43c68a3 | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 | # Problem definition
The **Security-Constrained Unit Commitment Problem** (SCUC) is formulated in
UC.jl as a two-stage stochastic mixed-integer linear optimization problem that
aims to find the minimum-cost schedule for electricity generation while
satisfying various physical, operational and economic constraints. In its most
basic form, the problem is composed by:
- A set of generators, which produce power, at a given cost;
- A set of loads, which consume power;
- A transmission network, which delivers power from generators to the loads.
In addition to the basic components above, SCUC also include a wide variety of
additional components, such as _energy storage devices_, _reserves_ and _network
interfaces_, to name a few. On this page, we present a complete definition of
the problem, as modeled in UC.jl. Please note that different sources in the
literature may have significantly different definitions and assumptions.
!!! note
UC.jl treats deterministic SCUC instances as a special case of the stochastic problem in which there is only one scenario, named `"s1"` by default. To access second-stage decisions, therefore, you must provide this scenario name as the value for `s`. For example, `model[:prod_above]["s1", g, t]`.
!!! warning
The problem definition presented in this page is mathematically equivalent to the one solved by UC.jl. However, some constraints (ramping, piecewise-linear costs and start-up costs) have been simplified in this page for clarity. The set of constraints actually enforced by UC.jl better describes the convex hull of the problem and leads to better computational performance, but it is much more complex to describe. For further details, we refer to the package's source code and associated references.
## 1. General modeling assumptions
- **Time discretization:** SCUC is a multi-period problem, with decisions
typically covering a 24-hour or 36-hour time window. UC.jl assumes that this
time window is discretized into time steps of fixed length. The number of time
steps, as well as the duration of each time step, are configurable. In the
equations below, the set of time steps is denoted by $T=\{1,2,\ldots,|T|\}$.
- **Decision under uncertainty:** SCUC is a two-stage stochastic problem. In the
first stage, we must decide the _commitment status_ of all thermal generators.
In the second stage, we determine the remaining decision variables, such power
output of all generators, the operation of energy storage devices and load
shedding. Stochasticity is modeled through a discrete number of scenarios
$s \in S$, each with given probability $p(S)$. The goal is to minimize the
minimum expected cost.
## 2. Thermal generators
A _thermal generator_ is a power generation unit that converts thermal energy,
typically from the combustion of coal, natural gas or oil, into electrical
energy. Scheduling thermal generators is particularly complex due to their
operational characteristics, including minimum up and down times, ramping rates,
and start-up and shutdown limits.
### Important concepts
- **Commitment, power output and startup costs:** Thermal generators can either
be online (on) or offline (off). When a thermal generator is on, it can
produce between a minimum and a maximum amount of power; when it is off, it
cannot produce any power. Switching a generator on incurs a startup cost,
which depends on how long the unit has been offline. More precisely, each
thermal generator $g$ has a number $K^{start}_g$ of startup categories (e.g.,
cold, warm and hot). Each category $k$ has a corresponding startup cost
$Z^{\text{start}}_{gk}$, and is available only if the unit has spent at most
$M^{\text{delay}}_{gk}$ time steps offline.
- **Piecewise-linear production cost curve:** Besides startup costs, thermal
generators also incur production costs based on their power output. The
relationship between production cost and power output is not a linear, but a
convex curve, which is simplified using a piecewise-linear approximation. For
this purpose, each thermal generator $g$ has a number $K^{\text{cost}}_g$ of
piecewise-linear segments and its power output $y^{\text{prod-above}}_{gts}$
are broken down into
$\sum_{k=1}^{K^{\text{cost}}_g} y^{\text{seg-prod}}_{gtks}$, so that
production costs can be more easily calculated.
- **Ramping, minimum up/down:** Due to physical and operational limits, such as
thermal inertia and mechanical stress, thermal generators cannot vary their
power output too dramatically from one time period to the next. Similarly,
thermal generators cannot switch on and off too frequently; after switching on
or off, units must remain at that state for a minimum specified number of time
steps.
- **Startup and shutdown limit:** A thermal generator cannot shut off if its
output power level in the immediately preceding time step is very high (above
a specified value); the unit must first ramp down, over potentially multiple
time steps, and only then shut off. Similarly, the unit cannot produce a very
large amount of power (above a specified limit) immediately after starting up;
it must ramp up over potentially multiple time steps.
- **Initial status:** The optimization process finds optimal commitment status
and power output level for all thermal generators starting at time period 1.
