGED CMT AT 3216 M",7.0 +15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 17:00:00+00:00,1993-02-24 20:30:00+00:00,3216.0,m,fixed,drilling -- casing,ok,success,"DISPLACED HOLE TO 1,40 SG PETROFREE MUD, USED 50 M3 SW AND 8 M3 HI-VISC AS SPACER",3.5 +15_9_19_ST2_1993_02_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-24T00:00:00+01:00,1993-02-25T00:00:00+01:00,1993-02-24 20:30:00+00:00,1993-02-24 23:00:00+00:00,3254.0,m,fixed,drilling -- casing,ok,success,"DRILLED CMT FROM 3216 AND RETAINER AT 3225 M, CONT DRILLING CMT TO 3254 M",2.5 +15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-24 23:00:00+00:00,1993-02-25 00:00:00+00:00,3260.0,m,fixed,drilling -- casing,ok,success,CONT DRILLING CMT FROM 3254 TO 3260 M,1.0 +15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 00:00:00+00:00,1993-02-25 02:30:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,WASHED AND REAMED FROM 3260 TO RETAINER AT 3535 M,2.5 +15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 02:30:00+00:00,1993-02-25 04:00:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED WELL FOR EVEN MUDWEIGHT IN/OUT 1,42 SG",1.5 +15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 04:00:00+00:00,1993-02-25 05:00:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"PRESS TESTED SURFACE LINES/KILL LINE TO 100 BAR CLOSED ANNULAR AND PRESS TESTED 9 5/8"" CASING TO 62 BAR, EQUAL TO 1,71 SG",1.0 +15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 05:00:00+00:00,1993-02-25 05:30:00+00:00,3535.0,m,fixed,drilling -- casing,ok,success,"PRESS TESTED CSG TO 62 BAR, EQUAL TO 1,71 SG",0.5 +15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 05:30:00+00:00,1993-02-25 12:30:00+00:00,3580.0,m,fixed,drilling -- casing,ok,success,DRILLED RETAINER AT 3535 M AND CMT TO 3480 M,7.0 +15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 12:30:00+00:00,1993-02-25 13:00:00+00:00,3581.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3580 TO 3581 M",0.5 +15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 13:00:00+00:00,1993-02-25 14:30:00+00:00,3581.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED AND CONDITIONED MUD,1.5 +15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 14:30:00+00:00,1993-02-25 16:00:00+00:00,3581.0,m,fixed,formation evaluation -- rft/fit,ok,success,"PERFORMED FIT EQUAL TO 1,71 SG MUD",1.5 +15_9_19_ST2_1993_02_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-25T00:00:00+01:00,1993-02-26T00:00:00+01:00,1993-02-25 16:00:00+00:00,1993-02-25 23:00:00+00:00,3595.0,m,fixed,drilling -- drill,ok,success,"DRILLED 8 1/2"" HOLE FROM 3581 TO 3595 M",7.0 +15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-25 23:00:00+00:00,1993-02-26 00:30:00+00:00,3595.0,m,fixed,drilling -- drill,ok,success,"ATTEMPTED TO CONT DRILLING 8 1/2"" HOLE, NO PROGRESS. FLOWCHECKED WELL",1.5 +15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 00:30:00+00:00,1993-02-26 05:00:00+00:00,284.0,m,fixed,drilling -- trip,ok,success,POOH FOR BIT CHANGE TO 284 M,4.5 +15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 05:00:00+00:00,1993-02-26 06:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,CONT. POOH. BROKE BIT AND BIT SUB.,1.0 +15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 06:00:00+00:00,1993-02-26 07:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,success,L/D MWD-TOOL. M/U NEW MWD-TOOL.,1.0 +15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 07:00:00+00:00,1993-02-26 12:30:00+00:00,3576.0,m,fixed,drilling -- trip,ok,success,RE-BUILT BHA. FUNCTION TESTED MWD-TOOL. RIH TO 3576M. BROKE CIRCULATION EACH 500M.,5.5 +15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 12:30:00+00:00,1993-02-26 13:30:00+00:00,3595.0,m,fixed,interruption -- repair,ok,success,LOGGED WITH THE NEW MWD-TOOL FROM 3576M TO 3595M.,1.0 +15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 13:30:00+00:00,1993-02-26 21:00:00+00:00,3643.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3595M TO 3643M.",7.5 +15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 21:00:00+00:00,1993-02-26 22:30:00+00:00,3643.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRCULATED BU FOR SAMPLES.,1.5 +15_9_19_ST2_1993_02_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-26T00:00:00+01:00,1993-02-27T00:00:00+01:00,1993-02-26 22:30:00+00:00,1993-02-26 23:00:00+00:00,3643.0,m,fixed,drilling -- trip,ok,success,FLOW CHECKED 15 MINS. SLUGGED PIPE.,0.5 +15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-26 23:00:00+00:00,1993-02-27 05:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,POOH. BROKE BIT. L/D MWD AND STABILIZERS.,6.0 +15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 05:00:00+00:00,1993-02-27 07:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,M/U CORE BARREL AND CORE HEAD.,2.0 +15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 07:00:00+00:00,1993-02-27 13:00:00+00:00,3641.0,m,fixed,formation evaluation -- trip,ok,success,"P/U 2 EACH 6 1/2"" DRILL COLLARS. RIH WITH BHA NO.21 TO 3641M.",6.0 +15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 13:00:00+00:00,1993-02-27 14:30:00+00:00,3641.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CIRCULATED BOTTOMS UP TO CHECK FOR TRIP GAS, NEGATIVE.",1.5 +15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 14:30:00+00:00,1993-02-27 15:30:00+00:00,3641.0,m,fixed,formation evaluation -- trip,ok,success,"SPACED OUT FOR CORING. DROPPED BALL, SEATED SAME.",1.0 +15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 15:30:00+00:00,1993-02-27 17:00:00+00:00,3648.0,m,fixed,formation evaluation -- core,ok,success,CUT CORE NO.1 FROM 3643M TO 3648M. CORE JAMMED OFF.,1.5 +15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 17:00:00+00:00,1993-02-27 22:30:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,POOH. BROKE CORE HEAD.,5.5 +15_9_19_ST2_1993_02_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-27T00:00:00+01:00,1993-02-28T00:00:00+01:00,1993-02-27 22:30:00+00:00,1993-02-27 23:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,RECOVERED CORE.,0.5 +15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-27 23:00:00+00:00,1993-02-28 00:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONTINUED RECOVERING CORE. RACKED CORE BARREL IN DERRICK. CLEANED RIG FLOOR.,1.5 +15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-28 00:30:00+00:00,1993-02-28 02:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,M/U BHA NO.22. P/U MUD MOTOR AND TESTED SAME. P/U MWD-TOOL. ORIENTED NORTRAK.,2.0 +15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-28 02:30:00+00:00,1993-02-28 05:00:00+00:00,1157.0,m,fixed,drilling -- trip,ok,success,RIH TO 1157M. FILLED PIPE AND BROKE CIRCULATION EACH 500M.,2.5 +15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-28 05:00:00+00:00,1993-02-28 08:00:00+00:00,3585.0,m,fixed,drilling -- trip,ok,success,CONTINUED RIH WITH BHA NO.22 TO 3585M. FILLED PIPE AND BROKE CIRC. EACH 500M.,3.0 +15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-28 08:00:00+00:00,1993-02-28 11:00:00+00:00,3648.0,m,fixed,drilling -- ream,ok,success,REAMED AND RE-LOGGED WITH MWD FROM 3585M TO 3648M.,3.0 +15_9_19_ST2_1993_03_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-02-28T00:00:00+01:00,1993-03-01T00:00:00+01:00,1993-02-28 11:00:00+00:00,1993-02-28 23:00:00+00:00,3749.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3648M TO 3749M: STEERED FROM 3648M TO 3662M, 3674-3691M, 3702-3716M, 3724-3730M, 3731-3740M AND 3742-3748M.",12.0 +15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-02-28 23:00:00+00:00,1993-02-28 23:30:00+00:00,3749.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED/ROTATED TO CLEAN HOLE.,0.5 +15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-02-28 23:30:00+00:00,1993-03-01 05:00:00+00:00,3797.0,m,fixed,drilling -- drill,ok,success,"CONTINUED DRILLING/SURVEYING 8 1/2"" HOLE TO 3797M: STEERED FROM 3763 TO 3767M AND 3769M TO 3779M.",5.5 +15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 05:00:00+00:00,1993-03-01 16:00:00+00:00,3873.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3797M TO 3873M: STEERED FROM 3797M TO 3799M AND FROM 3815M TO 3827M. ATTEMPTED STEERING AT 3869M, NEGATIVE AS MOTOR STALLED OUT. USED 50 TONS OVERPULL TO FREE PIPE AFTER ATTEMPTING TO STEER.",11.0 +15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 16:00:00+00:00,1993-03-01 17:30:00+00:00,3873.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED TO CLEAN HOLE.,1.5 +15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 17:30:00+00:00,1993-03-01 19:00:00+00:00,3546.0,m,fixed,drilling -- trip,ok,success,WIPER TRIP TO 3546M. ROTATED PIPE IN SLIPS ON FIRST 8 CONNECTIONS DUE TO TENDENCIES OF STICKING. NO TIGHT HOLE.,1.5 +15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 19:00:00+00:00,1993-03-01 20:00:00+00:00,3546.0,m,fixed,interruption -- maintain,ok,success,SLIPPED AND CUT 32M DRILL LINE.,1.0 +15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 20:00:00+00:00,1993-03-01 21:30:00+00:00,3873.0,m,fixed,drilling -- trip,ok,success,"RAN IN TO 3873M, NO FILL.",1.5 +15_9_19_ST2_1993_03_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-01T00:00:00+01:00,1993-03-02T00:00:00+01:00,1993-03-01 21:30:00+00:00,1993-03-01 23:00:00+00:00,3877.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3873M TO 3877M. STEERED FROM 3875M TO 3876M.",1.5 +15_9_19_ST2_1993_03_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-02T00:00:00+01:00,1993-03-03T00:00:00+01:00,1993-03-01 23:00:00+00:00,1993-03-02 05:00:00+00:00,3894.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3877M TO 3894M. ATTEMPTED STEERING AT 3877M, NEGATIVE DUE TO MOTOR STALLING OUT.",6.0 +15_9_19_ST2_1993_03_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-02T00:00:00+01:00,1993-03-03T00:00:00+01:00,1993-03-02 05:00:00+00:00,1993-03-02 23:00:00+00:00,3950.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 3894M TO 3950M. NO STEERING.",18.0 +15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-02 23:00:00+00:00,1993-03-03 02:00:00+00:00,3955.0,m,fixed,drilling -- drill,ok,success,CONT. ROTATION DRILLING/SURVEYING TO 3955M.,3.0 +15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 02:00:00+00:00,1993-03-03 03:30:00+00:00,3955.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED B/U AND SHAKERS CLEAN.,1.5 +15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 03:30:00+00:00,1993-03-03 05:00:00+00:00,3955.0,m,fixed,drilling -- trip,ok,success,FLOW CHECKED. PUMPED SLUG. POOH FOR BIT CHANGE TO 3528M.,1.5 +15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 05:00:00+00:00,1993-03-03 08:30:00+00:00,1200.0,m,fixed,drilling -- trip,ok,success,CONT. POOH TO 1200M.,3.5 +15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 08:30:00+00:00,1993-03-03 09:30:00+00:00,1200.0,m,fixed,interruption -- maintain,fail,equipment failure,FOUND MOTOR ON UPPER RACKING ARM LOOSE. REPAIRED SAME.,1.0 +15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 09:30:00+00:00,1993-03-03 12:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONT. POOH. BROKE BIT. L/D MWD TOOL, MOTOR, STABILISERS AND X-OVERS",3.0 +15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 12:30:00+00:00,1993-03-03 15:30:00+00:00,800.0,m,fixed,drilling -- trip,ok,success,"M/U BHA NO. 23 AND RIH TO 800M. TESTED MWD-TOOL. AT 800M, GOT ALARM ON LOW OIL PRESSURE ON TOP DRIVE.",3.0 +15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 15:30:00+00:00,1993-03-03 20:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,TOOK DOWN OIL PUMP ASSEMBLY TO REPAIR SAME.,5.0 +15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 20:30:00+00:00,1993-03-03 21:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,FUNCTION TESTED BOP ON YELLOW POD. TESTED ACOUSTIC SYSTEM.,1.0 +15_9_19_ST2_1993_03_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-03T00:00:00+01:00,1993-03-04T00:00:00+01:00,1993-03-03 21:30:00+00:00,1993-03-03 23:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,CONTINUED REPAIRING TDS: CHANGED OUT OIL PUMP.,1.5 +15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-03 23:00:00+00:00,1993-03-04 01:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,CONT. REPAIRING TDS. RE-INSTALLED OIL PUMP ASSEMBLY.,2.0 +15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 01:00:00+00:00,1993-03-04 01:30:00+00:00,800.0,m,fixed,drilling -- circulating conditioning,ok,success,FILLED PIPE. BROKE CIRCULATION AND CIRCULATED A RISER VOLUME.,0.5 +15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 01:30:00+00:00,1993-03-04 05:00:00+00:00,3028.0,m,fixed,drilling -- trip,ok,success,CONT. RIH TO 3028M. FILLED PIPE AND BROKE CIRC. EACH 500M.,3.5 +15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 05:00:00+00:00,1993-03-04 06:00:00+00:00,3565.0,m,fixed,drilling -- trip,ok,success,CONT. RIH WITH BHA NO.23 TO 3565M.,1.0 +15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 06:00:00+00:00,1993-03-04 06:30:00+00:00,3565.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED TO CONDITION MUD,0.5 +15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 06:30:00+00:00,1993-03-04 07:30:00+00:00,3884.0,m,fixed,drilling -- trip,ok,success,"CONT. RIH TO 3884M, TOOK WEIGHT.",1.0 +15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 07:30:00+00:00,1993-03-04 11:00:00+00:00,3955.0,m,fixed,drilling -- ream,ok,success,WASHED/REAMED TIGHT HOLE FROM 3884M TO 3955M.,3.5 +15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 11:00:00+00:00,1993-03-04 12:30:00+00:00,3971.0,m,fixed,drilling -- drill,ok,success,"ROTARY DRILLED AND SURVEYED 8 1/2"" HOLE FROM 3955M TO 3971M.",1.5 +15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 12:30:00+00:00,1993-03-04 13:00:00+00:00,3955.0,m,fixed,interruption -- repair,ok,success,RE-LOGGED WITH MWD-TOOL FROM 3941M TO 3955M.,0.5 +15_9_19_ST2_1993_03_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-04T00:00:00+01:00,1993-03-05T00:00:00+01:00,1993-03-04 13:00:00+00:00,1993-03-04 23:00:00+00:00,4083.0,m,fixed,drilling -- drill,ok,success,"CONTINUED DRILLING/SURVEYING 8 1/2"" HOLE FROM 3971M TO 4083M.",10.0 +15_9_19_ST2_1993_03_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-05T00:00:00+01:00,1993-03-06T00:00:00+01:00,1993-03-04 23:00:00+00:00,1993-03-05 05:00:00+00:00,4140.0,m,fixed,drilling -- drill,ok,success,"CONT. DRILLING/SURVEYING 8 1/2"" HOLE TO 4140M.",6.0 +15_9_19_ST2_1993_03_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-05T00:00:00+01:00,1993-03-06T00:00:00+01:00,1993-03-05 05:00:00+00:00,1993-03-05 23:00:00+00:00,4298.0,m,fixed,drilling -- drill,ok,success,"CONTINUED DRILLING/SURVEYING 8 1/2"" HOLE FROM 4140M TO 4298M. FLOW CHECKED AT 4239M DUE TO DRILLING BREAK, NEGATIVE.",18.0 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-05 23:00:00+00:00,1993-03-06 00:30:00+00:00,4308.0,m,fixed,drilling -- drill,ok,success,"CONT. DRILLING/SURVEYING 8 1/2"" HOLE TO 4308M. FLOW CHECKED AT 4303M AND AT 4308M DUE TO DRILLING BREAKS, NEGATIVE.",1.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 00:30:00+00:00,1993-03-06 01:00:00+00:00,4308.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED DUE TO HIGH ROP.,0.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 01:00:00+00:00,1993-03-06 03:30:00+00:00,4328.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 4308M TO 4328M.",2.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 03:30:00+00:00,1993-03-06 05:00:00+00:00,4328.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP FOR SAMPLE.,1.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 05:00:00+00:00,1993-03-06 05:30:00+00:00,4328.0,m,fixed,formation evaluation -- circulation samples,ok,success,CIRCULATED BOTTOMS UP FOR SAMPLES.,0.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 05:30:00+00:00,1993-03-06 06:00:00+00:00,4328.0,m,fixed,drilling -- drill,ok,success,"FLOWCHECKED FOR 15 MIN,NEGATIVE. PUMPED SLUG.",0.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 06:00:00+00:00,1993-03-06 08:00:00+00:00,3569.0,m,fixed,drilling -- trip,ok,success,POOH TO SHOE.WORKED TIGHT SPOT AT 3662M WITH MAX 30 TON OVERPULL.,2.0 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 08:00:00+00:00,1993-03-06 08:30:00+00:00,3569.0,m,fixed,drilling -- drill,ok,success,"FLOW CHECKED, NEGATIVE.",0.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 08:30:00+00:00,1993-03-06 10:00:00+00:00,2173.0,m,fixed,drilling -- trip,ok,success,POOH TO 2173M.,1.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 10:00:00+00:00,1993-03-06 10:30:00+00:00,2173.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED UPPER RACKING ARM.,0.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 10:30:00+00:00,1993-03-06 12:00:00+00:00,700.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH TO 700M.,1.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 12:00:00+00:00,1993-03-06 13:00:00+00:00,700.0,m,fixed,interruption -- maintain,fail,equipment failure,RAPAIRED UPPER RACKING ARM.,1.0 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 13:00:00+00:00,1993-03-06 15:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONTINUED POOH.LAID DOWN MONEL,STABILIZERS AND MWD TOOL.",2.0 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 15:00:00+00:00,1993-03-06 16:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,PICKED UP CBBL AND INSTALLED 27M ALUMINIUM INNER BARREL. SPACED OUT CBBL AND MADE UP COREHEAD.,1.0 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 16:00:00+00:00,1993-03-06 21:00:00+00:00,3550.0,m,fixed,formation evaluation -- trip,ok,success,RIH WITH BHA NO. 24 TO 3550M. BROKE CIRCULATION EACH 600M.,5.0 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 21:00:00+00:00,1993-03-06 21:30:00+00:00,3550.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED TO CONDITION MUD.,0.5 +15_9_19_ST2_1993_03_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-06T00:00:00+01:00,1993-03-07T00:00:00+01:00,1993-03-06 21:30:00+00:00,1993-03-06 23:00:00+00:00,4298.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH FROM 3550M TO 4298M.,1.5 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-06 23:00:00+00:00,1993-03-07 00:00:00+00:00,4328.0,m,fixed,formation evaluation -- trip,ok,success,BROKE CIRCULATION. WASHED/REAMED TO 4328M.,1.0 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 00:00:00+00:00,1993-03-07 01:30:00+00:00,4328.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP.,1.5 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 01:30:00+00:00,1993-03-07 02:00:00+00:00,4328.0,m,fixed,formation evaluation -- trip,ok,success,"DROPPED BALL, DISPLACED AND SEATED SAME.",0.5 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 02:00:00+00:00,1993-03-07 05:00:00+00:00,4338.0,m,fixed,formation evaluation -- core,ok,success,CUT CORE NO.2 FROM 4328M TO 4338M.,3.0 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 05:00:00+00:00,1993-03-07 09:30:00+00:00,4355.0,m,fixed,formation evaluation -- core,ok,success,CONTINUED CUTTING CORE NO.2 FROM 4338M TO 4355M.,4.5 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 09:30:00+00:00,1993-03-07 10:00:00+00:00,4355.