category_type stringclasses 5
values | collection_code stringclasses 66
values | collection_name stringclasses 110
values | department_code stringclasses 44
values | department_name stringclasses 563
values | department_type stringclasses 3
values | section_name stringlengths 0 265 | section_type stringclasses 4
values | subsection_code stringlengths 0 16 | subsection_name stringlengths 0 882 | rate_code stringlengths 21 24 | rate_original_name stringlengths 0 672 | rate_final_name stringlengths 1 274 | rate_unit stringclasses 210
values | row_type stringclasses 7
values | is_scope bool 2
classes | is_abstract bool 2
classes | is_machine bool 2
classes | is_material bool 2
classes | work_composition_text stringlengths 0 354 | resource_code stringlengths 0 26 | resource_name stringlengths 0 401 | resource_unit stringclasses 29
values | resource_quantity float64 0 7.72M ⌀ | parameter_resource_quantity float64 0 7.72M ⌀ | resource_price_per_unit_eur_current float64 0.01 463k ⌀ | resource_cost_eur float64 0 15.4M ⌀ | price_abstract_resource_est_price_median float64 0.05 94.4k ⌀ | unit_match_rate_and_price stringclasses 3
values | materials_resource_cost_eur float64 0 1.99M ⌀ | rate_unit_copy stringclasses 210
values | total_cost_per_position float64 0.3 7.72M ⌀ | price_machinist_wages float64 1.71 561 ⌀ | price_relocation_included stringclasses 3
values | personnel_machinist_grade stringclasses 43
values | electricity_consumption_kwh_per_machine_hour float64 0.01 2.89k ⌀ | electricity_cost_per_unit float64 0 385 ⌀ | electricity_cost_total_sum float64 0 92.5k ⌀ | cost_machinist_sum float64 0 200k ⌀ | count_workers_per_unit float64 1 163k ⌀ | count_engineers_per_unit float64 1 16.9k ⌀ | count_machinists_per_unit float64 1 19.7k ⌀ | count_total_people_per_unit float64 1 163k ⌀ | labor_hours_construction_workers float64 0.02 163k ⌀ | labor_hours_machinists float64 0.01 19.7k ⌀ | labor_hours_engineers float64 0.04 16.9k ⌀ | total_labor_hours_workers_machinists float64 0.01 163k ⌀ | total_labor_hours_all_personnel float64 0.01 163k ⌀ | total_value_machinery_equipment float64 0 1.58M ⌀ | cost_of_working_hours float64 0.34 2.92M ⌀ | count_people_per_day float64 1 23.3k ⌀ | total_material_cost_per_position float64 0.02 2.33M ⌀ | personnel_machinist_code stringclasses 43
values | price_cost_without_wages float64 0.01 30.3k ⌀ | machine_class3_name stringclasses 167
values | machine_class2_name stringclasses 22
values | price_code_prefix stringclasses 896
values | price_abstract_resource_common_start stringclasses 847
values | price_abstract_resource_variable_parts stringlengths 0 33.6k | price_abstract_resource_position_count float64 1 1.57k ⌀ | price_abstract_resource_est_price_min float64 0.04 91.3k ⌀ | price_abstract_resource_est_price_max float64 0.05 463k ⌀ | price_abstract_resource_est_price_mean float64 0.05 175k ⌀ | prais_abstresurs_smetnaya_tekushchaya_razmakh stringclasses 875
values | price_abstract_resource_unit stringclasses 122
values | price_abstract_resource_group_per_unit stringclasses 647
values | price_abstract_resource_common_start_per_unit stringclasses 863
values | price_abstract_resource_variable_parts_per_unit stringclasses 924
values | prais_abstresurs_smetnaya_tekushchaya_razmakh_po_ed stringclasses 920
values | abstract_resource_tech_group stringlengths 0 16 | mass_name stringclasses 2
values | mass_value float64 1 33.3k ⌀ | mass_unit stringclasses 3
values | service_category stringclasses 2
values | service_type stringclasses 2
values | parameter_service_code stringclasses 5
values | parameter_service_unit stringclasses 3
values | parameter_service_name stringclasses 5
values | parameter_service_quantity stringclasses 485
values | service_cost_sum float64 | price_abstract_resource_est_price_all_values stringlengths 0 26.2k | total_value_abstract_resources float64 0.02 2.33M ⌀ | total_resource_cost_per_position float64 0.3 7.72M ⌀ | price_abstract_resource_est_price_all_values_per_unit stringlengths 0 32.8k |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAMECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 1 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 1.54 | 1.54 | 16.73 | 25.77 | null | null | 1000 m3 | 5,030.23 | null | null | null | 205.99 | 92.64 | 11 | 42 | 7 | 60 | 10.76 | 6.4 | 41.31 | 17.16 | 58.47 | 5,004.46 | 189.99 | 9 | null | null | null | null | null | null | null | null | null | 5,030.23 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAMECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 1.6 | 1.6 | 33.07 | 52.91 | null | null | 1000 m3 | 5,030.23 | 12.2 | 1.0 | 6.0 | null | null | 205.99 | 92.64 | 11 | 42 | 7 | 60 | 10.76 | 6.4 | 41.31 | 17.16 | 58.47 | 5,004.46 | 189.99 | 9 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 5,030.23 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAMECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 1.6 | 1.6 | 12.2 | 19.52 | null | null | 1000 m3 | 5,030.23 | 12.2 | 1.0 | 6.0 | null | null | 205.99 | 92.64 | 11 | 42 | 7 | 60 | 10.76 | 6.4 | 41.31 | 17.16 | 58.47 | 5,004.46 | 189.99 | 9 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 5,030.23 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAMECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERIVO | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 15 m3 | Machine hours | 1.6 | 1.6 | 3,094.72 | 4,951.55 | null | null | 1000 m3 | 5,030.23 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 205.99 | 92.64 | 11 | 42 | 7 | 60 | 10.76 | 6.4 | 41.31 | 17.16 | 58.47 | 5,004.46 | 189.99 | 9 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 5,030.23 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAMECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXTO | Personnel: 3 man-hours/machine-hours | Machine hours | 1.6 | 1.6 | 45.7 | 73.11 | null | null | 1000 m3 | 5,030.23 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 205.99 | 92.64 | 11 | 42 | 7 | 60 | 10.76 | 6.4 | 41.31 | 17.16 | 58.47 | 5,004.46 | 189.99 | 9 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 5,030.23 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAMECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 1 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERIVO | Electricity: consumption DXNESA.RISA kW·h/machine-hour | Machine hours | 1.6 | 1.6 | 128.75 | 205.99 | null | null | 1000 m3 | 5,030.23 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 205.99 | 92.64 | 11 | 42 | 7 | 60 | 10.76 | 6.4 | 41.31 | 17.16 | 58.47 | 5,004.46 | 189.99 | 9 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 5,030.23 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAMECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 5,030.23 | null | null | null | 205.99 | 92.64 | 11 | 42 | 7 | 60 | 10.76 | 6.4 | 41.31 | 17.16 | 58.47 | 5,004.46 | 189.99 | 9 | null | null | null | null | null | null | null | null | null | 5,030.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAMECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 5,030.23 | null | null | null | 205.99 | 92.64 | 11 | 42 | 7 | 60 | 10.76 | 6.4 | 41.31 | 17.16 | 58.47 | 5,004.46 | 189.99 | 9 | null | null | null | null | null | null | null | null | null | 5,030.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAMECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 5,030.23 | null | null | null | 205.99 | 92.64 | 11 | 42 | 7 | 60 | 10.76 | 6.4 | 41.31 | 17.16 | 58.47 | 5,004.46 | 189.99 | 9 | null | null | null | null | null | null | null | null | null | 5,030.23 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KARICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 2 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 1.85 | 1.85 | 16.73 | 30.96 | null | null | 1000 m3 | 6,067.59 | null | null | null | 248.48 | 111.74 | 16 | 66 | 8 | 90 | 15.33 | 7.72 | 65.61 | 23.05 | 88.66 | 6,036.63 | 270.83 | 13 | null | null | null | null | null | null | null | null | null | 6,067.59 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KARICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 1.93 | 1.93 | 33.07 | 63.82 | null | null | 1000 m3 | 6,067.59 | 12.2 | 1.0 | 6.0 | null | null | 248.48 | 111.74 | 16 | 66 | 8 | 90 | 15.33 | 7.72 | 65.61 | 23.05 | 88.66 | 6,036.63 | 270.83 | 13 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 6,067.59 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KARICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 1.93 | 1.93 | 12.2 | 23.55 | null | null | 1000 m3 | 6,067.59 | 12.2 | 1.0 | 6.0 | null | null | 248.48 | 111.74 | 16 | 66 | 8 | 90 | 15.33 | 7.72 | 65.61 | 23.05 | 88.66 | 6,036.63 | 270.83 | 13 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 6,067.59 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KARICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERIVO | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 15 m3 | Machine hours | 1.93 | 1.93 | 3,094.72 | 5,972.81 | null | null | 1000 m3 | 6,067.59 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 248.48 | 111.74 | 16 | 66 | 8 | 90 | 15.33 | 7.72 | 65.61 | 23.05 | 88.66 | 6,036.63 | 270.83 | 13 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 6,067.59 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KARICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXTO | Personnel: 3 man-hours/machine-hours | Machine hours | 1.93 | 1.93 | 45.7 | 88.19 | null | null | 1000 m3 | 6,067.59 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 248.48 | 111.74 | 16 | 66 | 8 | 90 | 15.33 | 7.72 | 65.61 | 23.05 | 88.66 | 6,036.63 | 270.83 | 13 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 6,067.59 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KARICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 2 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERIVO | Electricity: consumption DXNESA.RISA kW·h/machine-hour | Machine hours | 1.93 | 1.93 | 128.75 | 248.48 | null | null | 1000 m3 | 6,067.59 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 248.48 | 111.74 | 16 | 66 | 8 | 90 | 15.33 | 7.72 | 65.61 | 23.05 | 88.66 | 6,036.63 | 270.83 | 13 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 6,067.59 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KARICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 6,067.59 | null | null | null | 248.48 | 111.74 | 16 | 66 | 8 | 90 | 15.33 | 7.72 | 65.61 | 23.05 | 88.66 | 6,036.63 | 270.83 | 13 | null | null | null | null | null | null | null | null | null | 6,067.59 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KARICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 6,067.59 | null | null | null | 248.48 | 111.74 | 16 | 66 | 8 | 90 | 15.33 | 7.72 | 65.61 | 23.05 | 88.66 | 6,036.63 | 270.83 | 13 | null | null | null | null | null | null | null | null | null | 6,067.59 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KARICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 6,067.59 | null | null | null | 248.48 | 111.74 | 16 | 66 | 8 | 90 | 15.33 | 7.72 | 65.61 | 23.05 | 88.66 | 6,036.63 | 270.83 | 13 | null | null | null | null | null | null | null | null | null | 6,067.59 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KATOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 3 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 2.27 | 2.27 | 16.73 | 37.99 | null | null | 1000 m3 | 7,388.29 | null | null | null | 302.55 | 136.06 | 15 | 112 | 10 | 137 | 14.67 | 9.4 | 111.6 | 24.07 | 135.67 | 7,350.3 | 281.91 | 20 | null | null | null | null | null | null | null | null | null | 7,388.29 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KATOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 