Many constraints, however, require knowledge of previous time periods (0, -1,
-2, ...) which are not part of the optimization model. For this reason, part
of the input data is the initial power output $M^{\text{init-power}}_{g}$ of
unit $g$ (that is, the output at time 0) and the initial status
$M^{\text{init-status}}_{g}$ of unit g (how many time steps has it been
online/offline at time time 0). If $M^{\text{init-status}}_{g}$ is positive,
its magnitude indicates how many time periods has the unit been online; and if
negative, how has it been offline.
- **Must-run:** Due to various factors, including reliability considerations,
some units must remain operational regardless of whether it is economical for
them to do so. Must-run constraints are used to enforce such requirements.
### Sets and constants
| Symbol | Unit | Description |
| :------------------------------ | :----- | :----------------------------------------------------------------------------------------- |
| $K^{cost}_g$ | | Number of piecewise linear segments in the production cost curve. |
| $K^{start}_g$ | | Number of startup categories (e.g. cold, warm, hot). |
| $M^{\text{delay}}_{gk}$ | | Delay for startup category $k$. |
| $M^{\text{init-power}}_{g}$ | MW | Initial power output of unit $g$. |
| $M^{\text{init-status}}_{g}$ | | Initial status of unit $g$. |
| $M^{\text{min-up}}_{g}$ | | Minimum amount of time $g$ must stay on after switching on. |
| $M^{\text{must-run}}_{gt}$ | Binary | One if unit $g$ must be on at time $t$. |
| $M^{\text{pmax}}_{gt}$ | MW | Maximum power output at time $t$. |
| $M^{\text{pmin}}_{gt}$ | MW | Minimum power output at time $t$. |
| $M^{\text{ramp-down}}_{g}$ | MW | Ramp down limit. |
| $M^{\text{ramp-up}}_{g}$ | MW | Ramp up limit. |
| $M^{\text{seg-pmax}}_{gtks}$ | MW | Maximum power output for piecewise-linear segment $k$ at time $t$ and scenario $s$. |
| $M^{\text{shutdown-limit}}_{g}$ | MW | Maximum power unit $g$ produces immediately before shutting down |
| $M^{\text{startup-limit}}_{g}$ | MW | Maximum power unit $g$ produces immediately after starting up |
| $R_g$ | | Set of spinning reserves that may be served by $g$. |
| $Z^{\text{pmin}}_{gt}$ | \$ | Cost to keep $g$ operational at time $t$ generating at minimum power. |
| $Z^{\text{pvar}}_{gtks}$ | \$/MW | Cost for unit $g$ to produce 1 MW of power under piecewise-linear segment $k$ at time $t$. |
| $Z^{\text{start}}_{gk}$ | \$ | Cost to start unit $g$ at startup category $k$. |
| $G^\text{therm}$ | | Set of thermal generators. |
### Decision variables
| Symbol | JuMP name | Description | Unit | Stage |
| :---------------------------- | :------------------ | :-------------------------------------------------------------------------------------------- | :----- | :---- |
| $x^{\text{is-on}}_{gt}$ | `is_on[g,t]` | One if generator $g$ is on at time $t$. | Binary | 1 |
| $x^{\text{switch-on}}_{gt}$ | `switch_on[g,t]` | One if generator $g$ switches on at time $t$. | Binary | 1 |
| $x^{\text{switch-off}}_{gt}$ | `switch_off[g,t]` | One if generator $g$ switches off at time $t$. | Binary | 1 |
| $x^{\text{start}}_{gtk}$ | `startup[g,t,s]` | One if generator $g$ starts up at time $t$ under startup category $k$. | Binary | 1 |
| $y^{\text{prod-above}}_{gts}$ | `prod_above[s,g,t]` | Amount of power produced by $g$ at time $t$ in scenario $s$ above the minimum power. | MW | 2 |
| $y^{\text{seg-prod}}_{gtks}$ | `segprod[s,g,t,k]` | Amount of power produced by $g$ at time $t$ in piecewise-linear segment $k$ and scenario $s$. | MW | 2 |