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CIRCULATED 10 MINS. FLOW CHECKED 15 MINS, NEGATIVE. PUMPED SLUG.",0.5 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 10:00:00+00:00,1993-03-07 16:00:00+00:00,29.0,m,fixed,formation evaluation -- trip,ok,success,"POOH TO 9 5/8"" CASING SHOE. FLOW CHECKED, NEGATIVE. CONTINUED POOH TO 29M, FLOW CHECKED AT 500M, NEGATIVE.",6.0 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 16:00:00+00:00,1993-03-07 18:00:00+00:00,29.0,m,fixed,formation evaluation -- log,ok,success,PREPARED FOR RECOVERING CORE.RECORDED 650 PPM H2S GAS FROM TOP OF COREBARREL. SOUNDED GENERAL ALARM AND ORDERED ALL ESSENTIAL PERSONNEL TO PORT BOX GIRDER FORWARD. EQUIPPED DRILL-FLOOR PERSONNEL WITH BREATHING APPARATUS. CLOSED SHEAR RAM TO MONITOR WELL ON CHOKE. CARRIED OUT H2S MEASUREMENTS ON RIG FLOOR.,2.0 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 18:00:00+00:00,1993-03-07 18:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,HELD SAFETY/PRE-OPERATION MEETING WITH INVOLVED PERSONNEL.,0.5 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 18:30:00+00:00,1993-03-07 19:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"INSTALLED LIFT SUB. PULLED OUT INNER BARREL, KEPT SAME HANGING IN TUGGER LINE FOR VENTING OUT H2S.",1.0 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 19:30:00+00:00,1993-03-07 21:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,RAN BACK IN WITH INNER BARREL. DRILLED 6MM DIAMETER VENT HOLES EACH METER. MEASURED H2S LEVELS WHILE DRILLING. PULLED INNER BARREL OUT AFTER DRILLING VENT HOLES.,1.5 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 21:00:00+00:00,1993-03-07 22:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,KEPT INNER BARREL HANGING IN TUGGER LINE FOR VENTING WHILE MEASURING H2S-LEVELS. ALLOWED PERSONNEL TO GO BACK INDOOR.,1.5 +15_9_19_ST2_1993_03_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-07T00:00:00+01:00,1993-03-08T00:00:00+01:00,1993-03-07 22:30:00+00:00,1993-03-07 23:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,HELD SAFETY MEETING WITH INVOLVED PERSONNEL PRIOR TO L/D CORE BARRELS.,0.5 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-07 23:00:00+00:00,1993-03-08 01:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,L/D INNER BARRELS. SECURED AREA AROUND BARRELS. BROKE CORE HEAD.,2.5 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 01:30:00+00:00,1993-03-08 02:00:00+00:00,0.0,m,fixed,drilling -- circulating conditioning,ok,success,"OPENED CHOKE. CIRCULATED DOWN KILL LINE, UP CHOKE LINE THROUGH POORBOY DEGASSER.",0.5 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 02:00:00+00:00,1993-03-08 03:00:00+00:00,0.0,m,fixed,drilling -- circulating conditioning,ok,success,"OPENED SHEAR RAM. FLOW CHECKED, NEGATIVE. CIRCULATED A RISER VOLUME DOWN K/C-LINES, NO GAS/H2S.",1.0 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 03:00:00+00:00,1993-03-08 04:00:00+00:00,0.0,m,fixed,drilling -- circulating conditioning,ok,success,VERIFIED RIG FLOOR/SURROUNDINGS H2S-FREE. BLEW RIG AIR INTO/THROUGH RELEVANT CAVITIES TO CLEAR EVENTUAL H2S. FINISHED THE USE OF BREATHING APPARATUS ON THE RIG FLOOR/SHAKER ROOM.,1.0 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 04:00:00+00:00,1993-03-08 05:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,MADE UP CORE BARREL WITH 27M ALUMINIUM INNER TUBES. SPACED OUT INNER BARREL AND MADE UP CORE HEAD.,1.0 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 05:00:00+00:00,1993-03-08 10:00:00+00:00,3548.0,m,fixed,formation evaluation -- trip,ok,success,RIH WITH CORE BARREL TO 3548M. BROKE CIRCULATION EACH 600M.,5.0 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 10:00:00+00:00,1993-03-08 11:00:00+00:00,3548.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED TO CONDITION MUD. INSTALLED MUD SAVER SUB ON DRILLING STAND,1.0 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 11:00:00+00:00,1993-03-08 13:00:00+00:00,4326.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED RIH TO 4326M.,2.0 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 13:00:00+00:00,1993-03-08 13:30:00+00:00,4355.0,m,fixed,drilling -- ream,ok,success,REAMED FROM 4326M TO 4355M.,0.5 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 13:30:00+00:00,1993-03-08 15:30:00+00:00,4355.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CIRCULATED BOTTOMS UP.,2.0 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 15:30:00+00:00,1993-03-08 16:00:00+00:00,4355.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,DROPPED BALL. DISPLACED AND SEATED SAME. TOOK S.C.R.,0.5 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 16:00:00+00:00,1993-03-08 21:00:00+00:00,4383.0,m,fixed,formation evaluation -- core,ok,success,CUT CORE NO. 3 FROM 4355M TO 4383M.,5.0 +15_9_19_ST2_1993_03_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-08T00:00:00+01:00,1993-03-09T00:00:00+01:00,1993-03-08 21:00:00+00:00,1993-03-08 23:00:00+00:00,4134.0,m,fixed,formation evaluation -- trip,ok,success,"CIRCULATED 15 MINUTES. FLOW CHECKED, NEGATIVE. SLUGGED PIPE. POOH WITH CORE BARREL TO 4134M.",2.0 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-08 23:00:00+00:00,1993-03-09 01:30:00+00:00,3555.0,m,fixed,formation evaluation -- trip,ok,success,CONT. POOH WITH CORE BARREL TO 3555M. WORKED TIGHT SPOT AT 3670M.,2.5 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 01:30:00+00:00,1993-03-09 05:00:00+00:00,1667.0,m,fixed,formation evaluation -- trip,ok,success,"FLOW CHECKED IN 9 5/8"" CASING SHOE, NEGATIVE. CONT. POOH TO 1667M.",3.5 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 05:00:00+00:00,1993-03-09 05:30:00+00:00,1667.0,m,fixed,interruption -- maintain,fail,operation failed,RE-ARRANGED SET-BACK IN DERRICK.,0.5 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 05:30:00+00:00,1993-03-09 07:30:00+00:00,717.0,m,fixed,formation evaluation -- trip,ok,success,CONTINUED POOH WITH CORE NO.3 TO 1260M. MONITORED 11 PPM H2S INSIDE THE PIPE. PREPARED H2S EQUIPMENT. CONTINUED POOH TO 717M. H2S IN PIPE FROM 9 PPM TO 17 PPM.,2.0 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 07:30:00+00:00,1993-03-09 08:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,INSTALLED MAERSK H2S SAFETY EQUIPMENT ON RIG FLOOR.,1.0 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 08:30:00+00:00,1993-03-09 11:00:00+00:00,0.0,m,fixed,formation evaluation -- trip,ok,success,"CONTINUED POOH FROM 717M. MEASURED H2S-LEVELS ON THE DRILL FLOOR AND IN THE PIPE: NO H2S DETECTED ON DRILL FLOOR, BETWEEN 6 PPM AND 15 PPM IN THE PIPE. PIPE CAME WET AT 545M, NO H2S DETECTED THEREAFTER. PREPARED BREATHING APPARATUS. PULLED CORE BARREL TO SURFACE. BROKE CORE HEAD. NO H2S.",2.5 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 11:00:00+00:00,1993-03-09 12:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"L/D INNER BARREL. RACKED OUTER BARREL IN DERRICK. RECOVERED 28,15M CORE,100%",1.5 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 12:30:00+00:00,1993-03-09 13:30:00+00:00,105.0,m,fixed,drilling -- bop activities,ok,success,M/U SPRING LOADED BOP TEST TOOL AND RIH TO 105M.,1.0 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 13:30:00+00:00,1993-03-09 17:00:00+00:00,105.0,m,fixed,drilling -- bop activities,ok,success,TESTED BOP ON BLUE POD: TESTED RAMS AND LAP TO 20/345 BAR FOR 5/10 MIN AND UAP TO 20/240 BAR FOR 5/10 MIN. FUNCTIONTESTED ON YELLOW POD.,3.5 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 17:00:00+00:00,1993-03-09 17:30:00+00:00,105.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED FUNCTIONING UPR AND MPR WITH ACOUSTIC FROM THE BRIDGE, GOT ERRATIC RESPONSE/NO VERIFICATION OF OPERATION. VERIFIED CLOSED RAMS BY OPENING SAME FROM THE KOOMEY UNIT.",0.5 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 17:30:00+00:00,1993-03-09 18:00:00+00:00,105.0,m,fixed,drilling -- bop activities,ok,success,"FUNCTIONED UPR AND MPR WITH ACOUSTIC SYSTEM FROM CELLAR DECK, OK.",0.5 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 18:00:00+00:00,1993-03-09 18:30:00+00:00,105.0,m,fixed,drilling -- bop activities,ok,success,POOH WITH SPRING LOADED TOOL. L/D SAME.,0.5 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 18:30:00+00:00,1993-03-09 21:30:00+00:00,105.0,m,fixed,drilling -- bop activities,ok,success,"PRESSURE TESTED STAB-IN VALVE, TDS INSIDE BOP'S, KELLY HOSE AND STANDPIPE VALVE TO 20/345 BAR, 5/10 MINS.",3.0 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 21:30:00+00:00,1993-03-09 22:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"M/U 8 1/2"" BIT AND TRIPLE COMBO MWD-TOOL.",1.0 +15_9_19_ST2_1993_03_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-09T00:00:00+01:00,1993-03-10T00:00:00+01:00,1993-03-09 22:30:00+00:00,1993-03-09 23:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED TESTING MWD-TOOL, NEGATIVE: LOSS OF CONTACT IN JUNCTION BOX FOR TEST CABLE. REPAIRED SAME.",0.5 +15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-09 23:00:00+00:00,1993-03-10 00:00:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,TESTED MWD. INSTALLED RADIOACTIVE SOURCE.,1.0 +15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 00:00:00+00:00,1993-03-10 05:00:00+00:00,3144.0,m,fixed,drilling -- trip,ok,success,CONTINUED M/U BHA NO.26 AND RIH TO 3144M. FILLED PIPE/BROKE CIRCULATION EACH 600M.,5.0 +15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 05:00:00+00:00,1993-03-10 06:00:00+00:00,3560.0,m,fixed,drilling -- trip,ok,success,"CONT. RIH WITH 8 1/2"" ROTARY ASSEMBLY TO 3560M. FILLED PIPE AND BROKE CIRCULATION EACH 600M.",1.0 +15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 06:00:00+00:00,1993-03-10 07:30:00+00:00,3560.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED TO CONDITION MUD.,1.5 +15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 07:30:00+00:00,1993-03-10 08:00:00+00:00,3608.0,m,fixed,drilling -- trip,ok,success,CONT. RIH TO 3608M.,0.5 +15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 08:00:00+00:00,1993-03-10 10:00:00+00:00,3655.0,m,fixed,formation evaluation -- log,ok,success,LOGGED WITH TRIPLE COMBO MWD-TOOL FROM 3608M TO 3655M.,2.0 +15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 10:00:00+00:00,1993-03-10 11:00:00+00:00,4297.0,m,fixed,drilling -- trip,ok,success,CONT. RIH TO 4297M. FILLED PIPE.,1.0 +15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 11:00:00+00:00,1993-03-10 14:30:00+00:00,4383.0,m,fixed,formation evaluation -- log,ok,success,BROKE CIRCULATION. LOGGED WITH MWD-TOOL FROM 4313M TO 4383M.,3.5 +15_9_19_ST2_1993_03_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-10T00:00:00+01:00,1993-03-11T00:00:00+01:00,1993-03-10 14:30:00+00:00,1993-03-10 23:00:00+00:00,4453.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 4383M TO 4453M. FLOW CHECKED AT 4392M AND 4415M, NEGATIVE.",8.5 +15_9_19_ST2_1993_03_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-11T00:00:00+01:00,1993-03-12T00:00:00+01:00,1993-03-10 23:00:00+00:00,1993-03-11 05:00:00+00:00,4503.0,m,fixed,drilling -- drill,ok,success,"CONTINUED DRILLING/SURVEYING 8 1/2"" HOLE FROM 4453M TO 4503M. FLOW CHECKED AT 4487M, NEGATIVE.",6.0 +15_9_19_ST2_1993_03_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-11T00:00:00+01:00,1993-03-12T00:00:00+01:00,1993-03-11 05:00:00+00:00,1993-03-11 07:30:00+00:00,4527.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 4503M TO 4527M.",2.5 +15_9_19_ST2_1993_03_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-11T00:00:00+01:00,1993-03-12T00:00:00+01:00,1993-03-11 07:30:00+00:00,1993-03-11 09:00:00+00:00,4527.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED HOLE CLEAN DUE TO HIGH TORQUE AND POOR HOLE CLEANING.,1.5 +15_9_19_ST2_1993_03_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-11T00:00:00+01:00,1993-03-12T00:00:00+01:00,1993-03-11 09:00:00+00:00,1993-03-11 23:00:00+00:00,4641.0,m,fixed,drilling -- drill,ok,success,"DRILLED/SURVEYED 8 1/2"" HOLE FROM 4527M TO TD AT 4641M.",14.0 +15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-11 23:00:00+00:00,1993-03-12 02:00:00+00:00,4641.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED HOLE CLEAN. FLOW CHECKED, NEGATIVE.",3.0 +15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 02:00:00+00:00,1993-03-12 05:00:00+00:00,3672.0,m,fixed,drilling -- trip,ok,success,"POOH TO 3672M FOR WIPER TRIP TO 9 5/8"" CASING SHOE. WORKED TIGHT SPOT AT 3672M. MAX 30 TON OVERPULL.",3.0 +15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 05:00:00+00:00,1993-03-12 05:30:00+00:00,3546.0,m,fixed,drilling -- trip,ok,success,CONTINUED POOH FROM 3672M TO 3546M.,0.5 +15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 05:30:00+00:00,1993-03-12 06:00:00+00:00,3546.0,m,fixed,drilling -- trip,ok,success,INSTALLED CIRCULATING EQUIPMENT AND CIRCULATED AT 3650M. CIRCULATED WITH 46 SPM AND 50 BAR.,0.5 +15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 06:00:00+00:00,1993-03-12 07:00:00+00:00,3650.0,m,fixed,drilling -- other,ok,success,SLIPPED AND CUT DRILL LINE.,1.0 +15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 07:00:00+00:00,1993-03-12 10:00:00+00:00,4612.0,m,fixed,drilling -- ream,ok,success,"RIGGED DOWN CIRCULATION EQUIPMENT. RIH AND WORKED TIGHT SPOTS FROM 3650M TO 3656M AND FROM 3664M TO 3670M. RIH TO 4612M,",3.0 +15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 10:00:00+00:00,1993-03-12 12:30:00+00:00,4641.0,m,fixed,drilling -- circulating conditioning,ok,success,BROKE CIRCULATION AND TAGGED BOTTOM AT 4641M. CIRCULATED HOLE CLEAN.,2.5 +15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 12:30:00+00:00,1993-03-12 15:00:00+00:00,3546.0,m,fixed,drilling -- trip,ok,success,POOH FROM 4641M TO 3546M AND FLOW CHECKED 15 MIN.,2.5 +15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 15:00:00+00:00,1993-03-12 22:30:00+00:00,3546.0,m,fixed,drilling -- trip,ok,success,POOH. LAID DOWN MWD TOOL AND STABS. LAID DOWN CORE BARREL FROM DERRICK.,7.5 +15_9_19_ST2_1993_03_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-12T00:00:00+01:00,1993-03-13T00:00:00+01:00,1993-03-12 22:30:00+00:00,1993-03-12 23:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,RIGGED UP ATLAS WIRELINE.,0.5 +15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-12 23:00:00+00:00,1993-03-13 00:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,FINISHED RIGGING UP ATLAS WIRELINE.,1.5 +15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 00:30:00+00:00,1993-03-13 05:00:00+00:00,4615.0,m,fixed,formation evaluation -- log,ok,success,RAN LOG NO 1. DIFL/AC/ZDL/CN/GR/CHT. IN AT 01:45 HRS.,4.5 +15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 05:00:00+00:00,1993-03-13 08:00:00+00:00,4488.0,m,fixed,formation evaluation -- log,ok,success,"CONTINUED LOG RUN NO 1. TO 9 5/8"" SHOE. RIH TO 3725M. LOGGED REPEAT SECTION FROM 3725M TO 3697M. UNABLE TO PASS 3697M. TOP OF TOOL AT 3664.5M.",3.0 +15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 08:00:00+00:00,1993-03-13 11:30:00+00:00,3664.5,m,fixed,formation evaluation -- other,fail,stuck equipment,MADE SEVERAL ATTEMTS TO FREE STUCK LOGGING TOOLS BY WORKING CABLE WITH MAX 6000 LBS OVERPULL. KEPT CABLE IN TENSION WHILE WORKING CALIPER ARM.,3.5 +15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 11:30:00+00:00,1993-03-13 16:00:00+00:00,3697.0,m,fixed,interruption -- fish,ok,success,"RIGGED DOWN ATLAS WIRELINE EQUIPMENT ON RIG FLOOR. INSTALLED T-BAR IN ROTARY AND CUT CABLE 5M ABOVE RKB. PREPAIRED AND MADE UP CATCHER, ATTACHED SAME AND PERFORMED PULLTEST. INSTALLED TOP SHEAVE AT CROWN. MADE UP OVER SHOT TO 5"" HWDP.",4.5 +15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 16:00:00+00:00,1993-03-13 17:30:00+00:00,57.0,m,fixed,interruption -- fish,ok,success,FEAD CATCHER THROUGH DP AND RIH WITH OVER SHOT ASSEMBLY.,1.5 +15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 17:30:00+00:00,1993-03-13 18:00:00+00:00,57.0,m,fixed,interruption -- repair,fail,equipment failure,HAD PROBLEMS WITH GEAR BOX ON ATLAS WIRELINE UNIT.,0.5 +15_9_19_ST2_1993_03_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-13T00:00:00+01:00,1993-03-14T00:00:00+01:00,1993-03-13 18:00:00+00:00,1993-03-13 23:00:00+00:00,804.0,m,fixed,interruption -- fish,ok,success,CONTINUED RIH WITH OVERSHOT ASSEMBLY TO 804M.,5.0 +15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-13 23:00:00+00:00,1993-03-14 05:00:00+00:00,2100.0,m,fixed,interruption -- fish,ok,success,CONTINUED RIH WITH OVERSHOT ASSEMBLY TO 2100M. BROKE CIRCULATION AND RETERMINATED CATCHER AT 1200M.,6.0 +15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 05:00:00+00:00,1993-03-14 11:30:00+00:00,3530.0,m,fixed,interruption -- fish,ok,success,CONTINUED RIH WITH OVERSHOT TO 3530M. BROKE CIRCULATION AND CHECKED CABLE HEAD AT 2400M AND 3530M.,6.5 +15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 11:30:00+00:00,1993-03-14 13:30:00+00:00,3530.0,m,fixed,interruption -- fish,ok,success,MADE UP PUMP-IN SUB AND STUFFING BOX ASSY ON A STAND AND RACKED SAME BACK IN DERRICK. PICKED UP ONE SINGLE FOR SPACE OUT.,2.0 +15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 13:30:00+00:00,1993-03-14 14:30:00+00:00,3656.0,m,fixed,interruption -- fish,ok,success,CONTINUED RIH WITH OVERSHOT TO 3656M.,1.0 +15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 14:30:00+00:00,1993-03-14 16:00:00+00:00,3656.0,m,fixed,interruption -- fish,ok,success,MADE UP CIRCULATION STAND. INSTALLED INSERTS FOR STUFFING BOX AND RIGGED UP CIRCULATION HOSE.,1.5 +15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 16:00:00+00:00,1993-03-14 19:30:00+00:00,3675.0,m,fixed,interruption -- fish,ok,success,"BROKE CIRCULATION WITH 7 SPM AND 23 BAR. RIH AND ENGAGED FISH AT 3675M. PULLED BACK 3M TO ENSURE ENGAGEMENT OF FISH. POOH TO 3512M. BOTTOM OF FISH AT 3545,5M.",3.5 +15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 19:30:00+00:00,1993-03-14 21:30:00+00:00,3512.0,m,fixed,interruption -- repair,fail,equipment failure,"WHILE REPLACING TRANSMISSION ON ATLAS UNIT: TENSIONED UP, RETERMINATED AND LANDED CABLE IN DRILL PIPE. SLUGGED PIPE.",2.0 +15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 21:30:00+00:00,1993-03-14 22:30:00+00:00,3512.0,m,fixed,interruption -- fish,ok,success,PREPARED TO BREAK WEAK POINT ON CABLE HEAD. LATCHED T-BAR IN ELEVATOR AND PULLED CABLE FREE WITH 5 TON OVERPULL.,1.0 +15_9_19_ST2_1993_03_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-14T00:00:00+01:00,1993-03-15T00:00:00+01:00,1993-03-14 22:30:00+00:00,1993-03-14 23:00:00+00:00,3512.0,m,fixed,interruption -- fish,ok,success,CONNECTED CABLE ENDS TOGETHER TO PULL CABLE OUT OF HOLE.,0.5 +15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-14 23:00:00+00:00,1993-03-15 00:00:00+00:00,3512.0,m,fixed,interruption -- fish,ok,success,PULLED CABLE OUT OF HOLE. ( CABLE BROKE AT WEEKPOINT AS INTENDED.),1.0 +15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 00:00:00+00:00,1993-03-15 01:30:00+00:00,3512.0,m,fixed,interruption -- fish,ok,success,RIGGED DOWN ATLAS WIRELINE AND PREPARED TO POOH WITH DRILLPIPE.,1.5 +15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 01:30:00+00:00,1993-03-15 05:00:00+00:00,900.0,m,fixed,interruption -- fish,ok,success,POOH WITH OVERSHOT AND LOGGING TOOLS FROM 3512M TO 900M.,3.5 +15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 05:00:00+00:00,1993-03-15 06:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,CONTINUED POOH WITH OVERSHOT AND LOGGING TOOLS.,1.5 +15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 06:30:00+00:00,1993-03-15 08:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,success,RECOVERED TOOLSTRING FROM OVERSHOT. REMOVED RADIOACTIVE SOURCES AND LAID DOWN LOGGING TOOLS.,2.0 +15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 08:30:00+00:00,1993-03-15 09:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,"RIGGED DOWN ATLAS WIRELINE, RE-ARRANGED SET-BACK AND CLEARED RIG FLOOR.",1.0 +15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 09:30:00+00:00,1993-03-15 16:30:00+00:00,4630.0,m,fixed,drilling -- casing,ok,success,"MADE UP 8 1/2"" CLEAN-OUT ASSEMBLY AND RIH TO 4630M. BROKE CIRCULATION AND FILLED PIPE EVERY 850M.",7.0 +15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 16:30:00+00:00,1993-03-15 21:30:00+00:00,4641.0,m,fixed,drilling -- casing,ok,success,"BROKE CIRCULATION. TAGGED BOTTOM AT 4641M, CIRCULATED AND CONDITIONED MUD PRIOR TO POOH, TO RUN 7"" LINER.",5.0 +15_9_19_ST2_1993_03_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-15T00:00:00+01:00,1993-03-16T00:00:00+01:00,1993-03-15 21:30:00+00:00,1993-03-15 23:00:00+00:00,4515.0,m,fixed,drilling -- casing,ok,success,"POOH TO RUN 7"" LINER.",1.5 +15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-15 23:00:00+00:00,1993-03-16 01:00:00+00:00,4515.0,m,fixed,drilling -- casing,fail,operation failed,"CONTINUED POOH. REAMED TIGHT SPOT AT 4515M, 4454M AND 4415M. WITH MAX 30 TONN OVERPULL. HAD PROBLEMS WITH STALLING ROTARY. RIH TO TD AT 4641M.",2.0 +15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 01:00:00+00:00,1993-03-16 04:00:00+00:00,4408.0,m,fixed,drilling -- casing,ok,success,BACKREAMED OUT OF HOLE FROM 4641M TO 4408M. HAD TO WORK TIGHT SPOT AT 4415M.,3.0 +15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 04:00:00+00:00,1993-03-16 05:00:00+00:00,4408.0,m,fixed,interruption -- maintain,fail,equipment failure,WORKED TIGHT SPOT AT 4408M WHEN SCR'S FOR TOP DRIVE FAILED. CIRCULATED AND WORKED STRING WHILE TROUBLESHOOTING SCR SYSTEMS. UNABLE TO PASS 4408M.,1.0 +15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 05:00:00+00:00,1993-03-16 12:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,CONTINUED BACKREAMING OUT OF HOLE FROM 4408M TO 3569M.,7.0 +15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 12:00:00+00:00,1993-03-16 13:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED BTM'S UP. FLOWCHECKED, NEGATIVE.",1.0 +15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 13:00:00+00:00,1993-03-16 21:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,PULLED OUT OF HOLE FORM 3569M. STRAPPED AND DRIFTED PIPE WHILE POOH.,8.5 +15_9_19_ST2_1993_03_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-16T00:00:00+01:00,1993-03-17T00:00:00+01:00,1993-03-16 21:30:00+00:00,1993-03-16 23:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"MADE UP CEMENT STAND AND RACKED SAME BACK IN DERRICK. RIGGED UP TO RUN 7"" CASING.",1.5 +15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-16 23:00:00+00:00,1993-03-16 23:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"FINISHED RIGGING UP 7"" CASING HANDLING EQUIPMENT. HELD PRE-JOB MEETING WITH CREW.",0.5 +15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-16 23:30:00+00:00,1993-03-17 05:00:00+00:00,351.0,m,fixed,drilling -- casing,ok,success,"RAN SHOE JOINT, INTERNEDIATE JOINT AND FLOAT COLLAR JOINT. CHECKED FLOAT, INSTALLED LANDING COLLAR. TREAD LOCKED FIRST THREE CONNECTIONS. RAN 31 JOINTS OF 7"" CASING TO 351M. FILLED CASING WITH 1,40 S.G. MUD EVREY 5 JOINTS WHILE RIH.",5.5 +15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-17 05:00:00+00:00,1993-03-17 16:00:00+00:00,1441.