2.35 | 2.35 | 33.07 | 77.71 | null | null | 1000 m3 | 7,388.29 | 12.2 | 1.0 | 6.0 | null | null | 302.55 | 136.06 | 15 | 112 | 10 | 137 | 14.67 | 9.4 | 111.6 | 24.07 | 135.67 | 7,350.3 | 281.91 | 20 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 7,388.29 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KATOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 2.35 | 2.35 | 12.2 | 28.67 | null | null | 1000 m3 | 7,388.29 | 12.2 | 1.0 | 6.0 | null | null | 302.55 | 136.06 | 15 | 112 | 10 | 137 | 14.67 | 9.4 | 111.6 | 24.07 | 135.67 | 7,350.3 | 281.91 | 20 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 7,388.29 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KATOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERIVO | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 15 m3 | Machine hours | 2.35 | 2.35 | 3,094.72 | 7,272.59 | null | null | 1000 m3 | 7,388.29 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 302.55 | 136.06 | 15 | 112 | 10 | 137 | 14.67 | 9.4 | 111.6 | 24.07 | 135.67 | 7,350.3 | 281.91 | 20 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 7,388.29 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KATOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXTO | Personnel: 3 man-hours/machine-hours | Machine hours | 2.35 | 2.35 | 45.7 | 107.39 | null | null | 1000 m3 | 7,388.29 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 302.55 | 136.06 | 15 | 112 | 10 | 137 | 14.67 | 9.4 | 111.6 | 24.07 | 135.67 | 7,350.3 | 281.91 | 20 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 7,388.29 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KATOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 3 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERIVO | Electricity: consumption DXNESA.RISA kW·h/machine-hour | Machine hours | 2.35 | 2.35 | 128.75 | 302.55 | null | null | 1000 m3 | 7,388.29 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 302.55 | 136.06 | 15 | 112 | 10 | 137 | 14.67 | 9.4 | 111.6 | 24.07 | 135.67 | 7,350.3 | 281.91 | 20 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 7,388.29 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KATOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 7,388.29 | null | null | null | 302.55 | 136.06 | 15 | 112 | 10 | 137 | 14.67 | 9.4 | 111.6 | 24.07 | 135.67 | 7,350.3 | 281.91 | 20 | null | null | null | null | null | null | null | null | null | 7,388.29 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KATOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 7,388.29 | null | null | null | 302.55 | 136.06 | 15 | 112 | 10 | 137 | 14.67 | 9.4 | 111.6 | 24.07 | 135.67 | 7,350.3 | 281.91 | 20 | null | null | null | null | null | null | null | null | null | 7,388.29 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KATOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 7,388.29 | null | null | null | 302.55 | 136.06 | 15 | 112 | 10 | 137 | 14.67 | 9.4 | 111.6 | 24.07 | 135.67 | 7,350.3 | 281.91 | 20 | null | null | null | null | null | null | null | null | null | 7,388.29 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAPUCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 4 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 3.19 | 3.19 | 16.73 | 53.38 | null | null | 1000 m3 | 10,437.64 | null | null | null | 427.43 | 192.22 | 23 | 171 | 14 | 208 | 22.09 | 13.28 | 170.1 | 35.37 | 205.47 | 10,384.26 | 425.17 | 30 | null | null | null | null | null | null | null | null | null | 10,437.64 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAPUCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 4 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 3.32 | 3.32 | 33.07 | 109.79 | null | null | 1000 m3 | 10,437.64 | 12.2 | 1.0 | 6.0 | null | null | 427.43 | 192.22 | 23 | 171 | 14 | 208 | 22.09 | 13.28 | 170.1 | 35.37 | 205.47 | 10,384.26 | 425.17 | 30 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 10,437.64 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAPUCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 4 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 3.32 | 3.32 | 12.2 | 40.51 | null | null | 1000 m3 | 10,437.64 | 12.2 | 1.0 | 6.0 | null | null | 427.43 | 192.22 | 23 | 171 | 14 | 208 | 22.09 | 13.28 | 170.1 | 35.37 | 205.47 | 10,384.26 | 425.17 | 30 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 10,437.64 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAPUCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 4 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERIVO | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 15 m3 | Machine hours | 3.32 | 3.32 | 3,094.72 | 10,274.47 | null | null | 1000 m3 | 10,437.64 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 427.43 | 192.22 | 23 | 171 | 14 | 208 | 22.09 | 13.28 | 170.1 | 35.37 | 205.47 | 10,384.26 | 425.17 | 30 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 10,437.64 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAPUCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 4 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXTO | Personnel: 3 man-hours/machine-hours | Machine hours | 3.32 | 3.32 | 45.7 | 151.71 | null | null | 1000 m3 | 10,437.64 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 427.43 | 192.22 | 23 | 171 | 14 | 208 | 22.09 | 13.28 | 170.1 | 35.37 | 205.47 | 10,384.26 | 425.17 | 30 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 10,437.64 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAPUCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 4 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERIVO | Electricity: consumption DXNESA.RISA kW·h/machine-hour | Machine hours | 3.32 | 3.32 | 128.75 | 427.43 | null | null | 1000 m3 | 10,437.64 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 