| $y^{\text{res}}_{grts}$ | `reserve[s,r,g,t]` | Amount of spinning reserve $r$ supplied by $g$ at time $t$ in scenario $s$. | MW | 2 |
### Objective function terms
- Production costs:
```math
\sum_{g \in G^\text{therm}} \sum_{t \in T} x^{\text{is-on}}_{gt} Z^{\text{pmin}}_{gt}
+ \sum_{s \in S} p(s) \left[
\sum_{g \in G^\text{therm}} \sum_{t \in T} \sum_{k=1}^{K^{cost}_g}
y^{\text{seg-prod}}_{gtks} Z^{\text{pvar}}_{gtks}
\right]
```
- Start-up costs:
```math
\sum_{g \in G} \sum_{t \in T} \sum_{k=1}^{K^{start}_g} x^{\text{start}}_{gtk} Z^{\text{start}}_{gk}
```
### Constraints
- Some units must remain on, even if it is not economical for them to do so:
```math
x^{\text{is-on}}_{gt} \geq M^{\text{must-run}}_{gt}
```
- After switching on, unit must remain on for some amount of time
(`eq_min_uptime[g,t]`):
```math
\sum_{i=max(1,t-M^{\text{min-up}}_{g}+1)}^t x^{\text{switch-on}}_{gi} \leq x^{\text{is-on}}_{gt}
```
- Same as above, but covering the initial time steps (`eq_min_uptime[g,0]`):
```math
\sum_{i=1}^{min(T,M^{\text{min-up}}_{g}-M^{\text{init-status}}_{g})} x^{\text{switch-off}}_{gi} = 0 \; \text{ if } \; M^{\text{init-status}}_{g} > 0
```
- After switching off, unit must remain offline for some amount of time
(`eq_min_downtime[g,t]`):
```math
\sum_{i=max(1,t-M^{\text{min-down}}_{g}+1)}^t x^{\text{switch-off}}_{gi} \leq 1 - x^{\text{is-on}}_{gt}
```
- Same as above, but covering the initial time steps (`eq_min_downtime[g,0]`):
```math
\sum_{i=1}^{min(T,M^{\text{min-down}}_{g}+M^{\text{init-status}}_{g})} x^{\text{switch-on}}_{gi} = 0 \; \text{ if } \; M^{\text{init-status}}_{g} < 0
```
- If the unit switches on, it must choose exactly one startup category
(`eq_startup_choose[g,t]`):
```math
x^{\text{switch-on}}_{gt} = \sum_{k=1}^{K^{start}_g} x^{\text{start}}_{gtk}
```
- If unit has not switched off in the last "delay" time periods, then startup
category is forbidden (`eq_startup_restrict[g,t,s]`). The last startup
category is always allowed. In the equation below, $L^{\text{start}}_{gtk}=1$
if category should be allowed based on initial status.
```math
x^{\text{start}}_{gtk} \leq L^{\text{start}}_{gtk} + \sum_{i=min\left(1,t - M^{\text{delay}}_{g,k+1} + 1\right)}^{t - M^{\text{delay}}_{kg}} x^{\text{switch-off}}_{gi}
```
- Link the binary variables together (`eq_binary_link[g,t]`):
```math
\begin{align*}
& x^{\text{is-on}}_{gt} - x^{\text{is-on}}_{g,t-1} = x^{\text{switch-on}}_{gt} - x^{\text{switch-off}}_{gt} & \forall t > 1 \\
\end{align*}
```
- Cannot switch on and off at the same time (`eq_switch_on_off[g,t]`):
```math
x^{\text{switch-on}}_{gt} + x^{\text{switch-off}}_{gt} \leq 1
```
- If the unit is off, it cannot produce power or provide reserves. If it is on,
it must to so within the specified production limits (`eq_prod_limit[s,g,t]`):
```math
y^{\text{prod-above}}_{gts} + \sum_{r \in R_g} y^{\text{res}}_{grts} \leq
(M^{\text{pmax}}_{gt} - M^{\text{pmin}}_{gt}) x^{\text{is-on}}_{gt}
```
- Break down the "production above" variable into smaller "segment production"
variables, to simplify the objective function (`eq_prod_above_def[s,g,t]`):
```math
y^{\text{prod-above}}_{gts} = \sum_{k=1}^{K^{cost}_g} y^{\text{seg-prod}}_{gtks}
```
- Impose upper limit on segment production variables
(`eq_segprod_limit[s,g,t,k]`):
```math
0 \leq y^{\text{seg-prod}}_{gtks} \leq M^{\text{seg-pmax}}_{gtks}
```
- Unit cannot increase its production too quickly (`eq_ramp_up[s,g,t]`):