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RUNNING 7"" CASING TO 1441M. FILLED CASING WITH 1,40 S.G. MUD EVERY 5 JOINTS WHILE RIH.",11.0 +15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-17 16:00:00+00:00,1993-03-17 16:30:00+00:00,1441.0,m,fixed,drilling -- casing,ok,success,"INSTALLED CEMENT PLUGS ONTO LINER HANGER AND MADE UP HANGER TO 7"" CASING.",0.5 +15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-17 16:30:00+00:00,1993-03-17 17:30:00+00:00,1441.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED 7"" LINER VOLUME PRIOR TO RUNNING.",1.0 +15_9_19_ST2_1993_03_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-17T00:00:00+01:00,1993-03-18T00:00:00+01:00,1993-03-17 17:30:00+00:00,1993-03-17 23:00:00+00:00,2587.0,m,fixed,drilling -- casing,ok,success,"RIH WITH LINER TO 2587M. FILLED PIPE WITH 1,40 S.G. MUD EVERY 3 STANDS AND BROKE CIRCULATION EVERY 6 STANDS.",5.5 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-17 23:00:00+00:00,1993-03-18 03:00:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RIH WITH LINER TO 3569M. FILLED PIPE WITH 1,40 S.G. MUD EVERY 3 STANDS AND BROKE CIRCULATION EVERY 6 STANDS.",4.0 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 03:00:00+00:00,1993-03-18 03:30:00+00:00,3569.0,m,fixed,drilling -- casing,ok,success,CIRCULATED AT CASING SHOE TO ESTABLISH MAX RATE BEFORE RUNNING INTO OPEN HOLE. MAX RATE 453 LTR AT 60 BAR. RECORDED UP AND DOWN WEIGHT.,0.5 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 03:30:00+00:00,1993-03-18 05:00:00+00:00,3809.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RIH WITH LINER TO 3809M. FILLED PIPE AND BROKE CIRCULATION WITH 1,40 S.G. MUD EVERY 3 STANDS.",1.5 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 05:00:00+00:00,1993-03-18 11:00:00+00:00,4630.0,m,fixed,drilling -- casing,ok,success,"CONTINUED RIH WITH 7"" LINER TO 4630M. FILLED PIPE AND BROKE CIRCULATION WITH 1,40 S.G. MUD EVERY 3 STANDS.",6.0 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 11:00:00+00:00,1993-03-18 12:00:00+00:00,4641.0,m,fixed,drilling -- casing,ok,success,BROKE CIRCULATION AND TAGGED BOTTOM AT 4641M. PICKED UP 1M.,1.0 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 12:00:00+00:00,1993-03-18 12:30:00+00:00,4640.0,m,fixed,drilling -- casing,ok,success,DROPPED SETTING BALL AND CHASED SAME WITH RIG PUMPS. SET LINER HANGER WITH 150 BAR. SHEARED OUT BALLSEAT WITH 185 BAR.,0.5 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 12:30:00+00:00,1993-03-18 15:00:00+00:00,4640.0,m,fixed,drilling -- casing,ok,success,CIRCULATED AND CONDITIONED MUD PRIOR TO CEMENT JOB. ROTATED LINER 20 RPM WHILE CIRCULATING. MAX TORQUE AT START OF ROTATION: 32540 NM (24000 FTLBS). MAX TORQUE DURING CIRCULATION: 23050 NM (17000 FTLBS). CIRCULATED WITH MAX 1400 LPM.,2.5 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 15:00:00+00:00,1993-03-18 16:00:00+00:00,4640.0,m,fixed,drilling -- casing,ok,success,RIGGED UP CEMENT HOSE. PUMPED 15 M3 SPACER WITH RIG PUMPS. PRESSURE TESTED SURFACE LINES TO 350 BAR. DROPPED DART FOR BOTTOM PLUG.,1.0 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 16:00:00+00:00,1993-03-18 17:30:00+00:00,4640.0,m,fixed,drilling -- casing,ok,success,"MIXED AND PUMPED 30,5 M3 1.90 S.G. CEMENT. DROPPED DART FOR TOP PLUG. PUMPED 1,5 M3 SPACER USING RIG PUMPS.",1.5 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 17:30:00+00:00,1993-03-18 18:30:00+00:00,4640.0,m,fixed,drilling -- casing,ok,success,"DISPLACED CEMENT WITH 53,7M3 1,40 SG MUD USING RIG PUMPS. PLUG DID NOT BUMP. ROTATED LINER WITH 40 RPM, REDUCED TO 20 RPM TOWARDS END OF DISPLACEMENT. MAX TORQUE WHILE DISPLACING CMT: 24400 NM (18000 FTLBS). NO BACKFLOW.",1.0 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 18:30:00+00:00,1993-03-18 20:00:00+00:00,2906.0,m,fixed,drilling -- casing,ok,success,"RELEASED LINER RUNNING TOOL, NO BACKPRESSURE/BACKFLOW. PULLED OUT OF HOLE FROM 3203M TO 2906M.",1.5 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 20:00:00+00:00,1993-03-18 21:30:00+00:00,2906.0,m,fixed,drilling -- casing,ok,success,CIRCULATED BOTTOMS UP. TRACES OF SPACER IN RETURNS.,1.5 +15_9_19_ST2_1993_03_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-18T00:00:00+01:00,1993-03-19T00:00:00+01:00,1993-03-18 21:30:00+00:00,1993-03-18 23:00:00+00:00,1470.0,m,fixed,drilling -- casing,ok,success,POOH WITH LINER RUNNING TOOL FROM 2906M TO 1470M.,1.5 +15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-18 23:00:00+00:00,1993-03-19 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"POOH WITH LINER RUNNING TOOL FROM 1470M TO SURFACE. LAID DOWN 78 JOINTS OF 5"" DP WHILE POOH.",6.0 +15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-19 05:00:00+00:00,1993-03-19 06:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,LAID DOWN NODECO HANGER RUNNING TOOL AND CEMENT STAND.,1.5 +15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-19 06:30:00+00:00,1993-03-19 14:00:00+00:00,2870.0,m,fixed,drilling -- casing,ok,success,"MADE UP 8 1/2"" BIT AND SCRAPER AND RIH TO 2870.",7.5 +15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-19 14:00:00+00:00,1993-03-19 16:30:00+00:00,3206.0,m,fixed,drilling -- casing,ok,success,"WASHED AND REAMED FROM 2870M TO TOP OF PBR AT 3206M, NO HARD CEMENT.",2.5 +15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-19 16:30:00+00:00,1993-03-19 18:30:00+00:00,3206.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATE BOTTOMS UP, NO TRACES OF CEMENT.",2.0 +15_9_19_ST2_1993_03_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-19T00:00:00+01:00,1993-03-20T00:00:00+01:00,1993-03-19 18:30:00+00:00,1993-03-19 23:00:00+00:00,827.0,m,fixed,drilling -- casing,ok,success,"SLUGGED PIPE AND POOH FROM 3206M TO 827M. LAID DOWN 14 JOINTS OF 5"" DP WHILE POOH.",4.5 +15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-19 23:00:00+00:00,1993-03-20 02:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"CONTINUED POOH FROM 827M TO SURFACE, BROKE BIT AND SCRAPER. LAID DOWN 49 JOINTS 5"" DRILLPIPE WHILE POOH.",3.5 +15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 02:30:00+00:00,1993-03-20 03:30:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"CHANGED TO SLIMHOLE HANDLING EQUIPMENT, PICKED UP 2 JOINTS 4 3/4"" DRILL COLLARS AND MADE UP 6"" BIT AND SCRAPER.",1.0 +15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 03:30:00+00:00,1993-03-20 04:00:00+00:00,0.0,m,fixed,formation evaluation -- rft/fit,ok,success,TESTED LINER LAP TO 70 BAR/10 MIN.,0.5 +15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 04:00:00+00:00,1993-03-20 05:00:00+00:00,90.0,m,fixed,drilling -- casing,ok,success,"CONTINUED MAKING UP 6"" BHA AND PICKED UP 3 1/2"" DRILL PIPE WHILE RIH TO 90M.",1.0 +15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 05:00:00+00:00,1993-03-20 21:00:00+00:00,4270.0,m,fixed,drilling -- casing,ok,success,"PICKED UP 137 JOINTS 3 1/2"" DRILLPIPE, PBR MILL AND TOPDRESS MILL, 9 5/8"" CASING SCRAPER WHILE RUNNING IN HOLE FROM 90M TO 4270M",16.0 +15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 21:00:00+00:00,1993-03-20 21:30:00+00:00,4305.0,m,fixed,drilling -- casing,ok,success,"WORKED AREA FROM 4270M TO 4305M WITH 7"" CASING SCRAPER ROTATING AT 66 RPM WITH 22000 NM TORQUE AND PUMPING WITH 890 LPM AT 54 BAR.",0.5 +15_9_19_ST2_1993_03_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-20T00:00:00+01:00,1993-03-21T00:00:00+01:00,1993-03-20 21:30:00+00:00,1993-03-20 23:00:00+00:00,4523.0,m,fixed,drilling -- casing,ok,success,"WASHED DOWN FROM 4300M AND TAGGED TOP OF CEMENT AT 4523M. WASHING WITH 190 LPM, 110 BAR AND 60 RPM.",1.5 +15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-20 23:00:00+00:00,1993-03-21 00:30:00+00:00,4523.0,m,fixed,drilling -- circulating conditioning,ok,success,"CIRCULATED WELL PRIOR TO DRILLING EXCESS CEMENT IN LINER, DUE TO HIGH CIRCULATION PRESSURES.",1.5 +15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 00:30:00+00:00,1993-03-21 02:00:00+00:00,4529.0,m,fixed,drilling -- casing,ok,success,"DRILLED EXCESS SEMENT IN 7"" LINER FROM 4523M TO 4529M.",1.5 +15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 02:00:00+00:00,1993-03-21 05:00:00+00:00,4529.0,m,fixed,drilling -- drill,fail,operation failed,"FIRST ROUND CIRCULATION ARRIVED AT SURFACE, AND IT WAS SO THICK IT MADE THE SHAKER TRAYS OVERFLOW. CLEANED SHAKERS FROM THICK MUD.",3.0 +15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 05:00:00+00:00,1993-03-21 10:30:00+00:00,4529.0,m,fixed,drilling -- drill,fail,operation failed,FINISHED CLEANING SHAKERS AND FLOW LINE OF THICK MUD.,5.5 +15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 10:30:00+00:00,1993-03-21 13:00:00+00:00,4529.0,m,fixed,drilling -- drill,fail,operation failed,CIRCULATED REMAINDER OF THICK MUD OUT OF WELL UNTIL SURFACE SYSTEMS WERE OPERATING PROPERLY.,2.5 +15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 13:00:00+00:00,1993-03-21 16:30:00+00:00,4588.0,m,fixed,drilling -- casing,ok,success,"DRILLED EXCESS CEMENT IN 7"" LINER FROM 4529M TO 4588M.",3.5 +15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 16:30:00+00:00,1993-03-21 17:30:00+00:00,4607.0,m,fixed,drilling -- drill,fail,operation failed,"DRILLED EXCESS CEMENT IN 7"" LINER FROM 4588M TO 4607M.",1.0 +15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 17:30:00+00:00,1993-03-21 18:00:00+00:00,4607.0,m,fixed,drilling -- casing,ok,success,"TAGGED LINER PBR AT 3207M, (HAD CIRCULATION PRESSURE INCREASE OF 5 BAR AND TORQUE INCREASE OF 7400 - 8900 NM) AND DRESSED OFF TOP OF PBR.",0.5 +15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 18:00:00+00:00,1993-03-21 19:30:00+00:00,4607.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRCULATED WELL CLEAN. TOOK UP/DOWN WEIGHTS AND TORQUE READINGS.,1.5 +15_9_19_ST2_1993_03_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-21T00:00:00+01:00,1993-03-22T00:00:00+01:00,1993-03-21 19:30:00+00:00,1993-03-21 23:00:00+00:00,2241.0,m,fixed,drilling -- casing,ok,success,SLUGGED PIPE AND POOH FROM 4607M TO 2241M.,3.5 +15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-21 23:00:00+00:00,1993-03-22 05:00:00+00:00,0.0,m,fixed,drilling -- casing,ok,success,"CONTINUED POOH FROM 2241M TO SURFACE. LAID DOWN SCRAPERS, PBR MILL, TOPDRESS MILL, JUNK BASKET AND BROKE BIT WHILE POOH. NOTHING IN JUNK BASKET. NB!! FLOAT MISSING ON FLOOR !!NB",6.0 +15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 05:00:00+00:00,1993-03-22 07:00:00+00:00,0.0,m,fixed,formation evaluation -- log,fail,success,"RIGGED UP TO RUN GR/CCL/CBL/VDL, RIGGED DOWN SAME DUE TO DRILL PIPE FLOAT FALLING INTO WELL.",2.0 +15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 07:00:00+00:00,1993-03-22 10:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,CIRCULATED KILL/CHOKE LINES AND CYCLE RAMS ON BOP WHILE PREPARING TO RUN CCL/JUNKBASKET/GAUGERING.,3.5 +15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 10:30:00+00:00,1993-03-22 14:00:00+00:00,1000.0,m,fixed,drilling -- circulating conditioning,fail,success,"RIH WITH CCL/JUNK BASKET/ GAUGERING, EXPERIENCED TOOL FAILURE AT 1000M. POOH AND ATTEMPTED TO LOCATE AND REPAIR FAILURE. RIGGED DOWN ATLAS WIRELINE.",3.5 +15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 14:00:00+00:00,1993-03-22 19:00:00+00:00,2770.0,m,fixed,drilling -- drill,fail,success,"MADE UP PBR AND TOP DRESS MILL (DRESSED WITH TUBE-LOCK ON MILL SURFACES), PICKED UP 3 JOINTS 6 1/2"" DRILL COLLARS AND RIH TO 2770M.",5.0 +15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 19:00:00+00:00,1993-03-22 21:30:00+00:00,2770.0,m,fixed,drilling -- drill,fail,success,"RE-RACKED 3 1/2"" DRILL PIPE IN DERRICK.",2.5 +15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 21:30:00+00:00,1993-03-22 22:00:00+00:00,3207.0,m,fixed,drilling -- drill,fail,success,"CONTINUED RIH AND HAD A SINGLE POINT OF TORQUE INCREASE FROM 5200NM TO 9600NM AT 3205M, BEFORE HITTING LINER TOP AT 3207M. HIT TOP OF LINER AT 3207M, (HAD TORQUE INCREASE FROM 5200NM TO 7400NM) AND DRESSED SAME WITH MAX TORQUE 11000NM.",0.5 +15_9_19_ST2_1993_03_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-22T00:00:00+01:00,1993-03-23T00:00:00+01:00,1993-03-22 22:00:00+00:00,1993-03-22 23:00:00+00:00,3207.0,m,fixed,drilling -- circulating conditioning,fail,success,STARTED CIRCULATING BOTTOMS UP.,1.0 +15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-22 23:00:00+00:00,1993-03-23 00:00:00+00:00,3207.0,m,fixed,drilling -- circulating conditioning,fail,success,FINISHED CIRCULATING BOTTOMS UP.,1.0 +15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 00:00:00+00:00,1993-03-23 05:00:00+00:00,0.0,m,fixed,drilling -- drill,fail,success,"SLUGGED PIPE AND POOH. LAID DOWN 24 JOINTS OF 5"" DRILL PIPE WHILE POOH.",5.0 +15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 05:00:00+00:00,1993-03-23 05:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,"BROKE PBR AND TOP DRESS MILL. TUBELOCK WAS GONE, THIS INDICATES THAT IT WAS ENGAGED WITH TOP OF LINER.",0.5 +15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 05:30:00+00:00,1993-03-23 15:00:00+00:00,4540.0,m,fixed,formation evaluation -- log,ok,success,"LOGGED CBL/VDL/GR/CCL FROM 4540M TO 3150M. RIH AT 07:50 HRS, OOH AT 1600 HRS.",9.5 +15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 15:00:00+00:00,1993-03-23 17:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,TESTED CASING/LINER LAP TO 147 BAR / 15 MIN. WHILE RIGGED DOWN CBL/VDL/GR/CCL AND RIGGED UP TO RUN VSP/GR.,2.5 +15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 17:30:00+00:00,1993-03-23 18:30:00+00:00,1000.0,m,fixed,formation evaluation -- log,ok,success,RIH WITH VSP/GR TO 1000M.,1.0 +15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 18:30:00+00:00,1993-03-23 20:30:00+00:00,1000.0,m,fixed,interruption -- repair,fail,equipment failure,REPAIRED HYDRAULIC LEAK ON ATLAS UNIT.,2.0 +15_9_19_ST2_1993_03_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-23T00:00:00+01:00,1993-03-24T00:00:00+01:00,1993-03-23 20:30:00+00:00,1993-03-23 23:00:00+00:00,3924.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED RIH WITH VSP FROM 1000M TO 3924M.,2.5 +15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-23 23:00:00+00:00,1993-03-24 05:00:00+00:00,4580.0,m,fixed,formation evaluation -- log,ok,success,CONTINUED RIH WITH VSP FROM 3924M TO 4580M. TOOK VSP SHOTS FROM 4580M TO 1294M.,6.0 +15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 05:00:00+00:00,1993-03-24 06:00:00+00:00,1294.0,m,fixed,formation evaluation -- log,ok,success,FINISHED LOGGING VSP LOG AND POOH.,1.0 +15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 06:00:00+00:00,1993-03-24 07:30:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,RIGGED DOWN VSP TOOLS AND RIGGED UP GYRO TOOLS.,1.5 +15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 07:30:00+00:00,1993-03-24 15:30:00+00:00,4540.0,m,fixed,formation evaluation -- log,ok,success,RAN GYRO SURVEY FROM 4540M TO 3503M.,8.0 +15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 15:30:00+00:00,1993-03-24 16:00:00+00:00,0.0,m,fixed,formation evaluation -- log,ok,success,RIGGED DOWN ATLAS WIRELINE.,0.5 +15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 16:00:00+00:00,1993-03-24 17:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,SLIPPED AND CUT 32M DRILL LINE.,1.5 +15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 17:30:00+00:00,1993-03-24 21:30:00+00:00,1000.0,m,fixed,drilling -- circulating conditioning,ok,success,RAN IN HOLE TO 1000M AND SWEPT HOLE WITH: 9M3 LOW REOLOGY PETROFREE MUD FOLLOWED BY 10M3 ESTER AND 50M3 SEAWATER. OBSERVED WELL ON TRIP TANK 30MIN. POOH,4.0 +15_9_19_ST2_1993_03_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-24T00:00:00+01:00,1993-03-25T00:00:00+01:00,1993-03-24 21:30:00+00:00,1993-03-24 23:00:00+00:00,106.0,m,fixed,drilling -- circulating conditioning,ok,success,MADE UP JETSUB AND WASHED RISER AND BOP WHILE RIH TO WELLHEAD. WASHED ACROSS BOP/WELLHEAD AREA SEVERAL TIMES WITH 3500LPM AND 30RPM. FLUSHED DOWN KILL/CHOKE LINES WHILE CYCLED ALL BOP CAVITIES. DISPLACED HOLE UNTIL RETURNS WERE CLEAN.,1.5 +15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-24 23:00:00+00:00,1993-03-25 03:00:00+00:00,106.0,m,fixed,drilling -- circulating conditioning,ok,success,"SWEPT HOLE WITH 5M3 ESTER FOLLOWED BY 5M3 DETERGENT PILL, 15M3 SEAWATER, 5M3 DETERGENT PILL (500LPM) AND SEA WATER (3500LPM/30RPM) UNTIL NTU READINGS WERE THE SAME IN AND OUT (NTU=60). WASHED RISER AGAIN WHILE POOH.",4.0 +15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 03:00:00+00:00,1993-03-25 03:30:00+00:00,0.0,m,fixed,drilling -- drill,fail,equipment failure,"HAD TO CHANGE 3 1/2"" ELEVATORS. THE ELEVATORS THAT WERE MOUNTED DID NOT WORK.",0.5 +15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 03:30:00+00:00,1993-03-25 05:00:00+00:00,173.0,m,fixed,drilling -- drill,fail,operation failed,"STARTED RIH WITH 3 1/2"" DRILLPIPE, COULD NOT FIND A X-OVER NEEDED TO PUT 7"" SCRAPER IN THE MIDDLE OF THE 3 1/2"" DRILL PIPE. POOH. (X-OVER 3 1/2""IF PINN X 4 1/2""FULL-HOLE PINN)",1.5 +15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 05:00:00+00:00,1993-03-25 08:30:00+00:00,1027.0,m,fixed,drilling -- drill,ok,success,"PICKED UP 7"" CASING SCRAPER AND RIH WITH 3 1/2"" DRILL PIPE TO 1072M.",3.5 +15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 08:30:00+00:00,1993-03-25 10:00:00+00:00,1072.0,m,fixed,formation evaluation -- rft/fit,ok,success,TESTED SURFACE LINES AGAINST FAILSAFE TO 345 BAR / 5 MIN. TESTED CASING / LINER LAP AGAINST UPPER PIPE RAM TO 345 BAR / 15 MIN.,1.5 +15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 10:00:00+00:00,1993-03-25 22:00:00+00:00,4572.0,m,fixed,drilling -- drill,ok,success,CONTINUED RIH FROM 1072M TO 4572M. SPACED OUT AND PICKED UP PBR PACKER ON THE WAY IN.,12.0 +15_9_19_ST2_1993_03_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-25T00:00:00+01:00,1993-03-26T00:00:00+01:00,1993-03-25 22:00:00+00:00,1993-03-25 23:00:00+00:00,4572.0,m,fixed,drilling -- drill,ok,success,ESTABLISHED CIRCULATION AND STUNG INTO LINER. SET PBR PACKER AND RELEASED RUNNING TOOL. PULLED OUT 10M AND PAINTED MARKER ON PIPE TO MARK LOWEST RECIPROCATING POINT.,1.0 +15_9_19_ST2_1993_03_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-26T00:00:00+01:00,1993-03-27T00:00:00+01:00,1993-03-25 23:00:00+00:00,1993-03-26 01:00:00+00:00,4562.0,m,fixed,drilling -- drill,ok,success,"PULLED OUT TO 4133M, WORKED AREA FROM 4133M TO 4103M WITH SCRAPER AND RAN BACK IN HOLE TO 4562M. WORKED SCRAPER BY RECIPROCATING AND ROTATING 30 RPM. (TORQUE READINGS: 21000NM WHILE PULLING AND 15000NM WHILE RUNNING IN.)",2.0 +15_9_19_ST2_1993_03_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-26T00:00:00+01:00,1993-03-27T00:00:00+01:00,1993-03-26 01:00:00+00:00,1993-03-26 05:00:00+00:00,4562.0,m,fixed,drilling -- circulating conditioning,ok,success,"SWEPT WELL WITH 15 M3 ESTER, 10 M3 DETERGENT PILL AND SEA WATER BY REVERSE CIRCULATION. (HOLDING BACKPRESSURE ON SURFACE TO MAINTAIN CONSTANT BOTTOM HOLE PRESSURE) PUMPED AT 40 SPM, 175 BAR AND FINAL VALUES WERE 40 SPM 277 BAR.",4.0 +15_9_19_ST2_1993_03_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-26T00:00:00+01:00,1993-03-27T00:00:00+01:00,1993-03-26 05:00:00+00:00,1993-03-26 07:00:00+00:00,4562.