427.43 | 192.22 | 23 | 171 | 14 | 208 | 22.09 | 13.28 | 170.1 | 35.37 | 205.47 | 10,384.26 | 425.17 | 30 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 10,437.64 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAPUCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 10,437.64 | null | null | null | 427.43 | 192.22 | 23 | 171 | 14 | 208 | 22.09 | 13.28 | 170.1 | 35.37 | 205.47 | 10,384.26 | 425.17 | 30 | null | null | null | null | null | null | null | null | null | 10,437.64 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAPUCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 10,437.64 | null | null | null | 427.43 | 192.22 | 23 | 171 | 14 | 208 | 22.09 | 13.28 | 170.1 | 35.37 | 205.47 | 10,384.26 | 425.17 | 30 | null | null | null | null | null | null | null | null | null | 10,437.64 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAPUCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 10,437.64 | null | null | null | 427.43 | 192.22 | 23 | 171 | 14 | 208 | 22.09 | 13.28 | 170.1 | 35.37 | 205.47 | 10,384.26 | 425.17 | 30 | null | null | null | null | null | null | null | null | null | 10,437.64 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KASACON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 5 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 3.71 | 3.71 | 16.73 | 62.08 | null | null | 1000 m3 | 12,104.07 | null | null | null | 495.67 | 222.91 | 32 | 251 | 16 | 299 | 31.51 | 15.4 | 250.2 | 46.91 | 297.11 | 12,041.99 | 608.95 | 43 | null | null | null | null | null | null | null | null | null | 12,104.07 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KASACON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 5 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 3.85 | 3.85 | 33.07 | 127.32 | null | null | 1000 m3 | 12,104.07 | 12.2 | 1.0 | 6.0 | null | null | 495.67 | 222.91 | 32 | 251 | 16 | 299 | 31.51 | 15.4 | 250.2 | 46.91 | 297.11 | 12,041.99 | 608.95 | 43 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 12,104.07 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KASACON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 5 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 3.85 | 3.85 | 12.2 | 46.98 | null | null | 1000 m3 | 12,104.07 | 12.2 | 1.0 | 6.0 | null | null | 495.67 | 222.91 | 32 | 251 | 16 | 299 | 31.51 | 15.4 | 250.2 | 46.91 | 297.11 | 12,041.99 | 608.95 | 43 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 12,104.07 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KASACON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 5 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERIVO | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 15 m3 | Machine hours | 3.85 | 3.85 | 3,094.72 | 11,914.67 | null | null | 1000 m3 | 12,104.07 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 495.67 | 222.91 | 32 | 251 | 16 | 299 | 31.51 | 15.4 | 250.2 | 46.91 | 297.11 | 12,041.99 | 608.95 | 43 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 12,104.07 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KASACON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 5 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXTO | Personnel: 3 man-hours/machine-hours | Machine hours | 3.85 | 3.85 | 45.7 | 175.93 | null | null | 1000 m3 | 12,104.07 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 495.67 | 222.91 | 32 | 251 | 16 | 299 | 31.51 | 15.4 | 250.2 | 46.91 | 297.11 | 12,041.99 | 608.95 | 43 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 12,104.07 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KASACON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 5 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERIVO | Electricity: consumption DXNESA.RISA kW·h/machine-hour | Machine hours | 3.85 | 3.85 | 128.75 | 495.67 | null | null | 1000 m3 | 12,104.07 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 495.67 | 222.91 | 32 | 251 | 16 | 299 | 31.51 | 15.4 | 250.2 | 46.91 | 297.11 | 12,041.99 | 608.95 | 43 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 12,104.07 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KASACON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 5 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 12,104.07 | null | null | null | 495.67 | 222.91 | 32 | 251 | 16 | 299 | 31.51 | 15.4 | 250.2 | 46.91 | 297.11 | 12,041.99 | 608.95 | 43 | null | null | null | null | null | null | null | null | null | 12,104.07 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KASACON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 5 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 12,104.07 | null | null | null | 495.67 | 222.91 | 32 | 251 | 16 | 299 | 31.51 | 15.4 | 250.2 | 46.91 | 297.11 | 12,041.99 | 608.95 | 43 | null | null | null | null | null | null | null | null | null | 12,104.07 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KASACON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 5 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 12,104.07 | null | null | null | 495.67 | 222.91 | 32 | 251 | 16 | 299 | 31.51 | 15.4 | 250.2 | 46.91 | 297.11 | 12,041.99 | 608.95 | 43 | null | null | null | null | null | null | null | null | null | 12,104.07 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KANECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 6 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 4.64 | 4.64 | 16.73 | 77.64 | null | null | 1000 m3 | 15,153.58 | null | null | null | 620.55 | 279.07 | 42 | 336 | 20 | 398 | 41.9 | 19.28 | 335.34 | 61.18 | 396.52 | 15,075.94 | 810.6 | 57 | null | null | null | null | null | null | null | null | null | 15,153.58 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KANECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 6 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 