```math
y^{\text{prod-above}}_{gts} + \sum_{r \in R_g} y^{\text{res}}_{grts} \leq
y^{\text{prod-above}}_{g,t-1,s} + M^{\text{ramp-up}}_{g}
```
- Same as above, for initial time (`eq_ramp_up[s,g,1]`):
```math
y^{\text{prod-above}}_{g,1,s} + \sum_{r \in R_g} y^{\text{res}}_{gr,1,s} \leq
\left(M^{\text{init-power}}_{g} - M^{\text{pmin}}_{gt}\right) + M^{\text{ramp-up}}_{g}
```
- Unit cannot decrease its production too quickly (`eq_ramp_down[s,g,t]`):
```math
y^{\text{prod-above}}_{gts} \geq
y^{\text{prod-above}}_{g,t-1,s} - M^{\text{ramp-down}}_{g}
```
- Same as above, for initial time (`eq_ramp_down[s,g,1]`):
```math
y^{\text{prod-above}}_{g,1,s} \geq
\left(M^{\text{init-power}}_{g} - M^{\text{pmin}}_{gt}\right) - M^{\text{ramp-down}}_{g}
```
- Unit cannot produce excessive amount of power immediately after starting up
(`eq_startup_limit[s,g,t]`):
```math
y^{\text{prod-above}}_{gts} + \sum_{r \in R_g} y^{\text{res}}_{grts} \leq
(M^{\text{pmax}}_{gt} - M^{\text{pmin}}_{gt}) x^{\text{is-on}}_{gt} -
max\left\{0,M^{\text{pmax}}_{gt} - M^{\text{startup-limit}}_{g}\right\}
x^{\text{switch-on}}_{gt}
```
- Unit cannot shutoff it it's producing too much power
(`eq_shutdown_limit[s,g,t]`):
```math
y^{\text{prod-above}}_{gts} \leq
(M^{\text{pmax}}_{gt} - M^{\text{pmin}}_{gt}) x^{\text{is-on}}_{gt} -
max\left\{0,M^{\text{pmax}}_{gt} - M^{\text{shutdown-limit}}_{g}\right\}
x^{\text{switch-off}}_{g,t+1}
```
## 3. Profiled generators
A _profiled generator_ is a simplified generator model that can be used to
represent renewable energy resources, including wind, solar and hydro. Unlike
thermal generators, which can be either on or off, profiled generators do not
have status variables; the only optimization decision is on their power output
level, which must remain between minimum and maximum time-varying amounts.
Production cost curves for profiled generators are linear, making them again
much simpler than thermal units.
### Constants
| Symbol | Unit | Description |
| :---------------------- | :---- | :------------------------------------------------- |
| $M^{\text{pmax}}_{sgt}$ | MW | Maximum power output at time $t$ and scenario $s$. |
| $M^{\text{pmin}}_{sgt}$ | MW | Minimum power output at time $t$ and scenario $s$. |
| $Z^{\text{pvar}}_{sgt}$ | \$/MW | Generation cost at time $t$ and scenario $s$. |
### Decision variables
| Symbol | JuMP name | Unit | Description | Stage |
| :-------------------- | :--------------------- | :--- | :------------------------------------------------------------ | :---- |
| $y^\text{prod}_{sgt}$ | `prod_profiled[s,g,t]` | MW | Amount of power produced by $g$ in time $t$ and scenario $s$. | 2 |
### Objective function terms
- Production cost:
```math
\sum_{s \in S} p(s) \left[
\sum_{t \in T} y^\text{prod}_{sgt} Z^{\text{pvar}}_{sgt}
\right]
```
### Constraints
- Variable bounds:
```math
M^{\text{pmin}}_{sgt} \leq y^\text{prod}_{sgt} \leq M^{\text{pmax}}_{sgt}
```
## 4. Conventional loads
Loads represent the demand for electrical power by consumers and devices
connected to the system. This section describes _conventional_ (or inelastic)
loads, which are not sensitive to changes in electricity prices, and must always
be served. Each bus in the transmission network has exactly one load; multiple
loads in the same bus can be modelled by aggregating them. If there is not
enough production or transmission capacity to serve all loads, some load can be
curtailed, at a penalty.