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,CONTINUED REV CIRCULATION. FINAL SHUT IN PRESS WHEN STOPPED PUMPING 93 BAR. BLEED OFF PRESS IN STEPS TO TEST LINER/PBR NEGATIVE. OBSERVED WELL ON TRIP TANK FOR 30 MIN.,2.0 +15_9_19_ST2_1993_03_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-26T00:00:00+01:00,1993-03-27T00:00:00+01:00,1993-03-26 07:00:00+00:00,1993-03-26 23:00:00+00:00,4562.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"PERFORMED TORQUE READINGS. PUMPED 10 M3 DETERGENT PILL FOLLOWED BY 15 M3 SEA WATER, REPEATED OPERATION THREE TIMES. CONT PUMPING 10 M3 FLOCCULANT PILL FOLLOWED BY SEAWATER. FINAL NTU READING 90 NTU. PUMPED 6 M3 SW, 6 M3 DETERGENT PILL FOLLOWED BE SW. ALL PILLS IN RETURN WERE ROUTED BACK TO SLOP PIT. FINAL NTU READING 80 NTU.",16.0 +15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-26 23:00:00+00:00,1993-03-27 00:30:00+00:00,4262.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"PUMPED 4,5 M3 1,36 SG CACL2 BRINE, DISPLACED SAME WITH 30.9 M3 SEA WATER TO PLACE THE BALANCED BRINE PILL.",1.5 +15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-27 00:30:00+00:00,1993-03-27 05:00:00+00:00,4340.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"POOH FROM 4562 TO 4340 M. DISPLACED WELL TO 1,15 SG NACL BRINE. LOST APPROX 65 M3 1,15 SG BRINE TO SEA DUE TO OPEN DRAIN VALVE IN CMT UNIT. NTU READING ON NACL IN RETURN: 52 NTU.",4.5 +15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-27 05:00:00+00:00,1993-03-27 06:30:00+00:00,4340.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"CONT DISPLACING WELL TO 1,15 SG NACL BRINE. FINAL NTU READING 52 NTU. PERFORMED TORQUE READINGS AFTER WELL DISPLACED TO BRINE.",1.5 +15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-27 06:30:00+00:00,1993-03-27 07:30:00+00:00,4340.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESS TESTED TIE-BACK PACKER/CASING TO 345 BAR/15 MIN,1.0 +15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-27 07:30:00+00:00,1993-03-27 16:30:00+00:00,0.0,m,fixed,drilling -- drill,ok,success,PUMPED 3 M3 CACL2 BRINE SLUG AND POOH.,9.0 +15_9_19_ST2_1993_03_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-27T00:00:00+01:00,1993-03-28T00:00:00+01:00,1993-03-27 16:30:00+00:00,1993-03-27 23:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,success,"RIH TO TEST BOP, TEST PLUG LEAKED. POOH AND CHANGED SEAL, RIH AND ATTEMPTED TO TEST BOP, PLUG LEAKED. POOH AND SET PLUG (SPRING LOADED TOOL) TO RETRIEVE WEAR BUSHING. RIH AND LANDED IN WB WITH 10 MT DOWN- WEIGHT. CLOSED MPR AND PRESS TESTED BOP 35 BAR/345 BAR, ANNULAR BAGS PRESS TESTED 35 BAR/240 BAR",6.5 +15_9_19_ST2_1993_03_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-28T00:00:00+01:00,1993-03-29T00:00:00+02:00,1993-03-27 23:00:00+00:00,1993-03-28 02:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,success,"CONT PRESS TESTING BOP. OPENED MPR AND POOH WITH TEST PLUG. CLOSED SHEAR RAM WITH ACCOUSTIC FROM BRIDGE, NO INDICATION ON PANEL, CHECKED FLUID COUNTER IN KOOMEY UNIT, INDICATED CLOSED RAM.",3.0 +15_9_19_ST2_1993_03_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-28T00:00:00+01:00,1993-03-29T00:00:00+02:00,1993-03-28 02:00:00+00:00,1993-03-28 04:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,CLEANED MUD PITS AND ALL LINES TO PREPARE FOR COMPLETION FLUID. CLEANED DERRICK AND RIG FLOOR. PRESS TESTED K/C MANIFOLD WHILE CLEANING RIG.,2.0 +15_9_19_ST2_1993_03_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-28T00:00:00+01:00,1993-03-29T00:00:00+02:00,1993-03-28 04:00:00+00:00,1993-03-28 22:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,"CONTINUED CLEANING UNDERNEATH RIGFLOOR, PITS AND ALL LINES TO PREPARE FOR COMPLETION FLUID. OPENED UP PLUGGED DRAINS. WHILE CLEANING PRESS TESTED RIG CHOKE MANIFOLD, STAND PIPE TO 35 BAR 5 MIN AND 345 BAR/10 MIN.",18.0 +15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-28 22:00:00+00:00,1993-03-29 02:30:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,CONTINUED CLEANING RIG FLOOR AND PITS.,4.5 +15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-29 02:30:00+00:00,1993-03-29 04:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"M/U DUMMY FLUTED HANGER TO X-OVERS, L/D ON DECK. M/U SSTT TO X-OVERS AND PUP JOINTS.",1.5 +15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-29 04:00:00+00:00,1993-03-29 07:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONTINUED M/U SSTT AND LUBRICATOR VALVE TO X-OVERS/PUP JOINTS,3.0 +15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-29 07:00:00+00:00,1993-03-29 08:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,success,CLEANED RIG FLOOR. HELD MEETING ON RIG FLOOR WITH PERSONEL INVOLVED IN BHA RUNNING OPERATION. PREPARED TO RUN TCP GUNS.,1.0 +15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-29 08:00:00+00:00,1993-03-29 21:00:00+00:00,425.0,m,fixed,formation evaluation -- rig up/down,ok,success,"PREPARE TO RUN TCP GUNS. RIH WITH TCP ASSEMBLIES AND LPR-N VALVE, PRESS TESTED STRING TO 200 BAR/15 MIN, CONT RIH WITH TEST STRING BHA AND ONE 4 1/2"" PH6 TUBING JNT. PRESS TESTED BHA TO 345 BAR/15 MIN.",13.0 +15_9_19_ST2_1993_03_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-29T00:00:00+02:00,1993-03-30T00:00:00+02:00,1993-03-29 21:00:00+00:00,1993-03-29 22:00:00+00:00,550.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT RIH WITH 4 1/2"" PH6 TUBING TO 550 M. FILLED STRING COMPLETLY WITH 1,15 SG BRINE EVERY 10 SINGLES",1.0 +15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-29 22:00:00+00:00,1993-03-30 04:00:00+00:00,1401.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT RIH WITH TEST TUBING FROM 550 TO 1401 M,6.0 +15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-30 04:00:00+00:00,1993-03-30 13:00:00+00:00,3055.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT RIH WITH 4 1/2"" PH-6 TEST TUBING FROM 1501 TO 3055 M. FILLED STRING WITH 1,15 SG BRINE",9.0 +15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-30 13:00:00+00:00,1993-03-30 15:30:00+00:00,3055.0,m,fixed,formation evaluation -- rig up/down,ok,success,"P/U FLOWHEAD AND M/U TO ONE SINGLE 4 1/2"" PH-4 TUBING, L/D SAME",2.5 +15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-30 15:30:00+00:00,1993-03-30 16:30:00+00:00,3097.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT RIH WITH 4 1/2"" PH4 TEST TUBING FROM 3055 TO 3097 M",1.0 +15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-30 16:30:00+00:00,1993-03-30 17:30:00+00:00,3097.0,m,fixed,interruption -- wait,ok,success,INSTALLED X-OVER ON TEST STANDPIPE,1.0 +15_9_19_ST2_1993_03_31.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-30T00:00:00+02:00,1993-03-31T00:00:00+02:00,1993-03-30 17:30:00+00:00,1993-03-30 22:00:00+00:00,3751.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT RIH WITH 4 1/2"" PH-4 TEST TUBING FROM 3097 TO 3751 M",4.5 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-30 22:00:00+00:00,1993-03-31 01:30:00+00:00,4231.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT RIH WITH TEST TUBING FROM 3097 TO 4231 M,3.5 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 01:30:00+00:00,1993-03-31 02:30:00+00:00,4231.0,m,fixed,formation evaluation -- drill stem test,ok,success,"M/U X-OVER ON TEST TUBING, PRESS TEST TEST TUBING TO 350 BAR/10 MIN",1.0 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 02:30:00+00:00,1993-03-31 04:00:00+00:00,4312.0,m,fixed,formation evaluation -- rig up/down,ok,success,"M/U BACK-UP FLUTED HANGER AND RIH WITH TEST STRING ON 5"" DP.",1.5 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 04:00:00+00:00,1993-03-31 05:30:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT RIH WITH TEST TUBING AND BACK-UP FLUTED HANGER, LANDED HANGER IN WELLHEAD",1.5 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 05:30:00+00:00,1993-03-31 06:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,R/U ATLAS WIRELINE EQUIP FOR RUNNING GR/CCL LOGS,0.5 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 06:00:00+00:00,1993-03-31 07:30:00+00:00,4338.0,m,wire line,workover -- wire line,ok,operation failed,"RIG WITH GR/CCL LOGS TO 2000 M, POOH TO CHANGE TOOL OD FROM 2 1/8"" TO 1 11/16""",1.5 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 07:30:00+00:00,1993-03-31 11:00:00+00:00,4338.0,m,wire line,workover -- wire line,ok,success,"RIH WITH GR/CCL LOGS FOR TUBING CORRELATION, CORRELATED AGAINST RADIOACTIVE MARKER IN LINER, POOH WITH LOGGING TOOLS. R/D AWS WIRELINE EQUIPMENT",3.5 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 11:00:00+00:00,1993-03-31 12:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CLOSED MPR 0N SSTT SLICK JOINT TO CHECK SPACEOUT, POOH WITH BACK-UP FLUTED HANGER. L/D DP LANDING STRING.",1.0 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 12:00:00+00:00,1993-03-31 12:30:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U SSTT/LUB VALVE CONTROL PANEL/HOSE REEL. P/U GLYCOL INJECTION UNIT.,0.5 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 12:30:00+00:00,1993-03-31 16:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,"SPACED OUT STRING WITH PUP JOINTS , M/U SSTT TO TEST STRING. H/U CONTROL HOSES AND FUNCTION TESTED SSTT. RIH WITH SSTT ON LANDING STRING, M/U LUBRICATOR VALVE TO TEST STRING, H/U CONTROL LINES AND FUNCTION TESTED.",3.5 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 16:00:00+00:00,1993-03-31 17:00:00+00:00,4324.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,PRESS TESTED DOWN TEST TUBING AGAINST LPR-N VALVE TO 350 BAR - NEG.,1.0 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 17:00:00+00:00,1993-03-31 19:30:00+00:00,4324.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESS TESTED SURFACE EQUIPMENT 350 BAR.,2.5 +15_9_19_ST2_1993_04_01.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-03-31T00:00:00+02:00,1993-04-01T00:00:00+02:00,1993-03-31 19:30:00+00:00,1993-03-31 22:00:00+00:00,4310.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,"PULLED LUBRICATOR VALVE ABOVE ROTARY. PRESS TESTED TEST STRING 350 BAR PRESS DROPPED 5 BAR IN 17 MIN. BLEED OFF PRESSURE TO 250 BAR, PRESS DROPPED 20 BAR IN 1 HR.",2.5 +15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-03-31 22:00:00+00:00,1993-04-01 01:00:00+00:00,4310.0,m,fixed,formation evaluation -- rig up/down,ok,success,L/D FLOWHEAD WITH COFLEXIP HOSE ON DECK. CHANGED OUT BAILS. L/D LUBRICATOR VALVE AND POOH WITH 3 STANDS TUBING,3.0 +15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 01:00:00+00:00,1993-04-01 03:00:00+00:00,4220.0,m,fixed,formation evaluation -- rig up/down,ok,success,"PULLED SSTT ABOVE ROTARY AND PRESS TESTED STRING AGAINST LPR VALVE TO 350 BAR, PRESS DROPPED 8 BAR IN 17 MIN",2.0 +15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 03:00:00+00:00,1993-04-01 04:00:00+00:00,4200.0,m,fixed,formation evaluation -- rig up/down,ok,success,L/D SSTT AND PUP JOINTS. PRESS TESTED TUBING 350 BAR,1.0 +15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 04:00:00+00:00,1993-04-01 05:00:00+00:00,4200.0,m,fixed,formation evaluation -- rig up/down,ok,success,PRESS TESTED TUBING AGAINST LPR-N VALVE TO 350 BAR/15 MIN,1.0 +15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 05:00:00+00:00,1993-04-01 08:30:00+00:00,4220.0,m,fixed,formation evaluation -- rig up/down,ok,success,SERVICE BROKE SSTT AND L/D SAME. P/U BACK-UP SSTT AND M/U TO TEST STRING. H/U CONTROL LINES AND FUNCTION TESTED SSTT. PRESS TESTED STRING AGAINST LPR-N TO 350 BAR/20 MIN.,3.5 +15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 08:30:00+00:00,1993-04-01 10:00:00+00:00,4260.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"RIH WITH LANDING STRING TO 4260 M, LOST PRESS ON SSTT CONTROL LINE. POOH AND FOUND LEAK ON SSTT, L/D SAME.",1.5 +15_9_19_ST2_1993_04_02.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-01T00:00:00+02:00,1993-04-02T00:00:00+02:00,1993-04-01 10:00:00+00:00,1993-04-01 22:00:00+00:00,4200.0,m,fixed,interruption -- repair,ok,operation failed,"HRS WORKED ON REPAIRING LEAKING SSTT`S RECEIVED NEW SSTT WITH HELICOPTER, PRESS TESTED SAME ON DECK PRIOR TO P/U ON DRILL FLOOR",12.0 +15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-01 22:00:00+00:00,1993-04-02 03:00:00+00:00,4200.0,m,fixed,interruption -- repair,ok,operation failed,PRESS TESTED NEW SSTT BODY AND BELOW BALL/FLAPPER 350 BAR/10 MIN HAD PROBLEMS WITH LEAKING HOSES AND NEEDLE VALVES.,5.0 +15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 03:00:00+00:00,1993-04-02 04:00:00+00:00,4200.0,m,fixed,formation evaluation -- rig up/down,ok,success,"R/U NEW SSTT AND CONTROL MANIFOLD. M/U CONNECTIONS AND PUP JNTS/X-OVER ON SSTT, H/U CONTROL LINES AND FUNCTION TESTED TREE.",1.0 +15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 04:00:00+00:00,1993-04-02 05:30:00+00:00,4200.0,m,fixed,interruption -- repair,ok,operation failed,CONT FUNCTION TESTED NEW SSTT. REPLACED SSTT CONTROL MANIFOLD DUE TO PROBLEMS WITH HYDRAULIC PUMPS.,1.5 +15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 05:30:00+00:00,1993-04-02 07:00:00+00:00,4200.0,m,fixed,interruption -- repair,ok,operation failed,"PRESS TESTED SSTT/TUBING - NEG, VOL INCREASED AT TRIP TANK. PULLED SSTT ABOVE ROTARY TO CHECK FOR LEAKS, PRESS TESTED SSTT/TUBING - NEG, NO LEAK OBSERVED AT SURFACE, OBSERVED VOLUME INCREASED IN TRIP TANK L/D SSTT ON DECK",1.5 +15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 07:00:00+00:00,1993-04-02 08:00:00+00:00,4200.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,"PRESS TESTED TUBING - NEG, OBSERVED VOL INCREASE ON TRIP TANK",1.0 +15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 08:00:00+00:00,1993-04-02 09:30:00+00:00,4200.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,L/D LUBRICATOR VALVE/SSTT FLUTED HANGER. R/D SSTT HOSE REEL AND PUMPING MANIFOLD,1.5 +15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 09:30:00+00:00,1993-04-02 19:00:00+00:00,430.0,m,fixed,formation evaluation -- rig up/down,ok,success,"POOH WITH 4 1/2"" TEST STRING DUE TO LEAK, RACKED BACK IN DERRICK",9.5 +15_9_19_ST2_1993_04_03.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-02T00:00:00+02:00,1993-04-03T00:00:00+02:00,1993-04-02 19:00:00+00:00,1993-04-02 22:00:00+00:00,210.0,m,fixed,formation evaluation -- rig up/down,ok,success,"POOH WITH BHA, FOUND LEAK IN HRS RD SAFETY CIRC VALVE.",3.0 +15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-02 22:00:00+00:00,1993-04-03 03:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT POOH WITH BHA AND PERFORATION GUNS,5.0 +15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 03:00:00+00:00,1993-04-03 04:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,BROKE OFF X-OVERS AND PUP JOINTS FROM HRS SSTT AND LUBRICATOR VALVE,1.0 +15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 04:00:00+00:00,1993-04-03 05:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,CONT SERVICE BREAK LUBRICATOR VALVE AND SSTT WITH FLUTED HANGER,1.5 +15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 05:30:00+00:00,1993-04-03 09:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,PREPARED BSC PERFORATION GUNS TO BE RUN IN HOLE,3.5 +15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 09:00:00+00:00,1993-04-03 12:30:00+00:00,217.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,RIH WITH PERF GUNS AND LPR-N ASSY,3.5 +15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 12:30:00+00:00,1993-04-03 16:00:00+00:00,217.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,"PRESS TESTED BHA BELOW LPR-N VALVE AGAINST BLIND PLUG TO 200 BAR - NEG FOUND LEAK ON X-OVER ABOVE BLANKING PLUG, REPAIRED SAME. PRESS TESTED AGAINST BLIND PLUG 200 BAR/15 MIN",3.5 +15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 16:00:00+00:00,1993-04-03 19:30:00+00:00,448.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"RIH WITH BHA, FILLED BHA ABOVE LPR-N VALVE WITH 250 LTR VISC PILL",3.5 +15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 19:30:00+00:00,1993-04-03 20:00:00+00:00,448.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,PRESS TESTED BHA AGAINST LPR-N VALVE 350 BAR,0.5 +15_9_19_ST2_1993_04_04.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-03T00:00:00+02:00,1993-04-04T00:00:00+02:00,1993-04-03 20:00:00+00:00,1993-04-03 22:00:00+00:00,1044.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"RIH WITH 4 1/2"" TEST TUBING TO 1044 M",2.0 +15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-03 22:00:00+00:00,1993-04-04 04:00:00+00:00,2972.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"CONT RIH WITH TEST TUBING FROM 1044 TO 2972 M FILLED STRING WITH 1,15 SG BRINE",6.0 +15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 04:00:00+00:00,1993-04-04 05:00:00+00:00,2972.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,PRESS TESTED TUBING 350 BAR/15 MIN,1.0 +15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 05:00:00+00:00,1993-04-04 06:30:00+00:00,3030.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"RIH WITH 1 STD 4 1/2"" PH-4 TUBING. P/U FLOWHEAD AND M/U ONE SINGLE TUBING BELOW, L/D SAME",1.5 +15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 06:30:00+00:00,1993-04-04 10:30:00+00:00,3227.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"CONT RIH WITH 4 1/2"" PH-4 TEST TUBING TO 3199 M RTTS PACKER DEPTH. TOOK 20 MT WEIGHT, WORKED STRING FREE. RIH, TOOK 10 MT WEIGHT AT 3208 AND 3216 M. WORKED STRING OUT, NOT ABLE TO PASS 3205 M, ATTEMPTED TO PULL STRING FREE WITH MAX 40 MT O/P, WORKED STRING DOWN AND CAME FREE WITH 25 MT D/W. RESIPROCATED STRING BETWEEN 3205 AND 3227 M.",4.0 +15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 10:30:00+00:00,1993-04-04 14:00:00+00:00,4230.