4.82 | 4.82 | 33.07 | 159.4 | null | null | 1000 m3 | 15,153.58 | 12.2 | 1.0 | 6.0 | null | null | 620.55 | 279.07 | 42 | 336 | 20 | 398 | 41.9 | 19.28 | 335.34 | 61.18 | 396.52 | 15,075.94 | 810.6 | 57 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 15,153.58 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KANECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 6 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 4.82 | 4.82 | 12.2 | 58.81 | null | null | 1000 m3 | 15,153.58 | 12.2 | 1.0 | 6.0 | null | null | 620.55 | 279.07 | 42 | 336 | 20 | 398 | 41.9 | 19.28 | 335.34 | 61.18 | 396.52 | 15,075.94 | 810.6 | 57 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 15,153.58 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KANECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 6 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERIVO | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 15 m3 | Machine hours | 4.82 | 4.82 | 3,094.72 | 14,916.54 | null | null | 1000 m3 | 15,153.58 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 620.55 | 279.07 | 42 | 336 | 20 | 398 | 41.9 | 19.28 | 335.34 | 61.18 | 396.52 | 15,075.94 | 810.6 | 57 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 15,153.58 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KANECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 6 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXTO | Personnel: 3 man-hours/machine-hours | Machine hours | 4.82 | 4.82 | 45.7 | 220.26 | null | null | 1000 m3 | 15,153.58 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 620.55 | 279.07 | 42 | 336 | 20 | 398 | 41.9 | 19.28 | 335.34 | 61.18 | 396.52 | 15,075.94 | 810.6 | 57 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 15,153.58 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KANECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 6 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERIVO | Electricity: consumption DXNESA.RISA kW·h/machine-hour | Machine hours | 4.82 | 4.82 | 128.75 | 620.55 | null | null | 1000 m3 | 15,153.58 | 45.7 | nan | 9.3 | 965.25 | 128.75 | 620.55 | 279.07 | 42 | 336 | 20 | 398 | 41.9 | 19.28 | 335.34 | 61.18 | 396.52 | 15,075.94 | 810.6 | 57 | null | PU_MEKAKA_KADXTO | 2,242.55 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 15,153.58 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KANECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 6 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 15,153.58 | null | null | null | 620.55 | 279.07 | 42 | 336 | 20 | 398 | 41.9 | 19.28 | 335.34 | 61.18 | 396.52 | 15,075.94 | 810.6 | 57 | null | null | null | null | null | null | null | null | null | 15,153.58 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KANECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 6 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 15,153.58 | null | null | null | 620.55 | 279.07 | 42 | 336 | 20 | 398 | 41.9 | 19.28 | 335.34 | 61.18 | 396.52 | 15,075.94 | 810.6 | 57 | null | null | null | null | null | null | null | null | null | 15,153.58 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KANECON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 15 m3, soil group 6 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 15,153.58 | null | null | null | 620.55 | 279.07 | 42 | 336 | 20 | 398 | 41.9 | 19.28 | 335.34 | 61.18 | 396.52 | 15,075.94 | 810.6 | 57 | null | null | null | null | null | null | null | null | null | 15,153.58 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KALICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 1 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 2.06 | 2.06 | 16.73 | 34.47 | null | null | 1000 m3 | 4,292.01 | null | null | null | 117.74 | 92.41 | 44 | 371 | 7 | 422 | 43.26 | 6.42 | 370.8 | 49.68 | 420.48 | 4,257.54 | 844.93 | 61 | null | null | null | null | null | null | null | null | null | 4,292.01 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KALICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 2.14 | 2.14 | 33.07 | 70.77 | null | null | 1000 m3 | 4,292.01 | 12.2 | 1.0 | 6.0 | null | null | 117.74 | 92.41 | 44 | 371 | 7 | 422 | 43.26 | 6.42 | 370.8 | 49.68 | 420.48 | 4,257.54 | 844.93 | 61 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 4,292.01 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KALICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 2.14 | 2.14 | 12.2 | 26.11 | null | null | 1000 m3 | 4,292.01 | 12.2 | 1.0 | 6.0 | null | null | 117.74 | 92.41 | 44 | 371 | 7 | 422 | 43.26 | 6.42 | 370.8 | 49.68 | 420.48 | 4,257.54 | 844.93 | 61 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 4,292.01 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KALICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 1 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERINE | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 10 m3 | Machine hours | 2.14 | 2.14 | 1,956.44 | 4,186.77 | null | null | 1000 m3 | 4,292.01 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 117.74 | 92.41 | 44 | 371 | 7 | 422 | 43.26 | 6.42 | 370.8 | 49.68 | 420.48 | 4,257.54 | 844.93 | 61 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 4,292.01 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KALICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 1 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXSA | Personnel: 2 man-hours/machine-hour | Machine hours | 2.14 | 2.14 | 30.98 | 66.3 | null | null | 1000 m3 | 4,292.01 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 117.74 | 92.41 | 44 | 371 | 7 | 422 | 43.26 | 6.42 | 370.8 | 49.68 | 420.48 | 4,257.54 | 844.93 | 61 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 4,292.01 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KALICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 