### Constants
| Symbol | Unit | Description |
| :---------------------- | :---- | :--------------------------------------------------------- |
| $M^\text{load}_{sbt}$ | MW | Conventional load on bus $b$ at time $s$ and scenario $s$. |
| $Z^\text{curtail}_{st}$ | \$/MW | Load curtailment penalty at time $t$ in scenario $s$. |
### Decision variables
| Symbol | JuMP name | Unit | Description | Stage |
| :----------------------- | :--------------- | :--- | :--------------------------------------------------------------- | :---- |
| $y^\text{curtail}_{sbt}$ | `curtail[s,b,t]` | MW | Amount of load curtailed at bus $b$ in time $t$ and scenario $s$ | 2 |
### Objective function terms
- Load curtailment penalty:
```math
\sum_{s \in S} p(s) \left[
\sum_{b \in B} \sum_{t \in T} y^\text{curtail}_{sbt} Z^\text{curtail}_{ts}
\right]
```
### Constraints
- Variable bounds:
```math
0 \leq y^\text{curtail}_{sbt} \leq M^\text{load}_{bts}
```
## 5. Price-sensitive loads
_Price-sensitive loads_ refer to components in the system which may increase or
reduce their power consumption according to energy prices. Unlike conventional
loads, described above, price-sensitive loads are only served if it is
economical to do so. More specifically, there are no constraints forcing these
loads to be served; instead, there is a term in the objective function rewarding
each MW served. Unlike conventional loads, there may be multiple price-sensitive
loads per bus.
!!! note
Some unit commitment models allow price-sensitive loads to have a piecewise-linear convex revenue curves, similar to thermal generators. This can be achieved in UC.jl by adding multiple price-sensitive loads to the bus, one for each piecewise-linear segment.
### Sets and constants
| Symbol | Unit | Description |
| :--------------------------- | :---- | :--------------------------------------------------------------- |
| $M^\text{psl-demand}_{spt}$ | MW | Demand of price-sensitive load $p$ at time $t$ and scenario $s$. |
| $Z^\text{psl-revenue}_{spt}$ | \$/MW | Revenue from serving load $p$ at $t$ in scenario $s$. |
| $\text{PSL}$ | | Set of price-sensitive loads. |
### Decision variables
| Symbol | JuMP name | Unit | Description | Stage |
| :------------------- | :------------- | :--- | :------------------------------------------------ | :---- |
| $y^\text{psl}_{spt}$ | `loads[s,p,t]` | MW | Amount served to $p$ in time $t$ and scenario $s$ | 2 |
### Objective function terms
- Revenue from serving price-sensitive loads:
```math
- \sum_{s \in S} p(s) \left[
\sum_{p \in \text{PSL}} \sum_{t \in T} y^\text{psl}_{spt} Z^\text{psl-revenue}_{spt}
\right]
```
### Constraints
- Variable bounds:
```math
0 \leq y^\text{psl}_{spt} \leq M^\text{psl-demand}_{spt}
```
## 6. Energy storage
_Energy storage_ units are able to store energy during periods of low demand,
then release energy back to the grid during periods of high demand. These
devices include _batteries_, _pumped hydroelectric storage_, _compressed air
energy storage_ and _flywheels_. They are becoming increasingly important in the
modern power grid, and can help to enhance grid reliability, efficiency and
integration of renewable energy resources.
### Concepts
- **Min/max energy level and charge rate:** Energy storage units can only store
a limited amount of energy (in MWh). To maintain the operational safety and
longevity of these devices, a minimum energy level may also be imposed. The
rate (in MW) at which these units can charge and discharge is also limited,
due to chemical, physical and operational considerations.
- **Operational costs:** Charging and discharging energy storage units may incur
a cost/revenue. We assume that this cost/revenue is linear on the
charge/discharte rate ($/MW).
- **Efficiency:** Charging an energy storage unit for one hour with an input of
1 MW might not result in an increase of the energy level in the device by
exactly 1 MWh, due to various inneficiencies in the charging process,
including coversion losses and heat generation. For similar reasons,
discharging a storage unit for one hour at 1 MW might reduce the energy level
by more than 1 MWh. Furthermore, even when the unit is not charging or
discharging, some energy level may be gradually lost over time, due to
unwanted chemical reactions, thermal effects of mechanical losses.
- **Myopic effect:** Because the optimization process considers a fixed time
window, there is an inherent bias towards exploiting energy storage units to
their maximum within the window, completely ignoring their operation just
beyond this horizon. For instance, without further constraints, the
optimization algorithm will often ensure that all storage units are fully
discharged at the end of the last time step, which may not be desirable. To
mitigate this myopic effect, a minimum and maximum energy level may be imposed
at the last time step.