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,CONT RIH WITH TUBING TO 4230 M,3.5 +15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 14:00:00+00:00,1993-04-04 15:00:00+00:00,4230.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,PRESS TESTED TUBING TO 350 BAR/15 MIN,1.0 +15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 15:00:00+00:00,1993-04-04 16:00:00+00:00,4230.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"SPACED OUT STRING, P/U EZ-TREE WITH FLUTED HANGER AND M/U TO TUBING",1.0 +15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 16:00:00+00:00,1993-04-04 18:00:00+00:00,4230.0,m,fixed,formation evaluation -- drill stem test,ok,operation failed,"R/U EZ-TREE CONTROL MANIFOLDS AND HOSE REEL. FUNCTION TESTED EZ-TREE. PRESS TESTED TUBING/EZ-TREE 350 BAR, BLEED OFF PRESS TO 250 BAR AND TESTED EZ-TREE FROM BELOW.",2.0 +15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 18:00:00+00:00,1993-04-04 21:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,"RIH WITH TUBING LANDING STRING, P/U LUBRICATOR VALVE AND M/U TO STRING CHANGED TO LONG BAILS AND R/U ATLAS SHEEVE IN TDS. M/U ONE SINGLE TUBING AND LANDED TUBING STRING IN WELLHEAD.",3.0 +15_9_19_ST2_1993_04_05.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-04T00:00:00+02:00,1993-04-05T00:00:00+02:00,1993-04-04 21:00:00+00:00,1993-04-04 22:00:00+00:00,4338.0,m,wire line,workover -- wire line,ok,success,R/U ATLAS WIRELINE GR/CCL LOGGING TOOLS AND RIH FOR TUBING CORRELATION,1.0 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-04 22:00:00+00:00,1993-04-05 00:00:00+00:00,4338.0,m,wire line,workover -- wire line,ok,success,CONT CORRELATION TUBING WITH GR/CCL LOG. POOH AND R/D ATLAS WIRELINE EQUIPMENT,2.0 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 00:00:00+00:00,1993-04-05 01:30:00+00:00,4338.0,m,fixed,formation evaluation -- drill stem test,ok,success,"PRESS TESTED TUBING/LUB VALVE TO 350 BAR, BLEED OFF PRESS TO 250 BAR, CLOSED LUBRICATOR VALVE AND TESTED FROM BELOW. PRESS TESTED LUBRICATOR VALVE FROM ABOVE TO 350 BAR",1.5 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 01:30:00+00:00,1993-04-05 04:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,POOH AND L/D ONE SINGLE TUBING. P/U FLOWHEAD AND M/U TO TUBING. R/U COFLEXIP HOSES AND CONTROL EQUIPMENT,2.5 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 04:00:00+00:00,1993-04-05 05:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,success,M/U FLOWHEAD KILL AND PRODUCTION COFLEXIP HOSES. R/U SURFACE CONTROL EQUIPMENT,1.0 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 05:00:00+00:00,1993-04-05 09:00:00+00:00,4338.0,m,fixed,formation evaluation -- drill stem test,ok,success,"PRESS TESTED KILL LINE AGAINST FLOWHEAD KILL VALVE 350 BAR. PRESS TEST FLOWHEAD AGAINST CLOSED LUBRICATOR VALVE 350 BAR, CLOSED AND PRESS TESTED MASTER VALVE WITH 350 BAR BELOW AND 35 BAR ABOVE. FLUSHED LINES TO BURNERS AND PRESS TESTED 350 BAR AGAINST CHOKE MANIFOLD. PRESS TEST KILL VALVE FROM WELL SIDE TO 350 BAR.",4.0 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 09:00:00+00:00,1993-04-05 14:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"ATTEMPTED TO SET RTTS PACKER SEVERAL TIMES, NO WEIGHT INDICATION OF PACKER SETTING",5.0 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 14:00:00+00:00,1993-04-05 15:00:00+00:00,4338.0,m,fixed,formation evaluation -- drill stem test,ok,success,"PRESS UP ANNULUS TO 110 BAR, LPR-N OPENED AT 50 BAR. HAD FULL COMMUNICATION BETWEEN ANNULUS AND TUBING.",1.0 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 15:00:00+00:00,1993-04-05 16:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,PULLED OUT 8 M AND ATTEMPTED TO SET RTTS PACKER - NEG.,1.0 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 16:00:00+00:00,1993-04-05 19:00:00+00:00,4338.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,R/D COFLEXIP HOSES AND L/D FLOWHEAD. CHANGED BAILS AND L/D LUBRICATOR VALVE,3.0 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 19:00:00+00:00,1993-04-05 21:00:00+00:00,4230.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,POOH WITH LANDING STRING. L/D EZ-TREE AND PUP JOINTS. R/D EZ-TREE CONTROL EQUIP AND CLEANED RIG FLOOR,2.0 +15_9_19_ST2_1993_04_06.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-05T00:00:00+02:00,1993-04-06T00:00:00+02:00,1993-04-05 21:00:00+00:00,1993-04-05 22:00:00+00:00,4170.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"POOH WITH 4 1/2"" TEST TUBING DUE TO PROBLEMS SETTING RTTS PACKER. PULLED SLOW DUE TO PROBLEMS WITH STRING HANGING UP FROM 4230 M. WORKED PIPE FREE.",1.0 +15_9_19_ST2_1993_04_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-06T00:00:00+02:00,1993-04-07T00:00:00+02:00,1993-04-05 22:00:00+00:00,1993-04-06 04:00:00+00:00,3100.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"CONT POOH WITH TEST TUBING, HAD PROBLEMS WITH STRING HANGING UP FROM 4170 TO 3900 M, WORKED PIPE UP AND DOWN SEVERAL TIMES TO FREE PIPE. MAX OVERPULL 25 MT, NO INDICATION OF STRING TAKING DOWNWEIGHT.",6.0 +15_9_19_ST2_1993_04_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-06T00:00:00+02:00,1993-04-07T00:00:00+02:00,1993-04-06 04:00:00+00:00,1993-04-06 10:00:00+00:00,448.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"CONT POOH WITH 4 1/2"" TEST TUBING FROM 3100 TO 448 M.",6.0 +15_9_19_ST2_1993_04_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-06T00:00:00+02:00,1993-04-07T00:00:00+02:00,1993-04-06 10:00:00+00:00,1993-04-06 17:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"POOH WITH BHA, L/D HRS TOOLS AND TCP GUNS. FOUND 6 EA SLIPS, 3 EA LOCKING SEGMENTS AND 3 EA BOLTS MISSING FROM HRS RTTS RETRIVEABLE PACKER. FUL-FLO BYPASS VALVE WAS BELLED OUT AND CRACKED.",7.5 +15_9_19_ST2_1993_04_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-06T00:00:00+02:00,1993-04-07T00:00:00+02:00,1993-04-06 17:30:00+00:00,1993-04-06 21:00:00+00:00,0.0,m,fixed,interruption -- wait,ok,operation failed,WAITED ON ATLAS WIRELINE TO ARRIVE ONBOARD WITH HELICOPTER. WHILE WAITING SERVICED TDS AND CLEANED RIG FLOOR.,3.5 +15_9_19_ST2_1993_04_07.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-06T00:00:00+02:00,1993-04-07T00:00:00+02:00,1993-04-06 21:00:00+00:00,1993-04-06 22:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,operation failed,"R/U ATLAS WIRELINE EQUIPMENT, PREPARED TOOLS FOR RUNNING MAGNET.",1.0 +15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-06 22:00:00+00:00,1993-04-07 01:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"RIH WITH 6,75"" ELECTRO-MAGNET FISHING TOOL ON ATLAS WIRELINE RUN Æ1 TO TOP LINER PBR AT 3191 M, SLACKED OFF 3 M CABLE. ACTIVATED MAGNET 30 M ABOVE LINER PBR POOH WITH MAGNET, RECOVERED 1 EA SEGMENT, 1 EA SLIPS FROM RTTS PACKER, AND 1 EA CUP IRON JUNK.",3.5 +15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 01:30:00+00:00,1993-04-07 04:00:00+00:00,300.0,m,fixed,interruption -- fish,ok,operation failed,"RIH WITH 6,75"" ELECTRO-MAGNET FISHING TOOL WITH ATLAS WIRELINE RUN Æ2 TO 3191, SLACKED OFF 3M CABLE AND POOH TO 300 M.",2.5 +15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 04:00:00+00:00,1993-04-07 04:30:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"CONT POOH WITH 6,75"" ELECTRO-MAGNET FISHING TOOL ON ATLAS WIRELINE RUN Æ2, RECOVERED 1 EA BOLT AND HALF CUP IRON JUNK.",0.5 +15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 04:30:00+00:00,1993-04-07 08:00:00+00:00,0.0,m,fixed,interruption -- fish,ok,operation failed,"RIH WITH ELECTRO-MAGNET ON ATLAS WIRELINE RUN Æ3 TO 2191 M, POOH RECOVERED 1/2 CUP IRON JUNK. R/D ATLAS WIRELINE EQUIP",3.5 +15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 08:00:00+00:00,1993-04-07 10:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"PREPARED TO RUN MILL FOR LINER PBR ASSY, P/U BHA ASSY.",2.0 +15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 10:00:00+00:00,1993-04-07 18:00:00+00:00,3160.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"RIH WITH 4 1/2"" TUBING AND 5"" DRILLPIPE TO 3160 M",8.0 +15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 18:00:00+00:00,1993-04-07 19:30:00+00:00,3191.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"WASHED DOWN FROM 3160 TO TOP LINER TIE-BACK PACKER PBR AT 3191, CLEANED TOP PBR, ENTERED PBR 1 M AND PULLED OUT ABOVE PBR, REPEATED OPERATION IN 1 M STEPS DOWN TO 3197 M, TOOK WEIGHT AND POLISHED TOP PBR. ROTATED PIPE 30 RPM AND PUMPED WITH 1600 L/MIN DURING WHOLE OPERATION.",1.5 +15_9_19_ST2_1993_04_08.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-07T00:00:00+02:00,1993-04-08T00:00:00+02:00,1993-04-07 19:30:00+00:00,1993-04-07 22:00:00+00:00,1377.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,POOH WITH TUBING/DP TO 1377 M,2.5 +15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-07 22:00:00+00:00,1993-04-08 02:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,CONT POOH WITH PBR MILL FROM 1377 M,4.0 +15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 02:00:00+00:00,1993-04-08 03:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"P/U AND BREAK OFF ONE SINGLE TUBING BELOW HRS FLOWHEAD, L/D SAME",1.0 +15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 03:00:00+00:00,1993-04-08 04:00:00+00:00,154.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"M/U BHA WITH 6"" MILL AND RIH TO 154 M",1.0 +15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 04:00:00+00:00,1993-04-08 09:30:00+00:00,2200.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"CONT RIH WITH 6"" MILL FROM 154 TO 2200 M",5.5 +15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 09:30:00+00:00,1993-04-08 10:30:00+00:00,2200.0,m,fixed,drilling -- drill,ok,operation failed,CUT AND SLIPPED DRILL LINE,1.0 +15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 10:30:00+00:00,1993-04-08 14:30:00+00:00,4500.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,CONT RIH FROM 2200 TO 4500 M WASHED LINER PBR/HANGER AREA FROM 3188 TO 3205 M,4.0 +15_9_19_ST2_1993_04_09.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-08T00:00:00+02:00,1993-04-09T00:00:00+02:00,1993-04-08 14:30:00+00:00,1993-04-08 22:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,operation failed,"POOH WITH 6"" MILL",7.5 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-08 22:00:00+00:00,1993-04-09 01:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,operation failed,"M/U BOP TEST TOOL AND RIH. PRESS TESTED BOP - NEG. POOH WITH TEST TOOL CHANGED SEAL ON TEST TOOL, M/U JET TOOL AND RIH WITH JET TOOL SUB AND BOP TEST TOOL. WASHED WELLHEAD AND LANDED TEST TOOL IN WELLHEAD.",3.0 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 01:00:00+00:00,1993-04-09 03:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,operation failed,"PRESS TESTED BOP AGAINST TEST PLUG 345 BAR, DROPPED 5 BAR/5 MIN, BRINE LEAKING OUT OF DP. BLEED OFF PRESS AND PULLED TEST TOOL ABOVE BOP, GAINED 1 M3 BRINE ON TRIP TANK. FLOWCHECKED - WELL STABLE.",2.5 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 03:30:00+00:00,1993-04-09 04:00:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,operation failed,LANDED TEST TOOL IN WELLHEAD AND PRESS TESTED BOP MPR 345 BAR,0.5 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 04:00:00+00:00,1993-04-09 06:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,operation failed,CONTINUED PRESSURE TESTING BOP.,2.0 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 06:00:00+00:00,1993-04-09 09:30:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,operation failed,KILL HOSE BURSTED. CONTINUED BOP-TESTING DOWN CHOKE LINE. TESTED ACOUSTIC SYSTEM AND FUNCTION TESTED BOP ON BLUE POD.,3.5 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 09:30:00+00:00,1993-04-09 13:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,INSTALLED NEW KILL HOSE. PRESSURE TESTED SAME TO 345 BAR/15 MINS.,4.0 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 13:30:00+00:00,1993-04-09 14:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,operation failed,"CLOSED UAP. LIFTED TEST TOOL FROM WELLHEAD AND OBSERVED FOR ANY PRESSURE BUILD-UP, NEGATIVE.",0.5 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 14:00:00+00:00,1993-04-09 14:30:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,operation failed,"OPENED UAP. OBSERVED WELL FLOWING, GAINED 1,1 M3. CIRCULATED BOTTOMS UP, MAX GAS 0,49%. POOH WITH SPRING LOADED TOOL.",0.5 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 14:30:00+00:00,1993-04-09 16:00:00+00:00,104.0,m,fixed,interruption -- repair,fail,operation failed,"RIH TO RETRIEVE WEAR BUSHING. ENGAGED WEAR BUSHING. POOH, LEFT WEAR BUSHING IN WELLHEAD. REPEATED ATTEMPT TO RETRIEVE WEAR BUSHING, NEGATIVE.",1.5 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 16:00:00+00:00,1993-04-09 17:30:00+00:00,104.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,MADE UP JET TOOL. RIH AND WASHED WELLHEAD. POOH. RIH WITH SPRING LOADED TOOL AND RETRIEVED WEAR BUSHING. POOH.,1.5 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 17:30:00+00:00,1993-04-09 19:00:00+00:00,104.0,m,fixed,interruption -- repair,fail,equipment failure,"FLUSHED SURFACE LINES. ATTEMPTED TESTING SHEAR RAM AGAINST CASING/SEAL ASSEMBLY, NEGATIVE. TESTED SURFACE LINES AGAINST FAIL SAFE TO 345 BAR OK. OPERATED SHEAR RAM, CHANGED TO YELLOW POD AND ATTEMPTED TESTING SHEAR RAM, NEGATIVE. SHEAR RAM LEAKING. PUMPED VOLUME IN RETURN TO TRIP TANK.",1.5 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 19:00:00+00:00,1993-04-09 21:00:00+00:00,104.0,m,fixed,drilling -- bop activities,ok,equipment failure,"RIH WITH JET TOOL. WASHED SHEAR RAM AREA. CLOSED UPR AND PRESSURE TESTED CASING/SEAL ASSEMBLY AGAINST UPR TO 345 BAR/30 MINS, OK.",2.0 +15_9_19_ST2_1993_04_10.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-09T00:00:00+02:00,1993-04-10T00:00:00+02:00,1993-04-09 21:00:00+00:00,1993-04-09 22:00:00+00:00,104.0,m,fixed,interruption -- repair,fail,equipment failure,"POOH. CLOSED SHEAR RAM. ATTEMPTED PRESSURE TESTING SHEAR RAM, NEG.",1.0 +15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-09 22:00:00+00:00,1993-04-09 22:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"DISPLACED RISER TO SEA WATER. OBSERVED WELL, WELL STATIC.",0.5 +15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-09 22:30:00+00:00,1993-04-10 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,PREPARED TO PULL BOP.,5.5 +15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-10 04:00:00+00:00,1993-04-10 07:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,P/U LANDING JOINT AND CONTINUED PREPARATIONS TO PULL BOP. DISCONNECTED AT 08:45 HRS. DE-BALLASTED RIG 3M.,3.0 +15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-10 07:00:00+00:00,1993-04-10 08:00:00+00:00,0.0,m,fixed,moving -- position,ok,equipment failure,MOVED RIG 25M STARBOARD,1.0 +15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-10 08:00:00+00:00,1993-04-10 12:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,DISCONNECTED KILL- AND CHOKE HOSES AND RUCKER LINES. PULLED BOP TO 33M.,4.5 +15_9_19_ST2_1993_04_11.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-10T00:00:00+02:00,1993-04-11T00:00:00+02:00,1993-04-10 12:30:00+00:00,1993-04-10 22:00:00+00:00,33.0,m,fixed,interruption -- waiting on weather,ok,equipment failure,WAITED ON WEATHER TO PULL BOP THROUGH SPLASH ZONE.,9.5 +15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-10 22:00:00+00:00,1993-04-11 00:30:00+00:00,33.0,m,fixed,interruption -- waiting on weather,ok,equipment failure,CONT. W.O.W.,2.5 +15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 00:30:00+00:00,1993-04-11 01:00:00+00:00,29.0,m,fixed,interruption -- repair,ok,equipment failure,"PULLED BOP TO 29M, L/D RISER PUP JOINT.",0.5 +15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 01:00:00+00:00,1993-04-11 03:00:00+00:00,29.0,m,fixed,interruption -- waiting on weather,ok,equipment failure,CONT. W.O.W.,2.0 +15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 03:00:00+00:00,1993-04-11 03:30:00+00:00,29.0,m,fixed,interruption -- waiting on weather,ok,equipment failure,CONT. W.O.W.,0.5 +15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 03:30:00+00:00,1993-04-11 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,PULLED BOP THROUGH SPLASH ZONE. PREPARED TO LAND BOP ON CARRIER.,0.5 +15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 04:00:00+00:00,1993-04-11 05:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,LANDED AND SECURED BOP ON CARRIER.,1.5 +15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 05:30:00+00:00,1993-04-11 17:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"OPENED SHEAR RAM DOORS ON BOP AND INSPECTED SEALS. FOUND DAMAGES ON T-SEAL AND ON 1 RAM-TOP SEAL, CHANGED OUT SAME AND CLOSED DOORS.",12.0 +15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 17:30:00+00:00,1993-04-11 19:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"PRESSURE TESTED MPR, INNER KILL VALVE AND UPR TO 20/345 BAR, 5/10 MINS ATTEMPTED PRESSURE TESTING SHEAR RAM, NEGATIVE. MAJOR LEAK ACROSS THE RAMS.",2.0 +15_9_19_ST2_1993_04_12.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-11T00:00:00+02:00,1993-04-12T00:00:00+02:00,1993-04-11 19:30:00+00:00,1993-04-11 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,DRAINED BOP. INVESTIGATED LEAK.,2.5 +15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-11 22:00:00+00:00,1993-04-12 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,CONT. INVESTIGATING LEAK. OPENED RAM DOORS TO CHECK SEALS. CHECKED RAM OPERATION. FOUND O-RINGS EXTRUDED OUT OF UPPER SEAL SEAT. PREPARED TO REMOVE UPPER SEAL SEAT TO CHANGE OUT O-RINGS.,6.0 +15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-12 04:00:00+00:00,1993-04-12 13:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"REMOVED SHEAR RAM UPPER SEAL SEAT. CHANGED OUT O-RINGS AND BACK-UP RING, RE-INSTALLED SEAL SEAT. CLOSED RAM DOORS.",9.5 +15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-12 13:30:00+00:00,1993-04-12 17:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"PREPARED TO TEST STACK. ATTEMPTED PRESSURE TESTING SHEAR RAM TWICE, NEGATIVE. PRESSURE TESTED SHEAR RAM OK ON THIRD ATTEMPT TO 20/345 BAR, 5/10 MINS.",3.5 +15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-12 17:00:00+00:00,1993-04-12 19:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"FILLED STACK. INSTALLED TEST TOOL. ATTEMPTED PRESSURE TESTING LAP TO 20/345 BAR, NEGATIVE, LEAKED 1 BAR/MIN ON HP-TEST. FUNCTIONED LAP TWICE. SPM-VALVE FAILED.",2.5 +15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-12 19:30:00+00:00,1993-04-12 20:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"CHANGED OUT 2 EA SPM VALVES FOR LAP, ON YELLOW POD.",1.0 +15_9_19_ST2_1993_04_13.