1 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERINE | Electricity: consumption PUMERI.SA kW·h/machine-hour | Machine hours | 2.14 | 2.14 | 55.02 | 117.74 | null | null | 1000 m3 | 4,292.01 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 117.74 | 92.41 | 44 | 371 | 7 | 422 | 43.26 | 6.42 | 370.8 | 49.68 | 420.48 | 4,257.54 | 844.93 | 61 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 4,292.01 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KALICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 4,292.01 | null | null | null | 117.74 | 92.41 | 44 | 371 | 7 | 422 | 43.26 | 6.42 | 370.8 | 49.68 | 420.48 | 4,257.54 | 844.93 | 61 | null | null | null | null | null | null | null | null | null | 4,292.01 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KALICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 4,292.01 | null | null | null | 117.74 | 92.41 | 44 | 371 | 7 | 422 | 43.26 | 6.42 | 370.8 | 49.68 | 420.48 | 4,257.54 | 844.93 | 61 | null | null | null | null | null | null | null | null | null | 4,292.01 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KALICON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 1 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 4,292.01 | null | null | null | 117.74 | 92.41 | 44 | 371 | 7 | 422 | 43.26 | 6.42 | 370.8 | 49.68 | 420.48 | 4,257.54 | 844.93 | 61 | null | null | null | null | null | null | null | null | null | 4,292.01 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAVOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 2 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 2.47 | 2.47 | 16.73 | 41.33 | null | null | 1000 m3 | 5,154.36 | null | null | null | 141.4 | 110.98 | 47 | 393 | 8 | 448 | 46.07 | 7.71 | 392.4 | 53.78 | 446.18 | 5,113.03 | 899 | 64 | null | null | null | null | null | null | null | null | null | 5,154.36 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAVOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 2.57 | 2.57 | 33.07 | 84.99 | null | null | 1000 m3 | 5,154.36 | 12.2 | 1.0 | 6.0 | null | null | 141.4 | 110.98 | 47 | 393 | 8 | 448 | 46.07 | 7.71 | 392.4 | 53.78 | 446.18 | 5,113.03 | 899 | 64 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 5,154.36 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAVOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 2.57 | 2.57 | 12.2 | 31.36 | null | null | 1000 m3 | 5,154.36 | 12.2 | 1.0 | 6.0 | null | null | 141.4 | 110.98 | 47 | 393 | 8 | 448 | 46.07 | 7.71 | 392.4 | 53.78 | 446.18 | 5,113.03 | 899 | 64 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 5,154.36 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAVOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 2 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERINE | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 10 m3 | Machine hours | 2.57 | 2.57 | 1,956.44 | 5,028.04 | null | null | 1000 m3 | 5,154.36 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 141.4 | 110.98 | 47 | 393 | 8 | 448 | 46.07 | 7.71 | 392.4 | 53.78 | 446.18 | 5,113.03 | 899 | 64 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 5,154.36 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAVOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 2 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXSA | Personnel: 2 man-hours/machine-hour | Machine hours | 2.57 | 2.57 | 30.98 | 79.62 | null | null | 1000 m3 | 5,154.36 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 141.4 | 110.98 | 47 | 393 | 8 | 448 | 46.07 | 7.71 | 392.4 | 53.78 | 446.18 | 5,113.03 | 899 | 64 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 5,154.36 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAVOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 2 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERINE | Electricity: consumption PUMERI.SA kW·h/machine-hour | Machine hours | 2.57 | 2.57 | 55.02 | 141.4 | null | null | 1000 m3 | 5,154.36 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 141.4 | 110.98 | 47 | 393 | 8 | 448 | 46.07 | 7.71 | 392.4 | 53.78 | 446.18 | 5,113.03 | 899 | 64 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 5,154.36 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAVOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 5,154.36 | null | null | null | 141.4 | 110.98 | 47 | 393 | 8 | 448 | 46.07 | 7.71 | 392.4 | 53.78 | 446.18 | 5,113.03 | 899 | 64 | null | null | null | null | null | null | null | null | null | 5,154.36 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAVOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 5,154.36 | null | null | null | 141.4 | 110.98 | 47 | 393 | 8 | 448 | 46.07 | 7.71 | 392.4 | 53.78 | 446.18 | 5,113.03 | 899 | 64 | null | null | null | null | null | null | null | null | null | 5,154.36 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KAVOCON | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 2 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 5,154.36 | null | null | null | 141.4 | 110.98 | 47 | 393 | 8 | 448 | 46.07 | 7.71 | 392.4 | 53.78 | 446.18 | 5,113.03 | 899 | 64 | null | null | null | null | null | null | null | null | null | 5,154.36 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KADX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 3 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 3.09 | 3.09 | 16.73 | 51.71 | null | null | 1000 m3 | 6,438.02 | null | null | null | 176.61 | 138.61 | 4 | null | 10 | 14 | 3.09 | 9.63 | null | 12.72 | 12.72 | 6,386.31 | 51.71 | 2 | null | null | null | null | null | null | null | null | null | 6,438.02 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KADX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 3.21 | 3.21 | 33.07 | 106.15 | null | null | 1000 m3 | 6,438.02 | 12.2 | 1.0 | 6.0 | null | null | 176.61 | 138.61 | 4 | null | 10 | 14 | 3.09 | 9.63 | null | 12.72 | 12.72 | 6,386.31 | 51.71 | 2 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 6,438.02 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KADX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 3.21 | 3.21 | 12.2 | 39.17 | null | null | 1000 m3 | 6,438.02 | 12.2 | 1.0 | 6.0 | null | null | 176.61 | 138.61 | 4 | null | 10 | 14 | 3.09 | 9.63 | null | 12.72 | 12.72 | 6,386.31 | 51.71 | 2 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 6,438.02 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KADX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 3 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERINE | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 10 m3 | Machine hours | 3.21 | 3.21 | 1,956.44 | 6,280.16 | null | null | 1000 m3 | 6,438.02 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 176.61 | 138.61 | 4 | null | 10 | 14 | 3.09 | 9.63 | null | 12.72 | 12.72 | 6,386.31 | 51.71 | 2 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 6,438.02 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KADX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 3 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXSA | Personnel: 2 man-hours/machine-hour | Machine hours | 3.21 | 3.21 | 30.98 | 99.44 | null | null | 1000 m3 | 6,438.02 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 176.61 | 138.61 | 4 | null | 10 | 14 | 3.09 | 9.63 | null | 12.72 | 12.72 | 6,386.31 | 51.71 | 2 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 6,438.02 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KADX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 3 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERINE | Electricity: consumption PUMERI.SA kW·h/machine-hour | Machine hours | 3.21 | 3.21 | 55.02 | 176.61 | null | null | 1000 m3 | 6,438.02 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 176.61 | 138.61 | 4 | null | 10 | 14 | 3.09 | 9.63 | null | 12.72 | 12.72 | 6,386.31 | 51.71 | 2 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 6,438.02 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KADX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 6,438.02 | null | null | null | 176.61 | 138.61 | 4 | null | 10 | 14 | 3.09 | 9.63 | null | 12.72 | 12.72 | 6,386.31 | 51.71 | 2 | null | null | null | null | null | null | null | null | null | 6,438.02 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KADX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 6,438.02 | null | null | null | 176.61 | 138.61 | 4 | null | 10 | 14 | 3.09 | 9.63 | null | 12.72 | 12.72 | 6,386.31 | 51.71 | 2 | null | null | null | null | null | null | null | null | null | 6,438.02 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_KADX | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 3 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 6,438.02 | null | null | null | 176.61 | 138.61 | 4 | null | 10 | 14 | 3.09 | 9.63 | null | 12.72 | 12.72 | 6,386.31 | 51.71 | 2 | null | null | null | null | null | null | null | null | null | 6,438.02 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 4 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 4.33 | 4.33 | 16.73 | 72.46 | null | null | 1000 m3 | 9,005.34 | null | null | null | 247.04 | 193.88 | 5 | null | 14 | 19 | 4.33 | 13.47 | null | 17.8 | 17.8 | 8,932.88 | 72.46 | 3 | null | null | null | null | null | null | null | null | null | 9,005.34 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 4 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 4.49 | 4.49 | 33.07 | 148.48 | null | null | 1000 m3 | 9,005.34 | 12.2 | 1.0 | 6.0 | null | null | 247.04 | 193.88 | 5 | null | 14 | 19 | 4.33 | 13.47 | null | 17.8 | 17.8 | 8,932.88 | 72.46 | 3 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 9,005.34 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 4 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 4.49 | 4.49 | 12.2 | 54.79 | null | null | 1000 m3 | 9,005.34 | 12.2 | 1.0 | 6.0 | null | null | 247.04 | 193.88 | 5 | null | 14 | 19 | 4.33 | 13.47 | null | 17.8 | 17.8 | 8,932.88 | 72.46 | 3 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 9,005.34 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 4 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERINE | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 10 m3 | Machine hours | 4.49 | 4.49 | 1,956.44 | 8,784.4 | null | null | 1000 m3 | 9,005.34 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 247.04 | 193.88 | 5 | null | 14 | 19 | 4.33 | 13.47 | null | 17.8 | 17.8 | 8,932.88 | 72.46 | 3 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 9,005.34 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 4 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXSA | Personnel: 2 man-hours/machine-hour | Machine hours | 4.49 | 4.49 | 30.98 | 139.1 | null | null | 1000 m3 | 9,005.34 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 247.04 | 193.88 | 5 | null | 14 | 19 | 4.33 | 13.47 | null | 17.8 | 17.8 | 8,932.88 | 72.46 | 3 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 9,005.34 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 4 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERINE | Electricity: consumption PUMERI.SA kW·h/machine-hour | Machine hours | 4.49 | 4.49 | 55.02 | 247.04 | null | null | 1000 m3 | 9,005.34 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 247.04 | 193.88 | 5 | null | 14 | 19 | 4.33 | 13.47 | null | 17.8 | 17.8 | 8,932.88 | 72.46 | 3 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 9,005.34 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 9,005.34 | null | null | null | 247.04 | 193.88 | 5 | null | 14 | 19 | 4.33 | 13.47 | null | 17.8 | 17.8 | 8,932.88 | 72.46 | 3 | null | null | null | null | null | null | null | null | null | 9,005.34 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 9,005.34 | null | null | null | 247.04 | 193.88 | 5 | null | 14 | 19 | 4.33 | 13.47 | null | 17.8 | 17.8 | 8,932.88 | 72.46 | 3 | null | null | null | null | null | null | null | null | null | 9,005.34 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEKA | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 4 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 9,005.34 | null | null | null | 247.04 | 193.88 | 5 | null | 14 | 19 | 4.33 | 13.47 | null | 17.8 | 17.8 | 8,932.88 | 72.46 | 3 | null | null | null | null | null | null | null | null | null | 9,005.34 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 5 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 5.05 | 5.05 | 16.73 | 84.5 | null | null | 1000 m3 | 10,509.51 | null | null | null | 288.3 | 226.27 | 6 | null | 16 | 22 | 5.05 | 15.72 | null | 20.77 | 20.77 | 10,425.01 | 84.5 | 4 | null | null | null | null | null | null | null | null | null | 10,509.51 | |||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 5 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KAME_KATOSA | Bulldozers, power 79 kW (108 hp) | Machine hours | 5.24 | 5.24 | 33.07 | 173.29 | null | null | 1000 m3 | 10,509.51 | 12.2 | 1.0 | 6.0 | null | null | 288.3 | 226.27 | 6 | null | 16 | 22 | 5.05 | 15.72 | null | 20.77 | 20.77 | 10,425.01 | 84.5 | 4 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 10,509.51 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 5 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | 5.24 | 5.24 | 12.2 | 63.94 | null | null | 1000 m3 | 10,509.51 | 12.2 | 1.0 | 6.0 | null | null | 288.3 | 226.27 | 6 | null | 16 | 22 | 5.05 | 15.72 | null | 20.77 | 20.77 | 10,425.01 | 84.5 | 4 | null | PU_MEKAKA_KANEKA | 23.96 | Bulldozers | Earthmoving machinery | null | null | null | null | null | null | null | 10,509.51 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 5 | 1000 m3 | Resource | false | false | true | false | DXME-KAME-KASA_MERINE | Single-bucket electric walking excavators with dragline working equipment, bucket capacity 10 m3 | Machine hours | 5.24 | 5.24 | 1,956.44 | 10,251.72 | null | null | 1000 m3 | 10,509.51 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 288.3 | 226.27 | 6 | null | 16 | 22 | 5.05 | 15.72 | null | 20.77 | 20.77 | 10,425.01 | 84.5 | 4 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 10,509.51 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 5 | 1000 m3 | Machinist | false | false | true | false | PU_MEKAKA_KADXSA | Personnel: 2 man-hours/machine-hour | Machine hours | 5.24 | 5.24 | 30.98 | 162.33 | null | null | 1000 m3 | 10,509.51 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 288.3 | 226.27 | 6 | null | 16 | 22 | 5.05 | 15.72 | null | 20.77 | 20.77 | 10,425.01 | 84.5 | 4 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 10,509.51 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 5 | 1000 m3 | Electricity | false | false | true | false | DXME-KAME-KASA_MERINE | Electricity: consumption PUMERI.SA kW·h/machine-hour | Machine hours | 5.24 | 5.24 | 55.02 | 288.3 | null | null | 1000 m3 | 10,509.51 | 30.98 | nan | 9.5 | 412.5 | 55.02 | 288.3 | 226.27 | 6 | null | 16 | 22 | 5.05 | 15.72 | null | 20.77 | 20.77 | 10,425.01 | 84.5 | 4 | null | PU_MEKAKA_KADXSA | 1,417.71 | Excavators | Earthmoving machinery | null | null | null | null | null | null | null | 10,509.51 | ||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 5 | 1000 m3 | Scope of work | true | false | false | false | Soil preparation. | null | null | null | null | null | null | 1000 m3 | 10,509.51 | null | null | null | 288.3 | 226.27 | 6 | null | 16 | 22 | 5.05 | 15.72 | null | 20.77 | 20.77 | 10,425.01 | 84.5 | 4 | null | null | null | null | null | null | null | null | null | 10,509.51 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 5 | 1000 m3 | Scope of work | true | false | false | false | Construction and maintenance of drainage ditches or protective embankments. | null | null | null | null | null | null | 1000 m3 | 10,509.51 | null | null | null | 288.3 | 226.27 | 6 | null | 16 | 22 | 5.05 | 15.72 | null | 20.77 | 20.77 | 10,425.01 | 84.5 | 4 | null | null | null | null | null | null | null | null | null | 10,509.51 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MEME | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 5 | 1000 m3 | Scope of work | true | false | false | false | Auxiliary work related to moving the excavator from the face to the face. | null | null | null | null | null | null | 1000 m3 | 10,509.51 | null | null | null | 288.3 | 226.27 | 6 | null | 16 | 22 | 5.05 | 15.72 | null | 20.77 | 20.77 | 10,425.01 | 84.5 | 4 | null | null | null | null | null | null | null | null | null | 10,509.51 | |||||||||||||||||||||||||||||
CONSTRUCTION WORK | ME | Earthworks | ME | MECHANIZED SOIL DEVELOPMENT (USING EXCAVATORS, SCRAPERS, BULLDOZERS, GRADERS, HYDRO-MECHANIZATION, ETC.) | Section | SOIL DEVELOPMENT BY EXCAVATORS IN A DUMP | Subsection | KAME_KAME_KAKAME | Excavation of soil into a dump using single-bucket electric walking dragline excavators with a bucket capacity of 15; 10; 6.3-6.5; 5-6 m3 when working on hydropower construction projects | KAME_KAME_KAKAME_MERI | Soil excavation using single-bucket electric dragline excavators with a bucket capacity of: | 10 m3, soil group 6 | 1000 m3 | Resource | false | false | false | true | ME_MEKAKA_TOVO | Worker Category 1 | hrs | 6.28 | 6.28 | 16.73 | 105.09 | null | null | 1000 m3 | 13,096.56 | null | null | null | 359.28 | 281.97 | 7 | null | 20 | 27 | 6.28 | 19.59 | null | 25.87 | 25.87 | 12,991.47 | 105.09 | 4 | null | null | null | null | null | null | null | null | null | 13,096.56 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.