- **Simultaneous charging and discharging:** Depending on charge and discharge
costs/revenue, it may make sense mathematically to simultaneously charge and
discharge the storage unit, thus keeping its energy level unchanged while
potentially collecting revenue. Additional binary variables and constraints
are required to prevent this incorrect model behavior.
### Sets and constants
| Symbol | Unit | Description |
| :------------------------------------ | :---- | :---------------------------------------------------------------------------------------------------- |
| $\text{SU}$ | | Set of storage units |
| $Z^\text{charge}_{sut}$ | \$/MW | Linear charge cost/revenue for unit $u$ at time $t$ in scenario $s$. |
| $Z^\text{discharge}_{sut}$ | \$/MW | Linear discharge cost/revenue for unit $u$ at time $t$ in scenario $s$. |
| $M^\text{discharge-max}_{sut}$ | \$/MW | Maximum discharge rate for unit $u$ at time $t$ in scenario $s$. |
| $M^\text{discharge-min}_{sut}$ | \$/MW | Minimum discharge rate for unit $u$ at time $t$ in scenario $s$. |
| $M^\text{charge-max}_{sut}$ | \$/MW | Maximum charge rate for unit $u$ at time $t$ in scenario $s$. |
| $M^\text{charge-min}_{sut}$ | \$/MW | Minimum charge rate for unit $u$ at time $t$ in scenario $s$. |
| $M^\text{max-end-level}_{su}$ | MWh | Maximum storage level of unit $u$ at the last time step in scenario $s$ |
| $M^\text{min-end-level}_{su}$ | MWh | Minimum storage level of unit $u$ at the last time step in scenario $s$ |
| $\gamma^\text{loss}_{s,u,t}$ | | Self-discharge factor. |
| $\gamma^\text{charge-eff}_{s,u,t}$ | | Charging efficiency factor. |
| $\gamma^\text{discharge-eff}_{s,u,t}$ | | Discharging efficiency factor. |
| $\gamma^\text{time-step}$ | | Length of a time step, in hours. Should be 1.0 for hourly time steps, 0.5 for 30-min half steps, etc. |
### Decision variables
| Symbol | JuMP name | Unit | Description | Stage |
| :------------------------------ | :---------------------- | :----- | :----------------------------------------------------------- | :---- |
| $y^\text{level}_{sut}$ | `storage_level[s,u,t]` | MWh | Storage level of unit $u$ at time $t$ in scenario $s$. | 2 |
| $y^\text{charge}_{sut}$ | `charge_rate[s,u,t]` | MW | Charge rate of unit $u$ at time $t$ in scenario $s$. | 2 |
| $y^\text{discharge}_{sut}$ | `discharge_rate[s,u,t]` | MW | Discharge rate of unit $u$ at time $t$ in scenario $s$. | 2 |
| $x^\text{is-charging}_{sut}$ | `is_charging[s,u,t]` | Binary | True if unit $u$ is charging at time $t$ in scenario $s$. | 2 |
| $x^\text{is-discharging}_{sut}$ | `is_discharging[s,u,t]` | Binary | True if unit $u$ is discharging at time $t$ in scenario $s$. | 2 |
### Objective function terms
- Charge and discharge cost/revenue:
```math
\sum_{s \in S} p(s) \left[
\sum_{u \in \text{SU}} \sum_{t \in T} \left(
y^\text{charge}_{sut} Z^\text{charge}_{sut} +
y^\text{discharge}_{sut} Z^\text{discharge}_{sut}
\right)
\right]
```
### Constraints
- Prevent simultaneous charge and discharge
(`eq_simultaneous_charge_and_discharge[s,u,t]`):
```math
x^\text{is-charging}_{sut} + x^\text{is-discharging}_{sut} \leq 1
```
- Limit charge/discharge rate (`eq_min_charge_rate[s,u,t]`,
`eq_max_charge_rate[s,u,t]`, `eq_min_discharge_rate[s,u,t]` and
`eq_max_discharge_rate[s,u,t]`):
```math
\begin{align*}
y^\text{charge}_{sut} \leq x^\text{is-charging}_{sut} M^\text{charge-max}_{sut} \\
y^\text{charge}_{sut} \geq x^\text{is-charging}_{sut} M^\text{charge-min}_{sut} \\
y^\text{discharge}_{sut} \leq x^\text{is-discharging}_{sut} M^\text{discharge-max}_{sut} \\
y^\text{discharge}_{sut} \geq x^\text{is-discharging}_{sut} M^\text{discharge-min}_{sut} \\
\end{align*}
```
- Calculate current storage level (`eq_storage_transition[s,u,t]`):