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-12T00:00:00+02:00,1993-04-13T00:00:00+02:00,1993-04-12 20:30:00+00:00,1993-04-12 22:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"OPERATED LAP SEVERAL TIMES. ATTEMPTED PRESSURE TESTING, NEGATIVE.",1.5 +15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-12 22:00:00+00:00,1993-04-13 01:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED PULLING TEST TOOL TO INSPECT LAP, NEGATIVE. TOOL HANGING UP. DRAINED STACK. FOUND TEST TOOL HANGING UP IN RUBBER LIP FROM LAP ELEMENT. CUT LOOSE AND REMOVED RUBBER LIP.",3.0 +15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 01:00:00+00:00,1993-04-13 04:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"PRESSURE TESTED LAP TO 20/345 BAR, 5/10 MINS. ATTEMPTED PRESSURE TESTING UAP, NEGATIVE ON LOW PRESSURE. OPERATED UAP 3 TIMES. PRESSURE TESTED UAP TO 20/240 BAR, 5/10 MINS. PRESSURE TESTED REMAINING FAIL SAFE VALVES AND SHEAR RAM TO 20/345 BAR, 5/10 MINS.",3.0 +15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 04:00:00+00:00,1993-04-13 07:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"CHANGED OUT LEAKING SPM-VALVE, UAP CLOSING FUNCTION ON YELLOW POD. PREPARED BOP FOR RUNNING. MOVED BOP CARRIER IN PLACE.",3.0 +15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 07:00:00+00:00,1993-04-13 14:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,"M/U 2 EA 50 FT RISER JOINTS TO BOP. INSTALLED GUIDE LINES. BURNT OFF SEA FASTENING. RAN BOP. PRESSURE TESTED K/C-LINES TO 345 BAR WHILE RUNNING BOP. INSTALLED K/C-HOSES, RISER TENSIONERS AND POD HOSE SADLES. DE-BALLASTED RIG 3M.",7.0 +15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 14:00:00+00:00,1993-04-13 15:00:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,MOVED RIG BACK OVER WELL AND RE-BALLASTED RIG.,1.0 +15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 15:00:00+00:00,1993-04-13 17:30:00+00:00,104.0,m,fixed,interruption -- repair,ok,equipment failure,"POSITIONED RIG. LANDED BOP, PULL TESTED WITH 25 TONS OVERPULL. STROKED OUT SLIP JOINT. L/D HANDLING JOINT. INSTALLED DIVERTER. CLOSED SHEAR RAM WITH ACOUSTIC. PRESSURE TESTED WELLHEAD CONNECTOR DOWN K/C-LINES AGAINST SHEAR RAM TO 20/345 BAR, 5/10 MINS. FUNCTION TESTED BOP ON YELLOW POD.",2.5 +15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 17:30:00+00:00,1993-04-13 18:30:00+00:00,0.0,m,fixed,interruption -- repair,ok,equipment failure,R/D RISER HANDLING EQUIPMENT. R/U PIPE HANDLING EQUIPMENT.,1.0 +15_9_19_ST2_1993_04_14.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-13T00:00:00+02:00,1993-04-14T00:00:00+02:00,1993-04-13 18:30:00+00:00,1993-04-13 22:00:00+00:00,105.0,m,fixed,interruption -- repair,fail,operation failed,"SPACED OUT AND MADE UP SPRING LOADED TOOL AND RIH TO RETRIEVE SEAL ASSEMBLY. LANDED OFF IN WELLHEAD. CLOSED LAP AND ESTABLISHED CIRCULATION DOWN KILL, UP CHOKE LINE. PULLED BACK TO RETRIEVE SEAL ASSEMBLY, NO PRESSURE BUILD-UP. POOH, MISRUN.",3.5 +15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-13 22:00:00+00:00,1993-04-13 23:30:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,"CHECKED SPRING LOADED TOOL. RE-RUN TO PULL SEAL ASSEMBLY. LANDED OFF, CLOSED LAP. PULLED BACK 3M. OBSERVED PRESSURE BUILD-UP TO 11 BAR/30 MINS. OBSERVED GAS IN RISER. INCREASED CLOSING PRESSURE ON LAP.",1.5 +15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-13 23:30:00+00:00,1993-04-14 00:00:00+00:00,102.0,m,fixed,interruption -- repair,ok,success,CIRCULATED THROUGH BOP AT 350 LPM HOLDING 10 BAR BACK PRESSURE.,0.5 +15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 00:00:00+00:00,1993-04-14 01:00:00+00:00,102.0,m,fixed,drilling -- casing,ok,success,BLED OFF PRESSURE. CLOSED IN TO OBSERVE BUILD-UP: 7 BAR/30 MINS. BLED OFF FROM 7 BAR. PRESSURE BUILT UP TO 5 BAR/20 MINS.,1.0 +15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 01:00:00+00:00,1993-04-14 02:00:00+00:00,102.0,m,fixed,drilling -- casing,ok,success,"CIRCULATED THROUGH BOP AT 350 LPM. BLED OFF PRESSURE. OBSERVED PRESSURE BUILD-UP 1,5 BAR. BLED OFF PRESSURE.",1.0 +15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 02:00:00+00:00,1993-04-14 04:00:00+00:00,102.0,m,fixed,drilling -- casing,ok,success,"RELEASED TRAPPED GAS FROM BOP AND DRILL STRING. OPENED LAP. FLOW CHECKED 15 MINS, NEG. POOH WITH SEAL ASSEMBLY TO 30M.",2.0 +15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 04:00:00+00:00,1993-04-14 04:30:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,CONTINUED POOH AND L/D SEAL ASSEMBLY.,0.5 +15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 04:30:00+00:00,1993-04-14 06:00:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,RIH WITH CEMENT CLEAN-OUT TOOL. WASHED WELLHEAD. POOH.,1.5 +15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 06:00:00+00:00,1993-04-14 08:00:00+00:00,105.0,m,fixed,drilling -- casing,ok,success,RIH WITH METAL-TO-METAL SEAL ASSEMBLY. INSTALLED AND PRESSURE TESTED SAME TO 345 BAR/10 MINS.,2.0 +15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 08:00:00+00:00,1993-04-14 08:30:00+00:00,105.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,INSTALLED WEAR BUSHING,0.5 +15_9_19_ST2_1993_04_15.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-14T00:00:00+02:00,1993-04-15T00:00:00+02:00,1993-04-14 08:30:00+00:00,1993-04-14 22:00:00+00:00,404.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CLEANED RIG FLOOR AND PREPARED FOR RUNNING DST-STRING. RIH WITH DST-BHA. PRESSURE TESTED RTTS-PACKER, LPR-N, BUNDLE CARRIER AND FULL-FLO BYPASS VALVE TO 200 BAR/10 MINS. SERVICE BROKE AND CHECKED EACH CONNECTION ON 4 3/4"" DC.",13.5 +15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-14 22:00:00+00:00,1993-04-14 23:30:00+00:00,443.0,m,fixed,formation evaluation -- rig up/down,ok,success,"CONT. RIH WITH DST-STRING. CONTINUED RUNNING/SERVICE BROKE 4 3/4"" DRILL COLLARS. M/U 2 EA TUBING JOINTS.",1.5 +15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-14 23:30:00+00:00,1993-04-15 00:30:00+00:00,443.0,m,fixed,formation evaluation -- drill stem test,fail,operation failed,"PRESSURE TESTED SURFACE LINES TO 20/345 BAR. ATTEMPTED PRESSURE TESTING DST-STRING AGAINST LPR-N. 20 BAR OK. 345 BAR, NEGATIVE, PRESSURE DROPPED 0,5 BAR/SEC.",1.0 +15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 00:30:00+00:00,1993-04-15 04:00:00+00:00,397.0,m,fixed,interruption -- repair,fail,operation failed,"L/D 2 EA TUBING JOINTS. ATTEMPTED PRESSURE TESTING DST-STRING, NEG. PULLED BACK 4 EA SLIP JOINTS. ATT. PRESSURE TESTING DST-STRING, NEG. L/D SLIP JOINTS. PULLED AND RACKED BACK 2 STANDS DRILL COLLARS. PRESSURE TESTED OK. RAN BACK IN WITH 1 STAND DRILL COLLAR, PRESSURE TESTED OK. RAN BACK IN WITH LAST STAND DRILL COLLAR, TESTED OK 345BAR",3.5 +15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 04:00:00+00:00,1993-04-15 06:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U SLIP JOINTS AND 1 SINGLE PH-6 TUBING. PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS.,2.0 +15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 06:00:00+00:00,1993-04-15 10:30:00+00:00,1684.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT. RIH WITH DST STRING TO 1684M. FILLED STRING EACH 5 JOINTS.,4.5 +15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 10:30:00+00:00,1993-04-15 11:00:00+00:00,1684.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS.,0.5 +15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 11:00:00+00:00,1993-04-15 14:30:00+00:00,2680.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT. RIH TO 2680M.,3.5 +15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 14:30:00+00:00,1993-04-15 16:00:00+00:00,2987.0,m,fixed,formation evaluation -- rig up/down,ok,success,"WHILE RECIPROCATING STRING, WORKED 2 LEFT HAND TURNS INTO STRING. CONT. RIH TO 2987M.",1.5 +15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 16:00:00+00:00,1993-04-15 17:00:00+00:00,2987.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED DST-STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS.,1.0 +15_9_19_ST2_1993_04_16.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-15T00:00:00+02:00,1993-04-16T00:00:00+02:00,1993-04-15 17:00:00+00:00,1993-04-15 22:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,RECIPROCATED STRING AND WORKED 2 TURNS LEFT HAND TORQUE INTO STRING. CONT. RIH.,5.0 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-15 22:00:00+00:00,1993-04-16 01:00:00+00:00,4237.0,m,fixed,formation evaluation -- rig up/down,ok,success,CONT. RIH TO 4237M.,3.0 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 01:00:00+00:00,1993-04-16 01:30:00+00:00,4237.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS.,0.5 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 01:30:00+00:00,1993-04-16 03:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U SUBSEA TEST TREE/FLUTED HANGER AND M/U TO DST STRING. CHECKED LATCH FUNCTION. CHECKED GLYCOL INJECTION SYSTEM. VERIFIED VALVE OPERATION.,1.5 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 03:00:00+00:00,1993-04-16 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS. VERIFIED GLYCOL INJECTION AGAINST 300 BAR INSIDE STRING. VERIFIED CHECK VALVE HOLDING. CLOSED SSTT AND TESTED SAME FROM BELOW TO 225 BAR DIFFERENTIAL PRESSURE/10 MINS.,1.0 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 04:00:00+00:00,1993-04-16 06:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U LANDING STRING. INSTALLED LUBRICATOR VALVE AND FUNCTION TESTED SAME. CHANGED TO 40 FT BAILS. P/U 1 PUP JOINT AND 1 SINGLE. LANDED STRING IN WELLHEAD. CLEANED RIG FLOOR.,2.5 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 06:30:00+00:00,1993-04-16 09:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/U AWS. RIH WITH GR/CCL TO CORRELATE DEPTH. POOH. R/D AWS.,2.5 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 09:00:00+00:00,1993-04-16 10:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,L/D 1 SINGLE. PRESSURE TESTED DST STRING AGAINST LPR-N VALVE TO 345 BAR/10 MINS. PRESSURE TESTED LUBRICATOR VALVE FROM BELOW TO 250 BAR.,1.5 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 10:30:00+00:00,1993-04-16 13:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,P/U FLOWHEAD. CONNECTED KILL/PRODUCTION HOSES AND CONTROL HOSES.,2.5 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 13:00:00+00:00,1993-04-16 14:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,fail,equipment failure,"LANDED DST STRING IN WELLHEAD. ATTEMPTED PRESSURE TESTING, NEGATIVE. OBSERVED LEAK IN CEMENT UNIT.",1.0 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 14:00:00+00:00,1993-04-16 17:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"CHANGED ALL 3 DISCHARGE VALVES ON 2 3/4"" CEMENT PUMP. FOUND 2 DAMAGED.",3.0 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 17:00:00+00:00,1993-04-16 19:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED LINES/HOSE FROM CEMENT UNIT AGAINST KILL VALVE TO 345 BAR/10 MINS. PRESSURE TESTED SWAB VALVE FROM BELOW TO 345 BAR/10 MINS TESTED MASTER VALVE FROM BELOW TO 345 BAR/10 MINS. FLUSHED THROUGH LINES TO BURNERS. TESTED UPSTREAM VALVES ON CHOKE MANIFOLD TO 345 BAR/ 10 MINS. TESTED KILL VALVE FROM BELOW TO 345 BAR/10 MINS.,2.5 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 19:30:00+00:00,1993-04-16 21:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"ATTEMPTED TO PICK UP DST STRING TO SPACE OUT FOR PACKER SETTING, NEG. STRING HUNG UP AFTER PULLING 3M (2,2 M ABOVE UPWEIGHT). MAX OVERPULL 15 TONS. REMOVED MASTER BUSHING AND WORKED STRING FREE.",1.5 +15_9_19_ST2_1993_04_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-16T00:00:00+02:00,1993-04-17T00:00:00+02:00,1993-04-16 21:00:00+00:00,1993-04-16 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"SPACED OUT BY PULLING 3,6 M. SET RTTS BY ROTATING AT MAX. 9000 FTLBS AND SET DOWN WEIGHT. RE-LANDED FLUTED HANGER. SET DOWN 35 TONS ON FLUTED HANGER. CLOSED MPR.",1.0 +15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-16 22:00:00+00:00,1993-04-16 22:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,PRESSURE TESTED RTTS FROM ABOVE TO 110 BAR DIFFERENTIAL FROM ABOVE FOR 15 MINS.,0.5 +15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-16 22:30:00+00:00,1993-04-16 23:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CYCLED OMNI FROM POS. 3 1/2 TO CIRCULATION POS. 11 1/2.,1.0 +15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-16 23:30:00+00:00,1993-04-17 01:00:00+00:00,0.0,m,fixed,formation evaluation -- circulating conditioning,ok,success,"LINED UP NBS FOR DIRECT SUCTION OF DIESEL. CIRCULATED 24,4 M3 DIESEL DOWN DST STRING AT 500 LPM. DISPLACED DIESEL WITH 0,5 M3 MEG.",1.5 +15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-17 01:00:00+00:00,1993-04-17 02:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CYCLED OMNI VALVE TO WELL TEST POSITION 2.,1.0 +15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-17 02:00:00+00:00,1993-04-17 03:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,HELD PRE-OPERATION MEETINGS WITH INVOLVED PERSONELL. INSPECTED RIG FLOOR AND WELL TEST AREAS. CHECKED ALL LINES AND VALVES. TESTED ESD-SYSTEMS.,1.5 +15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-17 03:30:00+00:00,1993-04-17 04:00:00+00:00,0.0,m,wire line,workover -- perforate,ok,success,"OPENED KILL VALVE. PRESSURED UP DST STRING TO 330 BAR AGAINST CLOSED CHOKE TO FIRE GUNS. CLOSED KILL VALVE. BLED DOWN STRING PRESSURE. PERFORATED WELL FROM 4338,0M TO 4316,0M MD AT 05:57 HRS. STARTED FLOW TO TANK.",0.5 +15_9_19_ST2_1993_04_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-17T00:00:00+02:00,1993-04-18T00:00:00+02:00,1993-04-17 04:00:00+00:00,1993-04-17 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,FLOWED WELL FOR CLEAN-UP. SHUT-IN WELL FOR BUILD-UP BY CLOSING LPR-N VALVE AT 23:57 HRS. CLOSED CHOKE AT 23:59 HRS.,18.0 +15_9_19_ST2_1993_04_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-18T00:00:00+02:00,1993-04-19T00:00:00+02:00,1993-04-17 22:00:00+00:00,1993-04-18 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,WELL SHUT-IN FOR BUILD-UP.,6.0 +15_9_19_ST2_1993_04_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-18T00:00:00+02:00,1993-04-19T00:00:00+02:00,1993-04-18 04:00:00+00:00,1993-04-18 16:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,WELL SHUT-IN FOR BUILD-UP.,12.5 +15_9_19_ST2_1993_04_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-18T00:00:00+02:00,1993-04-19T00:00:00+02:00,1993-04-18 16:30:00+00:00,1993-04-18 17:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"OPENED WELL AT LPR-N VALVE (18:22 HOURS) AND CHOKE MANIFOLD FLOWED WELL ON 23/64"" ADJUSTABLE CHOKE PRIOR TO RUN WIRELINE. SHUT IN WELL ON CHOKE MANIFOLD AT 19:10 HOURS.",0.5 +15_9_19_ST2_1993_04_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-18T00:00:00+02:00,1993-04-19T00:00:00+02:00,1993-04-18 17:00:00+00:00,1993-04-18 20:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,CLOSED LUB. VALVE AND CHECKED THAT SAME HELD PRESSURE FROM BELOW. INSTALLED SPS TOOLSTRING AND PRESSURE TESTED W.L. LUBRICATOR/STUFFING- BOX TO 250 BAR AGAINST LUB.VALVE AND FAILSAFE VALVE.EQUILIZED PRESSURE ACROSS LUB. VALVE AND OPENED SAME.,3.5 +15_9_19_ST2_1993_04_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-18T00:00:00+02:00,1993-04-19T00:00:00+02:00,1993-04-18 20:30:00+00:00,1993-04-18 22:00:00+00:00,4316.0,m,wire line,workover -- wire line,ok,success,"RIH WITH 1,90"" OD BLIND BOX ON SLICK LINE TO 4316M TO VERIFY FREE PASSAGE AND GUNS DROPPED.",1.5 +15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-18 22:00:00+00:00,1993-04-19 00:30:00+00:00,4316.0,m,wire line,workover -- wire line,ok,success,CONT. WIRELINING: POOH WITH BLIND BOX. CLOSED LUBRICATOR AND INFLOW TESTED SAME.,2.5 +15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 00:30:00+00:00,1993-04-19 02:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,"R/D BLIND BOX TOOLSTRING. M/U TOOLSTRING WITH 2 EA PETROTECH AND 2 EA SCHLUMBERGER BOTTOMHOLE SAMPLERS AND 1 MEMORY GAUGE AND INSTALLED SAME IN TEST STRING. PRESSURE TESTED LUBRICATOR TO 30/250 BAR, 5/10 MINS.",2.0 +15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 02:30:00+00:00,1993-04-19 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"EQUALIZED ACROSS LUBRICATOR VALVE AND OPENED SAME. OPENED UP WELL ON 12/64"" CHOKE AT 05:12 HRS. RIH WITH BHS WHILE FLOWING WELL ON 12/64"" FIXED CHOKE.",1.5 +15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 04:00:00+00:00,1993-04-19 08:30:00+00:00,3900.0,m,fixed,formation evaluation -- drill stem test,ok,success,"CONTINUED RIH WITH BHS TO 3900M WHILE FLOWING WELL ON 12/64"" CHOKE. HAD PICK-UP WEIGHT 430 KG AT 3900M WHILE FLOWING. SHUT IN WELL AT 10:15 HRS.",4.5 +15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 08:30:00+00:00,1993-04-19 09:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,TOOK BOTTOM HOLE SAMPLES.,1.0 +15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 09:30:00+00:00,1993-04-19 11:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"FLOWED WELL ON 12/64"" CHOKE FROM 11:43 HRS WHILE POOH WITH BHS, SHUT IN WELL AT 12:11 HRS. TOOK GRADIENT STOPS AT 3870M, 3840M AND IN LUBRICATOR WHILE POOH.",2.0 +15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 11:30:00+00:00,1993-04-19 12:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,CLOSED LUBRICATOR AT 13:34 HRS. VERIFIED LUBRICATOR VALVE HOLDING PRESSURE FROM BELOW.,0.5 +15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 12:00:00+00:00,1993-04-19 17:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"RIGGED DOWN BHS AND WIRELINE EQUIPMENT. TESTED SWAB VALVE AGAINST PROD.WING / LUBRICATOR VALVE TO 250 BAR. MADE SEVERAL ATTEMPTS TO PRESSURE TEST LUBRICATOR VALVE FROM BELOW BY BLEEDING DOWN TO 35 BAR ABOVE, NEG. OBSERVED VALVE LEAKING. EQUALIZED ACROSS LUBRICATOR VALVE AND OPENED SAME.",5.0 +15_9_19_ST2_1993_04_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-19T00:00:00+02:00,1993-04-20T00:00:00+02:00,1993-04-19 17:00:00+00:00,1993-04-19 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,OPENED WELL FOR MAIN FLOW PERIOD AT 19:24 HRS.,5.0 +15_9_19_ST2_1993_04_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-20T00:00:00+02:00,1993-04-21T00:00:00+02:00,1993-04-19 22:00:00+00:00,1993-04-20 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED MAIN FLOW.,6.0 +15_9_19_ST2_1993_04_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-20T00:00:00+02:00,1993-04-21T00:00:00+02:00,1993-04-20 04:00:00+00:00,1993-04-20 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED MAIN FLOW PERIOD.,18.0 +15_9_19_ST2_1993_04_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-21T00:00:00+02:00,1993-04-22T00:00:00+02:00,1993-04-20 22:00:00+00:00,1993-04-20 23:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CONTINUED MAIN FLOW PERIOD.,1.5 +15_9_19_ST2_1993_04_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-21T00:00:00+02:00,1993-04-22T00:00:00+02:00,1993-04-20 23:30:00+00:00,1993-04-21 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CLOSED IN WELL ON LPR-N VALVE AT 01:42 HRS. VERIFIED LPR-N VALVE CLOSED BY BLEEDING DOWN TUBING PRESSURE 20 BAR. CLOSED CHOKE MANIFOLD. WELL SHUT-IN FOR BUILD-UP.,4.5 +15_9_19_ST2_1993_04_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-21T00:00:00+02:00,1993-04-22T00:00:00+02:00,1993-04-21 04:00:00+00:00,1993-04-21 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,WELL SHUT-IN AT LPR-N VVALVE AND CHOKE MANIFOLD FOR BUILD-UP.,18.0 +15_9_19_ST2_1993_04_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-22T00:00:00+02:00,1993-04-23T00:00:00+02:00,1993-04-21 22:00:00+00:00,1993-04-22 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,WELL SHUT-IN AT LPR-N VVALVE AND CHOKE MANIFOLD FOR BUILD-UP.,6.0 +15_9_19_ST2_1993_04_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-22T00:00:00+02:00,1993-04-23T00:00:00+02:00,1993-04-22 04:00:00+00:00,1993-04-22 20:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,WELL SHUT INN ON LPR-N AND CHOKE MANIFOLD FOR MAIN BUILD-UP.,16.5 +15_9_19_ST2_1993_04_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-22T00:00:00+02:00,1993-04-23T00:00:00+02:00,1993-04-22 20:30:00+00:00,1993-04-22 21:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,BLED OFF GAS FROM TEST TUBING THROUGH CHOKE MANIFOLD TO BURNER UNTIL WHP BELOW 10 BAR.,1.0 +15_9_19_ST2_1993_04_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-22T00:00:00+02:00,1993-04-23T00:00:00+02:00,1993-04-22 21:30:00+00:00,1993-04-22 22:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CLOSED FLOW HEAD WING VALVE AND CHOKE MANIFOLD. OPENED FLOW HEAD KILL VALVE.,0.5 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-22 22:00:00+00:00,1993-04-22 22:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"PUMPED 18,6 M3 1,15 SG NACL BRINE DOWN TEST STRING WITH CEMENT UNIT AT 600 LPM TO REFILL STRING, PRESSURED UP TO 110 BAR TO EQUALIZE ACROSS LPR-N VALVE.",0.5 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-22 22:30:00+00:00,1993-04-23 00:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"OPENED LPR-N VALVE. BULLHEADED GAS/OIL BACK INTO FORMATION BY PUMPING 19,5 M3 1,15 SG NACL BRINE: FIRST 11 M3 AT MAX 90 BAR/1000 LPM, THEN PRESSURE INCREASED FROM 90 BAR TO 290 BAR/815 LPM WHILE PUMPING THE LAST 8,5 M3. TOTAL PUMPED 38,1 M3 BRINE. KILLED WELL BY PUMPING 4,0 M3 HI-VIS 1,38 SG MUD AT 630 LPM, PRESSURE INCR. FROM 150 TO 176 BAR,",2.0 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 00:30:00+00:00,1993-04-23 00:31:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"FOLLOWED BY 27,2 M3 1,38 SG MUD AT TYPICAL 650 LPM/180-200 BAR. MUD HIT PERFORATIONS AFTER HAVING PUMPED 26,7 M3. SLOWED DOWN TO 400 LPM THE LAST 4 M3. PUMPING PRESSURE INCREASED FROM 190 TO 240 BAR THE LAST 0,5 M3. BLED OFF PRESSURE ON CEMENT UNIT.",0.016666666666666666 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 00:31:00+00:00,1993-04-23 01:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,FLOW CHECKED WELL 30 MINS.,0.48333333333333334 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 01:00:00+00:00,1993-04-23 02:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CLOSED LPR-N VALVE AND LUBRICATOR VALVE. OPENED FLOW HEAD WING VALVE AND CHOKE MANIFOLD. FLUSHED SURFACE LINES TO BURNER ON STARBOARD SIDE. CLOSED FLOW HEAD WING VALVE. OPENED LUBRICATOR VALVE.,1.0 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 02:00:00+00:00,1993-04-23 02:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,CYCLED OMNI FROM WELL TEST POSITION TO CIRCULATING POSITION 11 1/2. RECORDED 47 BAR U-TUBE PRESSURE.,0.5 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 02:30:00+00:00,1993-04-23 04:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"DISPLACED ANNULUS TO 1,38 SG MUD BY CIRCULATING THROUGH OMNI VALVE AND HOLDING BACK PRESSURE ON CHOKE DUE TO U-TUBING. MAX RATE 1000 LPM.",1.5 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 04:00:00+00:00,1993-04-23 10:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"CONTINUED DISPLACING ANNULUS TO 1,38 S.G. MUD BY CIRCULATING THROUGH OMNI VALVE. CIRCULATED UNTIL GAS READINGS WERE LESS THAN 1%. MAX GAS 6%, MAX RATE 1000 LPM.",6.5 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 10:30:00+00:00,1993-04-23 11:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"DISPLACED RISER TO 1,38 S.G. MUD THROUGH KILL LINE.",0.5 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 11:00:00+00:00,1993-04-23 11:30:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,OPENED MPR AND OBSERVED WELL FOR 10 MIN.,0.5 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 11:30:00+00:00,1993-04-23 12:00:00+00:00,0.0,m,fixed,formation evaluation -- drill stem test,ok,success,"CIRCULATED WELL, REGISTERED NO GAS. OBSERVED WELL FOR 10 MIN.",0.5 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 12:00:00+00:00,1993-04-23 13:00:00+00:00,4312.0,m,fixed,formation evaluation -- drill stem test,ok,success,RELEASED RTTS PACKER AND FLOWCKECKED 30 MIN.,1.0 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 13:00:00+00:00,1993-04-23 16:30:00+00:00,4312.0,m,fixed,formation evaluation -- drill stem test,ok,success,"CLOSED MPR AND CIRCULATED WELL UNTIL GAS READINGS WERE UNDER 1%. MAX GAS 1,04%.",3.5 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 16:30:00+00:00,1993-04-23 18:00:00+00:00,4312.0,m,fixed,formation evaluation -- drill stem test,ok,success,"OPENED MPR, FLOWCHECKED 10 MIN. CONTINUED CIRCULATING UP RISER. FLOWCHECKED 30 MIN.",1.5 +15_9_19_ST2_1993_04_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-23T00:00:00+02:00,1993-04-24T00:00:00+02:00,1993-04-23 18:00:00+00:00,1993-04-23 22:00:00+00:00,4312.0,m,fixed,formation evaluation -- drill stem test,ok,success,"PUMPED SLUG. RIGGED DOWN CO-FLEX HOSES, LAID DOWN FLOW TREE, CHANGED BAILS AND ELEVATORS.",4.0 +15_9_19_ST2_1993_04_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-24T00:00:00+02:00,1993-04-25T00:00:00+02:00,1993-04-23 22:00:00+00:00,1993-04-23 23:30:00+00:00,4212.0,m,fixed,formation evaluation -- rig up/down,ok,success,SERVICE BROKE AND LAID DOWN LUB.VALVE. POOH AND LAID DOWN LANDING STRING.,1.5 +15_9_19_ST2_1993_04_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-24T00:00:00+02:00,1993-04-25T00:00:00+02:00,1993-04-23 23:30:00+00:00,1993-04-24 01:00:00+00:00,4202.0,m,fixed,formation evaluation -- rig up/down,ok,success,SERVICE BROKE AND LAID DOWN EZ-TREE. CLEARED DRILL FLOOR OF TESTING EQUIMENT.,1.5 +15_9_19_ST2_1993_04_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-24T00:00:00+02:00,1993-04-25T00:00:00+02:00,1993-04-24 01:00:00+00:00,1993-04-24 04:00:00+00:00,3813.0,m,fixed,formation evaluation -- rig up/down,ok,success,POOH AND LAID DOWN TESTING STRING.,3.0 +15_9_19_ST2_1993_04_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-24T00:00:00+02:00,1993-04-25T00:00:00+02:00,1993-04-24 04:00:00+00:00,1993-04-24 22:00:00+00:00,403.0,m,fixed,formation evaluation -- rig up/down,ok,success,POOH AND LAID DOWN TESTING STRING.,18.0 +15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-24 22:00:00+00:00,1993-04-25 04:00:00+00:00,15.0,m,fixed,formation evaluation -- rig up/down,ok,success,POOH AND LAID DOWN TESTING STRING. SERVICE BROKE DST TOOLS AND PACKER WHILE POOH.,6.0 +15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 04:00:00+00:00,1993-04-25 05:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,FINISHED POOH AND LAID DOWN TESTING STRING.,1.5 +15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 05:30:00+00:00,1993-04-25 06:00:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CLEARED FLOOR OF BAKER SAND CONTROL EQUIPMENT.,0.5 +15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 06:00:00+00:00,1993-04-25 07:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,PICKED UP AND BROKE OFF TUBING JOINT FROM SURFACE FLOW TREE AND SERVICE BROKE SAME.,1.5 +15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 07:30:00+00:00,1993-04-25 08:30:00+00:00,0.0,m,fixed,formation evaluation -- rig up/down,ok,success,CLEARED FLOOR OF REMAINING TESTING EQUIPMENT. REARRANGED COFLEXIP HOSE AND TAPE MEASURED HIGHT IN DERRICK WITH TOPDRIVE IN UPPER MOST POSITION (30 CM FROM CROWN).,1.0 +15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 08:30:00+00:00,1993-04-25 11:30:00+00:00,1417.0,m,fixed,plug abandon -- trip,ok,success,"RIGGED UP PIPE HANDLING EQUIPMENT, MADE UP BHA AND RAN SAME IN HOLE ON 3 1/2"" DRILLPIPE. FILLED PIPE AND BROKE CIRCULATION EVERY 30 STANDS.",3.0 +15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 11:30:00+00:00,1993-04-25 12:30:00+00:00,1417.0,m,fixed,plug abandon -- trip,ok,success,"RIGGED DOWN 3 1/2"" DRILL PIPE EQUIPMENT AND RIGGED UP 5"" DRILL PIPE EQUIPMENT. REARRANGED SETBACK.",1.0 +15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 12:30:00+00:00,1993-04-25 19:30:00+00:00,4570.0,m,fixed,plug abandon -- trip,ok,success,"CONTINUED RUNNING IN WITH 5"" DRILL PIPE. FILLED PIPE AND BROKE CIRCULATION EVERY 35 STANDS. TAGGED OBSTRUCTION AT 4560M PUSHED SAME DOWN TO BUT COULD NOT PASS 4570M WITH 40 TONN AND CIRCULATION.",7.0 +15_9_19_ST2_1993_04_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-25T00:00:00+02:00,1993-04-26T00:00:00+02:00,1993-04-25 19:30:00+00:00,1993-04-25 22:00:00+00:00,4570.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"CIRCULATED AND CONDITIONED MUD UNTIL WEIGTH WAS 1,38 S.G. AROUND. MAX GAS READING 2,39%.",2.5 +15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-25 22:00:00+00:00,1993-04-25 22:30:00+00:00,4570.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"PUMPED AND DISPLACED 1,90 S.G. MUD PILL FROM 4570M TO 4333M.",0.5 +15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-25 22:30:00+00:00,1993-04-26 04:00:00+00:00,1417.0,m,fixed,plug abandon -- trip,ok,success,POOH TO 1417M.,5.5 +15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 04:00:00+00:00,1993-04-26 06:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,FINISHED POOH AND LAID DOWN MILL AND BIT SUB.,2.5 +15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 06:30:00+00:00,1993-04-26 16:30:00+00:00,4305.0,m,fixed,plug abandon -- trip,ok,success,MADE UP EZSV SQUEEZE RETAINER AND RIH WITH SAME TO 4305M.,10.0 +15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 16:30:00+00:00,1993-04-26 19:00:00+00:00,4305.0,m,fixed,plug abandon -- mechanical plug,ok,success,"MADE UP KELLY COCK, PUMPIN SUB. SET EZSV PACKER AND LOAD TESTED SAME WITH 17 TONN. PULLED STINGER UP TO 4300M. MADE UP CEMENT HOSE AND TESTED SAME TO 345 BAR, 10 MIN. CLOSED MPR AND TESTED EZSV TO 100 BAR 5 MIN. OPENED MPR.",2.5 +15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 19:00:00+00:00,1993-04-26 20:30:00+00:00,4305.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"CLOSED UAP WITH REDUSED OPERATING PRESSURE AND PERFORMED CIRCULATION TEST THROUGH CHOKE. STUNG INTO EZSV AND PUT 20 TONN ON SAME. PERFORMED INJECTION TEST, FORMATION/FILTERCAKE BROKE DOWN AT 300 BAR. INJECTION RATES: 300 BAR - 200 LPM, 320 BAR - 250 LPM, 345 BAR - 275 LPM.",1.5 +15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 20:30:00+00:00,1993-04-26 21:30:00+00:00,4305.0,m,fixed,interruption -- repair,fail,equipment failure,"VENTLINE ON NBS/BJ SURGETANK PLUGGED UP WITH SEMISOLID CEMENT, UNPLUGGED SAME.",1.0 +15_9_19_ST2_1993_04_27.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-26T00:00:00+02:00,1993-04-27T00:00:00+02:00,1993-04-26 21:30:00+00:00,1993-04-26 22:00:00+00:00,4303.0,m,fixed,plug abandon -- squeeze,ok,success,"PULLED OUT OF EZSV AND UP TO 4303M. PUMPED 2 M3 FRESH WATER AHEAD OF CEMENT. MIXED AND PUMPED 5 M3 1,90 S.G. SLURRY. KEPT 50 BAR BACKPRESSURE ON ANNULUS TO AVOID U-TUBING.",0.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-26 22:00:00+00:00,1993-04-26 23:00:00+00:00,4303.0,m,fixed,plug abandon -- squeeze,ok,success,"PUMPED 1 M3 FRESH WATER BEHIND CEMENT SLURRY. DISPLACED CEMENT WITH 22,4 M3 1,38 SG MUD. KEPT 50 BAR BACKPRESSURE TO AVOID U-TUBING.",1.0 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-26 23:00:00+00:00,1993-04-26 23:30:00+00:00,4305.0,m,fixed,plug abandon -- squeeze,ok,success,"STUNG INTO EZSV AND PUT 20 TON ON SAME. PUMPED 0,5M3 FW AND 2,5M3 CMT THROUGH THE EZSV LEAVING 1,9 M3 CMT IN THE WELLBORE BELOW THE EZSV AND SQUEEZING 0,6 M3 CMT INTO THE FORMATION. INIT SQUEEZE RATE 200LPM AT 220BAR. PRESS INCR TO 345BAR AFTER 500LTRS, SHUT DOWN AND OBSERVED BLEED OFF. CONT SQUEEZE W/100LPM AT 286BAR, INCR TO 145LPM AT 275BAR.",0.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-26 23:30:00+00:00,1993-04-27 00:30:00+00:00,4197.0,m,fixed,plug abandon -- trip,ok,success,PULLED STINGER OUT OF EZSV AND BLED OFF U-TUBING THROUGH CHOKE. TOTAL VOLUME BLED BACK WAS 600 LTRS. DISCONNECTED CEMENT HOSE AND POOH TO 4197 M. RECONNECTED CEMENT HOSE.,1.0 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 00:30:00+00:00,1993-04-27 01:00:00+00:00,4197.0,m,fixed,plug abandon -- circulating conditioning,ok,success,REVERCED OUT EXCESS CEMENT AND WATER FROM WELL. TOTAL OF CEMENT AND WATER IN RETURNS WAS APPROXIMATLY 4 M3.,0.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 01:00:00+00:00,1993-04-27 04:00:00+00:00,2500.0,m,fixed,plug abandon -- trip,ok,success,POOH WITH CEMENT STINGER TO 2500M.,3.0 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 04:00:00+00:00,1993-04-27 08:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,POOH WITH CEMENT STINGER AND LAID DOWN SAME.,4.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 08:30:00+00:00,1993-04-27 09:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"M/U 9 5/8"" EZSV PERMANENT BRIDGE PLUG AND SETTING SLEEVE TO 5"" DP.",0.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 09:00:00+00:00,1993-04-27 09:30:00+00:00,0.0,m,fixed,plug abandon -- cement plug,ok,success,PRESSURE TESTED CEMENT PLUG/CEMENT RETAINER AGAINST SHEAR RAM TO 345 BAR/15 MIN.,0.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 09:30:00+00:00,1993-04-27 11:30:00+00:00,400.0,m,fixed,plug abandon -- trip,ok,success,"RIH WITH 9 5/8"" EZSV BRIDGE PLUG TO 400M.",2.0 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 11:30:00+00:00,1993-04-27 12:00:00+00:00,400.0,m,fixed,plug abandon -- mechanical plug,ok,success,SET EZSV PERMANENT BRIDGE PLUG AND PULLED OFF SETTING SLEEVE WITH 20 TON OVERPULL. LOAD TESTED BRIDGE PLUG WITH 5 TON DOWNWEIGHT.,0.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 12:00:00+00:00,1993-04-27 12:30:00+00:00,400.0,m,fixed,plug abandon -- cement plug,ok,success,R/U CEMENT HOSE TO PUMPIN SUB AND CIRCULATED TO FLUSH OUT AIR. PRESSURE TESTED SAME TO 345 BAR/5 MIN. CLOSED MPR AND PRESSURE TESTED EZSV BRIDGE PLUG TO 345 BAR/15 MIN. OPENED MPR.,0.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 12:30:00+00:00,1993-04-27 14:00:00+00:00,400.0,m,fixed,plug abandon -- cement plug,ok,success,"PUMPED 2 M3 SEAWATER FOLLOWED BY 9,5 M3 1,90 S.G. CEMENT SLURRY. DISPLACED CEMENT DOWN DP WITH 0,8 M3 SEAWATER.",1.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 14:00:00+00:00,1993-04-27 15:00:00+00:00,190.0,m,fixed,plug abandon -- trip,ok,success,"POOH WITH 5"" DP TO 190 M.",1.0 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 15:00:00+00:00,1993-04-27 15:30:00+00:00,190.0,m,fixed,plug abandon -- cement plug,ok,success,"REVERSE CIRCULATED OUT EXCESS CEMENT ABOVE 190 M. DUMPED 1,6 M3 GOOD CEMENT AND 1,6 M3 CONTAMINATED MUD/SEAWATER.",0.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 15:30:00+00:00,1993-04-27 17:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"RIGGED DOWN CEMENT HOSE AND POOH W/SETTING SLEEVE AND 5"" DP.",1.5 +15_9_19_ST2_1993_04_28.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-27T00:00:00+02:00,1993-04-28T00:00:00+02:00,1993-04-27 17:00:00+00:00,1993-04-27 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"POOH AND LAID DOWN 60 JOINTS 5"" DRILLPIPE AND 66 JOINTS 3 1/2"" DRILL PIPE",5.0 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-27 22:00:00+00:00,1993-04-28 00:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"LAID DOWN 33 JOINTS 3 1/2"" DRILL PIPE, 2 JOINTS 5"" DRILL PIPE AND TWO DRILLING JARS.",2.5 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 00:30:00+00:00,1993-04-28 01:30:00+00:00,0.0,m,fixed,interruption -- maintain,ok,success,SLIP AND CUT DRILL LINE.,1.0 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 01:30:00+00:00,1993-04-28 03:30:00+00:00,188.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"RIH AND TAGGED TOP OF CEMENT WITH 10 TONN AT 188M.DISPLACED WELL TO SEA WATER AND PLACED PACKER FLUID FROM 188M TO WELL HEAD. POOH. PACKER FLUID: FRESH WATER WITH 0,5 KG/M3 BIOSID 0,5 KG/M3 OKSYGEN SCAVENGER PH AT 10 TO 11",2.0 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 03:30:00+00:00,1993-04-28 04:00:00+00:00,60.0,m,fixed,plug abandon -- circulating conditioning,ok,success,CLOSED SHEAR RAM AND STARTED WASHING RISER.,0.5 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 04:00:00+00:00,1993-04-28 06:30:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"WASHED RISER DOWN TO SHEAR RAM AND TAGGED SAME. OPENED SHEAR RAM, WASHED BOP AND CIRCULATED WELL CLEAN. POOH.",2.5 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 06:30:00+00:00,1993-04-28 15:00:00+00:00,158.0,m,fixed,drilling -- bop activities,ok,success,"RIH WITH SPRING LOADED TOOL AND TESTED BOP TO 35BAR/5MIN, 345BAR/15MIN LAP 20BAR/5MIN, 345BAR/15MIN AND UAP 20BAR/5MIN, 240BAR/15MIN. RETESTED LAP BEFORE GOOD TEST, AND CHANGED LEAKING VALVE ON BJ-UNIT. TESTED ACCOUSTIC FROM BRIDGE.",8.5 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 15:00:00+00:00,1993-04-28 15:30:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"LINED UP ON CHOKE MANIFOLD DUE TO SMALL FLOW OVER TOP OF DRILL PIPE DURING BOP TEST (SINCE 12:00 HRS). CLOSED KELLY COCK, OPENED FAIL SAFE VALVES, CLOSED UPR AND RELEASED SPRING LOADED TOOL.",0.5 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 15:30:00+00:00,1993-04-28 16:00:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"OBSERVED WELL ON CHOKE MANIFOLD FOR 15 MIN. NO PRESSURE ON CHOKE, NO GAS READINGS IN TRIP TANK.",0.5 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 16:00:00+00:00,1993-04-28 17:00:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"OPENED UPR AND RECORDED WELL ON TRIP TANK, GAINED 100 LTRS ON TRIP TANK AND GAS BOILED OUT OF RISER.",1.0 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 17:00:00+00:00,1993-04-28 18:30:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"CIRCULATED DOWN CHOKE LINE AND UP RISER AT 1050 LPM. MAX GAS WAS 2.83% FROM BOTTOMS UP (C1=17242,C2=1412,C3=760,IC4=15 AND NC4=169 ALL PPM) CIRCULATED GAS DOWN TO 0,12%. OBSERVED WELL FOR 30 MIN. CONTINUED CIRCULATION DOWN CHOKE UP RISER AT 1050 LPM. MAX GAS AT BOTTOMS UP WAS 0,19% ( ONLY C1=2036 PPM).",1.5 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 18:30:00+00:00,1993-04-28 19:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,operation failed,"RAN IN AND LATCHED INTO WEAR BUSHING, PULLED WEAR BUSHING FREE WITH 10 TON OVER PULL. POOH, WEAR BUSHING WAS NOT RECOVERED.",0.5 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 19:00:00+00:00,1993-04-28 20:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RAN BACK IN, LATCHED INTO AND PUT 8 TON ON WEAR BUSHING. PULLED AND RECOVERED WEAR BUSHING.",1.0 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 20:00:00+00:00,1993-04-28 20:30:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"CIRCULATED DOWN CHOKE LINE AND UP RISER AT 1050 LPM. MAX GAS WAS 0,38% FROM BOTTOMS UP (C1=3861 AND C2=2 PPM) MADE UP PACKOFF RUNNING TOOL AND RIH WHILE CIRCULATING.",0.5 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 20:30:00+00:00,1993-04-28 21:30:00+00:00,158.0,m,fixed,interruption -- repair,fail,operation failed,"CIRCULATED DOWN DRILL PIPE AND UP RISER AT 1050 LPM. MAX GAS WAS 0,26% FROM DEPTH OF WELL HEAD (C1=1969 PPM)",1.0 +15_9_19_ST2_1993_04_29.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-28T00:00:00+02:00,1993-04-29T00:00:00+02:00,1993-04-28 21:30:00+00:00,1993-04-28 22:00:00+00:00,158.0,m,fixed,interruption -- repair,fail,success,"LANDED IN AND RETORQUED PACKOFF. RECIEVED ALL ROTATION BACK THAT IT TOOK TO TORQUE UP TO 15,000 FTLBS. CLOSED MPR, CHOKE LINE AND PRESSURE TESTED PACKOFF TO 345BAR/10MIN. OPENED MPR, TORQUED PACKOFF BACK UP TO 15,000 FTLBS. 