```math
y^\text{level}_{sut} =
(1 - \gamma^\text{loss}_{s,u,t}) y^\text{level}_{su,t-1} +
\gamma^\text{time-step} \gamma^\text{charge-eff}_{s,u,t} y^\text{charge}_{sut} -
\frac{\gamma^\text{time-step}}{\gamma^\text{discharge-eff}_{s,u,t}} y^\text{charge}_{sut}
```
- Enforce storage level at last time step (`eq_ending_level[s,u]`):
```math
M^\text{min-end-level}_{su} \leq y^\text{level}_{sut} \leq M^\text{max-end-level}_{su}
```
## 7. Buses and transmission lines
So far, we have described generators, which produce power, loads, which consume
power, and storage units, which store energy for later use. Another important
element is the transmission network, which delivers the power produced by the
generators to the loads and storage units. Mathematically, the network is
represented as a graph $(B,L)$ where $B$ is the set of **buses** and $L$ is the
set of **transmission lines**. Each generator, load and storage unit is located
at a bus. The **net injection** at the bus is the sum of all power injected
minus withdrawn at the bus. To balance production and consumption, we must
enforce that the sum of all net injections over the entire network equal to
zero.
Besides the net balance equations, we must also enforce flow limits on the
transmission lines. Unlike flows in other optimization problems, power flows are
directly determined by net injections and transmission line parameters, and must
follow physical laws. UC.jl uses the DC linearization of AC power flow
equations. Under this linearization, the flow $f_l$ in transmission line $l$ is
given by $\sum_{b \in B} \delta_{bl} n_b$, where $\delta_{bl}$ is a constant
known as _injection shift factor_ (also commonly called _power transfer
distribution factor_), computed from the line parameters, and $n_b$ is the net
injection at bus $b$.
!!! warning
To improve computational performance, power flow variables and constraints are generated on-the-fly, during `UnitCommitment.optimize!`; they are **not** added by `UnitCommitment.build_model`.
### Sets and constants
| Symbol | Unit | Description |
| :------------------------ | :---- | :---------------------------------------------------------- |
| $M^\text{limit}_{slt}$ | MW | Flow limit for line $l$ at time $t$ and scenario $s$. |
| $Z^\text{overflow}_{slt}$ | \$/MW | Overflow penalty for line $l$ at time $t$ and scenario $s$. |
| $L$ | | Set of transmission lines. |
| $B$ | | Set of buses. |
### Decision variables
| Symbol | JuMP name | Unit | Description | Stage |
| :------------------------ | :--------------------- | :--- | :-------------------------------------------------------------------- | :---- |
| $y^\text{flow}_{slt}$ | _(added on-the-fly)_ | MW | Flow in line $l$ at time $t$ and scenario $s$. | 2 |
| $y^\text{inj}_{sbt}$ | `net_injection[s,b,t]` | MW | Total net injection at bus $b$, time $t$ and scenario $s$. | 2 |
| $y^\text{overflow}_{slt}$ | `overflow[s,l,t]` | MW | Amount of flow above limit for line $l$ at time $t$ and scenario $s$. | 2 |
### Objective function terms
- Penalty for exceeding line limits:
```math
\sum_{s \in S} p(s) \left[
\sum_{l \in L} \sum_{t \in T} y^\text{overflow}_{slt} Z^\text{overflow}_{slt}
\right]
```
### Constraints
- Power produced equal power consumed (`eq_power_balance[s,t]`):
```math
\sum_{b \in B} \sum_{t \in T} y^\text{inj}_{sbt} = 0
```
- Definition of flow (_enforced on-the-fly_):
```math
y^\text{flow}_{slt} = \sum_{b \in B} \delta_{sbl} y^\text{inj}_{sbt}
```
- Flow limits (_enforced on-the-fly_):
```math
\begin{align*}
y^\text{flow}_{slt} & \leq M^\text{limit}_{slt} + y^\text{overflow}_{slt} \\
-y^\text{flow}_{slt} & \leq M^\text{limit}_{slt} + y^\text{overflow}_{slt}
\end{align*}
```
|