1 INCH OF ROTATION DID NOT COME BACK WHEN TORQUE WAS RELEASED.",0.5 +15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-28 22:00:00+00:00,1993-04-28 22:30:00+00:00,158.0,m,fixed,interruption -- repair,fail,success,"CIRCULATED DOWN DRILL PIPE AND UP RISER AT 1050 LPM. MAX GAS WAS 0,06% FROM DEPTH OF WELL HEAD (C1=491 PPM)",0.5 +15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-28 22:30:00+00:00,1993-04-28 23:00:00+00:00,158.0,m,fixed,plug abandon -- circulating conditioning,fail,success,DISPLACED TO PACKER FLUID FROM 160M TO WELLHEAD.,0.5 +15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-28 23:00:00+00:00,1993-04-28 23:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,fail,success,POOH AND LAID DOWN PACKOFF RUNNING TOOL.,0.5 +15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-28 23:30:00+00:00,1993-04-29 02:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"RIGGED UP TO AND PULLED BOP. INSPECTED WITH ROV WHEN CONNECTOR WAS RELEASED, VX-RING WAS NOT LEFT ON TOP OF 18 3/4"" HOUSING. SET ROP CAP ON TOP OF HOUSING. DID NOT OBSERVE ANY GAS FROM WELL AFTER PULLING BOP.",2.5 +15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 02:00:00+00:00,1993-04-29 03:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"SET ROV CAP ON TOP OF HOUSING. DISCONNECTED ALL GUIDEWIRES. DEBALASTED RIG 3,2M SO THAT BOP WAS 2M OVER TEMPLATE ROOF. RAN TV-WINCH TO TEMPLATE.",1.5 +15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 03:30:00+00:00,1993-04-29 04:00:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,ELECTRICAL ASSIGNMENT PROBLEMS IN SCR ROOM FOR ANCHOR WINCHES.,0.5 +15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 04:00:00+00:00,1993-04-29 04:30:00+00:00,0.0,m,fixed,plug abandon -- other,fail,equipment failure,PULLED OUT W/SCORPION ROV DUE TO PROBLEMS W/LEAKING HYDRAULIC HOSE. LAUNCHED SEA OWL ROV.,0.5 +15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 04:30:00+00:00,1993-04-29 05:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,MOVED RIG AND BOP 25 M OFF TEMPLATE IN DIRECTION 20 DEGREES.,0.5 +15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 05:00:00+00:00,1993-04-29 05:30:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,INSPECTED BOP-CONNECTOR FOR LOCATION OF VX-RING AND FOUND RING IN CONNECTOR. ACTIVATED VX-RING LOCKPINS SEVERAL TIMES AND REINSPECTED CONNECTOR. FOUND RING MISSING AND LOCATED SAME ON SEABOTTOM.,0.5 +15_9_19_ST2_1993_04_30.xml,NO 15/9-19 S,NO 15/9-19 ST2,1993-04-29T00:00:00+02:00,1993-04-30T00:00:00+02:00,1993-04-29 05:30:00+00:00,1993-04-29 07:00:00+00:00,0.0,m,fixed,plug abandon -- other,ok,success,LAUNCHED SCORPION ROV. PREPARED TO AND CLOSED HATCH COVER OVER SLOT S3.,1.5 +15_9_19_ST2_1997_07_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-16T00:00:00+02:00,1997-07-17T00:00:00+02:00,1997-07-16 13:30:00+00:00,1997-07-16 21:00:00+00:00,0.0,m,fixed,moving -- transit,ok,success,RIG MOVEMENT TO LOKE TEMPLATE 15/9,7.5 +15_9_19_ST2_1997_07_17.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-16T00:00:00+02:00,1997-07-17T00:00:00+02:00,1997-07-16 21:00:00+00:00,1997-07-16 22:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,ON LOCATION. STARTED ANCHOR HANDLING. DROPPED ANCHOR #3,1.0 +15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-16 22:00:00+00:00,1997-07-17 03:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,CONTINUED WITH ANCHOR HANDLING. ANCHOR #1 ON BOTTOM AT 0030 HRS - FAR SERVER. ANCHOR #10 ON BOTTOM 0040 HRS - NORMAN HUNTER. ANCHOR #7 ON BOTTOM 0220 HRS - FAR SERVER. ANCHOR #8 ON BOTTOM 0330 HRS - FAR SERVER. ANCHOR #4 ON BOTTOM 0500 HRS - NORMAN HUNTER. ANCHOR #11 ON BOTTOM 0530 HRS - RED ROOSTER,5.5 +15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 03:30:00+00:00,1997-07-17 04:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,ANCHOR # 2 ON BOTTOM 0545 HRS - FAR SERVER ANCHOR # 11 ON BOTTOM 0600 HRS - RED ROOSTER,0.5 +15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 04:00:00+00:00,1997-07-17 06:00:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,COMPLETED ANCHOR-HANDLING: NO. 5 ON BOTTOM 0615 HRS.,2.0 +15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 06:00:00+00:00,1997-07-17 13:30:00+00:00,0.0,m,fixed,moving -- transit,ok,success,BALLASTED RIG DOWN TO DRILLING DRAFT.,7.5 +15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 13:30:00+00:00,1997-07-17 19:30:00+00:00,0.0,m,fixed,moving -- anchor,ok,success,PRE-TENSIONED ALL ANCHORS TO 140 T. HAD TO RE-SET ANCHOR NO. 1.,6.0 +15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 19:30:00+00:00,1997-07-17 21:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"P/U THORT, R/U BOP TO TEST SPOOL AND RE-PERFORMED DUMMY RUN TO SET ORIENTATION.",1.5 +15_9_19_ST2_1997_07_18.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-17T00:00:00+02:00,1997-07-18T00:00:00+02:00,1997-07-17 21:00:00+00:00,1997-07-17 22:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,MOVED RIG 20 M TO STB AND RIGGED DOWN BOP SET UP.,1.0 +15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-17 22:00:00+00:00,1997-07-17 23:00:00+00:00,0.0,m,fixed,moving -- position,ok,success,RIGGED DOWN BOP SET UP.,1.0 +15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-17 23:00:00+00:00,1997-07-18 04:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,PREPARED FOR REMOVING HATCH FROM SLOT S3. LOWERED RETR. FRAME DOWN ONTO TEMPLATE BY USING CRANE. RE-POSITIONED RIG WHILE REMOVING TWO LOCKING BOLTS FROM HATCH BY USING ROV. RAN ROV-HOOK/SLINGS ON DP. CONN. TO RETR. FRAME. WORKED TO ENGAUGE RETR. FRAME INTO HATCH.,5.0 +15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 04:00:00+00:00,1997-07-18 07:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,RETRIEVED PROTECION HATCH FROM SLOT S3. PARKED SAME ON TOP OF TEMPLATE STRUCTURE.,3.0 +15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 07:00:00+00:00,1997-07-18 09:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,"CONNECTED GUIDE-LINES ON POSTS NO. 2 AND NO. 3, ASSISTED BY ROV. POOH W/ DP AND SLINGS. MOVED RIG OFF LOCATION.",2.0 +15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 09:00:00+00:00,1997-07-18 10:00:00+00:00,0.0,m,fixed,drilling -- other,ok,success,M/U CORROSION CAP RT ON DP.,1.0 +15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 10:00:00+00:00,1997-07-18 12:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,MOVED RIG OVER LOCATION.,2.5 +15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 12:30:00+00:00,1997-07-18 16:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,ATTEMPTED TO RETR. CORR. CAP ON DP. NEG. RAN RETR. TOOL ON TUGGER. RETRIEVED CORR. CAP ASSISTED BY ROV.,4.0 +15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 16:30:00+00:00,1997-07-18 18:30:00+00:00,0.0,m,fixed,drilling -- other,ok,success,MOVED RIG OFF LOCATION.,2.0 +15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 18:30:00+00:00,1997-07-18 19:30:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,P/U AND M/U FMC EMERGENCY HANGOFF TOOL. RACKED SAME IN DERRICK.,1.0 +15_9_19_ST2_1997_07_19.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-18T00:00:00+02:00,1997-07-19T00:00:00+02:00,1997-07-18 19:30:00+00:00,1997-07-18 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 5"" DP WHILE PREPARING BOP.",2.5 +15_9_19_ST2_1997_07_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-19T00:00:00+02:00,1997-07-20T00:00:00+02:00,1997-07-18 22:00:00+00:00,1997-07-19 04:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 5"" DP AND RACKED SAME IN DERRICK WHILE PREPARING/WORKING ON BOP: INSTALLED LATCH/UNLATCH INDICATOR ON BOP WH CONN. (FOR ROV VERIFIC.). PULLED YELLOW POD FROM LMRP RECEPTICLE AND INSTALLED PILOT LINES FOR ORIENTATION PIN OPERATION.",6.0 +15_9_19_ST2_1997_07_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-19T00:00:00+02:00,1997-07-20T00:00:00+02:00,1997-07-19 04:00:00+00:00,1997-07-19 12:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U 5"" DP WHILE PREPARING/WORKING ON BOP.",8.0 +15_9_19_ST2_1997_07_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-19T00:00:00+02:00,1997-07-20T00:00:00+02:00,1997-07-19 12:00:00+00:00,1997-07-19 13:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,R/U TO RUN BOP AND RISER.,1.5 +15_9_19_ST2_1997_07_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-19T00:00:00+02:00,1997-07-20T00:00:00+02:00,1997-07-19 13:30:00+00:00,1997-07-19 14:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,P/U AND M/U 2 X 50 FT RISER JOINTS.,1.0 +15_9_19_ST2_1997_07_20.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-19T00:00:00+02:00,1997-07-20T00:00:00+02:00,1997-07-19 14:30:00+00:00,1997-07-19 22:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,R/U TO RUN BOP: MOVED BOP FROM AFT POS. TO BELOW RT. MOVED LMRP FROM FWD POS. AND CONNECTED SAME TO BOP. DRESSED BOP W/GUIDE-LINES NO. 2 AND NO.3. FUNCTION TESTED BOP ON BOUTH PODS. CHECKED CONN. LATCH/UNLATCH. CHECKED FUNCT. OF ORIENTATION PIN (YELLOW POD). INST. BACON/SLOPE IND.,7.5 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-19 22:00:00+00:00,1997-07-20 01:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,HELD SAFETY MEETING PRIOR RUNNING BOP. RAN BOP AND RISER.,3.5 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 01:30:00+00:00,1997-07-20 03:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,P/U SLIP JOINT. M/U LANDING JOINT.,1.5 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 03:00:00+00:00,1997-07-20 04:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,INSTALLED KILL-/CHOKE-LINES.,1.0 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 04:00:00+00:00,1997-07-20 05:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,INSTALLED RUCKER RING ON RISER.,1.0 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 05:00:00+00:00,1997-07-20 06:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,POSITIONED RIG OVER LOCATION.,1.0 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 06:00:00+00:00,1997-07-20 07:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,"ORIENTED BOP/TEMPLATE. LANDED/LATCHED BOP ONTO 18-3/4"" WH AT 0930 HRS. TOOK 25 T OP.",1.5 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 07:30:00+00:00,1997-07-20 12:30:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,CONN. HOSE SADLES AND POD REELS. RELEASED INNER BARREL. L/D LANDING JNT. INSTALLED DIVERTER. L/D RISER HANDLING TOOL. CHANGED BAILS AND ELEVATORS.,5.0 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 12:30:00+00:00,1997-07-20 14:30:00+00:00,0.0,m,fixed,drilling -- bop activities,ok,success,M/U WB TO R/T. RIH. LANDED IN WH. PRESS. TESTED KILL-/CHOKE LINES AND BOP CONN. TO 345 BAR.,2.0 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 14:30:00+00:00,1997-07-20 16:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,operation failed,ATTEMPTED TO SET WB. NEGATIVE. POOH.,2.0 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 16:30:00+00:00,1997-07-20 18:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,operation failed,M/U AND RIH W/ JET SUB. WASHED AND CLEANED WH AREA. POOH.,1.5 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 18:00:00+00:00,1997-07-20 19:00:00+00:00,0.0,m,fixed,drilling -- bop/wellhead equipment,ok,success,M/U BACK-UP WB TO R/T. RIH AND SET WB.,1.0 +15_9_19_ST2_1997_07_21.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-20T00:00:00+02:00,1997-07-21T00:00:00+02:00,1997-07-20 19:00:00+00:00,1997-07-20 22:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"P/U AND M/U 8-1/2"" ROTARY DRILLING BHA. P/U DC'S AS RIH.",3.0 +15_9_19_ST2_1997_07_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-21T00:00:00+02:00,1997-07-22T00:00:00+02:00,1997-07-20 22:00:00+00:00,1997-07-20 23:00:00+00:00,0.0,m,fixed,drilling -- trip,ok,success,"CONT. M/U 8-1/2"" BHA. TAGGED TOP CMT. AT 190 M (WASHED DOWN LAST STD).",1.0 +15_9_19_ST2_1997_07_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-21T00:00:00+02:00,1997-07-22T00:00:00+02:00,1997-07-20 23:00:00+00:00,1997-07-21 00:00:00+00:00,190.0,m,fixed,drilling -- circulating conditioning,ok,success,"DISPLACED WELL TO 1,38 SG BENTONITE MUD. FLUSHED KILL-/CHOKE LINES. RECORDED SCR. PERFORMED CHOKE-DRILL.",1.0 +15_9_19_ST2_1997_07_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-21T00:00:00+02:00,1997-07-22T00:00:00+02:00,1997-07-21 00:00:00+00:00,1997-07-21 04:00:00+00:00,215.0,m,fixed,drilling -- drill,ok,success,"DRILLED HARD CMT INSIDE 9-5/8"" CSG FROM 190 M TO 215 M.",4.0 +15_9_19_ST2_1997_07_22.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-21T00:00:00+02:00,1997-07-22T00:00:00+02:00,1997-07-21 04:00:00+00:00,1997-07-21 22:00:00+00:00,356.0,m,fixed,drilling -- drill,ok,success,"DRILLED HARD CMT INSIDE 9-5/8"" CSG FROM 215 M TO 356 M.",18.0 +15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-21 22:00:00+00:00,1997-07-22 03:30:00+00:00,402.0,m,fixed,drilling -- drill,ok,success,"DRILLED HARD CMT INSIDE 9-5/8"" CSG FROM 356 M TO 402 M. HIT 9-5/8"" BRIDGE-PLUG AT 402 M.",5.5 +15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 03:30:00+00:00,1997-07-22 04:00:00+00:00,402.0,m,fixed,drilling -- drill,ok,success,"DRILLED ON 9-5/8"" BRIDGE-PLUG AT 402 M.",0.5 +15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 04:00:00+00:00,1997-07-22 06:00:00+00:00,403.0,m,fixed,drilling -- drill,ok,success,"DRILLED OUT 9-5/8"" BRIDGE-PLUG FROM 402 M TO 403 M.",2.0 +15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 06:00:00+00:00,1997-07-22 07:00:00+00:00,403.0,m,fixed,drilling -- circulating conditioning,ok,success,"BROKE THROUGH 9-5/8"" BRIDGE-PLUG. CLOSED UAP. CIRC. B/U THROUGH CHOKE- LINE. NO GAS.",1.0 +15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 07:00:00+00:00,1997-07-22 15:30:00+00:00,3199.0,m,fixed,drilling -- trip,ok,success,"RIH W/ 8-1/2"" BIT FROM 403 M. P/U 81 JNTS 5"" DP AS RIH. TOOK WT AT 3199 M (20 T).",8.5 +15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 15:30:00+00:00,1997-07-22 16:30:00+00:00,3200.0,m,fixed,drilling -- drill,ok,success,"MILLED 1 M W/ 20 T WOB. NO PROGRESS BELOW 3200 M, INDIC. TOP OF LINER AT 3200 M.",1.0 +15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 16:30:00+00:00,1997-07-22 17:30:00+00:00,3200.0,m,fixed,drilling -- circulating conditioning,ok,success,CIRC. BU.,1.0 +15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 17:30:00+00:00,1997-07-22 18:30:00+00:00,3000.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 8-1/2"" BIT TO 3000 M.",1.0 +15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 18:30:00+00:00,1997-07-22 19:30:00+00:00,0.0,m,fixed,interruption -- maintain,fail,equipment failure,REPAIRED ON DP ELEVATOR.,1.0 +15_9_19_ST2_1997_07_23.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-22T00:00:00+02:00,1997-07-23T00:00:00+02:00,1997-07-22 19:30:00+00:00,1997-07-22 22:00:00+00:00,1500.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 8-1/2"" BIT FROM 3000 M TO 1500 M. SCRAPED INTERV. 2190-2210 M SEVERAL TIMES (PLANNED BRIDGE-PLUG SETTING DEPTH).",2.5 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-22 22:00:00+00:00,1997-07-23 01:00:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"CONT. POOH W/ 8-1/2"" BIT FROM 1500 M. RACKED BHA IN DERRICK.",3.0 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 01:00:00+00:00,1997-07-23 04:00:00+00:00,1000.0,m,fixed,plug abandon -- trip,ok,success,"P/U AND M/U 6 STD 3-1/2"" CMT STINGER. RIH W/ SAME TO 1000 M.",3.0 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 04:00:00+00:00,1997-07-23 06:30:00+00:00,3208.0,m,fixed,plug abandon -- trip,ok,success,"RIH W/ 3-1/2"" CMT STINGER FROM 1000 M TO 3208 M. TOOK WT.",2.5 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 06:30:00+00:00,1997-07-23 07:30:00+00:00,3208.0,m,fixed,plug abandon -- trip,ok,success,"WORKED MULE-SHOW THROUGH RESTRICTION IN 7"" LINER LAP.",1.0 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 07:30:00+00:00,1997-07-23 08:00:00+00:00,3309.0,m,fixed,plug abandon -- trip,ok,success,"CONT. RIH W/ 3-1/2"" CMT STINGER FROM 3208 M TO 3309 M.",0.5 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 08:00:00+00:00,1997-07-23 10:00:00+00:00,3309.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"CIRC. TO CONDITION MUD. DISPLACED HI-VIS PILL (1,38 SG) FROM 3309 M - 3259 M.",2.0 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 10:00:00+00:00,1997-07-23 10:30:00+00:00,3259.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 3-1/2"" CMT STINGER FROM 3309 M TO 3259 M. R/U TO CMT UNIT.",0.5 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 10:30:00+00:00,1997-07-23 11:00:00+00:00,3259.0,m,fixed,plug abandon -- cement plug,ok,success,"SET A BALANCED CMT PLUG FROM 3259 M - 3109 M AS FOLLOWS: PUMPED 5 M3 FW SPACER, MIXED AND PUMPED 4,63 M3 1,92 SG CMT SLURRY. PUMPED 1,7 M3 FW SPACER BEHIND. DISPLACED PLUG W/ 26 M3 BENT. MUD.",0.5 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 11:00:00+00:00,1997-07-23 12:30:00+00:00,3050.0,m,fixed,plug abandon -- trip,ok,success,POOH W/ CMT STINGER FROM 3259 M TO 3050 M.,1.5 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 12:30:00+00:00,1997-07-23 13:00:00+00:00,3050.0,m,fixed,plug abandon -- circulating conditioning,ok,success,REV. CIRCULATED STINGER VOLUM.,0.5 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 13:00:00+00:00,1997-07-23 14:00:00+00:00,2800.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 3-1/2"" CMT STINGER FROM 3050 M TO 2800 M.",1.0 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 14:00:00+00:00,1997-07-23 14:30:00+00:00,2800.0,m,fixed,plug abandon -- circulating conditioning,ok,success,PLACED HI-VIS PILL FROM 2800 M TO 2300 M.,0.5 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 14:30:00+00:00,1997-07-23 15:30:00+00:00,2300.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 3-1/2"" CMT STINGER FROM 2800 M TO 2300 M.",1.0 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 15:30:00+00:00,1997-07-23 16:30:00+00:00,0.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"PREPARED TO DISPL. WELL TO 1,50 SG ULTIDRILL MUD, CLEANED RIG-FLOOR.",1.0 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 16:30:00+00:00,1997-07-23 20:00:00+00:00,2300.0,m,fixed,plug abandon -- circulating conditioning,ok,success,"DISPLACED WELL TO 1,50 SG ULTIDRILL MUD FROM 2300 M.",3.5 +15_9_19_ST2_1997_07_24.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-23T00:00:00+02:00,1997-07-24T00:00:00+02:00,1997-07-23 20:00:00+00:00,1997-07-23 22:00:00+00:00,750.0,m,fixed,plug abandon -- trip,ok,success,"POOH W/ 3-1/2"" CMT STINGER FROM 2300 M TO 750 M.",2.0 +15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-23 22:00:00+00:00,1997-07-23 23:30:00+00:00,0.0,m,fixed,plug abandon -- trip,ok,success,"CONT. POOH W/ 3-1/2"" CMT STINGER FROM 750 M. RACKED SAME IN DERRICK.",1.5 +15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-23 23:30:00+00:00,1997-07-24 01:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,R/U ATLAS WIRELINE.,1.5 +15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 01:00:00+00:00,1997-07-24 03:00:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"RIH W/ 9-5/8"" BRIDGE-PLUG ON ATLAS WIRELINE. CCL QUIT WORKING. POOH. CHANGED OUT CCL.",2.0 +15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 03:00:00+00:00,1997-07-24 04:00:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"RIH W/ 9-5/8"" BRIDGE-PLUG ON ATLAS WIRELINE.",1.0 +15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 04:00:00+00:00,1997-07-24 06:00:00+00:00,750.0,m,fixed,interruption -- repair,fail,equipment failure,"ATLAS WIRELINE RIH WITH 9 5/8"" BRIDGE-PLUG. CCL FAILED AGAIN AT 750M. POOH WITH BRIDGE-PLUG; OUT OF HOLE AT 0715 HRS. ATLAS REPAIRED CCL PROBLEM.",2.0 +15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 06:00:00+00:00,1997-07-24 10:00:00+00:00,2200.0,m,fixed,interruption -- repair,fail,equipment failure,RIH WITH BRIDGE-PLUG ON ATLAS E/LINE TO 2200 M. ELECTRICAL PROBLEM PREVENTED BAKER SETTING TOOL FROM SETTING BRIDGE-PLUG. POOH WITH BRIDGE-PLUG; OUT OF HOLE AT 1140 HRS.,4.0 +15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 10:00:00+00:00,1997-07-24 18:30:00+00:00,0.0,m,fixed,interruption -- repair,fail,equipment failure,"ATLAS WORKED ON TROUBLESHOOTING PROBLEM WITH SETTING TOOL.RETERMINATED CABLE HEAD. FLEW SETTING TOOL FIRING HEAD OUT TO RIG; REPLACED SAME. ATLAS CHECKED TOOL & MU 9 5/8"" BRIDGE-PLUG.",8.5 +15_9_19_ST2_1997_07_25.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-24T00:00:00+02:00,1997-07-25T00:00:00+02:00,1997-07-24 18:30:00+00:00,1997-07-24 22:00:00+00:00,2203.0,m,wire line,workover -- wire line,ok,success,"RIH WITH BRIDGE-PLUG ON E/LINE. LOCATED CASING COLLAR & SET TOP OF BRIDGE-PLUG 1,5 M BELOW COLLAR - AT 2203 M. POOH WITH E/LINE & SETTING TOOL. WITH B/S RAMS CLOSED, STARTED PRESSURING-UP ON 9 5/8"" X 10 3/4"" STRING WHILE RD ATLAS E/LINE.",3.5 +15_9_19_ST2_1997_07_26.xml,NO 15/9-19 S,NO 15/9-19 ST2,1997-07-25T00:00:00+02:00,1997-07-26T00:00:00+02:00,1997-07-24 22:00:00+00:00,1997-07-24 22:30:00+00:00,0.0,m,wire line,workover -- wire line,ok,success,"PRESSURE TESTED 9 5/8"" CASING + BRIDGE-PLUG TO 345 BAR FOR 10 MINUTES.",0.5